Component Mounting System

The component mounting system addresses worker efficiency limitations by using robots to transport and manage component units and racks, enabling flexible task management and timely supply, thus improving productivity and reducing time constraints.

JP7594123B2Active Publication Date: 2024-12-03YAMAHA MOTOR CO LTD
View PDF 8 Cites 0 Cited by

Patent Information

Application Number
JP2023538199
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2021-07-30
Publication Date
2024-12-03
Estimated Expiration
2041-07-30

AI Technical Summary

Technical Problem

Existing component mounting systems restrict worker efficiency by requiring them to perform tasks like loading replacement feeders, limiting their ability to use restrooms or take breaks, and reducing overall productivity.

Method used

A component mounting system with a robot that transports component units, including a placement section separate from the mounting area where workers can prepare and manage component supply sections, and an automated warehouse with robots to handle component racks, allowing flexible task management and reducing time constraints.

Benefits of technology

Enhances worker efficiency by allowing flexible task completion, including breaks and meal times, while ensuring timely component supply to the mounting apparatus through buffer sections and automated management, thereby optimizing resource utilization and preventing component shortages.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007594123000001
    Figure 0007594123000001
  • Figure 0007594123000002
    Figure 0007594123000002
  • Figure 0007594123000003
    Figure 0007594123000003
Patent Text Reader

Abstract

This component mounting system (100) comprises: a component mounting device (14) that is provided in a mounting area (AR1) and mounts a component on a substrate (S); a robot (20) that conveys component units (60, 70) that can hold a component; and an arrangement unit (30) that is provided in a work area (AR2) in which a worker (W) works, and is capable of arranging a plurality of component units to be conveyed by the robot, the work area (AR2) being separate from the mounting area.
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a component mounting system, and more particularly to a component mounting system that transports component units. [Background technology]

[0002] Conventionally, a component mounting system that transports component units has been known. Such a component mounting system is disclosed in, for example, Japanese Patent Application Laid-Open No. 2021-16009.

[0003] The above-mentioned JP 2021-16009 A discloses a component mounting system including a unit transporting device that transports a feeder (component unit) and a mounting line including a component mounter on which the feeder is arranged. In this component mounting system, a storage facility that stores replacement feeders for the component mounter is arranged on the mounting line. In addition, the unit transporting device transports the replacement feeder from a work location where a worker works to the storage facility. At the work location, the worker loads the replacement feeder onto the unit transporting device. [Prior art documents] [Patent documents]

[0004] [Patent Document 1] Patent Publication No. 2021-16009 Summary of the Invention [Problem to be solved by the invention]

[0005] However, in the above-mentioned JP 2021-16009 A, the worker loads the replacement feeder onto the unit conveying device at the work site, which may significantly restrict the worker's time. In this case, the worker cannot freely use the toilet, take a meal break, or do other work other than loading the feeder, so the worker's time cannot be used effectively, which may result in a decrease in work efficiency.

[0006] The present invention has been made to solve the problems described above, and one object of the present invention is to provide a component mounting system that can effectively utilize workers' time and improve work efficiency when transporting component units using a robot. [Means for solving the problem]

[0007] In order to achieve the above object, the present invention 1st~4th The component mounting system according to this aspect includes a component mounting device provided in a mounting area for mounting components on a board; a robot for transporting a component unit capable of holding components; and a placement unit provided in a work area separate from the mounting area and the warehouse area where workers work and capable of arranging a plurality of component units transported by the robot, the robot including a first robot for transporting component supply units as component units between the work area and the component mounting device, the work area being an area where workers attach reels that hold components to the component supply units or remove reels from the component supply units, and the placement unit is provided in the work area and includes a first placement unit capable of arranging a plurality of component supply units transported by the first robot. Moreover, in the component mounting system according to the above-mentioned first aspect, the first robot includes a storage section that stores the component supply section, and an insertion / removal unit that inserts or removes the component supply section between the storage section and the first placement section, and between the storage section and the component mounting device.

[0008] This invention 1st~4th In the component mounting system according to the above aspect, a placement section capable of placing a plurality of component units transported by a robot is provided in a work area where workers work, which is separate from the mounting area. This allows the placement section to be provided as a buffer section for component units, so that workers are less likely to be tied up in time for tasks such as transferring component units to the robot or receiving component units from the robot. As a result, unlike in cases where workers are significantly tied up in time, workers can relatively freely use the restroom, take a meal break, and perform other tasks, so that when component units are transported by a robot, the worker's time can be used effectively to improve work efficiency. Also, unlike in cases where a placement section is provided in a mounting line, a placement section is provided in a work area, so that when there are multiple mounting lines, the placement section can be used as a common placement section for the multiple mounting lines.

[0009] In the component mounting system according to the above aspect, the first arrangement unit can be provided as a buffer unit for the component supply unit, so that the worker is not significantly tied up in time for tasks such as transferring the component supply unit to the first robot or receiving the component supply unit from the first robot, etc. As a result, the worker can use his or her time effectively to improve work efficiency.

[0010] In the component mounting system according to the second aspect, The first arrangement section includes a supply stock section capable of arranging a plurality of component supply sections to be used, which the first robot transports from the work area to the component mounting device to supply, and a recovery stock section capable of arranging a plurality of used component supply sections to be collected from the component mounting device by the first robot to the work area. With this configuration, the supply stock section can be provided as a buffer section for the component supply sections to be supplied, so that the worker is not significantly constrained in time for the task of transferring the component supply sections to the first robot. In addition, the recovery stock section can be provided as a buffer section for the collected component supply sections, so that the worker is not significantly constrained in time for the task of receiving the component supply sections from the first robot. As a result, the worker can use his / her time more effectively and improve the work efficiency. In addition, when the supply stock section is provided as a buffer section for the component supply sections to be supplied, the worker can perform the task of preparing the component supply sections in a relatively flexible state. As a result, the variation in the time required for the task of preparing the component supply sections can be absorbed.

[0011] the above In the component mounting system according to the first and second aspects The first placement unit is configured to be capable of managing the placement location of the component supply unit in the first placement unit, that is, whether the component supply unit is placed and the placement location of the component supply unit. With this configuration, the placement location of the component supply unit can be managed by the first placement unit. As a result, it is possible to manage the progress of supply of the component supply unit to the component mounting device.

[0012] In this case, preferably, the first placement unit has a plurality of placement lanes in which the component supply units are respectively placed, and a component supply unit communication unit provided in each of the plurality of placement lanes, and is configured to be able to manage placement locations by communicating with the component supply units via the component supply unit communication unit. With this configuration, it is possible to grasp which component supply unit is placed in which of the plurality of placement lanes by the component supply unit communication unit. As a result, the first placement unit can easily manage the placement locations of the component supply units.

[0013] In the above-mentioned configuration in which the first placement unit is capable of managing the placement location, it is preferable that the first placement unit is configured to issue a warning when the placement location management detects that the component supply unit has not been placed in the component mounting device by a predetermined time before the component mounting device runs out of components. With this configuration, the warning allows the first placement unit to recognize that the component supply unit's supply of components to the component mounting device is delayed. As a result, even if the component supply unit's supply of components to the component mounting device is delayed, the component supply unit can make time to supply components to the component mounting device.

[0014] the above 1st and 2nd In the component mounting system according to the above aspect, the system further includes an automated warehouse, which is preferably provided in a warehouse area separate from the mounting area and the work area, and which retrieves component racks as component units, the robot includes a second robot which transports the component racks between the automated warehouse and the work area, and the placement unit includes a second placement unit capable of arranging a plurality of component racks transported by the second robot. With this configuration, the second placement unit can be provided as a buffer unit for the component racks, so that the worker is not significantly tied up in time for tasks such as handing over component racks to the second robot or receiving component racks from the second robot. As a result, the worker can use his or her time effectively to improve work efficiency.

[0015] In the component mounting system according to the third aspect, , The system further includes an automated warehouse that is provided in a warehouse area separate from the mounting area and the work area and that retrieves part racks as part units, the robot includes a second robot that transports the part racks between the automated warehouse and the work area, and the placement unit includes a second placement unit that is capable of arranging a plurality of part racks transported by the second robot.The second arrangement section includes a rack arrangement section capable of arranging a plurality of part racks holding parts to be transported from the automated warehouse to the work area by the second robot, and an empty rack arrangement section capable of arranging a plurality of empty part racks not holding parts to be collected from the work area by the second robot and transported to the automated warehouse. With this configuration, the rack arrangement section can be provided as a buffer section for the part racks, so that the worker is not significantly tied up in time for the task of receiving the part racks from the second robot. In addition, the empty rack arrangement section can be provided as a buffer section for the empty part racks, so that the worker is not significantly tied up in time for the task of handing over the empty part racks to the second robot. As a result, the worker can use his / her time more effectively and improve the work efficiency.

[0016] the above 1st~3rd In the component mounting system according to the above aspect, it is preferable to create a supply plan for components to the component mounting device based on information regarding the time when the component mounting device will run out of components. With this configuration, components can be systematically supplied to the component mounting device according to the supply plan, so that it is possible to easily deal with a component supply rush and to optimize (minimize) the number of robots operating to supply components.

[0017] In the component mounting system according to the fourth aspect, , The system is configured to create a supply plan for components to the component mounting device based on information regarding the time when the component mounting device will run out of components. The system further includes an automated warehouse that is provided in a warehouse area separate from the mounting area and the work area and that delivers component units, and is configured to calculate the work times of the robot, the automated warehouse, and the workers, and to create a supply plan that includes the target work completion time of the robot, the automated warehouse, and the workers by calculating backwards from the time when the component mounting device runs out of components based on the calculated work times. With this configuration, the robot, the automated warehouse, and the workers can easily grasp the target work completion time from the supply plan, and can easily complete the work by the target work completion time. As a result, it is possible to easily prevent the component mounting device from being stopped due to a component shortage in the component mounting device.

[0018] In the configuration for creating the above supply plan, it is preferable to create a work group of multiple rounds for replacing parts by the robot, and create a supply plan for the created work group. With this configuration, a supply plan can be created for each work group, so that it is easy to prevent the supply plan from becoming excessively large. In addition, since a supply plan can be created for each work group, it is easy to manage the progress of the supply plan for each work group. Effect of the Invention

[0019] According to the present invention, as described above, it is possible to provide a component mounting system that can effectively utilize the time of workers and improve work efficiency when transporting component units by a robot. [Brief description of the drawings]

[0020] [Figure 1] FIG. 1 is a diagram showing a component mounting system according to an embodiment of the present invention. [Diagram 2] 1 is a diagram showing a component mounting apparatus according to an embodiment of the present invention; [Diagram 3] FIG. 2 is a diagram illustrating a component supply unit according to an embodiment of the present invention. [Figure 4] FIG. 2 is a diagram showing a stock section and an exchange robot according to an embodiment of the present invention. [Diagram 5] FIG. 2 is a block diagram showing a stock unit according to an embodiment of the present invention. [Figure 6] FIG. 2 is a block diagram showing an exchange robot according to an embodiment of the present invention. [Figure 7] 11 is a diagram for explaining the transportation of a component supply section by a replacement robot according to an embodiment of the present invention. FIG. [Figure 8] FIG. 13 is a diagram for explaining preparation of a component supply unit according to an embodiment of the present invention. [Figure 9] 10 is a diagram for explaining the arrangement of a component supply unit in a stock unit according to an embodiment of the present invention; FIG. [Figure 10]13 is a diagram for explaining acquisition from a stock section of a component supply section according to an embodiment of the present invention. FIG. [Figure 11] 10 is a diagram for explaining the supply of components to a component mounting device from a component supply unit according to an embodiment of the present invention; FIG. [Figure 12] 11 is a diagram for explaining the return of the component supply unit to the stock unit according to an embodiment of the present invention. FIG. [Figure 13] FIG. 1 is a diagram showing a transport robot and an automated warehouse according to an embodiment of the present invention. [Figure 14] FIG. 2 illustrates a rack arrangement according to an embodiment of the present invention. [Figure 15] 1 is a block diagram showing a transfer robot according to an embodiment of the present invention; [Figure 16] FIG. 1 is a block diagram showing an automated warehouse according to an embodiment of the present invention. [Figure 17] FIG. 2 is a block diagram illustrating a rack arrangement according to an embodiment of the present invention. [Figure 18] 1 is a diagram for explaining the transportation of a part rack by a transport robot according to an embodiment of the present invention; [Figure 19] FIG. 2 is a block diagram illustrating a management device according to an embodiment of the present invention. [Figure 20] FIG. 1 is a diagram for explaining control of each device by a management device according to an embodiment of the present invention; [Figure 21] FIG. 2 is a diagram for explaining the control of each device by the management device according to one embodiment of the present invention; [Figure 22] 5 is a flowchart for explaining a control process relating to part replenishment according to an embodiment of the present invention. [Figure 23] FIG. 11 is a diagram for explaining a parts shortage prediction list according to an embodiment of the present invention. [Figure 24] 11A to 11C are diagrams for explaining a part delivery / transportation list, a tape setting operator instruction list, and a supply instruction list according to an embodiment of the present invention. [Diagram 25]FIG. 1 is a diagram for explaining management by automated warehouse management software and management by transport robot management software based on a part outsourcing / transportation list according to an embodiment of the present invention. [Figure 26] 11 is a diagram for explaining management by stock section management software based on a tape setting operator instruction list according to an embodiment of the present invention. FIG. [Figure 27] FIG. 13 is a diagram for explaining management by replacement robot management software based on a replenishment instruction list according to an embodiment of the present invention. [Figure 28] 5 is a flowchart for explaining a control process related to a warning during part replenishment according to an embodiment of the present invention. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0021] DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, preferred embodiments of the present invention will be described with reference to the accompanying drawings.

[0022] (Component mounting system configuration) The configuration of a component mounting system 100 according to an embodiment of the present invention will be described with reference to FIG.

[0023] 1, the component mounting system 100 according to the present embodiment is configured to mount components on a substrate S to manufacture the substrate S on which the components are mounted. The substrate S is a printed circuit board on which conductor wiring is formed. The components are electronic components such as LSIs, ICs, transistors, capacitors, and resistors.

[0024] The component mounting system 100 is provided in a component mounting factory 200. The component mounting factory 200 of this embodiment is provided with a mounting area AR1 where boards S on which components are mounted are manufactured, a work area AR2 where a worker W works, and a warehouse area AR3 where the components are stored. The components are transported from the warehouse area AR3 to the work area AR2, where the worker W works, and then transported to the mounting area AR1 where the components are mounted on the boards S. The mounting area AR1, the work area AR2, and the warehouse area AR3 are separate areas. The component mounting factory 200 of this embodiment is provided with one mounting area AR1 and one warehouse area AR3, and multiple (two) work areas AR2.

[0025] The component mounting system 100 includes a mounting line 10, a robot 20, a placement section 30, an automated warehouse 40, and a management device 50. The mounting line 10 is disposed in a mounting area AR1. The placement section 30 is disposed in a work area AR2. The automated warehouse 40 is disposed in a warehouse area AR3. The management device 50 may be disposed in a management area separate from the mounting area AR1, the work area AR2, and the warehouse area AR3, or may be disposed in any of the mounting area AR1, the work area AR2, and the warehouse area AR3.

[0026] A plurality of (four) mounting lines 10 are provided in the mounting area AR1. Each mounting line 10 includes a loader 11, a printer 12, a print inspection machine 13, a component mounting device 14, an appearance inspection device 15, a reflow device 16, and an unloader 17. The mounting line 10 is configured such that the board S is transported from the upstream side to the downstream side along the manufacturing line.

[0027] The loader 11 has a function of holding the board (wiring board) S before components are mounted thereon, and of carrying the board S into the mounting line 10.

[0028] The printer 12 is a screen printer, and has a function of applying cream solder onto the mounting surface of the substrate S.

[0029] The print inspection machine 13 has a function of inspecting the condition of the cream solder printed by the printer 12.

[0030] The component mounting device 14 includes a mounting head and has a function of mounting components at a predetermined mounting position of the board S on which the solder paste is printed. A plurality of component mounting devices 14 are provided along the conveying direction of the board S. The plurality of component mounting devices 14 have the same configuration. As shown in FIG. 2, the component mounting device 14 has a feeder bank 14a in which a plurality of component supply units 60 can be arranged in the horizontal direction. The feeder bank 14a is provided with a plurality of arrangement lanes 14b in which the component supply units 60 are respectively arranged. The arrangement lanes 14b are removably attached to the component supply units 60 by sliding them. The component mounting device 14 is configured to mount components on the board S using the component supply units 60. The component supply units 60 are an example of a "component unit" in the claims.

[0031] In addition, the component mounting device 14 is configured to be capable of alternate operation in which, by providing two component supply units 60 that supply the same type of components, when the component supply unit 60 in production runs out of components, the component supply unit 60 is switched to the refill component supply unit 60 to continue supplying the same type of components. That is, the component supply unit 60 in production and the refill component supply unit 60 are arranged in the multiple arrangement lanes 14b. This allows the refill component supply unit 60 to be arranged in advance, so that it is possible to suppress the occurrence of a refill rush in which components are crowded together, and to smoothly refill components. Note that the component mounting device 14 does not have to be configured to be capable of alternate operation. In this case, when the component supply unit 60 in production runs out of components, the refilled component supply unit 60 can be replaced with a new component supply unit 60.

[0032] 3, the component supply unit 60 is a tape feeder that supplies components using a component supply tape T that holds the components. Specifically, the component supply unit 60 is a cassette feeder that has a cassette-type main body 60a. The component supply unit 60 has, in the cassette-type main body 60a, a reel R that holds the component supply tape T, and a drive mechanism 60b that includes a sprocket, gears, etc. for feeding the component supply tape T.

[0033] As shown in FIG. 1, the appearance inspection device 15 has a function of inspecting the appearance of the board S on which components are mounted by the component mounting device .

[0034] The reflow device 16 has a function of joining the components to the electrodes of the substrate S by melting the solder through a heat treatment.

[0035] The unloader 17 has the function of unloading the board S from the mounting line 10 after the components have been mounted thereon.

[0036] The robot 20 is configured to transport a component unit capable of holding a component. Specifically, the robot 20 includes an exchange robot 21 and a transport robot 22. The exchange robot 21 is configured to transport a component supply unit 60 as a component unit between the work area AR2 and the component mounting device 14. The transport robot 22 is configured to transport a component rack 70 (see FIG. 13) as a component unit, which will be described later, between the automatic warehouse 40 and the work area AR2. A plurality of exchange robots 21 and transport robots 22 are provided in the component mounting factory 200. The exchange robot 21, the transport robot 22, and the component rack 70 are examples of the "first robot," "second robot," and "component unit" in the claims, respectively. The detailed configurations of the exchange robot 21 and the transport robot 22 will be described later.

[0037] Here, in this embodiment, the placement section 30 is configured to be able to place a plurality of component units transported by the robot 20. Specifically, the placement section 30 includes a first placement section 31 and a second placement section 32. In this embodiment, the first placement section 31 is configured to be able to place a plurality of component supply sections 60 as component units transported by the exchange robot 21. In addition, in this embodiment, the first placement section 31 includes a supply stock section 31a in which a plurality of component supply sections 60 to be used that the exchange robot 21 transports from the work area AR2 to the component mounting device 14 and supplies are placed, and a recovery stock section 31b in which a plurality of used component supply sections 60 that the exchange robot 21 collects from the component mounting device 14 and transports to the work area AR2 are placed. A plurality of the supply stock sections 31a and the recovery stock sections 31b are provided in the work area AR2. The detailed configurations of the supply stock section 31a and the recovery stock section 31b will be described later.

[0038] In this embodiment, the second arrangement section 32 is configured to be capable of arranging a plurality of part racks 70 as part units to be transported by the transport robot 22. In this embodiment, the second arrangement section 32 includes a rack arrangement section 32a capable of arranging a plurality of part racks 70 holding parts to be transported by the transport robot 22 from the automated warehouse 40 to the work area AR2, and an empty rack arrangement section 32b capable of arranging a plurality of empty part racks 70 not holding parts to be collected by the transport robot 22 from the work area AR2 and transported to the automated warehouse 40. A plurality of the rack arrangement sections 32a and the empty rack arrangement sections 32b are provided in the work area AR2. The detailed configurations of the rack arrangement section 32a and the empty rack arrangement section 32b will be described later.

[0039] In this embodiment, the arrangement section 30 (the supply stock section 31a, the recovery stock section 31b, the rack arrangement section 32a, and the empty rack arrangement section 32b) is provided as a common arrangement section for a plurality of mounting lines 10.

[0040] The automated warehouse 40 is configured to store parts and part racks 70 as part units, and to retrieve the part racks 70 holding parts. A plurality of automated warehouses 40 are provided in the warehouse area AR3. The detailed configuration of the automated warehouse 40 will be described later.

[0041] The management device 50 is one or more computers that manage the component mounting system 100. The detailed configuration of the management device 50 will be described later.

[0042] (Configuration of the stock section and exchange robot) Next, configurations of the supply stock unit 31a, the recovery stock unit 31b, and the exchange robot 21 will be described with reference to FIGS.

[0043] As shown in FIG. 4, the supply stock section 31a is a shelf having a storage section 31aa in which a plurality of component supply sections 60 can be arranged in a horizontal direction. The supply stock section 31a is provided as a temporary placement section in which the component supply sections 60 to be used, which are transported by the exchange robot 21 and supplied (mounted) to the component mounting device 14, are temporarily placed. The storage section 31aa is provided with a plurality of arrangement lanes 31ab in which the component supply sections 60 are respectively arranged. The component supply sections 60 are detachably attached to the arrangement lanes 31ab by sliding movement. The component supply sections 60 to be supplied to the component mounting device 14 are prepared and placed in the supply stock section 31a by the worker W. Then, the component supply sections 60 arranged in the supply stock section 31a are acquired by the exchange robot 21 and transported to the component mounting device 14.

[0044] As shown in FIG. 5, the resupply stock unit 31a further includes a control unit 31ac, a communication unit 31ad, a lighting unit 31ae, a display unit 31af, a reading unit 31ag, and a component supply unit communication unit 31ah. The control unit 31ac is a control circuit that controls the operation of the resupply stock unit 31a. The control unit 31ac includes a processor for executing a predetermined program and a memory for storing the predetermined program. The communication unit 31ad is configured to be able to communicate with each device of the component mounting system 100, such as the management device 50. The communication unit 31ad is configured to communicate, for example, by wireless communication. The lighting unit 31ae includes a light source unit such as an LED, and is configured to light up and emit light under the control of the control unit 31ac. The lighting unit 31ae is provided at a position corresponding to each of the multiple arrangement lanes 31ab, and functions as an indicator that notifies the installation of the component supply unit 60 to the arrangement lane 31ab.

[0045] The display unit 31af is a monitor such as a liquid crystal monitor, and is capable of displaying information. The reading unit 31ag is a barcode reader that reads a barcode including information indicating the ID of the component supply unit 60 attached to the component supply unit 60. The component supply unit communication unit 31ah is provided in each of the multiple arrangement lanes 31ab. The component supply unit communication unit 31ah is configured to communicatively connect the component supply unit 60 arranged in the arrangement lane 31ab to the resupply stock unit 31a. The control unit 31ac is also capable of detecting the component supply unit 60 arranged in the arrangement lane 31ab based on the communication state between the component supply unit 60 and the component supply unit 60 by the component supply unit communication unit 31ah.

[0046] In this embodiment, the resupply stock unit 31a as the first arrangement unit 31 is configured to be capable of managing the arrangement location (location management) of managing the presence or absence of arrangement of the component supply unit 60 in the resupply stock unit 31a as the first arrangement unit 31 and the arrangement location. Specifically, the resupply stock unit 31a as the first arrangement unit 31 is configured to be capable of managing the arrangement location by communicating with the component supply unit 60 via the component supply unit communication unit 31ah. The resupply stock unit 31a as the first arrangement unit 31 acquires the ID of the component supply unit 60 stored in the memory of the component supply unit 60 by communicating with the component supply unit 60 via the component supply unit communication unit 31ah. This allows the resupply stock unit 31a as the first arrangement unit 31 to detect which arrangement lane 31ab the component supply unit 60 with which ID is arranged.

[0047] In this embodiment, the management device 50 is configured to notify a warning when it is detected that the component supply unit 60 has not been placed in the resupply stock unit 31a serving as the first placement unit 31 by a predetermined time before the component mounting device 14 runs out of components, through placement location management in the resupply stock unit 31a serving as the first placement unit 31. Details of the warning notification will be described later.

[0048] The recovery stock section 31b is configured to return used component supply sections 60 recovered from the component mounting device 14. The recovery stock section 31b is provided as a temporary storage section where used component supply sections 60 recovered by the exchange robot 21 are temporarily placed. The recovery stock section 31b has the same configuration as the refill stock section 31a, except that it is a shelf where used component supply sections 60 are placed. For this reason, although detailed description is omitted, the recovery stock section 31b has a storage section 31aa, a plurality of placement lanes 31ab, a control section 31ac, a communication section 31ad, a lighting section 31ae, a display section 31af, a reading section 31ag, and a component supply section communication section 31ah.

[0049] As shown in Fig. 4, the exchange robot 21 is an autonomously traveling robot. The exchange robot 21 is configured to transport the component supply unit 60 between the component mounting device 14 and the resupply stock unit 31a and the recovery stock unit 31b. The exchange robot 21 is configured to transport the component supply unit 60 to be used, which is acquired from the resupply stock unit 31a, to the component mounting device 14. The exchange robot 21 is also configured to transport the used component supply unit 60, which is recovered from the component mounting device 14, to the recovery stock unit 31b.

[0050] The exchange robot 21 has a running unit 21a and a storage unit 21b provided on the running unit 21a. The running unit 21a has a plurality of wheels 21aa as drive wheels that are driven to rotate by a motor, and is configured to run autonomously. The running unit 21a is, for example, an AGV (Automatic Guided Vehicle). The storage unit 21b is configured to be able to store a plurality of component supply units 60 arranged in a horizontal direction. In addition, the storage unit 21b is provided with a plurality of arrangement lanes 21c in which the component supply units 60 are arranged. The component supply units 60 are detachably attached to the arrangement lanes 21c by sliding them. The arrangement lanes 31ab of the supply stock unit 31a, the arrangement lanes 21c of the exchange robot 21, and the arrangement lanes 14b of the component mounting device 14 are provided to correspond to each other.

[0051] 6, the exchange robot 21 further includes a control unit 21d, a communication unit 21e, an insertion / removal unit 21f, a slide unit 21g, and a battery 21h. The control unit 21d is a control circuit that controls the operation of the exchange robot 21. The control unit 21d includes a processor for executing a predetermined program and a memory that stores the predetermined program. The communication unit 21e is configured to communicate with each device of the component mounting system 100, such as the management device 50. The communication unit 21e is configured to communicate, for example, by wireless communication.

[0052] 4, the insertion / removal unit 21f is configured to pull the component supply unit 60 into the storage unit 21b and push the component supply unit 60 out of the storage unit 21b under the control of the control unit 21d. The insertion / removal unit 21f removes the component supply unit 60 from the arrangement lane 31ab of the storage unit 31aa of the supply stock unit 31a and pulls it into the arrangement lane 21c of the storage unit 21b, thereby recovering the component supply unit 60 from the supply stock unit 31a to the exchange robot 21. The insertion / removal unit 21f also supplies the component supply unit 60 from the exchange robot 21 to the component mounting device 14 by pushing the component supply unit 60 out of the arrangement lane 21c of the storage unit 21b and inserting it into the arrangement lane 14b of the component mounting device 14.

[0053] The insertion / removal unit 21f also removes the component supply unit 60 from the arrangement lane 14b of the component mounting device 14 and pulls it into the arrangement lane 21c of the storage unit 21b, thereby recovering the component supply unit 60 from the component mounting device 14 to the exchange robot 21. The insertion / removal unit 21f also pushes out the component supply unit 60 from the arrangement lane 21c of the storage unit 21b and inserts it into the arrangement lane 31ab of the storage unit 31aa of the recovery stock unit 31b, thereby returning the component supply unit 60 from the exchange robot 21 to the recovery stock unit 31b. The insertion / removal unit 21f has a feed mechanism such as a ball screw mechanism capable of inserting and removing (pushing and pulling) the component supply unit 60, and a motor that drives the feed mechanism.

[0054] The slide unit 21g is configured to slide the multiple placement lanes 21c in the horizontal direction in which the multiple placement lanes 21c are arranged. The slide unit 21g has a feed mechanism such as a ball screw mechanism capable of sliding the multiple placement lanes 21c, and a motor that drives the feed mechanism. The battery 21h is a secondary battery that supplies power to each part of the exchange robot 21. The exchange robot 21 is configured to be driven by power supplied from the battery 21h.

[0055] (Transport operation of exchange robot) 7 to 12, the transport operation of the component supply unit 60 by the exchange robot 21 will be described. Note that the transport operation of the component supply unit 60 by the exchange robot 21 is performed when the component mounting device 14 runs out of components.

[0056] As shown in FIG. 7, the exchange robot 21 transports the component supply unit 60 so as to travel along a patrol line R1 based on an instruction from the management device 50. The patrol line R1 is a route from the supply stock unit 31a to the recovery stock unit 31b via the component mounting device 14. The patrol line R1 is a route including movement between the work area AR2 and the mounting area AR1. The exchange robot 21 acquires the component supply unit 60 from the supply stock unit 31a while moving along the patrol line R1, and supplies the acquired component supply unit 60 to the component mounting device 14. The exchange robot 21 also collects the out-of-part component supply unit 60 from the component mounting device 14 while moving along the patrol line R1, and returns the collected component supply unit 60 to the recovery stock unit 31b.

[0057] 8, as advance preparation, the worker W prepares the component supply unit 60 to be transported by the exchange robot 21 in the work area AR2. Specifically, the worker W obtains a reel R from a component rack 70 described later, and performs the work of attaching the obtained reel R to the main body 60a of the component supply unit 60 to which the reel R is not attached. In this way, the worker W prepares the component supply unit 60 in which the reel R is attached in the main body 60a. At this time, the worker W performs the work of preparing the component supply unit 60, for example, on the work desk T1.

[0058] 9, the worker W places the prepared component supply unit 60 in the determined placement lane 31ab of the supply stock unit 31a. Since the component supply unit 60 is placed in the supply stock unit 31a in this manner, the worker W does not need to hand over the component supply unit 60 to the exchange robot 21.

[0059] 10, the exchange robot 21 moves to the front of the supply stock unit 31a where the worker W has placed the component supply unit 60. Then, the exchange robot 21 uses the insertion / removal unit 21f to pull in and obtain the component supply unit 60 from the placement lane 31ab of the supply stock unit 31a to the placement lane 21c.

[0060] 11, the exchange robot 21 moves along the patrol line R1 to the front of the component mounting device 14 that requires the component supply unit 60 (i.e., the component mounting device 14 that has run out of components). The exchange robot 21 then uses the insertion / removal unit 21f to push out the component supply unit 60 to be used from the placement lane 21c to the placement lane 14b of the component mounting device 14 to replenish it, and also uses the insertion / removal unit 21f to pull in the out-of-component supply unit 60 from the placement lane 14b of the component mounting device 14 to obtain it. As a result, the out-of-component supply unit 60 is replaced with a new component supply unit 60 that holds a component.

[0061] Then, as shown in FIG. 12, the exchange robot 21 moves to the front of the designated collection stock unit 31b along the patrol line R1. Then, the exchange robot 21 pushes out the out-of-parts component supply unit 60 from the arrangement lane 21c to the designated arrangement lane 31ab of the collection stock unit 31b by the inserting / removing unit 21f and returns it. Then, the worker W collects the out-of-parts component supply unit 60 from the collection stock unit 31b at a predetermined timing and removes the reel R (i.e., the out-of-parts reel R) from the main body 60a of the collected component supply unit 60. In this way, since the out-of-parts component supply unit 60 is arranged in the collection stock unit 31b, the worker W does not need to receive the out-of-parts component supply unit 60 from the exchange robot 21.

[0062] As described above, the transport operation of the component supply unit 60 is performed by the exchange robot 21. Note that the transport operation of the component supply unit 60 shown in Figs. 7 to 12 is an example, and the transport operation of the component supply unit 60 by the exchange robot 21 is not particularly limited to the example shown in Figs. 7 to 12.

[0063] (Configuration of transport robot, rack placement unit and automated warehouse) Next, the configurations of the transport robot 22, the rack arrangement section 32a, the empty rack arrangement section 32b, and the automated warehouse 40 will be described with reference to FIGS.

[0064] 13, the transport robot 22 is an autonomously traveling robot. The transport robot 22 is configured to transport part racks 70 between the automated warehouse 40 and the rack arrangement unit 32a and the empty rack arrangement unit 32b. The transport robot 22 is configured to transport part racks 70 holding parts to be used that have been obtained from the automated warehouse 40 to the rack arrangement unit 32a. The transport robot 22 is also configured to transport empty part racks 70 that do not hold parts that have been collected from the empty rack arrangement unit 32b to the automated warehouse 40.

[0065] The part rack 70 is a rack capable of holding a plurality of reels R that hold parts. Specifically, the part rack 70 has a plurality of shelf sections 70a, each capable of holding a reel R. The plurality of shelf sections 70a are arranged in the vertical direction, and are configured so that a reel R is placed on each of the horizontal support surfaces. The transport robot 22 is capable of transporting a plurality of parts (a plurality of reels R) at once by transporting the part rack 70.

[0066] The transport robot 22 has a running section 22a and a receiving unit 22b provided on the running section 22a. The running section 22a has a plurality of wheels 22aa as drive wheels that are rotationally driven by a motor, and is configured to run autonomously. The running section 22a is, for example, an AGV (Automatic Guided Vehicle). The receiving unit 22b is configured to be able to receive and hold the part rack 70. In addition, the receiving unit 22b is configured to be able to hand over the held part rack 70.

[0067] Specifically, the receiving unit 22b is configured to receive and hold a part rack 70 holding parts (reels R) from the automated warehouse 40. The receiving unit 22b is also configured to deliver the part rack 70 holding parts (reels R) to the rack arrangement section 32a. The receiving unit 22b is also configured to receive and hold an empty part rack 70 not holding parts (reels R) from the empty rack arrangement section 32b. The receiving unit 22b is also configured to deliver the empty part rack 70 to the automated warehouse 40. The receiving unit 22b has a feed mechanism, such as rollers, capable of receiving and delivering the part rack 70.

[0068] 15, the transport robot 22 further includes a control unit 22c, a communication unit 22d, and a battery 22e. The control unit 22c is a control circuit that controls the operation of the transport robot 22. The control unit 22c includes a processor for executing a predetermined program and a memory that stores the predetermined program. The communication unit 22d is configured to communicate with each device of the component mounting system 100, such as the management device 50. The communication unit 22d is configured to communicate, for example, by wireless communication. The battery 22e is a secondary battery that supplies power to each part of the transport robot 22. The transport robot 22 is configured to be driven by power supplied from the battery 22e.

[0069] 13, the automated warehouse 40 is a warehouse that stores reels R holding parts and empty part racks 70 that do not hold parts. The automated warehouse 40 is configured to place reels R (parts) on empty part racks 70 and to retrieve the part racks 70 holding reels R (parts). The automated warehouse 40 has an entry / exit opening 40a through which the reels R and part racks 70 can be entered and retrieved.

[0070] As shown in FIG. 16, the automated warehouse 40 further includes a control unit 40b, a communication unit 40c, and a delivery unit 40d. The control unit 40b is a control circuit that controls the operation of the automated warehouse 40. The control unit 40b includes a processor for executing a predetermined program and a memory for storing the predetermined program. The communication unit 40c is configured to communicate with each device of the component mounting system 100, such as the management device 50. The communication unit 40c is configured to communicate, for example, by wireless communication. The delivery unit 40d is configured to hold the reel R (components) in the component rack 70 and to deliver the component rack 70 holding the reel R (components) from the inlet / outlet port 40a.

[0071] As shown in FIG. 14, the rack arrangement section 32a is a platform having a placement section 32aa on which a plurality of component racks 70 can be arranged in a horizontal direction. The rack arrangement section 32a is provided as a temporary placement section on which the component racks 70 are temporarily placed, which hold the reels R (components) to be used and which are to be supplied (mounted) to the component mounting device 14 transported by the transport robot 22. The placement section 32aa is provided to extend in a horizontal direction. The component racks 70 are placed on the placement section 32aa by sliding. The worker W removes the reels R from the component racks 70 placed on the placement section 32aa of the rack arrangement section 32a, and attaches them to the main body 60a of the component supply section 60. The worker W also moves the empty component racks 70 from which all the reels R have been removed, from the rack arrangement section 32a to the empty rack arrangement section 32b.

[0072] As shown in FIG. 16, the rack arrangement unit 32a further includes a control unit 32ab, a communication unit 32ac, and a rack presence / absence detection unit 32ad. The control unit 32ab is a control circuit that controls the operation of the rack arrangement unit 32a. The control unit 32ab includes a processor for executing a predetermined program and a memory for storing the predetermined program. The communication unit 32ac is configured to be able to communicate with each device of the component mounting system 100, such as the management device 50. The communication unit 32ac is configured to communicate, for example, by wireless communication. The rack presence / absence detection unit 32ad is configured to detect the presence or absence of the component rack 70 on the placement unit 32aa. The rack presence / absence detection unit 32ad is not particularly limited, but may be, for example, a photosensor that can optically detect the presence or absence of the component rack 70, or an operation switch that can detect the presence or absence of the component rack 70 by operating the operator W.

[0073] The empty rack arrangement section 32b is configured to accommodate empty part racks 70 from which a worker W has removed all reels R (parts). The empty rack arrangement section 32b is provided as a temporary placement section where used, empty part racks 70 are temporarily placed. Moreover, the empty rack arrangement section 32b has a similar configuration to the rack arrangement section 32a, except that it is a platform on which used, empty part racks 70 are placed. For this reason, although a detailed description will be omitted, the empty rack arrangement section 32b includes a placement section 32aa, a control section 32ab, a communication section 32ac, and a rack presence / absence detection section 32ad.

[0074] (Transport robot transport operation) Next, the operation of transporting the part rack 70 by the transport robot 22 will be described with reference to FIG.

[0075] As shown in FIG. 18, the transport robot 22 transports the part rack 70 along the movement flow line R2 based on an instruction from the management device 50. The movement flow line R2 is a route including movement between the automated warehouse 40 and the rack arrangement unit 32a and the empty rack arrangement unit 32b. The movement flow line R2 is also a route including movement between the warehouse area AR3 and the work area AR2. While moving along the movement flow line R2, the transport robot 22 acquires the part rack 70 from the automated warehouse 40 and arranges the acquired part rack 70 in the rack arrangement unit 32a. Also, while moving along the movement flow line R2, the transport robot 22 collects the empty part rack 70 from the empty rack arrangement unit 32b and returns the collected part rack 70 to the automated warehouse 40.

[0076] First, the automated warehouse 40 prepares a part rack 70 on which the reel R is arranged, and then removes the prepared part rack 70. The transport robot 22 moves to the front of the automated warehouse 40, and receives the part rack 70 removed from the automated warehouse 40 by the receiving unit 22b. The transport robot 22 then moves to the front of the determined rack arrangement section 32a along the movement flow line R2. The transport robot 22 then delivers the part rack 70 on the receiving unit 22b to the placement section 32aa of the rack arrangement section 32a by the receiving unit 22b. In this way, the part rack 70 is arranged in the rack arrangement section 32a, so that the worker W does not need to receive the part rack 70 from the transport robot 22.

[0077] Furthermore, the transport robot 22 moves in front of the empty rack arrangement section 32b where the empty part rack 70 is arranged at a predetermined timing, and receives the empty part rack 70 by the receiving unit 22b. The transport robot 22 then moves along the movement flow line R2 to the predetermined automated warehouse 40. The transport robot 22 then delivers the empty part rack 70 on the receiving unit 22b to the automated warehouse 40 by the receiving unit 22b. In this way, the part rack 70 is collected from the empty rack arrangement section 32b, so that the worker W does not need to deliver the empty part rack 70 to the transport robot 22.

[0078] In the manner described above, the transport robot 22 transports the part rack 70. Note that the transport operation of the part rack 70 shown in Fig. 18 is just an example, and the transport operation of the part rack 70 by the transport robot 22 is not particularly limited to the example shown in Fig. 18.

[0079] (Management Device Configuration) Next, the configuration of the management device 50 will be described with reference to FIGS.

[0080] 19, the management device 50 has a control unit 50a and a communication unit 50b. The control unit 50a is a control circuit that controls the operation of the component mounting system 100. The control unit 50a has a processor for executing a predetermined program and a memory that stores the predetermined program. The communication unit 50b is configured to communicate with each device of the component mounting system 100. The communication unit 50b is configured to communicate, for example, by wireless communication.

[0081] As shown in FIG. 20, the management device 50 has, as a software configuration, integrated management software 51 for integrally managing each device group of the component mounting system 100 (a group of the automated warehouse 40, a group of the rack arrangement units 32a, a group of the empty rack arrangement units 32b, a group of the transport robots 22, a group of the supply stock units 31a, a group of the recovery stock units 31b, a group of the exchange robots 21, and a group of the component mounting devices 14), and a plurality of group management software 52a to 52f for managing each device group of the component mounting system 100. Specifically, the management device 50 has, as group management software, an automated warehouse management software 52a, a rack arrangement unit management software 52b, a transport robot management software 52c, a stock unit management software 52d, an exchange robot management software 52e, and a mounting line management software 52f. The management device 50 may be configured to execute each software on one computer, or may be configured to execute each software on multiple computers.

[0082] The integrated management software 51 is configured to perform integrated management of each device group of the component mounting system 100 (the group of automated warehouses 40, the group of rack arrangement units 32a, the group of empty rack arrangement units 32b, the group of transport robots 22, the group of replenishment stock units 31a, the group of recovery stock units 31b, the group of exchange robots 21, and the group of component mounting devices 14) via the group management software 52a to 52f.

[0083] The automated warehouse management software 52a is configured to manage a group of automated warehouses 40 consisting of a plurality of automated warehouses 40 in the component mounting factory 200. The rack arrangement unit management software 52b is configured to manage a group of rack arrangement units 32a consisting of a plurality of rack arrangement units 32a in the component mounting factory 200, and a group of empty rack arrangement units 32b consisting of a plurality of empty rack arrangement units 32b in the component mounting factory 200. The transport robot management software 52c is configured to manage a group of transport robots 22 consisting of a plurality of transport robots 22 in the component mounting factory 200. The stock unit management software 52d is configured to manage a group of supply stock units 31a consisting of a plurality of supply stock units 31a in the component mounting factory 200, and a group of recovery stock units 31b consisting of a plurality of recovery stock units 31b. The exchange robot management software 52e is configured to manage a group of exchange robots 21 consisting of a plurality of exchange robots 21 in the component mounting factory 200. The mounting line management software 52 f is configured to manage a group of component mounting apparatuses 14 in the component mounting factory 200 .

[0084] 21, the management device 50 may have robot management software 52g instead of the transport robot management software 52c and the exchange robot management software 52e. The robot management software 52g is configured to manage a group of transport robots 22 consisting of a plurality of transport robots 22 and a group of exchange robots 21 consisting of a plurality of exchange robots 21 in the component mounting factory 200. In this case, the transport robot 22 and the exchange robot 21 are managed by a common software (robot management software 52g).

[0085] (Management Device Configuration) Next, the control process regarding part replenishment by management device 50 will be described with reference to FIGS.

[0086] 22, in step S1, the management device 50 uses the integrated management software 51 to predict a component shortage of the component mounting device 14. Specifically, the integrated management software 51 acquires the number of parts used, the number of parts remaining, and the line operation status (operation status such as in operation, stopped, under maintenance, etc.) based on information from the mounting line management software 52f. Then, the integrated management software 51 predicts a component shortage based on the number of parts used, the number of parts remaining, and the line operation status.

[0087] At this time, as shown in FIG. 23, the management device 50 creates a parts shortage prediction list. The parts shortage prediction list includes information on the part type, the target equipment, the equipment location, the number of parts used, the number of remaining parts, the number of boards that can be produced, the cycle time, the remaining time, and the predicted time of parts shortage. The information on the part type indicates the type of parts that will cause the parts shortage. The information on the target equipment indicates the component mounting equipment 14 where the parts shortage will occur. The information on the equipment location indicates the component placement position (placement lane 14b) in the component mounting equipment 14 where the parts shortage will occur. The information on the number of parts used indicates the number of parts used per board. The number of remaining parts indicates the current number of remaining parts. The information on the number of boards that can be produced indicates the number of boards S that can be produced with the current number of remaining parts. The number of boards that can be produced can be calculated by (number of remaining parts / number of used parts). The information on the cycle time indicates the time required to produce one board. The information on the remaining time indicates the time until the parts shortage occurs. The remaining time can be calculated by (number of boards that can be produced x cycle time). The information on the predicted time of parts shortage indicates the time when a parts shortage is predicted to occur. The predicted time of parts shortage can be calculated by (current time + remaining time).

[0088] 22, in step S2, the management device 50 creates a supply plan for components to the component mounting device 14 based on information related to the time when the component mounting device 14 will run out of components (component shortage prediction list) using the integrated management software 51. In this embodiment, as shown in FIGS. 23 and 24, the integrated management software 51 creates a supply plan including target work completion times for the robot 20 (exchange robot 21 and transport robot 22), the automated warehouse 40, and the worker W by calculating backwards from the time when the component mounting device 14 will run out of components based on the work times of the robot 20 (exchange robot 21 and transport robot 22), the automated warehouse 40, and the worker W.

[0089] Specifically, based on the parts shortage prediction list, the integrated management software 51 calculates the shipping operation time required for the automated warehouse 40 to ship the parts rack 70, the transport operation time required for the transport robot 22 to transport the parts rack 70, the installation operation time required for the worker W to install the reel R to the main body 60a of the parts supply unit 60, and the replacement operation time required for the replacement robot 21 to replace the parts supply unit 60.

[0090] Then, the integrated management software 51 sets the target work completion time of the exchange robot 21, the transport robot 22, the automated warehouse 40, and the worker W by calculating backwards from the time when the component mounting device 14 ran out of components based on the calculated work time for each component. In the example shown in Fig. 24, the time about 3.5 hours before the time when the component ran out of components is set as the target work completion time of the automated warehouse 40, the time about 3 hours before the time when the component ran out of components is set as the target work completion time of the transport robot 22, the time about 2 hours before the time when the component ran out of components is set as the target work completion time of the worker W, and the time about 1 hour before the time when the component ran out of components is set as the target work completion time of the exchange robot 21.

[0091] The integrated management software 51 may set the target work completion time of the exchange robot 21, the transport robot 22, the automated warehouse 40, and the worker W by performing a back calculation based on a predetermined fixed value without calculating each work time. For example, the integrated management software 51 may set the target work completion time of the automated warehouse 40 to a time about 3.5 hours (fixed value) before the time of parts shortage, set the target work completion time of the transport robot 22 to a time about 3 hours (fixed value) before the time of parts shortage, set the target work completion time of the worker W to a time about 2 hours (fixed value) before the time of parts shortage, and set the target work completion time of the exchange robot 21 to a time about 1 hour (fixed value) before the time of parts shortage, without calculating each work time.

[0092] In addition, in this embodiment, the integrated management software 51 creates a work group for the tour of parts replacement by the replacement robot 21, and creates a supply plan for the created work group. In the example shown in Fig. 23 and Fig. 24, "Parts A", "Parts B", "Parts C", "Parts D", and "Parts E" are parts that the replacement robot 21 replaces in one tour, so work groups for these five types of parts are created. The integrated management software 51 creates a supply plan for each work group.

[0093] The supply plan also includes a parts delivery / transport list, a tape set operator instruction list, and a supply instruction list. The parts delivery / transport list is instruction information related to parts delivery to the automated warehouse management software 52a (automated warehouse 40) and the transport robot management software 52c (transport robot 22). The parts delivery / transport list includes information on the part type, number of parts, target delivery completion time, work area, rack arrangement section, and target transport completion time. The part type information indicates the type of part that will run out of parts. The number of parts information indicates the number of parts (reels R). The target delivery completion time indicates the target work completion time of the automated warehouse 40. The work area information indicates the work area AR2 of the transport destination. The rack arrangement section information indicates the rack arrangement section 32a of the transport destination. The target transport completion time information indicates the target work completion time of the transport robot 22.

[0094] The tape set worker instruction list is instruction information regarding part supply to worker W and the stock section management software 52d (supply stock section 31a and recovery stock section 31b). The tape set worker instruction list includes information on part type, quantity, stock section location, and target work completion time. The part type information indicates the type of part that will run out of parts. The quantity information indicates the number of parts (reel R). The stock section location information indicates the placement lane 31ab of the placement destination supply stock section 31a. The target work completion time indicates the target work completion time for worker W.

[0095] The supply instruction list is instruction information regarding the supply of parts to the exchange robot management software 52e (exchange robot 21). The supply instruction list includes information on part type, number, stock section location, target equipment, equipment location, and target work completion time. The part type information indicates the type of part that will run out of parts. The number information indicates the number of parts (reel R). The stock section location information indicates the placement lane 31ab of the placement destination supply stock section 31a. The target equipment information indicates the component mounting equipment 14 where the part shortage will occur. The equipment location information indicates the placement position of the part (placement lane 14b) in the component mounting equipment 14 where the part shortage will occur. The target work completion time indicates the target work completion time for the exchange robot 21.

[0096] Then, as shown in FIG. 22, in step S3, the management device 50 issues an outgoing instruction to the automated warehouse 40 by the automated warehouse management software 52a. Specifically, as shown in FIG. 25, the automated warehouse management software 52a issues an outgoing instruction to the automated warehouse 40 and manages outgoing of the automated warehouse 40 based on the part outgoing / transportation list. Based on the part outgoing / transportation list, the automated warehouse management software 52a checks the type of part to be outgoing, the completion status of the warehousing work of the outgoing part, and the presence or absence of part racks 70 in the automated warehouse 40. In addition, the automated warehouse management software 52a specifies the automated warehouse 40 from which the part racks 70 are to be outgoing and the part racks 70 to be outgoing from the automated warehouse 40, and issues an outgoing instruction to the automated warehouse 40 so that the part racks 70 are outgoing by the target outgoing completion time. In the example shown in FIG. 25, the automated warehouses 40 of "Storage-A" and "Storage-B" are specified as the automated warehouses 40 from which the part racks 70 are to be outgoing. Furthermore, the part racks 70 of "RACK-11A" and "RACK-22B" are specified as the part racks 70 to be removed from the automated warehouse 40. The automated warehouse management software 52a also manages the removal completion time and performs delay determination. If a delay is detected by the delay determination, the automated warehouse management software 52a notifies a warning to the worker W as the manager.

[0097] 22, in step S4, the automated warehouse 40 performs a retrieval operation for the part rack 70. In step S4, the automated warehouse 40 specified by the automated warehouse management software 52a causes the part rack 70 specified by the automated warehouse management software 52a to hold the part specified by the automated warehouse management software 52a, and retrieves the part rack 70 holding the part.

[0098] In step S5, the management device 50 issues a transport instruction to the transport robot 22 by the transport robot management software 52c. Specifically, as shown in FIG. 25, the transport robot management software 52c issues a transport instruction to the transport robot 22 and manages the transport of the transport robot 22 based on the part delivery / transport list. The transport robot management software 52c checks the type of part to be delivered, the work area AR2 of the transport destination, and the rack arrangement unit 32a of the transport destination based on the part delivery / transport list. In addition, the transport robot management software 52c checks the automated warehouse 40 of the transport source, the part rack 70 delivered from the automated warehouse 40 of the transport source, and the completion status of the delivery work of the automated warehouse 40 of the transport source based on the information of the automated warehouse management software 52a. In addition, the transport robot management software 52c checks the availability of the rack arrangement unit 32a of the transport destination based on the information of the rack arrangement unit management software 52b.

[0099] The transport robot management software 52c also checks the available transport robots 22, the charging status of the batteries 22e of the available transport robots 22, and the available movement routes. The transport robot management software 52c then designates the transport robot 22 that transports the part rack 70, and issues a transport instruction to the transport robot 22 to transport the part rack 70 by the target transport completion time. In the example shown in FIG. 25, the transport robot 22 of "ROBOT-33A" is designated as the transport robot 22 that transports the part rack 70. In the example shown in FIG. 25, one transport robot 22 of "ROBOT-33A" transports the part rack 70 twice, but the two transport robots 22 may transport the part rack 70 once each. The transport robot management software 52c also manages the transport completion time and performs delay determination. If a delay is detected by the delay determination, the transport robot management software 52c notifies a warning to the operator W as the manager.

[0100] 22, in step S6, the transport robot 22 performs a transport operation of the part rack 70. In step S6, the transport robot 22 specified by the transport robot management software 52c moves to the front of the automated warehouse 40 specified by the transport robot management software 52c. The transport robot 22 then receives the part rack 70 that has been removed from the automated warehouse 40 by the receiving unit 22b. The transport robot 22 then transports the received part rack 70 to the rack arrangement unit 32a specified by the transport robot management software 52c.

[0101] Furthermore, in step S7, the management device 50 checks the rack arrangement unit 32a using the rack arrangement unit management software 52b. In step S7, the rack arrangement unit management software 52b checks the presence or absence of the part rack 70 in the rack arrangement unit 32a based on the detection result of the part rack 70 by the rack presence / absence detection unit 32ad of the rack arrangement unit 32a.

[0102] In step S8, the worker W attaches the reel R to the main body 60a of the component supply unit 60. In step S9, the management device 50 checks the supply stock unit 31a using the stock unit management software 52d.

[0103] Specifically, as shown in FIG. 26, the stock section management software 52d performs work instructions to the worker W and placement management of the parts supply section 60 in the supply stock section 31a based on the tape set worker instruction list. The stock section management software 52d checks the type of parts to be placed in the supply stock section 31a, the number of parts to be placed in the supply stock section 31a, and the placement lane 31ab of the supply stock section 31a, based on the tape set worker instruction list. The stock section management software 52d also checks the arrival status of the parts racks 70 in the rack placement section 32a based on the information of the rack placement section management software 52b. The stock section management software 52d also checks the availability of the supply stock section 31a based on the communication result with the parts supply section 60 by the parts supply section communication section 31ah of the supply stock section 31a. That is, the stock section management software 52d performs placement location management for managing the presence or absence of placement of the parts supply section 60 in the supply stock section 31a and the placement location together with the supply stock section 31a.

[0104] The stock section management software 52d also issues a work instruction to the worker W to specify the ID of the component supply unit 60 that holds the components (reel R) and to arrange the component supply unit 60 by the target work completion time. The stock section management software 52d issues a work instruction to the worker W, for example, by displaying information as shown in Fig. 26 on a monitor provided in the work area AR2.

[0105] The worker W acquires the reel R holding the part specified by the stock section management software 52d from the part rack 70 transported from the automated warehouse 40 by the transport robot 22. The worker W then attaches the acquired reel R to the main body 60a of the part supply unit 60 having the ID specified by the stock section management software 52d, and prepares the part supply unit 60 to be placed in the supply stock section 31a. The worker W then arranges the prepared part supply unit 60 in the arrangement lane 31ab of the supply stock section 31a specified by the stock section management software 52d.

[0106] In addition, the stock section management software 52d manages the work completion time (placement completion time) and performs delay judgment. If a delay is detected by the delay judgment, the stock section management software 52d notifies a warning to the worker W as a manager.

[0107] In step S10, the management device 50 issues an exchange instruction to the exchange robot 21 by the exchange robot management software 52e. Specifically, as shown in FIG. 27, the exchange robot management software 52e issues an exchange instruction to the exchange robot 21 and manages the exchange of the exchange robot 21 based on the supply instruction list. Based on the supply instruction list, the exchange robot management software 52e checks the type of the part to be replaced, the arrangement lane 31ab of the supply stock unit 31a at the transport source, and the arrangement lane 14b of the component mounting device 14 at the transport destination. Based on the information of the stock unit management software 52d, the exchange robot management software 52e checks the arrangement status of the component supply unit 60 of the supply stock unit 31a at the transport source. Based on the information of the mounting line management software 52f, the exchange robot management software 52e checks the availability of the arrangement lane 14b of the component mounting device 14 at the transport destination.

[0108] In addition, the exchange robot management software 52e checks the free exchange robot 21, the charging status of the battery 21h of the free exchange robot 21, and the free patrol route. Then, the exchange robot management software 52e designates the exchange robot 21 that transports and replaces the part supply unit 60, and issues a transport instruction to the exchange robot 21 to transport and replace the part supply unit 60 by the target work completion time. In the example shown in FIG. 27, the exchange robot 21 of "ROBOT-44B" is designated as the exchange robot 21 that transports and replaces the part supply unit 60. In addition, the exchange robot management software 52e manages the work completion time (replacement completion time) and performs delay judgment. When a delay is detected by the delay judgment, the exchange robot management software 52e notifies a warning to the worker W as the manager.

[0109] Then, as shown in FIG. 22, in step S11, the exchange robot 21 performs the replacement work of the component supply unit 60. In step S11, the exchange robot 21 designated by the exchange robot management software 52e moves in front of the supply stock unit 31a designated by the exchange robot management software 52e. Then, the exchange robot 21 acquires the component supply unit 60 from the arrangement lane 31ab of the supply stock unit 31a designated by the exchange robot management software 52e by the insertion / removal unit 21f. Then, the exchange robot 21 transports the acquired component supply unit 60 to the arrangement lane 14b of the component mounting device 14 designated by the exchange robot management software 52e for replacement. In addition, the exchange robot 21 transports the component supply unit 60 collected from the component mounting device 14 by the replacement to the collection stock unit 31b for return.

[0110] Then, in step S12, the management device 50 confirms, by the integrated management software 51, that the replacement of the component supply unit 60 specified in the supply plan has been completed. Then, the control process related to the component replenishment by the management device 50 is terminated. The control process related to the component replenishment by the management device 50 is performed, for example, at predetermined time intervals (such as every few hours). As a result, components are appropriately replenished to the component mounting device 14 that is running out of components.

[0111] In the above explanation, for convenience, the processing of steps S3 to S11 of the flowchart shown in FIG. 22 has been explained in the order of the flowchart. However, strictly speaking, the processing of steps S3 to S11 of the flowchart shown in FIG. 22 is not performed in the order of the flowchart, and processing that can be performed in parallel is performed in parallel with each other.

[0112] (Control process for warnings during parts supply) Next, with reference to FIG. 28, a control process regarding a warning when the component supply unit 60 is not arranged in the replenishing stock unit 31a will be described based on a flowchart.

[0113] First, in step S21, the management device 50 judges whether or not all of the component supply units 60 to be arranged in the supply stock unit 31a have been arranged. In step S21, the management device 50 judges whether or not all of the component supply units 60 to be arranged in the supply stock unit 31a have been arranged based on the information of the arrangement location management by the supply stock unit 31a. If it is judged that all of the component supply units 60 to be arranged in the supply stock unit 31a have been arranged, the process proceeds to step S22. Then, in step S22, the management device 50 issues an exchange instruction to the exchange robot 21. Also, if it is judged in step S21 that all of the component supply units 60 to be arranged in the supply stock unit 31a have not been arranged, the process proceeds to step S23.

[0114] Then, in step S23, the management device 50 judges whether or not the current time has passed the target task completion time of the worker W. If it is judged that the current time has not passed the target task completion time of the worker W, the processing of step S21 is repeated. On the other hand, if it is judged that the current time has passed the target task completion time of the worker W, the processing proceeds to step S24.

[0115] Then, in step S24, the management device 50 notifies the worker W as the administrator of the warning. In step S24, for example, the management device 50 notifies the warning to a mobile terminal carried by the worker W as the administrator.

[0116] Then, in step S25, the worker W as the manager checks whether or not there are parts (reels R) on the work desk T1 in the work area AR2. If there are parts (reels R) on the work desk T1 in the work area AR2, the process proceeds to step S28. If there are no parts (reels R) on the work desk T1 in the work area AR2, the process proceeds to step S26.

[0117] Then, in step S26, the worker W as the manager checks whether or not there is a part (reel R) in the part rack 70 arranged in the rack arrangement section 32a. If there is a part (reel R) in the part rack 70 arranged in the rack arrangement section 32a, the process proceeds to step S28. If there is no part (reel R) in the part rack 70 arranged in the rack arrangement section 32a, the process proceeds to step S27.

[0118] Then, in step S27, the worker W as the manager manually removes the parts (reels R) from the automated warehouse 40. Then, the process proceeds to step S28.

[0119] Then, in step S28, the worker W as the manager prepares the component supply unit 60 by attaching the components (reel R) to the main body 60a of the component supply unit 60. Then, the worker W as the manager places the prepared component supply unit 60 in the supply stock unit 31a. Then, the process proceeds to step S21, where it is determined that all of the component supply units 60 to be placed in the supply stock unit 31a have been placed. Then, the process proceeds to step S22, where an exchange instruction is given to the exchange robot 21.

[0120] (Effects of this embodiment) In this embodiment, the following effects can be obtained.

[0121] In this embodiment, as described above, the placement section 30 capable of placing a plurality of component units transported by the robot 20 is provided in the work area AR2 where the worker W works, which is separate from the mounting area AR1. This allows the placement section 30 to be provided as a buffer section for the component units, so that the worker W is less likely to be tied up in time for tasks such as transferring component units to the robot 20 or receiving component units from the robot 20. As a result, unlike in cases where the worker W is significantly tied up in time, the worker W is relatively free to use the restroom, take a meal break, and perform other tasks, so that when the robot 20 transports component units, the worker W's time can be used effectively to improve work efficiency. Also, unlike the case where the placement section 30 is provided in the mounting line 10, the placement section 30 is provided in the work area AR2, so that when there are a plurality of mounting lines 10, the placement section 30 can be used as a common placement section 30 for the plurality of mounting lines 10.

[0122] In this embodiment, as described above, the robot 20 includes the exchange robot 21 that transports the component supply unit 60 as a component unit between the work area AR2 and the component mounting device 14. The placement unit 30 also includes a first placement unit 31 in which a plurality of component supply units 60 transported by the exchange robot 21 can be placed. This allows the first placement unit 31 to be provided as a buffer unit for the component supply units 60, so that the worker W is not significantly tied up in time for tasks such as transferring the component supply unit 60 to the exchange robot 21 or receiving the component supply unit 60 from the exchange robot 21. As a result, the worker W can effectively use his or her time to improve work efficiency.

[0123] In the present embodiment, as described above, the first arrangement section 31 includes a supply stock section 31a capable of arranging a plurality of component supply sections 60 that the exchange robot 21 transports from the work area AR2 to the component mounting device 14 to supply, and a recovery stock section 31b capable of arranging a plurality of component supply sections 60 that the exchange robot 21 retrieves from the component mounting device 14 to the work area AR2. This allows the supply stock section 31a to be provided as a buffer section for the component supply sections 60 to be replenished, so that the worker W is not significantly tied up in time for the task of transferring the component supply sections 60 to the exchange robot 21. In addition, the recovery stock section 31b can be provided as a buffer section for the retrieved component supply sections 60, so that the worker W is not significantly tied up in time for the task of receiving the component supply sections 60 from the exchange robot 21. As a result, the worker W can use his or her time more effectively to improve work efficiency. In addition, when the resupply stock section 31a is provided as a buffer section for the component supply section 60 to be replenished, the worker W can prepare the component supply section 60 with comparatively good time flexibility. As a result, the variation in the time required for the preparation of the component supply section 60 can be absorbed.

[0124] In the present embodiment, as described above, the first placement unit 31 is configured to be capable of managing the placement location of the component supply unit 60 in the first placement unit 31, that is, whether the component supply unit 60 is placed and the placement location of the component supply unit 60. This allows the first placement unit 31 to manage the placement location of the component supply unit 60. As a result, the progress of supply of the component supply unit 60 to the component mounting device 14 can be managed.

[0125] In this embodiment, as described above, the resupply stock unit 31a of the first placement unit 31 has a plurality of placement lanes 31ab in which the component supply units 60 are respectively placed, and a component supply unit communication unit 31ah provided in each of the plurality of placement lanes 31ab, and is configured to be able to manage placement locations by communicating with the component supply units 60 via the component supply unit communication unit 31ah. This allows the component supply unit communication unit 31ah to know which component supply unit 60 is placed in which placement lane 31ab among the plurality of placement lanes 31ab. As a result, the resupply stock unit 31a of the first placement unit 31 can easily manage the placement locations of the component supply units 60.

[0126] Furthermore, in this embodiment, as described above, when it is detected by the placement location management that the component supply unit 60 has not been placed in the resupply stock unit 31a of the first placement unit 31 by a predetermined time before the component mounting device 14 runs out of components, a warning is issued. This allows the user to recognize that the component supply unit 60 is late in resupplying the component mounting device 14. As a result, even if the component supply unit 60 is late in resupplying the component mounting device 14, the component supply unit 60 can make time to resupply the component mounting device 14.

[0127] In addition, in this embodiment, as described above, the component mounting system 100 includes an automated warehouse 40 that is provided in a warehouse area AR3 separate from the mounting area AR1 and the work area AR2 and that delivers the component racks 70 as component units. The robot 20 also includes a transport robot 22 that transports the component racks 70 between the automated warehouse 40 and the work area AR2. The placement unit 30 includes a second placement unit 32 that can place multiple component racks 70 transported by the transport robot 22. This allows the second placement unit 32 to be provided as a buffer unit for the component racks 70, so that the worker W does not have to spend a lot of time on tasks such as transferring the component racks 70 to the transport robot 22 or receiving the component racks 70 from the transport robot 22. As a result, the worker W can use his or her time effectively to improve work efficiency.

[0128] In the present embodiment, as described above, the second arrangement section 32 includes the rack arrangement section 32a capable of arranging a plurality of part racks 70 holding parts to be transported by the transport robot 22 from the automated warehouse 40 to the work area AR2, and the empty rack arrangement section 32b capable of arranging a plurality of empty part racks 70 not holding parts to be collected by the transport robot 22 from the work area AR2 and transported to the automated warehouse 40. This allows the rack arrangement section 32a to be provided as a buffer section for the part racks 70, so that the worker W is not significantly tied up in time for the task of receiving the part racks 70 from the transport robot 22. In addition, the empty rack arrangement section 32b can be provided as a buffer section for the empty part racks 70, so that the worker W is not significantly tied up in time for the task of handing over the empty part racks 70 to the transport robot 22. As a result, the worker W can use his / her time more effectively and improve the work efficiency.

[0129] Furthermore, in this embodiment, as described above, the management device 50 is configured to create a supply plan for components to the component mounting device 14 based on information related to the time when the component mounting device 14 runs out of components. This allows components to be supplied to the component mounting device 14 in a planned manner according to the supply plan, making it possible to easily deal with a component supply rush and to optimize (minimize) the number of robots 20 operating to supply components.

[0130] In addition, in this embodiment, as described above, the component mounting system 100 includes an automated warehouse 40 that is provided in a warehouse area AR3 separate from the mounting area AR1 and the work area AR2 and that delivers component units. The management device 50 is configured to create a supply plan including the target work completion time of the robot 20, the automated warehouse 40, and the worker W by calculating backwards from the time when the component mounting device 14 runs out of components based on the work times of the robot 20, the automated warehouse 40, and the worker W. This allows the robot 20, the automated warehouse 40, and the worker W to easily grasp the target work completion time from the supply plan, and therefore allows the robot 20, the automated warehouse 40, and the worker W to easily complete the work by the target work completion time. As a result, it is possible to easily prevent the component mounting device 14 from stopping due to the component shortage of the component mounting device 14.

[0131] In this embodiment, as described above, the management device 50 is configured to create a work group for the robot 20's patrol for replacing parts, and to create a supply plan for the created work group. This allows a supply plan to be created for each work group, making it easy to prevent the supply plan from becoming excessively large. In addition, since a supply plan can be created for each work group, it is easy to manage the progress of the supply plan for each work group.

[0132] (Modification) The embodiments disclosed herein should be considered to be illustrative and not restrictive in all respects. The scope of the present invention is indicated by the claims, not by the description of the embodiments above, and further includes all modifications (variations) within the meaning and scope of the claims.

[0133] For example, in the above embodiment, an example is shown in which one mounting area and one warehouse area are provided, and two work areas are provided, but the present invention is not limited to this. In the present invention, the number of mounting areas, work areas, and warehouse areas may be any number.

[0134] In the above embodiment, the robot includes an exchange robot and a transport robot, but the present invention is not limited to this. For example, the robot may include only one of the exchange robot and the transport robot. Also, the robot may include a robot other than the exchange robot and the transport robot.

[0135] In the above embodiment, the arrangement section includes the first arrangement section and the second arrangement section, but the present invention is not limited to this. For example, the arrangement section may include only one of the first arrangement section and the second arrangement section. Also, the arrangement section may include an arrangement section other than the first arrangement section and the second arrangement section.

[0136] In the above embodiment, the first arrangement section includes a supply stock section and a recovery stock section, but the present invention is not limited to this. For example, the first arrangement section may include only one of the supply stock section and the recovery stock section. Also, the first arrangement section may include a stock section other than the supply stock section and the recovery stock section.

[0137] In the above embodiment, the second arrangement section includes a rack arrangement section and an empty rack arrangement section, but the present invention is not limited to this. For example, the second arrangement section may include only one of the rack arrangement section and the empty rack arrangement section. Also, the second arrangement section may include a rack section other than the rack arrangement section and the empty rack arrangement section.

[0138] In the above embodiment, the supply stock unit is configured to be able to manage the location of the supply stock unit, but the present invention is not limited to this. For example, the supply stock unit does not have to be configured to be able to manage the location of the supply stock unit.

[0139] In the above embodiment, an example is shown in which the software for managing the component mounting system includes the integrated management software and the multiple group management software, but the present invention is not limited to this. In the present invention, the software for managing the component mounting system may have any configuration as long as it is capable of managing the component mounting system.

[0140] In the above embodiment, the management device creates a work group for one round of part replacement by the replacement robot, and creates a supply plan for the created work group, but the present invention is not limited to this. For example, the management device may create a work group for multiple rounds of part replacement by the replacement robot, and create a supply plan for the created work group. [Explanation of symbols]

[0141] 14 Component mounting equipment 20. Robot 21 Replacement robot (first robot) 22 Transport robot (second robot) 30 Placement section 31 1st placement part 31a Supply Stock Section 31ab Placement lane 31ah Parts Supply Department Communication Department 31b Collection Stock Section 32 Second placement part 32a Rack placement section 32b Empty rack placement area 40 Automated Warehouse 60 Parts Supply Department (Parts Unit) 70 Parts rack (parts unit) 100 Component Mounting System AR1 Mounting area AR2 Work Area AR3 Warehouse Area S-substrate W Worker

Claims

1. a component mounting device provided in the mounting area for mounting components on a board; a robot that transports a component unit capable of holding the component; a placement unit that is provided in a work area where workers work, separate from the mounting area and the warehouse area, and capable of placing a plurality of the component units transported by the robot; the robot includes a first robot that transports a component supply unit as the component unit between the work area and the component mounting device, the work area is an area in which the worker performs an operation of attaching a reel that holds the components to the component supply unit or an operation of removing the reel from the component supply unit, the placement unit includes a first placement unit that is provided in the work area and on which a plurality of the component supply units transported by the first robot can be placed; A component mounting system comprising: a storage section that stores the component supply section; and an insertion / removal unit that inserts or removes the component supply section between the storage section and the first placement section, and between the storage section and the component mounting device.

2. A component mounting device provided in a mounting area for mounting components on a board; a robot that transports a component unit capable of holding the component; a placement unit that is provided in a work area where workers work, separate from the mounting area and the warehouse area, and capable of placing a plurality of the component units transported by the robot; the robot includes a first robot that transports a component supply unit as the component unit between the work area and the component mounting device, the work area is an area in which the worker performs an operation of attaching a reel that holds the components to the component supply unit or an operation of removing the reel from the component supply unit, the placement unit includes a first placement unit that is provided in the work area and on which a plurality of the component supply units transported by the first robot can be placed; The component mounting system includes: a replenishment stock unit capable of arranging a plurality of the component supply units to be used which the first robot will transport from the work area to the component mounting device to replenish the components; and a recovery stock unit capable of arranging a plurality of the used component supply units which the first robot will recover from the component mounting device and transport to the work area.

3. 3. The component mounting system according to claim 1, wherein the first placement section is configured to be capable of managing placement locations of the component supply sections in the first placement section, the placement locations being managed.

4. 4. The component mounting system of claim 3, wherein the first placement unit has a plurality of placement lanes in which the component supply units are respectively placed, and a component supply unit communication unit provided in each of the plurality of placement lanes, and is configured to be able to manage the placement locations by communicating with the component supply units via the component supply unit communication unit.

5. 5. The component mounting system according to claim 3, further comprising a component supply unit that is arranged to supply a component to the first placement unit when the component supply unit is not placed in the first placement unit by a predetermined time before the component mounting device runs out of components.

6. an automated warehouse that is provided in the warehouse area separate from the mounting area and the work area and that outputs part racks as part units; the robot includes a second robot that transports the part rack between the automated warehouse and the work area, 6. The component mounting system according to claim 1, wherein the placement section includes a second placement section capable of placing a plurality of the component racks transported by the second robot.

7. A component mounting device provided in the mounting area for mounting components on the board; a robot that transports a component unit capable of holding the component; a placement unit that is provided in a work area where workers work, separate from the mounting area and the warehouse area, and capable of placing a plurality of the component units transported by the robot; the robot includes a first robot that transports a component supply unit as the component unit between the work area and the component mounting device, the work area is an area in which the worker performs an operation of attaching a reel that holds the components to the component supply unit or an operation of removing the reel from the component supply unit, the placement unit includes a first placement unit that is provided in the work area and on which a plurality of the component supply units transported by the first robot can be placed; an automated warehouse that is provided in the warehouse area separate from the mounting area and the work area and that outputs part racks as part units; the robot includes a second robot that transports the part rack between the automated warehouse and the work area, the placement unit includes a second placement unit capable of placing a plurality of the part racks transported by the second robot, The component mounting system includes: a rack placement unit capable of placing a plurality of the component racks holding the components to be transported by the second robot from the automated warehouse to the work area; and an empty rack placement unit capable of placing a plurality of empty component racks not holding the components to be retrieved by the second robot from the work area and transported to the automated warehouse.

8. The component mounting system according to any one of claims 1 to 7, configured to create a supply plan for the components to the component mounting device based on information regarding the time when the component mounting device will run out of components.

9. A component mounting device provided in the mounting area for mounting components on a board; a robot that transports a component unit capable of holding the component; a placement unit that is provided in a work area where workers work, separate from the mounting area and the warehouse area, and capable of placing a plurality of the component units transported by the robot; the robot includes a first robot that transports a component supply unit as the component unit between the work area and the component mounting device, the work area is an area in which the worker performs an operation of attaching a reel that holds the components to the component supply unit or an operation of removing the reel from the component supply unit, the placement unit includes a first placement unit that is provided in the work area and on which a plurality of the component supply units transported by the first robot can be placed; a supply plan for the component mounting device is created based on information about a time when the component mounting device runs out of components; an automated warehouse that is provided in the warehouse area separate from the mounting area and the work area and that outputs the component units; a component mounting system configured to create the supply plan including target work completion times for the robot, the automated warehouse, and the worker by calculating the working times of the robot, the automated warehouse, and the worker, and calculating backwards from a time when the component mounting device runs out of components based on the calculated working times.

10. 10. The component mounting system according to claim 8, further comprising: a work group for a plurality of tours of the replacement of the components by the robot; and a supply plan for the work group.

Citation Information

Patent Citations

  • Component mounting line

    JP2020014019A

  • Component packaging system

    JP2021016009A

  • Preparation work support system

    WO2015019412A1

  • Operation management system and component mounting system

    WO2019187033A1

  • Component replenishment management system and component mounting system

    WO2019229881A1