Grit chamber

The settling basin design with adjustable discharge ports and supply pipes effectively addresses inefficiencies in sand removal, ensuring complete drainage and cost-effective construction in sand settling ponds.

JP7577380B2Active Publication Date: 2024-11-05AQUAINTECH CORP
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
JP2023199598
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2023-11-27
Publication Date
2024-11-05
Estimated Expiration
2038-06-06

AI Technical Summary

Technical Problem

Existing sand settling ponds face inefficiencies in flushing out accumulated sand from the bottom surface, necessitating a more effective design for efficient sand removal.

Method used

The design incorporates a settling basin with a supply pipe extending along the accumulation section, featuring discharge ports that direct fluid to flush settled sand towards a collection part, and a main pipe connected to the supply pipe, with adjustable discharge directions and cross-sectional areas to optimize sand removal.

Benefits of technology

This configuration enables efficient drainage of sand accumulated on the pond bottom, ensuring complete removal without residual sand, adaptable to various pond shapes, and cost-effective construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007577380000001
    Figure 0007577380000001
  • Figure 0007577380000002
    Figure 0007577380000002
  • Figure 0007577380000003
    Figure 0007577380000003
Patent Text Reader

Abstract

To provide a sedimentation basin where sand stacked on a bottom surface of the basin is devised so as to be efficiently flowed.SOLUTION: A sedimentation basin 2 where sand contained in received water is precipitated on a bottom surface 7 of the basin comprises: a main trough 8 which extends in a prescribed direction and where precipitated sand is collected; a supply pipe 92 extended from one end side to the other end side along an extending direction of the main trough 8 at a position separated from the main trough 8; and a discharge port 911 being arranged with a plurality of supply pipes 92 in an extending direction and discharging fluid for flowing the precipitated sand toward the main trough 8 in atmosphere. The supply pipe 92 has a connection part to a header pipe 93 supplying the fluid to the supply pipe 92 at one end side and is constituted so that a cross sectional area of an inner space partitioned by an inner wall 920 of the supply pipe 92 becomes gradually small as it moves toward the other end side from one end side.SELECTED DRAWING: Figure 14
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a settling basin in which sand contained in received water settles to the bottom of the basin. [Background technology]

[0002] Some wastewater treatment facilities are provided with a grit basin that receives wastewater such as sewage and rainwater, settles the sand contained in the wastewater into a groove or on the bottom of the pond, and then collects the sand deposited on the bottom of the pond or the groove in a sand collection pit to remove it from the wastewater. As such a grit basin, one that is equipped with a sand collection means that discharges the wastewater from the pond to expose the sand deposited on the bottom of the pond to the atmosphere, and then moves the sand toward the groove by the flow of a fluid discharged from an outlet provided near the side wall of the grit basin. In addition, a grit basin has been proposed in which a plurality of small troughs extending from the vicinity of the side wall toward the groove are provided on the bottom of the pond, the bottom of the pond is divided into a plurality of small areas divided by the small troughs, and an outlet is provided for each small area, thereby efficiently discharging the sand deposited on the bottom of the pond into the groove (see, for example, Patent Document 1, etc.). [Prior art documents] [Patent documents]

[0003] [Patent Document 1] Japanese Patent Application Publication No. 07-100306 Summary of the Invention [Problem to be solved by the invention]

[0004] Recently, there has been a demand for settling basins that have been designed to more efficiently flush away sand that has accumulated on the bottom of the basin.

[0005] In view of the above circumstances, the present invention aims to provide a settling basin that is designed to efficiently flush away sand that has accumulated on the bottom of the basin. [Means for solving the problem]

[0006] The settling basin of the present invention, which solves the above-mentioned object, receives water While the water flows in the direction from upstream to downstream In a settling basin where the sand contained in settles to the bottom of the basin, Orthogonal to the flow direction a collection section extending in the direction of the river and in which the settled sand is collected; a supply pipe extending from one end side to the other end side along the extending direction of the stacking portion at a position away from the stacking portion; A plurality of outlets arranged in the extending direction of the supply pipe for discharging a fluid into the atmosphere to cause the settled sand to flow toward the accumulation portion. And Preparation, before The supply pipe has a connection portion at one end thereof with a mother pipe that supplies the fluid to the supply pipe, and is configured such that a cross-sectional area of ​​an internal space defined by an inner wall of the supply pipe gradually decreases from the one end toward the other end. the law of nature, The supply pipes are disposed in an upstream region upstream of the accumulating portion and a downstream region downstream of the accumulating portion, and the supply pipes disposed in the upstream region are disposed in such a manner that the one end side and the other end side are inverted from the supply pipes disposed in the downstream region. It is characterized by the above. Effect of the Invention

[0007] According to the present invention, a settling basin can be provided that is designed to efficiently flush away sand that has accumulated on the bottom of the basin. [Brief description of the drawings]

[0008] [Figure 1] 1 is a schematic cross-sectional view of a wastewater treatment facility including a grit basin according to one embodiment of the present invention. [Diagram 2] FIG. 2 is a plan view of a settling basin corresponding to one embodiment of the present invention, viewed from above. [Diagram 3] 3 is a cross-sectional view of the grit chamber shown in FIG. 2 along line AA. [Figure 4] FIG. 4 is an enlarged view showing a portion B in FIG. [Diagram 5] FIG. 4(a) is a plan view showing the ridges, and FIG. 4(b) is a side view showing the ridges. [Figure 6]FIG. 1A is a cross-sectional view illustrating a state in which one pipe having a lap joint is joined to another pipe, and FIG. 1B is a cross-sectional view illustrating a state in which, by loosening the bolt, the one pipe having the lap joint can freely rotate about its axial direction relative to the other pipe. [Figure 7] (a) is a CC cross-sectional view of Figure 4, (b) is a cross-sectional view similar to (a) showing the bottom surface near the upstream end of the settling basin and the bottom surface near the sand collection pit, and (c) is a cross-sectional view similar to (a) to explain the change in discharge direction by the sand collection nozzle. [Figure 8] This is a diagram of a water supply system in a sewage treatment facility. [Figure 9] FIG. 2 is an explanatory diagram showing the water level of the grit basin and the water level sensor. [Figure 10] 8(a) is a diagram showing a first modified example of the supply pipe and the sand collecting nozzle shown in FIG. 7, and (b) is a diagram showing a second modified example of the supply pipe and the sand collecting nozzle shown in FIG. [Figure 11] FIG. 11 is a plan view of a settling basin of the second embodiment, seen from above. [Figure 12] FIG. 12 is a DD cross-sectional view of the settling basin shown in FIG. [Figure 13] FIG. 13 is a detailed view of a part E shown in FIG. [Figure 14] (a) is a plan view showing part of the supply pipe, sand collection nozzle, and mother pipe, and (b) is a view viewed from the arrow F in the direction of arrow F shown in (a) of the same figure. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0009] Hereinafter, an embodiment of the present invention will be described with reference to the drawings. A grit basin according to one embodiment of the present invention is disposed in a wastewater treatment facility, and causes sand contained in wastewater such as sewage and rainwater to settle, and then moves the settled sand to a sand collection pit to be removed from the wastewater.

[0010] FIG. 1 is a schematic cross-sectional view of a wastewater treatment facility including a grit basin according to one embodiment of the present invention.

[0011] As shown in FIG. 1, sewage treatment facility 1 has a grit basin 2, a pump well 3, and a dam device 4. Wastewater such as sewage and rainwater flows into this sewage treatment facility 1. The sewage treatment facility 1 receives sewage from the left side in FIG. 1. The received sewage flows slowly toward pump well 3 on the right side of the figure in the grit basin 2, causing the sand contained in the sewage to settle (see the straight arrow in FIG. 1). Hereinafter, the upstream side of the flow of the received sewage will be simply referred to as the upstream side, and the downstream side of the flow of the sewage will be simply referred to as the downstream side.

[0012] A dam device 4 is disposed upstream of the grit basin 2 in the wastewater treatment facility 1. The dam device 4 has an opening wall 41, an inflow gate 42, and a gate drive device 43. The downstream wall surface of the opening wall 41 defines the upstream end of the grit basin 2. An inflow port 411 is opened at the lower end of the opening wall 41. The inflow gate 42 is provided so as to be movable up and down along the upstream wall surface of the opening wall 41. When the inflow gate 42 is in the lower position shown by the solid line in FIG. 1, it blocks the inflow port 411 and blocks the inflow of wastewater upstream of the dam device 4 into the grit basin 2. When the inflow gate 42 is raised to the upper position shown by the two-dot chain line in FIG. 1, it allows the wastewater to flow into the grit basin 2. The gate drive device 43 has a drive mechanism (not shown) therein and moves the inflow gate 42 up and down in response to a command from a control device that controls the dam device 4. By this vertical movement, the inflow gate 42 is selectively placed at either the upper position or the lower position.

[0013] The settling basin 2 is equipped with a dust remover 5 located upstream, a sand collection pit 6 located midstream, and a sand lifting pump 61 that transports sand in the sand collection pit 6 to the outside of the basin. A sand lifting pipe 64 is connected to the sand lifting pump 61. The sand sucked up by the sand lifting pump 61 is sent through the sand lifting pipe 64 to a sand separator (not shown) located outside the settling basin 2. The dust remover 5 is used to remove contaminants (seed residue) mixed in with the wastewater that flows into the settling basin 2. The configuration of the settling basin 2 will be described in detail later.

[0014] A pump well 3 is formed downstream of the grit basin 2 in the sewage treatment facility 1. The pump well 3 stores sewage from which sand has been removed by the grit basin 2. The bottom of the pump well 3 is the deepest part of the sewage treatment facility 1. A lifting pump 31 and a feed pump 33 are arranged in the pump well 3. The lifting pump 31 moves the sewage stored in the pump well 3 to the outside of the sewage treatment facility 1. A lifting pipe 32 is connected to the lifting pump 31. The sewage sucked by the lifting pump 31 is sent through this lifting pipe 32 to a sedimentation tank (not shown) that performs the next stage of sewage treatment. The feed pump 33 is arranged closer to the bottom of the pump well than the lifting pump 31. A feed pipe 34 is connected to the feed pump 33. The sewage sucked by the feed pump 33 is sent through this feed pipe 34 to each nozzle (described later). The wastewater sucked by the water supply pump 33 is referred to as a fluid in the following description.

[0015] Fig. 2 is a plan view of a grit basin corresponding to one embodiment of the present invention, seen from above. In Fig. 2, the dust collector is indicated by a two-dot chain line rectangle. The flow direction of the wastewater is indicated by a straight arrow.

[0016] As shown in FIG. 2, the settling basin 2 is a generally rectangular basin in plan view, and includes a dust remover 5, a sand collection pit 6, a pond bottom surface 7, a main trough 8, and a sand collection means 9 between a left side wall Wa and a right side wall Wb. The main trough 8 in this embodiment corresponds to an example of an accumulation section. Hereinafter, the left side wall Wa and the right side wall Wb may be collectively referred to as a side wall W. A support wall 10 for supporting the dust remover 5 is provided in the center of the pond width direction on the upstream side of the settling basin 2. The sand collection pit 6, the pond bottom surface 7, and the main trough 8 are each provided in the pond bottom of the settling basin 2. This settling basin 2 is a so-called low-pressure sand collection type settling basin in which sand that has settled on the pond bottom surface 7 is collected by discharging low-pressure water of less than 3 kg / cm2 to the pond bottom surface 7 while draining wastewater from the settling basin 2. Hereinafter, the long side direction of the settling basin 2 is referred to as the longitudinal direction, and the short side direction is referred to as the pond width direction. In this embodiment, the longitudinal direction is a direction perpendicular to the width direction of the settling basin.

[0017] A building, piping, etc. (not shown) may be arranged above the settling basin 2 (the front side of the paper in FIG. 2). A pillar 11 may be formed adjacent to the settling basin 2 in order to support the building, etc. In the settling basin 2 shown in FIG. 2, the pillar 11 is formed near the left side wall Wa. A protruding wall portion Wa1 protruding toward the center in the width direction of the pond is formed in the part of the left side wall Wa that serves as the base of the pillar 11. Conversely, it can be said that a recessed wall portion Wa2 recessed toward the outside in the width direction of the pond is formed in the part of the left side wall Wa where the pillar 11 does not exist. In addition, a sloping wall portion Wa3 inclined with respect to the longitudinal direction and the width direction of the pond is formed in the part connecting the protruding wall portion Wa1 and the recessed wall portion Wa2. Since there is no pillar near the right side wall Wb, the right side wall Wb is formed in a substantially straight line in a plan view.

[0018] The sand collection pit 6 is located slightly downstream of the center of the longitudinal direction of the settling basin 2. The sand collection pit 6 is formed by a recess formed between the left side wall Wa and the right side wall Wb of the settling basin 2. Inside the sand collection pit 6, a sand lifting pump 61, an agitation nozzle 62, and a sand collection nozzle for the pit 63 are arranged. The central part of the sand collection pit 6 in the width direction of the pond is the deepest part 6a, which is the deepest part in the settling basin 2. This deepest part 6a has a rectangular shape in a plan view. The sand lifting pump 61 is arranged in this deepest part 6a. The bottom of the sand collection pit 6, between the side wall W and the deepest part 6a, is an inclined surface 6b that gradually becomes deeper toward the deepest part 6a in the central part in the width direction of the pond.

[0019] A total of four stirring nozzles 62 are disposed near each corner of the deepest part 6a. The stirring nozzles 62 are for stirring the sand collected in the deepest part 6a. By discharging a fluid from the discharge port 62a of the stirring nozzle 62 while the sand lifting pump 61 is driven, the efficiency of the sand collected in the deepest part 6a by the sand lifting pump 61 can be improved. Two sand collection nozzles 63 for the pit are disposed at each end in the width direction of the pond. By discharging a fluid from the discharge port 63a of the sand collection nozzle 63 for the pit with the water level of the grit basin 2 lower than a predetermined value, the sand accumulated on the inclined surface 6b can be collected in the deepest part 6a.

[0020] The pond bottom surface 7 is connected to the main trough 8 at the center of the settling basin 2 in the pond width direction. The pond bottom surface 7 is inclined downward from the side wall W at the outer end of the pond width direction toward the center of the pond width direction by about 5 degrees so that the end of the main trough 8 side is the deepest. The pond bottom surface 7 is also inclined downward by about 1 degree in the longitudinal direction toward the sand collection pit 6 so that the end of the sand collection pit 6 side is the deepest. A protrusion 72 is installed on the pond bottom surface 7. The protrusion 72 is a long member that extends in the pond width direction from the vicinity of the side wall W. A plurality of protrusions 72 are arranged at equal intervals in the longitudinal direction. In this embodiment, 28 protrusions 72 are arranged on each side of the settling basin 2 across the main trough 8, for a total of 56 protrusions 72. The shape and installation structure of the protrusions 72 will be described in detail later.

[0021] The main trough 8 is composed of an upstream main trough 81 that extends longitudinally from near the upstream end of the settling basin 2 and is connected to the sand collection pit 6, and a downstream main trough 82 that extends longitudinally from near the downstream end of the settling basin 2 and is connected to the sand collection pit 6. The upstream main trough 81 and the downstream main trough 82 are grooves formed by a trough former that is a stainless steel plate with a U-shaped cross section. The upstream main trough 81 and the downstream main trough 82 are inclined downward by about 1 degree toward the sand collection pit 6, similar to the pond bottom surface 7, and the part connected to the sand collection pit 6 is the deepest.

[0022] As shown in FIG. 2, the upstream main trough 81 has an upstream branch portion 811 that branches into two and a downstream straight portion 812, and is formed into a Y-shape in plan view as a whole. The branch portions 811 extend in the longitudinal direction, sandwiching the support wall 10. The straight portion 812 extends in the longitudinal direction at the center in the width direction of the pond. The downstream end of the upstream main trough 81 is connected to the deepest portion 6a of the sand collection pit 6. An upstream trough nozzle 83 is provided at each of the upstream ends of the two branch portions 811. With the water level of the grit basin 2 lowered below a predetermined value, the sand accumulated in the upstream main trough 81 can be moved to the sand collection pit 6 by discharging a fluid from the discharge port 83a of the upstream trough nozzle 83.

[0023] The downstream main trough 82 extends linearly in the longitudinal direction at the center in the width direction of the settling basin 2. The upstream end of the downstream main trough 82 is connected to the deepest part 6a of the sand collection pit 6. A downstream trough nozzle 84 is provided at the downstream end of the downstream main trough 82. With the water level of the settling basin 2 kept lower than a predetermined value, a fluid is discharged from the discharge port 84a of the downstream trough nozzle 84, thereby moving the sand accumulated in the downstream main trough 82 to the sand collection pit 6.

[0024] As shown in FIG. 2, two dust removers 5 are provided in the upstream portion of the grit basin 2, side by side in the width direction of the basin with a support wall 10 therebetween. These two dust removers 5, 5 have the same configuration. The dust removers 5 are for removing contaminants (screen residue) mixed in the wastewater flowing into the grit basin 2. One dust remover 5 shown in the upper part of FIG. 2 is supported by the left side wall Wa and the support wall 10, and the other dust remover 5 shown in the lower part of FIG. 2 is supported by the right side wall Wb and the support wall 10. By arranging the two dust removers 5, 5 side by side in the width direction of the basin, the width of each dust remover 5 in the width direction of the basin can be shortened. By shortening the width of the dust remover 5 in the width direction of the basin, the strength of the dust remover 5 is increased, and even if the amount and flow rate of wastewater flowing into the grit basin 2 increases due to heavy rain, the dust remover 5 can be prevented from being damaged.

[0025] Figure 3 is a cross-sectional view taken along line AA of the settling basin shown in Figure 2. The columns and sand-lifting pump are omitted from Figure 3. The direction of sewage flow is indicated by a straight arrow. The water level WL of the settling basin fluctuates depending on the amount of rain and sewage flowing in, but during normal times when the amount of rain and sewage is expected, it is located at a mid-height in the height direction of the settling basin 2 as shown in Figure 3.

[0026] As shown in FIG. 3, the dust collector 5 has an endless chain 51, a plurality of rakes 52 attached to the endless chain 51 at intervals, and a filter screen 53. The endless chain 51 is provided in an upright state at an angle on both sides of the width of the grit basin 2, and is wound around a ground-side sprocket 511 and a pond-bottom-side sprocket 512. The upper part of the endless chain 51 and the ground-side sprocket 511 are disposed on the ground portion of the grit basin 2. When the water surface WL is in a normal state, if the ground-side sprocket 511 is driven in the rotation direction indicated by the arc-shaped arrow R by a motor (not shown), the endless chain 51 circulates and the rake 52 moves in and out of the water. FIG. 3 shows the water surface WL in a normal state. The filter screen 53 is disposed downstream of the endless chain 51. The filter screen 53 is a bar that extends vertically and is arranged at a predetermined interval (for example, 25 mm to 75 mm) in the width direction of the pond, and blocks the passage of contaminants larger than the predetermined interval. The contaminants blocked by the filter screen 53 are scooped up by the rake 52, and the scooped up contaminants are placed on a conveying means such as a belt conveyor (not shown) on the ground side. The bottom sprocket 512 and the lower end of the filter screen 53 are located upstream of the bottom surface 7 and the main trough 8. On the other hand, the upper ends of the ground sprocket 511 and the filter screen 53 are located above the upstream parts of the bottom surface 7 and the main trough 8. That is, the upper parts of the endless chain 51 and the filter screen 53 overlap with the bottom surface 7 and the main trough 8 in the longitudinal direction. By arranging the dust collector 5 so that a part of the dust collector 5 overlaps with the bottom surface 7 and the main trough 8 in the longitudinal direction, the longitudinal length of the grit basin 2 can be shortened.

[0027] The sand collecting means 9 includes a first nozzle header 9a, a second nozzle header 9b, and a third nozzle header 9c arranged on the left side wall Wa side of the settling basin 2, and a fourth nozzle header 9d, a fifth nozzle header 9e, and a sixth nozzle header 9f arranged on the right side wall Wb side (see FIG. 2). FIG. 3 shows the sand collecting means 9 on the left side wall Wa side. The sand collecting means 9 on the right side wall Wb side has the same configuration, so the description of the sand collecting means 9 on the right side wall Wb side is omitted. Each of the first nozzle header 9a, the second nozzle header 9b, and the third nozzle header 9c includes ten sand collecting nozzles 91, a supply pipe 92, and a main pipe 93. The supply pipe 92 is arranged opposite the left side wall Wa and extends in the longitudinal direction. The main pipe 93 includes a single pipe 931 extending above the settling basin 2, and a branch pipe 932 connected to the end of the single pipe 931 on the bottom side of the basin. The single pipe 931 and the branch pipe 932 are fixed to the left side wall Wa by fixing metal fittings (not shown).

[0028] Figure 4 is an enlarged view of part B in Figure 3. In Figure 4, the flow direction of the wastewater is indicated by a straight arrow. A side wall is also shown in Figure 4. Also, Figure 4 shows one of the six nozzle headers, but the other five nozzle headers have the same configuration as the nozzle header shown in Figure 4.

[0029] As shown in FIG. 4, the branch pipe 932 is connected to the single pipe 931 by a flange joint 933. The branch pipe 932 branches into two at the lower side of the part connected to the single pipe 931, and the branched parts extend in the longitudinal direction of the grit basin 2. The supply pipes 92 to which the lap joints 934 are fixed are connected to the tip parts of the branched parts. In this embodiment, three supply pipes 92 are provided for one mother pipe 93: an upstream supply pipe 921 arranged upstream of the branch pipe 932, a downstream supply pipe 923 arranged downstream of the branch pipe 932, and an intermediate supply pipe 922 arranged between the upstream supply pipe 921 and the downstream supply pipe 923. The other end of the upstream supply pipe 921 and the downstream supply pipe 923, opposite to the one end connected to the branch pipe 932, is closed by a lid 97. Both ends of the intermediate supply pipe 922 are connected to the branch pipe 932.

[0030] Three sand collection nozzles 91 are fixed at equal intervals to each of the upstream supply pipe 921 and the downstream supply pipe 923. Four sand collection nozzles 91 are fixed at equal intervals to the intermediate supply pipe 922. The total of ten sand collection nozzles 91 are all arranged at equal intervals. The interval between the most downstream sand collection nozzle 91 of the first nozzle header 9a (see FIG. 3) and the most upstream sand collection nozzle 91 of the second nozzle header 9b is also the same as the interval between the ten sand collection nozzles. That is, the sand collection nozzles 91 are all arranged at equal intervals in the longitudinal direction of the grit basin 2. The number of sand collection nozzles 91 arranged in each supply pipe 92 may be appropriately determined depending on factors such as the length of the supply pipe 92. A discharge port 911 is formed at the tip of each sand collection nozzle 91. By lowering the water level of the settling basin 2 below a predetermined value and exposing the sand accumulated on the discharge port 911 and the pond bottom 7 to the atmosphere, a fluid is discharged into the atmosphere from the discharge port 911 of the sand collection nozzle 91, and the sand accumulated on the pond bottom 7 can be collected in the main trough 8.

[0031] The distance from the supply pipe 92 to the left side wall Wa is different between the portion facing the protruding wall Wa1 and the portion facing the recessed wall Wa2. That is, the supply pipe 92 has a first region 92a extending from the left side wall Wa in the pond width direction at a first interval, and a second region 92b extending from the left side wall Wa in the pond width direction at a second interval. In addition, in the settling basin 2 of this embodiment, an inclined wall Wa3 is formed in the portion connecting the protruding wall Wa1 and the recessed wall Wa2, so that the supply pipe 92 has a third region 92c which is a region connecting the first region and the second region. Each sand collecting nozzle 91 and its discharge port 911 are arranged opposite the left side wall Wa and are fixed to the supply pipe 92 in a line in the longitudinal direction. In the second nozzle header 9b shown in FIG. 4, the upstream supply pipe 921 is arranged opposite the protruding wall Wa1. That is, the region where the upstream supply pipe 921 is located corresponds to the first region 92a. On the other hand, the region of the intermediate supply pipe 922 where the outlet 911 located in the part closest to the upstream supply pipe 921 is arranged is arranged facing the inclined wall portion Wa3. That is, this region corresponds to the third region 92c. Also, the region of the intermediate supply pipe 922 where three outlets 911 are arranged from the downstream supply pipe 923 side, and the region of the downstream supply pipe 923 where two outlets 911 are arranged from the intermediate supply pipe 922 side are arranged facing the recessed wall portion Wa2. That is, these regions correspond to the second region 92b. Also, the region of the downstream supply pipe 923 where the outlet 911 located in the most downstream side is arranged is arranged facing the inclined wall portion Wa3. That is, this region corresponds to the third region 92c. Between these respective regions, a direction change means using a lap joint 934 is provided.

[0032] The entire surface of the bottom surface 7 of the pond is made of a resin plate 73 of ultra-high molecular weight polyethylene having a thickness of 10 mm. The ultra-high molecular weight polyethylene constituting the resin plate 73 is Himolar manufactured by SKS Engineering Co., Ltd. However, instead of the ultra-high molecular weight polyethylene, for example, Delrin (registered trademark) of polyacetal resin or Teflon (registered trademark) of fluorine-based resin may be used. By forming the bottom surface 7 of the pond with the resin plate 73, the smoothness of the bottom surface 7 of the pond is increased and the friction coefficient with respect to sand is reduced compared to when the bottom surface 7 of the pond is formed with concrete, so that the sand accumulated on the bottom surface 7 of the pond can be easily washed away. However, the bottom surface 7 of the pond may be formed with concrete without providing the resin plate 73. By forming the bottom surface of the pond with concrete, the cost of the resin plate 73 can be reduced. A plurality of ridges 72 are arranged on the resin plate 73. The ridges 72 extend from between the discharge ports 911 in a direction toward the main trough 8. That is, the outer end of the protrusion 72 in the pond width direction is located near the side wall W (see FIG. 2), and the central end of the protrusion 72 in the pond width direction reaches just above the edge of the U-shaped trough forming body that constitutes the main trough 8. Since the upper surface of the resin plate 73 is covered by the protrusion 72 in the portion where the protrusion 72 is formed, the resin plate 73 in the portion where the protrusion 72 is formed may be omitted. That is, it is sufficient for the resin plate 73 to cover the space between adjacent protrusions 72.

[0033] As shown in FIG. 4, the ribs 72 are provided between adjacent outlets 911. As described above, the ribs 72 are arranged at equal intervals in the longitudinal direction, and the pond bottom surface 7 is exposed between adjacent ribs 72. The ribs 72 can prevent the fluid discharged from each outlet 911 into the atmosphere from spreading beyond the ribs 72 in the longitudinal direction. That is, the adjacent ribs 72 separate the pond bottom surface 7 into a plurality of flow-down regions that are the flow-down ranges of the fluid discharged from each outlet 911. The flow-down regions correspond to an example of a small area. The ribs 72 are arranged at equal intervals, and therefore these flow-down regions are formed to have approximately the same area.

[0034] Fig. 5(a) is a plan view showing the ridges, and Fig. 5(b) is a side view showing the ridges. Fig. 5(b) also shows a resin plate. When installed in the settling basin, the ridges are slightly inclined in both the basin width and length directions, but Fig. 5 shows them in an uninclined state. When the ridges are installed in the settling basin, the basin width direction in Fig. 5(a) is roughly the up-down direction. Similarly, in Fig. 5(b), the basin width direction is roughly perpendicular to the paper.

[0035] As shown in FIG. 5(a) and FIG. 5(b), the protrusion 72 has an attachment portion 721, a protruding portion 722 protruding upward from one end of the attachment portion 721, and a round bar 723 disposed at the upper end of the protruding portion 722, and is configured as a long member having an L-shaped cross section as a whole. The lower surface of the attachment portion 721 becomes the attachment surface to the resin plate 73. The attachment portion 721 and the protruding portion 722 are formed by bending a stainless steel plate having a thickness of 4 mm. The round bar 723 is a stainless steel bar having a diameter of 10 mm welded to the protruding end of the protruding portion 722. By providing this round bar 723, it is possible to prevent a worker from cutting his / her hands or the like at the protruding end of the protruding portion 722 during maintenance of the settling basin 2. The height of the protrusion 72, that is, the distance from the lower surface of the attachment portion 721 to the upper end of the round bar, is 200 mm. However, the height of the protrusion 72 may be different as long as it is 100 mm or more and 200 mm or less. If the height is less than 100 mm, the fluid discharged from each outlet 911 (see FIG. 4) is more likely to climb over the protrusions 72 together with the sand when it reaches the sand and move to the next downstream area. On the other hand, if the protrusions 72 are made too high, there is a risk that the flow of wastewater toward the downstream direction is obstructed, making it difficult for the wastewater to flow downstream. Furthermore, the higher the protrusion height, the larger the moment applied to the protrusions 72 becomes, making the protrusions 72 more likely to collapse, and the material cost becomes expensive. Even if the protrusions 72 are made higher than 200 mm, the function of suppressing the movement of fluid and sand to the next downstream area is almost the same as when the protrusions 72 are 200 mm, so it is desirable to make the protrusions 200 mm or less in height. A through hole 721a is formed near the end of the mounting portion 721 in the pond width direction, penetrating the mounting portion 721 in the vertical direction. In addition, a through hole is formed in a portion of the mounting portion 721 at the center position in the pond width direction, which is omitted in the drawing. With the ridges 72 installed on the pond bottom surface 7, a plate through-hole 73a is formed in the resin plate 73 at a position facing the through-hole 721a. By inserting a chemical anchor (registered trademark) (not shown) through the through-hole 721a and the plate through-hole 73a from above the mounting portion 721 to the concrete below the resin plate 73, the ridges 72 and the resin plate 73 are fixed to the concrete below.The ribs 72 and the resin plate 73 may be fixed to the concrete below with fixing members other than chemical anchors, such as adhesives or bolts. The ribs 72 and the resin plate 73 may be fixed using different fixing means. When multiple ribs 72 are installed on the pond bottom 7, each rib 72 protrudes upward from the pond bottom 7, thereby forming the above-mentioned multiple flow-down areas on the pond bottom 7.

[0036] Fig. 6(a) is a cross-sectional view illustrating a state in which one pipe provided with a lap joint is joined to another pipe, and Fig. 6(b) is a cross-sectional view illustrating a state in which one pipe provided with a lap joint can rotate freely about its axial direction relative to the other pipe by loosening a bolt. In Fig. 6, a supply pipe is shown as one pipe and a branch pipe is shown as the other pipe, but the same configuration applies when supply pipes are connected together with a lap joint.

[0037] As shown in FIG. 6(a) and FIG. 6(b), a lap joint 934 is welded to the end of the supply pipe 92. The lap joint 934 is composed of a small diameter portion 934a welded to the supply pipe 92 and a large diameter portion 934b disposed on the branch pipe 932 side. The small diameter portion 934a has an outer diameter equal to that of the supply pipe 92. A free flange 935 is disposed on the outer periphery of the lap joint 934. The free flange 935 is ring-shaped with an inner diameter slightly larger than the outer diameter of the lap joint 934. The free flange 935 has eight free flange through holes 935a evenly spaced in the circumferential direction, into which the bolts 95 are inserted. The free flange 935 is connected to the lap joint 934 so as to be rotatable relative to the lap joint 934 and movable in the axial direction. A fixed flange 9322 is welded to the outer diameter portion of the tip of the branch pipe 932. The fixed flange 9322 is formed with eight fixed flange through holes 9322a into which bolts 95 are inserted, similar to the free flange 935. A ring-shaped packing 94 is disposed between the lap joint 934 and the fixed flange 9322. This packing 94 is intended to prevent leakage of fluid passing through the supply pipe 92 and the branch pipe 932 when the supply pipe 92 and the branch pipe 932 are joined.

[0038] The bolt 95 is inserted into the fixed flange through hole 9322a of the fixed flange 9322 and the free flange through hole 935a of the free flange 935. When the bolt 95 and the nut 96 are fastened, the lap joint 934 is sandwiched between the fixed flange 9322 and the free flange 935 together with the packing 94, as in the supply pipe 92 shown in FIG. 6(a), so that the supply pipe 92 is fixed to the branch pipe 932. On the other hand, when the bolt 95 is loosened, the supply pipe 92 becomes rotatable about its axial direction relative to the branch pipe 932, as in the supply pipe 92 shown in FIG. 6(b). That is, in this embodiment, the mother pipe 93 (see FIG. 3) and the supply pipe 92 are connected to each other using the lap joint 934 and the free flange 935, so that the supply pipe 92 is configured to be steplessly rotatable about its axial direction relative to the mother pipe 93. Incidentally, even if other loose-fitting flanges such as loose flanges are used instead of the lap joint 934, the supply pipe 92 can be connected to the mother pipe 93 so as to be capable of rotating in a stepless manner.

[0039] As shown in FIG. 4, a lap joint 934 is disposed between the outlet 911 disposed in the first region 92a and the outlet 911 disposed in the third region 92c, and between the outlet 911 disposed in the second region 92b and the outlet 911 disposed in the third region 92c. Therefore, the outlets 911 disposed in the first region 92a, the second region 92b, and the third region 92c are configured to be able to rotate steplessly around the axial direction of the supply pipe 92 independently of each other. With this configuration, the discharge direction of the fluid from the outlet 911 in each region can be set according to the distance from the supply pipe 92 to the left side wall Wa. The lap joint 934 disposed between the outlet 911 disposed in the first region 92a and the outlet 911 disposed in the third region 92c corresponds to an example of a first direction changing means. The lap joint 934 disposed between the outlet 911 disposed in the second region 92b and the outlet 911 disposed in the third region 92c corresponds to an example of a second direction changing means. In addition, in the first region 92a of the supply pipe 92 shown in FIG. 4, the discharge direction of the fluid from the three discharge ports 911 arranged in the first region 92a can be changed collectively, so that the discharge direction in the first region 92a can be easily adjusted. In the second region 92b of the supply pipe 92 shown in FIG. 4, the three discharge ports 911 arranged in the intermediate supply pipe 922 can be changed collectively, and the two discharge ports 911 arranged in the downstream supply pipe 923 can be changed collectively, so that the discharge direction in the second region 92b can be easily adjusted. That is, the lap joint 934 in the case where the discharge directions of the multiple discharge ports 911 can be changed collectively corresponds to an example of a collective direction changing means. Note that, when the longitudinal direction of the third region 92c is short and no discharge port 911 exists in the third region 92c, or when the third region 92c does not exist, the lap joint 934 may be disposed between the first region 92a and the second region 92b.

[0040] Fig. 7(a) is a cross-sectional view taken along line CC of Fig. 4. In Fig. 7(a), the side walls, the bottom surface of the pond, and the ridges are also shown.

[0041] As described above, the left side wall Wa has a protruding wall portion Wa1 and a recessed wall portion Wa2. In FIG. 7(a), the protruding wall portion Wa1 is shown by a solid line, and the recessed wall portion Wa2 is shown by a two-dot chain line. In the discharge port 911 shown by a solid line in FIG. 7(a), the discharge direction of the fluid is directed toward the center of the pond width direction rather than the direction (vertical direction) directly downward from the center of the supply pipe 92. In this discharge port 911, the angle θ at which the fluid is discharged with respect to the pond bottom surface 7 is set to about 50 degrees. By setting the angle θ to about 50 degrees, the fluid that has reached the pond bottom surface 7 can be divided into a direction toward the main trough 8 and a direction toward the protruding wall portion Wa1. This angle θ may be any angle at which the discharged fluid is divided into a direction toward the main trough 8 and a direction toward the protruding wall portion Wa1, and specifically, may be any angle between 30 degrees and 60 degrees with respect to the pond bottom surface 7. By setting this angle, when the supply pipe 92 and the left side wall Wa are close to each other as in the protruding wall portion Wa1, i.e., in the first region 92a, the diverted fluid reaches the sand accumulated on the pond bottom surface 7 between the supply pipe 92 and the left side wall Wa, and can wash away the sand. Also, since the discharge direction of the fluid is directed toward the main trough 8 side in the center of the pond width direction rather than the vertical direction of the supply pipe 92, the momentum of the fluid flowing toward the main trough 8 side is stronger than the momentum of the fluid flowing toward the left side wall Wa side. This momentum of the fluid allows the sand accumulated on the pond bottom surface 7 between the supply pipe 92 and the main trough 8 to flow efficiently toward the main trough 8.

[0042] 7(a), the supply pipe 92 is spaced from the left side wall Wa. Therefore, in the discharge direction of the discharge port 911 shown by the solid line, even if the discharged fluid is diverted, it does not reach the vicinity of the recess wall Wa2, or even if it does, only a very small amount of fluid reaches it. If the amount of fluid that reaches the vicinity of the recess wall Wa2 is small, the sand that is accumulated between the supply pipe 92 and the recess wall Wa2 and that is near the recess wall Wa2 cannot be sufficiently washed away.

[0043] In this embodiment, the supply pipe 92 is configured to be rotatable about its axis, so that the discharge direction of the fluid from the sand collection nozzle 91 can be freely changed. In FIG. 7(a), the sand collection nozzle 91 in which the discharge direction of the fluid discharged from the discharge port 911 is adjusted according to the position of the recessed wall portion Wa2 is shown by a two-dot chain line. In the sand collection nozzle 91 shown by the two-dot chain line, the discharge direction of the fluid discharged from the discharge port 911 is directed outward in the pond width direction rather than the direction (vertical direction) directly downward from the center of the supply pipe 92. By adjusting the discharge direction of the fluid discharged from the discharge port 911 according to the distance from the supply pipe 92 to the left side wall Wa, even if the supply pipe 92 and the left side wall Wa are separated as in the second region 92b, the sand accumulated near the left side wall Wa can be sufficiently washed away. In this embodiment, the mother pipe 93 and the supply pipe 92 or the supply pipes 92 themselves are connected using a lap joint 934 and a free flange 935, so that the connected supply pipe 92 can be rotated steplessly about its axis. Since it can be rotated steplessly, in the supply pipe 92 (third region 92c) located opposite the inclined wall portion Wa3 (see FIG. 2) between the protruding wall portion Wa1 and the recessed wall portion Wa2, the discharge direction of the fluid can be set to a direction intermediate between the discharge direction of the sand collecting nozzle 91 shown by the solid line in FIG. 7(a) and the discharge direction of the sand collecting nozzle 91 shown by the two-dot chain line.

[0044] In this embodiment, the parent pipe 93 is provided with a branch pipe 932, so that a total of three supply pipes 92, including the upstream supply pipe 921, the intermediate supply pipe 922, and the downstream supply pipe 923, are connected to one parent pipe 93 in line in the longitudinal direction of the grit basin 2. In contrast, if there is no branch pipe 932 and the supply pipe 92 is connected to the single pipe 931, at most two supply pipes 92 can be connected to one parent pipe 93 in the longitudinal direction of the grit basin 2. That is, there are two supply pipes 92, one extending from the tip of the parent pipe 93 to the upstream side of the grit basin 2 and the other extending to the downstream side. The discharge direction of the fluid discharged from the discharge port 911 can be set for each supply pipe 92. Therefore, compared to the case where there is no branch pipe 932, when the branch pipe 932 is provided, the discharge direction of the fluid discharged from the discharge port 911 can be adjusted at many points in the longitudinal direction of the grit basin 2, so that it is possible to more flexibly respond to the shape of the side wall W.

[0045] As shown in FIG. 7(a), the end of the protrusion 72 on the outer side in the width direction of the pond is located close to the side wall W. That is, there is a small gap between the protrusion 72 and the side wall W. Without this gap, the flow of the fluid discharged from the discharge port 911 weakens near the corner formed by the protrusion 72 and the side wall W, and the sand accumulated near the corner cannot be washed away. In this embodiment, since there is a gap between the protrusion 72 and the side wall W, a small part of the fluid discharged from the discharge port 911 can move from the gap to the adjacent flow-down area, and during this movement, the sand accumulated near the corner can be washed away to the adjacent flow-down area. Note that the gap from the side wall W to the end of the protrusion 72 may be widened to some extent. However, if the gap between the side wall W and the protrusion 72 is made too large, the fluid discharged from each discharge port 911 will easily move to the adjacent flow-down area, which may cause a large variation in the amount of fluid flowing down from each flow-down area, so it is desirable to set the gap to a certain value or less.

[0046] Figure 7(b) is a cross-sectional view similar to Figure 7(a), showing the bottom surface near the upstream end of the settling basin and the bottom surface near the sand collection pit. The side walls and the bottom surface of the basin are also shown. The resin plate is omitted in Figure 7(b).

[0047] As described above, the pond bottom surface 7 is inclined downward by about 1 degree toward the sand collection pit 6 side so that the end on the sand collection pit 6 side is the deepest (see FIG. 3). Therefore, the pond bottom surface 7 is located at a lower position near the sand collection pit 6 than near the upstream end of the settling basin 2. In FIG. 7(b), the pond bottom surface 7 near the upstream end of the settling basin 2 is shown by a solid line, and the pond bottom surface 7 near the sand collection pit 6 is shown by a two-dot chain line. As shown in the figure, even if a fluid is discharged from the discharge port 911 at the same position, the positions of the pond bottom surface 7 in the height direction are different between the upstream end of the settling basin 2 and near the sand collection pit 6, so that a difference in distance Y occurs in the point where the discharged fluid reaches the pond bottom surface 7. In particular, in the settling basin 2 having a long longitudinal length, the distance Y becomes long, and even if the discharge direction is optimal for one of the upstream end of the settling basin 2 and the vicinity of the sand collection pit 6, it may be an inefficient discharge direction for the other. In this embodiment, the direction in which the fluid is discharged from the discharge port 911 can be changed, so that the fluid can be discharged in the optimal direction corresponding to the depth of the pond bottom 7 (the height from the supply pipe 92 to the pond bottom 7).

[0048] Fig. 7(c) is a cross-sectional view similar to Fig. 6(a) for explaining the change in discharge direction by the sand collecting nozzle. Fig. 7(c) also shows the side wall and the bottom surface of the pond. In Fig. 7(c), the resin plate is omitted.

[0049] As shown in FIG. 6(c), the sand collection nozzle 91 is bent at the middle and is formed in an inverted L-shape when viewed in the longitudinal direction as shown by the solid line. Since the sand collection nozzle 91 shown in the solid line is formed in an inverted L-shape, when the sand collection nozzle 91 shown in the solid line is rotated 180 degrees around the axis L of the attachment part with the supply pipe 92, the discharge direction of the fluid can be changed from the center side in the pond width direction to the outside in the pond width direction as shown by the two-dot chain line. By forming the sand collection nozzle 91 in an inverted L-shape and configuring the connection part between the sand collection nozzle 91 and the supply pipe 92 to be rotatable, it is possible to change the discharge direction of the fluid for each discharge port 911. That is, the shape of the sand collection nozzle 91 in this embodiment and the configuration in which the sand collection nozzle 91 can rotate with respect to the supply pipe 92 correspond to an example of an individual direction changing means.

[0050] Figure 8 is a diagram of the water supply system in a sewage treatment facility.

[0051] As shown in FIG. 8, the water supply pump 33 selectively supplies water from the pump well 3 to the stirring nozzle 62, the sand collection nozzle for pit 63, the nozzle for upstream trough 83, the nozzle for downstream trough 84, and the sand collection means 9. The water supply pipe 34 connected to the water supply pump 33 is provided with a supply switching valve Va for switching whether or not to supply fluid to each of the nozzles and the sand collection means 9, and a release switching valve Vb for switching whether or not to return the fluid sucked up by the water supply pump to the pump well 3. The pipeline between the supply switching valve Va and the stirring nozzle 62 is provided with a stirring switching valve Vc for switching whether or not to supply fluid to the stirring nozzle 62. The pipeline between the supply switching valve Va and the sand collection nozzle for pit 63 is provided with a pit sand collection switching valve Vd for switching whether or not to supply fluid to the sand collection nozzle for pit 63. The pipeline between the supply switching valve Va and the nozzle for upstream trough 83 is provided with an upstream trough switching valve Ve for switching whether or not to supply fluid to the nozzle for upstream trough 83. A downstream trough switching valve Vf that switches whether or not to supply fluid to the downstream trough nozzle 84 is provided in the pipeline between the supply switching valve Va and the nozzle headers 9a, 9b, 9c, 9d, 9e, and 9f of the sand collecting means 9 is provided in each pipeline between the supply switching valve Va and the nozzle headers 9a, 9b, 9c, 9d, 9e, and 9f of the sand collecting means 9. These switching valves are composed of solenoid valves, and the opening and closing of the valves is controlled by a control device (not shown).

[0052] FIG. 9 is an explanatory diagram showing the water level of the grit basin and the water level sensor.

[0053] As shown in Fig. 9, a water level sensor 99 is disposed in the sand collection pit 6 of the settling basin 2. This water level sensor 99 detects and outputs an output when the water level of the settling basin 2 reaches a first high water level HHWL that is above the upper end 6c of the sand collection pit 6, a second high water level HWL that is below the upper end 6c of the sand collection pit 6 and above the lower end 8a of the main trough 8, a low water level LWL that is below the upper end 6c of the sand collection pit 6 and above the lower end 8a of the main trough 8, a middle water level MWL between the second high water level HWL and the low water level LWL, and an interlock water level LLWL that is even lower than the low water level LWL.

[0054] The operation of the wastewater treatment facility 1 having the above-mentioned configuration will be described with reference to FIG. 1 and FIG. 2. At a predetermined time when a certain amount of sand has accumulated on the bottom of the grit basin 2, the wastewater treatment facility 1 performs an operation to remove the accumulated sand. This time may be periodically, for example, once a month, or may be when the total flow rate of the wastewater flowing into or discharged from the grit basin 2 reaches a certain amount. In the sand removal operation, first, the inflow gate 42 of the dam device 4 shown in FIG. 1 is driven to block the inflow port 411, thereby blocking the inflow of the wastewater into the grit basin 2. Next, the lifting pump 31 is driven to lower the water level of the grit basin 2. When the water level of the pump well 3 drops to a predetermined value, the lifting pump 31 is stopped. When the water level of the grit basin 2 drops to the second high water level HWL (see FIG. 9), the feed water pump 33 is driven to discharge a fluid from the stirring nozzle 62 shown in FIG. 2, and the sand lifting pump 61 is driven. Thereafter, the sand lifting pump 61 is automatically controlled to stop driving in response to an output from the water level sensor 99 indicating the low water level LWL (see FIG. 9), and to resume driving in response to an output indicating the second high water level HWL (see FIG. 9). Meanwhile, the water supply pump 33 shown in FIG. 1 continues to drive until the sand removal operation is completed. The sand that has been flushed into the sand collection pit 6 is transported by the sand lifting pump 61, while the sand lifting pump 61 is operating, to a sand separator (not shown) outside the settling basin 2. Note that if the water level sensor 99 detects that the water level has reached the first high water level HHWL or the interlock water level LLWL (see FIG. 9), it is believed that some kind of abnormality has occurred, so an alert is displayed and the wastewater treatment facility 1 stops the sand removal operation.

[0055] Then, the agitation nozzle 62 and the upstream trough nozzle 83 shown in FIG. 2 are discharged for a certain period of time to cause the sand accumulated in the upstream main trough 81 to flow into the sand collection pit 6. After the certain period of time has elapsed, the discharge of the fluid from the agitation nozzle 62 and the upstream trough nozzle 83 is stopped, and the fluid is discharged for a certain period of time from the discharge port 911 provided in the fifth nozzle header 9e. This discharge can wash away the sand accumulated on the pond bottom surface 7 between the right side wall Wb near where the fifth nozzle header 9e is located and the upstream main trough 81 into the upstream main trough 81. After the certain period of time has elapsed, the discharge of the fluid from the discharge port 911 provided in the fifth nozzle header 9e is stopped. Then, the agitation nozzle 62 and the upstream trough nozzle 83 are discharged for a certain period of time to send the sand that has flowed into the upstream main trough 81 to the sand collection pit 6. Then, the discharge of the fluid from the stirring nozzle 62 and the upstream trough nozzle 83 is stopped, and the fluid is discharged from the discharge port 911 provided in the second nozzle header 9b for a certain period of time. In this embodiment, the discharge direction of the fluid from the discharge port 911 in the vicinity of the recessed wall portion Wa2 and the inclined wall portion Wa3 in the left side wall Wa is adjusted so that a certain amount of fluid reaches the left side wall Wa depending on the distance from the supply pipe 92 to the left side wall Wa. Therefore, all the sand accumulated on the pond bottom surface 7 between the left side wall Wa near where the second nozzle header 9b is arranged and the upstream main trough 81 can be washed away to the upstream main trough 81. After a certain period of time has passed, the discharge of the fluid from the discharge port 911 provided in the second nozzle header 9b is stopped. Then, the fluid is discharged from the stirring nozzle 62 and the upstream trough nozzle 83 for a certain period of time to send the sand that has been washed into the upstream main trough 81 to the sand collection pit 6. Thereafter, in the same manner as the above-mentioned operation, the fluid is discharged in the order of the fourth nozzle header 9d, the stirring nozzle 62 and the upstream trough nozzle 83, the first nozzle header 9a, the stirring nozzle 62 and the upstream trough nozzle 83, so that all the sand accumulated on the bottom of the pond upstream of the sand collection pit 6 is carried out to the outside of the grit basin 2. The order in which the fluid is discharged from each nozzle header 9a, 9b, 9d, and 9e may be any order. However, if the sand accumulated on the side farther from the sand collection pit 6 is flushed first, the sand accumulated on the side closer to the sand collection pit 6 will flow into the main trough 8 together with the sand to be flushed, and the sand will accumulate in the main trough, which may make it difficult to send the sand in the main trough 8 to the sand collection pit 6.For this reason, it is desirable to eject fluid from the second nozzle header 9b and the fifth nozzle header 9e, which are closer to the sand collection pit 6, and then eject fluid from the first nozzle header 9a and the fourth nozzle header 9d, which are farther from the sand collection pit 6.

[0056] After removing the sand accumulated on the upstream side by the above-mentioned operation, the fluid is discharged from the stirring nozzle 62 and the downstream trough nozzle 84 for a certain period of time to flow the sand accumulated in the downstream main trough 82 into the sand collection pit 6. Then, the discharge of the fluid from the stirring nozzle 62 and the downstream trough nozzle 84 is stopped, and the fluid is discharged from the outlet 911 provided in the sixth nozzle header 9f for a certain period of time. After the certain period of time has elapsed, the discharge of the fluid from the outlet 911 provided in the sixth nozzle header 9f is stopped. Then, the fluid is discharged from the stirring nozzle 62 and the downstream main trough 82 for a certain period of time to send the sand that has flowed into the downstream main trough 82 to the sand collection pit 6. Next, similar to the above-mentioned operation, the fluid is discharged in the order of the third nozzle header 9c, the stirring nozzle 62, and the downstream trough nozzle 84, so that all the sand accumulated on the bottom of the pond downstream of the sand collection pit 6 is carried out to the outside of the grit basin 2. Finally, the sand accumulated on the inclined surface 6b of the sand collecting pit 6 is flushed to the deepest part 6a by discharging fluid from the sand collecting nozzle 63 for the pit. After all of these operations are completed, the water supply pump 33 is stopped, and after a predetermined time has elapsed, the sand lifting pump 61 is also stopped. In this sand removal operation, when the fluid is discharged from the discharge ports 911 provided in the nozzle headers 9a, 9b, 9c, 9d, 9e, and 9f of the sand collecting means 9, the discharged fluid flows through the corresponding flow-down area and is prevented from flowing out into the adjacent flow-down area by the protrusions 72, so that the accumulated sand can be efficiently flushed into the main trough 8.

[0057] In this embodiment, when the sand removal operation is being performed, the amount of fluid pumped by the sand lifting pump 61 is set to be slightly greater than the amount of fluid pumped by the feedwater pump 33. Therefore, the sand lifting pump 61 is stopped and restarted several times while the sand removal operation is being performed. However, if the sand lifting pump 61 is repeatedly driven and stopped, the pump life will be reduced due to the inrush current at the start of driving. As a countermeasure, the pumping capacity of the feedwater pump 33 and the pumping capacity of the sand lifting pump 61 may be made closer to each other to minimize the change in the water level during the sand removal operation. Also, when the water level sensor 99 detects that the water level has reached the intermediate water level MWL, additional fluid may be discharged from other nozzles in addition to the nozzles that are discharging fluid at that time. By increasing the number of nozzles that discharge fluid, the load (throttling resistance) on the flow of the fluid is reduced, so that the fluid pumped by the feedwater pump 33 increases, and as a result, more fluid can be supplied to the grit basin 2. This makes it less likely that the water level will reach the low water level LWL, so the number of times the sand lifting pump 61 is stopped and restarted can be reduced. Here, the other nozzle is preferably a sand collecting nozzle 91 provided in the nozzle header scheduled to discharge next. By discharging fluid from the nozzle header scheduled to discharge next, the sand on the bottom surface to be washed next can be preliminarily washed away, so that the remaining sand can be further suppressed. The additional fluid to be discharged may be a fluid stored in another facility. Furthermore, the sand lifting pump 61 may not be stopped even when the water level becomes low LWL, and instead, a fluid stored in another facility may be supplied to the settling basin 2 in addition to the fluid pumped up by the feed water pump 33. In this case, the supply of the fluid stored in the other facility to the settling basin 2 may be stopped when the water level becomes the second high water level HWL. By reducing the number of times that the sand lifting pump 61 is stopped and driven repeatedly, the deterioration of the sand lifting pump 61 can be suppressed and the life of the sand lifting pump 61 can be extended.

[0058] Next, modified examples of the sand collecting means 9 will be described. In the modified examples described below, the differences from the embodiment shown in Figures 1 to 9 will be mainly described, and components having the same names as those in the embodiment shown in Figures 1 to 9 will be described using the same reference numerals as used above, and duplicated descriptions will be omitted.

[0059] FIG. 10(a) is a diagram showing a first modified example of the supply pipe and the sand collecting nozzle shown in FIG. 7, and FIG. 10(b) is a diagram showing a second modified example of the supply pipe and the sand collecting nozzle shown in FIG.

[0060] The first modified example differs from the example shown in FIG. 7(a) in that the supply pipe 92 does not have a lap joint 934, the supply pipe 92 and the branch pipe 932 are flange-connected, and the sand collecting nozzle 91 is provided with a ball joint 912. In FIG. 10(a), the sand collecting nozzle 91 corresponding to the protruding wall portion Wa1 is shown in solid lines, and the sand collecting nozzle 91 corresponding to the recessed wall portion Wa2 is shown in two-dot chain lines. In this modified example, a ball joint 912 is provided between the supply pipe 92 and each discharge port 911. This ball joint 912 allows the discharge direction of the fluid to be changed steplessly not only in the rotational direction around the axis of the supply pipe 92, but also in various other directions. Therefore, the discharge direction can be finely adjusted for each discharge port 911. It is also possible to provide a lap joint 934 on the supply pipe 92 and further provide a ball joint 912 on the sand collecting nozzle 91. In this case, the lap joint 934 corresponds to an example of a collective changing means, and the ball joint 912 corresponds to an example of an individual direction changing means.

[0061] The second modified example differs from the example shown in FIG. 7(a) in that the supply pipe 92 does not have a lap joint 934, the supply pipe 92 and the branch pipe 932 are flange-connected, and a plurality of mounting parts 924 for the sand collection nozzle 91 are formed in the circumferential direction of the supply pipe 92. In FIG. 10(b), the sand collection nozzle 91 corresponding to the protruding wall part Wa1 is shown by a solid line, and the sand collection nozzle 91 corresponding to the recessed wall part Wa2 is shown by a two-dot chain line. In this modified example, six mounting parts 924 for the sand collection nozzle 91 are formed in the circumferential direction of the supply pipe 92. As a result, after the supply pipe 92 is fixed to the branch pipe 932, the sand collection nozzle 91 can be mounted on any one of the six mounting parts 924. Before the sand collection nozzle 91 is mounted, plug members are attached to all mounting parts 924. When the sand collection nozzle 91 is to be mounted, the plug members are removed before the sand collection nozzle 91 is mounted. Alternatively, a lap joint 934 may be disposed on supply pipe 92, and mounting portion 924 may be formed on supply pipe 92. In this case, lap joint 934 corresponds to an example of a collective changing means, and mounting portion 924 corresponds to an example of an individual direction changing means. Although six mounting portions 924 are formed in the circumferential direction in this modification, the number of mounting portions 924 may be two or more, five or less, or seven or more.

[0062] According to this embodiment or its modified example, the flow-down area is formed by the ridges 72 protruding upward from the pond bottom surface 7, so that the pond bottom surface 7 can be divided into a plurality of flow-down areas by a simple operation even after the pond bottom surface 7 is formed. This makes it possible to provide a settling basin 2 divided into a plurality of flow-down areas at low cost. In addition, since the discharge direction of the fluid discharged from the discharge port 911 can be changed, the sand accumulated on the pond bottom surface 7 can be washed away by the fluid without remaining thereon. In addition, even in a settling basin in which the left side wall Wa or the right side wall Wb is not formed in a straight line, the straight supply pipe 92 can be used, so that the settling basin 2 can be provided at low cost. In addition, even if the shape of the side wall W is unknown when the settling basin 2 is designed or when the supply pipe 92 is created, the discharge direction can be adjusted when the settling basin 2 is constructed, so that it is possible to flexibly accommodate settling basins 2 of various shapes.

[0063] Next, the grit basin of the second embodiment will be described. In the following description, the components having the same names as those described so far will be assigned the same reference numerals as those used so far, and duplicated descriptions may be omitted. Also, descriptions of the configurations of the pump well, dam device, and dust collector shown in FIG. 1 will be omitted.

[0064] Fig. 11 is a plan view of the settling basin of the second embodiment as seen from above. In Fig. 11, the left side of the figure is the upstream side, and the right side of the figure is the downstream side. In Fig. 11, the sand collecting nozzle is shown in a simplified form.

[0065] The settling basin 2 shown in FIG. 11 differs from the settling basin 2 shown in FIG. 2 mainly in that the direction in which sand is flowed by the sand collecting means 9 is the longitudinal direction of the settling basin 2. A sand collection pit 6 extending in the basin width direction is formed in the longitudinal center of the settling basin 2. This sand collection pit 6 corresponds to an example of an accumulation section. A sand lifting pump 61, an agitation nozzle 62, and a sand collection nozzle for the pit 63 are arranged in the sand collection pit 6. A deepest part 6a, which is the deepest part in the settling basin 2, is formed in the vicinity of the left side wall Wa of the sand collection pit 6. The sand lifting pump 61 is arranged in the deepest part 6a. A slope 6b is formed in the bottom of the sand collection pit 6 between the end on the right side wall Wb side and the deepest part 6a, which is gradually deeper toward the deepest part 6a. A total of two agitation nozzles 62 are arranged in the vicinity of the sand lifting pump 61. This agitation nozzle 62 is for agitating the sand collected in the deepest part 6a. By discharging fluid from the discharge port 62a of the stirring nozzle 62 while the sand lifting pump 61 is operating, the efficiency of suction by the sand lifting pump 61 of the sand collected in the deepest part 6a can be improved. The sand collection nozzle for the pit 63 has discharge ports 63a near the center in the pond width direction and near the right side wall Wb. By discharging fluid from the discharge port 63a of the sand collection nozzle for the pit 63 while the water level of the grit basin 2 is kept lower than a predetermined value, the sand accumulated on the inclined surface 6b can be collected in the deepest part 6a. The left haunch Wbh and the right haunch Wah are formed at the lower end portions of the right side wall Wb and the left side wall Wa, which are inclined at about 45 degrees toward the pond bottom surface 7 and approach the center in the pond width direction.

[0066] The sand collecting means 9 has an eleventh nozzle header 9g, a twelfth nozzle header 9h, a thirteenth nozzle header 9i, a fourteenth nozzle header 9j, and a fifteenth nozzle header 9k arranged downstream of the sand collecting pit 6, and a sixteenth nozzle header 9m, a seventeenth nozzle header 9n, an eighteenth nozzle header 9p, a nineteenth nozzle header 9q, and a twentieth nozzle header 9r arranged upstream of the sand collecting pit 6. In the following description, the eleventh to fifteenth nozzle headers arranged downstream of the sand collecting pit 6 may be collectively referred to as the downstream nozzle headers 9g to 9k, and the sixteenth to twentieth nozzle headers arranged upstream of the sand collecting pit 6 may be collectively referred to as the upstream nozzle headers 9m to 9r. Also, the eleventh to twentieth nozzle headers may be collectively referred to as all nozzle headers 9g to 9r. Each of the downstream nozzle headers 9g-9k has nine sand collecting nozzles 91 arranged in the pond width direction, a supply pipe 92 extending in the pond width direction, and a mother pipe 93 arranged along the right side wall Wb. Also, the upstream nozzle headers 9m-9r have nine sand collecting nozzles 91, a supply pipe 92 extending in the pond width direction, and a mother pipe 93 arranged along the left side wall Wa. Since the mother pipe 93 in this embodiment is composed of a single pipe, each nozzle header is connected to the mother pipe 93 at one point. The supply pipes 92 of the downstream nozzle headers 9g-9k extend from the vicinity of the right side wall Wb where the connection part with the mother pipe 93 is located to the vicinity of the left side wall Wa. Also, the upstream nozzle headers 9m-9r extend from the vicinity of the left side wall Wa where the connection part with the mother pipe 93 is located to the vicinity of the right side wall Wb. Each of the sand collecting nozzles 91 is arranged in a line in the extension direction of the supply pipe 92. An outlet 911 is formed at the tip of the sand collection nozzle 91. With the water level of the grit basin 2 lowered below the pond bottom surface 7, a fluid is discharged into the atmosphere from the outlet 911 of the sand collection nozzle 91, so that sand accumulated on the pond bottom surface 7 can be washed away toward the sand collection pit 6. In addition, the supply pipes 92 of each of the nozzle headers 9g to 9r are covered from above with a header cover 90 shown by a two-dot chain line in FIG. 11. The header cover 90 extends from the vicinity of the right side wall Wb to the vicinity of the left side wall Wa. The configuration of this header cover 90 will be described later.

[0067] The ridges 72 include a first ridge 72a, a second ridge 72b, a third ridge 72c, a fourth ridge 72d, a fifth ridge 72e, a sixth ridge 72f, a seventh ridge 72g, and an eighth ridge 72h arranged downstream of the sand collection pit 6, and a ninth ridge 72i, a tenth ridge 72j, an eleventh ridge 72k, a twelfth ridge 72m, a thirteenth ridge 72n, a fourteenth ridge 72p, a fifteenth ridge 72q, and a sixteenth ridge 72r arranged upstream of the sand collection pit 6. The first ridge 72a extends from the vicinity of the downstream end of the grit basin 2 to the sand collection pit 6, between the group of outlets closest to the right side wall Wb of each of the downstream nozzle headers 9g to 9k and the second group of outlets from the right side wall Wb of each of the downstream nozzle headers 9g to 9k. The discharge port group here refers to five discharge ports 911 arranged in a row at intervals in the longitudinal direction of the grit basin 2 (hereinafter the same). Similarly, the second ridge 72b extends from near the downstream end of the grit basin 2 to the sand collection pit 6 between the second and third discharge port groups from the right side wall Wb, the third ridge 72c extends between the third and fourth discharge port groups from the right side wall Wb, the fourth ridge 72d extends between the fourth and fifth discharge port groups from the right side wall Wb, the fifth ridge 72e extends between the fifth and sixth discharge port groups from the right side wall Wb, the sixth ridge 72f extends between the sixth and seventh discharge port groups from the right side wall Wb, the seventh ridge 72g extends between the seventh and eighth discharge port groups from the right side wall Wb, and the eighth ridge 72h extends between the eighth and ninth discharge port groups from the right side wall Wb. In addition, the ninth protrusion 72i extends from near the upstream end of the settling basin 2 to the sand collection pit 6 between the group of outlets closest to the right side wall Wb of each of the upstream nozzle headers 9m to 9r and the second group of outlets from the right side wall Wb of each of the upstream nozzle headers 9m to 9r. Similarly, the tenth ridge 72j is between the second and third groups of outlets from the right side wall Wb, the eleventh ridge 72k is between the third and fourth groups of outlets from the right side wall Wb, the twelfth ridge 72m is between the fourth and fifth groups of outlets from the right side wall Wb, the thirteenth ridge 72n is between the fifth and sixth groups of outlets from the right side wall Wb, the fourteenth ridge 72p is between the sixth and seventh groups of outlets from the right side wall Wb, the fifteenth ridge 72q is between the seventh and eighth groups of outlets from the right side wall Wb, and the sixteenth ridge 72r is between the eighth and ninth groups of outlets from the right side wall Wb, and they all extend from near the upstream end of the settling basin 2 to the sand collection pit 6.That is, the protrusions 72 extend in a direction toward the sand collecting pit 6 from between the discharge ports 911 of the sand collecting nozzles 91 aligned in the pond width direction.

[0068] Figure 12 is a DD cross-sectional view of the settling basin shown in Figure 11. In Figure 12, the right side of the figure is the downstream side, and the left side of the figure is the upstream side. Note that the parent pipe is omitted in Figure 12.

[0069] As shown in Fig. 12, the bottom surface 7 of the settling basin 2 is connected to the sand collection pit 6 located near the center of the settling basin 2 in the longitudinal direction. The bottom surface 7 is formed in a stepped manner so that it gradually becomes deeper toward the sand collection pit 6, and has four step portions 7a on both the downstream side and the upstream side of the sand collection pit 6. A downstream-most step portion 7b is formed at the most downstream side of the settling basin 2, and an upstream-most step portion 7c is formed at the most upstream side of the settling basin 2. Each step formed in a stepped manner is inclined downward by about 2 degrees toward the sand collection pit 6.

[0070] Fig. 13 is a detailed view of part E shown in Fig. 12. Fig. 13 shows the detailed structure of the step part. Since the other step parts have the same structure, the description of the other step parts is omitted.

[0071] As shown in FIG. 13, the upper pond bottom surface 7 in the step portion 7a is composed of the upper surface of the resin plate 73 and the upper surface of the header cover 90 fixed on the end of the resin plate 73 closest to the sand collection pit 6 (see FIG. 12). The header cover 90 is a stainless steel plate bent so that its cross section is V-shaped, and one end side protrudes toward the sand collection pit 6 side more than the upper resin plate 73. The step 7a1 is formed by the difference in height between the protruding end edge of the header cover 90 and the upper surface of the lower resin plate 73. The header cover 90 is fixed to the concrete below the resin plate 73 by a chemical anchor (not shown). Note that the header cover 90 may be fixed by a fixing member other than the chemical anchor, such as an adhesive or a bolt. The header cover 90 may also be fixed to the protrusion 72 or the resin plate 73 by an adhesive or the like. A supply pipe 92 is arranged below the header cover 90. In other words, the upper part of the supply pipe 92 is covered by the header cover 90. In addition, the sand collection nozzle 91 has an upper part of its base covered by a header cover 90, and its tip part including a discharge port 911 protrudes further toward the sand collection pit 6 than the protruding edge of the header cover 90.

[0072] An adjustment plate 722a is provided between the protrusion 72 protruding upward from the upper pond bottom surface 7 in the step portion 7a and the protrusion 72 protruding upward from the lower pond bottom surface 7. This adjustment plate 722a constitutes a part of the protrusion 72, and connects the protrusion 72 of the upper protrusion 72 (referred to as the upper protrusion 722u in the description of this paragraph) and the protrusion 72 of the lower protrusion 72 (referred to as the lower protrusion 72d in the description of this paragraph). By providing the adjustment plate 722a, it is possible to prevent fluid or sand from moving to the adjacent flow-down area at the step portion 7a. This adjustment plate 722a is welded to each of the upper protrusion 722u and the lower protrusion 722d. The protrusion 72 may be integrally formed from the longitudinal end of the settling basin 2 to the sand collection pit 6 without providing the adjustment plate 722a, but the shape becomes complicated and expensive, so it is preferable to provide the adjustment plate 722a between the upper protrusion 722u and the lower protrusion 722d. The round bar 723 extends along the upper ends of the upper protrusion 722u, the adjustment plate 722a, and the lower protrusion 722d. The downstream most step portion 7b and the upstream most step portion 7c have the same configuration as the above-mentioned step portion 7a, except that the upper protrusion 72 and the adjustment plate 722a are not provided.

[0073] The supply pipe 92 is a pipe with a hollow rectangular cross section having an inner wall 920 that defines an internal space through which the fluid passes. Note that the wall thickness of the supply pipe 92 is exaggerated in Fig. 13. The sand collecting nozzle 91 has a hollow cylindrical shape whose end opposite the discharge port 911 communicates with the internal space defined by the inner wall 920, and discharges the fluid that has passed through the inside of the supply pipe 92 from the discharge port 911.

[0074] Fig. 14(a) is a plan view showing a supply pipe, sand collection nozzle, and part of the mother pipe, and Fig. 14(b) is a view seen from the direction of arrow F in Fig. 14(a). In Fig. 14, the thickness of the supply pipe is exaggerated, and the middle part of the supply pipe in the extension direction is omitted. In Fig. 14, the left-right direction of the figure is the pond width direction.

[0075] As shown in FIG. 14(a), the supply pipe 92 has a connection portion with the mother pipe 93 at one end and extends toward the other end. A sand collecting nozzle 91 is attached to one surface of the supply pipe 92. The surface to which the sand collecting nozzle 91 is attached is inclined with respect to the pond width direction, and the supply pipe 92 as a whole is a tapered pipe whose pipe width becomes narrower toward the other end. Also, as shown in FIG. 14(b), the height of the supply pipe 92 is the same throughout the extension direction of the supply pipe. Therefore, the cross-sectional area of ​​the internal space defined by the inner wall 920 is configured to gradually decrease from the one end where the connection portion with the mother pipe 93 is located toward the other end. When a fluid is supplied from the mother pipe 93, a pressure loss occurs in the fluid moving toward the other end during the movement inside the pipe. As described above, by configuring the supply pipe 92 as a tapered pipe, the pressure loss can be compensated for and the pressure of the fluid passing through the supply pipe 92 can be made almost uniform. By making the pressure of the fluid in the supply pipe 92 uniform, the discharge pressure and discharge flow rate of the fluid discharged from the discharge ports 911 of the sand collection nozzle 91 can be made uniform at all of the discharge ports lined up in the extension direction.

[0076] Next, the operation of the wastewater treatment facility 1 having the above-mentioned configuration will be described with reference to FIG. 1 and FIG. 11. At a predetermined time when a certain amount of sand has accumulated on the bottom of the grit basin 2, the wastewater treatment facility 1 performs an operation to remove the accumulated sand. This time may be periodically, for example, once a month, or may be when the total flow rate of the wastewater flowing into or discharged from the grit basin 2 reaches a certain amount. In the sand removal operation, first, the inflow gate 42 of the dam device 4 shown in FIG. 1 is driven to block the inflow port 411, thereby blocking the inflow of the wastewater into the grit basin 2. Next, the lifting pump 31 is driven to lower the water level of the grit basin 2. When the water level of the pump well 3 drops to a predetermined value, the lifting pump 31 is stopped. When the water level of the grit basin 2 drops to the second high water level HWL (see FIG. 9), the feed water pump 33 is driven to discharge fluid from the stirring nozzle 62 and the pit sand collecting nozzle 63 shown in FIG. 11, and the sand lifting pump 61 is driven. Thereafter, the sand lifting pump 61 is automatically controlled to stop driving in response to an output from the water level sensor 99 indicating the low water level LWL (see FIG. 9), and to resume driving in response to an output indicating the second high water level HWL (see FIG. 9). Meanwhile, the water supply pump 33 shown in FIG. 1 continues to drive until the sand removal operation is completed. The sand that has been flushed into the sand collection pit 6 is transported by the sand lifting pump 61, while the sand lifting pump 61 is operating, to a sand separator (not shown) outside the settling basin 2. Note that if the water level sensor 99 detects that the water level has reached the first high water level HHWL or the interlock water level LLWL (see FIG. 9), it is believed that some kind of abnormality has occurred, so an alert is displayed and the wastewater treatment facility 1 stops the sand removal operation.

[0077] Next, after stopping the discharge of fluid from the stirring nozzle 62 and the sand collection nozzle for the pit 63 shown in FIG. 11, the sand accumulated on the first stage of the pond bottom surface 7 downstream of the sand collection pit 6 is washed into the sand collection pit 6. Specifically, the fluid is discharged for a certain period of time from the discharge port 911 provided in the 15th nozzle header 9k to wash the sand accumulated on the pond bottom surface 7 between the sand collection pit 6 and the 15th nozzle header 9k into the sand collection pit 6. Then, the discharge of fluid from the 15th nozzle header 9k is stopped, and the fluid is discharged for a certain period of time from the stirring nozzle 62 and the sand collection nozzle for the pit 63 to suck up the sand in the sand collection pit 6 with the sand lifting pump 61.

[0078] Next, after stopping the discharge of fluid from the stirring nozzle 62 and the sand collection nozzle for the pit 63 shown in FIG. 11, the sand deposited on the second stage of the pond bottom surface 7 downstream of the sand collection pit 6 is washed into the sand collection pit 6. Specifically, the fluid is discharged from the discharge port 911 provided in the 14th nozzle header 9j for a certain period of time to wash the sand deposited on the pond bottom surface 7 between the 15th nozzle header 9k and the 14th nozzle header 9j upstream of the 15th nozzle header 9k. After the certain period of time has elapsed, the discharge of fluid from the 14th nozzle header 9j is stopped, and the fluid is discharged from the discharge port 911 provided in the 15th nozzle header 9k for a certain period of time to wash the sand on the pond bottom surface 7 between the sand collection pit 6 and the 15th nozzle header 9k into the sand collection pit 6. Then, the discharge of fluid from the 15th nozzle header 9k is stopped, and the fluid is discharged from the stirring nozzle 62 and the sand collection nozzle for the pit 63 for a certain period of time to suck up the sand in the sand collection pit 6 with the sand lifting pump 61.

[0079] Next, after stopping the discharge of fluid from the stirring nozzle 62 and the sand collection nozzle for the pit 63 shown in FIG. 11, the sand accumulated on the third stage of the pond bottom surface 7 downstream of the sand collection pit 6 is washed into the sand collection pit 6. Specifically, the fluid is discharged for a certain period of time from the discharge port 911 provided in the 13th nozzle header 9i to wash away the sand accumulated on the pond bottom surface 7 between the 14th nozzle header 9j and the 13th nozzle header 9i upstream of the 14th nozzle header 9j. After the certain period of time has elapsed, the discharge of fluid from the 13th nozzle header 9i is stopped, and the fluid is discharged for a certain period of time from the discharge port 911 provided in the 14th nozzle header 9j to wash away the sand on the pond bottom surface 7 between the 15th nozzle header 9k and the 14th nozzle header 9j upstream of the 15th nozzle header 9k. After a certain time has elapsed, the discharge of fluid from the 14th nozzle header 9j is stopped, and fluid is discharged for a certain time from the discharge port 911 provided in the 15th nozzle header 9k to wash away the sand on the pond bottom surface 7 between the sand collection pit 6 and the 15th nozzle header 9k into the sand collection pit 6. Then, the discharge of fluid from the 15th nozzle header 9k is stopped, and fluid is discharged for a predetermined time from the agitation nozzle 62 and the sand collection nozzle for the pit 63 to suck up the sand in the sand collection pit 6 with the sand lifting pump 61.

[0080] Next, after stopping the discharge of fluid from the stirring nozzle 62 and the sand collection nozzle for the pit 63 shown in FIG. 11, the sand deposited on the fourth stage of the pond bottom surface 7 downstream of the sand collection pit 6 is washed into the sand collection pit 6. Specifically, the fluid is discharged for a certain period of time from the discharge port 911 provided in the 12th nozzle header 9h to wash away the sand deposited on the pond bottom surface 7 between the 13th nozzle header 9i and the 12th nozzle header 9h upstream of the 13th nozzle header 9i. After the certain period of time has elapsed, the discharge of fluid from the 12th nozzle header 9h is stopped, and the fluid is discharged for a certain period of time from the discharge port 911 provided in the 13th nozzle header 9i to wash away the sand on the pond bottom surface 7 between the 14th nozzle header 9j and the 13th nozzle header 9i upstream of the 14th nozzle header 9j. After a certain time has passed, the discharge of the fluid from the 13th nozzle header 9i is stopped, and the fluid is discharged for a certain time from the discharge port 911 provided in the 14th nozzle header 9j to wash away the sand on the pond bottom surface 7 between the 15th nozzle header 9k and the 14th nozzle header 9j to the upstream side of the 15th nozzle header 9k. After a certain time has passed, the discharge of the fluid from the 14th nozzle header 9j is stopped, and the fluid is discharged for a certain time from the discharge port 911 provided in the 15th nozzle header 9k to wash away the sand on the pond bottom surface 7 between the sand collection pit 6 and the 15th nozzle header 9k to the sand collection pit 6. Then, the discharge of the fluid from the 15th nozzle header 9k is stopped, and the fluid is discharged for a certain time from the stirring nozzle 62 and the sand collection nozzle for the pit 63 to suck up the sand in the sand collection pit 6 with the sand lifting pump 61.

[0081] Next, after stopping the discharge of fluid from the stirring nozzle 62 and the sand collection nozzle for the pit 63 shown in FIG. 11, the sand accumulated on the pond bottom surface 7 of the fifth stage downstream of the sand collection pit 6 is washed into the sand collection pit 6. Specifically, the fluid is discharged for a certain period of time from the discharge port 911 provided in the 11th nozzle header 9g to wash away the sand accumulated on the pond bottom surface 7 between the 12th nozzle header 9h and the 11th nozzle header 9g upstream of the 12th nozzle header 9h. After the certain period of time has elapsed, the fluid is discharged for a certain period of time from the discharge port 911 provided in the 12th nozzle header 9h to wash away the sand on the pond bottom surface 7 between the 13th nozzle header 9i and the 12th nozzle header 9h upstream of the 13th nozzle header 9i. After a certain time has passed, the discharge of the fluid from the 12th nozzle header 9h is stopped, and the fluid is discharged for a certain time from the discharge port 911 provided in the 13th nozzle header 9i to wash away the sand on the pond bottom surface 7 between the 14th nozzle header 9j and the 13th nozzle header 9i to the upstream side of the 14th nozzle header 9j. After a certain time has passed, the discharge of the fluid from the 13th nozzle header 9i is stopped, and the fluid is discharged for a certain time from the discharge port 911 provided in the 14th nozzle header 9j to wash away the sand on the pond bottom surface 7 between the 15th nozzle header 9k and the 14th nozzle header 9j to the upstream side of the 15th nozzle header 9k. After a certain time has passed, the discharge of the fluid from the 14th nozzle header 9j is stopped, and the fluid is discharged for a certain time from the discharge port 911 provided in the 15th nozzle header 9k to wash away the sand on the pond bottom surface 7 between the sand collection pit 6 and the 15th nozzle header 9k to the sand collection pit 6. Then, the discharge of fluid from the 15th nozzle header 9k is stopped, and fluid is discharged from the agitation nozzle 62 and the sand collection nozzle for the pit 63 for a predetermined time, and the sand in the sand collection pit 6 is sucked up by the sand lifting pump 61. When the predetermined time has elapsed, the discharge of fluid from the agitation nozzle 62 and the sand collection nozzle for the pit 63 is stopped.

[0082] Thereafter, by a similar operation, the accumulated sand is washed away from the pond bottom surface 7 on the upstream side of the sand collection pit 6, starting from the side closest to the sand collection pit 6, using the upstream nozzle headers 9m to 9r, and is sucked up by the sand lifting pump 61. In other words, the sand accumulated in each stage on the upstream side of the sand collection pit 6 is washed away from the side closest to the sand collection pit 6 to the sand collection pit 6, step by step, in order, and is sucked up by the sand lifting pump 61.

[0083] By the above operation, the sand deposited on the bottom surface 7 of the pond is washed into the sand collection pit 6, and is sucked up by the sand lifting pump 61 and sent to a sand separator (not shown) outside the sand collection basin 2. At this time, since each discharge port group is partitioned by the protrusion 72, the fluid discharged from each discharge port 911 flows through the corresponding flow-down area and is prevented from flowing out to the adjacent flow-down area, so that the deposited sand can be efficiently washed into the sand collection pit 6. In this sand removal operation, the sand deposited on the bottom surface 7 of the pond in the step closest to the sand collection pit 6 is washed up to the sand collection pit 6 and sucked up by the sand lifting pump 61, and then the sand in the step next closest to the sand collection pit 6 is washed out. This prevents the sand from accumulating too much on a particular step, which makes it impossible to wash the sand accumulated on that step down to the step on the sand collection pit 6 side. In addition, the sand does not accumulate too much in the sand collection pit 6, which makes it impossible to suck it up by the sand lifting pump 61.

[0084] The present invention is not limited to the above-mentioned embodiment and modified examples, and various modifications can be made within the scope of the claims. For example, in this embodiment, the present invention is used in the grit basin 2 of the wastewater treatment facility 1 into which sewage and rainwater flow, but it can also be applied to the grit basin of the rainwater treatment facility into which only rainwater flows. In this embodiment, the protrusion 72 is formed of a long member having an L-shaped cross section, but it may be formed of a long member having a U-shaped cross section with an open upper part, a long member having an inverted T-shaped cross section, or a long member having an I-shaped cross section. When formed of a U-shaped long member, two protrusions 72 can be formed from one long member. In addition, the protrusion 72 may be used instead of a small trough when a new grit basin 2 is constructed, or may be used on an existing pond bottom surface 2 where a small trough is not formed. In addition, the mounting portion 721 of the protrusion 72 is arranged on the resin plate 73, but the resin plate 73 may be arranged on the mounting portion 721. In this case, the resin plate 73 may be divided into a plurality of parts in the pond width direction, and the protruding portions 722 of the ridges 72 may be made to protrude between the adjacent resin plates 73 .

[0085] According to the two embodiments or the modified examples thereof described above, it is possible to provide a settling basin 2 in which sand accumulated on the basin bottom surface 7 can be washed away by a fluid without leaving any residue. In addition, it is possible to provide the settling basin 2 at low cost.

[0086] The following inventive concept can also be extracted from the settling basin of this embodiment.

[0087] In a settling basin where sand contained in the received water settles to the bottom of the basin, an accumulation section extending in a predetermined direction and collecting settled sand; a plurality of discharge ports arranged along an extension direction of the accumulation portion at positions away from the accumulation portion, the discharge ports discharging a fluid into the atmosphere to cause the settled sand to flow toward the accumulation portion; a supply pipe in which a plurality of the discharge ports are arranged side by side in the predetermined direction; a mother pipe connected to the supply pipe for supplying a fluid to the supply pipe; A settling basin characterized in that the internal cross-sectional area of ​​the supply pipe decreases as it moves away from the connection portion with the main pipe.

[0088] In addition, the following inventive concept can be extracted from the settling basin of this embodiment.

[0089] In a settling basin where sand contained in the received water settles, A groove is provided in a bottom portion of the pond that is lower than the side wall and extends in a predetermined direction; A bottom surface provided at the bottom of the pond and connected to the groove; a discharge port that discharges a fluid for causing the sand that has settled on the bottom surface to flow from the side wall side toward the groove, A settling basin characterized in that the direction of the fluid discharged from the discharge port is changeable.

[0090] In this settling basin, A supply pipe provided with the discharge port; a mother pipe for supplying a fluid to the supply pipe; The supply pipe may be rotatable relative to the mother pipe about an axial direction of the supply pipe.

[0091] In addition, in the settling basin, The supply pipe may have a plurality of outlets.

[0092] Furthermore, in the settling basin, a supply pipe provided with the discharge port, The discharge port may be capable of changing the discharge direction of the fluid by a ball joint disposed between the supply pipe and the discharge port.

[0093] In addition, in the settling basin, The discharge port has a supply pipe detachably provided therein, The supply pipe may have a plurality of mounting portions, to which the discharge ports are attached, in a circumferential direction of the supply pipe.

[0094] In addition, the following inventive concept can be extracted from the settling basin of this embodiment.

[0095] In a settling basin where sand contained in the received water settles, A groove is provided in a bottom portion of the pond that is lower than the side wall and extends in a predetermined direction; A bottom surface provided at the bottom of the pond and connected to the groove; a discharge port that discharges a fluid for causing the sand that has settled on the bottom surface to flow from the side wall side toward the groove; a supply pipe that is disposed closer to the center in the pond width direction than the side wall and has a plurality of the discharge ports aligned in the predetermined direction; The supply pipe has a first region extending from the side wall in a pond width direction at a first interval, and a second region extending from the side wall in a pond width direction at a second interval, A sedimentation basin characterized in that the discharge direction of the fluid from the discharge outlet arranged in the first area and the discharge outlet arranged in the second area can be changed independently of each other.

[0096] The number of outlets provided in the first region may be multiple or may be one. When the number of outlets provided in the first region is multiple, it is preferable that the discharge direction of the fluid from those outlets can be changed collectively. The number of outlets provided in the second region may be multiple or may be one. When the number of outlets provided in the second region is multiple, it is preferable that the discharge direction of the fluid from those outlets can be changed collectively. The term "changeable collectively" as used herein means that, for example, the first region part and the second region part of the supply pipe rotate separately around the axial direction of the supply pipe. In addition, the supply pipe may have a rotatable portion at both ends of the first region, and a rotatable portion at both ends of the second region. The supply pipe may be a straight pipe, or a pipe with a slightly bent portion.

[0097] the supply pipe is provided with a third region connecting the first region and the second region, The ejection port provided in the third region may be capable of changing the ejection direction of a fluid, separately from the ejection port provided in the first region and the ejection port provided in the second region.

[0098] The third region may be an inclined region in which the distance between the third region and the sidewall changes gradually in the extension direction, or may be a region in which the distance changes stepwise.

[0099] Also, the number of outlets provided in the third region may be multiple or may be one. When the number of outlets provided in the third region is multiple, it is preferable that the discharge direction of the fluid from these outlets can be changed collectively. Here, "changeable collectively" is realized, for example, by rotating the portion of the third region of the supply pipe about the axial direction of the supply pipe separately from the portion of the first region and the portion of the second region.

[0100] In addition, the following inventive concept can be extracted from the settling basin of this embodiment.

[0101] In a settling basin where sand contained in the received water settles, A groove is provided in a bottom portion of the pond that is lower than the side wall and extends in a predetermined direction; A bottom surface provided at the bottom of the pond and connected to the groove; a plurality of discharge ports disposed opposite the side wall and configured to discharge a fluid for causing the sand that has settled on the bottom surface to flow from the side wall toward the groove; The side wall has a protruding wall portion protruding toward the center in the pond width direction and extending in the predetermined direction, and a recessed wall portion recessed toward the outside in the pond width direction and extending in the predetermined direction, the discharge port is disposed opposite the protruding wall portion and the recessed wall portion, A sedimentation basin characterized by being equipped with a direction changing means capable of changing the discharge direction of a fluid discharged from an outlet arranged opposite the recessed wall portion to a different direction from the discharge direction of a fluid discharged from an outlet arranged opposite the protruding wall portion.

[0102] Furthermore, the following inventive concept can be extracted from the settling basin of this embodiment.

[0103] In a settling basin where sand contained in the received water settles, A groove is provided in a bottom portion of the pond that is lower than the side wall and extends in a predetermined direction; A bottom surface provided at the bottom of the pond and connected to the groove; A supply pipe disposed opposite the side wall and extending in the predetermined direction; a plurality of discharge ports disposed in the supply pipe for discharging a fluid for causing the sand that has settled on the bottom surface to flow from the side wall side toward the groove; The side wall has a protruding wall portion protruding toward the center in the pond width direction and extending in the predetermined direction, and a recessed wall portion recessed toward the outside in the pond width direction and extending in the predetermined direction, the discharge port is disposed at a position facing the protruding wall portion and a position facing the recessed wall portion, A settling basin characterized in that the supply pipe is provided with a direction changing means between an outlet located opposite the protruding wall portion and an outlet located opposite the recessed wall portion, which is capable of changing the discharge direction of the fluid discharged from the outlet.

[0104] In addition, in this settling basin, The side wall has an inclined wall portion formed between the protruding wall portion and the recessed wall portion and extending in a direction inclined with respect to the predetermined direction and the pond width direction, The discharge port is also disposed at a position facing the inclined wall portion, the supply pipe includes a first direction changing means between a discharge port arranged opposite to the protruding wall portion and a discharge port arranged opposite to the inclined wall portion, the first direction changing means being capable of changing a discharge direction of a fluid discharged from the discharge port, The nozzle may be provided with a second direction changing means between the plurality of outlets arranged opposite the recessed wall portion and the outlets arranged opposite the inclined wall portion, the second direction changing means being capable of changing the discharge direction of the fluid discharged from the outlets.

[0105] In addition, the following inventive concept can be extracted from the settling basin of this embodiment.

[0106] In a settling basin where sand contained in the received water settles, A groove is provided in a bottom portion of the pond that is lower than the side wall and extends in a predetermined direction; A bottom surface provided at the bottom of the pond and connected to the groove; a plurality of outlets for discharging a fluid for causing the sand that has settled on the bottom surface to flow from the side wall toward the groove; a collective direction changing means capable of collectively changing the discharge direction of fluid discharged from at least two of the plurality of discharge ports; A settling basin characterized by being equipped with an individual direction changing means capable of changing the discharge direction of the fluid discharged from the discharge outlet for each discharge outlet.

[0107] Note that even if a component is included only in the description of each of the embodiments and modified examples described above, that component may be applied to other embodiments or other modified examples.

[0108] In addition, the settling basin described above is a settling basin in which the sand contained in the received water settles to the bottom of the basin. an accumulation section extending in a predetermined direction and collecting settled sand; a plurality of discharge ports arranged along an extension direction of the accumulation portion at positions away from the accumulation portion, the discharge ports discharging a fluid into the atmosphere to cause the settled sand to flow toward the accumulation portion; a protrusion extending from between adjacent ones of the discharge ports toward the accumulation portion, The protrusions may be characterized in that they protrude from the bottom surface of the pond.

[0109] Here, the accumulation portion may extend in the width direction of the settling basin, or in a direction perpendicular to the width direction of the settling basin. Also, the protrusions may extend in the width direction of the settling basin, or in a direction perpendicular to the width direction of the settling basin.

[0110] This settling basin allows the basin bottom to be divided into multiple small areas at low cost.

[0111] In addition, the settling basin described above is a settling basin in which the sand contained in the received water settles to the bottom of the basin. an accumulation section extending in a predetermined direction and collecting settled sand; a plurality of discharge ports arranged along an extension direction of the accumulation portion at positions away from the accumulation portion, the discharge ports discharging a fluid into the atmosphere to cause the settled sand to flow toward the accumulation portion; a protrusion extending from between adjacent ones of the discharge ports toward the accumulation portion, The discharge port is disposed along a side wall of the settling basin, The protrusion may protrude from the bottom surface of the pond and extend along the width direction of the pond.

[0112] The protrusions prevent the fluid discharged into the atmosphere from the outlets arranged along the side wall from spreading in a direction perpendicular to the width of the pond, thereby allowing sand accumulated on the bottom of the pond to flow efficiently toward the center of the pond width.

[0113] Furthermore, in this settling basin, the protrusion may be composed of a long member having an L-shaped cross section that is fixed to the bottom surface of the basin by a fixing member.

[0114] The L-shaped long member is simply fixed to the pond bottom surface with a fixing member, so the protrusions can be formed on the pond bottom surface with simple work.

[0115] In this settling basin, the discharge outlet may discharge the fluid after lowering the water level below the bottom surface of the basin.

[0116] By lowering the water level, the sand accumulated on the bottom of the pond is exposed to the atmosphere, so the water accumulated in the settling basin no longer acts as resistance to weaken the flow of the discharged fluid, and the sand can easily flow toward the accumulation area.

[0117] In addition, in this settling basin, a plurality of the protrusions may be provided, and the spaces between the protrusions may be covered with resin plates.

[0118] According to this aspect, the bottom surface of the pond is formed of a resin plate, and since the resin plate has low frictional resistance, the sand can be easily caused to flow toward the accumulation section.

[0119] In addition, the settling basin described above is a settling basin in which the sand contained in the received water settles to the bottom of the basin. an accumulation section extending in a predetermined direction and collecting settled sand; a plurality of discharge ports arranged along an extension direction of the accumulation portion at positions away from the accumulation portion, the discharge ports discharging a fluid into the atmosphere to cause the settled sand to flow toward the accumulation portion; a protrusion extending from between adjacent ones of the discharge ports toward the accumulation portion, The protrusion protrudes from the bottom surface of the pond, The bottom surface of the pond has a step portion, The discharge port is formed at a tip portion of the sand collecting nozzle, The sand collecting nozzle may be disposed at the step portion.

[0120] In this settling basin, the sand collection nozzle may have an upper part at its base covered by the bottom surface of the upper stage of the stepped portion.

[0121] In addition, the settling basin described above is a settling basin in which the sand contained in the received water settles to the bottom of the basin. an accumulation section extending in a predetermined direction and collecting settled sand; a plurality of discharge ports arranged along an extension direction of the accumulation portion at positions away from the accumulation portion, the discharge ports discharging a fluid into the atmosphere to cause the settled sand to flow toward the accumulation portion; a protrusion extending from between adjacent ones of the discharge ports toward the accumulation portion, The protrusion protrudes from the bottom surface of the pond, The bottom surface of the pond has a step portion, The discharge port is formed at a tip portion of the sand collecting nozzle, The sand collecting nozzle is disposed in the step portion, and an upper portion of a root portion is covered by a header cover that constitutes the pond bottom surface of the upper stage of the step portion, The header cover may protrude in a direction toward the stacking section, and the protruding side portion may be inclined so as to be positioned downward toward the protruding end side.

[0122] In addition, the settling basin described above is a settling basin in which the sand contained in the received water settles to the bottom of the basin. an accumulation section extending in a predetermined direction and collecting settled sand; a plurality of discharge ports arranged along an extension direction of the accumulation portion at positions away from the accumulation portion, the discharge ports discharging a fluid into the atmosphere to cause the settled sand to flow toward the accumulation portion; a protrusion extending from between adjacent ones of the discharge ports toward the accumulation portion, The protrusion protrudes from the bottom surface of the pond, The bottom surface of the pond has a step portion, The discharge port is formed at a tip portion of the sand collecting nozzle, The sand collecting nozzle is disposed in the step portion, and an upper portion of a root portion is covered by a header cover that constitutes the pond bottom surface of the upper stage of the step portion, The header cover may be characterized in that it is composed of a protruding side portion that protrudes in a direction toward the accumulation section and is inclined so as to be positioned downward toward the protruding end side, which is one end side, and an other end side portion that is parallel to the pond bottom surface on the other end side of the header cover. The above-described settling basin is a settling basin in which sand contained in the received water settles to the bottom of the basin. an accumulation section extending in a predetermined direction and collecting settled sand; a supply pipe extending from one end side to the other end side along the extending direction of the stacking portion at a position away from the stacking portion; a plurality of discharge ports arranged in line in the extension direction of the supply pipe, the discharge ports discharging a fluid into the atmosphere for causing the settled sand to flow toward the accumulation portion; a protrusion extending from between adjacent ones of the discharge ports toward the accumulation portion, The protrusion protrudes from the bottom surface of the pond, The bottom surface of the pond has a step portion, The discharge port is formed at a tip portion of the sand collecting nozzle, The sand collection nozzle may be characterized in that the supply pipe arranged in the step portion has a connection portion at one end with a mother pipe that supplies the fluid to the supply pipe, and is configured so that the cross-sectional area of ​​the internal space defined by the inner wall of the supply pipe gradually becomes smaller as it moves from the one end to the other end. [Explanation of symbols]

[0123] 2. Grit chamber 6 Sand collection pit 7 Pond bottom surface 8 Main Trough 72 protrusion 73 Resin Plate 911 Discharge port W side wall

Claims

[Claim 1] In a settling basin in which sand contained in the received water settles to the bottom of the basin as the water flows from the upstream side to the downstream side, A collection section extending in a direction perpendicular to the flow direction and in which settled sand is collected; a supply pipe extending from one end side to the other end side along the extending direction of the stacking portion at a position away from the stacking portion; a plurality of discharge ports arranged in a line in the extension direction of the supply pipe, the discharge ports discharging a fluid into the atmosphere for causing the settled sand to flow toward the accumulation portion; the supply pipe has a connection portion at the one end with a mother pipe that supplies the fluid to the supply pipe, and is configured such that a cross-sectional area of ​​an internal space defined by an inner wall of the supply pipe gradually decreases from the one end toward the other end, A settling basin characterized in that the supply pipes are arranged in an upstream region upstream of the accumulation section and a downstream region downstream of the accumulation section, and the supply pipe arranged in the upstream region is arranged in an inverted position with respect to the one end side and the other end side of the supply pipe arranged in the downstream region.

Citation Information

Patent Citations

  • Spraying device

    JP1983004189U

  • - - Spray header

    JP1983023664U

  • Sand collecting method for sedimentation basin and its device

    JP1995100306A

  • Alkali washing liquid recycling apparatus and method for using it

    JP2005230608A

  • Sand collection nozzle and sand collection nozzle device

    JP2013202570A