Distributor boom device carrier

The carrier system for the boom device with a main frame and swivel base addresses inefficiencies in assembly and transportation by stabilizing the boom row, reducing vibration and hydraulic cylinder load, enhancing workability and safety.

JP7586701B2Active Publication Date: 2024-11-19KYOKUTO KAIHATSU IND
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
JP2020214254
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2020-12-23
Publication Date
2024-11-19
Estimated Expiration
2040-12-23

AI Technical Summary

Technical Problem

The conventional boom device assembly and installation process is inefficient and prone to vibration issues during transportation, leading to excessive load on hydraulic cylinders due to improper positioning and support of the boom row on the vehicle.

Method used

A carrier system with a main frame that supports the boom device in a horizontal position, featuring boom row holding sections and cable attachment points, allowing for stable transportation and reduced vibration, and includes a swivel base for the boom support base to minimize load on hydraulic cylinders during lifting.

Benefits of technology

The system enables efficient assembly and transportation of the boom device with reduced vibration and load on hydraulic cylinders, improving workability and safety by stabilizing the boom row during lifting and transportation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007586701000001
    Figure 0007586701000001
  • Figure 0007586701000002
    Figure 0007586701000002
  • Figure 0007586701000003
    Figure 0007586701000003
Patent Text Reader

Abstract

To provide a carriage for a boom device of a distributor reducing a load on a hydraulic cylinder for a boom derricking motion by effectively suppressing vibration of a boom column when transporting a boom device of a distributor for supplying concrete on a vehicle as the boom column is placed in a lateral posture.SOLUTION: A carriage U for a boom device used for transporting the boom device 30 of a distributor D for supplying concrete as a boom column BT is placed in a lateral posture extends generally along a longitudinal direction of the boom device 30 below the boom device 30 while the boom column BT is placed in the lateral posture, and is provided with: a main frame 90 loadable on a transportation vehicle V; a boom support base support part Z0 fixed on the main frame 90 to allow the boom support base BS to be detachably connected and fixed; and boom column maintaining parts Z1, Z2 fixed on the main frame 90 to allow a middle part of the boom column BT to be held.SELECTED DRAWING: Figure 22
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a concrete supply distributor having a mast device that stands up from a base device and a boom device supported on the mast device, and more particularly to a boom device carrier used to transport the boom device of the distributor. [Background technology]

[0002] In the above-mentioned concrete supply distributor, a boom device having a boom train consisting of a plurality of booms arranged in series with each other and connected to each other so that they can be flexibly swung, and a boom support base attached to the top of the mast device and supporting the basemost boom in the boom train so that it can be raised and lowered, is previously known, as disclosed in Patent Document 1, for example. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] Special Publication No. 2016-503133 Summary of the Invention [Problem to be solved by the invention]

[0004] Incidentally, in a distributor such as that shown in Patent Document 1, the boom row of the boom device is transported by vehicle alone (i.e., the boom row is separated from the boom support base), and the boom support base is installed at the top of the mast device which is erected on the base device, and then the boom row is connected to the boom support base, and the boom device is assembled and installed on the mast device. However, this assembly and installation work must be carried out at the top of the mast device, i.e., at a high position, which makes it difficult to work.

[0005] Therefore, it is considered to load an assembly (i.e., the entire boom device) formed by previously connecting the boom train and the boom support base onto a vehicle and transport it to the vicinity of the work site. In this case, if the boom support base is simply fixed and supported on the surface of the vehicle's loading platform, there is a risk that the boom train will vibrate while the vehicle is traveling, causing unnecessary loads to act on the hydraulic cylinders for operating the boom train, particularly the first cylinder on the base end side.

[0006] It may be possible to therefore provide an additional boom row support part on the surface of the vehicle's loading platform, but if the relative position or relative height between the boom row support part on the surface of the vehicle's loading platform and the boom support base support part is inappropriate, the vibration of the boom row cannot be adequately suppressed, and the above problem remains.

[0007] SUMMARY OF THE PRESENT INVETION The present invention has been proposed in view of the above, and has an object to provide a carrier for a distributor boom device that can solve the problems of the conventional structure with a simple structure. [Means for solving the problem]

[0008] In order to achieve the above object, the present invention provides a boom device comprising a mast assembly erected from a base assembly and a boom assembly supported on the mast assembly, the boom assembly comprising a boom train consisting of a plurality of booms arranged in series with each other and connected to each other so as to be able to bend and swing, a boom support base attached to an upper portion of the mast assembly and supporting the most proximal boom in the boom train so as to be able to be raised and lowered, and a hydraulic cylinder for raising and lowering the proximal boom. The boom support base includes a fixed base fixed to the mast device and a swivel base rotatably supported on the fixed base. The first feature of this boom device transport platform is that it is used to transport the boom device of a concrete supply distributor alone, and it comprises a main frame that extends approximately along the longitudinal direction of the boom device under the boom device when the boom row is folded in a horizontal position and can be loaded onto a transport vehicle, a boom support base support section that is fixed to the main frame and can detachably connect and fix the boom support base, and a boom row holding section that is fixed to the main frame and can hold a middle section of the boom row.

[0009] In addition to the first feature, the present invention has a second feature in that a rope mounting portion to which a lifting rope can be attached is connected to the main frame and is used when lifting the boom device with the boom row folded and in a horizontal position via the carrier platform with a crane.

[0010] In addition to the second feature, the present invention has a third feature in that the cable mounting portion includes a support base side cable mounting portion, and at least a portion of the support base side cable mounting portion is located in approximately the same position in the longitudinal direction as a portion of the boom support base support portion.

[0011] Furthermore, in addition to the second or third feature, the present invention has a fourth feature in that the main frame has at least two boom row holding sections spaced apart from each other in the longitudinal direction, and the cable mounting section includes a boom row side cable mounting section to which the lifting cable can be attached between the two boom row holding sections.

[0012] In the present invention, the "sideways position" refers to the folded position of the boom row when the longitudinal direction of the boom row folded to the minimum size is approximately horizontal (i.e., horizontal, or a side direction slightly inclined from the horizontal as in Figures 14 and 15 of the embodiment).

[0013] Furthermore, in the present invention, particularly in the third feature, "at least a part of the support base side rope mounting portion is located in approximately the same position in the longitudinal direction as a part of the boom support base support part" not only includes cases where at least a part of the support base side rope mounting portion and a part of the boom support base support part are located in the same position in the longitudinal direction (i.e., the longitudinal positions of the two overlap, in other words, are in a position where they overlap), but also includes cases where, even if they are not in the same position in the strict sense, at least a part of the support base side rope mounting portion is located in close proximity to the boom support base support part in the longitudinal direction (i.e., located in a position close enough to achieve the effect of the third feature). Effect of the Invention

[0014] According to the present invention, there are provided a main frame which extends substantially along the longitudinal direction of the boom device under the boom device when the boom row is folded in a sideways position and which can be loaded onto a transport vehicle, a boom support base support part which is fixed to the main frame and to which the boom support base can be detachably coupled and fixed, and a boom row holding part which is fixed to the main frame and can hold an intermediate part of the boom row, so that the boom support base support part and the boom row holding part can be disposed on a single common main frame which can be loaded onto a transport vehicle while appropriately setting their relative positions. This makes it possible to support the boom device in a sideways position on the main frame in an optimal position, effectively suppressing vibration of the boom row even while the vehicle is traveling and contributing to reducing the load on the hydraulic cylinder.

[0015] According to the second feature, since the cable mounting portion to which the cable for lifting is attached is connected to the main frame and used when the boom device in the folded-up horizontal position is lifted by a crane via the carrier, the boom device can be lifted by a crane via the carrier and loaded onto or unloaded from a transport vehicle. This makes it possible to reduce the load acting on the hydraulic cylinder during loading and unloading, compared to when the boom device is directly lifted and loaded onto or unloaded.

[0016] According to the third feature, the cable mounting portion includes a support base side cable mounting portion, and at least a portion of the support base side cable mounting portion is located in approximately the same position in the longitudinal direction as a portion of the boom support base support portion. Therefore, a heavy boom support base can be efficiently lifted by the support base side cable mounting portion located in close proximity to the boom support base support portion that supports it, which can contribute to reducing the load burden on the main frame during lifting.

[0017] According to a fourth feature, the main frame has at least two boom row holding sections arranged at a distance from each other in the longitudinal direction, and the cable mounting section includes a boom row side wire mounting section to which a lifting cable can be attached between the two boom row holding sections. Therefore, the main frame (and therefore the boom row held thereon via the two boom row holding sections) can be lifted in a balanced manner via the boom row side wire mounting section located between the two boom row holding sections, making it possible to stabilize the lifting operation. [Brief description of the drawings]

[0018] [Figure 1] FIG. 1A is a vertical cross-sectional view showing an example of an operating state of a distributor according to an embodiment of the present invention, and FIG. 1B is a view taken along the arrow 1B in FIG. [Diagram 2] Overall side view of the base device (enlarged view of the portion viewed from the arrow 2 in FIG. 1(A)) [Diagram 3] FIG. 3 is a plan view of the base device (view taken along the arrow 3 in FIG. 2 ); [Figure 4] FIG. 4 is a partially cutaway enlarged plan view of the area indicated by the arrow in FIG. 3. [Diagram 5] (A) is a cross-sectional view taken along line 5A-5A in FIG. 4, and (B) is a cross-sectional view taken along line 5B-5B in FIG. 4. [Figure 6] 6(a) is an exploded plan view of the main part of the base body and the outriggers as viewed from the same side as in FIG. 4, (b) is a cross-sectional view taken along line bb in FIG. 6(a), and (c) is a cross-sectional view taken along line cc in FIG. 6(a). [Figure 7] Overall perspective view of the base device [Figure 8] A simplified plan view showing the relationship between the upper and lower connecting pins and the upper and lower pin insertion holes that are in an operational state when the outriggers are stowed and deployed. [Figure 9] Side view of the main part of the mast device [Figure 10] 9A is a cross-sectional view taken along line 10A-10A in FIG. 9, (B) is a cross-sectional view taken along line 10B-10B in FIG. 9, and (C) is a cross-sectional view taken along line 10C-10C in FIG. 9. [Figure 11] FIG. 1 is an overall side view of a boom device in which a boom row is in a horizontal position (an enlarged side view of the portion indicated by the arrow 11 in FIG. 1). [Figure 12](A) is a cross-sectional view taken along line 12A-12A in FIG. 11, and (B) is a cross-sectional view taken along line 12B-12B in FIG. 12(A). [Figure 13] Overall perspective view of the boom support base [Figure 14] Schematic diagram of the distributor's [assembly process] [Figure 15] 14(A) is an enlarged side view of the portion indicated by the arrow 15A in FIG. 14, and FIG. 15(B) is an enlarged side view of the portion indicated by the arrow 15B in FIG. 15(A). [Figure 16] Schematic diagram of the distributor's [refilling process] [Figure 17] 16(F) and (B) is an enlarged side view of the portion indicated by the arrow 17A in FIG. 16(F), and (B) is an enlarged side view of the portion indicated by the arrow 17B in FIG. 17(A). [Figure 18] 17(A) is an enlarged side view of the portion indicated by the arrow 18A in FIG. 17(B), and FIG. 17(B) is an enlarged side view of the portion indicated by the arrow 18B in FIG. 17(A). [Figure 19] A schematic diagram showing variations of the latter stages of the distributor's [refilling process] [Figure 20] FIG. 21 is a side view showing an example of a carrier for a distributor boom device (viewed in the direction of arrow 20 in FIG. 21). [Figure 21] Plan view of the carrier (view taken along arrow 21 in Figure 20) [Figure 22] FIG. 22 is a side view showing an example of a state in which a boom device is mounted on a carrier in a horizontal position (view taken along arrow 22 in FIG. 23). [Figure 23] FIG. 23 is a plan view showing an example of a state in which a boom device is mounted on a carrier in a horizontal position (view taken along arrow 23 in FIG. 22). [Figure 24] FIG. 24 is a perspective view showing an example of a boom support platform support portion in a main frame of the carrier platform (view taken along arrow 24 in FIG. 21 ). [Diagram 25] FIG. 25 is an enlarged cross-sectional view of the main part of the carrier with the boom device mounted thereon (enlarged cross-sectional view taken along line 25-25 in FIG. 22). [Figure 26] FIG. 26 is an enlarged bottom view of the main part of the carrier with the boom device mounted thereon (as viewed from the arrow 26 in FIG. 22). [Figure 27] (A) is an enlarged cross-sectional view of line 27A-27A in Figures 20 and 21, (B) is an enlarged cross-sectional view of line 27B-27B in Figures 20 and 21, and (C) is an enlarged cross-sectional view of line 27C-27C in Figures 20 and 21. [Figure 28] A side view showing an example of a state in which a carrier platform with a boom device in a horizontal position is lifted by a crane (corresponding to FIG. 22) [Figure 29] FIG. 29 is a front view showing an example of a lifting wire when a carrier platform equipped with a boom device in a horizontal position is lifted by a crane (an enlarged view taken along the line 29-29 in FIG. 28). [Diagram 30] FIG. 1 is an overall side view showing an example of a state in which a carrier platform with a boom device mounted thereon is loaded onto a loading platform of a transport vehicle. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0019] DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS The present invention will be described in detail below with reference to the accompanying drawings.

[0020] The concrete supply distributor D is used to receive ready mixed concrete for constructing various parts of the structure (such as floor slabs and walls) at a construction site such as a building from a concrete pump (not shown) placed on the ground at the site, and supply it to various parts of the casting site located at an elevated position. An example of its use is shown in Figure 1.

[0021] This distributor D comprises a base device 10 serving as a foundation, a height-adjustable mast device 20 supported in an upright state on the base device 10, and a boom device 30 mounted on the mast device 20. Next, an example of each of the devices 10, 20, 30 will be described in order with reference to Figs. 2 to 13.

[0022] First, the base device 10 will be described with reference to Figures 2 to 7. The base device 10 has a base body 10m and an outrigger 16 whose base portion 16b is rotatably supported on the base body 10m via a rotational support shaft 17. The outrigger 16 is rotatable between a storage position 16B that fits within the base body 10m and a predetermined deployment position 16A that projects outward from the storage position 16B (i.e., outside the base body 10m). The base body 10m is made up of a rigid frame formed by a plurality of metal frames.

[0023] That is, the base main body 10m includes a base frame 11 serving as a central skeleton, and this base frame 11 integrally includes a square tube portion 11b formed in a rectangular cross section and extending in the vertical direction, and four vertical walls 11a extending radially from the tops of the square tube portion 11b on the front, rear, left and right sides. Since each vertical wall portion 11a has a complex three-dimensional shape as is clear from Figs. 2 to 7, it is formed by integrally connecting (for example, by welding, bolting, etc.) a plurality of wall elements to each other. Note that a bracket 11ab with a locking hole for locking the lower end of a hanging wire is fixed (for example, by welding, etc.) to the upper part of each vertical wall portion 11a when the base device 10 is hung independently by a crane (for example, see Fig. 14(A)).

[0024] In particular, the rectangular tube portion 11b in this embodiment has a cross-sectional shape that is approximately the same as that of a mast M of the mast device 20, which will be described later, and a number of connecting blocks 21 are fixed at intervals to the outer periphery of the upper end of this rectangular tube portion 11b. Using these connecting blocks 21 and a number of connecting blocks 21' fixed to the outer periphery of the lower end of the lowest mast M, the lowest mast M and the rectangular tube portion 11b (and therefore the base body 10m) are connected to each other, as will be described later.

[0025] The base body 10m also includes the above-mentioned base frame 11, a plurality of upper frames 12 (four in the illustrated example) fixed to the base frame 11 and arranged to surround the base frame 11, an upper bearing 14 connecting adjacent ends of adjacent upper frames 12, a plurality of lower frames 13 fixed to the base frame 11 and arranged at intervals directly below the upper frames 12 corresponding to the plurality of upper frames 12, and a lower bearing 15 connecting adjacent ends of adjacent lower frames 13. The upper bearing 14 and the lower bearing 15 each include a cylindrical bearing body 14b, 15b and a surrounding frame 14k, 15k fixed (for example, welded) to the bearing body 14b, 15b and surrounding the outer periphery thereof. A plurality of support legs 13a that can be grounded are provided protruding from the lower surface of the lower frame 13.

[0026] Thus, the upper bearing 14 is structured to be joined to the adjacent ends of the adjacent upper frames 12 so as to connect them, so that the upper bearing 14 is joined to the adjacent ends of the upper frames 12 so that at least a part of the upper bearing 14 is located inward (i.e., toward the square tube portion 11b, in other words, toward the center of the base body 10m) from the intersection point O of the extension lines of the outer surfaces of the adjacent upper frames 12 along the longitudinal direction in a plan view. On the other hand, the lower bearing 15 is structured to be joined to the adjacent ends of the adjacent lower frames 13 so as to connect them, so that the lower bearing 15 is joined to the adjacent ends of the adjacent lower frames 13 so that at least a part of the lower bearing 15 is located inward (i.e., toward the square tube portion 11b, in other words, toward the center of the base body 10m) from the intersection point O of the extension lines of the outer surfaces of the adjacent lower frames 13 along the longitudinal direction in a plan view.

[0027] This results in a layout in which the outrigger base 16b disposed between the upper bearing 14 and the lower bearing 15 is disposed in the space between the upper bearing 14, which is connected to the adjacent end of the adjacent upper frame 12 near the inside of the base frame 11 (i.e., near the square tube portion 11b, in other words, near the center of the base body 10m), and the lower bearing 15, which is connected to the adjacent end of the adjacent lower frame 13 near the inside of the base frame 11 (i.e., near the square tube portion 11b, in other words, near the center of the base body 10m). This effectively prevents the outrigger 16 from protruding outward from the base body 10m (i.e., the frame including the base frame 11 and the upper and lower frames 12 and 13) during storage, thereby making the base device 10 smaller in size and reducing the space it occupies. As a result, the base device 10 can be moved easily through a narrow space at a construction site (for example, a through hole penetrating the top and bottom of a floor slab, etc.), improving workability.

[0028] The above-mentioned surrounding frames 14k, 15k have plate-shaped surrounding frame bodies 140, 150 that surround the bearing bodies 14b, 15b with an annular gap therebetween, and upper and lower pairs of first and second support plate parts 141, 142; 151, 152 that are fixed (for example, butt-welded) to the upper and lower ends of the surrounding frame body 140, 150 so as to sandwich the surrounding frame body 140, 150 from above and below. The upper and lower pairs of first and second support plate parts 141, 142; 151, 152 are fixed (for example, welded) to the upper bearing 14 or lower bearing 15 that penetrates them.

[0029] In particular, the enclosing frame main body 140, 150 of the embodiment has flat mounting surfaces 14kf, 15kf on the surface facing the upper frame 12 or the lower frame 13, which are perpendicular to the longitudinal center line of the upper and lower frames 12, 13. The end faces 12e, 13e of the upper frame 12 or the lower frame 13 are fixed (butt-welded in the embodiment) to these mounting surfaces 14kf, 15kf. As a result, even if the bearing main body 14b, 15b is cylindrical, the enclosing frame 14k, 15k is interposed between the outer circumferential surface of the bearing main body 14b, 15b and the upper and lower frames 12, 13, so that the load can be transmitted substantially evenly between the bearing main body 14b, 15b and the upper and lower frames 12, 13 without bias, and the load burden of each part is reduced accordingly, thereby improving durability.

[0030] In this embodiment, one (142) of the pair of first and second support plate portions 141, 142 on the upper side and one (151) of the pair of first and second support plate portions 151, 152 on the lower side are formed integrally with a part of the corresponding vertical wall portion 11a of the base frame 11, but these may also be formed separately and later fixed (e.g., by welding, bolting, etc.) to the tip of the vertical wall portion 11a.

[0031] Further, on the outer edge of each vertical wall portion 11a of the base frame 11, midway between the corresponding upper bearing 14 and lower bearing 15, a concave curved portion 18 is formed that is recessed in an arc shape on the inward side (i.e., toward the square tube portion 11b).

[0032] As can be seen in Figure 4, the contact surfaces between the above-mentioned mounting surfaces 14kf, 15kf of the enclosure frame main body 140, 150 and the corresponding upper frame 12 or lower frame 13 are positioned outside an imaginary vertical plane X that passes through the central axis of the upper bearing 14 or lower bearing 15 surrounded by the enclosure frame 14k, 15k having the mounting surfaces 14kf, 15kf and is parallel to the longitudinal center line of the corresponding upper frame 12 or lower frame 13.

[0033] Furthermore, each outrigger 16 is set to a maximum vertical width L1 (see Figure 6(c)) which is smaller than the mutual distance between the opposing surfaces of the upper and lower frames 12, 13 so that it can enter the space between the corresponding upper and lower frames 12, 13 when stored, and a longitudinal length L2 (see Figure 6(a)) which prevents the tip 16a of the outrigger 16 from interfering with the base 16b of an adjacent outrigger 16 when stored.

[0034] The outrigger body 16m, which is the main part of each outrigger 16, is made of a metal frame having a sturdy hollow closed cross-sectional structure with a flat rectangular cross section, and is formed into a horizontally long rectangle in side view. Each outrigger 16 has a bearing tube portion 16ba extending vertically integrally with the base portion 16b, and each bearing tube portion 16ba is disposed between the corresponding upper bearing 14 and lower bearing 15. When each outrigger 16 is set on the base body 10m, the pivot shaft 17 is inserted into the upper bearing 14, the bearing tube portion 16ba, and the lower bearing 15, which are aligned on the same vertical axis, so as to be relatively rotatable. As a result, the outrigger 16 can pivot around the pivot shaft 17 between a storage position 16B along the upper frame 12 and the lower frame 13 and a deployment position 16A extending outward from the storage position 16B.

[0035] In addition, a retaining means 19 for preventing the rotation support shaft 17 from coming off is interposed between the rotation support shaft 17 and the upper bearing 14 (or the lower bearing 15) so as to be detachable from the upper bearing 14 (or the lower bearing 15).

[0036] As is clear from Figure 3, in the embodiment, the deployment position 16A of the outrigger 16 can be selectively set to a main deployment position 16A0 extending in the extension direction of the vertical wall portion 11a in a plan view, and first and second secondary deployment positions 16A1, 16A2 extending in the respective extension directions of the upper and lower frames 12, 13 on one and the other sides, sandwiching the upper and lower bearings 14, 15.

[0037] In this embodiment, the outriggers 16 and the base main body 10m are provided with pin insertion holes 16h0, 16h1-16h3; 10h0, 10h1, 10h2 into which the connecting pins P1, P2 capable of fixing the outrigger 16 to the base main body 10m are removably inserted when the outrigger 16 is at least in the deployed position 16A (also in this embodiment, when the outrigger is in the stored position 16B). The inner diameters of the pin insertion holes 16h0, 16h1-16h3; 10h0, 10h1, 10h2 are set to the same diameter, and the outer diameters of the upper and lower connecting pins P1, P2 are set to the same diameter that is slightly smaller than the inner diameters.

[0038] In this embodiment, the upper connecting pin P1 is connected to the upper part of each upper bearing 14 via a wire to improve workability and prevent loss, and the lower connecting pin P2 is connected to the outer surface of the base 16b of each outrigger 16 via a wire to improve workability and prevent loss. Incidentally, instead of attaching the connecting pins P1 and P2 to the base main body 10m in this manner, workers may store them in appropriate locations on site and take them out and use them whenever necessary.

[0039] Next, the structure of each pin insertion hole will be specifically described with reference to Figs. 4 to 6. The upper and lower walls 161, 162 of the outrigger body 16m having a rectangular cross section are formed slightly wider than the planar shape of the upper and lower intermediate parts of the outrigger body 16m. The upper and lower extension parts 161f, 162f of the upper and lower walls 161, 162 that protrude outward from the upper and lower intermediate walls of the outrigger body 16m are provided with three pin insertion holes 16h1 to 16h3 on the outrigger 16 side for fixing the deployed position, spaced apart in the circumferential direction, particularly on the base part 16b side of the outrigger 16. The pin insertion holes 16h1 to 16h3 for fixing the deployed position are distributed and arranged at three locations, as is clear from Fig. 6(a), corresponding to the three deployed positions 16A of the outrigger 16 (i.e., the main deployed position 16A0 and the first and second auxiliary deployed positions 16A1, 16A2). Additionally, the upper extension 161f of the tip 16a of the outrigger 16 is provided with a pin insertion hole 16h0 for fixing the storage position.

[0040] Furthermore, at least one of the pin insertion holes 16h0, 16h1 to 16h3 provided on the outrigger 16 side may be provided by drilling a hole in a main part of the outrigger main body 16m, for example a wall part that constitutes the closed cross section of the outrigger main body 16m, instead of providing it in the upper and lower extension portions 161f, 162f.

[0041] On the other hand, the base main body 10m has a pin insertion hole 16h0 on the tip 16a side of the outrigger 16 and a first pin insertion hole 10h0 on the side of the base main body 10m for cooperating with the upper connecting pin P1 to fix the outrigger 16 to the storage position 16B, and this first pin insertion hole 10h0 is arranged in a fixed bracket 12b in the middle part of the upper frame 12.

[0042] In addition, the base main body 10m, particularly the upper and lower support plate portions 141, 142; 151, 152 of the enclosing frames 14k, 15k which clamp the upper and lower bearings 14, 15 from above and below, respectively, have multiple (two in the illustrated example) second pin insertion holes 10h1, 10h2 on the side of the base main body 10m for cooperating with the upper and lower pin insertion holes 16h1 to 16h3 on the base 16b side of the outrigger 16 to fix the outrigger 16 to the three deployed positions 16A0, 16A1, 16A2, respectively.

[0043] As can be seen in Figure 5(A), some of the multiple second pin insertion holes 10h1, 10h2 (particularly the pin insertion hole 10h1 provided in the upper and lower support plate portions 151, 152 of the surrounding frame 15k of the lower bearing 15) can be inserted into the lower connecting pin P2 together with one of the pin insertion holes 16h1 to 16h3 on the base 16b side of the outrigger 16 (the lower pin insertion hole 16h2 in the illustrated example), thereby fixing the outrigger 16 in the storage position 16B.

[0044] FIG. 8 is a diagram that clearly explains how the mutual insertion relationship between the upper and lower connecting pins P1, P2 and the pin insertion holes 16h0, 16h1-16h3; 10h0, 10h1, 10h2 to be used to fix the outrigger 16 in the embodiment to each operating position (i.e., the storage position 16B and the three deployed positions 16A0, 16A1, 16A2) changes.

[0045] In this Figure 8, the thick black dots indicate the connecting pins P1, P2 selected to fix the outrigger 16 in the operating position (16B, 16A0, 16A1, 16A2), and the reference symbols of the pin insertion holes in parentheses indicate the pin insertion holes into which the selected connecting pins P1, P2 are inserted.

[0046] In this manner, in this embodiment, when the outrigger 16 is in the storage position 16B or the deployed position 16A, by inserting the connecting pins P1, P2 into the pin insertion holes 16h1-16h3, 10h1, 10h2 of the outrigger 16 and the base main body 10m, the outrigger 16 can be securely fixed to the storage position 16B or the deployed position 16A, respectively, relative to the base main body 10m, thereby stabilizing support of the base device 10 and, ultimately, support of the distributor D.

[0047] Next, an example of the mast assembly 20 will be described with reference to FIGS.

[0048] The mast assembly 20 is divided into a plurality of masts M which are supported in an upright state on the base assembly 10 and connected to each other in a vertical row, and the overall length (and therefore the overall height) of the mast assembly 20 can be increased (higher) by increasing the number of connected masts M. A boom assembly 30 is mounted on the upper part of the mast assembly 20 (i.e., on the upper part of the uppermost mast M).

[0049] The masts M are basically of the same structure, and have a sturdy closed cross-sectional structure with a rectangular cross section. A ladder 23 is fixed to the outer periphery of each mast M so that an operator can ascend and descend along the mast assembly 20, and a work platform 24 is fixed to the top of the highest mast M so that an operator can safely perform various tasks thereon. These fixing operations are performed in advance, for example, by a fixing means (e.g., bolting, pinning, caulking, etc.) not shown, before the mast assembly 20 is installed on the base assembly 10. The above-mentioned various operations on the work platform 24 include, for example, the operation of connecting the mast assembly 20 and the boom assembly 30 in the "assembly process" of the distributor D described later, the operation of connecting various pipes, and also the maintenance operations such as inspection and maintenance of each part of the boom support BS and lubrication.

[0050] Furthermore, connecting pipes 28 that can be connected to a concrete pumping pipe extending from a concrete pump (not shown) and that extend in a vertical arrangement along the mast M are fixed to the outer periphery of each mast M, and adjacent connecting pipes 28 can be connected to each other in a liquid-tight manner by appropriate joints. In this embodiment, the length of the connecting pipes 28 is set to 1 / 2 the length of one mast M, and for example, two 2 m connecting pipes 28 are connected in series for a mast M with a total length of 4 m.

[0051] A plurality of connecting blocks 21, 21' are fixed (for example, welded) to the outer periphery of the upper and lower ends of each mast M, arranged at the same circumferential position at both ends and spaced apart from each other in the circumferential direction. The connecting blocks 21, 21' fixed to the outer periphery of the adjacent ends of a pair of adjacent masts M abut against each other in a state in which the two masts M are vertically arranged. At least one convex portion 22t is provided on one of the abutment surfaces 22, 22' (i.e., the abutment surface facing upward), and at least one concave portion 22d is provided on the other abutment surface 22, 22' (i.e., the abutment surface facing downward). These convex portion 22t and concave portion 22d engage with each other so as to correctly position the pair of adjacent masts M relative to each other and to suppress circumferential and radial positional deviations between the pair of masts M in the directions along the abutment surfaces 22, 22'.

[0052] The pair of connecting blocks 21, 21' that abut against each other are integrally connected to each other by a plurality of bolts 25 that penetrate both connecting blocks 21, 21', and this connection maintains the connecting blocks 21, 21' in abutment with each other, and therefore the engagement between the convex portions 22t and the concave portions 22d. In this case, the fastening effect of the abutting surfaces by the bolts 25 and the meshing effect of the concave-convex engaging portions combine (i.e., the cooperation of the connecting blocks 21, 21' and the bolts 25), making it possible to tightly and firmly connect both masts M to each other while reliably preventing misalignment of the pair of adjacent masts M.

[0053] 10(A) and 10(B), the bolts 25 of the embodiment include a first bolt 25 penetrating the tip surface of the convex portion 22t and the bottom surface of the concave portion 22d abutting the tip surface, a second bolt 25 penetrating the abutment surfaces 22, 22' of the joining blocks 21, 21' on one side of the convex portion 22t, and a third bolt 25 penetrating the abutment surfaces 22, 22' of the joining blocks 21, 21' on the other side of the convex portion 22t. This allows the clamping effect of the abutment surfaces by the first to third bolts to be more strongly exerted at the engagement portions between the convex portions and the concave portions and their surrounding areas, thereby enhancing the interlocking effect of the concave-convex engagement portions, making it possible to more reliably prevent positional deviation between a pair of adjacent masts and to firmly join the two masts.

[0054] Incidentally, instead of using the first to third bolts 25 described above, it is also possible to connect the two masts M, M using only the first bolt 25 that penetrates the convex portion 22t and the concave portion 22d. It is also possible to connect the two masts M, M using the second and third bolts 25 that penetrate both sides of the convex portion 22t and the concave portion 22d.

[0055] As is clear from Figures (B) and (C), the connecting blocks 21, 21' in this embodiment are arranged so that the abutment surfaces 22, 22' each protrude beyond the end face of the mast M to which they are fixed on the outer periphery of the end. This leaves a certain amount of clearance 29 between the opposing end faces of adjacent masts M. This allows the connecting blocks 21, 21' to abut against each other accurately without being affected by machining errors on the end faces of the masts M, making it possible to accurately connect adjacent masts M while reducing the machining costs of the masts M.

[0056] Incidentally, the clearance 29 may be omitted and the opposing end faces of the adjacent masts M may be brought into direct contact with each other.

[0057] Thus, the concave-convex engagement of the abutment surfaces of the above-mentioned joining blocks 21, 21' makes it easy to position a pair of adjacent masts M relative to each other, and the above-mentioned concave-convex engagement reliably prevents misalignment of the pair of masts M relative to each other in the direction along the abutment surfaces, so that the joining work of the masts M can be carried out quickly and accurately, greatly improving work efficiency.

[0058] Furthermore, a projection 21t is integrally formed on the back surface of each of the connecting blocks 21, 21', i.e., the surface 26 facing the outer periphery of the mast M, to fit into a support hole 27 provided in the end of the mast M with which the connecting blocks 21, 21' contact. By fitting this projection 21t into the support hole 27, the installation portion of each connecting block 21, 21' on the end of the mast M can be easily and accurately positioned. Moreover, the fitting portion between the projection 21t and the support hole 27 is welded, and the outer periphery of the facing surface 26 of the connecting blocks 21, 21' is welded over a wide area in the circumferential direction to the outer surface of the mast M, so that the welded area can be increased as a whole, and as a result, the connection strength between each connecting block 21, 21' and the mast M can be effectively increased as a whole.

[0059] Furthermore, the concave-convex engagement portion formed by the protrusions 21t and the support holes 27 may be omitted on the opposing surfaces between the back surfaces of the connecting blocks 21, 21' and the outer periphery of the mast M, in which case the opposing surfaces, each of which has a flat surface, are directly brought into plane contact with each other and welded.

[0060] In this embodiment, the concave-convex engagement structure of the contact surfaces of the joining blocks 21, 21' is exemplified by a structure in which the convex portions 22t and the concave portions 22d provided on one and the other of the contact surfaces are formed as step-like concave-convex surfaces. However, the concave-convex engagement structure is not limited to the embodiment, and for example, a protrusion and a concave hole that fit into each other may be formed as a convex portion and a concave portion.

[0061] In the above description of the structure of the base frame 11 of the base device 10, it was explained that a plurality of connecting blocks 21 are fixed at intervals to the outer periphery of the upper end of the square tube portion 11b, which has approximately the same cross-sectional shape as the mast M. The connecting blocks 21 of this square tube portion 11b have the same structure as the connecting blocks 21 on the upper end side of the mast M, and the structure for fixing the blocks to the square tube portion 11b is also similar to the structure for fixing the connecting blocks 21, 21' to the mast M. In other words, the method for connecting the connecting block 21 of the square tube portion 11b to the connecting block 21' fixed to the lower end of the lowermost mast M is the same as the method for connecting the connecting blocks 21, 21' between adjacent masts M described above.

[0062] Next, an example of the boom device 30 will be described with reference to FIGS.

[0063] The boom device 30 comprises a boom train BT consisting of a plurality of booms B1-B4 arranged in series with each other and pivotally connected to each other so that they can be flexibly swung, and a boom support base BS that is attached to the upper part of the mast device 20 (specifically, the upper end part of the uppermost mast M) and supports the first boom B1, the most base side in the boom train BT, so that it can be raised and lowered by pivot J1.

[0064] The boom support base BS comprises a fixed base 31 fixed to the upper part of the mast device 20, and a swivel base 32 supported on the fixed base 31 so as to be rotatable via a vertical swivel axis J5, and the upper part of the swivel axis J5 is connected to the swivel base 32 so as to rotate integrally therewith.

[0065] A plurality of slewing bearings 31b are fixed in the fixed base 31, which engage and support the slewing shaft J5 so that it cannot move axially relative to the actuator but can rotate relative to the actuator. An interlocking connection mechanism (not shown) is provided between the slewing shaft J5 and a slewing actuator (not shown) in the fixed base 31, which forcibly rotates the slewing shaft J5 (and therefore the slewing base 32) about the vertical axis in conjunction with the actuator. Since the structures of the slewing actuator and the interlocking connection mechanism are well known in the technical field of crane apparatuses with multi-stage booms, a cover body 31c which is connected to the fixed base 31 and covers the actuator and the interlocking connection mechanism is merely illustrated in Figures 12 and 13, and further explanation will be omitted.

[0066] A plurality of connecting blocks 21' of the same structure as those fixed to the lower end of the mast M are fixed to the outer periphery of the lower end of the fixed base 31, and the fixed base 31 and the uppermost mast M are connected by abutting the connecting block 21' on the fixed base 31 side and the connecting block 21 on the upper end side of the uppermost mast M and fastening them together with bolts 25. In other words, the method of connecting the connecting block 21' on the fixed base 31 side to the connecting block 21 on the upper end side of the uppermost mast M is the same as the method of connecting the connecting blocks 21, 21' between adjacent masts M.

[0067] The swivel base 32 includes a swivel base main body 32m to which the upper end of the swivel shaft J5 is fixed, and a pair of left and right standing wall portions 32s integrally provided on the upper surface of the swivel base main body 32m, with both standing wall portions 32s connected by a plurality of connecting walls 32c. Meanwhile, the base of the first boom B1 is formed in a U-shape in cross section so as to sandwich both standing wall portions 32s from both the left and right sides.

[0068] A pair of left and right side wall portions 35 of the base of the first boom B1 and adjacent upright wall portions 32s of the swivel base 32 are connected to each other via a pair of left and right short cylindrical pivot shafts J1 so as to be capable of relative rotation. Thus, the first boom B1 is supported on the swivel base 32 so as to be capable of hoisting and pivoting about the pivot shafts J1. Therefore, the pivot shafts J1 constitute a pivot support portion that pivotally supports the first boom B1 on the swivel base 32 so as to be capable of hoisting and pivoting.

[0069] The revolving shaft J5 is formed in a cylindrical shape extending in the vertical direction, and a first relay pipe 38, which is held by the fixed base 31 and passes through the inside and outside of the fixed base 31, is inserted partway through the hollow portion. The upstream end (i.e., the lower end) of this first relay pipe 38 is liquid-tight connected via a joint to the downstream end (i.e., the upper end) of the connection pipe 28 provided along the uppermost mast M described above. Meanwhile, the portion (upper part) of the first relay pipe 38 downstream of the revolving shaft J5 is drawn out to the outside of the first boom B1 via one of the left and right pivot shafts J1, and the drawn-out end, i.e., the downstream end, is liquid-tight connected to a second relay pipe 39 described below that is arranged on the boom row BT side.

[0070] In the boom train BT, a hydraulic cylinder C1 is interposed between the first boom B1 and the boom support base BS (particularly the upright wall portion 32s of the swivel base 32 described later) to forcibly raise and lower the first boom B1 relative to the boom support base BS. Hydraulic cylinders C2 to C4 are interposed between adjacent booms in the boom train BT (i.e., between the first boom B1 at the base end and the next second boom B2, between the second boom B2 and the next third boom B3, and between the third boom B3 and the fourth boom B4 at the most distal end), respectively, to forcibly flex and swing between them, either directly or via a link mechanism.

[0071] A hydraulic supply system (including, for example, an oil tank, hydraulic pump, control valve, etc.) installed on the boom support base BS (particularly the fixed base 31 described later) is connected to each of the hydraulic cylinders C1-C4 via hydraulic piping (not shown) routed along the boom row BT. The supply and discharge of hydraulic pressure between this hydraulic supply system and each of the hydraulic cylinders C1-C4 is controlled based on the operation of an operator. The configuration of the hydraulic control system is also well known in the technical field of multi-boom crane equipment.

[0072] Further, a flexible blow-out tube 37 capable of blowing out ready mixed concrete from its tip is attached to the tip of the fourth boom B4. The base end of this blow-out tube 37 and the downstream end of the aforementioned connection pipe 28 installed along the mast M are connected via the first relay pipe 38 provided on the boom support base BS and a second relay pipe 39 supported by each of the booms B1-B4 of the boom row BT and arranged along each of the booms B1-B4.

[0073] The second relay pipe 39 is bent at a folded portion midway through the hollow pivots J2 to J4 which serve as pivotal connections between the adjacent booms B1, B2; B2, B3; B3, B4, and is routed along the adjacent booms B1 to B4.

[0074] Moreover, the upstream end of the second relay pipe 39 and the downstream end of the first relay pipe 38 are connected via a joint that connects them to be relatively rotatable around the axis of the pivot J1. Also, joints that connect the upstream pipe section and the downstream pipe section to be relatively rotatable are provided midway along the second relay pipe 39, particularly near each of the turnback sections. Therefore, these joints enable the second relay pipe 39 to smoothly follow the up-down rotation and bending swing of the first boom B1 and the bending and swinging of adjacent booms B1, B2; B2, B3; B3, B4 relative to each other.

[0075] Meanwhile, on the fixed base 31, a plurality of first attachment parts T1 are installed which are used when the boom row BT is folded and in a horizontal position (see FIG. 15) or a vertical position (see FIG. 17) and can be connected to the first ropes W1 by a crane to hoist the boom device 30 via the first ropes W1. In this embodiment, the first ropes W1 connected to the respective first attachment parts T1 are composed of a single wire 51 (see FIG. 15) each having an eye-shaped connected part 51a at both ends. Note that, since a crane for hoisting the boom device 30 is conventionally well known, the crane body is not shown in the embodiment, and only a crane hook 80 suspended from the boom tip of the claim body via a wire is shown.

[0076] In particular, in this embodiment, two sets of pairs of first mounting parts T1 arranged at intervals in a predetermined direction (hereinafter simply referred to as the width direction of the boom row BT) along the axis of the pivot J1 of the base of the first boom B1 are disposed on the fixed base 31 at intervals in a horizontal direction perpendicular to the width direction (i.e., four locations in total on the front, back, left and right sides of the fixed base 31). It is noted that three or more sets of pairs of first mounting parts T1 may be provided.

[0077] Therefore, when the boom row BT is in a vertical position and the boom device 30 is lifted by a crane via the first ropes W1, if the boom support base BS is lifted by the same number of first ropes W1 via the first mounting parts T1 that are distributed at at least three or more locations spaced apart from each other, the boom device 30 can be lifted in as stable a vertical position as possible.

[0078] Each of the first mounting portions T1 includes a support wall 41w with a support hole 42 provided in each of four support brackets 41 fixed to the fixed base 31, and a connector 40 detachably connected to the support wall 41w, and the connector 40 includes a U-shaped connecting hook 43 having a pair of arms 43a that sandwich the support wall 41w, and a mounting shaft 44 that passes through both arms 43a and the support hole 42 of the support wall 41w so as to be relatively rotatable. A knob 44a that also serves as a stopper and engages with one arm 43a is integrally provided on one end of the mounting shaft 44, and a stopper member 45 (e.g., a split pin) that engages with the other arm 43a is detachably engaged with the other end of the mounting shaft 44.

[0079] To attach the eye-shaped connected portion 51a of the first rope W1 to the first attachment portion T1, for example, the split pin 45 is removed and the attachment shaft 44 is pulled out from the support wall 41w to remove the connecting hook 43 from the support bracket 41, and this is then connected (inserted) to the connected portion 51a of the first rope W1, and the connecting hook 43 is then reattached to the support bracket 41 via the attachment shaft 44 in the reverse order to the previous procedure. In this case, the attachment shaft 44 functions as a locking member that closes the gap between both arms 43a of the connecting hook 43 when it is set on the connecting hook 43, thereby reliably maintaining the connection between the connecting hook 43 (and therefore the first attachment portion T1) and the connected portion 51a at the end of the first rope W1.

[0080] The structure of the connector 40 that connects the connected portion 51a of the first rope W1 to the first mounting portion T1 is not limited to the embodiment, and may be any connector structure that is attached to at least the fixed base 31 (support bracket 41) and can be attached and detached as needed to the connected portion 51a of the first rope W1. For example, as a variation (not shown) of the connector 40, a hook-shaped connecting hook whose hook opening is always open, or a hook with a stopper piece that supports a stopper piece for preventing disengagement on the hook body and that can open and close the hook opening, and that is always resiliently biased to a position that closes the hook opening, may be used as the connector.

[0081] Incidentally, the first mounting part T1 described above is provided on the boom support base BS, particularly the fixed base 31, via the support bracket 41, but it may also be provided directly on the fixed base 31. Also, instead of providing the first mounting part T1 on the fixed base 31, it may be provided on the swivel base 32 directly or via a support member such as a bracket.

[0082] Further, a second attachment part T2 is provided midway along the first boom B1, which is used when the boom device 30 is hoisted by a crane via the second rope W2 while the boom row BT is in a horizontal position and which can be connected to the second rope W2. The second rope W2 connected to the second attachment part T2 is formed of a single wire 52 (see FIG. 15) having eye-shaped connected parts 52a at both ends, similar to the first rope W1.

[0083] The installation location of the second mounting part T2 is set at a location such that when the boom device 30 is lifted by a crane via the first and second ropes W1, W2 with the boom row BT in a horizontal position, the center of gravity of the entire boom device 30 (see reference symbol G in Figure 15) is midway between the first and second mounting parts T1, T2 in the longitudinal direction of the boom row BT.

[0084] The second mounting part T2 is equipped with, for example, a connecting arm 46 that straddles the middle part of the first boom B1 from above, and a connector 40 that is detachably connected to an upper support wall 46w of the connecting arm 46, and a pair of bifurcated legs 46a of the connecting arm 46 are rotatably supported by shafts 46p on the left and right side walls of the first boom B1, respectively. The connector 40 has the same structure as the connector 40 of the first mounting part T1 described above, that is, a U-shaped connecting hook 43 is rotatably supported by a mounting shaft 44 in a support hole provided in the upper support wall 46w.

[0085] Then, in a state in which the mounting shaft 44 is removed and the connecting hook 43 is separated from the upper support wall 46w, the connecting hook 43 is engaged with the eye-shaped connected portion 51a of the second rope W2 and then reattached to the upper support wall 46w via the mounting shaft 44, whereby the second rope W2 can be detachably connected to the upper support wall 46w of the first boom B1 via the connector 40 and the connecting arm 46. Note that, like the first mounting part T1, the connector 40 of the second mounting part T2 is not limited to the embodiment, and for example, variations not shown that have been described for the first mounting part T1 can also be employed.

[0086] 15, when the boom device 30 is hoisted by a crane via the first and second ropes W1, W2 with the boom row BT in a lateral position, in this embodiment, the position of the first attachment part T1 relative to the boom support base BS is set so that the first rope W1 passes closer to the tip of the first boom B1 than the axis of the rotation shaft support part (pivot J1) of the boom support base BS relative to the first boom B1 in a side view. In this case, in the illustrated example of FIG. 15, the first rope W1 is connected to the first attachment part T1 on the tip side of the first boom B1 (the right side in FIG. 15), but it may also be connected to the first attachment part T1 on the opposite side (the left side in FIG. 15).

[0087] The above-mentioned installation position of the first mounting part T1 is determined from the viewpoint of effectively preventing the boom row BT from opening and swinging relative to the boom support base BS when the boom device 30 is hoisted in the above-mentioned horizontal position, as described below. However, if such an inhibitory effect is not important, the installation position of the first mounting part T1 relative to the boom support base BS may be set so that the first rope W1 passes outside the above-mentioned pivot support part (pivot J1) in a side view, i.e., on the left side in Figure 15.

[0088] Further, a third attachment part T3 is provided at the base of the first boom B1 for holding the second rope W2 on the first boom B1 in cooperation with the second attachment part T2 when not in use. The third attachment part T3 includes, for example, an upper support wall 49 with a support hole 48 protruding from the upper surface of the base of the first boom B1, and a connector 40 detachably connected to the upper support wall 49. The connector 40 also has the same structure as the connector 40 of the first attachment part T1 described above, that is, a U-shaped connecting hook 43 is rotatably supported via a mounting shaft 44 in a support hole provided in the upper support wall 49w. The connector 40 of the third attachment part T3 is also not limited to the embodiment, and for example, a variation not shown described for the first attachment part T1 can be adopted.

[0089] Furthermore, the third mounting part T3 can be omitted. In that case, the second rope W2, which is not required during concrete pouring work, can be removed from the second mounting part T2 (first boom B1), and the second rope W2 can be attached to the second mounting part T2 when assembling and dismantling the distributor D.

[0090] Next, with reference to Figures 17 and 18, an example of a boom device lifting auxiliary device that can be used when lifting the boom device 30 with a crane via multiple first ropes W1 when the boom row BT is in a vertical position using the concrete supply distributor D of this embodiment will be described.

[0091] That is, the auxiliary device includes a suspension rod 50, both ends of which are detachably connected to at least one pair of the first ropes W1 when the first ropes W1 are connected to all the first attachment parts T1 and the boom device 30 is hoisted by a crane in a vertical position via the first ropes W1 as shown in FIG. 17. The suspension rod 50 is formed as a rod-shaped body having a length greater than the maximum width of the boom row BT in a predetermined direction and has rigidity. The connection position of the suspension rod 50 to the first ropes W1 is set so that the suspension rod 50 can straddle the boom device 30 near the upper end of the boom device 30 in the vertical position. A pair of triangular support plates 55 are fixed (for example, welded) to both ends of the suspension rod 50, and a pair of support holes 56 are provided at an interval between the support plates 55.

[0092] The first rope W1 is divided into a first rope portion W1u above the suspension rod 50 and a second rope portion W1d below. The connected portions 51a of the first and second rope portions W1u and W1d are detachably connected to the corresponding support plates 55 via a pair of upper and lower connectors 40. The pair of upper and lower connectors 40 each have the same structure as the connector 40 of the first mounting part T1 described above, that is, a U-shaped connecting hook 43 is rotatably supported by a pair of support holes 56 of the support plate 55 via a mounting shaft 44. Therefore, the attachment and detachment operation of the connector 40 used for this suspension rod 50 is also the same as that of the connector 40 of the first mounting part T1.

[0093] The structure of the connector 40 used for the hanging rod 50 is also not limited to the embodiment, and for example, a variation (not shown) described for the first attachment portion T1 can be adopted.

[0094] Furthermore, when the boom device 30 is hoisted by a crane via a plurality of first cords W1 with the boom row BT in a vertical position as described above, the auxiliary device is provided with an annular support 60 that is detachably connected to at least two of the first cords W1 in the vertical direction between the lifting rod 50 and the first mounting portion T1 (at a position near the upper end of the boom device 30 in the illustrated example) and that surrounds all of the first cords W1 and the boom row BT.

[0095] The annular support 60 is intended to prevent the boom train BT from tilting by a predetermined angle or more with the first attachment part T1 as the tilting fulcrum when the boom device 30 is hoisted via the multiple first ropes W1 with the boom train BT in the vertical position. The annular support 60 is composed of a flexible and sturdy annular body (e.g., an endless wire rope, chain, etc.), and in the middle of the annular support 60, connecting members 61 fixed (e.g., by crimping, welding, bolting, etc.) to at least two of the first ropes W1 (parts close to the hanging rod 50) are detachably connected via connectors 40.

[0096] The connector 40 used to connect the annular support 60 has the same structure as the connector 40 of the first attachment part T1 described above, that is, a U-shaped connecting hook 43 is rotatably supported in a support hole 62 of a connecting member 61 via an attachment shaft 44. Therefore, the attachment and detachment operation of the connector 40 used to connect the annular support 60 is also similar to that of the connector 40 of the first attachment part T1. The structure of the connector 40 used for the annular support 60 is also not limited to the embodiment, and for example, a variation not shown described for the first attachment part T1 can be adopted.

[0097] Meanwhile, a grease pump Gi as a grease injection section, a distribution valve Vd connected to the grease pump Gi via a single grease base pipe GL0, and a plurality of grease pipes, i.e., the first to fourth grease pipes GL1 to GL4, connected in parallel to the grease base pipe GL0 (and therefore the grease pump Gi) via the distribution valve Vd, are fixed and supported on the fixed base 31 of the boom support base BS. The grease pump Gi is provided with, for example, a grease holding section capable of storing a predetermined amount of grease, and a grease pushing means such as a piston capable of manually pumping the stored grease in the grease holding section to the grease base pipe GL0, and the structure thereof is conventionally known. The distribution valve Vd distributes the grease flowing therein to the first to fourth grease pipes GL1 to GL4 in equal volumes, and the structure thereof is conventionally known.

[0098] The first to fourth grease pipes GL1 to GL4 are mostly flexible, and their midsections are bundled together and extend upward outside the fixed base 31, and then pass through the swivel base 32 and the base of the first boom B1. Of the first to fourth grease pipes GL1 to GL4 that extend from inside the base to the outside of the first boom B1, the first grease pipe GL1 in particular extends to the vicinity of the pivot J1 that serves as a rotational support for the first boom B1, and is capable of supplying grease to parts to be lubricated around the pivot J1 (for example, the fitting portion between the outer periphery of the pivot J1 and a bearing, and the fitting portion between the inner periphery of the pivot J1 and the second relay pipe 39).

[0099] The second to fourth grease pipes GL2 to GL4 protruding from the first boom B1 are fixed along the first boom B1 and extend to the tip of the first boom B1. At the tip of the first boom B1, the second grease pipe GL2 of the second to fourth grease pipes GL2 to GL4 extends to the vicinity of the pivot J2 which is the pivotal joint of the first and second booms B1 and B2, and can supply grease to parts to be lubricated around the pivot J2 (for example, the fitting portion between the outer periphery of the pivot J2 and the bearing, and the fitting portion between the inner periphery of the pivot J2 and the second relay pipe 39). Meanwhile, the third and fourth grease pipes GL3 and GL4 are fixed along the second boom B2 and extend to the tip of the second boom B2.

[0100] At the tip of the second boom B2, the third and fourth grease pipes GL3 and GL4, particularly the third grease pipe GL3, extend to the vicinity of the pivot J3 that is the pivotal connection part of the second and third booms B2 and B3, and can supply grease to the lubricated parts around the pivot J3 (for example, the fitting part between the outer periphery of the pivot J3 and the bearing, and the fitting part between the inner periphery of the pivot J3 and the second relay pipe 39). On the other hand, the fourth grease pipe GL4 is fixed along the third boom B3 and extends to the tip of the third boom B3. At the tip of the third boom B3, the fourth grease pipe GL4 extends to the vicinity of the pivot J4 that is the pivotal connection part of the third and fourth booms B3 and B4, and can supply grease to the lubricated parts around the pivot J4 (for example, the fitting part between the outer periphery of the pivot J4 and the bearing, and the fitting part between the inner periphery of the pivot J4 and the second relay pipe 39).

[0101] Thus, the first to fourth GL1 to GL4 extend to the respective lubricated parts of the plurality of booms B1 to B4 of the boom train BT and supply grease to those lubricated parts.

[0102] As is clear from FIG. 12, the first to fourth backup pipes GE1 to GE4 are individually branched from the first to fourth grease pipes GL1 to GL4. The backup pipes GE1 to GE4 have grease injection ports GEi1 to GEi4 as backup grease injection parts that can individually inject grease into the corresponding backup pipes GE1 to GE4. Each of the grease injection ports GEi1 to GEi4 is provided with a manual plug that normally closes the port, and each plug can open and close the grease injection ports GEi1 to GEi4 at any time. In addition, the first to fourth grease pipes GL1 to GL4 are provided with a check valve Vc between the branching part of the grease pipes GL1 to GL4 where the backup pipes GE1 to GE4 branch and the distribution valve Vd, to prevent grease from flowing back from the grease pipes GL1 to GL4 to the distribution valve Vd.

[0103] According to the above-described grease supply structure, grease can be simultaneously supplied to the multiple grease pipes GL1 to GL4 from a single common grease pump Gi via a distribution valve Vd. This allows grease to be quickly and easily supplied to the lubricated parts of the multiple booms B1 to B4 in the boom train BT even when the boom train BT remains attached to the boom support base BS (i.e., without lowering the booms B1 to B4).

[0104] Next, a usage example of the distributor D of the embodiment will be described with reference to Figs.

[0105] When the distributor D is used at a building construction site, for example, a reinforced concrete floor slab FS1 of the lowest floor (for example, the first floor) is constructed in advance, and the floor slab FS1 has through holes H that connect the spaces above and below it. Then, an assembly process is performed in which the distributor D is assembled and installed on the floor slab FS1, and a process is performed in which the upper floor slab and associated walls are constructed based on the pouring of ready mixed concrete using the installed distributor D.

[0106] Once the upper floor slabs FS2, FS3, etc. have been constructed in this manner, a process is carried out in which the distributor D as a whole is placed on the upper floor slab in order to construct the upper floor slabs, etc. (This process is called "re-laying" on-site.) The above-mentioned distributor D assembly process and re-laying process will now be described in order. [Assembly process] First, as illustrated in Figure 14(A), the base device 10 of the distributor D is suspended by a crane and lowered to approximately the same level as the floor slab FS1, and the outrigger 16 in the deployed position 16A is placed on the floor slab FS1 and fixed with a conventional fixing means (for example, an anchor bolt that passes through the outrigger 16).

[0107] Next, as shown in Figure 14 (B), the mast device 20, which has been assembled in advance at another location including the ladder 23, connecting pipes 28 and work platform 24 together with one or more masts M, is suspended by a crane, placed on the base device 10 (on the square tube portion 11b of the base frame 11), and connected to the base device 10 via connecting blocks 21, 21' and bolts 25.

[0108] Next, as shown in Fig. 14(C), the boom device 30, which has been assembled in advance as an assembly of the boom train BT and the boom support base BS at a different location, is folded up and placed in a substantially horizontal lateral position, and the connected parts 51a at the lower ends of the first and second ropes W1, W2 are respectively connected to the fixed base 31 and the first and second mounting parts T1, T2 on the first boom B1. Then, the upper parts of the first and second ropes W1, W2 are lifted up by a crane and placed on the upper end of the uppermost mast M of the mast device 20 as shown in Fig. 14(D), and connected to the uppermost mast M via the connecting blocks 21, 21' and bolts 25. This connecting work is performed by a worker who has climbed onto the work platform 24 in cooperation with the crane operator.

[0109] Thereafter, the first rope W1 is removed from the crane hook 80 and the first mounting part T1 and stored in another storage location. The upper end of the second rope W2 is removed from the crane and attached to the third mounting part T3, and the lower end is left connected to the second mounting part T2.

[0110] Furthermore, the downstream end (upper end) of the connection pipe 28 fixed to the mast M is liquid-tightly connected to the upstream end (lower end) of the first relay pipe 38 on the fixed base 31 side via a joint, and this connection work is also performed by a worker on the workbench 24. Meanwhile, the upstream end (lower end) of the connection pipe 28 is liquid-tightly connected via a joint to a concrete pressure pipe extending from an external concrete pump (not shown). This makes it possible to pressure-feed and supply ready-mixed concrete from the concrete pump to the connection pipe 28, the first and second relay pipes 38, 39, and the blow-out tube 37 in that order.

[0111] Thus, the installation of the distributor D on the floor slab FS1 of the lowest level is completed, and from this state, the distributor D can supply ready mixed concrete to a desired casting location from the blow-out tube 37 at the end of the boom train BT by appropriately bending the booms B1 to B4 of the boom train BT relative to each other and rotating the swivel base 32 (and therefore the boom train BT). This makes it possible to sequentially build the floor slab FS2 and wall of the next level, and further the floor slab FS3 and wall of the next level.

[0112] Once the upper floor slabs FS2, FS3 and wall bodies have been built in this manner, the next re-laying process is performed in which the entire distributor D is re-placed, for example, on the floor slab FS2 in order to build the upper floor slab FS4, etc. [Refilling process] In this step, for example, the connection pipe 28 fixed to the mast M is disconnected from the concrete pump-connected concrete pumping pipe, and the outriggers 16 are released from their fixing to the floor slab FS1. Then, as shown in Fig. 16(E), the folded boom row BT is raised and swung up until it is in a substantially vertical position, and in this state, the connected parts 51a at the lower ends of the four first ropes W1 are respectively connected to the four first mounting parts T1 of the boom support base BS (fixed base 31). Then, the connected parts 51a at the upper ends of the first ropes W1 are engaged with the crane hook 80, and the entire distributor D is lifted up by a crane.

[0113] 16(F), the outriggers 16 are rotated to the storage position 16B so that the outriggers 16 do not interfere with the periphery of the through-hole H of the floor slab FS2 of the upper floor when the distributor D is raised. Then, the entire distributor D is hoisted and raised by a crane until the base device 10 is at approximately the same level as the floor slab FS2 of the upper floor.

[0114] After the ascent, as shown in FIG. 16(G), the outriggers 16 are deployed again to the deployment position 16A, and then placed and fixed on the floor slab FS2 of the upper floor. Next, the lower ends of all the first ropes W1 are removed from the first mounting parts T1 of the fixing base 31 and stored in another storage location. The upper end of the extension pipe 28' extending downward is connected and fixed to the upstream end (lower end) of the connection pipe 28 fixed to the mast M, and the middle of the extension pipe 28' is supported by a beam or the like around the through hole H of the floor slab (for example, the floor slab FS2) of the lower floor via a fixing means 81. Then, by connecting the lower end of the extension pipe 28' to a concrete pressure pipe connected to the concrete pump, it becomes possible to pressure-feed and supply ready-mixed concrete to the connection pipe 28, the first and second relay pipes 38, 39, and the blow-out tube 37 in that order.

[0115] Thus, the distributor D's work of transferring concrete to the upper floor is completed, and from this state, the distributor D lays down the first boom B1 of the boom train BT, bends the booms B1 to B4 relative to each other as appropriate, and rotates the swivel base 32 (and therefore the boom train BT), so that ready-mixed concrete can be supplied from the blow-out tube 37 at the end of the boom train BT to a desired casting location on the upper floor. This makes it possible to construct the floor slab FS4 and walls of the upper floor.

[0116] By carrying out the above-mentioned replacement process in sequence as the floor slab FS increases in level, it becomes possible to easily construct medium-rise and high-rise buildings using the same distributor D.

[0117] According to the present embodiment described above, the first attachment portion T1, which is used when lifting the boom device 30 via the first ropes W1 with a crane while the folded boom row BT is in a horizontal or vertical position and can be connected to the first ropes W1, is provided on the boom support base BS (fixed base 31 in the illustrated example), so that the boom device 30 can be lifted via the first ropes W1 with a crane in the state where the boom row BT and the boom support base BS are assembled together. This eliminates the need to assemble the boom device 30 on a high mast device 20 as in the conventional case, and accordingly improves the ease of assembly of the boom device 30.

[0118] In particular, during so-called rearrangement work in which the boom device 30 is lifted with the boom train BT in the vertical position, the entire boom device 30 is lifted, particularly at the boom support base BS, via the multiple first mounting parts T1 and multiple first ropes W1 of the boom support base BS, so the load on the connection between the base end of the boom train BT (base of the first boom B1) and the boom support base BS during the lifting can be effectively reduced compared to the conventional case of lifting with the boom train BT. This simplifies the structure of the connection and ultimately reduces costs.

[0119] The boom support base BS of the embodiment includes a fixed base 31 fixed to the upper part of the mast device 20, theThe fixed base 31 is supported so as to be rotatable about a rotation axis J5. The base of the first boom B1 is pivotally supported so as to be able to rise and fall. The boom support base BS includes a swivel base 32, and the fixed base 31 is provided with a first attachment part T1. As a result, the fixed base 31 of the boom support base BS in particular is hoisted by the first ropes W1, so that the load on the swivel mechanism (i.e., the swivel shaft J5, swivel bearing 31b, etc.) that rotatably supports the fixed base 31 on the swivel base 32 is reduced compared to the case where the swivel base 32 is hoisted by the first ropes W1, which simplifies the structure of the swivel mechanism and reduces costs.

[0120] In the embodiment, a second attachment part T2 that is used when lifting the boom device 30 by a crane via the second rope W2 with the boom train BT in a particularly horizontal position and that can be connected to the second rope W2 is provided midway on the first boom B1. This makes it possible to lift the boom device 30 by a crane via the first and second ropes W1, W2 (thus with a long support span in the horizontal direction) with the boom train BT in a horizontal position, thereby stabilizing the lifting support and improving workability.

[0121] Furthermore, in the embodiment, when the boom device 30 is hoisted by a crane via the first and second ropes W1, W2 with the boom train BT in a lateral position, the position of the first attachment part T1 relative to the boom support base BS is set so that the first rope W1 passes through the tip side of the first boom B1 relative to the axis of the rotation shaft support part (i.e., the pivot J1) of the boom support base BS relative to the first boom B1 in a side view. As a result, during the process of hoisting the boom device 30 with the boom train BT in a lateral position, the boom train BT can be effectively prevented from opening and swinging relative to the boom support base BS by the moment that the lifting load applied to the boom support base BS by the first rope W1 via the first attachment part T1 exerts on the boom support base BS, and therefore the simple opening suppression structure utilizing the lifting load improves the safety of the work.

[0122] Also, a third attachment part T3 is provided at the base of the first boom B1 for holding the second cord W2 on the first boom B1 in cooperation with the second attachment part T2 when not in use. As a result, even if one end of the second cord W2 remains connected to the second attachment part T2 when not in use, the other end of the second cord W2 can be connected and held to the third attachment part T3, so that the second cord can be held on the first boom while preventing the second cord from interfering with the concrete pouring work. Moreover, the next time the second cord W2 is used, the effort of connecting one end of the second cord W2 to the second attachment part T2 is eliminated, which improves work efficiency.

[0123] In particular, in order to carry out the rearrangement work, when the boom train BT is in the vertical position and the first ropes W1 are connected to all of the first mounting parts T1 and the boom device 30 in the vertical position is hoisted by a crane via the first ropes W1, it is desirable to connect both ends of a suspension rod 50 that is longer than the maximum width of the boom train BT in the width direction to the middle of a pair of first ropes W1 aligned in the width direction of the boom train BT (particularly above the upper end of the boom train BT). In this case, the pair of first ropes W1 with both ends of the suspension rod 50 connected in the middle are subjected to the tensioning action of the suspension rod 50 interposed between the first ropes W1, thereby reliably preventing excessive interference of the first ropes W1 with the boom train BT.

[0124] Furthermore, when the boom device 30 in the vertical position is hoisted by a crane via the first ropes W1 for the above-mentioned repositioning work, it is desirable to connect an annular support 60 surrounding all of the first ropes W1 and the boom train BT to the middle of at least one of the first ropes W1 (particularly the portion close to the hoisting rod 50) between the hoisting rod 50 and the first mounting part T1 in the vertical direction. In this case, the annular support 60 can suppress the boom train BT from tilting excessively (i.e., more than a predetermined angle) with the first mounting part T1 as the tilting fulcrum, so that it is possible to effectively prevent the boom train BT from tilting too much and falling over when the boom device 30 is hoisted.

[0125] When the boom device 30 in the vertical position described above is hoisted by a crane, both the hoist rod 50 and the annular support 60 may be omitted. It is also possible to use only the hoist rod 50 without using the annular support 60. It is also possible to use only the annular support 60 without using the hoist rod 50. In this case, it is possible to hoist the boom device 30 in the vertical position with only one first rope W1 via one first mounting portion T1 on the boom support base BS side, and at that time, it is possible to prevent the boom device 30 from falling over with the annular support 60 connected to the first rope W1.

[0126] In addition, in carrying out the [Reloading Process], in the embodiment, the boom device 30 in the vertical position is hoisted by a crane via the first rope W1 as shown in Fig. 16. However, even if the boom device 30 is hoisted in the horizontal position via the first and second ropes W1 and W2, the reloading work may be carried out with the boom device 30 in the horizontal position, provided that the boom device 30 does not interfere with the already constructed structure (e.g., the floor slab of the upper layer, etc.).

[0127] Figures 20 to 30 show an example of a boom device transport platform U used to transport the boom device 30 of the distributor D described above with the boom row BT in a horizontal position by a transport vehicle V, and an example of its usage.

[0128] The transport platform U includes a main frame 90 that extends substantially along the longitudinal direction of the boom device 30 under the boom device 30 when the boom train BT is folded and in a horizontal position (see Figs. 22 and 23) and that can be loaded onto the loading platform Va (see Fig. 30) of a transport vehicle V, a boom support train support part Z0 that is fixed to the main frame 90 and capable of connecting and fixing the boom support train BS, and first and second boom train holding parts Z1, Z2 that are fixed to the main frame 90 at a distance in the longitudinal direction. In this case, the longitudinal direction (front-rear direction) of the main frame 90 substantially coincides with the longitudinal direction of the boom device 30 in a horizontal position, but particularly in this specification, the end of the main frame 90 on the boom support train BS side in the longitudinal direction is referred to as the "front end" and the opposite end is referred to as the "rear end".

[0129] Thus, the first boom train holding part Z1 is installed at the rear end of the main frame 90 to hold the lower part of the boom train BT (more specifically, the middle part of the fourth boom B4) at a position closer to the front end of the main frame 90, and the second boom train holding part Z2 is installed at a middle part closer to the front end of the main frame 90 to hold the lower part of the boom train BT (more specifically, the middle part of the fourth boom B4) at a position closer to the base of the boom train BT (i.e., the base end of the first boom B1) in the horizontal orientation.

[0130] As is clear from FIG. 20 and FIG. 21, the main frame 90 extends in the longitudinal direction of the boom row BT in the horizontal position. Bite The frame is made up of a pair of left and right vertical frames 91 that are parallel to each other, and a plurality of horizontal frames 92 that are spaced apart in the longitudinal direction and are integrally joined (for example, welded) between the vertical frames 91, and is configured as a ladder-shaped rigid frame in a plan view. As is clear from Fig. 24, a pair of left and right reinforcing frames 93 are disposed between the two front horizontal frames 92, extending along the vertical frames 91 to integrally connect the two horizontal frames 92 and joined and fixed (for example, welded) to the underside of the vertical frames 91.

[0131] As is clear from Fig. 25, the lower end surfaces of the horizontal frame 92 and the reinforcing frame 93 are formed at the same level and function as a contact surface, for example, when the transport platform U is stored on the ground, the lower end surface is placed on the ground, and when the transport platform U is loaded on the loading platform Va of a transport vehicle V as shown in Fig. 30, the lower end surface is placed on the loading platform Va. In the embodiment, the vertical and horizontal frames 91, 92 and the reinforcing frame 93 are all made of frame materials having a U-shaped cross section, but frame materials having other cross-sectional shapes (for example, I-shaped) may also be used.

[0132] A pair of front and rear support plates 94 extending along the two front horizontal frames 92 are butt-welded at both ends to the left and right reinforcing frames 93, and each of the support plates 94 has an L-shaped cross section, and one side edge is adjacent to and fixed (for example, welded) to the opposing side surfaces of the two front horizontal frames 92. The support strength of each support plate 94 is increased by a triangular reinforcing plate 95 welded across the reinforcing frames 93 and the vertical frames 91.

[0133] The horizontal upper surfaces of the front and rear support plates 94 become the seating surfaces of the fixed base 31 of the boom support base BS when the boom device 30 is transported, and the lower end surface of the fixed connecting block 21' is placed and fixed to the lower outer periphery of the fixed base 31. This fixing is achieved, for example, by using bolts 25 which pass through the bolt insertion holes of the connecting block 21' and the corresponding bolt insertion holes 94h provided in each support plate 94, and weld nuts 25 which are welded to the back surface of each support plate 94 corresponding to the bolt insertion holes 94h and into which the bolts 25 are screwed. u This is done using.

[0134] The front and rear support plates 94 are made up of two front horizontal frames 92, left and right reinforcing frames 93 and reinforcing plates 95, as well as bolts 25 and weld nuts 25. u cooperate with each other to form a boom support base support part Z0 which detachably connects and fixes the boom support base BS onto the main frame 90.

[0135] 20 and 27(C), a first support frame 96 made of a rigid frame formed of a plurality of frame members is erected and fixed (for example, by bolts or welding) to the rear end of the main frame 90 (more specifically, to the left-right central portion of the rearmost horizontal frame 92). The upper portion of this first support frame 96 has an upwardly facing groove-shaped holding surface 96a that fits and holds the lower half of the intermediate portion (fourth boom B4) near the front of the boom row BT in the horizontal orientation, and a buffer rubber sheet 97 made of a hard rubber material with which the lower surface of the fourth boom B4 can come into contact and be separated is joined and fixed (for example, by bolts or adhesive) to the bottom surface of the holding surface 96a.

[0136] Thus, this rubber sheet 97 and the first support frame 96 cooperate with each other to form a first boom train holding portion Z1 that engages and holds the lower part of the boom train BT (the lower half of the fourth boom B4) at a position near the tip of the boom train BT in a horizontal position.

[0137] 20 and 27(B), a second support frame 98 made of a rigid frame formed of multiple frame materials is erected and fixed (e.g., bolted or welded) to the middle of the main frame 90 (more specifically, the left-right central part of the horizontal frame 92 closer to the front end than the front-rear center) and fixed to the top surface of the upper frame of the second support frame 98. A shock absorbing holder tube 99 made of hard rubber formed in a cylindrical shape and extending in the left-right direction is fixed (e.g., bolted or glued at the lower end) to the top surface of the upper frame of the second support frame 98. The shock absorbing holder tube 99 is capable of placing and holding the underside of the lower part of the boom row BT (fourth boom B4) in a horizontal position, and is somewhat elastically deformed in this holding state.

[0138] Thus, the buffer retaining tube 99 and the second support frame 98 cooperate with each other to form the second boom train retaining portion Z2 which supports and retains the underside of the middle portion (fourth boom B4) of the boom train BT at a position near the base of the boom train BT in a horizontal position.

[0139] Meanwhile, the main frame 90 has four rope mounting portions T5, T6 arranged at intervals from each other on the front, back, left and right sides of the main frame 90, which are used when lifting the boom device 30 with the boom row BT folded and in a horizontal position via the transport platform U with a crane and to which a lifting rope W can be attached.

[0140] The pair of left and right cable mounting portions T5 on the front side function as support base side cable mounting portions, at least a portion of which is located at the same position in the longitudinal direction of the main frame 90 as a portion of the boom support base support portion Z0 (i.e., the longitudinal positions overlap, in other words, they overlap), while the pair of left and right cable mounting portions T6 on the rear side function as boom row side cable mounting portions to which lifting cables W can be attached between the first and second boom row holding portions Z1, Z2.

[0141] Furthermore, the pair of left and right front cable mounting portions T5 may be positioned so that at least a portion of them is located in a vicinity of a portion of the boom support base support portion Z0, even if it is not in the same position in the longitudinal direction as that portion.

[0142] The left and right support-base-side rope attachment parts T5 include support walls 92b with support holes 92bh that are erected and fixed to the upper surfaces of both left and right ends of the horizontal frame 92 near the front end of the main frame 90, and connectors 40 that are detachably connected to the support walls 92b. On the other hand, the left and right boom-row-side rope attachment parts T6 include support walls 92b with support holes 92bh that are erected and fixed to the upper surfaces of both left and right ends of the horizontal frame 92 located at the rear end of the main frame 90, and connectors 40 that are detachably connected to the support walls 92b.

[0143] The structure and function of the connectors 40 used in these cable mounting parts T5, T6 are basically the same as those of the connectors 40 (see the partially enlarged view in Figure 15) which have a U-shaped connecting hook 43 and a mounting shaft 44 as their main parts and are used in the aforementioned first and second mounting parts T1, T2 provided on the boom support base BS and the boom row BT for directly lifting the boom device 30, so further explanation will be omitted.

[0144] Next, an example of the front and rear carrier lifting wires W connected to the support-side wire mounting portion T5 and the boom-row-side wire mounting portion T6 will be described with reference to Figures 28 and 29. Note that since the front and rear carrier lifting wires W have the same configuration, only the front lifting wire W will be described.

[0145] That is, the front lifting wire W includes left and right lower cables Wd connected to the left and right support base side cable mounting parts T5 via connectors 40, respectively, and left and right upper cables Wu whose upper ends are connected and engaged with the crane hook 80. The left and right upper and lower cables Wu, Wd are connected to each other via a spacing bar 100 extending in the left and right direction, and for this connection, an upward support wall 101 and a downward support wall 102 each having a support hole are protruded from both left and right ends of the spacing bar 100. The upward support wall 101 and the downward support wall 102 are connected to connectors 40 having the same basic configuration as the connectors 40 used in the first and second mounting parts T1, T2 described above, and the upper ends of the left and right lower cables Wd and the lower ends of the left and right upper cables Wu are connected to each other via the connectors 40.

[0146] Thus, when the crane hook 80 hoists the carrier 90 via the lifting wire W, the left and right mutual spacing between the left and right lower ropes Wd and the left and right upper ropes Wu is ensured sufficiently and uniformly by the bracing action of the spacing maintaining bar 100. This effectively prevents the left and right lower ropes Wd from coming into contact with the boom train BT and boom support base BS on the carrier U.

[0147] The structure of the connector 40 used in the support-base-side cable mounting part T5, the boom-row-side cable mounting part T6, and the intermediate spacing bar 100 of the lifting cable W is not limited to the embodiment, and may be a connecting structure that is at least attached to the support wall 92b and can be attached and detached as needed to the connected part 51a' of the lifting cable W. For example, as a variation of the connector 40 (not shown), a hook-shaped connecting hook whose hook opening is always open, or a hook with a stopper piece that supports a stopper piece for preventing disengagement on the hook body and that can open and close the hook opening, and that is always resiliently biased to a position that closes the hook opening, may be used as the connector.

[0148] When the concrete supply distributor D of the embodiment is transported from a manufacturing plant, a maintenance plant, or a storage site, etc., away from the construction site, to the construction site, a transport vehicle V as shown in Fig. 30 is used. Then, the boom device 30, which is an assembly in which the boom support base BS and the boom row BT in a horizontal position are assembled in advance, is lifted up and lowered by a crane via a rope W, and the transport base U The boom device 30 is placed and fixed on the carrier. U The crane lifts and lowers the carrier on the platform Va of the transport vehicle V. U Place and secure the above.

[0149] The carrier U When the boom device 30 is placed and fixed on the carrier stand, the lower end of the fixing base 31 of the boom support stand BS is fastened and fixed by the bolt 25 at the boom support stand supporting portion Z0 of the main frame 90, while the lower portion of the boom row BT (fourth boom B4) is placed and held via the shock absorbing rubber sheet 97 and the shock absorbing holding tube 99 at the first and second boom row holding portions Z1 and Z2. U In the above, the boom support base BS (fixed base 31) of the boom device 30 is firmly fixed, while the middle part of the boom row BT in a horizontal position can be stably held, and even if the boom row BT tends to vibrate slightly due to vibrations during transportation, the vibration impact can be effectively mitigated by the cushioning action of the cushioning rubber sheet 97 and the cushioning holding tube 99.

[0150] Also, the carrier U As a means for fastening the load to the loading platform Va, a conventionally known fastening means (such as a fastening rope with a fastener, a fastening clamp, a bolt, etc.) used for firmly fastening a heavy load to the loading platform of a truck can be appropriately adopted, although it is not shown in the figure. U If necessary, a locking claw or a stopper projection may be provided to more firmly secure the cargo bed Va.

[0151] In addition, the transport stand UA plurality of support brackets 91b each having a support hole 91bh are protrudingly provided on the upper surface of the vertical frame 91. The support brackets 91b are fixed to the carrier by passing the wires of the fixing means through the support holes 91bh. U The support bracket 91b can be used to fix the carrier. U It may also be used to engage a fixing means (e.g., a lashing rope with a fastener) for more securely fixing the boom support BS onto the boom support support part Z0.

[0152] The transport platform U of the embodiment includes a main frame 90 that extends substantially along the longitudinal direction of the boom device 30 under the boom device 30 with the boom train BT in the horizontal position and that can be loaded onto the bed Va of the transport vehicle V, a boom support platform support part Z0 that is fixed to the main frame 90 to connect and fix the boom support platform BS, and first and second boom train holding parts Z1, Z2 that are fixed to the main frame 90 at intervals in the longitudinal direction. This makes it possible to arrange the boom support platform support part Z0 and the boom train holding parts Z1, Z2 on a single common main frame 90 that can be loaded onto the transport vehicle V while appropriately setting their relative positions, so that the boom device 30 with the boom train BT in the horizontal position can be supported on the main frame 90 in an optimal position, and vibration of the boom train BT is effectively suppressed even while the transport vehicle V is traveling, which is particularly advantageous in reducing the load on the first hydraulic cylinder C1 that raises and lowers the first boom B1 on the base end side.

[0153] Furthermore, in the transport platform U of the embodiment, a plurality of cable attachment portions T5, T6 to which lifting cables W can be attached are disposed on the main frame 90 and which are used when the boom device 30 with the boom row BT in the horizontal position is lifted by a crane via the transport platform U. This allows the boom device 30 to be lifted by a crane via the transport platform U and loaded onto or unloaded from the transport vehicle V, thereby making it possible to further reduce the load acting on the first hydraulic cylinder C1 during loading and unloading, compared to when the boom device 30 is directly lifted and loaded onto or unloaded from the transport vehicle V.

[0154] In this case, in particular, the support-base-side rope mounting part T5 is disposed so that at least a portion of it and a portion of the boom support base support part Z0 (and therefore the lower end of the fixed base 31 on the boom support base support part Z0) are in the same position in the longitudinal direction of the main frame 90 (and therefore the boom device 30). According to this arrangement, the heavy boom support base BS can be efficiently lifted by the support-base-side rope mounting part T5 located in close proximity to the boom support base support part Z0 that supports it, and therefore the load on the main frame 90 during lifting can be effectively reduced.

[0155] Furthermore, two boom row holding parts Z1, Z2 are disposed on the main frame 90, spaced apart from each other in the longitudinal direction, and a boom row side cable mounting part T6 to which a lifting cable W can be attached between the two boom row holding parts Z1, Z2 is provided on the main frame 90. This makes it possible to lift the main frame 90 (and therefore the boom row BT held thereon via the two boom row holding parts Z1, Z2) in a balanced manner via the boom side cable mounting part T6 located between the two boom row holding parts Z1, Z2, and stabilizes the lifting operation.

[0156] Although the embodiment of the present invention has been described above, the present invention is not limited to the embodiment, and various embodiments can be implemented within the scope of the present invention.

[0157] For example, in the embodiment, when the boom device 30 in a horizontal position is lifted by a crane via the carrier U, the cables W are connected at the front and rear cable mounting parts T5, T6 on the main frame 90 to perform the lifting operation, but in addition to the front and rear cable mounting parts T5, T6, it is also possible to perform the lifting operation by connecting the cables W at the first mounting part T1 of the boom support base BS as an auxiliary means. In that case, by lifting at the first mounting part T1 as well, it is possible to further stabilize the lifting operation of the boom device 30 and the carrier U while avoiding adverse effects on the first cylinder C1 of the boom device 30.

[0158] In the above embodiment, the lower end surface of the connecting block 21' provided at the lower end of the mast M is placed on the flat upper surface of the support plate 94 of the boom support base support part Z0 and connected by bolts 25. However, a projection to prevent misalignment may be provided on the flat upper surface of the support plate 94, which fits into the recess 22d on the lower end surface of the connecting block 21'.

[0159] In the above embodiment, the middle part of the boom row BT (fourth boom B4) is substantially floatingly supported on the second support frame 98 via the buffer retaining tube 99 at the second boom row retaining portion Z2, but the middle part of the boom row BT (fourth boom B4) may be abutted and supported on the second support frame 98 (second boom row retaining portion Z2) without using an elastic body such as the buffer retaining tube 99.

[0160] In the above embodiment, the mast assembly 20 is formed of two masts M arranged in a vertical line and connected to each other, and the boom assembly 30 is replaced together with the mast assembly 20 and the base assembly 10. However, depending on the length of the mast M and the work conditions at the site, the mast assembly 20 may be formed of a single mast M, or the mast assembly 20 may be formed by connecting three or more masts M in a vertical line.

[0161] In the above embodiment, the connecting blocks 21, 21' fixed to the outer peripheries of adjacent ends of adjacent masts M at intervals in the circumferential direction are vertically adjacent to each other, facing and abutting in the vertical direction, and their abutting surfaces are connected to each other with bolts 25, but other connecting means (for example, welding, caulking, pinning, etc.) other than bolts can be used as the connecting means. Also, the connecting blocks 21, 21' may be adjacent to each other in the circumferential direction of the mast M, facing and abutting in the circumferential direction, and their abutting surfaces may be connected to each other with bolts 25 or other connecting means, and in this case, a horizontal (i.e., circumferentially facing) bolt or fixing pin is used as the bolt or fixing pin that connects the abutting surfaces to each other.

[0162] In addition, in the above embodiment, the boom train BT in the boom device 30 is shown as being composed of first to fourth booms B1 to B4 arranged in series and capable of bending and swinging relative to each other, but the boom train BT only needs to connect at least two booms and is not limited to the number of booms in the embodiment.

[0163] In addition, in the above embodiment, no length adjustment auxiliary device such as a conventionally known chain block is used for the first and second ropes W1, W2, but such a length adjustment auxiliary device may be used to connect at least a portion of the first and second ropes W1, W2 to at least a portion of the first and second mounting portions T1, T2 while making the length adjustable.

[0164] In the above embodiment, in the [assembly process] of the distributor D, after the base device 10 and the mast device 20 are installed on site as shown in Figures 14(A) to (D), the boom row BT (in this embodiment, the first boom B1) of the boom device 30 with the boom row BT in a horizontal position and the boom rotating base BS (in this embodiment, the fixed base 31) are suspended by a crane via the first and second ropes W1, W2 and the first and second mounting parts T1, T2, and the fixed base 31 is connected to the uppermost mast M in this suspended state. In contrast to this, in the [assembly process] of the distributor D, as shown in the flow from Figure 14(A)(B) to Figure 19(C')(D'), after the base device 10 and the mast device 20 are installed on site, the fixed base 31 of the boom device 30 with the boom row BT in the vertical position can be suspended by a crane via the four first ropes W1 and the first mounting part T1, and the fixed base 31 can be connected to the uppermost mast M in this suspended state.

[0165] In the above embodiment, in the "assembly process" of the distributor D, as shown in Figures 14(A) to (D), the base device 10 is first installed on the floor slab FS1 of the lowest level (e.g., basement or first floor) of the site, and then the mast device 20 is constructed and the boom device 30 is assembled above it. However, prior to the "assembly process" of the distributor D (i.e., without using the distributor D), a lower level slightly above the lowest level (e.g., floor slab FS2 or FS3 in the embodiment) may also be constructed, and then the base device 10 may be first installed on the upper floor slab FS2 or FS3 to start the "assembly process". [Explanation of symbols]

[0166] BS····Boom support stand BT...Boom row B1: Multiple booms, first boom as the base boom B2~B4: 1st to 4th booms as multiple booms C1: First hydraulic cylinder as a hydraulic cylinder D...Concrete supply distributor T5: Cable attachment part on the support side T6: Boom row side cable attachment part as cable attachment part U·····Transport platform V...Transport vehicle W·························... Z0 Boom support base support part Z1, Z2: First and second boom row support parts as boom row support parts 10. Base device 20 Mast device 30. Boom device 90 Mainframe

Claims

1. a boom device transport platform (U) used for transporting the boom device (30) of a concrete supply distributor (D) comprising a mast device (20) erected from a base device (10) and a boom device (30) supported on the mast device (20), the boom device (30) comprising a boom train (BT) consisting of a plurality of booms (B1-B4) arranged in series with one another and connected to one another so as to be able to be flexibly swung; a boom support base (BS) attached to an upper portion of the mast device (20) and pivotally supporting the boom (B1) on the most proximal side of the boom train (BT) so as to be able to be raised and lowered; and a hydraulic cylinder (C1) for raising and lowering the boom (B1) on the proximal side, the boom support base (BS) comprising a fixed base (31) fixed to the mast device (20) and a swivel base (32) rotatably supported on the fixed base (31); A transport platform for a boom device of a distributor, comprising: a main frame (90) which extends substantially along the longitudinal direction of the boom device (30) under the boom device (30) when the boom row (BT) is folded and in a horizontal position, and which can be loaded onto a transport vehicle (V); a boom support base support section (Z0) which is fixed to the main frame (90) and which can detachably connect and fix the boom support base (BS); and boom row holding sections (Z1, Z2) which are fixed to the main frame (90) and which can hold an intermediate section of the boom row (BT).

2. 2. The carrier stand for a distributor boom device as described in claim 1, characterized in that a rope mounting portion (T5, T6) to which a lifting rope (W) can be attached is connected to the main frame (90) and which is used when lifting the boom device (30) with the boom row (BT) folded and in a horizontal position via the carrier stand (U) with a crane.

3. The cable mounting portion includes a support base side cable mounting portion (T5), The transport base for a distributor boom device as described in claim 2, characterized in that at least a portion of the support base side rope mounting portion (T5) is located at approximately the same position in the longitudinal direction as a portion of the boom support base support portion (Z0).

4. The main frame (90) includes at least two boom row holding portions (Z1, Z2) spaced apart from each other in the longitudinal direction, 4. The transport platform for a distributor boom device as described in claim 2 or 3, characterized in that the cable mounting portion includes a boom row side cable mounting portion (T6) to which the lifting cable (W) can be attached between the two boom row holding portions (Z1, Z2).

Citation Information

Patent Citations

  • Concrete pump vehicle equipped with concrete transfer boom apparatus

    JP1985047162A

  • A sheet feeding device - concrete

    JP1985162646U

  • Concrete pump car equipped with boom

    JP1997217489A

  • Concrete pump vehicle

    JP2013091934A

  • Mobile concrete pump

    JP2015530497A