Hydrogen gas production device and hydrogen gas production method
The system efficiently produces pressurized hydrogen gas by utilizing a gasifier, separation device, and gas turbine to drive a compressor, addressing inefficiencies in existing methods and enhancing hydrogen yield and operational stability.
Patent Information
- Application Number
- JP2021019927
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2021-02-10
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2041-02-10
AI Technical Summary
Existing technologies do not efficiently produce pressurized hydrogen gas from a gasifier with low environmental impact, missing opportunities for profitable hydrogen gas production.
A system comprising a gasifier, separation device, gas turbine, and gas compressor, where the gas turbine rotates using combustible gas to drive the compressor, efficiently compressing hydrogen gas to a pressurized state.
The system enables efficient production of pressurized hydrogen gas with reduced energy loss, allowing for higher hydrogen yield and stable operation by adjusting waste processing and hydrogen storage.
Smart Images

Figure 0007577556000001 
Figure 0007577556000002 
Figure 0007577556000003
Abstract
Description
[Technical field]
[0001] The present invention relates to a hydrogen gas production device and a hydrogen gas production method. [Background technology]
[0002] Due to the increasing demand for clean energy in recent years, hydrogen gas is increasingly being used as an energy source. In order to save space in tanks that store hydrogen gas, the hydrogen gas is usually stored in a gas tank under a pressurized state of several atmospheres or more.
[0003] Incidentally, the following Patent Document 1 describes a method in which waste is thermally decomposed in a gasification furnace to obtain combustible gas containing hydrogen gas, and this combustible gas is used to operate a gas engine to obtain electricity. [Prior art documents] [Patent documents]
[0004] [Patent Document 1] JP 2020-76008 A Summary of the Invention [Problem to be solved by the invention]
[0005] If pressurized hydrogen gas could be efficiently produced from the gas generated in a gasifier as described in Patent Document 1, hydrogen gas with low environmental impact could be obtained, which would be of great benefit. However, such consideration has not been sufficient. Therefore, an object of the present invention is to efficiently produce pressurized hydrogen gas from the gas generated in a gasifier. [Means for solving the problem]
[0006] To solve the above problems, the present invention provides: a gasifier for gasifying the waste material containing hydrocarbons; a separation device for separating hydrogen gas contained in the combustible gas from the combustible gas obtained by the gasification; a gas turbine including a turbine that rotates using the remaining combustible gas after the hydrogen gas is separated by the separation device; and a gas compressor that is mechanically connected to the turbine and is driven by the rotation of the turbine to compress the hydrogen gas.
[0007] To solve the above problems, the present invention provides: A hydrogen gas production method for producing pressurized hydrogen gas using a hydrogen gas production apparatus, comprising: gasifying the waste material containing hydrocarbons in a gasifier; Separating hydrogen gas contained in the combustible gas from the combustible gas obtained by the gasification; rotating a turbine using the remaining combustible gas after the hydrogen gas is separated; the rotation of the turbine is transmitted to a compressor to drive the compressor, and the hydrogen gas is compressed in the compressor to bring it into a pressurized state. Effect of the Invention
[0008] According to the present invention, pressurized hydrogen gas can be efficiently produced from gas generated in a gasification furnace. [Brief description of the drawings]
[0009] [Figure 1] 1 is a schematic configuration diagram of a hydrogen gas production device according to a first embodiment. [Diagram 2] FIG. 1 is a schematic diagram showing a part of a hydrogen gas production device in which hydrogen gas is compressed in two stages. [Diagram 3] FIG. 11 is a schematic configuration diagram of a hydrogen gas production device according to a second embodiment. [Figure 4] FIG. 6 is a schematic diagram showing how gas power generation is carried out in a hydrogen gas production device according to a second embodiment. [Diagram 5]FIG. 11 is a schematic diagram showing how hydrogen gas is produced and gas power generation is performed in a hydrogen gas production device according to a second embodiment. [Figure 6] FIG. 6 is a schematic diagram showing how gas power generation is carried out in a hydrogen gas production device according to a second embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0010] Hereinafter, an embodiment of the present invention will be described with reference to the drawings. In the present invention, hydrogen gas is produced while treating waste materials. In the following, an embodiment (first embodiment) that mainly produces hydrogen gas, and an embodiment (second embodiment) that not only produces hydrogen gas but also generates electricity from combustible gas will be described. First, a first embodiment of the present invention will be described with reference to FIGS.
[0011] (First embodiment) The hydrogen gas production device in this embodiment is configured to be able to produce hydrogen gas from waste materials that contain hydrocarbons, such as waste plastics. As shown in FIG. 1, the hydrogen gas production device 1 in this embodiment includes a waste storage section 10 that serves as a stockyard for waste containing hydrocarbons, and a gas storage section 90 that stores hydrogen gas.
[0012] The hydrogen gas production apparatus 1 comprises a gasification furnace 20 which gasifies the waste supplied from the waste storage section 10, a separation device 30 which separates the hydrogen gas contained in the combustible gas obtained by the gasification from the combustible gas, a gas turbine 40 equipped with a turbine 41 which rotates using the remaining combustible gas after the hydrogen gas is separated by the separation device 30, and a gas compressor 50 which is mechanically connected to the turbine 41 and driven by the rotation of the turbine 41 to compress the hydrogen gas, and is configured so that the hydrogen gas pressurized by the gas compressor 50 can be stored in the gas storage section 90.
[0013] The hydrogen gas production device 1 of this embodiment includes a reformer 60 that reforms the combustible gas before separation in the separation device 30 to increase the hydrogen gas concentration in the combustible gas.
[0014] The hydrogen gas production apparatus 1 of this embodiment is capable of receiving information (hereinafter also referred to as "gas volume information I1") relating to the storage status of hydrogen gas in the gas storage section 90 (current storage volume, predicted future consumption volume, etc.) and information (hereinafter also referred to as "waste volume information I2") relating to the storage status of waste in the waste storage section 10 (current storage volume, predicted future acceptance volume, etc.), and further includes a control device 100 that transmits a signal (hereinafter also referred to as "processing volume signal C1") relating to the amount of waste supplied to the gasification furnace 20 (amount of waste processed per unit time) based on this information (I1, I2).
[0015] The hydrocarbons contained in the waste stored in the waste storage section 10 may be contained in the form of rubber, plastic, paper, textile products, vegetation, food, sludge, etc. The waste may be mixed with non-combustible materials (e.g., materials that do not thermally decompose at a temperature of about 800°C) such as metals, ceramics, and glass. The ratio of non-combustible materials in the waste is preferably 50% or less by mass. The ratio of non-combustible materials may be 40% or less, or may be 30% or less. Among the combustible materials decomposed in the gasification furnace 20, rubber and plastic are preferable as the waste to be gasified in this embodiment in that they have a lower moisture content than paper, food, etc., and the combustible components contained in the gas discharged from the gasification furnace 20 are less likely to be diluted by water vapor. If the difference between the mass of the waste supplied to the gasification furnace 20 and the mass of the decomposition residue discharged from the gasification furnace 20 without being thermally decomposed in the gasification furnace 20 is taken as the mass of combustible material gasified in the gasification furnace 20, and this mass is taken as 100%, then it is preferable that 20% or more of the waste supplied to the gasification furnace 20 is rubber or plastic, and more preferably 30% or more is rubber or plastic. The proportion of rubber or plastic may be 40% or more, or may be 50% or more.
[0016] The waste storage section 10 may include a weighing device (not shown) for obtaining waste amount information I2 to be transmitted to the control device 100.
[0017] The gasification furnace 20 is configured to thermally decompose high molecular weight solid hydrocarbons such as rubber (e.g., natural rubber, styrene butadiene rubber, butyl rubber, EPDM, chloroprene rubber, urethane rubber, etc.) or plastics (e.g., polyethylene, polypropylene, polyvinyl chloride, polyethylene terephthalate, polystyrene, thermoplastic elastomer, etc.) contained in the waste inside the furnace, and discharge combustible gases containing combustible components such as low molecular weight hydrocarbon gases such as methane, ethane, propane, and butane, hydrogen gas, and carbon monoxide gas. The gasification furnace 20 is preferably a fluidized bed furnace, a shaft furnace, a fixed bed furnace, or a melting furnace. When gasifying waste containing a large amount of plastics that melt at a relatively low temperature of 100 to 200°C or amorphous materials such as sludge, the gasification furnace 20 is preferably a fluidized bed furnace.
[0018] In the hydrogen gas production apparatus 1 of this embodiment, the combustible gas discharged from the gasification furnace 20 is reformed by the reformer 60 before being introduced into the separation device 30. This combustible gas before reforming (hereinafter also referred to as "non-reformed gas") contains a small amount of hydrogen gas and a large amount of organic combustible components (CH4, CO, etc.).
[0019] In the reformer 60 of this embodiment, hydrogen gas is generated by decomposition of the hydrocarbon gas, and a reaction takes place in which the hydrogen gas concentration in the combustible gas (hereinafter also referred to as "unseparated gas") after passing through the reformer 60 and before separation in the separation device 30 becomes higher than that in the non-reformed gas. In the reformer 60, for example, the following reaction occurs between the hydrocarbon gas and water vapor in the presence of a metal catalyst. C n H 2n+2 +nH2O → nCO+(2n+1)H2
[0020] The water vapor used in the above reaction may be introduced into the reformer 60 to react with the combustible gas, or may be mixed with the combustible gas upstream of the reformer 60. Furthermore, the water vapor may be present in advance in the combustible gas discharged from the gasifier 20. The amount of water vapor in the combustible gas at the time of discharge from the gasifier 20 can be adjusted, for example, depending on the proportion of waste with a high moisture content, such as grass and food. When the gasifier 20 is a fluidized bed furnace, the water vapor content of the non-reformed gas discharged from the gasifier 20 can be adjusted by using part or all of the fluidized gas as water vapor.
[0021] In the reformer 60, reforming is preferably performed such that the combustible gas (unseparated gas) after passing through the reformer 60 has a lower hydrocarbon gas concentration than the non-reformed gas and a higher hydrogen gas concentration than the non-reformed gas. In the reforming in the reformer 60, the volumetric ratio of hydrogen gas is increased, for example, to 1.2 times or more. The volumetric ratio of hydrogen gas in the combustible gas (unseparated gas) after passing through the reformer 60 may be 1.5 times or more than that of the non-reformed gas. The combustible gas after passing through the reformer 60 preferably contains 10% or more by volume of hydrogen gas, and preferably contains 20% or more by volume of hydrogen gas. The hydrogen gas concentration in the unseparated gas is usually 80% or less by volume.
[0022] The separation device 30 is configured to separate hydrogen gas from the combustible gas (unseparated gas) reformed by the reformer 60. The hydrogen gas production device 1 of this embodiment includes a first path (hereinafter also referred to as a "hydrogen gas path HL") for discharging the separated hydrogen gas from the separation device 30, and a second path (hereinafter also referred to as a "residual gas path GL") for discharging the combustible gas from which the hydrogen gas has been removed (hereinafter also referred to as a "residual gas path GL").
[0023] The separation device 30 may be a pressure swing adsorption device (PSA), a temperature swing adsorption device (TSA), a membrane separation device, etc. Preferably, the separation device 30 is a pressure swing adsorption device (PSA) or a membrane separation device.
[0024] The gas turbine 40 of this embodiment is an internal combustion engine that is connected to the separation device 30 through the residual gas path GL and can be operated using the residual gas as fuel. The gas turbine 40 of this embodiment may use only the residual gas as fuel, or may be capable of using, for example, fossil fuel as an auxiliary fuel. The gas turbine 40 of this embodiment has a turbine 41 fixed to one end of a rotating shaft 42, and is configured such that the turbine 41 rotates around the axis together with the rotating shaft 42 by combustion of the residual gas.
[0025] The gas compressor 50 in this embodiment is connected to the separation device 30 through the hydrogen gas path HL, and is capable of being supplied with the hydrogen gas separated in the separation device 30. The gas compressor 50 is configured so that the hydrogen gas is in a pressurized state compared to before it is introduced into the gas compressor 50.
[0026] The gas compressor 50 may be one that compresses gas by directly utilizing the rotational force transmitted from a gas turbine as the rotational force, or one that compresses gas by converting the rotational force into a reciprocating motion. The gas compressor 50 may be a turbo compressor such as a centrifugal compressor or an axial compressor, or a volumetric compressor such as a reciprocating compressor, a diaphragm compressor, a scroll compressor, or a rotary compressor.
[0027] The gas compressor 50 has a rotating shaft 51, which is configured to be rotated by the rotating shaft 42 of the gas turbine 40, and is configured to be able to convert the rotational power transmitted from the rotating shaft 42 into power to compress hydrogen gas. The rotating shaft 42 of the gas turbine 40 and the rotating shaft 51 of the gas compressor 50 may be mechanically connected to each other as a single common shaft, or may be mechanically connected to each other via a transmission G.
[0028] The gas compressor 50 may be of a type that compresses hydrogen gas to a pressurized state by only one stage of pressure increase. The gas compressor 50 of this embodiment may be of a multi-stage compression type that is capable of increasing the pressure of hydrogen gas in multiple stages so that the pressure can be increased to a higher pressure. The gas compressor 50 of the multi-stage compression type may be of a type in which gas cooling (intermediate cooling) is performed between one compression stage of a plurality of compression stages and the compression stage next to the one compression stage.
[0029] The gas compressor 50 is preferably capable of compressing hydrogen gas to a pressure (gauge pressure) of 1 MPa or more, and more preferably capable of compressing hydrogen gas to a pressure of 10 MPa or more. The hydrogen gas is usually compressed to a pressure of 100 MPa or less by the gas compressor 50.
[0030] In the hydrogen gas production apparatus 1 of this embodiment, the portion indicated by the dashed line A in Fig. 1 can be modified as shown in Fig. 2. In the hydrogen gas production apparatus 1 of this embodiment, in addition to the gas compressor 50 driven by the gas turbine 40, another gas compressor (hereinafter also referred to as "second gas compressor 501") may be provided as necessary, and the hydrogen gas pressurized by the gas compressor 50 (hereinafter also referred to as "first gas compressor 50") may be further compressed to a higher pressure.
[0031] The second gas compressor 501 may be driven by another gas turbine (hereinafter also referred to as "second gas turbine 401") in the same way that the first gas compressor 50 can be driven by the gas turbine 40 (hereinafter also referred to as "first gas turbine 40"). That is, the second gas compressor 501 may have a rotating shaft 511, and the rotating shaft 511 is configured to be rotated by the rotating shaft 421 of the second gas turbine 401, and may have a configuration capable of converting the rotational power of the turbine 411 in the second gas turbine 401 into power for compressing hydrogen gas. In this case, as shown in FIG. 2, the residual gas path GL may be branched to distribute and supply the residual gas to both the first gas compressor 50 and the second gas compressor 501, and the hydrogen gas that has been pressurized by the first gas compressor 50 may be further compressed by the second gas compressor 501 to a higher pressure.
[0032] As described above, the hydrogen gas production apparatus 1 of this embodiment may include a plurality of gas turbines including a first gas turbine 40 and a second gas turbine 401, each of which is equipped with a turbine that rotates using the remaining combustible gas after the hydrogen gas is separated by the separation device 30. The remaining combustible gas after separation by the separation device 30 may be distributed to the first gas turbine 40 and the second gas turbine 401. The first gas compressor 50 may be mechanically connected to the turbine 41 of the first gas turbine 40 and driven by the rotation of the turbine 41 to compress the hydrogen gas, and the second gas compressor 501 may be mechanically connected to the turbine 411 of the second gas turbine 401 and driven by the rotation of the turbine 411 to further compress the hydrogen gas compressed by the first gas compressor 50. In this case, by adjusting the distribution ratio of the residual gas from the separation device 30 to the first gas turbine 40 and the second gas turbine 401, it may be possible to adjust the degree of compression of hydrogen gas in the first gas compressor 50 and the degree of compression of hydrogen gas in the second gas compressor 501.
[0033] The second gas compressor 501 may be one that is not driven by the second gas turbine 401 but can be one that can be operated by grid power or the like. In this case, the structure of the device can be simplified since there is no need to branch the residual gas path GL. A cooling device C for cooling the hydrogen gas flowing through the hydrogen gas path HL may be provided between the first gas compressor 50 and the second gas compressor 501.
[0034] In this embodiment, the pressurized hydrogen gas is stored in the gas storage unit 90 at a pressure of, for example, 70 MPa or more and 100 MPa or less. The gas storage unit 90 may be configured with a hydrogen gas tank or the like. The gas storage unit 90 may have a pressure sensor that detects the pressure of the stored hydrogen gas so that the control device 100 can acquire gas amount information I1.
[0035] In this embodiment, pressurized hydrogen gas is produced using the above-mentioned hydrogen gas production apparatus 1. In the method for producing hydrogen gas using this hydrogen gas production apparatus 1, the following steps are performed: gasifying waste containing hydrocarbons in a gasification furnace 20, separating hydrogen gas contained in the combustible gas from the combustible gas obtained by the gasification, rotating a turbine 41 using the remaining combustible gas after the hydrogen gas is separated, transmitting the rotation of the turbine 41 to the first gas compressor 50 to drive the first gas compressor 50, and compressing the hydrogen gas in the first gas compressor 50 to produce a pressurized state.
[0036] Unlike a case where the gas turbine 40 generates electricity, and the kinetic energy due to the rotation of the turbine 41 is converted into electrical energy once, and the electrical energy is used to drive the first gas compressor 50, this embodiment can suppress the occurrence of energy loss due to energy conversion. Therefore, this embodiment has the effect of efficiently compressing hydrogen gas.
[0037] In a preferred aspect of the present embodiment, the combustible gas is reformed to increase the hydrogen gas concentration in the combustible gas before separating the hydrogen gas, thereby achieving the effect of enabling a larger amount of hydrogen gas to be produced from the waste.
[0038] In a preferred embodiment of the present invention, since the control device 100 is provided, a processing amount signal C1 can be transmitted to reduce the amount of waste material supplied to the gasification furnace 20 when the supply of hydrogen gas to the gas storage unit 90 becomes excessive. Therefore, in this embodiment, it is possible to avoid a situation in which the gas storage unit 90 is unable to store all the hydrogen gas, or a situation in which the operation of the gasification furnace 20 must be suspended. The above-mentioned effects can also be achieved in the second embodiment described below.
[0039] Second embodiment 3 to 6 are diagrams showing the hydrogen gas production device 1 and its operation method in the second embodiment. In these figures, the same components as those in the first embodiment are denoted by the same reference numerals. In the following, detailed description will not be repeated for configurations similar to those in the first embodiment. For example, the aspect shown in Fig. 2 in the first embodiment can also be adopted in this second embodiment, but detailed description of this aspect will not be repeated in the following.
[0040] As shown in FIG. 3, the hydrogen gas production device 1 of this embodiment further includes a gas generator 80 capable of generating electricity by burning a combustible gas.
[0041] The hydrogen gas production apparatus 1 of this embodiment includes a switching device (hereinafter also referred to as a "first switching device 71") that switches the supply path of the non-reformed gas so that a part or all of the non-reformed gas discharged from the gasification furnace 20 is supplied to the gas generator 80 without being supplied to the reformer 60 or the separation device 30. The hydrogen gas production apparatus 1 of this embodiment also includes a switching device (hereinafter also referred to as a "second switching device 72") that switches the path so that a part or all of the residual gas supplied to the gas turbine 40 through the residual gas path GL is supplied to the gas generator 80 without being supplied to the gas turbine 40. The hydrogen gas production apparatus 1 of this embodiment also includes a switching device (hereinafter also referred to as a "third switching device 73") that switches the path so that a part or all of the hydrogen gas supplied to the gas compressor 50 through the hydrogen gas path HL is supplied to the gas generator 80 without being supplied to the gas compressor 50.
[0042] The hydrogen gas production device 1 of this embodiment is configured such that the switching of the gas path by the first switching device 71, the second switching device 72, and the third switching device 73 is performed by the control device 100. By having such a configuration, the hydrogen gas production device 1 of this embodiment makes it easier to stabilize the amount of waste material processed and the amount of hydrogen gas stored in the gas storage section 90.
[0043] Although the quality of the non-reformed gas discharged from the gasifier 20 is stable to a certain degree during normal operation after a certain amount of time has elapsed since the start of gasification, the ratio of combustible components and the specific substances of the combustible components contained therein change significantly when the gasifier 20 is started up and gasification begins. Therefore, at the start of gasification of the waste, it is preferable to operate the gas generator 80 with the non-reformed gas without producing hydrogen gas with the non-reformed gas, as shown in FIG.
[0044] In this embodiment, once the properties of the non-reformed gas have stabilized over a certain period of time following the start of gasification, production of hydrogen gas can be started in the manner shown in Fig. 3, and until then, energy can be recovered in the form of electric power through the power generation by the gas generator 80. The quality of the non-reformed gas can become unstable not only at the start of gasification, but also when the quality of the waste input into the gasifier 20 changes significantly. In this embodiment, even in such a case, the supply destination of the non-reformed gas can be switched from the reformer 60 or the separator 30 to the gas generator 80 by the first switching device 71.
[0045] The switching of the supply destination of the non-reformed gas by the first switching device 71 does not necessarily require switching the supply destination of the entire amount of combustible gas generated from the gasification furnace 20, and the gas generator 80 may be operated with a portion of the combustible gas while hydrogen gas is produced with the remainder. That is, the hydrogen gas production device 1 of this embodiment may not only be capable of distributing the combustible gas generated from the gasification furnace 20 to the reformer 60 (separator 30) and the gas generator 80, but also may vary the distribution ratio. This allows for stable production of hydrogen gas and treatment of waste materials.
[0046] In this embodiment, as shown in Fig. 5, the combustible gas generated from the gasification furnace 20 can be supplied to the separation device 30 through the reformer 60 while simultaneously supplying the combustible gas to the gas generator 80. Therefore, for example, if the amount of combustible gas supplied to the separation device 30 per unit time is constant and the remaining amount is supplied to the gas generator 80, the amount of hydrogen gas produced per unit time can be made constant even if the amount of waste that needs to be treated per unit time fluctuates with time. Conversely, even in a situation where it is necessary to cause the amount of hydrogen gas produced to fluctuate with time due to a large change in the consumption of hydrogen gas, in this embodiment, the distribution ratio of combustible gas can be changed in response to the required amount of hydrogen gas produced, so that the amount of waste treated per unit time can be made constant.
[0047] To enable the above-mentioned operation, it is preferable that the switching of the supply destination of the non-reformed gas by the first switching device 71 in this embodiment can also be performed based on the gas amount information I1, the waste amount information I2, etc. That is, power generation in the gas generator 80 is performed by changing the amount of combustible gas supplied to the gas generator 80 per unit time, and it is preferable that the change in the amount of the combustible gas is performed based on the amount of waste held in the waste storage unit 10 or the amount of the hydrogen gas stored in the gas storage unit 90.
[0048] For example, when operation is performed based on the amount of waste stored in the waste storage unit 10, a predetermined reference value (Xws) for the amount of waste stored is set to determine whether waste treatment is necessary, and the current amount of waste stored in the waste storage unit 10 or a predicted amount of waste stored after a certain time is set as a control value (Xwr). Then, when the control value is equal to or greater than the reference value (Xws≦Xwr), it is determined that the amount of waste to be processed should be increased regardless of the amount of hydrogen gas stored, and the amount of waste supplied to the gasification furnace 20 is increased. That is, if the supply of waste to the gasification furnace 20 has stopped up to that point, the supply of waste to the gasification furnace 20 is started at that timing, and if waste has been supplied up to that point, the amount of waste supplied per unit time to the gasification furnace 20 is increased at that timing. At this time, if the amount of hydrogen gas stored is sufficient, the gas generator 80 generates electricity without reforming, so that electricity can be generated while treating the waste.
[0049] As described above, a reference value (Xws) is set in advance for the amount of waste held. Either the amount of waste held in the waste storage unit 10 at the current time or the predicted value of the amount of waste held in the waste storage unit 10 after a certain period of time is used as a comparison value (Xwr). When the comparison value is equal to or greater than the reference value (Xws ≦ Xwr), the amount of waste gasified per unit time is increased to prevent the amount of waste held in the waste storage unit 10 from becoming excessive. As the reference value (Xws), a plurality of reference values including a first reference value (Xws1) and a second reference value (Xws2) having a value larger than the first reference value (Xws1) may be set. In that case, in a first case where the comparison value (Xwr) is equal to or greater than the first reference value (Xws1) and less than the second reference value (Xws2) (Xws1 ≦ Xwr < Xws2), and in a second case where the comparison value (Xwr) is equal to or greater than the second reference value (Xws2) (Xws2 ≦ Xwr), the rate of increase of the waste to be gasified may be changed, and the rate of increase of the waste to be gasified in the second case may be made higher than that in the first case. When the ratio of the waste to be gasified is increased in this way, the quality (component ratio) of the combustible gas obtained by gasification in the gasification furnace 20 may change significantly. Therefore, the reforming in the reformer 60 and the separation of hydrogen gas in the separation device 30 may be stopped, and the supply of hydrogen gas to the gas storage unit 90 may be stopped. In that case, for example, the supply of hydrogen gas to the gas storage unit 90 may be carried out in the first case, and the supply of hydrogen gas to the gas storage unit 90 may be stopped in the second case.
[0050] Also, when operating based on the hydrogen gas storage amount, it is possible to perform an operation in which the demand for hydrogen gas is predicted or the waste supply amount is increased and power generation is stopped to preferentially produce hydrogen gas when the hydrogen gas storage amount becomes equal to or less than a predetermined reference value. That is, a reference value (Xhls) is set in advance for the lower limit of the hydrogen gas holding amount also in the gas storage unit 90, and either the current hydrogen gas holding amount in the gas storage unit 90 or the predicted value of the hydrogen gas holding amount in the gas storage unit 90 after a certain period of time is used as a comparison value (Xhr). When the comparison value becomes equal to or less than the reference value (Xhr≦Xhls), the supply amount of hydrogen gas to the gas storage unit 90 per unit time is increased, thereby preventing a shortage of the hydrogen gas holding amount in the gas storage unit 90. Furthermore, a reference value (Xhhs(Xhls<Xhhs)) is set in advance for the upper limit of the hydrogen gas holding amount in the gas storage unit 90, and when the comparison value becomes equal to or greater than the reference value (Xhhs≦Xhr), the supply amount of hydrogen gas to the gas storage unit 90 per unit time is decreased, thereby preventing an excess of the hydrogen gas holding amount in the gas storage unit 90.
[0051] Regarding the reference value (Xhhs) that is the upper limit of the hydrogen gas holding amount, similar to the reference value (Xws) of the waste holding amount, a plurality of reference values including a first reference value (Xhhs1) and a second reference value (Xhhs2) having a value larger than the first reference value (Xhhs1) may be set. Then, in a first case (Xhhs1≦Xhr<Xhhs2) where the comparison value (Xhr) is equal to or greater than the first reference value (Xhhs1) and less than the second reference value (Xhhs2), and in a second case (Xhhs2≦Xhr) where the comparison value (Xhr) is equal to or greater than the second reference value (Xhhs2), the reduction ratio of the supply amount of hydrogen gas to the gas storage unit 90 may be changed, and the reduction ratio may be higher in the second case than in the first case. In that case, for example, in the first case, the supply amount of hydrogen gas to the gas storage unit 90 may be reduced but continued, and in the second case, the supply of hydrogen gas to the gas storage unit 90 may be stopped.
[0052] Regarding the reference value (Xhls) that is the lower limit of the hydrogen gas holding amount, a plurality of reference values including a first reference value (Xhls1) and a second reference value (Xhls2) having a value smaller than the first reference value (Xhls1) may be set. Then, in a first case (Xhls2 < Xhr ≤ Xhls1) where the control value (Xhr) exceeds the second reference value (Xhhs2) and is equal to or less than the first reference value (Xhls1), and in a second case (Xhr ≤ Xhls2) where the control value (Xhr) is equal to or less than the second reference value (Xhls2), the increase rate of the supply amount of hydrogen gas to the gas storage unit 90 may be changed, and the increase rate in the second case may be made higher than that in the first case.
[0053] The increase or decrease in the supply amount of hydrogen gas to the gas storage unit 90 can be adjusted by the distribution amount when the distribution of combustible gas to the gas generator 80 is being carried out. Also, the increase or decrease in the supply amount of hydrogen gas to the gas storage unit 90 can be adjusted by the supply amount of waste per unit time to the gasifier 20 (the amount of combustible gas generated in the gasifier).
[0054] The reformer 60 and the separation device 30 may not need to be frequently stopped or restarted. Since the hydrogen gas production apparatus 1 of the present embodiment has a second switching device 72 and a third switching device 73 and can supply the separated hydrogen gas and residual gas to the gas storage unit 90, as shown in FIG. 6, the supply of hydrogen gas to the gas storage unit 90 can be stopped while continuing the operation of the reformer 60 and the separation device 30.
[0055] Also, the gasifier 20 may not need to be frequently stopped or restarted. Since the hydrogen gas production apparatus 1 of the present embodiment has a first switching device 71 and a gas generator 80 and can supply combustible gas to the gas generator 80, the supply of hydrogen gas to the gas storage unit 90 can be stopped without stopping the gasifier 20. In this case, the waste supply amount to the gasifier 20 is not particularly limited, but it may be the minimum amount that allows the gasifier 20 to maintain its function.
[0056] The hydrogen gas production device 1 of this embodiment has the above-mentioned configuration, and therefore it is easy to set a time period during the day when hydrogen gas is mainly supplied to the gas storage section 90 and a time period during the day when the gas generator 80 is mainly operated. For example, in this embodiment, when the power demand is relatively high during the day from 7:00 to 23:00, the gas generator 80 is mainly used for power generation, and from 23:00 to 7:00 the next day, the reformer 60 and the separator 30 are basically stopped until about 22:00, and after 22:00, the operation of the reformer 60 and the separator 30 is started while the separated hydrogen gas and the remaining gas are supplied to the gas generator 80 to generate power in the gas generator 80 as shown in FIG. 6, and then, at 23:00, power generation is stopped (FIG. 3), or the supply of hydrogen gas to the gas storage section 90 is started (FIG. 5) while continuing to generate power using a portion of the combustible gas. Furthermore, even during periods of high electricity demand, an operating method can be adopted in which hydrogen gas is supplied to the gas storage section 90 in accordance with the amount of hydrogen gas stored, as shown in FIG.
[0057] In this embodiment, as described above, a separation stop period in which the operation of the separation device 30 is stopped without supplying the combustible gas generated in the gasification furnace 20 to the separation device 30, a separation start period in which the operation of the separation device 30 is started to separate hydrogen gas from the combustible gas but the hydrogen gas is not supplied to the gas storage section 90, and a gas supply start period in which the supply of hydrogen gas separated by the separation device 30 to the gas storage section 90 is started can be implemented in sequence, thereby suppressing unnecessary energy consumption in operating the separation device 30 and the reformer 60.
[0058] In this embodiment, as described above, during the period from 7:00 to 23:00 when the demand for electricity is high, the distribution ratio of the combustible gas generated in the gasification furnace 20 to the gas generator 80 side can be made higher than that to the separation device 30 side, and during the period from 23:00 to 7:00 the next morning when the demand for electricity is low, the distribution ratio to the separation device 30 side can be made higher than that to the gas generator 80 side. The distribution ratio of the combustible gas to the gas generator 80 side during the period from 7:00 to 23:00 can be, for example, 60% or more on average for one week. The distribution ratio may be 70% or more, 80% or more, or the entire amount (100%) if necessary. That is, in this embodiment, hydrogen gas can be produced and stored at night, and the device can be operated mainly for power generation during the day.
[0059] The electricity generated by the gas generator 80 may be sold to a local power company or may be used in the device. For example, when the second gas compressor is used to further compress and pressurize the hydrogen gas compressed by the first gas compressor 50 driven by the turbine 41, the electricity generated by the gas generator 80 may be used as an energy source for driving the second gas compressor. Furthermore, the electricity generated may be used for various purposes, not limited to such purposes.
[0060] In the above, the invention according to this embodiment is specifically explained by giving specific examples of the hydrogen gas production apparatus 1 and the hydrogen gas production method as described above. However, in the present invention, each of the technical matters exemplified above can be modified as appropriate, and even matters not directly described above can be added as appropriate with matters that are conventionally known. That is, the present invention is not limited to the above examples. [Explanation of symbols]
[0061] 1: hydrogen gas production device, 10: waste storage section, 20: gasification furnace, 30: separation device, 40: gas turbine, 41: turbine, 42: rotating shaft, 50: gas compressor (first gas compressor), 501: gas compressor (second gas compressor), 60: reformer, 80: gas generator, 90: gas storage section, 100: control device
Claims
1. a gasifier for gasifying the waste material containing hydrocarbons; a separation device for separating hydrogen gas contained in the combustible gas from the combustible gas obtained by the gasification; a gas turbine including a turbine that rotates using the remaining combustible gas after the hydrogen gas is separated by the separation device; a gas compressor that is mechanically connected to the turbine and driven by the rotation of the turbine to compress the hydrogen gas separated in the separation device to a pressure of 10 MPa or more.
2. 2. The hydrogen gas production apparatus according to claim 1, further comprising a reformer for reforming the combustible gas before separation by the separation device to increase the hydrogen gas concentration in the combustible gas.
3. 3. The hydrogen gas production apparatus according to claim 1, wherein the separation device is a pressure swing adsorption device or a membrane separation device.
4. 4. The hydrogen gas production apparatus according to claim 1, wherein the gasification furnace is a fluidized bed furnace, a shaft furnace, a fixed bed furnace, or a melting furnace.
5. 5. The hydrogen gas production device according to claim 1, further comprising a gas generator capable of generating electricity by burning the combustible gas.
6. A hydrogen gas production method for producing pressurized hydrogen gas using a hydrogen gas production apparatus, comprising: gasifying the waste material containing hydrocarbons in a gasifier; Separating hydrogen gas contained in the combustible gas from the combustible gas obtained by the gasification; supplying the remaining combustible gas after the hydrogen gas is separated to a gas turbine to rotate a turbine of the gas turbine; the rotation of the turbine is transmitted to a gas compressor to drive the gas compressor, and the hydrogen gas is compressed in the gas compressor to a pressurized state of 10 MPa or more.
7. 7. The method for producing hydrogen gas according to claim 6, further comprising the step of reforming the combustible gas to increase the hydrogen gas concentration in the combustible gas before separating the hydrogen gas.
8. The hydrogen gas production apparatus further includes a gas generator, 8. The method for producing hydrogen gas according to claim 6 or 7, further comprising burning the combustible gas in the gas generator to generate electricity.
9. the hydrogen gas production apparatus has a gas storage section that stores the hydrogen gas pressurized by the gas compressor, The power generation in the gas generator is carried out by changing the amount of the combustible gas supplied to the gas generator per unit time, 9. The method for producing hydrogen gas according to claim 8, wherein the amount of the flammable gas is changed based on the amount of the waste material or the amount of the hydrogen gas stored in the gas storage section.
Citation Information
Patent Citations
Production of hydrogen-containing gas stream
JP1987048793A
Hydrogen manufacturing apparatus
JP2003183006A
Hydrogen manufacturing equipment and manufacturing method
JP2006224885A
Electric power generation system combined with hydrogen production facility, electric power generating method
JP2007138900A
Method and apparatus for producing hydrogen gas and carbon monoxide gas from inflammable waste
JP2007277479A