Cultivation facilities

The cultivation facility addresses uneven gas distribution by using solenoid valves and a control device to uniformly supply resources, enhancing plant growth consistency and reducing costs.

JP7568215B2Active Publication Date: 2024-10-16藤原庆太 +1
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
JP2020177136
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2020-10-22
Publication Date
2024-10-16
Estimated Expiration
2040-10-22

AI Technical Summary

Technical Problem

Existing cultivation facilities face uneven distribution of gases like carbon dioxide due to decreasing flow rates in branch ducts, leading to variations in plant growth and quality.

Method used

A cultivation facility with solenoid valves controlled by a control device to manage resource supply pipes, ensuring uniform resource distribution across multiple cultivation beds.

Benefits of technology

The solution ensures even supply of resources like carbon dioxide, reducing variations in plant growth and promoting uniform quality while minimizing equipment costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007568215000001
    Figure 0007568215000001
  • Figure 0007568215000002
    Figure 0007568215000002
  • Figure 0007568215000003
    Figure 0007568215000003
Patent Text Reader

Abstract

To provide a cultivation system that allows each cultivation bed to be evenly supplied with resources such as a gas.SOLUTION: A cultivation system has a plurality of cultivation beds A, a plurality of resource supply pipes a4, a5 that are arranged at each of the cultivation beds A and supply the cultivation bed A with resources, a resource source T that supplies the resource supply pipes a4, a5 with resources, and an electromagnetic valve interposed between the resource source T and the resource supply pipes a4, a5, the electromagnetic valve controlled by a controller C to open and close for each of the resource supply pipes a4, a5.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a cultivation facility for cultivating plants. [Background technology]

[0002] Patent Document 1 discloses a cultivation facility equipped with a gas delivery device that delivers gas such as hot air or carbon dioxide to plants from branch ducts for supplying gas that are arranged in each of a plurality of cultivation beds.

[0003] In the gas delivery device, each of the branch ducts extending over each cultivation bed is connected to the main duct, and the gas is delivered to the main duct by a hot air blower. As a result, the delivered gas is blown out from small holes provided in each branch duct and supplied to each cultivation bed. [Prior art documents] [Patent documents]

[0004] [Patent Document 1] JP 2020-110074 A Summary of the Invention [Problem to be solved by the invention]

[0005] However, with the above-mentioned configuration of the gas delivery device, the flow rate of the gas decreases as the branch duct is farther from the hot air heater, which causes unevenness in the amount of gas supplied to each cultivation bed. As a result, for example, when gas for promoting plant growth, such as carbon dioxide, is supplied from the branch duct, unevenness in the growth of the plants occurs, which causes variation in quality.

[0006] Therefore, an object of the present invention is to provide a cultivation facility that can solve such problems and uniformly supply various resources such as gas to each cultivation bed. [Means for solving the problem]

[0007] In order to achieve the above object, the first invention provides: A plurality of growing beds; A plurality of resource supply pipes are arranged in the plurality of cultivation beds, respectively, and supply various resources to the cultivation beds; a resource supply source that supplies various resources to the plurality of resource supply pipes; The cultivation facility is characterized in that an electromagnetic valve that is controlled to open and close by a control device is interposed between the resource supply source and the plurality of resource supply pipes for each of the resource supply pipes.

[0008] According to the first aspect of the present invention, the supply amount of various resources to each cultivation bed can be made uniform by controlling the opening and closing of the solenoid valves provided for each resource supply pipe, thereby solving the problem of unevenness in the amount of various resources supplied to each cultivation bed.

[0009] The second invention has the same configuration as the first invention, as well as: The control device is characterized in that it determines one of the plurality of cultivation beds to which various resources are to be supplied, and controls the solenoid valves to supply various resources to the plurality of cultivation beds in sequence.

[0010] According to the second invention, in addition to the effect of the first invention, by controlling the supply of various resources to each cultivation bed in sequence, the amount of various resources supplied to each cultivation bed can be more uniformly achieved.

[0011] The third invention has the same configuration as the second invention, but further comprises: A sensor unit having a moving means capable of moving on the plurality of cultivation beds, The control device determines the supply time of the various resources in response to the measured values ​​obtained by the sensor units.

[0012] According to the third invention, in addition to the effect of the second invention, the equipment cost can be significantly reduced as compared with the case where a sensor unit is provided in each cultivation bed.

[0013] The fourth invention is, in addition to the configuration of the third invention, When the control device determines one of the plurality of cultivation beds to be supplied with various resources, moving the sensor unit onto the determined cultivation bed by the moving means; Acquire information on the carbon dioxide concentration measured by the sensor unit; The method is characterized in that the time for supplying carbon dioxide to the determined cultivation bed is determined based on the obtained information on the measured value of carbon dioxide.

[0014] According to the fourth aspect of the present invention, in addition to the effects of the third aspect of the present invention, Carbon dioxide can be efficiently supplied to each growing bed to promote plant growth. Effect of the Invention

[0015] According to the present invention, it is possible to provide a cultivation facility that can uniformly supply resources such as gas to each cultivation bed. [Brief description of the drawings]

[0016] [Figure 1] FIG. 1 is a schematic perspective view of a cultivation facility 1 according to a preferred embodiment of the present invention. [Diagram 2] FIG. 2 is a schematic vertical cross-sectional view of the cultivation bed and its surroundings shown in FIG. [Diagram 3] FIG. 3 is a schematic plan view of the cultivation facility of FIG. [Figure 4] FIG. 4 is a control block diagram of the control device of FIG. [Diagram 5] FIG. 5 is a flowchart showing an example of the operation of the control device of FIG. [Figure 6] FIG. 6 is a flowchart showing an example of the operation of the control device of FIG. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0017] <1. Overall composition> FIG. 1 is a schematic perspective view of a cultivation facility 1 according to a preferred embodiment of the present invention. As shown in Fig. 1, the cultivation facility 1 has cultivation beds A (A1 to A4) arranged in parallel in the interior space of a plastic house H constructed of a framework such as a steel frame, each having a substantially rectangular area with a predetermined longitudinal direction, and an aisle R for an automatic harvesting device for plants T to be cultivated and for workers to walk through is formed between the cultivation beds A. The plants G are, for example, agricultural crops such as tomatoes.

[0018] <2. Configuration of cultivation bed> FIG. 2 is a schematic vertical cross-sectional view of the cultivation bed A and its periphery in FIG. 2, the cultivation bed A is configured such that a cultivation container a3 containing a culture medium a2 is placed and fixed on an elevated bench a1, and further includes an underground supply pipe a4 buried so as to penetrate the ground of the culture medium a2, and an aboveground supply pipe a5 disposed above the ground of the culture medium a2. Note that, in the following, a case where the cultivation bed A has four rows will be described, but the embodiment of the present invention is not limited thereto.

[0019] The underground supply pipe a4 and the aboveground supply pipe a5 function as resource supply pipes that supply various resources for growth to the plants G, and are formed of porous tubular bodies known as porous pipes.

[0020] In addition, the underground supply pipe a4 and the aboveground supply pipe a5 are arranged to extend along the longitudinal direction of the cultivation bed A, so that liquids such as water passing through the pipes and gases such as carbon dioxide can be released outside the pipes and supplied to the entire area of ​​the cultivation bed A.

[0021] Furthermore, a frame F is provided so as to span across each cultivation bed A (A1 to A4), and a slider pg2 is provided on the frame F so as to be movable along a rail pg1 laid on the frame F by a pinion rack mechanism PG, and a sensor unit S is mounted and fixed on the slider pg2.

[0022] <3. Supply means configuration> FIG. 3 is a schematic plan view of the inside of the cultivation facility 1. As shown in Figure 3, as resource supply sources T for supplying various resources, a water supply source T1 for supplying water, a liquid fertilizer supply source T2 for supplying liquid fertilizer, an antibody bacteria supply source T3 for supplying antibody bacteria, a carbon dioxide gas supply source T4 for supplying carbon dioxide gas, an air supply source T5 for supplying air, and an oxygen supply source T6 for supplying oxygen are connected to the main supply pipe a6 via solenoid valves B (B1 to B6) that can be opened and closed by a control device C.

[0023] The main supply pipe a6 is connected to the first supply pipe a7 and the second supply pipe a8 via solenoid valves B7 and B8. The first supply pipe a7 and the second supply pipe a8 are connected to both sides of a plurality of above-ground supply pipes a5 and a plurality of underground supply pipes a4 so that gas or liquid can be supplied to the cultivation bed A (A1 to A4) from both directions, and solenoid valves B (B9 to B24) are interposed on both sides of the plurality of above-ground supply pipes a5 and the plurality of underground supply pipes a4. This allows gas or liquid to be supplied to the above-ground supply pipes a5 and the underground supply pipes a4 from both directions without causing pressure loss or flow rate shortage.

[0024] With this configuration, the cultivation facility 1 is able to supply any one of water, liquid fertilizer, antibody bacteria, carbon dioxide, air, and oxygen to each cultivation bed A (A1-A4) at an appropriate timing from the underground supply pipe a4 and / or aboveground supply pipe a5 by controlling the opening and closing of the solenoid valves B (B1-B24) by the control device C. As a result, the cultivation facility 1 is able to select a specific row of each cultivation bed A (A1-A4) and supply any one of water, liquid fertilizer, antibody bacteria, carbon dioxide, air, and oxygen from the underground supply pipe a4 and / or aboveground supply pipe a5.

[0025] For example, when supplying any one of liquids, water, liquid fertilizer, or antibody bacteria, to the cultivation bed A1 in the first row from the left in Fig. 3, the control device C controls solenoid valve B1, solenoid valve B2, or solenoid valve B3 to open, and further controls solenoid valves B7, B8, B11, and B12 to open, and controls other solenoid valves B to close. As a result, any one of water, liquid fertilizer, or antibody bacteria is supplied from the underground supply pipe a4 of the cultivation bed A1 in the first row from the left.

[0026] Also, for example, when supplying any of the gases carbon dioxide, air, and oxygen to the cultivation bed A2 in the second row from the left, the control device C controls solenoid valve B4, solenoid valve B5, and solenoid valve B6 to open, and further controls solenoid valves B7, B8, B15, and B16 to open, and controls other solenoid valves B to close. As a result, any of carbon dioxide, air, and oxygen is supplied from the underground supply pipe a4 of the cultivation bed A2 in the second row from the left.

[0027] Furthermore, when supplying any of the gases carbon dioxide, air, and oxygen to the cultivation bed A2 in the second row from the left, the control device C may, instead of the above-mentioned control, control the solenoid valve B4, the solenoid valve B5, or the solenoid valve B6 to open, and further control the solenoid valves B7, B8, B15, and B16 to open, and control the other solenoid valves B to close. As a result, any of the gases carbon dioxide, air, and oxygen is supplied from the aboveground supply pipe of the cultivation bed A2 in the second row from the left.

[0028] Furthermore, when supplying any of the gases carbon dioxide, air, and oxygen to the cultivation bed A2 in the second row from the left, the control device C may, instead of the above-mentioned control, control the solenoid valve B4, the solenoid valve B5, or the solenoid valve B6 to open, and further control the solenoid valves B7, B8, B13, B14, B15, and B16 to open, and control the other solenoid valves B to close. As a result, any of the gases carbon dioxide, air, and oxygen is supplied from the underground supply pipe a4 and the aboveground supply pipe a5 of the cultivation bed A2 in the second row from the left.

[0029] <4. Configuration of the control device> FIG. 4 is a control block diagram of the control device C. The control device C is an information processing device that is configured from a known microcomputer including a CPU, ROM, RAM, etc., and its peripheral circuits. The input side of the control device C is connected to a sensor unit S and a timer C1. The output side is connected to a solenoid valve B (B1 to B16) and a pinion rack mechanism PG.

[0030] The sensor unit S is a measurement sensor group equipped with multiple sensors for measuring environmental factors related to the growth of plants G, such as temperature, humidity, illuminance, and carbon dioxide concentration within the cultivation facility 1, as numerical values, and is configured to transmit information on each measurement value to the control device C.

[0031] The timing unit C1 is an electronic device that measures the elapsed time from a specific point in time, and is configured to transmit the measurement result to the control device C. The timing unit C1 may have a clock function that measures the current time and a calendar function that identifies the current date.

[0032] Solenoid valve B is equipped with mechanisms such as an electrically controllable actuator and ball valve, and is capable of switching between communication and cut-off of each port.

[0033] The pinion rack mechanism PG includes an electric motor (not shown), which is electrically connected to the control device C and configured to be capable of controlling forward and reverse rotation. The rotation of the electric motor allows the slider pg to move on the rail pg1 laid on the frame F horizontally hung above the cultivation bed A, and as a result, the sensor unit S mounted and fixed on the slider pg can move onto each cultivation bed A (A1 to A4). In this way, the control device C can control the position of the sensor unit S.

[0034] <5. Control method by the control device> FIG. 5 is a flowchart showing an example of the operation of the control device C. 5 shows an example of an operation when carbon dioxide gas is supplied to each cultivation bed A in sequence, row by row. In the illustrated example, the cultivation bed A to be supplied is the Nth row, and the total number of cultivation beds A is M rows.

[0035] The control device C sets a variable N to 1, and determines the cultivation bed A to be supplied with carbon dioxide gas as the first row (step S1).

[0036] The control device C controls the pinion rack mechanism PG to move the sensor unit S onto the Nth row of cultivation beds A. Then, the sensor unit S measures the carbon dioxide concentration near the Nth row of plants G and obtains information on the measured value (step S2).

[0037] The control device C refers to the acquired measurement value information and determines whether the carbon dioxide concentration is below the standard value. If it is below the standard value, it is determined that there is a shortage of carbon dioxide, and therefore controls to open the solenoid valves B of the Nth row cultivation bed A and the underground supply pipe a4 and / or aboveground supply pipe a5, as well as any other necessary solenoid valves B, to supply carbon dioxide to the Nth row cultivation bed A (YES in step S3).

[0038] Next, the control device C counts the time using the timer C1, and continues to supply carbon dioxide gas to the cultivation bed A in the Nth row until a predetermined time has elapsed (step S5). This predetermined time is set in advance in the control device, but may be configured to increase or decrease depending on the amount of solar radiation measured by the sensor unit S. For example, the predetermined time may be configured to be shortened from 5 minutes to 3 minutes when the amount of solar radiation is equal to or greater than a predetermined value. This allows carbon dioxide gas to be efficiently supplied to the cultivation bed A.

[0039] Next, when a predetermined time has elapsed, the control device C controls the necessary solenoid valves B to stop the supply of carbon dioxide gas to the Nth row of cultivation beds A. Then, it is determined whether a processing end condition for ending a series of processing (for example, the passage of sunset time) is met (step S1).

[0040] If the processing end condition is met, the series of processing is terminated (YES in step S6), and if not met, the variable N is incremented by 1, the cultivation bed A in the next row is designated as the target for carbon dioxide gas supply (step S7), and the process returns to step S2. Note that at this time, if the value of the variable N becomes larger than M, it is determined that the cultivation bed A4 in the last row was the target for carbon dioxide gas supply, so the process returns to step S1 instead of step 2, and the variable N is initialized by setting it to 1 again (step S8).

[0041] FIG. 6 is a flowchart showing an example of the operation of the control device C. FIG. 6 shows an example of an operation when water is supplied to each cultivation bed A in sequence, row by row.

[0042] The control device C sets the variable N to 1, and determines the cultivation bed A to be supplied with carbon dioxide gas as the first row (step S21).

[0043] The control device C controls the pinion rack mechanism PG to move the sensor unit S onto the Nth cultivation bed A. Then, the sensor unit S measures the conformity near the Nth plant G and obtains information on the measured value (step S22).

[0044] The control device C refers to the acquired information on the measured values, and sets the supply time for supplying water (for example, 3 to 5 minutes) according to the measured values ​​(step S23).

[0045] Next, the control device C controls to open the solenoid valves B of the Nth cultivation bed A and the underground supply pipe a4, as well as other necessary solenoid valves B, to supply water to the Nth cultivation bed A (step S24).

[0046] Next, the control device C counts the time using the timer C1, and continues to supply water to the cultivation bed A in the Nth row until the set supply time has elapsed (step S25). This allows water to be efficiently supplied to the cultivation bed A.

[0047] Next, when the set time has elapsed, the control device C controls the necessary solenoid valves B to stop the supply of water to the Nth row of cultivation beds A. Then, it is determined whether a processing end condition for ending the series of processing (for example, the passage of sunset time) is satisfied (step S26).

[0048] If the supply end condition is met, the series of processes is terminated (YES in step S26), and if not met, the variable N is incremented by 1, the cultivation bed A in the next row is set as the target for water supply (step S27), and the process returns to step S22. Note that at this time, if the value of the variable N becomes larger than M, it is determined that the cultivation bed A4 in the last row was the target for carbon dioxide supply, so the process returns to step S21 instead of step S22, and the variable N is initialized by setting it to 1 again (step S8).

[0049] <7.Technical significance> According to the above embodiment, the supply amount of various resources to each cultivation bed A can be made uniform by controlling the opening and closing of the solenoid valve B provided for each of the resource supply pipes a4 and a5. This solves the problem of unevenness in the amount of various resources supplied to each cultivation bed A.

[0050] In addition, the control device C controls the supply of various resources to each cultivation bed A in sequence, row by row, so that various resources can be more effectively and evenly supplied to each cultivation bed A. At the same time, the consumption of these resources can be reduced and they can be supplied efficiently.

[0051] In addition, since the pinion rack mechanism PG is controlled to move the sensor unit S onto the Nth row of cultivation bed A, equipment costs can be significantly reduced compared to a case in which a sensor unit S is provided on each cultivation bed A.

[0052] <8. Variations> The present invention is not limited to the above-described embodiments, and various modifications are possible within the scope of the invention described in the claims, and it goes without saying that these modifications are also included within the scope of the present invention.

[0053] For example, the flowchart in Figure 5 shows an example of an operation in which carbon dioxide gas is supplied by the control device C, but this is not limited to this. In steps S2 and S3, various measurement values ​​measured by the sensor unit S are referenced, and based on the measurement values, in steps S4 and S5, the solenoid valve B is controlled to open and close, thereby supplying water, liquid fertilizer, antibody bacteria, air, and oxygen at optimal timing.

[0054] 1 and 4 show a configuration in which the pinion rack mechanism PG allows the sensor unit S to move on each cultivation bed A, but in addition to this, by adding a moving mechanism such as an electric actuator, the sensor unit S may be moved within a predetermined range along the longitudinal direction of each cultivation bed A. This allows for wide-range measurement in each cultivation bed A, enabling more precise control.

[0055] <8. Variations> Although the preferred embodiment of the present invention has been described in detail above, the present invention is not limited to the above-described embodiment, etc. Therefore, various modifications and changes can be made to the embodiment within the scope of the gist of the present invention. For example, FIG. 5 shows a configuration in which the carbon dioxide concentration is acquired for each row of cultivation beds A1 to A4 in order and carbon dioxide gas is supplied to each row. However, when the carbon dioxide concentration in the Nth row of cultivation beds is sufficiently high, it is also possible to skip one row and perform the carbon dioxide gas supply process for the N+2th row of cultivation beds. [Explanation of symbols]

[0056] 1. Cultivation facility A Cultivation bed a1 Elevated bench a2 medium a3 cultivation container A4 underground supply pipe A5 ground supply pipe a6 Main supply pipe a7 1st supply pipe a8 2nd supply pipe C Control device C1 Clock section B Solenoid valve H Plastic House PG pinion rack mechanism T1 water source T2 liquid fertilizer source T3 antibody bacterial source T4 Carbon Dioxide Supply Source T5 Air Supply Source T6 oxygen source

Claims

1. A plurality of growing beds; A resource supply pipe is provided for each of the plurality of cultivation beds, and supplies carbon dioxide as a resource to the plurality of cultivation beds; A resource supply source that supplies carbon dioxide to the resource supply pipe; Between the resource supply source and the resource supply pipe, an electromagnetic valve that is controlled to open and close by a control device is interposed for each of the plurality of cultivation beds, A moving means capable of moving on the plurality of cultivation beds is provided, and a sensor unit configured to be able to measure the carbon dioxide concentration of each of the plurality of cultivation beds is provided, A cultivation facility characterized in that the control device controls the opening and closing of the solenoid valve in response to the measurement values ​​for each of the plurality of cultivation beds measured by the sensor unit, thereby determining the carbon dioxide supply time for each of the plurality of cultivation beds.

2. The control device sequentially determines a cultivation bed to be a supply target of carbon dioxide among the plurality of cultivation beds, The sensor unit is moved onto the cultivation bed determined as a supply target by the moving means; Acquire information on the carbon dioxide concentration measured by the sensor unit; The cultivation facility according to claim 1, characterized in that the time for supplying carbon dioxide to the cultivation bed determined as the supply target is determined based on the acquired carbon dioxide measurement value information.

Citation Information

Patent Citations

  • Cultivation apparatus and its control

    JP1992299927A

  • Hydroponic apparatus

    JP1999075586A

  • Plant cultivation controller

    JP2009044999A

  • Environmental control system

    JP2017035025A

  • Plant cultivation method and device

    JP2019118332A