Self-location determination system and method for a total station in bridge surface surveying, and bridge surface surveying method

The self-locating system for a total station simplifies bridge surveying by automating the positioning process, eliminating the need for inclinometers and allowing direct measurement of construction block surfaces, thus enhancing efficiency and accuracy in managing fluctuating block heights.

JP7588536B2Active Publication Date: 2024-11-22ZENITAKA CORPORATION +1
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
JP2021047235
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2021-03-22
Publication Date
2024-11-22
Estimated Expiration
2041-03-22

AI Technical Summary

Technical Problem

Existing bridge surveying systems require additional equipment like inclinometers, complicating the setup and not efficiently guiding formwork positioning during construction, and do not account for the fluctuating heights of construction blocks due to load and environmental changes.

Method used

A self-locating system for a total station that uses a control unit to automatically track and laser mark temporary reference points, determining the three-dimensional position of the total station relative to fixed reference points, eliminating the need for inclinometers and allowing direct surveying of construction block surfaces.

Benefits of technology

Enables efficient, obstacle-free surveying of construction block surfaces by simplifying the setup and reducing the need for additional equipment, while accurately measuring and managing the fluctuating heights of completed blocks.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007588536000001
    Figure 0007588536000001
  • Figure 0007588536000002
    Figure 0007588536000002
  • Figure 0007588536000003
    Figure 0007588536000003
Patent Text Reader

Abstract

To easily measure an upper surface of a construction block by facilitating specification of a three-dimensional self-position of a total station each time a movable work vehicle moves.SOLUTION: A self-positioning system comprises: a total station TS placed in an existence region of a movable work vehicle; a first reference point 11 arranged at the top of a bridge; a first tentative reference point 13 and a second tentative reference point 14 arranged on a completed block BL positioned in the overhang direction from a column head 9; and a control unit 15 that controls the survey by TS. The control unit: receives a remote command to guide laser marking to the positions of the first tentative reference point and the second tentative reference point and collimate them; obtains a tentative self-position (X, Y, Zt) of the TS based on the position information of both tentative reference points 13, 14; collimates the first reference point 11 with the automatic tracking function of the TS based on the temporary self-position; obtains a vertical position (Z) of the TS based on the position information; and specifies a self-location (X, Y, Z) of the TS by replacing Zt for the tentative self-location (X, Y, Zt) with Z.SELECTED DRAWING: Figure 2
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a self-location identifying system and method for a total station in bridge surface surveying, and a bridge surface surveying method. [Background technology]

[0002] For example, in the construction of PC bridges using cantilever construction, the height of the girders changes successively during construction due to changes in the load condition and structure, as well as changes in the environmental temperature. For this reason, the bridge surface height must be surveyed periodically and the construction height must be corrected as construction progresses. Recently, systems that use total stations to automatically measure the height of the completed bridge have been used. One specific example is the installation height management system described in Patent Document 1. This installation height management system installs a total station on the bridge's column capitals and places a target on the top surface of a completed block after construction is complete. In addition, an inclinometer is placed on the top surface of the block under construction. The total station, target, and inclinometer in each position are used to measure the bridge surface height of the block under construction. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2020-33762 A Summary of the Invention [Problem to be solved by the invention]

[0004] In the installation height management system described in the above Patent Document 1, the top surface of the block being constructed cannot be sighted from the total station installed on the bridge column head. Therefore, an inclinometer is placed on the top surface of the construction block being constructed to compensate for this. That is, the system of Patent Document 1 requires an inclinometer in addition to a target, which increases the number of types of equipment required and complicates the overall configuration of the system. Furthermore, there is no mention of considering using a total station to guide the position of the formwork for the blocks when installing them during the construction of the blocks, thereby improving workability.

[0005] The object of the present invention is to provide a self-location determination system and method for a total station in bridge surface surveying, and a bridge surface surveying method, which allows the position of a total station to be moved as construction progresses, easily determining the three-dimensional self-location of the total station each time it is moved, and eliminates the need for tasks such as looking through a telescope eyepiece to align the total station when determining its self-location, thereby making it easy to survey the top surface of a construction block. [Means for solving the problem]

[0006] In order to achieve the above-mentioned object, the self-location determination system for a total station in bridge surface surveying according to a first aspect of the present invention comprises a total station placed in an area where a mobile work vehicle is present on the bridge, a first reference point (X0, Y0, Z0) placed at the capital of the bridge, a first temporary reference point (X1, Y1, Z1) and a second temporary reference point (X2, Y2, Z2) placed on a completed block located in the protruding direction from the capital of the bridge and at a position where the total station can be aimed, and a control unit that controls surveying by the total station. The total station has the functions of automatic tracking and laser marking, and the control unit receives a remote command to guide and aim the laser marking to the positions of a first temporary reference point (X1, Y1, Z1) and a second temporary reference point (X2, Y2, Z2), calculates a three-dimensional temporary self-position (X, Y, Zt) of the total station based on the detection results of the position information of the first temporary reference point (X1, Y1, Z1) and the second temporary reference point (X2, Y2, Z2), aims the first reference point (X0, Y0, Z0) using the automatic tracking function of the total station based on the temporary self-position (X, Y, Zt), calculates the vertical position (Z) of the total station based on the detection results of the position information of the first reference point (X0, Y0, Z0), and specifies the three-dimensional self-position (X, Y, Z) of the total station by replacing Zt of the temporary self-position (X, Y, Zt) with the calculated Z.

[0007] Here, "being positioned in the area where a mobile work vehicle on a bridge is located" is used in this specification to mean not only that the total station is directly attached to a component part of the mobile work vehicle, but also that it can be positioned in the area where the mobile work vehicle is located independently from the mobile work vehicle by using a tripod or the like.

[0008] According to this aspect, the total station is placed in the area where the mobile work vehicle is present on the bridge. Therefore, the total station can be positioned in the area where the mobile work vehicle is present, i.e., in a place where it can overlook the top surface of the construction block. As a result, the total station, which has been able to identify its own position, is less susceptible to the influence of obstacles when surveying the top surface of the construction block, making it possible to directly survey it. In other words, equipment such as a conventional inclinometer is no longer necessary.

[0009] On the other hand, the total station moves together with the mobile work vehicle every time the construction progresses, and therefore its own position changes. Therefore, it is necessary to grasp the self-position of the total station every time the mobile work vehicle moves. According to this embodiment, the first reference point (X0, Y0, Z0) is placed at the head of the bridge, and the first temporary reference point (X1, Y1, Z1) and the second temporary reference point (X2, Y2, Z2) are placed on a completed block located in the protruding direction from the head of the bridge, which is a collimating position of the total station. Then, upon receiving a remote command, the control unit guides and aims the laser marking to the positions of the first temporary reference point (X1, Y1, Z1) and the second temporary reference point (X2, Y2, Z2), and determines the three-dimensional temporary self-position (X, Y, Zt) of the total station based on the detection results of the positional information of the first temporary reference point (X1, Y1, Z1) and the second temporary reference point (X2, Y2, Z2). In this way, the laser marking is guided to the positions of the first tentative reference point (X1, Y1, Z1) and the second tentative reference point (X2, Y2, Z2) and collimated, so that when grasping the tentative self-position (X, Y, Zt) of the total station, it is possible to eliminate the need for an operation such as looking through a telescope eyepiece for aligning the total station. In other words, it is easy to specify the tentative self-position.

[0010] Furthermore, the control unit aims a first reference point (X0, Y0, Z0) using the automatic tracking function of the total station based on the determined tentative self-position (X, Y, Zt), and determines the vertical position (Z) of the total station based on the detection results of the position information of the first reference point (X0, Y0, Z0). In this way, the first reference point (X0, Y0, Z0) is collimated using the automatic tracking function of the total station, eliminating the need to look through the eyepiece of a telescope to align the total station when determining its vertical position (Z).

[0011] Furthermore, the completed block on which the first temporary reference point (X1, Y1, Z1) and the second temporary reference point (X2, Y2, Z2) are located has an unspecified three-dimensional position before completion, but is specified after completion. However, the completed block is positioned in the direction of projection from the column capital of the bridge, so it exists in a cantilever structure. In this cantilever structure, its height direction (Z direction) may fluctuate due to changes in the load condition, structural system, and even changes in environmental temperature. On the other hand, it is possible to consider that the two-dimensional position (X, Y) in the horizontal direction does not fluctuate. For this reason, in the tentative self-position (X, Y, Zt) obtained above, the two-dimensional position (X, Y) in the horizontal direction can be used as the self-position of the total station as is, but it is not appropriate to use the vertical direction Zt as is since there is a risk of the above-mentioned fluctuation. According to this aspect, the vertical position (Z) of the total station is obtained based on the detection result of the position information of the first reference point (X0, Y0, Z0). The capital column of the bridge where the first reference point (X0, Y0, Z0) is located is not a cantilever structure like the completed block, so there is no risk of the three-dimensional position fluctuating. Therefore, it can be said that the vertical position (Z) of the total station obtained based on the detection result of the position information of the first reference point (X0, Y0, Z0) can be used as the self-position of the total station as it is. Therefore, by replacing Zt of the tentative self-position (X, Y, Zt) with the calculated Z, the three-dimensional self-position (X, Y, Z) of the total station can be easily identified. Then, the total station, with its own position (X, Y, Z) specified, can easily carry out surveying of the upper surface of the construction block in the area where the mobile work vehicle is present. That is, in the early stage of block construction, it becomes possible to guide the formwork position when setting up the formwork for the block, and also, after the construction block is completed, the finished height of the upper surface can be easily measured.

[0012] A second aspect of the present invention is characterized in that in the self-location determination system of a total station in bridge surface surveying of the first aspect, a first temporary reference point (X1, Y1, Z1) and a second temporary reference point (X2, Y2, Z2) are survey points for the finished height of the completed block. According to this embodiment, the first temporary reference point (X1, Y1, Z1) and the second temporary reference point (X2, Y2, Z2) are survey points for the finished height of the completed block, so the survey points which are the survey positions for the finished height can also be used as reference points required for determining the self-position of the total station, which is efficient.

[0013] A method for identifying the self-position of a total station in a bridge surface surveying system according to a third aspect of the present invention includes disposing a total station in an area where a mobile work vehicle is present on a bridge, disposing a first reference point (X0, Y0, Z0) on the head of the bridge, disposing a first temporary reference point (X1, Y1, Z1) and a second temporary reference point (X2, Y2, Z2) on a completed block located in a position where the total station can be aimed and in a protruding direction from the head of the bridge, guiding and aiming the laser markings of the total station to the positions of the first temporary reference point (X1, Y1, Z1) and the second temporary reference point (X2, Y2, Z2) by a remote command, and aiming the laser markings of the total station at the first temporary reference point (X1, Y1, Z1) and the second temporary reference point (X2, Y2, Z2). The method is characterized in that a three-dimensional virtual self-position (X, Y, Zt) of the total station is calculated based on the detection results of positional information of (X1, Y1, Z1) and a second virtual reference point (X2, Y2, Z2), the total station is made to automatically track a first reference point (X0, Y0, Z0) based on the virtual self-position and aim at the first reference point (X0, Y0, Z0), the vertical position (Z) of the total station is calculated based on the detection results of positional information of the first reference point (X0, Y0, Z0), and the three-dimensional self-position (X, Y, Z) of the total station is specified by replacing Zt of the virtual self-position (X, Y, Zt) with the calculated Z. According to this aspect, it is possible to obtain the same effects as those of the first aspect.

[0014] A fourth aspect of the present invention is characterized in that, in the self-positioning method of a total station in bridge surface surveying of the third aspect, a first temporary reference point (X1, Y1, Z1) and a second temporary reference point (X2, Y2, Z2) are survey points for the finished height of the completed block. According to this aspect, it is possible to obtain the same effects as those of the second aspect.

[0015] A bridge surface surveying method according to a fifth aspect of the present invention is characterized in that the self-position of a total station is determined by a self-positioning method of a total station in a bridge surface surveying system of the third or fourth aspect, and a survey of the top surface of a construction block in the area where the mobile work vehicle is located is performed by the total station in the self-positioning state. Here, "performing a survey of the top surface of a construction block" is used to mean not only measuring the finished height of the top surface of the construction block after it is completed, but also guiding the position of the formwork when installing the formwork for the block in the early stages of construction. According to this aspect, substantially the same effects as those of the first aspect can be obtained.

[0016] A sixth aspect of the present invention is characterized in that, in the bridge surface surveying method of the fifth aspect, a survey of the finished height of the completed block is carried out by a total station in a state in which the self-position has been identified. The finished height of the completed block varies from time to time due to the cantilever structure. According to this aspect, the finished height of the completed block is measured, so that the finished height of the completed block can be managed. [Brief description of the drawings]

[0017] [Figure 1] 1 is a schematic side view for explaining a first embodiment of a self-location identifying system for a total station in bridge surface surveying according to the present invention. FIG. [Diagram 2] FIG. 2 is a perspective view of a main part for explaining the first embodiment. [Diagram 3] 4 is a flowchart for explaining the execution of surveying using the bridge surface surveying method of the first embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0018] [Embodiment 1] Hereinafter, a self-location identifying system for a total station in bridge surface surveying according to the first embodiment of the present invention will be described in detail with reference to Figs. 1 to 3. In the following explanation, the three mutually perpendicular axes are referred to as the X-axis, Y-axis, and Z-axis, as shown in each figure. The Z-axis direction corresponds to the vertical direction (the direction in which gravity acts). The X-axis and Y-axis directions correspond to the horizontal direction. Here, the X-axis direction corresponds to the overhang direction of the bridge in overhang construction of a PC bridge, and the Y-axis direction corresponds to the width direction of the bridge.

[0019] 1 and 2, the self-localization system 1 of the total station in bridge surface surveying of this embodiment includes a total station 7 arranged in an area where a mobile work vehicle 5 exists on a bridge 3, a first reference point (X0, Y0, Z0) 11 arranged on a column head 9 of the bridge 3, a first temporary reference point (X1, Y1, Z1) 13 and a second temporary reference point (X2, Y2, Z2) 14 arranged on a completed block BL located in a collimating position of the total station 7 and in the overhanging direction (X-axis direction) from the column head 9 of the bridge 3, and a control unit 15 that controls the surveying by the total station 7. The total station 7 has the functions of automatic tracking 23 and laser marking 25. Then, the control unit 15 receives a remote command via a tablet 32 ​​or the like carried by an operator 31 (Figure 2), guides and aims the laser marking 25 to each of the positions of the first temporary reference point (X1, Y1, Z1) 13 and the second temporary reference point (X2, Y2, Z2) 14, and determines the three-dimensional temporary self-position (X, Y, Zt) of the total station 7 based on the detection results of the positional information of the first temporary reference point (X1, Y1, Z1) 13 and the second temporary reference point (X2, Y2, Z2) 14. Furthermore, the control unit 15 is configured to aim the first reference point (X0, Y0, Z0) 11 using the automatic tracking 23 function of the total station 7 based on the determined tentative self-position (X, Y, Zt), determine the vertical position (Z) of the total station 7 based on the detection results of the position information of the first reference point (X0, Y0, Z0) 11, and identify the three-dimensional self-position (X, Y, Z) of the total station 7 by replacing Zt of the tentative self-position (X, Y, Zt) with the determined Z. Here, the "reference points" in the first reference point (X0, Y0, Z0) 11, the first temporary reference point (X1, Y1, Z1) 13, and the second temporary reference point (X2, Y2, Z2) 14 mean points whose three-dimensional positions are specified, i.e., points whose three-dimensional positions are grasped.

[0020] In Fig. 1, reference numeral 2 denotes a pier, and a column capital part 9 is located on top of a leg head part 4 of the pier 2. A bridge 3 is constructed by constructing blocks BL one block at a time (1BL → 2BL → 3BL → 4BL) in two directions that are the overhanging directions from the column capital part 9 via a mobile work vehicle 5, that is, in two directions, the +X direction and the -X direction in the X-axis direction. In Fig. 1, each block 1BL, 2BL, 3BL, 4BL denotes a completed block. The next block nBL is constructed to extend the completed block 4BL located at the tip of the overhanging direction. Figure 1 shows the state where the formwork 6 for the block for constructing the next block nBL is installed, which corresponds to the initial stage of construction of the next block nBL. The control unit 15 is configured to perform surveying by having the total station 7, having determined its own position (X, Y, Z), shine light on the top surface 19 of the construction block 17 (Figure 2), which is the next block nBL in the presence area of ​​the mobile work vehicle 5.

[0021] Hereinafter, each of the components constituting the self-location identifying system 1 of a total station for bridge surface surveying according to this embodiment will be described in detail. <Total Station> The total station 7 is a widely used surveying instrument that can measure the distance and angle to a target point by shining light onto the target point and electronically analyzing the light that is reflected back to the instrument. If the self-position and orientation of the total station 7 are specified in advance by surveying or the like, the three-dimensional position (X, Y, Z) of the target point can be measured by converting the distance and angle obtained by the measurement into three-dimensional coordinates. In this embodiment, the total station 7 has each function of automatic tracking 23 and laser marking 25.

[0022] <Total station placement> The total station 7 is placed in an area on the bridge 3 where the mobile work vehicle 5 is located. In this embodiment, the total station 7 is directly attached to a component of the mobile work vehicle 5. That is, it is attached so as to be located above the upper surface so as to face the upper surface 19 of the construction block 17. The mounting structure for mounting the total station 7 to the component of the mobile work vehicle 5 is a general one, so illustration and explanation are omitted. In Figure 2, the mobile work vehicle 5 is not illustrated and only the total station 7 is shown. In Figure 1, the total station 7 is located above the completed block 4BL in the area where the mobile work vehicle 5 is located on the bridge 3, but it is not limited to this location and may be located above the construction block 17. Furthermore, the total station 7 is not limited to being attached directly to a component part of the mobile work vehicle 5, but may also be placed independently of the mobile work vehicle 5 using a tripod or the like, in a location that overlooks the area in which the mobile work vehicle 5 is located, i.e., the top surface of the construction block 17.

[0023] <1st reference point> In this embodiment, the first reference point (X0, Y0, Z0) 11 used to grasp the self-position of the total station 7 is placed at the column capital 9 of the bridge 3 as described above. Specifically, the first reference point 11 is located on the top surface of the column capital part 9, at the center in the X-axis direction and the Y-axis direction. However, it is not limited to this central location. The three-dimensional position of the top surface of the column capital part 9 of the bridge 3 can be considered to be specified. A prism target, which is widely used in the surveying field, is used as the first reference point 11. However, the first reference point 11 is not limited to the prism target as long as it can return reflected light to the total station 7.

[0024] <First tentative reference point, second tentative reference point> The first temporary reference point (X1, Y1, Z1) 13 and the second temporary reference point (X2, Y2, Z2) 14 are disposed at collimating positions of the total station 7 as described above. In this embodiment, the first temporary reference point 13 is located on the completed block 4BL located in the overhanging direction (X-axis direction) from the column capital 9 of the bridge 3. More specifically, the first temporary reference point 13 is a measurement point 21 of the finished height of the completed block 4BL, which is the tip of the completed block 4BL in the overhanging direction, as shown in Figures 1 and 2. The second temporary reference point 14 is located on the completed block 3BL located in the overhanging direction (X-axis direction) from the column capital 9 of the bridge 3. More specifically, the second temporary reference point 14 is a measurement point 21 of the finished height of the completed block 3BL, which is the tip of the completed block 3BL in the overhanging direction, as shown in Figures 1 and 2. In this embodiment, the measurement point 21 of the finished height is located at the center of the completed blocks 3BL and 4BL in the Y-axis direction. Here, it is needless to say that the first temporary reference point 13 and the second temporary reference point 14 are not limited to being located at the center. Prism targets that are widely used in the surveying field are used for the first temporary reference point 13 and the second temporary reference point 14, like the first reference point 11. Moreover, the first temporary reference point 13 and the second temporary reference point 14 may also be any target that can return reflected light to the total station 7, and are of course not limited to the prism targets.

[0025] <Control unit, determining the self-position of the total station> The control unit 15 receives a remote command from a tablet 32 ​​or the like, guides and aims the laser marking 25 at each of the first temporary reference point 13 and the second temporary reference point 14, and determines the three-dimensional virtual self-position (X, Y, Zt) of the total station 7 based on the detection results of the position information of the first temporary reference point 13 and the second temporary reference point 14. Furthermore, the control unit 15 aims the first reference point 11 using the automatic tracking 23 function of the total station 7 based on the determined tentative self-position (X, Y, Zt), and determines the vertical position (Z) of the total station based on the detection results of the position information of the first reference point (X0, Y0, Z0). Then, by replacing Zt of the tentative self-position (X, Y, Zt) with the calculated Z, the three-dimensional self-position (X, Y, Z) of the total station 7 is specified.

[0026] <Reason for replacing Zt in the tentative self-position (X, Y, Zt) with the Z calculated above> The completed blocks 3BL, 4BL on which the first temporary reference point 13 and the second temporary reference point 14 are located have their three-dimensional positions not specified before completion, but are specified after completion. However, since the completed blocks 3BL, 4BL are located in the protruding direction from the column capital 9 of the bridge 3, they exist in a cantilever structure. In this cantilever structure, the height direction (Z direction) may fluctuate due to changes in the load condition, structural system, and even changes in environmental temperature. On the other hand, it is possible to consider that the two-dimensional position (X, Y) in the horizontal direction does not fluctuate. For this reason, in the tentative self-position (X, Y, Zt) obtained above, the two-dimensional position (X, Y) in the horizontal direction can be used as the self-position of the total station 7 as is, but it is not appropriate to use the vertical direction Zt as is since there is a risk of the above-mentioned fluctuation. On the other hand, the column capital 9 of the bridge 3 where the first reference point 11 is located is not a cantilever structure like the completed blocks 3BL and 4BL, so there is no risk of the three-dimensional position fluctuating. Therefore, it can be said that the vertical position (Z) of the total station calculated based on the detection result of the position information of the first reference point 11 can be used as the self-position of the total station as it is. Therefore, the three-dimensional self-position (X, Y, Z) of the total station is specified by replacing Zt of the tentative self-position (X, Y, Zt) with the calculated Z.

[0027] Specifically, the total station 7 irradiates light onto the first tentative reference point 13 and the second tentative reference point 14, which are collimated by the function of the laser marking 25 of the total station 7, and the reflected light is received and electronically analyzed to measure the distance and angle to the target point. The total station 7 does not have a specific self-position, but the positions of the first tentative reference point 11 and the second tentative reference point 14, which are the target points, are both specific. Therefore, first, the distance obtained by the measurement is converted by the two-point method of the resection method to obtain the tentative self-position (X, Y, Zt) of the total station 7. Next, the control unit 15 irradiates light from the total station 7 to the first reference point 11, which is collimated by the automatic tracking 23 function of the total station 7 based on the calculated tentative self-position (X, Y, Zt), and receives and electronically analyzes the reflected light to measure the distance and angle to the target point. Then, based on the detection result of the position information of the first reference point 11, the vertical position (Z) of the total station 7 is obtained. Since it can be said that there is no risk of positional fluctuation of the first reference point 11, the self-position (Z) in the height direction can be obtained by irradiating the first reference point 11 with light.

[0028] <Survey of the top surface of the construction block> As described above, the control unit 15 performs surveying by having the total station 7 determine its own position (X, Y, Z) by shining light onto the top surface 19 of the construction block 17, which is the next block nBL in the area where the mobile work vehicle 5 is located. Specifically, in the early stages of construction of the construction block 17, when setting up the formwork 6 for the block, the formwork position is guided by light irradiation 8 (Fig. 1) from a total station 7. That is, the formwork 6 for the block is set up along the irradiation point of the light irradiation 8. Then, the construction block 17 is made by assembling reinforcing bars and pouring concrete inside the formwork 6. Next, with the concrete of the construction block 17 in a hardened state, light 10 is irradiated onto the upper surface 19 thereof, and the height of the upper surface 19 is measured. The height of the upper surface 19 of the construction block 17 can be measured either with or without placing a prism target.

[0029] <Measurement of the finished height of the completed block> The height of the completed blocks 4BL, 3BL, etc. varies successively due to the cantilever structure. According to this embodiment, the total station 7, whose self-position has been identified, can easily measure the finished height of the completed blocks 4BL, 3BL, etc. This makes it possible to manage the finished height of the completed blocks 4BL, 3BL, etc.

[0030] <Determining the self-position of the total station 7 ~ Surveying of construction blocks> Next, the entire process of surveying a bridge surface using the bridge surface surveying system 1 of this embodiment will be described with reference to the flowchart of FIG. (1) First, in step S1, the following steps (101) to (104) are carried out. (101) A total station 7 is attached to a mobile work vehicle 5 on a bridge 3. (102) A first reference point 11 is placed at the column capital 9 of the bridge 3. (103) A first temporary reference point 13 is placed on the completed block 4BL, which is a collimating position of the total station 7, and a second temporary reference point 14 is placed on the completed block 3BL. Here, since there is no need to decide the order of performing (101) to (103), they may be performed simultaneously. The relative arrangement of the total station 7 with the first reference point 11, the first temporary reference point 13, and the second temporary reference point 14 is such that the total station 7 can sight the first reference point 11, the first temporary reference point 13, and the second temporary reference point 14.

[0031] (2) Next, in step S2, the following steps (201) and (202) are carried out. (201) The tentative self-position (X, Y, Zt) of the total station 7 is calculated as described above. (202) The height direction self-position (Z) of the total station 7 is calculated as described above.

[0032] (3) Next, in step S3, the three-dimensional self-position (X, Y, Z) of the total station 7 is identified by replacing Zt of the tentative self-position (X, Y, Zt) obtained in (201) and (202) above with the obtained Z. (4) Next, in step S4, the total station 7, with its own position (X, Y, Z) identified, measures the top surface 19 of the construction block 17 in the area in which the mobile work vehicle 5 is located. That is, in the early stages of construction of block BL, the formwork position is guided when setting up the formwork 6 for the block. In addition, after the construction block 17 is completed, the finished height of its top surface 19 is measured. The total station 7 also easily measures the finished height of the completed blocks 4BL, 3BL, etc. After the measurement, the mobile work vehicle 5 is moved and the construction of the next block is carried out in the same manner as above.

[0033] <Explanation of Effects of First Embodiment> (1) According to this embodiment, the total station 7 is placed in the area where the mobile work vehicle 5 is present on the bridge 3. Therefore, the total station 7 can be positioned in a place where it can overlook the area where the mobile work vehicle 5 is present, i.e., the top surface of the construction block. As a result, the total station 7, which has identified its own position, is less susceptible to the influence of obstacles when surveying the top surface 19 of the construction block 17, and can therefore directly survey the top surface 19. In other words, there is no need for equipment such as a conventional inclinometer.

[0034] (2) On the other hand, since the total station 7 changes its own position every time it moves as the construction progresses, it is necessary to grasp the own position of the total station 7 each time. According to this embodiment, the first reference point 11 is located at the column head 9 of the bridge 3, and the first temporary reference point 13 and the second temporary reference point 14 are located on the completed block BL, which is a collimated position of the total station 7 and is located in the protruding direction from the column head 9 of the bridge 3. Then, upon receiving a remote command, the control unit 15 guides and aims the laser marking 25 at each of the first temporary reference point 13 and the second temporary reference point 14, and determines the three-dimensional virtual self-position (X, Y, Zt) of the total station 7 based on the detection results of the position information of the first temporary reference point 13 and the second temporary reference point 14. In this way, the laser marking 25 is guided and aimed at each of the first temporary reference point 13 and the second temporary reference point 14, so that when determining the temporary self-position (X, Y, Zt) of the total station 7, it is possible to eliminate the need for tasks such as looking through the eyepiece of a telescope to align the total station 7. (3) Furthermore, the control unit 15 aims the first reference point 11 using the automatic tracking 23 function of the total station 7 based on the determined tentative self-position (X, Y, Zt), and determines the vertical position (Z) of the total station 7 based on the detection results of the position information of the first reference point 11. In this way, the first reference point 11 is collimated using the automatic tracking 23 function of the total station 7, making it possible to eliminate the need for tasks such as looking through a telescope eyepiece to align the total station 7 when determining the vertical position (Z) of the total station 7.

[0035] (4) Furthermore, according to this embodiment, the three-dimensional self-position (X, Y, Z) of the total station 7 is determined by replacing Zt of the tentative self-position (X, Y, Zt) of the total station 7 obtained based on the detection results of the position information of the first tentative reference point 13 and the second tentative reference point 14 with the vertical position (Z) of the total station 7 obtained based on the detection results of the position information of the first reference point 11. Therefore, the three-dimensional self-position (X, Y, Z) of the total station 7 can be easily determined without being substantially affected by the state of the cantilever structure of the completed block BL.

[0036] (5) Then, the total station 7 with its own position (X, Y, Z) specified can easily carry out surveying of the top surface 19 of the construction block 17 in the area where the mobile work vehicle 5 is present. That is, in the early stages of block construction, it becomes possible to guide the formwork position when setting up the formwork 6 for the block, and also, after the construction block 17 is completed, the finished height of its top surface 19 can be easily measured. (6) Furthermore, according to this embodiment, the total station 7, whose self-position has been determined, can easily measure the finished height of the completed blocks 4BL, 3BL, etc., so that it becomes possible to manage the finished height of the completed blocks 4BL, 3BL, etc., whose height is prone to fluctuation.

[0037] (7) Furthermore, according to this embodiment, the first temporary reference point 13 and the second temporary reference point 14 are survey points 21 for the finished height of the completed blocks 4BL and 3BL. Therefore, the survey point 21, which is the survey position for the finished height, can also be used as a reference point required for determining the self-position of the total station 7, which is efficient.

[0038] [Other embodiments] Although the present invention has been described above using embodiment 1, the present invention is not limited to the above embodiment, and various modifications are possible within the scope of the invention described in the claims, and it goes without saying that these modifications are also included within the scope of the present invention. For example, in the above embodiment, the first temporary reference point 13 and the second temporary reference point 14 are survey points 21 for the finished height of the completed blocks 4BL, 3BL at each end in the protruding direction of the completed blocks 4BL, 3BL, but this is not limited to this and survey points for the finished height of other completed blocks 2BL, etc. may also be used.

[0039] Furthermore, in the above embodiment, the total station 7 is attached directly to the mobile work vehicle 5, so when construction of the construction block 17 is completed and the mobile work vehicle 5 moves to the next construction position, it moves together with the mobile work vehicle 5. If the total station 7 is not directly attached to a component of the mobile work vehicle 5, but is placed in the area where the mobile work vehicle 5 is present while being independent of the mobile work vehicle 5 using a tripod or the like, movement to the next construction position can be easily performed by moving the total station 7 together with the tripod. [Explanation of symbols]

[0040] 1...bridge surface survey system, 2...pier, 3...bridge, 4...leg head, 5...mobile work vehicle, 6...formwork for blocks, 7...total station, 8...light irradiation, 9...column capital, 10...light irradiation, 11...first reference point, 13...first tentative reference point, 14...second tentative reference point, 15...control section, 17...construction block, 19...top surface, 21...measurement point of finished height, 23...Automatic tracking, 25...Laser marking, 31 Worker, 32 Tablet, BL...block, nBL...next block

Claims

1. a total station arranged in an area where a mobile work vehicle is present on a bridge; A first reference point (X0, Y0, Z0) located at the capital of the bridge; A first temporary reference point (X1, Y1, Z1) and a second temporary reference point (X2, Y2, Z2) are arranged on a completed block located in a projecting direction from the column head of the bridge, which is a collimating position of the total station; A control unit for controlling the surveying by the total station, The total station has the functions of automatic tracking and laser marking, The control unit is receiving a remote command, guiding and aiming the laser marking at the positions of the first tentative reference point (X1, Y1, Z1) and the second tentative reference point; A three-dimensional tentative self-position (X, Y, Z) of the total station is calculated based on the detection results of the position information of the first tentative reference point (X1, Y1, Z1) and the second tentative reference point (X2, Y2, Z2); Based on the tentative self-position, a first reference point (X0, Y0, Z0) is collimated by an automatic tracking function of the total station; A vertical position (Z) of the total station is obtained based on the detection result of the position information of the first reference point (X0, Y0, Z0); The three-dimensional self-position (X, Y, Z) of the total station is identified by replacing Zt of the tentative self-position (X, Y, Zt) with the obtained Z. A self-location system for a total station in bridge surface surveying, comprising:

2. In the self-localization system for a total station in bridge surface surveying according to claim 1, The first temporary reference point (X1, Y1, Z1) and the second temporary reference point (X2, Y2, Z2) are measurement points for the finished height of the completed block. A self-location system for a total station in bridge surface surveying, comprising:

3. A total station is placed in the area where the mobile work vehicle is present on the bridge, A first reference point (X0, Y0, Z0) is placed on the bridge column head. A first temporary reference point (X1, Y1, Z1) and a second temporary reference point (X2, Y2, Z2) are arranged on a completed block located in a projection direction from the column head of the bridge at a collimating position of the total station; The laser marking of the total station is guided to the positions of the first temporary reference point (X1, Y1, Z1) and the second temporary reference point (X2, Y2, Z2) by a remote command and collimated; A three-dimensional tentative self-position (X, Y, Z) of the total station is calculated based on the detection results of the position information of the first tentative reference point (X1, Y1, Z1) and the second tentative reference point (X2, Y2, Z2); making the total station automatically track a first reference point (X0, Y0, Z0) based on the tentative self-position and collimating the first reference point (X0, Y0, Z0); A vertical position (Z) of the total station is obtained based on the detection result of the position information of the first reference point (X0, Y0, Z0); The three-dimensional self-position (X, Y, Z) of the total station is identified by replacing Zt of the tentative self-position (X, Y, Zt) with the obtained Z. A method for self-locating a total station in a bridge surface surveying system, comprising:

4. The method for identifying a self-position of a total station in bridge surface surveying according to claim 3, The first temporary reference point (X1, Y1, Z1) and the second temporary reference point (X2, Y2, Z2) are measurement points for the finished height of the completed block. A method for determining the self-position of a total station in bridge surface surveying, comprising:

5. The self-position of the total station is determined by the self-position determining method of the total station in bridge surface surveying according to claim 3 or 4, A survey is carried out on the top surface of the construction block in the area where the mobile work vehicle is present by the total station in the state where the self-location has been identified. A bridge surface survey method comprising the steps of:

6. The bridge surface surveying method according to claim 5, A survey of the finished height of the completed block is carried out by the total station in the self-located state. A bridge surface survey method comprising the steps of:

Citation Information

Patent Citations

  • General surveying system of tunnel

    JP2001182484A

  • Method of surveying in tunnel hole and system of surveying in tunnel hole

    JP2004138422A

  • Installation height management system and installation height management method

    JP2020033762A

  • Bridge surface survey system and bridge surface survey method

    JP2022081079A

  • Bridge paving device

    US9739019B1