Requirement calculation device, requirement calculation method, and requirement calculation program
The requirements calculation device automatically determines the necessary amounts of intermediates and raw materials based on sales plans, improving inter-departmental planning and simulation capabilities.
Patent Information
- Application Number
- JP2021091368
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2021-05-31
- Publication Date
- 2024-10-17
- Estimated Expiration
- 2041-05-31
AI Technical Summary
Existing technologies fail to automatically calculate the required amounts of lower-level items, such as intermediates and raw materials, necessary for manufacturing final products based on sales plans.
A requirements calculation device and method that utilizes a control section and storage section to manage hierarchical structures, extracting and calculating the required quantities of lower-level items using sales plan data, configuration patterns, and equipment information to determine manufacturing needs.
Enables automatic calculation of required quantities for intermediates and raw materials, facilitating early decision-making across departments and simulating production schedules, enhancing business efficiency and reducing waste.
Smart Images

Figure 0007569270000001 
Figure 0007569270000002 
Figure 0007569270000003
Abstract
Description
[Technical field]
[0001] The present invention relates to a requirement calculation device, a requirement calculation method, and a requirement calculation program. [Background technology]
[0002] Patent document 1 discloses a product search device that can speed up search times by improving product management (see paragraph 0006 of Patent document 1), and also discloses that in the relationship between two or more groups of items (items), items that are relatively close to the product (items in the downstream process) are defined as higher-level items, and items that are not (items in the upstream process) are defined as lower-level items (see paragraph 0024 of Patent document 1). [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2014-126993 A Summary of the Invention [Problem to be solved by the invention]
[0004] Here, to manufacture a final product, sub-items such as intermediates and raw materials are required, but the technology described in Patent Document 1 above was not able to automatically calculate the required amounts of those sub-items.
[0005] The present invention has been made in consideration of the above-mentioned problems, and has an object to provide a requirements calculation device, a requirements calculation method, and a requirements calculation program that can automatically calculate the requirements of sub-items that constitute a final product or are raw materials for the final product, based on a sales plan for the final product. [Means for solving the problem]
[0006] In order to solve the above-mentioned problems and achieve the object, a requirements calculation device according to the present invention is a requirements calculation device comprising a control unit and a storage unit, wherein the storage unit stores sales plan data including a category, a year and month, top-level item identification data which is item identification data for a top-level item that is the highest-level item, and a planned sales quantity of the top-level item, the category and a pattern correspondence master including configuration pattern identification data for identifying a pattern of a hierarchical structure composed of the items, and a manufacturing configuration master which manages the hierarchical structure by including higher-level item identification data which is the item identification data for a higher-level item that is the highest-level item, the configuration pattern identification data, lower-level item identification data which is the item identification data for lower-level items that are lower levels that constitute the higher-level item or are raw materials for the higher-level item, a constituent numerator, and a constituent denominator, and the control unit performs operations including: planned sales quantity etc. acquisition means for acquiring the top-level item identification data and the planned sales quantity of the top-level item linked to a specified category and year and month from the sales plan data; and planned sales quantity etc. acquisition means for acquiring the specified category and month from the pattern correspondence master. a configuration pattern acquisition means for acquiring configuration pattern identification data linked to the top-level item identification data acquired by the planned sales quantity, etc. acquisition means from the manufacturing configuration master, executing a process for acquiring lower-level item identification data, a configuration numerator, and a configuration denominator that are linked to the same upper level item identification data as the top-level item identification data acquired by the planned sales quantity, etc. acquisition means and that are linked to the configuration pattern identification data acquired by the configuration pattern acquisition means, and further, when the acquired lower-level item identification data is set as the upper level item identification data of a one level lower hierarchy in the manufacturing configuration master, using the acquired lower-level item identification data as the upper level item identification data, and repeating a process similar to the process described above until the acquired lower-level item identification data is not set as the upper level item identification data in the manufacturing configuration master;and a requirement calculation means for calculating a requirement using the calculated requirement and the constituent numerator and constituent denominator acquired by the lower-level item acquisition means.
[0007] In the requirement calculation device according to the present invention, the storage unit further stores a production instruction master including the item identification data, the configuration pattern identification data, equipment identification data for identifying equipment, and a unit equipment operation time, and an equipment master including the equipment identification data and a maximum equipment operation time per predetermined period, and the control unit acquires from the production instruction master the top-level item identification data acquired by the planned sales quantity, etc. acquisition means and equipment identification data and unit equipment operation time linked to the configuration pattern identification data acquired by the configuration pattern acquisition means, and further acquires the lower-level item identification data acquired by the lower-level item, etc. acquisition means and the equipment identification data and unit equipment operation time linked to the configuration pattern identification data acquired by the configuration pattern acquisition means, and the top-level item is specified in the equipment identified by the equipment identification data acquired by the equipment, etc. acquisition means. and an operation time calculation means for calculating an operation time of the equipment required to manufacture the lower-level item in the specified month at the equipment specified by the equipment identification data acquired by the equipment, etc. acquisition means, using the requirement of the lower-level item calculated by the requirement calculation means and the unit equipment operation time for the lower-level item acquired by the equipment, etc. acquisition means; and an equipment operation rate calculation means for calculating an equipment operation rate of the equipment specified by the equipment identification data by dividing a value obtained by collecting the operation time calculated by the operation time calculation means for each of the equipment identification data, by a maximum equipment operation time per specified period in the equipment master corresponding to the equipment identification data.
[0008] Furthermore, in a required quantity calculation method according to the present invention, there is provided a required quantity calculation method executed by an information processing device having a control unit and a storage unit, wherein the storage unit stores sales plan data including a category, a year and a month, top-level item identification data which is item identification data for a top-level item that is the highest-level item, and a planned sales quantity of the top-level item, a pattern correspondence master including the category and configuration pattern identification data for identifying a pattern of a hierarchical structure composed of the items, and a manufacturing configuration master which manages the hierarchical structure by including higher-level item identification data which is the item identification data for a higher-level item that is a higher-level item, the configuration pattern identification data, lower-level item identification data which is the item identification data for a lower-level item that is a lower-level item that constitutes the higher-level item or is a raw material for the higher-level item, a configuration numerator, and a configuration denominator, and the control unit executes a planned sales quantity, etc. acquisition step of acquiring from the sales plan data the top-level item identification data and the planned sales quantity of the top-level item linked to a specified category and year and a configuration pattern acquisition step of acquiring a top-level item identification data, a configuration numerator, and a configuration denominator from the manufacturing configuration master, which are linked to the same top-level item identification data as the top-level item identification data acquired in the planned sales quantity, etc. acquisition step, and which are linked to the configuration pattern identification data acquired in the configuration pattern acquisition step, and further, if the acquired lower-level item identification data is set as the top-level item identification data of a one-level lower hierarchy in the manufacturing configuration master, a lower-level item etc. acquisition step of repeating a process similar to the process described above using the acquired lower-level item identification data as the top-level item identification data until the acquired lower-level item identification data is not set as the top-level item identification data in the manufacturing configuration master;and a requirement calculation step of calculating a requirement using the calculated requirement and the constituent numerator and constituent denominator acquired in the sub-item, etc. acquisition step.
[0009] Furthermore, in a requirements calculation program according to the present invention, there is provided a requirements calculation program to be executed by an information processing device having a control unit and a storage unit, the storage unit stores sales plan data including a category, a year and month, top-level item identification data which is item identification data for a top-level item that is the highest-level item, and a planned sales quantity of the top-level item, the category and a pattern correspondence master including configuration pattern identification data for identifying a pattern of a hierarchical structure constituted by the items, and a manufacturing configuration master which manages the hierarchical structure by including higher-level item identification data which is the item identification data for a higher-level item that is the highest-level item, the configuration pattern identification data, lower-level item identification data which is the item identification data for lower-level items that are lower levels that constitute the higher-level item or are raw materials for the higher-level item, a constituent numerator, and a constituent denominator, and the requirements calculation program is to be executed by the control unit, the steps of: acquiring from the sales plan data the top-level item identification data and the planned sales quantity of the top-level item linked to a specified category and year and a configuration pattern acquisition step of acquiring configuration pattern identification data associated with the top-level item identification data acquired in the planned sales quantity, etc. acquisition step from the manufacturing configuration master, a process of acquiring lower-level item identification data, a constituent numerator, and a constituent denominator that are associated with the same upper level item identification data as the top-level item identification data acquired in the planned sales quantity, etc. acquisition step, and that are associated with the configuration pattern identification data acquired in the configuration pattern acquisition step, and further, if the acquired lower-level item identification data is set as the upper level item identification data of a one level lower hierarchy in the manufacturing configuration master, a lower-level item, etc. acquisition step of repeating a process similar to the above process using the acquired lower-level item identification data as the upper level item identification data until the acquired lower-level item identification data is not set as the upper level item identification data in the manufacturing configuration master, and a required quantity is calculated for the lower-level item identification data acquired first in the lower-level item, etc. acquisition step using the planned sales quantity of the top-level item acquired in the planned sales quantity, etc. acquisition step and the constituent numerator and constituent denominator acquired in the lower-level item, etc. acquisition step, and further, for the lower-level item identification data acquired second or later in the lower-level item, etc. acquisition step,and a requirement calculation step of calculating a requirement using the calculated requirement and the constituent numerator and constituent denominator acquired in the sub-item, etc. acquisition step. Effect of the Invention
[0010] According to the present invention, it is possible to automatically calculate the required quantities of lower-level items that constitute an end product or that are raw materials for the end product, based on a sales plan for the end product. [Brief description of the drawings]
[0011] [Figure 1] FIG. 1 is a block diagram showing an example of the configuration of a requirement calculation device. [Diagram 2] FIG. 2 is a diagram showing an example of the correlation between each master and each data. [Diagram 3] FIG. 3 is a diagram illustrating an example of the sales plan data. [Figure 4] FIG. 4 is a diagram illustrating an example of the pattern correspondence master, the manufacturing instruction master, and the equipment master. [Diagram 5] FIG. 5 is a diagram illustrating an example of the manufacturing configuration master. [Figure 6] FIG. 6 is a diagram showing an example of an expanded image of sub-items when the processing category is 1. [Figure 7] FIG. 7 is a diagram showing an example of an expanded image of sub-items when the processing category is 2. [Figure 8] FIG. 8 is a diagram illustrating an example of production schedule data. [Figure 9] FIG. 9 is a diagram illustrating an example of the facility determination data. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0012] Hereinafter, preferred embodiments of a requirement calculation device, a requirement calculation method, and a requirement calculation program according to the present invention will be described in detail with reference to the accompanying drawings. Note that the present invention is not limited to the preferred embodiments.
[0013] [1. Overview] In the manufacturing industry, not only is it necessary to have a sales plan for the final product, but it is also necessary to calculate the production plan for the intermediate work-in-progress. In order to create a production plan, it is also necessary to have a purchasing plan for the raw materials to be used.
[0014] However, in the past, production plans for work-in-progress and purchasing plans for raw materials required to manufacture work-in-progress were often created manually, and it took a lot of time to coordinate plans between departments such as the sales department, manufacturing department, and purchasing department. Even if it was possible to systematize it, the conventional system did not allow the selection of configuration information according to the purpose when developing a production schedule, and therefore it was not possible to compare configurations or distinguish from normal work, and as a result, it was not possible to simulate a production schedule within the same system.
[0015] Therefore, in this embodiment, for example, sales plan information of the final product is imported, and the manufacturing configuration master is referenced at multiple levels to calculate multiple patterns of required quantities (planned quantities) up to the intermediate and raw material levels, making it possible to provide information for early plan determination. More specifically, in this embodiment, for example, the following (1) to (3) are made possible.
[0016] (1) In order to facilitate adjustment of sales plans taking into account production plans, the system has been made to allow calculation of the required quantities (required numbers) of intermediates and raw materials based on sales plans. The intermediates contribute to the determination of production plans and have subordinate structures in the production configuration master. Meanwhile, the raw materials contribute to the determination of purchasing budgets and do not have subordinate structures in the production configuration master. Making it possible to make such calculations has made it possible to make early decisions on plans that span the divisions of the sales department, production department, and purchasing department.
[0017] (2) In order to enable simulations with multiple patterns according to the purpose, it is now possible to calculate the planned production volume with multiple sales plans (annual, monthly, budget, etc.) and configuration patterns (for actual business and simulation, etc.). This makes it possible to compare between periods and to verify changes in the manufacturing configuration.
[0018] (3) In order to be able to confirm the production capacity and feasibility of the manufacturing equipment, that is, to be able to confirm whether the production capacity of the manufacturing equipment is sufficient for the production plan, the operation rate of the equipment can be calculated. This makes it possible to simulate the production capacity. The specific configuration and operation are explained below.
[0019] [2. Configuration] An example of the configuration of a requirement calculation device 100 according to this embodiment will be described with reference to Fig. 1. Fig. 1 is a block diagram showing an example of the configuration of the requirement calculation device 100.
[0020] The requirement calculation device 100 is a commercially available desktop personal computer. Note that the requirement calculation device 100 is not limited to a stationary information processing device such as a desktop personal computer, and may be a portable information processing device such as a commercially available notebook personal computer, a PDA (Personal Digital Assistant), a smartphone, or a tablet personal computer.
[0021] The requirement calculation device 100 includes a control unit 102, a communication interface unit 104, a storage unit 106, and an input / output interface unit 108. The units included in the scheduled start / end date calculation device 100 are connected to each other so as to be able to communicate with each other via any communication path.
[0022] The communication interface unit 104 communicably connects the requirement calculation device 100 to a network 300 via a communication device such as a router and a wired or wireless communication line such as a dedicated line. The communication interface unit 104 has a function of communicating data with other devices via the communication line. Here, the network 300 has a function of connecting the requirement calculation device 100 and the server 200 so that they can communicate with each other, and is, for example, the Internet or a LAN (Local Area Network). Note that data such as various masters described later may be stored in the server 200, for example.
[0023] An input device 112 and an output device 114 are connected to the input / output interface unit 108. The output device 114 may be a monitor (including a home television), a speaker, or a printer. The input device 112 may be a keyboard, a mouse, a microphone, or a monitor that cooperates with a mouse to realize a pointing device function. In the following, the output device 114 may be referred to as the monitor 114, and the input device 112 may be referred to as the keyboard 112 or the mouse 112.
[0024] Various databases, tables, files, etc. are stored in the storage unit 106. Computer programs for cooperating with an OS (Operating System) to give instructions to a CPU (Central Processing Unit) to perform various processes are recorded in the storage unit 106. For example, memory devices such as RAM (Random Access Memory) and ROM (Read Only Memory), fixed disk devices such as hard disks, flexible disks, and optical disks can be used as the storage unit 106.
[0025] The storage unit 106 includes, for example, sales plan data 106a, a pattern correspondence master 106b, a manufacturing configuration master 106c, a manufacturing instruction master 106d, an equipment master 106e, production schedule data 106f, and equipment evaluation data 106g.
[0026] The sales plan data 106a is data for managing the planned sales quantity of the top-level item (i.e., the final product). As shown in Fig. 2 and Fig. 3, the sales plan data 106a includes, for example, a division (processing division), a year and month (accounting year and month), top-level item identification data (item CD) which is item identification data for the top-level item that is the top-level item, and the planned sales quantity of the top-level item. Examples of the division (processing division) include monthly, annual, and budget.
[0027] As shown in FIG. 2 and FIG. 4, the pattern correspondence master 106b includes, for example, the division (processing division) and configuration pattern identification data (configuration pattern CD) for identifying a pattern of a hierarchical structure constituted by the items.
[0028] The manufacturing configuration master 106c is a feature of the present invention, and is a master for managing the hierarchical structure. As shown in Fig. 2 and Fig. 5, the manufacturing configuration master 106c includes, for example, upper item identification data (item CD) which is the item identification data for the upper item, which is the upper item, the configuration pattern identification data (configuration pattern CD), a revision date, a configuration number, lower item identification data (lower item CD) which is the item identification data for the lower item, which is the lower item that constitutes the upper item or is a raw material for the upper item, a configuration numerator, a configuration denominator, a yield rate, and the like.
[0029] Here, the hierarchical structure specified by the configuration pattern CD "X" in the manufacturing configuration master 106c in Fig. 5 will be explained with reference to Fig. 6. As shown in Fig. 5, bulk A and drums are set as lower-level items CD for the item CD "product A" and the configuration pattern CD "X". This relationship is expressed in a hierarchical structure as shown in Fig. 6 for cost Lv=1.
[0030] Next, as shown in Figure 5, drums are not set as an item CD (i.e., there are no subitems that belong to drums). On the other hand, as shown in Figure 5, bulk A is set as an item CD, and product B and raw material B are set as subitems CD for item CD "bulk A." This relationship can be expressed in a hierarchical structure as shown in Figure 6 for cost level 2.
[0031] As shown in FIG. 5, raw material B is not set as an item CD (i.e., there are no sub-items belonging to raw material B). On the other hand, product B is set as an item CD, and bulk B and containers are set as sub-items CD for item CD "product B." This relationship can be expressed in a hierarchical structure as shown in FIG. 6, where cost level = 3. As shown in FIG. 5, containers are not set as an item CD (i.e., there are no sub-items belonging to containers), but on the other hand, although omitted in FIG. 5, bulk B is set as an item CD (i.e., there are sub-items belonging to bulk B).
[0032] In the hierarchical structure of cost levels 1 to 3 described above using FIG. 6 as an example, "Bulk A," "Product B," and "Bulk B" are subitems of a certain item, and are items that themselves have subitems. Such items are defined as "intermediates" in this embodiment. On the other hand, in the hierarchical structure of cost levels 1 to 3 described above using FIG. 6 as an example, "Drum," "Raw Material B," and "Container" are subitems of a certain item, but are items that do not themselves have subitems. Such items are defined as "raw materials" in this embodiment.
[0033] The manufacturing instruction master 106d is a master for managing the unit equipment operation time. As shown in FIG. 2 and FIG. 4, the manufacturing instruction master 106d includes, for example, the item identification data (item CD), the configuration pattern identification data (configuration pattern CD), equipment identification data (equipment CD) for identifying equipment, and unit equipment operation time. The unit equipment operation time is the number of hours required to manufacture one unit of the item. For example, the first line in the manufacturing instruction master 106d in FIG. 4 indicates that the time required to manufacture 1 kg of product A in equipment A is 0.1 hours. Note that, as will be described in detail in [3. Specific example of processing] below, it is possible to calculate the operation time and operation rate of each equipment by linking the lower-level items into which the final product is expanded with the equipment information (equipment CD and unit equipment operation time) in the manufacturing instruction master 106d.
[0034] The equipment master 106e is a master for managing the maximum equipment operation time per predetermined period. As shown in Fig. 2 and Fig. 4, the equipment master 106e includes, for example, the equipment identification data (equipment CD) and the maximum equipment operation time per predetermined period.
[0035] The production schedule data 106f is data for managing the lower items expanded from the top item (i.e., the final product) and their required quantities. As shown in Fig. 8, the production schedule data 106f includes, for example, the category (processing category), the year and month (accounting year and month), the hierarchical level (cost Lv) when expanded, the top item identification data (top item CD), the top item identification data (parent item CD), the required quantity of the top item (parent item quantity), the lower item identification data (child item CD), the required quantity of the lower item (child item quantity), the equipment identification data (equipment CD), the unit equipment operation time, the equipment operation time, and the like.
[0036] The hierarchical level (cost Lv) will be described. The hierarchical level (cost Lv) is the number of hierarchical levels when the final product is expanded into the intermediates and the raw materials with reference to the manufacturing configuration master 106c. The cost Lv for the top item (i.e., the final product) is 0, and the value of the cost Lv increases with each additional hierarchical level. In the production schedule data 106f, for cost Lv=0, a record is generated in which the top item itself is the parent and child (i.e., in the example of FIG. 8, parent item CD and child item CD are both "product A"). On the other hand, for cost Lv=1 and above, a record indicating a parent-child relationship is generated by setting different items CD for the parent item CD and child item CD.
[0037] The child item quantity will now be described. The child item quantity can be calculated using the manufacturing configuration master 106c, for example, by the formula "child item quantity = parent item quantity x composition numerator / composition denominator". However, for the child item quantity in a record where the cost level = 0, the same quantity as the parent item quantity is set as the initial value, so it is not calculated by this formula.
[0038] The equipment operation time will now be described. The equipment operation time can be calculated, for example, by the formula "equipment operation time = child item quantity x unit equipment operation time". Note that a child item refers to an item that actually needs to be produced, and since the child item CD of the child item is linked to the unit equipment operation time in the production instruction master 106d and managed, it is possible to calculate the equipment operation time corresponding to each child item.
[0039] The equipment judgment data 106g is a master for managing the equipment operation rate. The equipment judgment master 106f includes, for example, the classification (processing classification), the equipment identification data (equipment CD), the total equipment operation time per predetermined period (total equipment operation time), the maximum equipment operation time per predetermined period (maximum equipment operation time), the equipment operation rate, and the like, as shown in Figs. 2 and 9.
[0040] The control unit 102 is a CPU or the like that performs overall control of the required amount calculation device 100. The control unit 102 has an internal memory for storing control programs such as an OS, programs that define various processing procedures, required data, and the like, and executes various information processing based on these stored programs.
[0041] The control unit 102 conceptually functions as, for example, (1) a planned sales quantity, etc. acquisition unit 102a serving as planned sales quantity, etc. acquisition means for acquiring from the sales plan data the top-level item identification data linked to a specified category and year and month and the planned sales quantity of the top-level item, (2) a configuration pattern acquisition unit 102b serving as configuration pattern acquisition means for acquiring configuration pattern identification data linked to the specified category from the pattern correspondence master, and (3) a process for acquiring from the manufacturing configuration master lower-level item identification data, a configuration numerator, and a configuration denominator that are linked to the same upper item identification data as the top-level item identification data acquired by the planned sales quantity, etc. acquisition means and that are linked to the configuration pattern identification data acquired by the configuration pattern acquisition means, and further, when the acquired lower-level item identification data is set as the upper item identification data of a layer one level lower in the manufacturing configuration master, the acquired lower-level item identification data is used as the upper item identification data, and a process similar to the process is performed in a state in which the acquired lower-level item identification data is not set as the upper item identification data in the manufacturing configuration master. a lower-level item etc. acquisition unit 102c as a lower-level item etc. acquisition means which repeats this process until the lower-level item etc. acquisition is completed; (4) a requirement calculation unit 102d as a requirement calculation means which calculates a requirement using the planned sales quantity of the top-level item acquired by the planned sales quantity etc. acquisition means and the constituent numerator and constituent denominator acquired by the lower-level item etc. acquisition means for the lower-level item identification data acquired first by the lower-level item etc. acquisition means, and further calculates a requirement using the calculated requirement and the constituent numerator and constituent denominator acquired by the lower-level item etc. acquisition means for the lower-level item identification data acquired second or later by the lower-level item etc. acquisition means; (5) a facility etc. acquisition unit 102e as a facility etc. acquisition means which acquires, from the production instruction master, facility identification data and unit facility operation time linked to the top-level item identification data acquired by the planned sales quantity etc. acquisition means and the configuration pattern identification data acquired by the configuration pattern acquisition means, and further acquires facility identification data and unit facility operation time linked to the lower-level item identification data acquired by the lower-level item etc. acquisition means and the configuration pattern identification data acquired by the configuration pattern acquisition means;(6) Calculating the operation time of the equipment required to manufacture the top-level item in the designated month at the equipment identified by the equipment identification data acquired by the equipment, etc. acquisition means, using the planned sales quantity of the top-level item acquired by the planned sales quantity, etc. acquisition means and the unit equipment operation time for the top-level item acquired by the equipment, etc. acquisition means, and further calculating the operation time of the equipment required to manufacture the lower-level item in the designated month at the equipment identified by the equipment identification data acquired by the equipment, etc. acquisition means, using the required quantity of the lower-level item calculated by the required quantity calculation means. (7) a production schedule data generating unit 102g; and (8) an equipment availability calculation unit 102h as equipment availability calculation means for calculating the equipment availability of the equipment identified by the equipment identification data by dividing the value obtained by aggregating the operation time calculated by the operation time calculation means for each piece of equipment identification data by the maximum equipment operation time per predetermined period in the equipment master corresponding to the equipment identification data.
[0042] The planned sales quantity etc. acquisition unit 102a acquires the top-level item identification data and the planned sales quantity of the top-level item linked to the specified category and year and month from sales plan data 106a (see Figure 3) which includes the category (processing category), the year and month (accounting year and month), the top-level item identification data (item), and the planned sales quantity of the top-level item.
[0043] The configuration pattern acquisition unit 102b acquires configuration pattern identification data linked to the specified division (processing division) from the pattern correspondence master 106b (see FIG. 4) that includes the division (processing division) and the configuration pattern identification data (configuration pattern CD).
[0044] The lower item etc. acquisition unit 102c acquires information on the lower items constituting a layer one layer lower than the layer to which the top item belongs by the process described in this paragraph. That is, the lower item etc. acquisition unit 102c executes a process of acquiring the lower item identification data, the constituent numerator, and the constituent denominator, which are linked to the same upper item identification data as the top item identification data acquired by the planned sales quantity etc. acquisition unit 102a and are linked to the constituent pattern identification data acquired by the constituent pattern acquisition unit 102b, from the manufacturing configuration master 106c (see FIG. 5) including the upper item identification data (item CD), the configuration pattern identification data (configuration pattern CD), the lower item identification data (lower item CD), the constituent numerator, and the constituent denominator.
[0045] The lower-level item etc. acquiring unit 102c further acquires information on the lower-level items constituting the layer one layer lower than the layer one layer lower than the layer to which the top-level item belongs, through the process described in this paragraph. That is, when the acquired lower-level item identification data is set as the upper-level item identification data of the layer one layer lower in the manufacturing configuration master 106c, the lower-level item etc. acquiring unit 102c uses the acquired lower-level item identification data as the upper-level item identification data, and repeats the same process as the process described in the previous paragraph, until the acquired lower-level item identification data is no longer set as the upper-level item identification data in the manufacturing configuration master 106c.
[0046] The required quantity calculation unit 102d calculates the required quantity for the lower-level items that constitute the hierarchical level one level lower than the hierarchical level to which the top-level item belongs, by the process described in this paragraph. That is, for the lower-level item identification data acquired first by the lower-level item, etc. acquisition unit 102c, the required quantity calculation unit 102d calculates the required quantity using the planned sales quantity of the top-level item acquired by the planned sales quantity, etc. acquisition unit 102a and the constituent numerator and constituent denominator acquired by the lower-level item, etc. acquisition unit 102c.
[0047] The requirement calculation unit 102d further calculates the requirement for the lower items constituting the hierarchical level one level lower than the hierarchical level to which the top item belongs, through the process described in this paragraph. That is, for the second or subsequent lower item identification data acquired by the lower item, etc. acquisition unit 102c, the requirement calculation unit 102d calculates the requirement using the calculated requirement and the constituent numerator and constituent denominator acquired by the lower item, etc. acquisition unit 102c.
[0048] The equipment etc. acquisition unit 102e acquires the top-level item identification data acquired by the planned sales quantity etc. acquisition unit 102a and the equipment identification data and unit equipment operation time linked to the configuration pattern identification data acquired by the configuration pattern acquisition unit 102b from the manufacturing instruction master 106d (see Figure 4) which includes the item identification data (item CD), the configuration pattern identification data (configuration pattern CD), the equipment identification data (equipment CD), and the unit equipment operation time, and further acquires the lower-level item identification data acquired by the lower-level item etc. acquisition unit 102c and the equipment identification data and unit equipment operation time linked to the configuration pattern identification data acquired by the configuration pattern acquisition unit 102b.
[0049] The operation time calculation unit 102f calculates the operation time of the equipment required to manufacture the top-level item in the specified month at the equipment identified by the equipment identification data acquired by the equipment etc. acquisition unit 102e, using the planned sales quantity of the top-level item acquired by the planned sales quantity etc. acquisition unit 102a and the unit equipment operation time for the top-level item acquired by the equipment etc. acquisition unit 102e, and further calculates the operation time of the equipment required to manufacture the lower-level item in the specified month at the equipment identified by the equipment identification data acquired by the equipment etc. acquisition unit 102e, using the requirement for the lower-level item calculated by the requirement calculation unit 102d and the unit equipment operation time for the lower-level item acquired by the equipment etc. acquisition unit 102e.
[0050] The production schedule data generating unit 102g generates production schedule data 106f by using the results of the processes from the planned sales quantity obtaining unit 102a to the process from the operation time calculating unit 102f.
[0051] The equipment availability calculation unit 102h calculates the equipment availability of the equipment identified by the equipment identification data by dividing the value, obtained by aggregating the operation time calculated by the operation time calculation unit 102f for each equipment identification data, by the maximum equipment operation time in the equipment master 106e (see FIG. 4) corresponding to the equipment identification data.
[0052] [3. Specific examples of processing] In this section, a specific example of the process according to the present embodiment will be described. First, the generation of the production schedule data 106f when the process type is 1 will be described, then the generation of the production schedule data 106f when the process type is 2 will be described, and finally the generation of the equipment judgment data 106g will be described.
[0053] As a premise for the explanation in this section, it is assumed that the sales plan data 106a has the content shown in FIG. 3, the pattern correspondence master 106b, the production instruction master 106d, and the equipment master 106e have the content shown in FIG. 4, and the production configuration master 106c has the content shown in FIG. 5, and that these have all been registered in advance.
[0054] [3-1. Processing category = 1] In this section, we will specifically explain how to generate the production schedule data 106f when 1 is specified as the processing category and 2021 / 04 is specified as the accounting year and month.
[0055] First, the planned sales quantity etc. acquisition unit 102a acquires the item "Product A" and the planned sales quantity "300" from the sales plan data 106a in FIG. 3 as information linked to the specified processing category "1" and accounting year and month "2021 / 04".
[0056] Next, the configuration pattern acquisition unit 102b acquires the configuration pattern CD "X" from the pattern correspondence master 106b in FIG. 4 as information associated with the specified process category "1."
[0057] Below, we will explain the details of the process of expanding the top item, final product A, to the first layer (layer with cost level = 1), the second layer (layer with cost level = 2), and the bottom layer, the third layer (layer with cost level = 3), for each layer. After that, we will explain the calculation of the equipment operating time and the generation of the production schedule data 106f.
[0058] (1) About the first layer (layer with cost level = 1) The subitem etc. acquiring unit 102c acquires subitems etc. for the first hierarchical level (hierarchical level where cost level = 1) by expanding the information of the final product A as follows. That is, the subitem etc. acquiring unit 102c acquires the subitem "Bulk A", the numerator "30", and the denominator "30", as well as the subitem "Drum", the numerator "1", and the denominator "30", as information linked to the item "Product A" acquired by the planned sales quantity etc. acquiring unit 102a and linked to the configuration pattern CD "X" acquired by the configuration pattern acquiring unit 102b from the manufacturing configuration master 106c in FIG. 5.
[0059] The required quantity calculation unit 102d calculates the required quantity of the acquired sub-item as follows: That is, the required quantity calculation unit 102d calculates the required quantity for the acquired sub-item "Bulk A" as 300 kg using the formula "(Planned sales quantity 300 of product A acquired by the planned sales quantity acquisition unit 102a) x (the acquired constituent numerator 30) ÷ (the acquired constituent denominator 30)". The required quantity calculation unit 102d also calculates the required quantity for the acquired sub-item "Drum" as 10 drums using the formula "(Planned sales quantity 300 of product A acquired by the planned sales quantity acquisition unit 102a) x (the acquired constituent numerator 1) ÷ (the acquired constituent denominator 30)".
[0060] The diagram summarizing the sub-items and their required quantities obtained as the first hierarchy (cost level = 1 hierarchy) is shown in Figure 6 as the Cost Level = 1 diagram.
[0061] (2) Regarding the second layer (layer with cost level = 2) Of the sub-items "Bulk A" and "Drum" acquired in (1) above, "Drum" is not set in the "Item CD" column of the manufacturing configuration master 106c in Fig. 5, so there are no sub-items belonging to "Drum". On the other hand, "Bulk A" is set in the "Item CD" column of the manufacturing configuration master 106c in Fig. 5, so there are sub-items belonging to "Bulk A".
[0062] Therefore, the lower-level item etc. acquiring unit 102c acquires lower-level items etc. for the second hierarchical level (hierarchical level of cost Lv=2) by expanding the information of "Bulk A" as follows. That is, the lower-level item etc. acquiring unit 102c acquires the lower-level item "Product B", the constituent numerator "20", the constituent denominator "30", and the lower-level item "Raw material B", the constituent numerator "10", and the constituent denominator "30" as information linked to "Bulk A" and linked to the configuration pattern CD "X" acquired by the configuration pattern acquiring unit 102b from the manufacturing configuration master 106c of FIG. 5.
[0063] The requirement calculation unit 102d calculates the requirement of the acquired lower-level item as follows. That is, the requirement calculation unit 102d calculates the requirement for the acquired lower-level item "product B" to be 200 kg using the formula "(requirement amount 300 calculated for "bulk A" in (1) above) x (the acquired constituent numerator 20) ÷ (the acquired constituent denominator 30)". The requirement calculation unit 102d also calculates the requirement for the acquired lower-level item "raw material B" to be 100 kg using the formula "(requirement amount 300 calculated for "bulk A" in (1) above) x (the acquired constituent numerator 10) ÷ (the acquired constituent denominator 30)".
[0064] The diagram summarizing the sub-items and their required quantities obtained as the second hierarchy (cost level = 2 hierarchy) is shown in Figure 6 as the diagram of cost level = 2.
[0065] (3) Regarding the third layer (layer with cost level = 3) Of the sub-items "Product B" and "Raw Material B" acquired in (2) above, "Raw Material B" is not set in the "Item CD" column of the manufacturing configuration master 106c in Fig. 5, so there are no sub-items belonging to "Raw Material B." In contrast, "Product B" is set in the "Item CD" column of the manufacturing configuration master 106c in Fig. 5, so there are sub-items belonging to "Product B."
[0066] Therefore, the lower-level item etc. acquiring unit 102c acquires lower-level items etc. for the third hierarchical level (hierarchical level of cost Lv=3) by expanding the information of "product B" as follows. That is, the lower-level item etc. acquiring unit 102c acquires the lower-level item "bulk B", the constituent numerator "15", the constituent denominator "20", and the lower-level item "container", the constituent numerator "5", and the constituent denominator "20" as information linked to "product B" and linked to the configuration pattern CD "X" acquired by the configuration pattern acquiring unit 102b from the manufacturing configuration master 106c of FIG. 5.
[0067] The requirement calculation unit 102d calculates the requirement of the acquired sub-item as follows. That is, the requirement calculation unit 102d calculates the requirement for the acquired sub-item "Bulk B" to be 150 kg using the formula "(requirement amount 200 calculated for "Product B" in (2) above) x (the acquired constituent numerator 15) ÷ (the acquired constituent denominator 20)". The requirement calculation unit 102d also calculates the requirement for the acquired sub-item "Container" to be 50 kg using the formula "(requirement amount 200 calculated for "Product B" in (2) above) x (the acquired constituent numerator 5) ÷ (the acquired constituent denominator 20)".
[0068] The diagram summarizing the sub-items and their required quantities obtained as the third hierarchy (cost level = 3 hierarchy) is shown in Figure 6 as the diagram of cost level = 3.
[0069] The characteristics of the process of expanding from the top-level item, as explained in (1) to (3) above, can be summarized as follows: 1. By referring to the pattern correspondence master 106b, expansion can be performed according to the configuration pattern identification data (configuration pattern CD) corresponding to the division (processing division). 2. The required quantity (expanded quantity) for the first hierarchical level can be calculated based on the planned sales volume in the sales plan data 106a, and the required quantity (expanded quantity) for the second and subsequent hierarchical levels can be calculated based on the expanded quantity for the next higher hierarchical level. 3. How many levels below the hierarchy are expanded is determined by the settings of the manufacturing configuration master 106c. If the acquired sub-item CD is set as an item CD, it can be expanded further down. On the other hand, if the acquired sub-item CD is not set as an item CD, it cannot be expanded further down.
[0070] (4) Calculation of equipment operating hours Next, the equipment operation time for the top item (product A) and the intermediates (bulk A, product B, and bulk B) is calculated as follows: Note that the raw materials (drums, raw material B, and containers) are not manufactured in-house but are purchased from other companies, so equipment operation time does not occur in the first place and is therefore not calculated.
[0071] First, the calculation of the equipment operation time for the top item (product A) will be described. The equipment etc. acquisition unit 102e acquires the equipment CD "equipment A" and the unit equipment operation time "0.1" as information associated with "product A" and the configuration pattern CD "X" acquired by the configuration pattern acquisition unit 102b from the manufacturing instruction master 106d in FIG.
[0072] Next, the operation time calculation unit 102f calculates the equipment operation time required to manufacture product A at equipment A in April 2021 to be 30 hours using the formula "(planned sales quantity of product A 300 kg) x (0.1 unit equipment operation time acquired by the equipment etc. acquisition unit 102e)".
[0073] Next, the calculation of the equipment operation time for the intermediates (Bulk A, Product B, and Bulk B) will be described. The equipment acquisition unit 102e acquires the equipment CD "Equipment A" and the unit equipment operation time "0.1" from the manufacturing instruction master 106d of FIG. 4 as information associated with "Bulk A" and the configuration pattern CD "X" acquired by the configuration pattern acquisition unit 102b. The equipment acquisition unit 102e also acquires the equipment CD "Equipment B" and the unit equipment operation time "0.1" as information associated with "Product B" and the configuration pattern CD "X" acquired by the configuration pattern acquisition unit 102b. The equipment acquisition unit 102e also acquires the equipment CD "Equipment B" and the unit equipment operation time "0.1" as information associated with "Bulk B" and the configuration pattern CD "X" acquired by the configuration pattern acquisition unit 102b.
[0074] Next, the operation time calculation unit 102f calculates the equipment operation time required to manufacture bulk A in equipment A in April 2021 to be 30 hours using the formula "(required amount of bulk A 300 kg) x (unit equipment operation time 0.1 acquired by the equipment acquisition unit 102e)". The operation time calculation unit 102f also calculates the equipment operation time required to manufacture product B in equipment B in April 2021 to be 20 hours using the formula "(required amount of product B 200 kg) x (unit equipment operation time 0.1 acquired by the equipment acquisition unit 102e)". The operation time calculation unit 102f then calculates the equipment operation time required to manufacture bulk B in equipment B in April 2021 to be 15 hours using the formula "(required amount of bulk B 100 kg) x (unit equipment operation time 0.1 acquired by the equipment acquisition unit 102e)".
[0075] (5) Generation of production schedule data Finally, the production schedule data generation unit 102g generates the upper half of the production schedule data 106f shown in Fig. 8 (= the portion corresponding to processing category = 1) based on the information acquired and calculated by the processing up to this point in [3-1]. In the production schedule data 106f shown in Fig. 8, the child items CD shown in hatching correspond to the lower order items acquired by the lower order item etc. acquisition unit 102c in the above (1) to (3), the child item quantities shown in hatching correspond to the required amounts calculated by the required amount calculation unit 102d in the above (1) to (3), the unit equipment operation times shown in hatching correspond to the unit equipment operation times acquired by the equipment etc. acquisition unit 102e in the above (4), and the equipment operation times shown in hatching correspond to the equipment operation times calculated by the operation time calculation unit 102f in the above (4).
[0076] [3-2. Processing category = 2] In this section, we will specifically explain how to generate the production schedule data 106f when 2 is specified as the processing category and 2021 / 04 is specified as the accounting year and month.
[0077] First, the planned sales quantity etc. acquisition unit 102a acquires the item "Product A" and the planned sales quantity "600" from the sales plan data 106a in FIG. 3 as information linked to the specified processing category "2" and accounting year and month "2021 / 04".
[0078] Next, the configuration pattern acquisition unit 102b acquires the configuration pattern CD "Y" from the pattern correspondence master 106b in FIG. 4 as information associated with the specified process category "2."
[0079] Hereafter, a process is executed in which the top item, product A, is expanded to the first layer (layer with cost level = 1), the second layer (layer with cost level = 2), and the third layer, which is the lowest layer (layer with cost level = 3), but since the method of this process is the same as in [3-1], a detailed explanation is omitted. A diagram summarizing the sub-items and their required quantities obtained as the first layer (layer with cost level = 1) is shown in Fig. 7 as the diagram with cost level = 1. A diagram summarizing the sub-items and their required quantities obtained as the second layer (layer with cost level = 2) is shown in Fig. 7 as the diagram with cost level = 2. A diagram summarizing the sub-items and their required quantities obtained as the third layer (layer with cost level = 3) is shown in Fig. 7 as the diagram with cost level = 3.
[0080] The method of calculating the equipment operation time and generating the production schedule data 106f is also the same as in [3-1], so detailed explanations will be omitted. The calculated equipment operation time and the generated production schedule data 106f are shown in the lower half of the production schedule data 106f in Figure 8 (= the part corresponding to processing category = 2).
[0081] [3-3. Generation of equipment judgment data] In this section, a detailed description will be given of how the equipment judgment data 106g is generated based on the production schedule data 106f generated in [3-1] and [3-2].
[0082] The equipment operation rate calculation unit 102h aggregates the equipment operation time in the production schedule data 106f of Fig. 8 for each combination of processing category and equipment. Specifically, the equipment operation rate calculation unit 102h aggregates the total equipment operation time in 2021 / 04 for the combination of processing category = 1 and equipment CD = equipment A as 30 hours + 30 hours = 60 hours, aggregates the total equipment operation time in 2021 / 04 for the combination of processing category = 1 and equipment CD = equipment B as 20 hours + 15 hours = 35 hours, aggregates the total equipment operation time in 2021 / 04 for the combination of processing category = 2 and equipment CD = equipment A as 60 hours + 60 hours = 120 hours, and aggregates the total equipment operation time in 2021 / 04 for the combination of processing category = 2 and equipment CD = equipment B as 40 hours + 20 hours = 60 hours.
[0083] Additionally, the equipment availability calculation unit 102h acquires the maximum equipment operation time corresponding to each piece of equipment from the equipment master 106e in Fig. 4. Specifically, the equipment availability calculation unit 102h acquires 120 hours as the maximum equipment operation time (per month) corresponding to equipment CD = equipment A, and acquires 300 hours as the maximum equipment operation time (per month) corresponding to equipment CD = equipment B, from the equipment master 106e in Fig. 4.
[0084] Then, the equipment operation rate calculation unit 102h calculates the equipment operation rate by dividing the total equipment operation time for April 2021 calculated in the paragraph before last by the maximum equipment operation time (per month) obtained in the previous paragraph. Specifically, the equipment availability calculation unit 102h calculates the equipment availability rate in 2021 / 04 for the combination of processing category = 1 and equipment CD = equipment A as 60 hours ÷ 120 hours × 100 = 50%, calculates the equipment availability rate in 2021 / 04 for the combination of processing category = 1 and equipment CD = equipment B as 35 hours ÷ 300 hours × 100 ≒ 12%, calculates the equipment availability rate in 2021 / 04 for the combination of processing category = 2 and equipment CD = equipment A as 120 hours ÷ 120 hours × 100 = 100%, and calculates the equipment availability rate in 2021 / 04 for the combination of processing category = 2 and equipment CD = equipment B as 60 hours ÷ 300 hours × 100 = 20%. A table summarizing the results of the calculations is shown in FIG. 9 as equipment judgment data 106g.
[0085] In this way, by calculating the equipment operating rate of each piece of equipment, it is possible to determine, for example, the excess production capacity of the equipment and the production possibility for the sales plan.
[0086] [4. Summary of the present embodiment] In this way, as described in [3-1] and [3-2], the requirement calculation device 100 according to this embodiment can automatically calculate the requirement of subitems that constitute a final product or are raw materials for the final product based on the sales plan of the final product. This enables early decision-making across departments such as the sales department, manufacturing department, and purchasing department.
[0087] Furthermore, as described in [3-1] and [3-2], the requirement calculation device 100 according to this embodiment can flexibly change what sales plan (set in the sales plan data 106a) is used and what hierarchical structure (set in the manufacturing configuration master 106c) is used to calculate the requirement, depending on the processing category. As a result, for example, if a planned sales volume per month is set in the sales plan data 106a, the requirement of lower-level items per month can be grasped. Also, for example, if a hierarchical structure for actual business and a hierarchical structure for simulation are separately registered in the manufacturing configuration master 106c, the requirement of lower-level items from two perspectives, that is, for actual business and simulation, can be grasped.
[0088] According to the requirement calculation device 100 of this embodiment, as described in [3-3], the operating rate of each piece of equipment can be calculated based on the automatically calculated requirement of the lower-level item. This makes it possible to perform a simulation of the number of units that can be produced, for example.
[0089] [5. Contribution to the United Nations-led Sustainable Development Goals (SDGs)] This embodiment can contribute to improving business efficiency and promoting appropriate management decisions by companies, thereby contributing to goals 8 and 9 of the SDGs.
[0090] Furthermore, this embodiment can contribute to reducing waste and promoting paperless and electronic systems, thereby contributing to the achievement of goals 12, 13, and 15 of the SDGs.
[0091] Furthermore, this embodiment can contribute to strengthening control and governance, making it possible to contribute to Goal 16 of the SDGs.
[0092] 6. Other embodiments The present invention may be embodied in various different embodiments other than those described above within the scope of the technical concept set forth in the claims.
[0093] For example, among the processes described in the embodiments, all or part of the processes described as being performed automatically can be performed manually, or all or part of the processes described as being performed manually can be performed automatically using known methods.
[0094] In addition, the processing procedures, control procedures, specific names, information including parameters such as registered data and search conditions for each process, screen examples, and database configurations shown in this specification and drawings may be changed as desired unless otherwise specified.
[0095] Moreover, with regard to the required amount calculation device 100, the components shown in the figures are merely conceptual functional elements, and the device does not necessarily have to be physically configured as shown in the figures.
[0096] For example, the processing functions of the requirement calculation device 100, particularly the processing functions performed by the control unit, may be realized in whole or in part by a CPU and a program interpreted and executed by the CPU, or may be realized as hardware using wired logic. The program is recorded in a non-transient computer-readable recording medium including programmed instructions for causing the information processing device to execute the processes described in this embodiment, and is mechanically read by the requirement calculation device 100 as necessary. That is, a computer program for giving instructions to the CPU in cooperation with the OS and performing various processes is recorded in a storage unit such as a ROM or HDD (Hard Disk Drive). This computer program is executed by being loaded into a RAM, and constitutes the control unit in cooperation with the CPU.
[0097] In addition, this computer program may be stored in an application program server connected to the requirement calculation device 100 via any network, and it is also possible to download all or a part of it as necessary.
[0098] In addition, the program for executing the process described in this embodiment may be stored in a non-transient computer-readable recording medium, or may be configured as a program product. Here, the "recording medium" includes any "portable physical medium" such as a memory card, a Universal Serial Bus (USB) memory, a Secure Digital (SD) card, a flexible disk, a magneto-optical disk, a ROM, an Erasable Programmable Read Only Memory (EPROM), an Electrically Erasable and Programmable Read Only Memory (EEPROM (registered trademark)), a Compact Disk Read Only Memory (CD-ROM), a Magneto-Optical disk (MO), a Digital Versatile Disk (DVD), and a Blu-ray (registered trademark) Disc.
[0099] Moreover, a "program" is a data processing method written in any language or description method, and may be in any form, such as source code or binary code. Note that a "program" is not necessarily limited to a single configuration, but also includes a distributed configuration as multiple modules or libraries, and a program that works with a separate program, such as an OS, to achieve its function. Note that the specific configuration and reading procedure for reading a recording medium in each device shown in the embodiments, as well as the installation procedure after reading, may use well-known configurations and procedures.
[0100] The various databases etc. stored in the memory unit are storage means such as memory devices such as RAM and ROM, fixed disk devices such as hard disks, flexible disks, and optical disks, and store various programs, tables, databases, and web page files etc. used for various processes and providing websites.
[0101] The requirement calculation device 100 may be configured as an information processing device such as a known personal computer or a workstation, or may be configured as the information processing device to which any peripheral device is connected. The requirement calculation device 100 may be realized by installing software (including programs, data, etc.) that causes the device to realize the processes described in this embodiment.
[0102] Furthermore, the specific form of distribution and integration of the devices is not limited to that shown in the drawings, and all or part of them can be functionally or physically distributed and integrated in any unit according to various additions or functional loads. In other words, the above-mentioned embodiments can be implemented in any combination, or the embodiments can be implemented selectively. [Industrial Applicability]
[0103] The present invention is useful, for example, in the chemical industry and the machinery industry. [Explanation of symbols]
[0104] 100 Requirement calculation device 102 Control section 102a Sales Schedule Acquisition Department 102b Configuration pattern acquisition unit 102c Sub-item Acquisition Division 102d Requirement Calculation Section 102e Equipment acquisition department 102f Operating time calculation section 102g Production schedule data generation section 102h Equipment operating rate calculation section 104 Communication interface section 106 Storage section 106a Sales planning data 106b Pattern compatible master 106c Manufacturing configuration master 106d Manufacturing instruction master 106e Facility Master 106f production schedule data 106g Equipment Judgment Data 108 Input / Output Interface Section 112 Input Devices 114 Output Device 200 Servers 300 Network
Claims
1. A requirement calculation device including a control unit and a storage unit, The storage unit includes: Sales plan data including a category, a year and a month, top-level item identification data which is item identification data for a top-level item that is a top-level item, and a planned sales quantity of the top-level item; a pattern correspondence master including the classification and configuration pattern identification data for identifying a pattern of a hierarchical structure composed of the items; a manufacturing configuration master for managing the hierarchical structure, comprising: higher-level item identification data, which is the item identification data for a higher-level item that is a higher-level item; the configuration pattern identification data; lower-level item identification data, which is the item identification data for a lower-level item that is a component of the higher-level item or is a raw material for the higher-level item; a constituent numerator; and a constituent denominator; is stored, The control unit is a means for acquiring a planned sales quantity, etc., for acquiring top-level item identification data and a planned sales quantity of the top-level item associated with a designated category and date from the sales plan data; a configuration pattern acquisition means for acquiring configuration pattern identification data associated with the specified category from the pattern correspondence master; a lower item etc. acquisition means for executing a process of acquiring, from said manufacturing configuration master, lower item identification data, constituent numerators and constituent denominators, which are linked to the same upper item identification data as the top-level item identification data acquired by said planned sales quantity etc. acquisition means and which are linked to the configuration pattern identification data acquired by said configuration pattern acquisition means, and further, when said acquired lower item identification data is set as the upper item identification data of a one-level lower hierarchy in said manufacturing configuration master, said acquired lower item identification data is used as said upper item identification data, and a process similar to the process is repeated until said acquired lower item identification data is no longer set as said upper item identification data in said manufacturing configuration master; a requirement calculation means for calculating a required quantity using the planned sales quantity of the top item acquired by the planned sales quantity acquisition means and the constituent numerator and denominator acquired by the lower-level item acquisition means for the lower-level item identification data acquired first by the lower-level item acquisition means, and for calculating a required quantity using the calculated required quantity and the constituent numerator and denominator acquired by the lower-level item acquisition means for the lower-level item identification data acquired second or later by the lower-level item acquisition means; To have A required amount calculation device comprising:
2. The storage unit includes: a manufacturing instruction master including the item identification data, the configuration pattern identification data, equipment identification data for identifying equipment, and unit equipment operation time; An equipment master including the equipment identification data and a maximum equipment operation time per predetermined period; is further stored, The control unit is an equipment etc. acquisition means for acquiring, from the manufacturing instruction master, equipment identification data and unit equipment operation time linked to the top-level item identification data acquired by the planned sales quantity etc. acquisition means and the configuration pattern identification data acquired by the configuration pattern acquisition means, and further acquiring the lower level item identification data acquired by the lower level item etc. acquisition means and the equipment identification data and unit equipment operation time linked to the configuration pattern identification data acquired by the configuration pattern acquisition means; an operation time calculation means for calculating an operation time of the equipment required to manufacture the top item in the specified month at the equipment specified by the equipment identification data acquired by the equipment, etc. acquisition means, using the planned sales quantity of the top item acquired by the planned sales quantity, etc. acquisition means and the unit equipment operation time for the top item acquired by the equipment, etc. acquisition means, and further for calculating an operation time of the equipment required to manufacture the lower item in the specified month at the equipment specified by the equipment identification data acquired by the equipment, etc. acquisition means, using the requirement of the lower item calculated by the requirement calculation means and the unit equipment operation time for the lower item acquired by the equipment, etc. acquisition means; an equipment operation rate calculation means for calculating an equipment operation rate of the equipment specified by the equipment identification data by dividing a value obtained by aggregating the operation time calculated by the operation time calculation means for each of the equipment identification data by a maximum equipment operation time per predetermined period in the equipment master corresponding to the equipment identification data; Further comprising:
2. The required amount calculation device according to claim 1,
3. A required amount calculation method executed by an information processing device including a control unit and a storage unit, The storage unit includes: Sales plan data including a category, a year and a month, top-level item identification data which is item identification data for a top-level item that is a top-level item, and a planned sales quantity of the top-level item; a pattern correspondence master including the classification and configuration pattern identification data for identifying a pattern of a hierarchical structure composed of the items; a manufacturing configuration master for managing the hierarchical structure, comprising: higher-level item identification data, which is the item identification data for a higher-level item that is a higher-level item; the configuration pattern identification data; lower-level item identification data, which is the item identification data for a lower-level item that is a component of the higher-level item or is a raw material for the higher-level item; a constituent numerator; and a constituent denominator; is stored, Executed by the control unit, a step of acquiring a planned sales quantity, etc., for acquiring top-level item identification data and a planned sales quantity of the top-level item associated with a specified category and date from the sales plan data; a configuration pattern acquisition step of acquiring configuration pattern identification data associated with the specified category from the pattern correspondence master; a lower-item etc. acquisition step for executing a process of acquiring, from the manufacturing configuration master, lower-item identification data, constituent numerators, and constituent denominators that are linked to the same upper-level item identification data as the top-level item identification data acquired in the planned sales quantity etc. acquisition step and that are linked to the configuration pattern identification data acquired in the configuration pattern acquisition step, and further, if the acquired lower-item identification data is set as the upper-level item identification data of a one-level lower hierarchical level in the manufacturing configuration master, using the acquired lower-item identification data as the upper-level item identification data, and repeating a process similar to the above process until the acquired lower-item identification data is no longer set as the upper-level item identification data in the manufacturing configuration master; a requirement calculation step for calculating a required quantity using the planned sales quantity of the top item obtained in the planned sales quantity, etc. acquisition step and the constituent numerator and constituent denominator obtained in the sub-item, etc. acquisition step for the first sub-item identification data obtained in the sub-item, etc. acquisition step, and further, for the second or subsequent sub-item identification data obtained in the sub-item, etc. acquisition step, calculating a required quantity using the calculated required quantity and the constituent numerator and constituent denominator obtained in the sub-item, etc. acquisition step; containing, A method for calculating a required quantity, comprising:
4. A required amount calculation program to be executed by an information processing device including a control unit and a storage unit, The storage unit includes: Sales plan data including a category, a year and a month, top-level item identification data which is item identification data for a top-level item that is a top-level item, and a planned sales quantity of the top-level item; a pattern correspondence master including the classification and configuration pattern identification data for identifying a pattern of a hierarchical structure composed of the items; a manufacturing configuration master for managing the hierarchical structure, comprising: higher-level item identification data, which is the item identification data for a higher-level item that is a higher-level item; the configuration pattern identification data; lower-level item identification data, which is the item identification data for a lower-level item that is a component of the higher-level item or is a raw material for the higher-level item; a constituent numerator; and a constituent denominator; is stored, To cause the control unit to execute a step of acquiring a planned sales quantity, etc., for acquiring top-level item identification data and a planned sales quantity of the top-level item associated with a specified category and date from the sales plan data; a configuration pattern acquisition step of acquiring configuration pattern identification data associated with the specified category from the pattern correspondence master; a lower-item etc. acquisition step for executing a process of acquiring, from the manufacturing configuration master, lower-item identification data, constituent numerators, and constituent denominators that are linked to the same upper-level item identification data as the top-level item identification data acquired in the planned sales quantity etc. acquisition step and that are linked to the configuration pattern identification data acquired in the configuration pattern acquisition step, and further, if the acquired lower-item identification data is set as the upper-level item identification data of a one-level lower hierarchical level in the manufacturing configuration master, using the acquired lower-item identification data as the upper-level item identification data, and repeating a process similar to the above process until the acquired lower-item identification data is no longer set as the upper-level item identification data in the manufacturing configuration master; a requirement calculation step for calculating a required quantity using the planned sales quantity of the top item obtained in the planned sales quantity, etc. acquisition step and the constituent numerator and constituent denominator obtained in the sub-item, etc. acquisition step for the first sub-item identification data obtained in the sub-item, etc. acquisition step, and further, for the second or subsequent sub-item identification data obtained in the sub-item, etc. acquisition step, calculating a required quantity using the calculated required quantity and the constituent numerator and constituent denominator obtained in the sub-item, etc. acquisition step; containing, A requirement calculation program characterized by the above.
Citation Information
Patent Citations
Production management method and production management program
JP2004062674A
Cost simulation device
JP2012221020A
Information processor
JP2013206148A
Product retrieval device and program of product retrieval method
JP2014126993A