Spacer for adjusting the position of a rehabilitating pipe and a position adjustment method using the same
The spacer system with a wedge-shaped member and elastically deformable pieces addresses the positioning and filler flow issues in pipe rehabilitation, enhancing the adjustment and distribution of rehabilitated pipes within existing pipes.
Patent Information
- Application Number
- JP2021029128
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2021-02-25
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2041-02-25
AI Technical Summary
Existing pipe rehabilitation methods face challenges in adjusting the position of rehabilitated pipes due to their lower specific gravity, leading to floating issues, and insufficient filler flow into the gap between the rehabilitated and existing pipes, resulting in cavities.
A spacer system comprising a first wedge-shaped member with a guide groove and teeth, and a second wedge-shaped member with elastically deformable pieces and filler passage holes, allowing easy adjustment of the rehabilitated pipe's position and facilitating filler flow.
The spacer system enables easy release of lock engagement, allows large filler flow, and minimizes cavities, effectively positioning the rehabilitated pipe and ensuring uniform filler distribution.
Smart Images

Figure 0007577318000001 
Figure 0007577318000002 
Figure 0007577318000003
Abstract
Description
[Technical field]
[0001] The present invention relates to a position adjustment spacer that is inserted into the gap between an existing pipe and a rehabilitating pipe that repairs or rehabilitates the existing pipe, for adjusting the position of the rehabilitating pipe, and a position adjustment method using the same. [Background technology]
[0002] There is a known method of repairing or rehabilitating an existing pipe by installing a rehabilitating pipe with an outer diameter slightly smaller than the inner diameter of the existing pipe inside the existing pipe such as a sewer pipe, filling the gap between the outer periphery of the rehabilitating pipe and the inner wall surface of the existing pipe with a filler material and hardening it to construct a composite pipe. In this existing pipe rehabilitation work, it is usually necessary to adjust the position of the rehabilitating pipe in the vertical and horizontal directions within the existing pipe to a position slightly downward from a position concentric with the existing pipe, and to adjust the lower end of its outer periphery to a position that touches the bottom of the existing pipe, and then fix the rehabilitating pipe.
[0003] This is to ensure the flow of fluids in the existing pipe by lowering the bottom of the rehabilitating pipe as close as possible to the bottom of the existing pipe, and because most of the damage to the existing pipe occurs in its upper part, to make the filler thicker on the upper part to increase its strength. On the other hand, since the rehabilitating pipe is made of plastic, its specific gravity is smaller than that of the filler, and it floats on the filler, so in order to hold it down, it is necessary to adjust its position as described above.
[0004] To adjust the position of such rehabilitation pipes, a configuration is known which includes a first wedge-shaped member inclined at a predetermined angle so that the rear side in the insertion direction is higher, a second wedge-shaped member inclined at the same angle as the first wedge-shaped member and stacked on top of the first wedge-shaped member with its inclined surface aligned, and a locking means which allows the second wedge-shaped member to move in the insertion direction relative to the first wedge-shaped member but locks it so that it cannot move in the reverse direction, and which adjusts the height of the entire spacer to a predetermined height (Patent Document 1 below).
[0005] Also known is a configuration in which the second wedge-shaped member is provided with an elastically deforming piece that can release the engagement with the first wedge-shaped member, and this elastically deforming piece is elastically deformed to release the engagement between both wedge-shaped members and move the second wedge-shaped member in the direction opposite to the insertion direction (Patent Document 2 below). [Prior art documents] [Patent documents]
[0006] [Patent Document 1] JP 2005-265070 A [Patent Document 2] JP 2016-176571 A Summary of the Invention [Problem to be solved by the invention]
[0007] In the configuration described in Patent Document 2, if the height of the entire spacer is adjusted to a predetermined height and it is inconvenient, the elastic deformation piece is elastically deformed to move the second wedge-shaped member in the opposite direction, thereby readjusting the height of the entire spacer. However, when the elastic deformation piece is elastically deformed, the elastic deformation piece hits the lower surface of the second wedge-shaped member, and the amount of displacement of the elastic deformation piece is small, making it difficult to release the engagement with the first wedge-shaped member.
[0008] In addition, in order to allow the flow of the filler material filling the gap between the outer periphery of the rehabilitating pipe and the inner wall surface of the existing pipe, the spacer is formed with long holes through which the filler material can flow. However, with the conventional structure, there was a problem that the filler material did not flow sufficiently into the spacer, resulting in the formation of cavities within the spacer.
[0009] The present invention has been made to solve these problems, and its objective is to provide a spacer for adjusting the position of a rehabilitation pipe, which increases the amount of displacement of the elastic deformation piece, making it easy to release the engagement between the first and second wedge-shaped members, and which enables a large amount of filler material to be poured into the spacer, as well as a position adjustment method using the same. [Means for solving the problem]
[0010] The present invention relates to A spacer for adjusting the position of a rehabilitation pipe is inserted into a gap between an existing pipe and a rehabilitation pipe to rehabilitate the existing pipe, and adjusts the position of the rehabilitation pipe relative to the existing pipe, a first wedge-shaped member that is inclined at a predetermined angle so that the rear side in the insertion direction is higher, and that has a guide groove with teeth formed at a predetermined pitch and extending in the inclined direction; a second wedge-shaped member that is overlapped with the first wedge-shaped member with its inclined surface aligned, and that has teeth formed thereon to engage with the teeth of the guide groove so that the second wedge-shaped member can move relative to the first wedge-shaped member in an insertion direction in which the height of the entire spacer increases, but is prevented from moving in the opposite direction; The second wedge-shaped member is formed with a filler passage hole through which a filler to be injected into the gap between the existing pipe and the rehabilitating pipe passes, The portion where the teeth of the second wedge-shaped member are formed is an elastically deformable piece that can elastically deform into the filler passing hole, and when the elastically deformable piece is elastically deformed into the filler passing hole, the teeth of the second wedge-shaped member and the teeth of the guide groove are disengaged, and the second wedge-shaped member becomes movable in the direction opposite to the insertion direction. Furthermore, the present invention is characterized in that by using such a spacer, the second wedge-shaped member is moved in the insertion direction relative to the first wedge-shaped member, and also moved in the opposite direction to the insertion direction, thereby adjusting the height of the entire spacer and adjusting the position of the rehabilitated pipe relative to the existing pipe. Effect of the Invention
[0011] According to the present invention, the elastically deformable piece can be elastically deformed into the filler passing hole, so the amount of elastic deformation can be increased, and the teeth of the first and second wedge-shaped members can be easily disengaged to move the second wedge-shaped member in the opposite direction. Also, the filler passing hole into which the elastically deformable piece deforms extends across the entire width of the second wedge-shaped member, so a large amount of filler flows into the spacer, minimizing the cavities formed in the spacer. [Brief description of the drawings]
[0012] [Figure 1] FIG. 2 is a perspective view showing the structure of a segment used in assembling a rehabilitation pipe. [Diagram 2] FIG. 11 is a perspective view showing a state in which the segments are connected in the circumferential direction to form a pipe unit. [Diagram 3] FIG. 11 is an explanatory diagram showing a state in which segments of a pipe unit are connected in the pipe length direction using connecting bolts. [Figure 4] FIG. 11 is an explanatory diagram illustrating the state in which a pipe unit is assembled and a rehabilitation pipe is laid inside an existing pipe. [Diagram 5] 1 is a cross-sectional view showing the state in which a filler material is injected into the gap between the outer periphery of the laid rehabilitation pipe and the inner wall surface of the existing pipe. FIG. [Figure 6] 1 is a perspective view showing the structure of a first wedge-shaped member constituting a spacer for adjusting the position of a rehabilitation pipe. FIG. [Figure 7] 11 is a perspective view showing the lower surface side of a second wedge-shaped member constituting the spacer. FIG. [Figure 8] FIG. 11 is an explanatory diagram showing a state in which the second wedge-shaped member is superimposed on the first wedge-shaped member. [Figure 9] 10 is a cross-sectional view illustrating movement of a second wedge-shaped member relative to a first wedge-shaped member, taken at the center in the width direction of both wedge-shaped members. FIG. [Figure 10] FIG. 11 is an explanatory diagram showing a state in which the position of a rehabilitation pipe is adjusted by a spacer. [Figure 11] 11A to 11C are cross-sectional views showing a process of releasing the engagement between the teeth of the first and second wedge-shaped members. [Figure 12] 11 is a cross-sectional view showing a state in which a second wedge-shaped member is moved in a direction opposite to the insertion direction. FIG. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0013] The present invention will be described below based on the embodiments shown in the accompanying drawings. The present invention is suitable for rehabilitating or repairing large-diameter existing pipes such as sewer pipes, water pipes, tunnels, or agricultural irrigation channels. In the embodiments, the rehabilitating pipe is described as having a circular cross-sectional shape perpendicular to the pipe length direction, but the present invention can of course be applied to rehabilitating pipes of shapes other than circular, such as rectangular. Furthermore, the present invention can be applied to pipes that do not have a closed cross-sectional shape, such as a horseshoe shape, semicircular shape, or concave shape, with one side open, by regarding them as pipes.
[0014] In this specification, the pipe length direction refers to the direction indicated by the arrow X in FIG. 2 which extends in the length direction of the pipe of the pipe unit 10, and the circumferential direction refers to the circumferential direction of the circle of the pipe unit 10.
[0015] The structure of a rehabilitation pipe segment 1 (hereinafter simply referred to as a segment) is shown in Figure 1. Segment 1 is an integrally molded block-shaped member made of plastic, consisting of an inner plate 101 that forms the inner peripheral surface of the rehabilitation pipe, side plates 102 and 103 of the same thickness that are erected vertically on both sides extending in the circumferential direction of the inner plate 101, and end plates 104 and 105 that are erected vertically on both ends of the inner plate 101 that extend in the pipe length direction.
[0016] In order to reinforce the mechanical strength of the segment 1, a number of internal plates 106, 107 having the same thickness and shape as the side plates 102, 103 are erected on the inside of the side plates 102, 103 on the upper surface of the inner plate 101 at equal intervals and parallel to the side plates 102, 103.
[0017] Segment 1 is curved into a predetermined angle that divides the circumference into multiple equal parts, for example a 60-degree arc that divides the circumference into six parts, but it can also be shaped like a rectangular prism or a curved shape with rounded corners at right angles, depending on the cross-sectional shape or size of the existing pipe, or the part of the existing pipe to be repaired.
[0018] In the side plates 102 and 103, a plurality of circular insertion holes 102a and 103a are formed at equal intervals in the circumferential direction for passing connecting bolts 11 and nuts 12 (FIG. 3) therethrough to connect the segments 1 in the pipe length direction. In the inner plate 106, a plurality of circular insertion holes 106a are also formed at equal intervals for passing the connecting bolts 11 through, and in the inner plate 107, a plurality of cutouts 107a are formed at equal intervals to function as insertion holes through which the connecting bolts 11 can be inserted. The insertion holes 102a, 103a, 106a and the cutouts 107a are all in the same circumferential position.
[0019] The end plates 104, 105 are formed with a plurality of circular insertion holes 104a, 105a for passing connecting bolts such as bolts that connect the segments 1 in the circumferential direction. The end plate 105 of a segment 1 is abutted against the end plate 104 of another segment, and the bolts 6 and nuts 7 (FIG. 3) are screwed together to connect the segments in the circumferential direction.
[0020] By sequentially connecting the segments in the circumferential direction, a ring-shaped pipe unit 10 having a predetermined width D perpendicular to the pipe length direction X can be assembled as shown in Fig. 2. The outer diameter of the pipe unit 10 is slightly smaller than the inner diameter of the existing pipe to be rehabilitated. Note that Fig. 2 shows the main structural members of the segment 1, that is, the inner plate 101, side plates 102, 103, and end plates 104, 105, but the reinforcing structures such as internal plates 106, 107 are omitted to avoid complexity.
[0021] Such pipe units 10 are successively connected in the pipe length direction, as shown in Fig. 3. In Fig. 3, a plurality of metal nuts 12 are fixed to the inner plates 106 of the segments 1a, 1b, and 1c of the pipe unit by using connecting bolts 13. The length of the nuts 12 in the pipe length direction is longer than the distance between the side plate 102 and the inner plate 106, and protrudes from the side plate 102 to be equal to or greater than the thickness of the other side plate 103 of the segment. The connecting bolts 11 are cylindrical, elongated bolts having a threaded portion 11a formed at one end to screw into the nuts 12, and a head 14 with a flange 14a fixed to the other end.
[0022] When connecting a segment 1a of a pipe unit to a segment 1b of an adjacent pipe unit, the nut 12 protruding from the side plate 102 of the segment 1b is passed through the hole 103a in the side plate 103 of the segment 1a, and the side plates 103, 102 of both segments 1a, 1b are butted together.
[0023] Next, the connecting bolt 11 is passed through the insertion hole 102a of the side plate 102 of segment 1a, the insertion hole 106a of the internal plate 106, and the notch 107a of the internal plate 107, and the threaded portion 11a is screwed into the nut 12 fixed to segment 1b. This connects the connecting bolt 11 and the nut 12. Thereafter, the connecting bolt 11 is screwed into the nut 12 until the flange 14a of the head 14 is pressed against the leftmost internal plate 106 of segment 1a, and both segments 1a, 1b are bolted together to connect them in the pipe length direction.
[0024] As shown in Fig. 4, the segments 1 are carried into the existing pipe 21 through a manhole 20, and the segments 1 are successively connected in the circumferential direction to assemble the pipe unit 10. Next, the segments of the pipe unit 10 are successively connected in the pipe length direction as shown in Fig. 3, the rehabilitation pipe 40 is laid in the existing pipe 21, and the gap between the rehabilitation pipe 40 and the existing pipe 21 is filled with a filler material.
[0025] Since the laid rehabilitation pipe 40 is made of plastic material and has a low specific gravity, it floats on the filler material, so it must be pressed down and its position adjusted to a position slightly downward from its concentric position with the existing pipe 21, so that the bottom end of its outer periphery touches the bottom of the existing pipe 21. For this reason, in this embodiment, each time a predetermined length (for example, about 1 m) of rehabilitation pipe 40 is assembled by connecting a plurality of pipe units 10, spacers 50 shown in Fig. 5 are inserted between the outer periphery of the upper side of the rehabilitation pipe 40 and the inner wall surface of the existing pipe 21 at multiple points on the outer periphery to adjust the position.
[0026] The spacer 50 is constructed by stacking a first plastic wedge-shaped member 51, the upper surface of which is shown in FIG. 6, and a second plastic wedge-shaped member 52, the lower surface of which is shown in FIG.
[0027] The first wedge-shaped member 51 has an overall outer shape that is generally wedge-shaped, with the upper surface inclined at a predetermined angle (e.g., about 10 degrees) so that the back side in the insertion direction is higher, the lower surface being horizontal, and a guide groove 51a of a predetermined width is formed linearly along the inclined line direction in the center in the width direction. A large number of teeth 51b are formed in the bottom surface of the guide groove 51a in a sawtooth shape with a short, predetermined pitch of, for example, about several mm.
[0028] A number of long holes 51c (16 in the illustrated example) are formed on both sides of the guide groove 51a in the width direction for passing the filler material, and a foot 51d is formed at one end of the first wedge-shaped member 51 for engaging the first wedge member 51 with the segment 1.
[0029] The second wedge-shaped member 52, whose underside is shown in Figure 7, has an overall wedge-shaped outer shape and is the same in length and width as the first wedge-shaped member 51. When viewed in Figure 7, the upper surface is inclined at the same angle as the upper surface of the first wedge-shaped member 51, and the lower surface is horizontal when viewed in Figure 7.
[0030] A protrusion 52a that fits into guide groove 51a of first wedge-shaped member 51 is formed in the center in the width direction of second wedge-shaped member 52. One end side of protrusion 52a is thinner in the vertical direction and is configured to elastically deform downward as viewed in Fig. 7. Hereinafter, the thinned portion of protrusion 52a is referred to as elastic deformation piece 52c.
[0031] The elastically deforming piece 52c has a plurality of teeth 52b (two in the example of FIG. 7) formed at a large pitch (for example, about 10 to 20 mm) that is an integer multiple of the pitch of the teeth 51b of the first wedge-shaped member 51. As shown in FIG. 8, when the convex portion 52a of the second wedge-shaped member 52 is fitted into the guide groove 51a of the first wedge-shaped member 51 and the inclined surfaces of both wedge-shaped members 51, 52 are aligned, the teeth 52b of the elastically deforming piece 52c engage with the teeth 51b of the guide groove 51a.
[0032] In the second wedge-shaped member 52, a number of elongated holes 52d (six in the illustrated example) for passing the filler are formed on both sides of the protruding portion 52a, and a filler passing hole 52e is also formed in the elastically deforming piece 52c. The filler passing hole 52e is larger than the elongated hole 52d and extends over the entire width of the second wedge-shaped member 52, and is large enough to allow a large amount of filler to flow through. In addition, the elastically deforming piece 52c has a length that allows it to elastically deform into the filler passing hole 52e without hindrance, as described later.
[0033] As shown in Figure 8, when the inclined surfaces of the first and second wedge-shaped members 51, 52 are aligned and the convex portion 52a of the second wedge-shaped member 52 is fitted into the guide groove 51a of the first wedge-shaped member 51, the teeth 52b of the second wedge-shaped member 52 engage with one of the teeth 51b of the first wedge-shaped member 51, and the surfaces opposite the inclined surfaces of the first and second wedge-shaped members 51, 52 become parallel to each other.
[0034] 9, when second wedge-shaped member 52 is pressed in the insertion direction, one engagement end of teeth 51b, 52b forms an inclined surface, so that second wedge-shaped member 52 can be moved in the insertion direction and the overall height H of spacer 50 can be increased and adjusted to the desired height. On the other hand, when second wedge-shaped member 52 is pulled in the reverse direction, the other engagement end of teeth 51b, 52b is nearly vertical, so that the second wedge-shaped member 52 is prevented from moving in the reverse direction.
[0035] In the state shown in the upper part of Fig. 11 where the teeth 51b, 52b of the first and second wedge-shaped members 51, 52 are engaged with each other, a tool is inserted in the direction shown by the arrow. Next, the elastically deformable piece 52c is lifted with the tool, and as shown in the lower part of Fig. 11, the elastically deformable piece 52c is elastically deformed into the filler passage hole 52e, disengaging the teeth 51b, 52b. When the engagement is released, as shown in Fig. 12, it becomes possible to move the second wedge-shaped member 52 in the direction of the arrow in the figure, and it becomes possible to adjust the height of the entire spacer to be lower. The tip of the elastically deformable piece 52c has an inclined surface to make it easier to insert the tool.
[0036] When adjusting the position of the rehabilitating pipe 40 using the spacer 50 configured as described above, the first and second wedge-shaped members 51 are inserted into the gap between the existing pipe 21 and the rehabilitating pipe 40 while overlapping each other, and the leg 51d of the first wedge-shaped member 51 is engaged with the internal plate 106 of the segment 1 to fix the first wedge-shaped member 51, as shown in Figure 10. Next, by pressing and moving the second wedge-shaped member 52 in the insertion direction shown by arrow A, the height of the entire spacer can be increased in stages and adjusted to a height corresponding to the desired gap dimension.
[0037] If the overall height of the spacer is too high, the elastically deforming piece 52c can be lifted with a tool or the like to elastically deform the elastically deforming piece 52c into the filler passage hole 52e, thereby releasing the engagement between the teeth 51b, 52b, as shown in Fig. 11. This allows the second wedge-shaped member 52 to be moved in the opposite direction, as shown in Fig. 12, making it possible to adjust the overall height of the spacer so that it is lower.
[0038] In this embodiment, the portion of the second wedge-shaped member 52 where the teeth 52b are formed and engage with the teeth 51b of the first wedge-shaped member 51 is an elastically deforming piece 52c, and the elastically deforming piece 52c can be elastically deformed into the filler passing hole 52e. This increases the amount of elastic deformation of the elastically deforming piece 52c, making it possible to easily release the engagement between the teeth 51b, 52b and facilitate the movement of the second wedge-shaped member 52 in the reverse direction.
[0039] In this way, the second wedge-shaped member 52 is moved in the insertion direction or the opposite direction relative to the first wedge-shaped member 51 to adjust the position of the rehabilitating pipe 40, and then the filler 30 is filled into the gap between the inner wall surface of the existing pipe 21 and the outer periphery of the rehabilitating pipe 40, and into the space outside the inner plate 101 of the segment 1, as shown in Figure 5. The filler 30 is injected from a filling hose 41 connected to a hole 41a formed in an appropriate position of the segment 1.
[0040] The first wedge-shaped member 51 and the second wedge-shaped member 52 are each formed with an elongated hole 51c, an elongated hole 52d, etc., so that the filler 30 flows into and circulates through the spacer 50, and no cavities are formed within the spacer. Also, the filler passage hole 52e into which the elastically deforming piece 52c deforms extends across the entire width of the second wedge-shaped member 52, so that a large amount of the filler 30 flows into the spacer 50, minimizing the cavities formed within the spacer.
[0041] The pitch of the teeth 51b of the first wedge-shaped member 51 is different from the pitch of the teeth 52b of the second wedge-shaped member 52, but may be the same pitch.
[0042] Furthermore, it goes without saying that the present invention can be widely used not only for adjusting the position of a rehabilitated pipe in existing pipe rehabilitation work, but also for position adjustment performed by inserting a spacer into the gap between a fixed object and an object to be adjusted in position. [Explanation of symbols]
[0043] 1 Segment 10 Tube Unit 21 Existing pipes 40 Rehabilitation pipe 50 Spacer 51 First wedge-shaped member 51a Guide groove 51b Teeth 52 Second wedge-shaped member 52a Convex part 52b Teeth 52c Elastic deformation piece 52e Filler passage hole
Claims
1. A spacer for adjusting the position of a rehabilitation pipe is inserted into a gap between an existing pipe and a rehabilitation pipe to rehabilitate the existing pipe, and adjusts the position of the rehabilitation pipe relative to the existing pipe, a first wedge-shaped member that is inclined at a predetermined angle so that the rear side in the insertion direction is higher, and that has a guide groove with teeth formed at a predetermined pitch and extending in the inclined direction; a second wedge-shaped member that is overlapped with the first wedge-shaped member with its inclined surface aligned, and that has teeth formed thereon to engage with the teeth of the guide groove so that the second wedge-shaped member can move relative to the first wedge-shaped member in an insertion direction in which the height of the entire spacer increases, but is prevented from moving in the opposite direction; The second wedge-shaped member is formed with a filler passage hole through which a filler to be injected into the gap between the existing pipe and the rehabilitating pipe passes, A spacer for adjusting the position of a rehabilitation pipe, characterized in that the portion where the teeth of the second wedge-shaped member are formed is an elastically deformable piece that can elastically deform into the filler passing hole, and when the elastically deformable piece is elastically deformed into the filler passing hole, the teeth of the second wedge-shaped member and the teeth of the guide groove are disengaged, and the second wedge-shaped member becomes movable in the direction opposite to the insertion direction.
2. 2. The spacer for adjusting the position of a rehabilitating pipe according to claim 1, wherein the filler passage hole extends over the entire area in the width direction of the second wedge-shaped member.
3. 3. A spacer for adjusting a position of a rehabilitating pipe according to claim 1 or 2, wherein the teeth of the second wedge-shaped member and the teeth of the guide groove are formed at the same or different pitches.
4. A position adjustment method for adjusting the position of a rehabilitating pipe by inserting the rehabilitating pipe position adjustment spacer according to any one of claims 1 to 3 into a gap between an existing pipe and a rehabilitating pipe, A position adjustment method characterized by inserting the first and second wedge-shaped members, overlapping each other, into the gap between the existing pipe and the rehabilitated pipe, and then moving the second wedge-shaped member in the insertion direction relative to the first wedge-shaped member and then in the opposite direction to the insertion direction, thereby adjusting the height of the entire spacer and adjusting the position of the rehabilitated pipe relative to the existing pipe.
Citation Information
Patent Citations
Spacer for position adjustments of regenerating pipe, and method for adjusting position using the same
JP2005265070A
Position adjustment spacer for regeneration pipe and position adjustment method using spacer
JP2016176571A
Pipe regeneration method
JP2017025976A
Pipe regeneration method
JP2018109433A