Shipping Management Device

The shipping management device addresses the challenge of selecting building materials based on user VOC sensitivity by managing inventory and estimating emission rates, ensuring safe VOC levels on scheduled dates.

JP7582521B1Active Publication Date: 2024-11-13SEKISUI HOUSE KK
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
JP2024004090
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2024-01-15
Publication Date
2024-11-13
Estimated Expiration
2044-01-15

Smart Images

  • Figure 0007582521000001_ABST
    Figure 0007582521000001_ABST
Patent Text Reader

Abstract

To obtain a shipping management device capable of appropriately selecting building materials to be used in the construction of a building according to the sensitivity of residents to chemical substances. [Solution] A data storage unit stores inventory information indicating the stock status of multiple building materials stored in a warehouse, the inventory information including product identification information, inventory quantity information, and substance emission information indicating the emission rate of chemical substances from the building materials, for each of the multiple building materials, and a data processing unit acquires the inventory information, building information, and diagnostic information, the building information including required quantity information indicating the quantity of building materials required to construct a building, and the diagnostic information including sensitivity information indicating the sensitivity of residents living in the building to chemical substances, and based on the inventory information, the building information, and the diagnostic information, building materials to be used in the construction of the building are selected from the multiple building materials stored in the warehouse.
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a construction material shipping management device. [Background technology]

[0002] The health effects of formaldehyde and volatile organic compounds (VOCs) emitted from building materials on home occupants have been noted.

[0003] The emission rate test using the small chamber method is known as a test for inspecting the emission rate of VOCs from building materials.

[0004] In addition, the following Patent Document 1 discloses an inventory management system for construction materials that can reduce the effort and cost involved in picking up construction materials by construction companies and the like. [Prior art documents] [Patent documents]

[0005] [Patent Document 1] Patent No. 6723588 Summary of the Invention [Problem to be solved by the invention]

[0006] Users with chemical hypersensitivity who are sensitive to VOCs have different tolerances to VOCs from those who are not. Therefore, it would be desirable to be able to select appropriate building materials to be used depending on the sensitivity to VOCs of the user ordering the construction of a house or other building.

[0007] The present invention has been made in consideration of the above circumstances, and has an object to provide a shipping management device that can appropriately select building materials to be used in the construction of a building depending on the occupants' sensitivity to chemical substances. [Means for solving the problem]

[0008] A management device according to a first aspect of the present invention comprises a data processing unit and a data memory unit, wherein the data memory unit stores inventory information indicating the inventory status of a plurality of building materials stored in a warehouse, the inventory information including product identification information, inventory quantity information, and substance emission information indicating the emission rate of chemical substances from the building materials, for each of the plurality of building materials, the data processing unit acquires the inventory information, building information, and diagnostic information, wherein the building information includes required quantity information indicating the quantity of building materials required to construct a building, and the diagnostic information includes sensitivity information indicating the sensitivity of residents living in the building to chemical substances, and based on the inventory information, the building information, and the diagnostic information, selects building materials to be used in the construction of the building from the plurality of building materials stored in the warehouse.

[0009] According to the first aspect, the data processing unit selects the building materials to be used for the construction of the building from among the multiple building materials stored in the warehouse based on the inventory information, the construction information, and the diagnosis information. This allows the building materials to be appropriately selected for use in the construction of the building depending on the sensitivity of the residents to chemical substances.

[0010] In the management device of the second aspect of the present invention, in the first aspect, the building information further includes scheduled date information indicating the scheduled date of shipment of building materials from the warehouse, the scheduled date of delivery of the building to the resident, or the scheduled date of the resident moving into the building, and the data processing unit, in selecting the building materials, calculates the decay characteristics of the emission rate over time based on the substance emission information, and estimates the emission rate on the scheduled shipping date, the scheduled delivery date, or the scheduled occupancy date based on the decay characteristics and the scheduled date information.

[0011] According to the second aspect, the data processing unit estimates the emission rate on the scheduled shipping date, scheduled delivery date, or scheduled occupancy date based on the attenuation characteristics and the scheduled date information. This makes it possible to appropriately select building materials whose emission rates on these scheduled dates are equal to or lower than the allowable value.

[0012] A third aspect of the present invention relates to a management device in accordance with the second aspect, wherein the data processing unit, in selecting the building materials, corrects the attenuation characteristics based on at least one of the ventilation rate, storage temperature, and storage humidity in the warehouse.

[0013] According to the third aspect, the data processing unit corrects the attenuation characteristics based on at least one of the ventilation rate, storage temperature, and storage humidity in the warehouse, thereby improving the estimation accuracy of the emission rate on the scheduled shipping date, scheduled delivery date, or scheduled occupancy date. Effect of the Invention

[0014] According to the present invention, the building materials used in the construction of a building can be appropriately selected depending on the sensitivity of the occupants to chemical substances. [Brief description of the drawings]

[0015] [Figure 1] 1 is a diagram showing a simplified overall configuration of a shipping management system according to an embodiment of the present invention; [Diagram 2] FIG. 2 is a diagram showing a simplified configuration of a shipping management device. [Diagram 3] FIG. 13 is a diagram illustrating a simplified example of inventory information. [Figure 4] FIG. 13 is a diagram illustrating a simplified example of storage information. [Diagram 5] FIG. 2 is a diagram showing a simplified example of building information. [Figure 6] FIG. 13 is a diagram illustrating a simplified example of diagnostic information. [Figure 7] 13 is a flowchart showing a process executed by a data processing unit. [Figure 8] FIG. 10 is a diagram illustrating an example of attenuation characteristics. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0016] Hereinafter, an embodiment of the present invention will be described in detail with reference to the drawings. In addition, elements with the same reference numerals in different drawings indicate the same or corresponding elements.

[0017] 1 is a simplified diagram showing the overall configuration of a shipment management system 1 according to an embodiment of the present invention. The shipment management system 1 includes a shipment management device 11, an order terminal 12, a plurality of management terminals 13 (in the following example, three management terminals 13A to 13C), and a communication network 15. The communication network 15 may be a dedicated line network or a public line network. The shipment management device 11 is capable of communicating with the order terminal 12 and the management terminals 13A to 13C via the communication network 15.

[0018] The shipment management device 11 is a cloud server or the like installed on a communication network 15. The order terminal 12 is a personal computer or a tablet terminal or the like installed in a sales office or a showroom of a housing manufacturer. The management terminals 13A to 13C are edge servers, on-premise servers, personal computers, or the like installed in warehouses 14A to 14C of a building material manufacturer.

[0019] 2 is a diagram showing a simplified configuration of the shipment management device 11. The shipment management device 11 includes a data processing unit 31, a data storage unit 32, and a communication unit 33. The data processing unit 31 includes a processor such as a CPU. The data storage unit 32 includes an HDD, an SSD, a semiconductor memory, or the like. The communication unit 33 includes a communication module compatible with the communication standard of the communication network 15. The data storage unit 32 stores inventory information 41, storage information 42, building information 43, and diagnosis information 44.

[0020] FIG. 3 is a simplified diagram showing an example of inventory information 41. Inventory information 41 is a database including the following items: manufacturer ID, product ID, inventory quantity, and test results. Inventory information 41 may include other items. The manufacturer ID is identification information for identifying the manufacturer of the building material. The product ID is identification information for identifying the building material, which is a product. The inventory quantity indicates the quantity of the building material stored in warehouse 14. The test results indicate the results of tests conducted by each manufacturer on the building materials stored in warehouse 14. The tests are, for example, emission rate tests using a small chamber method. Each manufacturer conducts tests on each building material on multiple days to obtain multiple test results for each building material. The test results are the emission rate [μg / (m 2 The information includes the number of days since manufacture of the building material at the time the test was conducted (time since manufacture of the building material at the time the test was conducted), and corresponds to substance emission information indicating the VOC emission rate from the building material. The data processing unit 31 creates inventory information 41 based on the information received from the management terminals 13A-13C, and stores it in the data storage unit 32. The data processing unit 31 updates the inventory information 41 in real time or periodically, such as at a fixed time every day.

[0021] FIG. 4 is a simplified diagram showing an example of the storage information 42. The storage information 42 is a database including the following items: manufacturer ID, ventilation equipment, ventilation frequency, air conditioning equipment, storage temperature, and storage humidity. The storage information 42 may include other items. The ventilation equipment indicates whether or not the warehouse 14 of each manufacturer has ventilation equipment. The ventilation frequency indicates the volume [m 3 ] ventilation volume per unit time by ventilation equipment [m 3 The information indicates the ratio [times / h] of the number of times per hour to the number of times per hour. Air conditioning equipment indicates whether or not each manufacturer's warehouse 14 has air conditioning equipment. Storage temperature indicates the set temperature [°C] inside the warehouse 14 for warehouses 14 that have air conditioning equipment. Storage humidity indicates the set humidity [%] inside the warehouse 14 for warehouses 14 that have air conditioning equipment. The data processing unit 31 creates storage information 42 based on this information received from the management terminals 13A-13C and stores it in the data storage unit 32.

[0022] FIG. 5 is a simplified diagram showing an example of the building information 43. The building information 43 is a database including the following items: house ID, scheduled delivery date, scheduled occupancy date, product ID, required quantity, construction area, and scheduled shipping date. The building information 43 may include other items. The house ID is identification information for identifying a house ordered by a user who will become a resident. The scheduled delivery date is the date on which the house whose construction is completed is scheduled to be handed over to the user. The scheduled occupancy date is the date on which the user plans to move into the house that has been handed over. The product ID is identification information for identifying the building materials used in the construction of the house. The required quantity indicates the amount of building materials required for the construction of the house. The construction area indicates the construction area of ​​the building materials in the house. The scheduled shipping date is the date on which the building materials are scheduled to be shipped from the warehouse 14 in accordance with the construction date using the building materials. At a sales office or showroom of a house manufacturer, an operator 20 obtains information required for business negotiations with a user who is a client 21, and inputs the information into the ordering terminal 12. The data processing unit 31 creates building information 43 based on the information received from the ordering terminal 12 and stores it in the data storage unit 32 .

[0023] FIG. 6 is a simplified diagram showing an example of the diagnostic information 44. The diagnostic information 44 is a database including items such as a house ID and prospective residents (in this example, the father, mother, and eldest son). The diagnostic information 44 may include other items. The prospective residents item indicates the sensitivity of each prospective resident to VOCs. The sensitivity is expressed as a score, with 100 being the maximum, and the higher the score, the more sensitive the resident is to VOCs. At the house manufacturer's sales office or showroom, the operator 20 performs a sensitivity diagnosis to VOCs for each prospective resident and inputs the diagnosis results into the ordering terminal 12. The sensitivity diagnosis may be performed using a known diagnostic method such as a diagnosis using a QEESI (Quick Environment Exposure Sensitivity Inventory) questionnaire, a diagnosis using the EESI (The Environmental Exposure and Sensitivity Inventory) questionnaire by Miller and Prihoda, or a diagnosis using the MM040EA questionnaire by Andersson. The data processing unit 31 creates diagnostic information 44 based on the information received from the ordering terminal 12 and stores it in the data storage unit 32 .

[0024] FIG. 7 is a flowchart showing the processing executed by the data processing unit 31.

[0025] First, in step SP11, the data processing unit 31 acquires the stock information 41 by reading it out from the data storage unit 32.

[0026] Next, in step SP12, the data processing unit 31 obtains the storage information 42 by reading it from the data storage unit 32.

[0027] Next, in step SP13, the data processing unit 31 acquires the building information 43 by reading it out from the data storage unit 32.

[0028] Next, in step SP14, the data processing unit 31 obtains the diagnostic information 44 by reading it out from the data storage unit 32.

[0029] Next, in step SP15, the data processing unit 31 determines whether the resident's (prospective resident's) sensitivity to VOCs is equal to or greater than a predetermined threshold based on the diagnosis information 44. If there are multiple residents, the data processing unit 31 determines whether the highest sensitivity of the resident is equal to or greater than the threshold.

[0030] If the sensitivity is equal to or greater than the threshold value (step SP15: YES), then in step SP16, the data processing unit 31 extracts substance emission information corresponding to the test results corresponding to the product ID of the product to be ordered, based on the inventory information 41. The data processing unit 31 calculates the attenuation characteristic 50 of the emission rate over time, based on the multiple emission rates and multiple days since manufacture included in the extracted substance emission information.

[0031] Fig. 8 is a diagram showing a schematic example of the attenuation characteristic 50. In this example, the data processing unit 31 calculates the nonlinear attenuation characteristic 50 for the building material of the product ID to be ordered by performing calculations such as power approximation using three measured values ​​of the dissipation rate corresponding to 1 day, 3 days, and 7 days after manufacture. For example, in the example shown in Fig. 3, when the product ID to be ordered is "E01", the data processing unit 31 calculates the attenuation characteristic 50 for each of the building material with the manufacturer ID "M01" and the product ID "E01" and the building material with the manufacturer ID "M02" and the product ID "E01".

[0032] In calculating the attenuation characteristic 50, the data processing unit 31 may correct the attenuation characteristic 50 based on the storage information 42. The higher the ventilation rate, the higher the storage temperature, or the higher the storage humidity, the greater the emission rate of VOCs from building materials. The data processing unit 31 corrects the attenuation characteristic 50 based on the difference between the ventilation rate, storage temperature, and storage humidity for each warehouse 14A-14C and the ventilation rate (0.5 times / h), storage temperature (28°C), and storage humidity (50%) specified by the small chamber method, so that the storage conditions are common or normalized for all warehouses 14A-14C. Note that for correction based on temperature, humidity, or temperature and humidity, known methods such as the Inoue formula or the Berge formula may be used.

[0033] When the attenuation characteristic 50 is expressed by a power approximation curve, the diffusion rate Y is defined by the following formula using coefficients α and β and the number of attenuation days X corresponding to the expected date K.

[0034] Y=αX -β

[0035] The data processor 31 calculates the values ​​of the coefficients α and β based on the multiple emission rates and multiple days since manufacture included in the extracted substance emission information. The data processor 31 also corrects the decay days X based on the difference between the ventilation rate, storage temperature, and storage humidity for each of the warehouses 14A to 14C and the ventilation rate, storage temperature, and storage humidity specified by the Small Chamber Law.

[0036] Next, in step SP17, the data processing unit 31 estimates the emission rate of the building material to be ordered on a scheduled date K based on the attenuation characteristic 50 calculated in step SP16 and the scheduled date information included in the building information 43. The scheduled date K is the scheduled shipping date, the scheduled delivery date, or the scheduled occupancy date.

[0037] Next, in step SP18, the data processing unit 31 judges whether or not there is a building material whose emission rate on the scheduled date K is equal to or lower than the resident's tolerance for VOCs. The tolerance is a value obtained by multiplying a general standard value (for example, a standard value established by the Study Group for Standardization of VOC Emission Rates from Building Materials) by a coefficient value, for example, 0.5. The coefficient value may be changed according to the resident's sensitivity. For example, the higher the sensitivity, the smaller the coefficient value is set to be below 0.5, and the lower the sensitivity, the larger the coefficient value is set to be above 0.5. The coefficient value may also be changed according to the construction area of ​​the building material. For example, the larger the construction area, the smaller the coefficient value is set to be below 0.5, and the smaller the construction area, the larger the coefficient value is set to be above 0.5.

[0038] If there is a building material whose emission rate on the scheduled date K is equal to or lower than the allowable value (step SP18: YES), the data processing unit 31 selects the building material as the building material to be used in the construction of the house, and executes the ordering process.

[0039] If there are no building materials whose emission rate on the scheduled date K is below the allowable value (step SP18: NO), the data processing unit 31 calculates the earliest scheduled date for which the emission rate will be below the allowable value based on the attenuation characteristics 50, and notifies the operator 20 and the client 21 by transmitting the earliest scheduled date and building materials to the ordering terminal 12.

[0040] If the sensitivity is less than the threshold value (step SP15: NO), then in step SP19, the data processing unit 31 selects the building materials to be used for the construction of the house by normal arrangement that does not consider the emission rate, and executes the ordering process. In normal arrangement, the data processing unit 31 selects the building materials of the manufacturer with the largest stock quantity, for example.

[0041] According to this embodiment, the data processing unit 31 selects building materials to be used for constructing a building such as a house from a plurality of building materials stored in the warehouse 14 based on the inventory information 41, building information 43, and diagnosis information 44. This allows the building materials to be used for constructing a building to be appropriately selected according to the sensitivity of the residents to chemical substances.

[0042] Furthermore, according to this embodiment, the data processing unit 31 estimates the emission rate on the scheduled date K (scheduled shipping date, scheduled delivery date, or scheduled occupancy date) based on the attenuation characteristics 50 and the scheduled date information. This makes it possible to appropriately select building materials whose emission rate on the scheduled date K is equal to or lower than the allowable value.

[0043] Furthermore, according to this embodiment, the data processing unit 31 corrects the attenuation characteristic 50 based on at least one of the ventilation rate, the storage temperature, and the storage humidity in the warehouse 14. This can improve the estimation accuracy of the emission rate on the scheduled date K. [Explanation of symbols]

[0044] 1. Shipping Management System 11 Shipping management device 31 Data Processing Unit 32 Data storage unit 41 Stock Information 42 Storage information 43 Architectural information 44 Diagnostic Information

Claims

1. A data processing unit; A data storage unit; Equipped with The data storage unit stores inventory information indicating an inventory status of a plurality of building materials stored in a warehouse, the inventory information includes, for each of the plurality of building materials, product identification information, inventory quantity information, and substance emission information indicating a rate at which a chemical substance is emitted from the building material; The data processing unit includes: acquiring the inventory information, construction information, and diagnostic information; The building information includes required quantity information indicating the quantity of building materials required to build a building, the diagnostic information includes sensitivity information indicative of sensitivity of occupants of the building to chemical substances; selecting a building material to be used in the construction of the building from among the plurality of building materials stored in the warehouse based on the inventory information, the construction information, and the diagnosis information; Shipping management device.

2. The building information further includes scheduled date information indicating a scheduled date of shipment of building materials from the warehouse, a scheduled date of delivery of the building to the resident, or a scheduled date of occupancy of the resident in the building; The data processing unit, in the selection of the building material, Calculating a decay characteristic of the emission rate over time based on the substance emission information; estimating the emission rate on the scheduled shipping date, the scheduled delivery date, or the scheduled occupancy date based on the attenuation characteristic and the scheduled date information; The shipment management device according to claim 1 .

3. The data processing unit corrects the attenuation characteristics based on at least one of a ventilation rate, a storage temperature, and a storage humidity in the warehouse in the selection of the building material. The shipment management device according to claim 2.

Citation Information

Patent Citations

  • Commodity information providing system

    JP2005038215A

  • Housing environment general management method

    JP2006132121A

  • Method for predicting density of volatile organic compound in building, information processing system, and building

    JP2019178977A

  • Management server and construction material stock management method

    JP2021043628A

  • Management server and construction material inventory management method

    JP6723588B1