Operation system for mobile work vehicles for bridge construction

The operation system for mobile work vehicles electronically manages jack stroke lengths using dedicated terminals and sensors, addressing manual measurement challenges and reducing human error in bridge construction, enhancing safety and efficiency.

JP7587235B2Active Publication Date: 2024-11-20TAISEI CORP +2
View PDF 9 Cites 0 Cited by

Patent Information

Application Number
JP2021063335
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2021-04-02
Publication Date
2024-11-20
Estimated Expiration
2041-04-02

AI Technical Summary

Technical Problem

Conventional mobile work vehicles for bridge construction require manual measurement of jack stroke length, which is time-consuming and prone to human error, especially when constructing sloped bridges, and necessitate multiple operators to manage jack operations safely and accurately.

Method used

An operation system for mobile work vehicles that uses dedicated terminals and reflective laser distance sensors to manage and control jack stroke lengths electronically, allowing separate operation of left and right jacks, reducing the need for manual measurement and minimizing human error.

Benefits of technology

The system improves safety and efficiency by electronically managing jack stroke lengths, enabling separate operation of left and right jacks, thus reducing work time and preventing errors, especially on sloped bridges.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007587235000001
    Figure 0007587235000001
  • Figure 0007587235000002
    Figure 0007587235000002
  • Figure 0007587235000003
    Figure 0007587235000003
Patent Text Reader

Abstract

To provide an operation system for movable work vehicle used in bridge construction that can be operated using dedicated terminal devices separately for left and right when a bridge to be constructed is inclined, and in which a computer can manage the protrusion and retraction of a jack stroke length to eliminate the need for a worker to directly measure the jack stroke length with a scale or the like and the need to work in confined spaces; thus, improving work safety.SOLUTION: An operation system for a movable work vehicle 1 used in bridge construction that travels on the rails of an existing bridge girder in the bridge axis direction and erects overhangs comprises: a frame body 5 provided on the left and right sides in the bridge width direction and having a pair of main frames 4 mounted on the rails; a formwork 6 suspended from the tip of the frame body 5; the movable work vehicle 1 for bridge construction having jacks installed on the pair of left and right main frames 4; and control means 16 for controlling the operation of the jacks on the moveable work vehicle 1 for bridge construction.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to an operating system for a mobile work vehicle for bridge erection that travels on a bridge girder in the bridge axis direction to perform cantilever erection. [Background technology]

[0002] The bridge construction method using a mobile bridge construction vehicle involves pouring, for example, one or several blocks of concrete at the tip of the bridge's main girder, then moving the mobile bridge construction vehicle forward and pouring another block or several blocks of concrete, and repeating this process to erect the main girder. As a bridge construction method using a mobile work vehicle for bridge construction, the mobile work vehicle described in JP 2009-293207 A is generally known. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2009-293207 A Summary of the Invention [Problem to be solved by the invention]

[0004] Generally, when erecting main girders, various types of jacks are used when operating a mobile work vehicle for bridge construction, as it is necessary to maintain the levelness of the mobile work vehicle, move it forward, and secure it to an existing bridge. When operating each jack on a mobile work vehicle, it is necessary to constantly and accurately manage how much the jack stroke length (jack extension / retraction amount) of that jack has changed.

[0005] Therefore, in the past, it was necessary for a hand worker to directly measure the jack stroke length of the jack using a scale, etc. In other words, the hand worker had to go to a narrow place to measure the jack stroke length using a scale, etc., and report it to the jack operation operator by signaling, and at least multiple people, such as the jack operator and the hand worker, were required. In addition, since the measurement of the jack stroke length is performed in a narrow place, there was also a problem in terms of worker safety management.

[0006] Furthermore, conventionally, one operator was configured to operate the jacks on multiple frames, for example a pair of main frames installed on the left and right sides of the bridge width. This meant that operation took time and there was also the issue that human error was likely to occur because only one operator had to operate the jacks on multiple frames (especially the left and right frames installed on the left and right sides of the bridge width).

[0007] In other words, since a single operator had to operate the jacks on multiple frames of the mobile work vehicle, it took a lot of time and there was a high possibility of human error occurring.

[0008] In particular, even when the bridge being erected is inclined, the body of the bridge erection mobile work vehicle must be kept level, and for this reason it is necessary to set different stroke lengths for each jack attached to the left and right frames installed on the left and right sides of the bridge width.

[0009] In such a case, if a single operator were to simultaneously operate the jacks on both the left and right frames installed on the left and right sides of the bridge width, it would be an extremely difficult task.

[0010] Thus, the present invention has been made to solve the above-mentioned problems of the prior art, and the jack stroke length of the jack, or more specifically, the protruding and retracting states of the jack stroke length, can be displayed in units of actual length and managed by a computer, so that the worker at hand does not need to directly measure the jack stroke length with a scale or the like, and work in a narrow space is not required, improving work safety. In addition, the jack operation on the left and right frames can be performed using dedicated terminals, for example, and therefore the work time can be reduced. The object of this invention is to provide an operating system for a mobile work vehicle for bridge erection that can shorten the time required and prevent human error, and in particular, when the bridge to be erected is inclined and the body of the mobile work vehicle for bridge erection must be kept level, the stroke lengths of the jacks attached to the left and right frames installed on the left and right sides of the bridge in the width direction are set to different lengths; in such cases, the left and right jacks can be operated separately using dedicated terminal devices, thereby eliminating the need for a single operator to simultaneously operate the jacks on both frames installed on the left and right sides of the bridge in the width direction, as was the case in the past. [Means for solving the problem]

[0011] The present invention relates to This is an operating system for a mobile bridge construction vehicle that runs on the rails of an existing bridge girder in the bridge axis direction to perform cantilever construction. A mobile work vehicle for bridge erection having a frame body including a pair of main frames provided on the left and right sides in the bridge width direction and placed on the rails, and a left propulsion jack and a right propulsion jack respectively installed on the pair of left and right main frames; A control means for controlling the operation of the left propulsion jack and the right propulsion jack attached to the bridge erection mobile work vehicle is provided, The control means extends the rams of the left and right thrust jacks to lock the reaction rods connected to the rails at predetermined positions in the longitudinal direction. backward a locking nut is pressed, and the bridge construction mobile work vehicle to which the left propulsion jack and the right propulsion jack are attached is moved forward by the pressing force; The reaction barThe left propulsion jack and the right propulsion jack The front locking nut located at the front is moved forward in a forward direction by operating the loop-shaped rotating body. The above The ram parts of the left and right propulsion jacks In forward direction Extended operation, After the rear locking nuts located behind the left propulsion jack and the right propulsion jack of the reaction bar are screwed and moved in the forward direction, the rear locking nuts are pressed by the ram portion, The pushing force causes the bridge construction mobile work vehicle to which the left propulsion jack and the right propulsion jack are attached to move forward. It is characterized by: or This is an operating system for a mobile bridge construction vehicle that runs on the rails of an existing bridge girder in the bridge axis direction to perform cantilever construction. The bridge has a frame body provided with a pair of main frames disposed on the left and right sides in the bridge width direction and placed on the rails, and a left propulsion jack and a right propulsion jack are respectively installed on the pair of left and right main frames and attached to a bridge erection mobile work vehicle, The left and right thrust jacks each have a ram section that protrudes from both sides, and a through hole that penetrates the ram section in the ram section axial direction has a threaded portion on the outer circumferential surface, and a reaction rod connected to the rail is loosely fitted into the through hole, A locking nut is screwed onto the reaction bar, and the locking nut is moved to a predetermined position in the longitudinal direction of the reaction bar by operating the loop-shaped rotating body. The ram portion protrudes and presses the locking nut screwed into a predetermined position of the reaction bar, so that the reaction force of the reaction bar connected to the rail can be used to move the bridge construction mobile work vehicle forward and backward. It is characterized by: or This is an operating system for a mobile bridge construction vehicle that runs on the rails of an existing bridge girder in the bridge axis direction to perform cantilever construction. A movement assist rod is installed on both sides of the left and right thrust jacks in the longitudinal direction in parallel with the reaction rod, and has a groove or a protrusion on its outer circumferential surface in the axial direction; an automatic return device comprising: a moving nut having a through hole formed with a convex portion or a concave portion corresponding to the concave groove or the convex portion, the moving auxiliary rod being inserted into the through hole; a loop-shaped rotating body connecting the moving nut and the front locking nut; a loop-shaped rotating body connecting the moving nut and the rear locking nut; and a rotating device for rotating each of the moving auxiliary rods; Equipped with When the rotating device rotates the movement assist rod, the loop-shaped rotating body rotates the locking nut to screw and move the reaction rod. It is characterized by: or This is an operating system for a mobile bridge construction vehicle that runs on the rails of an existing bridge girder in the bridge axis direction to perform cantilever construction. A frame body having a pair of main frames provided on the left and right sides of the bridge width direction and placed on the rails, a formwork suspended from the tip of the frame body, a mobile bridge construction vehicle having jacks installed on the pair of left and right main frames, and a control means for controlling the operation of the jacks of the mobile bridge construction vehicle. a terminal device corresponding to each of the pair of left and right main frames and wirelessly transmitting and receiving information to and from the control means; having The terminal device can operate only the jacks installed on each main frame, and the results of the operation can be displayed on each terminal device; The control means stores the value of the extension amount desired by each of the jacks after the value of the extension amount desired by each of the jacks is set and input, When each of the jacks is extended or retracted, a reflective laser distance sensor provided on each of the jacks detects the amount of extension or retraction of each of the jacks, and the stored value of the amount of extension or retraction desired by each of the jacks is compared with the value of the amount of extension or retraction detected by the reflective laser distance sensor. When the extension or retraction of each jack reaches the desired amount of extension or retraction, each jack stops its extension or retraction operation. It is characterized by: or This is an operating system for a mobile bridge construction vehicle that runs on the rails of an existing bridge girder in the bridge axis direction to perform cantilever construction. A frame body having a pair of main frames provided on the left and right sides of the bridge width direction and placed on the rails, a formwork suspended from the tip of the frame body, a mobile bridge construction vehicle having a front support jack, a rear support jack, and a rear wheel jack installed on the pair of left and right main frames, and a control means for controlling the operation of each of the jacks of the mobile bridge construction vehicle. a terminal device corresponding to each of the pair of left and right main frames and wirelessly transmitting and receiving information to and from the control means; having The terminal device can operate only the jacks installed on each main frame, and the results of the operation can be displayed on each terminal device; The control means stores the value of the extension / contraction amount desired by each of the jacks after the value of the extension / contraction amount desired by each of the jacks is set and input, When each of the jacks is extended or retracted, a reflective laser distance sensor provided on each of the jacks detects the amount of extension or retraction of each of the jacks, and the stored value of the amount of extension or retraction desired by each of the jacks is compared with the value of the amount of extension or retraction detected by the reflective laser distance sensor. When the extension or retraction of each of the jacks reaches the amount of extension or retraction individually desired by each of the jacks, each of the jacks stops extending or retracting. It is characterized by: or This is an operating system for a mobile bridge construction vehicle that runs on the rails of an existing bridge girder in the bridge axis direction to perform cantilever construction. The vehicle has a jack used to operate the bridge construction mobile work vehicle, and a control means for controlling the operation of the jack, The control means includes an expansion amount setting unit in which a set value of the expansion amount of the jack is set, and a memory unit in which the set value set by the expansion amount setting unit is stored. The device has a detection value input unit to which the extension / retraction amount of the operating jack is detected by a reflective laser distance sensor and the detected value is input, a comparison unit to compare the detection value input to the detection value input unit with a set value stored in the memory unit, and an automatic stop unit to automatically stop the extension / retraction of the jack when the detection value input at any time reaches the set value. The set value of the extension / retraction amount of the jack can be input in digital numbers in units of length, and the detection of the extension / retraction amount of the jack by the reflective laser distance sensor can also be converted to units of length, and the comparison unit compares the set value with the detected value. It is characterized by the above. Effect of the Invention

[0012] According to the present invention, the jack stroke length of the jack can be managed by a computer using units of length, so that the worker at hand does not need to directly measure the jack stroke length with a scale or the like, and there is no need to work in a narrow space, improving work safety. In addition, the jacks of multiple frames can be operated using multiple dedicated terminals, so that work time can be shortened and human error can be prevented. In particular, when the bridge to be erected is inclined and the body of the mobile bridge erection work vehicle must be kept level, the stroke lengths of the jacks on the left and right frames installed on the left and right sides of the bridge width direction are set to be different. In such cases, the left and right can be operated separately using dedicated terminal devices, so that an operating system for a mobile bridge erection work vehicle can be provided in which the jacks of the left and right frames installed on the left and right sides of the bridge width direction do not have to be operated simultaneously by a single operator, as in the past. BEST MODE FOR CARRYING OUT THEINVENTION

[0013] Hereinafter, the present invention will be described based on the illustrated embodiments. Fig. 1 shows the schematic configuration of a bridge construction vehicle 1 according to the present invention. The bridge construction vehicle 1 is configured so that it can move forward approximately in the bridge axial direction on rails 3 installed at an upper surface 2 of an existing bridge. Fig. 2 is a plan view showing the schematic installation positions of each jack, described later, installed on the bridge construction vehicle 1.

[0014] Here, the bridge erection mobile work vehicle 1 is placed on the rails 3 and is composed of a frame body 5 equipped with a pair of main frames 4 arranged on the left and right in the width direction of the bridge, a formwork 6 suspended from the tip of the frame body 5, and a left jack 7 for the front fulcrum, a right jack 8 for the front fulcrum, a left jack 9 for the rear fulcrum, a right jack 10 for the rear fulcrum, a left jack 11 for the rear wheels, a right jack 12 for the rear wheels, a left propulsion jack 26, and a right propulsion jack 27 installed on the pair of left and right main frames 4 (see Figures 1 and 2).

[0015] The front fulcrum left jack 7 and front fulcrum right jack 8 are primarily used to set the pair of left and right main frames 4, and thus the bridge construction mobile work vehicle 1, horizontally, and the rear fulcrum left jack 9 and rear fulcrum right jack 10 are similarly used to set the main frames 4, and thus the bridge construction mobile work vehicle 1, horizontally.

[0016] In particular, even when constructing an inclined bridge, the bridge erection mobile work vehicle 1 needs to be set horizontally, and in that case, the front fulcrum left jack 7, front fulcrum right jack 8, rear fulcrum left jack 9, and rear fulcrum right jack 10, which are respectively attached to a pair of left and right main frames 4, must be controlled separately for the left and right main frames 4. In other words, the jacks attached to the separate left and right main frames 4 cannot be set horizontally unless the left and right jack extension amounts are controlled separately.

[0017] In addition, the left jack 11 for the rear wheels and the right jack 12 for the rear wheels have the function of engaging the bridge construction mobile work vehicle 1, which includes a pair of left and right main frames 4, to the rails 3, and are provided on the pair of left and right main frames 4.

[0018] Furthermore, the bridge construction vehicle 1 has a left propulsion jack 26 and a right propulsion jack 27, which are used to propel the bridge construction vehicle 1 forward, for example, one block or several blocks.

[0019] That is, the left propulsion jack 26 and the right propulsion jack 27 are used to advance the frame body 5 having the main frame 4 in a so-called inchworm-like manner, for example, by using a reaction force against the rails 3. The formwork 6 is set in front of the existing bridge section by the formwork setting device 14, and, for example, one or several blocks of concrete are poured into the front side of the existing bridge, thereby constructing the bridge.

[0020] After the concrete hardens, the formwork 6 is removed, and then the rails 3 are moved forward in the bridge construction direction, and the left and right thrust jacks 26 and 27 are operated to move the frame body 5 having the pair of left and right main frames 4 forward. In other words, the left and right thrust jacks 26 and 27 are used to generate a reaction force, which in turn moves the frame body 5 having the main frames 4, and in turn the bridge construction mobile work vehicle 1, forward in a so-called inchworm-like manner. The above steps are then repeated in sequence to erect the main girders in a cantilevered manner.

[0021] When moving the bridge construction mobile work vehicle 1 forward, it is necessary to remove the anchors 44 that secure the bridge construction mobile work vehicle 1 to the existing bridge 45 and to extend and operate the left jack 11 for the rear wheels, the right jack 12 for the rear wheels, etc. to lift the bridge construction mobile work vehicle 1 off the rails 3.

[0022] Here, the configurations of the left propulsion jack 26, the right propulsion jack 27, and the automatic return device 40 that operates in conjunction with the operation of these jacks will be described with reference to FIG.

[0023] 3, the left propulsion jack 26 and, although not shown, the right propulsion jack 27 are configured as jacks with rods protruding from both sides and having a center hole in the axial direction. The left propulsion jack 26 and, although not shown, the right propulsion jack 27 each have a main body 48 and ram parts 47 protruding from both sides of the main body 48, and the ram parts 47 are further provided with a center hole passing through in the axial direction.

[0024] A reaction rod 36 made of, for example, a PC steel rod is inserted through the center hole. The left end of the reaction rod 36, for example, is connected and locked to a stop portion 37, which is connected and integrated with the rail 3 (see FIG. 1). The rail 3 is connected to an existing bridge 45 by an anchor 44.

[0025] Therefore, in order to utilize the reaction force of the reaction rod 36, the left thrust jack 26 and, further, the right thrust jack 27 (not shown) apply a pressing force to the reaction rod 36 in the axial direction, which causes the position of a rear locking nut 38 (described later) to move to the right in the axial direction of the reaction rod 36 by the distance that the main frame 4 and the bridge construction mobile work vehicle 1 including the main frame 4 can move in front of the existing bridge 45, i.e., to the left in Figure 3.

[0026] A threaded portion is provided on the outer circumferential surface of the reaction rod 36, and the threaded portion of the rear locking nut 38 is screwed into this threaded portion. Furthermore, a U-shaped rear locking wall 39 is provided to surround this rear locking nut 38, and when the ram portion 47 constituting the left propulsion jack 26 moves protrudingly from the main body portion 48 to the right in Fig. 3, the tip of the left propulsion jack 26 abuts against one wall of the rear locking wall 39, moving the rear locking wall 39 and the rear locking nut 38 to the right by a predetermined length. This movement does not mean the axial movement of the reaction rod 36, but means that the bridge erection mobile work vehicle 1 to which the left propulsion jack 26 and the right propulsion jack 27 are fixed moves forward on the rails 3.

[0027] Therefore, the bridge construction mobile work vehicle 1 moves forward by the length that the rear retaining wall 39 and the rear retaining nut 38 have moved to the right, for example, the length from part A to part B in FIG.

[0028] However, to move the vehicle further forward, it is necessary to move the ram portion 47 of the left propulsion jack 26 so that it protrudes to the left from the body portion 48 in Fig. 3. Also, the rear locking nut 38, which has moved to the right, must be returned to its original position, i.e., to part A shown in Fig. 3.

[0029] In addition, in Fig. 3, reference numeral 49 denotes a front locking nut, and reference numeral 50 denotes a front locking wall surrounding the front locking nut 49. When the above-mentioned left propulsion jack 26 is moved to the left in Fig. 3, the front locking nut 49 and the front locking wall 50 must also be moved from part D to part C. Otherwise, the ram part 47 cannot move to the left in Fig. 3.

[0030] Therefore, in order to carry out the above operation, the present invention uses an automatic return device 40. As can be seen from Figure 3, the left push jack 26 and the mobility auxiliary rod 41 arranged above the left push jack 26 are integrally attached to a plate-shaped mounting body 52, and the mounting body 52 is fixed to the side of the bridge construction mobile work vehicle 1.

[0031] Then, when the left propulsion jack 26 presses the rear locking nut 38 described above, moving the reaction rod 36, which is locked to the rail 3, from part A to part B shown in Figure 3, the bridge construction mobile work vehicle 1 moves forward on the rail 3 by that length.

[0032] Incidentally, above the left propulsion jack 26, a pair of movement assistance rods 41 are installed on both sides of the longitudinal direction of the left propulsion jack 26, arranged horizontally to the reaction rod 36 and having a groove extending axially on their outer circumferential surface.

[0033] The moving nuts 42, each having a protrusion that fits loosely into the groove and is provided in a through hole, are inserted through the respective moving auxiliary rods 41, and the moving auxiliary rods 41 and the moving nuts 42 are configured to rotate together. Note that the grooves and the protrusions may be formed in the opposite direction. A surrounding locking wall 53 is attached to the moving auxiliary rod 41 so as to surround the moving nuts 42.

[0034] The rear locking nut 38 screwed onto the reaction bar 26 and the movable nut 42 attached to the auxiliary rod 41 for movement, or the front locking nut 49 and the movable nut 42 attached to the auxiliary rod 41 for movement, are connected by a loop-shaped rotating body 43 composed of, for example, a sprocket and chain, and as this loop-shaped rotating body 43 rotates, the rear locking nut 38 in Figure 3 is rotated, and thus the rear locking nut 38 can be moved from position B in Figure 3 to position A in Figure 3 by screwing and moving it relative to the reaction bar 36, and then returned.

[0035] At this time, the front locking nut 49 and the front locking wall 50, which are at the position of part D in Fig. 3, must also be returned to the position of part C. As described above, this is because, unless this is done, the ram part 47 cannot be moved to project leftward in Fig. 3.

[0036] Then, after the rear locking nut 38 has returned to position A, by operating the left propulsion jack 26 again, the reaction force can again be used to move the bridge construction mobile work vehicle 1 further forward.

[0037] Here, the automatic return device 40 is configured with a rear locking nut 38 and a moving nut 42, or a front locking nut 49 and a moving nut 42, a loop-shaped rotating body 43 having, for example, a sprocket and chain that connects these nuts and rotates them in conjunction with each other, and a rotating device (not shown) that rotates the loop-shaped rotating body 43.

[0038] Here, the operation of moving the rear locking nut 38 and the front locking nut 49 using the automatic return device 40 will be further described with reference to FIG. In addition, the rear engaging wall 39 and the front engaging wall 50 are omitted in FIG.

[0039] FIG. 4(1) shows a state in which the rear locking nut 38 is pressed by the ram portion 47, and the bridge construction mobile work vehicle 1 moves forward due to the reaction force of the pressing force.

[0040] Next, the automatic return device 40 is operated to move the front locking nut 49 to the position shown in Fig. 4(2). After that, the ram portion 47 is moved to the left (Fig. 4(3)). After the ram portion 47 has been moved to the left, the rear locking nut 38 is rotated and moved to the left (Fig. 4(4)).

[0041] The jack starts from the state shown in FIG. 4(4), the ram portion 47 presses the rear locking nut 38, and the reaction force of the reaction rod 36 causes the bridge construction mobile work vehicle 1 to move forward. 3 and 4 explain the operation of the left propulsion jack 26, the operation of the right propulsion jack 27 is similar except that the forward direction is changed.

[0042] Further, the operation for moving the bridge construction vehicle 1 forward has been described, but if the ram portion 47 presses the front locking nut 49, the bridge construction vehicle 1 can also be moved backward.

[0043] Furthermore, the operation of the rotating device can be controlled by a control means 16 such as a computer or a tablet terminal device, in which case the work can be performed even faster and safer.

[0044] The present invention comprises the left jack 7 for the front fulcrum, the right jack 8 for the front fulcrum, the left jack 9 for the rear fulcrum, the right jack 10 for the rear fulcrum, the left jack 11 for the rear wheels, the right jack 12 for the rear wheels, the left propulsion jack 26, the right propulsion jack 27, operating means 15 comprising, for example, a hydraulic device for operating these jacks, control means 16 comprising a computer or the like, and a terminal device 17 comprising, for example, a tablet capable of wirelessly transmitting and receiving information to and from the control means 16.

[0045] As the operating means 15, a hydraulic device such as a hydraulic pump is used as described above, and as a device for controlling the operation of the operating means 15, a control means 16 and a tablet-type terminal device 17 capable of wireless transmission and reception are used.

[0046] As can be seen from Fig. 5 and the like, the control means 16 is configured as a control device having a transmission unit 18, a reception unit 19, a control unit 20, a storage unit 21, an input unit 22, a display unit 23, and the like, and further, a terminal device 17 such as a tablet is also configured to have a transmission unit 18, a reception unit 19, a control unit 20, a storage unit 21, an input unit 22, a display unit 23, and the like. The control means 16 and the terminal device 17 are configured to be able to transmit and receive wirelessly, for example, via a communication line network 24 or without the communication line network 24, and thus the terminal device 17 is configured to access the control means 16 and control the operation of the operation means 15 that operates the front fulcrum left jack 7, the front fulcrum right jack 8, the rear fulcrum left jack 9, the rear fulcrum right jack 10, the rear wheel left jack 11, and the rear wheel right jack 12.

[0047] In the present invention, a plurality of the terminal devices 17 are required, and for example, two terminal devices 17 are prepared, one dedicated to the left side and the other dedicated to the right side. The left side terminal device 17 is configured to operate and control the left front fulcrum jack 7, the left rear fulcrum jack 9, and the left rear wheel jack 11, which are provided on the main frame 4 on the left side in the bridge width direction, and the right side terminal device 17 is configured to operate and control the right front fulcrum jack 8, the right rear fulcrum jack 10, and the right rear wheel jack 12, which are provided on the main frame 4 on the right side in the bridge width direction.

[0048] As described above, by preparing a plurality of dedicated terminal devices 17 and having a plurality of operators operate the jacks individually using their respective designated dedicated terminal devices 17, the hassle of one operator operating all the jacks in complex positions using one terminal can be eliminated, and as a result, simple human error can be prevented.

[0049] That is, by making it possible to operate the jacks of the pair of left and right main frames 4 of the mobile work vehicle for bridge construction 1 separately for each pair of left and right main frames 4 (if there are two main frames 4, two wireless terminal devices 17 are used), the jacks of different main frames 4 can be operated simultaneously and separately, which increases the efficiency of the moving and setting up work of the mobile work vehicle for bridge construction 1 and reduces the time required. Also, one operator can concentrate on operating only the dedicated jack for which he or she is responsible, reducing the possibility of human error. At first glance, it may seem that the number of people will increase, but since the mobile work vehicle for bridge construction 1 is not actually moved and set up by one person, it is more efficient and time-saving to move and set up with the number of people according to the number of main frames 4.

[0050] Operation using the present invention will now be described. 6 to 15 show the display screens of the terminal devices 17 dedicated to the left and right, respectively. As shown in each figure, the screens are clearly marked as dedicated to the left side or the right side to prevent confusion for the operator.

[0051] Fig. 6 shows an image of the initial screen of the left-side and right-side dedicated terminal devices 17. For example, this screen is displayed after the left-side and right-side dedicated terminal devices 17 are turned on. When the "○× Construction" logo is touched on this screen, the screen of Fig. 7 is displayed.

[0052] Figure 7 shows the detailed settings screen. On this detailed settings screen, various settings for each jack to be used can be made. For example, the rated capacity of the jack to be used, the pressure-receiving area of ​​the jack to be used, the operating pressure of the jack to be used, the rated output of the pressure transducer (see the product inspection report), etc. are entered as values. When you touch the number you want to change, a numeric keypad will appear and you can enter the changed value.

[0053] Figure 8 shows abnormality setting / confirmation screens for terminal devices 17 dedicated to the left side and right side. On the terminal device 17 dedicated to the left side, the upper load limit values ​​for the left jack 7 for the front fulcrum, the left jack 9 for the rear fulcrum, and the left jack 11 for the rear wheels, which are mounted on the main frame 4 on the left side in the bridge width direction, can be set, and on the terminal device 17 dedicated to the right side, the upper load limit values ​​for the right jack 8 for the front fulcrum, the right jack 10 for the rear fulcrum, and the right jack 12 for the rear wheels, which are mounted on the main frame 4 on the right side in the bridge width direction, can be set.

[0054] The load value registered here becomes the upper limit, and when this upper limit is detected by, for example, a pressure transducer, an emergency stop will occur. To change the value, touch the number you want to change and a numeric keypad will appear, allowing you to enter the value there. Also, when the emergency stop button is pressed, a buzzer will sound and the screen will change to this one. On both the left and right terminal devices 17, the cause of the abnormality displayed in the red frame can be checked, and the cause can be removed.

[0055] FIG. 9 shows the operation selection screens for the terminal devices 17 dedicated to the left side and the right side. Here, the user can select the jack to be operated. Upon selection, the user is transferred to the corresponding operation screen. For example, if "moving operation" is selected on the terminal device 17 dedicated to the left side, only "moving operation" can be selected on the terminal device 17 dedicated to the right side. Note that the jack operation on the terminal device 17 that made the selection first takes priority.

[0056] FIG. 10 shows the rear wheel operation screen on the terminal device 17 dedicated to the left side and the right side, which is configured to display the displacement value (amount of expansion and contraction) of the left jack 11 for the rear wheels and the right jack 12 for the rear wheels in units of actual length, specifically in mm.

[0057] The amount of extension and contraction (displacement value) of each of the left jack for the rear wheels 11 and the right jack for the rear wheels 12 is measured in units of length, specifically in units of mm, by a reflective laser distance sensor 25 and a reflector 35 installed on the left jack for the rear wheels 11 and the right jack for the rear wheels 12.

[0058] Here, the reflective laser distance sensor 25 is configured to have a light projecting section that projects a light projecting signal such as a laser beam, a reflector 35 that projects the light projecting signal, and a light receiving section that receives the light reflected by the reflector 35, and measures the light receiving signal received by the light receiving section as the amount of expansion and contraction of the jack. Note that an example of mounting the reflective laser distance sensor 25 and the reflector 35 on the jack is shown in Figure 16.

[0059] Here, when the "Pump Start" button shown in Fig. 10 is pressed, a pump consisting of a hydraulic pump or the like is started. Then, the motor is operated at a predetermined frequency, and the left jack for the rear wheels 11 and the right jack for the rear wheels 12 are operated so as to reach the set displacement value (amount of expansion and contraction).

[0060] The operation control of the left jack 11 for the rear wheels and the right jack 12 for the rear wheels will now be described in detail. When the values ​​of the desired extension amounts of the set left jack 11 for the rear wheels and right jack 12 for the rear wheels are inputted numerically in units of length, specifically in units of mm, the control means 16 stores the values ​​of the desired extension amounts of the left jack 11 for the rear wheels and the right jack 12 for the rear wheels in the memory unit 21.

[0061] Next, the left rear wheel jack 11 and the right rear wheel jack 12 are extended or retracted by the operating means 15, and the amount of extension or retraction of the left rear wheel jack 11 and the right rear wheel jack 12 is detected by the reflective laser distance sensor 25 at any time, and the detected value is input to the control unit 20. Then, the comparison unit 33 compares the stored value of the desired amount of extension or retraction of the left rear wheel jack 11 and the right rear wheel jack 12 with the value of the amount of extension or retraction of the jacks detected by the reflective laser distance sensor 25 at any time, and when the extension or retraction of the left rear wheel jack 11 and the right rear wheel jack 12 individually reaches the desired amount of extension or retraction, they are automatically stopped.

[0062] In addition, the extension amounts of the left jack 11 for the rear wheels and the right jack 12 for the rear wheels are each equipped with a function that allows the extension amount to be reset to zero, so that the target extension amount can be input directly without adding it from the current extension position of the jack.

[0063] To further explain the operation control of the jack, first, a target value for the extension / retraction of the jack is specified by the terminal device 17. As described above, this target value is characterized in that it can be specified by digital numbers in actual units of length, specifically in units of mm.

[0064] Then, the operating means 16, for example, a hydraulic pump and an electromagnetic switching valve in the hydraulic circuit, are started, and hydraulic oil is sent to the left jack 11 for the rear wheels and the right jack 12 for the rear wheels, which are configured as hydraulic jacks.

[0065] The jack lengths of the left jack 11 for the rear wheels and the right jack 12 for the rear wheels, which are extending and retracting, are constantly measured by a reflective distance sensor 25 and compared with the specified extension / retraction target value in the control means 16 (e.g., the comparison unit 33 of the PLC control unit 20).

[0066] When the specified jack extension / retraction target value and the measured value match, a matching signal is sent from control means 16 consisting of a PLC or the like. This signal causes operating means 16, for example an electromagnetic switching valve in the hydraulic circuit, to cut off the hydraulic circuit, thereby stopping the extension / retraction of the left jack 11 for the rear wheels and the right jack 12 for the rear wheels, which are composed of hydraulic jacks or the like. If the load reaches the upper limit value registered on the "Abnormality Settings / Confirmation Screen" mentioned above, it will be determined to be an emergency stop, and the pump will stop, as well as the jack operation.

[0067] The rear fulcrum operation screen is shown in Fig. 11. This rear fulcrum operation screen allows the operation of the rear fulcrum left jack 9 and the rear fulcrum right jack 10 to be controlled. As in FIG. 10, the displacement values ​​of the rear fulcrum left jack 9 and the rear fulcrum right jack 10 are configured to be expressed in digital numbers in units of actual length, specifically in units of mm.

[0068] The amount of extension and contraction (displacement value) of the jacks in the left rear fulcrum jack 9 and the right rear fulcrum jack 10 is also measured by a reflective laser distance sensor 25 installed in the left rear fulcrum jack 9 and the right rear fulcrum jack 10.

[0069] When the "Pump Start" button is pressed, the pump consisting of a hydraulic pump etc. starts. Then, the motor operates at a specified frequency, and the rear support left jack 9 and the rear support right jack 10 operate so as to reach the set displacement value.

[0070] Here, the details of the operation control of the rear fulcrum left jack 9 and the rear fulcrum right jack 10 are similar to the operation control of the rear wheel left jack 11 and the rear wheel right jack 12.

[0071] Figure 12 shows the “front support operation screen.” The "front fulcrum operation screen" allows the user to operate the front fulcrum left jack 7 and the front fulcrum right jack 8. As in Figures 10 and 11, the screen is configured so that the displacement values ​​of the front fulcrum left jack 7 and the front fulcrum right jack 8 can be displayed in digital numbers in actual length units, specifically in mm units.

[0072] The amount of extension and contraction (displacement value) of the jacks in the front fulcrum left jack 7 and the front fulcrum right jack 8 is measured by a reflective laser distance sensor 25 installed in the front fulcrum left jack 7 and the front fulcrum right jack 8.

[0073] Pressing the "Pump Start" button on the screen starts the pump. In other words, the motor operates at a specified frequency, which causes the front support left jack 7 and the front support right jack 8 to operate to the set displacement value.

[0074] The operation control of the front fulcrum left jack 7 and the front fulcrum right jack 8 is similar to the operation control of the rear wheel left jack 11 and the rear wheel right jack 12.

[0075] The "movement operation screen" is shown in Figure 13. On the "movement operation screen", the left propulsion jack 26 and the right propulsion jack 27 for movement can be operated. As mentioned above, the bridge construction mobile work vehicle 1 can be moved forward by utilizing the reaction force corresponding to the extension of these jacks.

[0076] In other words, the left thrust jack 26 and the right thrust jack 27, which are extended to a predetermined length, utilize the reaction force of the reaction rod 36 attached to the main frame 4 to move the frame body 5 having the main frame 4 forward in a so-called inchworm-like manner. The operation control of the left propulsion jack 26 and the right propulsion jack 27 using the automatic return device 40 has already been described.

[0077] Next, the operation control method of each jack equipped with the reflective laser distance sensor 25 and the reflector 35 according to the present invention will be further described with reference to FIG. The control means 16 or tablet-type terminal device 17 each has a control unit 20, and the extension amount setting unit 30 of the control unit 20, for example, in the case of a terminal device 17 dedicated to the left side, is configured so that the jack extension amounts operating the front fulcrum left jack 7, the rear fulcrum left jack 9, and the rear wheel left jack 11 provided on the main frame 4 on the left side in the bridge width direction can be set in advance in digital numbers in units of length. The set extension amounts are then stored in the memory unit 21.

[0078] When the characters "Jack extension" or "Jack retraction" are tapped on each screen of the terminal device 17, the jack operation instruction unit 31 sends a jack operation instruction to the operation means 15, and each jack operates. The extension and retraction of the jack is detected by the reflective laser distance sensor 25 at any time, and the detected value is input to the detection value input unit 32 at any time.

[0079] The comparison unit 33 compares the set amount of extension and contraction with the detection value input at any time, and when the detection value input at any time reaches the set value of the amount of extension and contraction, the extension and contraction of the jack is automatically stopped by the automatic stop unit 34.

[0080] As described above, the set value for the amount of extension or retraction of the jack can be input in units of length, the reflective laser distance sensor 25 and the reflector 35 can also be used to convert the amount of extension or retraction of the jack to units of length at any time, and the comparison between the set value and the detected value at any time by the comparison unit 33 can also be done in units of length. Therefore, there is no need for the worker at hand to directly measure the extended or retracted jack stroke length using a scale or the like, as in the past, and there is no need to work in narrow spaces, improving work safety. In addition, the system is configured so that operation of multiple frame jacks can be performed using multiple dedicated terminals, shortening work time and preventing simple human error. [Brief description of the drawings]

[0081] [Figure 1] 1 is a schematic side view showing an example of a bridge construction mobile work vehicle according to the present invention. [Diagram 2] FIG. 2 is a schematic plan view showing the installation positions of each jack provided on the bridge construction mobile work vehicle according to the present invention. [Diagram 3] 1 is an explanatory diagram illustrating the operating operation of a propulsion jack and the operating state of an automatic return device. FIG. [Figure 4] FIG. 4 is an explanatory diagram illustrating an operating state of the automatic return device. [Diagram 5] FIG. 1 is an explanatory diagram illustrating an overview of an operating system according to the present invention. [Figure 6] FIG. 1 is an explanatory diagram (1) illustrating a display screen of a terminal device according to the present invention. [Figure 7] FIG. 2 is an explanatory diagram (2) for explaining the display screen of the terminal device according to the present invention. [Figure 8] FIG. 3 is an explanatory diagram for explaining a display screen of the terminal device according to the present invention. [Figure 9] FIG. 4 is an explanatory diagram (4) for explaining the display screen of the terminal device according to the present invention. [Figure 10] FIG. 5 is an explanatory diagram (5) for explaining the display screen of the terminal device according to the present invention. [Figure 11] FIG. 6 is an explanatory diagram for explaining a display screen of the terminal device according to the present invention. [Figure 12] FIG. 7 is an explanatory diagram (7) for explaining the display screen of the terminal device according to the present invention. [Figure 13] FIG. 8 is an explanatory diagram for explaining a display screen of the terminal device according to the present invention. [Figure 14] FIG. 9 is an explanatory diagram for explaining a display screen of the terminal device according to the present invention. [Figure 15] FIG. 10 is an explanatory diagram for explaining a display screen of a terminal device according to the present invention. [Figure 16] 1 is an explanatory diagram illustrating a method for controlling the operation of each jack equipped with a reflective laser distance sensor and a reflector according to the present invention. FIG. [Explanation of symbols]

[0082] 1 Mobile work vehicle for bridge construction 2. Top surface of existing bridge 3. Rail 4 Main Frame 5 Frame body 6 Formwork 7 Left jack for front support 8 Right jack for front support 9 Left jack for rear support 10 Right rear jack 11 Left rear wheel jack 12 Right rear wheel jack 14 Formwork setting device 15 Means of operation 16 Control Means 17 Terminal Equipment 18 Transmitter 19 Receiving section 20 Control section 21 Memory section 22 Input section 23 Display section 24 Telecommunications Network 25 Reflective laser distance sensor 26 Left propulsion jack 27 Right propulsion jack 30 Expansion / contraction amount setting section 31 Jack Operation Instructions 32 Detection value input section 33 Comparison section 34 Automatic stop 35 Reflector 36 Reaction rod 37 Stop section 38 Locking nut 39 Retaining Wall 40 Automatic return device 41 Mobility support rod 42 Moving Nut 43 Loop-shaped rotating body 44 Anchor 45 Existing bridges 47 Ram Club 48 Main body 49 Front locking nut 50 Front retaining wall 52 Mounting body 53 Enclosure retaining wall

Claims

1. This is an operating system for a mobile bridge construction vehicle that travels along the rails of an existing bridge girder in the bridge axis direction to perform cantilever erection. a frame body provided on the left and right sides of the bridge width direction and equipped with a pair of main frames placed on the rails; and a mobile bridge construction vehicle having a left propulsion jack and a right propulsion jack installed on each of the pair of left and right main frames; a control means for controlling the operation of the left propulsion jack and the right propulsion jack attached to the bridge erection mobile work vehicle; the control means extends the ram portions of the left propulsion jack and the right propulsion jack to press rear locking nuts that lock the reaction rods connected to the rails at predetermined positions in the longitudinal direction, and uses the pressing force to move the bridge erection mobile work vehicle to which the left propulsion jack and the right propulsion jack are attached forward; The front locking nuts located in front of the left propulsion jack and the right propulsion jack of the reaction rod are threadedly moved in the forward direction by operating the loop-shaped rotating body, The ram portions of the left propulsion jack and the right propulsion jack are extended in a forward direction, After the rear locking nuts located behind the left propulsion jack and the right propulsion jack of the reaction rod are threadedly moved in the forward direction, the rear locking nuts are pressed by the ram portion, and the pushing force causes the bridge erection mobile work vehicle to which the left propulsion jack and the right propulsion jack are attached to move forward. An operating system for a mobile work vehicle for bridge construction.

2. This is an operating system for a mobile bridge construction vehicle that travels along the rails of an existing bridge girder in the bridge axis direction to perform cantilever erection. The bridge has a frame body with a pair of main frames provided on the left and right sides in the bridge width direction and placed on the rails, and a left propulsion jack and a right propulsion jack installed on each of the pair of left and right main frames and attached to a bridge erection mobile work vehicle, The left propulsion jack and the right propulsion jack each have a ram portion that protrudes from both sides, and a through hole that penetrates the ram portion in the axial direction of the ram portion has a threaded portion on the outer circumferential surface, and a reaction rod connected to the rail is loosely fitted into the through hole. A locking nut is threadedly engaged with the reaction rod, and the locking nut is moved to a predetermined position in the longitudinal direction of the reaction rod by operating a loop-shaped rotating body. The ram portion protrudes and presses a locking nut screwed into a predetermined position on the reaction rod, so that the reaction force of the reaction rod connected to the rail can be used to move the bridge construction mobile work vehicle forward and backward. An operating system for a mobile work vehicle for bridge construction.

3. An operating system for a mobile bridge erection vehicle that travels on the rails of an existing bridge girder in the bridge axis direction to perform cantilever erection, a movement assist rod installed on both longitudinal sides of the left propulsion jack and the right propulsion jack in parallel with the reaction rod, the movement assist rod having a groove or a protrusion on its outer circumferential surface in the axial direction; an automatic return device comprising: a moving nut having a through hole formed therein with a convex portion or a concave portion corresponding to the concave groove or the convex portion, and the moving auxiliary rod inserted into the through hole; a loop-shaped rotating body connecting the moving nut and the front locking nut; a loop-shaped rotating body connecting the moving nut and the rear locking nut; and a rotating device for rotating each moving auxiliary rod; Equipped with When the rotation device rotates the movement assist rod, the loop-shaped rotation body rotates the locking nut to threadably move the reaction rod.

3. An operation system for a bridge erection mobile work vehicle according to claim 1 or 2.

4. This is an operating system for a mobile bridge construction vehicle that travels along the rails of an existing bridge girder in the bridge axis direction to perform cantilever erection. The bridge erection vehicle comprises a frame body provided on the left and right sides of the bridge width direction and equipped with a pair of main frames placed on the rails, a formwork suspended from the tip of the frame body, a mobile bridge erection vehicle having jacks installed on the pair of left and right main frames, control means for controlling the operation of the jacks of the mobile bridge erection vehicle, and terminal devices corresponding to each of the pair of left and right main frames and for wirelessly transmitting and receiving information to and from the control means, The terminal device can operate only the jacks installed on each main frame individually, and the results of the operation can be displayed on each terminal device; The control means stores the value of the extension / contraction amount desired by each jack after the value of the extension / contraction amount desired by each jack is set and input, When each of the jacks is extended or retracted, a reflective laser distance sensor provided on each of the jacks detects the extension or retraction amount of each jack, and the stored value of the desired extension or retraction amount of each jack is compared with the value of the extension or retraction amount of each jack detected by the reflective laser distance sensor. When the extension or retraction amount of each jack reaches the desired extension or retraction amount, the extension or retraction operation of each jack is stopped.

3. An operation system for a bridge erection mobile work vehicle according to claim 1 or 2.

5. This is an operating system for a mobile bridge construction vehicle that travels along the rails of an existing bridge girder in the bridge axis direction to perform cantilever erection. The bridge erection vehicle comprises a frame body provided on the left and right sides of the bridge width direction and equipped with a pair of main frames placed on the rails, a formwork suspended from the tip of the frame body, a mobile bridge erection vehicle having a front support jack, a rear support jack, and a rear wheel jack installed on the pair of left and right main frames, control means for controlling the operation of each of the jacks on the mobile bridge erection vehicle, and terminal devices corresponding to each of the pair of left and right main frames for wirelessly transmitting and receiving information to and from the control means, The terminal device can operate only the jacks installed on each main frame individually, and the results of the operation can be displayed on each terminal device; The control means stores the value of the extension / contraction amount desired by each of the jacks after the value of the extension / contraction amount desired by each of the jacks is set and input, When each of the jacks is extended or retracted, a reflective laser distance sensor provided on each of the jacks detects the extension or retraction amount of each jack, and the stored value of the extension or retraction amount desired by each jack is compared with the value of the extension or retraction amount detected by the reflective laser distance sensor. When the extension or retraction of each jack reaches the individually desired extension or retraction amount, each jack stops its extension or retraction operation.

3. An operation system for a bridge erection mobile work vehicle according to claim 1 or 2.

6. This is an operating system for a mobile bridge construction vehicle that travels along the rails of an existing bridge girder in the bridge axis direction to perform cantilever erection. The system has a jack used to operate the bridge erection mobile work vehicle and a control means for controlling the operation of the jack, The control means includes an expansion / contraction amount setting unit that sets a set value of the expansion / contraction amount of the jack, and a memory unit that stores the set value set by the expansion / contraction amount setting unit. The device has a detection value input unit in which the extension / retraction amount of the operating jack is detected by a reflective laser distance sensor and the detected value is input, a comparison unit that compares the detection value input to the detection value input unit with a set value stored in the memory unit, and an automatic stop unit that automatically stops the extension / retraction of the jack when the detection value input at any time reaches the set value. The set value of the extension / contraction amount of the jack can be input in digital numbers in units of length, and the detection of the extension / contraction amount of the jack by the reflective laser distance sensor can also be converted into units of length, and the comparison unit compares the set value with the detected value.

3. An operation system for a bridge erection mobile work vehicle according to claim 1 or 2.

Citation Information

Patent Citations

  • The pushing device bridge

    JP1985100411U

  • Moving hydraulic device for large scale movable timbering

    JP1991008909A

  • Moving construction device for high level structure

    JP1991275803A

  • Cantilever erection device

    JP1999117235A

  • Lift