How to build embankment structures

The method of constructing embankments using lightweight block members with through holes and crushed stone fills addresses buoyancy and cost issues, enhancing drainage and reducing construction costs.

JP7579185B2Active Publication Date: 2024-11-07SUMITOMO MITSUI CONSTRUCTION CO LTD
View PDF 11 Cites 0 Cited by

Patent Information

Application Number
JP2021040424
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2021-03-12
Publication Date
2024-11-07
Estimated Expiration
2041-03-12

AI Technical Summary

Technical Problem

Existing embankment structures using lightweight foam materials face issues with insufficient buoyancy countermeasures, complex shapes leading to high manufacturing and transportation costs, and time-consuming construction.

Method used

A method involving block members made of lightweight materials with vertical and horizontal through holes, filled with crushed stone, and using pile members or geotextile to prevent crushed stone flow, forming a drain and increasing weight to counter buoyancy.

Benefits of technology

The method reduces construction and transportation costs while improving drainage and buoyancy resistance, allowing for efficient and economical embankment construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007579185000001
    Figure 0007579185000001
  • Figure 0007579185000002
    Figure 0007579185000002
  • Figure 0007579185000003
    Figure 0007579185000003
Patent Text Reader

Abstract

To provide a construction method of a banking structure which can construct banking with an inexpensive and simple configuration.SOLUTION: A construction method of a banking structure includes: a first step of preparing a block member comprising a light-weight material having a through hole penetrating at least in a vertical direction; a second step of stacking the block members in a prescribed range to a predetermined height; and a third step of filling crushed stones in the through hole.SELECTED DRAWING: Figure 8
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a method for constructing an embankment structure using block members made of lightweight materials such as foam materials. [Background technology]

[0002] 2. Description of the Related Art Conventionally, in civil engineering work on soft ground, etc., when forming embankments using soil and sand, it is known to construct the embankments using lightweight materials made of synthetic resin foams such as expanded polystyrene and expanded polystyrene.

[0003] Various types of block members used in such methods of constructing embankment structures are known, for example, embankment blocks for constructing embankment structures as described in the following patent documents.

[0004] The blocks for constructing embankments described in Patent Document 1 are embankment blocks made of expanded polystyrene that are stacked in multiple layers on the ground to construct an embankment structure. A hollow portion is formed inside to allow water to enter the block, and an inlet for flowing water into the hollow portion and an outlet for draining water from the hollow portion are provided continuously from the block to the end face.

[0005] With this type of embankment block for constructing embankments, by providing a hollow section that allows water to penetrate inside, it is possible to significantly reduce buoyancy while taking advantage of the inherent property of polystyrene foam blocks, that is, their ultra-lightweightness. As a result, the amount of embankment needed to counter buoyancy is reduced, making it possible to construct an economical embankment structure.

[0006] The foamed resin block for embankments described in Patent Document 2 has square upper and lower surfaces, and has n2 (n is a natural number) through holes of the same size that penetrate the upper and lower surfaces of the foamed resin block. The four side surfaces of the foamed resin block have n (n is the same as above) side surface through-holes that penetrate the upper and lower surfaces of the block and have half the shape of the through holes, and the four corners of the foamed resin block have four-corner through-holes that penetrate the upper and lower surfaces of the block and have a quarter of the shape of the through holes, and the through holes, side surface through-holes and four-corner through-holes are arranged at regular intervals and are connected by lateral grooves that have openings on the lower surface of the foamed resin block, and protrusions are provided on the upper surface of the foamed resin block at positions corresponding to the lateral grooves.

[0007] Such a foamed resin block for banking has square upper and lower surfaces, and has n2 (n is a natural number) through holes of the same size penetrating the upper and lower surfaces of the foamed resin block, and on the four side surfaces of the foamed resin block, n (n is the same as above) side surface through-holes each penetrating the upper and lower surfaces of the block and having half the shape of the through-holes, and on the four corners of the foamed resin block, four corner through-holes each penetrating the upper and lower surfaces of the block and having a quarter of the shape of the through-holes, and further each through-hole The holes, side recesses and four corner recesses are arranged at regular intervals and are connected by horizontal grooves having openings on the underside of the foamed resin block, and protrusions are provided on the upper side of the foamed resin block at positions corresponding to the horizontal grooves, so that the voids function efficiently as drainage channels, the foamed resin block does not float up even if the groundwater level rises, and even if the water level drops, the foamed resin block can maintain its original function as a foamed resin block for embankments, and furthermore, a foamed resin block for embankments is obtained that is simple in structure and easy to construct. Moreover, the cost of molds can be reduced.

[0008] The foamed resin block for embankments described in Patent Document 3 is a foamed resin block body that is inverted and combined to form a foamed resin block for embankments, in which a number of support posts are protruding from a foamed resin plate in a fixed arrangement, and a number of through holes are provided in a fixed arrangement in the parts of the foamed resin plate where the support posts are not provided.

[0009] Such an embankment foamed resin block is made by butting together multiple support columns that are set in a fixed array on a foamed resin plate to form a block, which can support the load evenly and increase the compressive strength. Also, to counter buoyancy, the sides of the support columns on one side of the foamed resin plate serve as water inlet and outlet channels, while the multiple penetrations set in a fixed array on the foamed resin plate on the other side serve as water inlet and outlet channels, allowing water to be smoothly inlet and outlet even in the event of a sudden rise in water level or flooding, and minimizing buoyancy. [Prior art documents] [Patent documents]

[0010] [Patent Document 1] Japanese Patent Publication No. 63-251521 [Patent Document 2] JP 2001-271353 A [Patent Document 3] JP 2006-183287 A Summary of the Invention [Problem to be solved by the invention]

[0011] However, the embankment block for constructing an embankment structure described in Patent Document 1 does not provide sufficient countermeasures against buoyancy, and there is a problem in that a pressing load is still required to suppress the buoyancy. Also, the embankment foamed resin blocks described in Patent Documents 2 and 3 have a complex shape, so it is difficult to suppress the manufacturing costs of the embankment foamed resin blocks, and construction is time-consuming, so there is a problem in that it is difficult to suppress construction costs.

[0012] Furthermore, the foamed resin blocks for banking described in Patent Documents 2 and 3 have a complex shape, which means that they take up a large volume when transported, making it difficult to reduce transportation costs.

[0013] Therefore, the present invention has been made in consideration of the above problems, and has an object to provide a method for constructing an embankment structure that can construct an embankment at a lower cost and with a simpler configuration. [Means for solving the problem]

[0014] The method for constructing an embankment structure according to the present invention is to provide a method for constructing an embankment structure having a through hole penetrating at least in the vertical direction. Polyethylene, polystyrene, polypropylene, or polyurethane foam A first step of preparing a block member comprising: The through holes are arranged to communicate with each other, A second step of piling up the through holes to a predetermined area and a predetermined height. Part of and a third step of filling the cavity with crushed stone. The third step includes a sixth step of driving pile members into the other through holes not filled with crushed stone, the pile members being capable of serving as a foundation when a heavy object is placed thereon. It is characterized by having:

[0015] In the method for constructing an embankment structure according to the present invention, the through hole is formed in a direction intersecting the vertical direction. In communication with each other It is preferable that the tunnel has an extending horizontal through hole, and at the intersection of the horizontal through hole and the vertical through hole, there is a crushed stone prevention means for preventing crushed stone filled in the vertical through hole from flowing into the horizontal through hole.

[0016] In the method for constructing an embankment structure according to the present invention, it is preferable that the second step has a fourth step of forming a crushed stone layer between the piled up block members.

[0017] In addition, in the method for constructing an embankment structure according to the present invention, it is preferable that the fourth step includes a fifth step of providing a crushed stone suppression means between the block member and the crushed stone layer to prevent the crushed stone from flowing out.

[0018] In the method for constructing an embankment structure according to the present invention, the crushed stone is ,vinegar It is preferably constructed from rag aggregate.

[0019] In the method for constructing an embankment structure according to the present invention, it is preferable that the crushed stone is mixed with a biodegradable material.

[0021] In addition, in the method for constructing an embankment structure according to the present invention, the block member is In the vertical cross section, Horizontal at least It is preferred that one end has a step.

[0022] In addition, in the method for constructing an embankment structure according to the present invention, the block member is In the vertical cross section, It is preferable that a slope is formed on at least one end in the horizontal direction. In addition, the method for constructing an embankment structure according to the present invention comprises a first step of preparing a block member made of any one of foamed materials such as polyethylene, polystyrene, polypropylene, or polyurethane having a through hole that penetrates at least in the vertical direction, a second step of driving pile members into the block members in advance, a second step of arranging the block members so that the through holes are connected to each other, inserting the pile members into some of the through holes, and stacking them to a predetermined range and to a predetermined height, and a third step of filling with crushed stone the other through holes into which the pile members have not been inserted, and the pile members can serve as a foundation when a heavy object is placed on the embankment structure.

[0023] The above summary of the invention does not list all of the necessary features of the present invention, and any subcombination of these features may also constitute an invention. Effect of the Invention

[0024] The method for constructing an embankment structure of the present invention comprises a first step of preparing block members made of lightweight material having through holes penetrating at least in the vertical direction, a second step of stacking the block members to a predetermined area and to a predetermined height, and a third step of filling the through holes with crushed stone.Therefore, the block members can be constructed with a simple structure that does not have the complex structure of conventional embankment foam blocks, and since it comprises the third step of filling the through holes with crushed stone, the through holes can be used as drains, and by filling the crushed stone, the weight of the entire embankment can be increased, thereby providing a measure against buoyancy.

[0025] In addition, the method of constructing an embankment structure according to the present invention has a through hole extending in the vertical direction and a lateral through hole extending in the horizontal direction, and at the intersection of the vertical through hole and the lateral through hole, there is a crushed stone suppression means for preventing crushed stone filled in the vertical through hole from flowing into the lateral through hole, so that it is possible to prevent a decrease in the filling rate of crushed stone filled in the vertically extending through hole due to crushed stone flowing into the lateral through hole.

[0026] Furthermore, according to the method for constructing an embankment structure of the present invention, the volume of the crushed stone layer can be adjusted by using slag aggregate with high density for the crushed stone, and by mixing biodegradable material with the crushed stone filled into the through holes, clogging of the crushed stone layer due to long-term use can be prevented. [Brief description of the drawings]

[0027] [Figure 1] FIG. 1 is a schematic diagram of an embankment structure according to an embodiment of the present invention. [Diagram 2] FIG. 2 is a schematic diagram showing a first modified example of the embankment structure according to the present embodiment. [Diagram 3] FIG. 4 is a schematic diagram showing a second modified example of the embankment structure according to the present embodiment. [Figure 4] FIG. 1 is a schematic diagram of an embankment using an embankment structure according to this embodiment. [Diagram 5] 5A and 5B are diagrams for explaining the configuration of a block member used in the embankment structure according to this embodiment, where (a) is a plan view and (b) is a front view. [Figure 6] 5A and 5B are diagrams for explaining the configuration of a first modified example of a block member used in the embankment structure according to this embodiment, where (a) is a plan view and (b) is a front view. [Figure 7] 5A and 5B are diagrams for explaining the configuration of a second modified example of a block member used in the embankment structure according to this embodiment, where (a) is a plan view and (b) is a front view. [Figure 8] FIG. 2 is a flow diagram of a method for constructing an embankment structure according to the present embodiment. [Figure 9] FIG. 4 is a flow diagram of a second process for the embankment structure according to this embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0028] Preferred embodiments for carrying out the present invention will be described below with reference to the drawings. Note that the following embodiments do not limit the inventions according to the claims, and all of the combinations of features described in the embodiments are not necessarily essential to the solution of the invention.

[0029] FIG. 1 is a schematic diagram of an embankment structure according to this embodiment, FIG. 2 is a schematic diagram showing a first modified example of the embankment structure according to this embodiment, FIG. 3 is a schematic diagram showing a second modified example of the embankment structure according to this embodiment, FIG. 4 is a schematic diagram of an embankment using the embankment structure according to this embodiment, FIG. 5 is a diagram for explaining the configuration of a block member used in the embankment structure according to this embodiment, (a) is a plan view and (b) is a front view, FIG. 6 is a diagram for explaining the configuration of a first modified example of the block member used in the embankment structure according to this embodiment, (a) is a plan view and (b) is a front view, FIG. 7 is a diagram for explaining the configuration of a second modified example of the block member used in the embankment structure according to this embodiment, (a) is a plan view and (b) is a front view, FIG. 8 is a flow diagram of a method of constructing an embankment structure according to this embodiment, and FIG. 9 is a flow diagram of a second process of the embankment structure according to this embodiment.

[0030] <Composition of embankment structure> As shown in Fig. 1, the embankment structure 1 according to this embodiment is constructed by stacking roughly rectangular block members 10 in a predetermined area (horizontal direction in Fig. 1) and to a predetermined height (vertical direction in Fig. 1). The block members 10 are rectangular members having through holes 11 formed therethrough in the vertical direction, and are constructed from lightweight materials. More specifically, foamed materials such as polyethylene, polystyrene, polypropylene, and polyurethane are preferably used as the lightweight materials.

[0031] The block member 10 has a plurality of through holes 11 formed therein that penetrate in the height direction, and the through holes 11 are arranged so that the through holes 11 of the block members 10 that overlap in the height direction communicate with each other, and are filled with crushed stone 20. The through holes 11 of the overlapping block members 10 may be aligned visually when stacking the block members 10, or a rod-shaped jig may be inserted through the through holes 11 to stack the block members 10 and then the jig may be removed. The edges of the through holes 11 of the block members 10 may be formed to have recesses or protrusions so that they can be engaged with each other in a recess-protruding manner.

[0032] The crushed stone 20 is preferably made of slag aggregate with high density, but is not limited to this and various crushed stones can be used as long as they can increase the weight of the entire embankment. Biodegradable materials and polystyrene beads may also be mixed into the crushed stone 20. By mixing such materials, the through hole 11 can be used as a drain D and clogging can be prevented.

[0033] Also, instead of filling the through holes 11 with crushed stone 20, pile members may be driven into some of the through holes 11. By driving pile members (not shown) into the through holes 11 in this manner, the rigidity of the embankment structure 1 can be increased, and the embankment structure 1 can serve as a foundation when a heavy object is placed on it.

[0034] As shown in FIG. 2, the through holes 11 may be formed not only in the vertical direction but also in the horizontal through holes 12 extending in a direction intersecting the vertical direction. In this case, at the intersection where the vertical through holes 11 and the horizontal through holes 12 intersect, a crushed stone prevention means 13 is provided to prevent the crushed stone 20 filled in the vertical through holes 11 from flowing into the horizontal through holes 12. The crushed stone prevention means 13 is preferably made of a geotextile or stainless steel mesh having a finer mesh than the crushed stone 20. The horizontal through holes 12, together with the through holes 11 filled with the crushed stone 20, constitute the drain D of the embankment structure 1, and the permeability can be adjusted by adjusting the number and dimensions of the holes.

[0035] 3, a crushed stone layer 14 may be formed between overlapping block members 10. The crushed stone layer 14 uses a material similar to the crushed stone 20 filled in the through holes 11 between the block members 10, and a crushed stone suppression means 15 is interposed between the crushed stone layer 14 and the block member 10. The crushed stone suppression means 15 is preferably made of a geotextile or stainless steel mesh that is finer than the crushed stone 20, similar to the above-mentioned crushed stone prevention means 13.

[0036] In this way, by forming a crushed stone layer 14 between the block members 10, the weight of the entire embankment can be increased, and the crushed stone layer 14 can function as a drain D extending laterally, improving drainage performance.

[0037] The embankment structure 1 constructed in this manner can reduce the amount of embankment 30, as shown in Fig. 4, which reduces the earth pressure and allows the thickness of the retaining wall 31 to be reduced. In addition, the weight of the crushed stones 20 filled in the through holes 11 and the crushed stone layers 14 formed between the block members 10 acts as a buoyancy countermeasure, and these crushed stones 20 and crushed stone layers 14 function as drains D, improving the permeability.

[0038] Next, the block member 10 used in the embankment structure 1 according to this embodiment will be described. As shown in Fig. 5(a), the block member 10 has a plurality of through holes 11 formed therethrough from the top surface to the bottom surface. In Fig. 5(a), two rows of four through holes 11 are formed horizontally on the top surface, for a total of eight through holes. Also, as shown in Fig. 5(b), the block member 10 may have a flattened shape.

[0039] In this way, by making the block member 10 flat, when the block member 10 is loaded onto a carrier or container for transportation, it can be transported with as few gaps as possible, thereby improving transportation efficiency and reducing the construction costs of the embankment structure 1.

[0040] Also, as shown in Fig. 6(b), a step 16 may be formed at one end in the horizontal direction of the block member 10a. In this case, as shown in Figs. 6(a) and (b), by combining the step portions 16 so that they overlap each other, it is possible to transport the embankment structure 1 with as few gaps as possible, thereby improving the transportation efficiency and reducing the construction cost of the embankment structure 1. Also, by arranging the step portion 16 at the end of the embankment structure 1, it is possible to make the external step of the embankment structure 1 finer, and it is possible to provide an embankment structure 1 that can reduce the amount of embankment.

[0041] Furthermore, as shown in Fig. 7(b), a slope 17 may be formed on at least one end of the block member 10b. In this case, similar to the case where the step portion 16 described above is formed, by combining the slopes 17 so that they overlap each other, it is possible to transport the embankment structure 1 with as few gaps as possible, thereby improving the transportation efficiency and reducing the construction cost of the embankment structure 1. Furthermore, by arranging the slope 17 at the end of the embankment structure 1, a slope can be formed in the external shape of the embankment structure 1, and the embankment structure 1 can be made in such a way that the amount of embankment can be reduced.

[0042] <How to construct embankment structures> Next, a method for constructing an embankment structure according to this embodiment will be described with reference to Figures 8 and 9. As shown in Figure 8, the method for constructing an embankment structure according to this embodiment includes a first step (S101) of preparing block members 10 made of lightweight material having through holes penetrating at least in the vertical direction, a second step (S102) of piling up the block members 10 to a predetermined range and height, and a third step (S103) of filling the through holes 11 with crushed stone 20.

[0043] In the first step (S101), the above-mentioned block member 10 is transported to a construction site of the embankment structure 1 according to this embodiment and prepared. When the block member 10 has a horizontal through hole 12 formed therein, a crushed stone prevention means 13 is attached to the through hole 11 of the block member 10 so that the crushed stone 20 does not flow out into the horizontal through hole 12.

[0044] In the second step (S102), the block members 10 are piled up in a predetermined range and to a predetermined height at the construction site of the embankment structure 1. Specifically, as shown in FIG. 9, first, the block members 10 are lined up in a predetermined range (S201). Next, a fifth step (S202) is performed in which crushed stone suppression means 15 is placed on the upper surfaces of the lined up block members 10. After that, a fourth step (S203) is performed in which crushed stones 20 are placed on the crushed stone suppression means 15 to form the crushed stone layer 14. By repeating this second step, the crushed stone layer 14 can be formed between the overlapping block members 10, and the crushed stone suppression means 15 can be formed between the block members 10 and the crushed stone layer 14.

[0045] Furthermore, the through holes 11 of the block members 10 are aligned so that the through holes 11 of overlapping block members 10 communicate with each other when stacking the block members 10. When constructing an embankment structure 1, 1a as shown in Fig. 1 or 2 that does not have a crushed stone layer 14, the fourth step (S203) and the fifth step (S202) can be omitted.

[0046] In the third step (S103), crushed stone 20 is filled into the through holes 11 arranged to communicate with one another. At this time, it is possible to have a sixth step of driving pile members into predetermined through holes 11 without filling all of the through holes 11 with crushed stone 20. In this way, by driving pile members instead of crushed stone 20, the rigidity of the embankment structure 1 is increased, and the embankment structure 1 can serve as a foundation when a heavy object is placed on it.

[0047] Thus, according to the method for constructing the embankment structure 1 of this embodiment, by simply stacking the block members 10 each having the through-holes 11 formed therein, it is possible to form through-holes that communicate in the vertical direction, and by filling the through-holes 11 with crushed stones 20 to form drains, it is possible to inexpensively improve the drainage performance of the embankment structure 1. In addition, by filling the through-holes 11 with crushed stones 20, the weight of the crushed stones 20 can also be used to counter the buoyancy of the embankment structure 1.

[0048] Furthermore, the method for constructing an embankment structure according to the present invention makes it possible to construct the embankment structure 1 at low cost even in cases where it is necessary to reduce load and earth pressure, such as embankments on soft ground, embankments on steep slopes, backfilling of structures, and widening of upright walls and embankments.

[0049] In the above-described embankment structure 1 according to the present embodiment, eight through holes 11 are formed in the block members 10, but the number of through holes 11 is not limited to this and can be increased or decreased as appropriate. In addition, the method of driving the pile members into the through holes 11 when driving the pile members has been described, but the pile members may be piled up so that the through holes 11 are inserted into the pile members that have been driven in advance. In addition, the above-described embodiment has been described in which the through holes 11 are formed in the block members 10 in advance, but the through holes 11 may be formed after stacking block members without the through holes 11 formed therein to a predetermined height. It is clear from the claims that such modified or improved forms are also included in the technical scope of the present invention. [Explanation of symbols]

[0050] 1 embankment structure, 10, 10a, 10b block members, 11 through hole, 12 horizontal through hole, 13 crushed stone prevention means, 14 crushed stone layer, 15 crushed stone prevention means, 16 step portion, 17 slope, 20 crushed stone, 30 embankment, 31 retaining wall, D drain.

Claims

1. A first step of preparing a block member made of any one of foamed materials of polyethylene, polystyrene, polypropylene, and polyurethane, the block member having a through hole extending at least in a vertical direction; a second step of arranging the block members so that the through holes are in communication with each other and stacking the block members to a predetermined area and to a predetermined height; A third step of filling a part of the through hole with crushed stone, The method for constructing an embankment structure is characterized in that the third step includes a sixth step of driving pile members into other through holes that are not filled with crushed stone, the pile members being able to serve as a foundation when a heavy object is placed on them.

2. The through holes include horizontal through holes extending in a direction intersecting the vertical direction and communicating with each other, A method for constructing an embankment structure as described in claim 1, characterized in that at the intersection of the horizontal through hole and the vertical through hole, there is a crushed stone prevention means for preventing crushed stone filled in the vertical through hole from flowing into the horizontal through hole.

3. 3. The method for constructing an embankment structure according to claim 1 or 2, wherein the second step includes a fourth step of forming a crushed stone layer between the piled up block members.

4. 4. The method for constructing an embankment structure according to claim 3, characterized in that the fourth step includes a fifth step of providing a crushed stone suppression means between the block member and the crushed stone layer to prevent the crushed stone from flowing out.

5. 5. A method for constructing an embankment structure according to claim 1, wherein the crushed stone is made of slag aggregate.

6. 6. The method for constructing an embankment structure according to claim 1, wherein the crushed stone is mixed with a biodegradable material.

7. 7. A method for constructing an embankment structure according to claim 1, wherein the block member has a step at least on one horizontal end in a vertical cross section.

8. 7. A method for constructing an embankment structure according to claim 1, wherein the block member has a slope formed on at least one horizontal end in a vertical cross section.

9. A method for manufacturing a block member, comprising: a first step of preparing a block member made of any one of foamed materials of polyethylene, polystyrene, polypropylene, and polyurethane, the block member having a through hole penetrating at least in the vertical direction; A step of driving a pile member in advance; a second step of arranging the block members so that the through holes are in communication with each other, inserting the pile members into some of the through holes, and stacking the block members to a predetermined range and a predetermined height; and a third step of filling crushed stone into other through holes into which the pile members are not inserted, A method for constructing an embankment structure, characterized in that the pile members can serve as a foundation when a heavy load is placed on the embankment structure.

Citation Information

Patent Citations

  • Construction of structure of expanded resin

    JP1988060328A

  • Banking block for construction of banking structure

    JP1988251521A

  • Banking structure containing light weight material

    JP1990157319A

  • Construction method for light weight banking

    JP1991087417A

  • Method of constructing foam-resin block structure

    JP1994101232A