Electric energy management system, electric energy management method, and electric energy management program

The power amount management system addresses the challenge of managing CO2 emissions in dispersed organizational structures by using hierarchical structures and conversion information to calculate and display emissions accurately and comprehensively.

JP7603269B1Active Publication Date: 2024-12-20RVSTA INC
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
JP2024157659
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2024-09-11
Publication Date
2024-12-20
Estimated Expiration
2044-09-11

AI Technical Summary

Technical Problem

Existing systems fail to accurately manage CO2 emissions across organizational structures with branches scattered in various regions, lacking a comprehensive understanding of energy use and emissions in these dispersed locations.

Method used

A power amount management system that utilizes a storage unit to store hierarchical structures and conversion information for CO2 emission calculations, an acquisition unit to gather power classifications and amounts, and a calculation unit to determine CO2 emissions in specific dependent ranges based on these structures and information.

Benefits of technology

Enables easy and accurate management of CO2 emissions by allowing users to specify ranges and types within organizational structures, providing detailed breakdowns and comparisons of emissions across locations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007603269000001_ABST
    Figure 0007603269000001_ABST
Patent Text Reader

Abstract

The present invention relates to an energy management system, an energy management method, and an energy management program. The power management system 1 includes a storage unit, an acquisition unit, and a calculation unit. The storage unit stores a hierarchical structure indicating the subordinate relationships between a plurality of locations, and conversion information for converting the amount of electric power for each electric power classification based on predetermined conditions into an amount of CO2 emission. The acquisition unit acquires the power classification and the amount of power for each power classification at each location and stores them in the memory unit in association with the hierarchical structure, and the calculation unit calculates the CO2 emissions for a specific dependent range specified by the user in the hierarchical structure based on the amount of power associated with the hierarchical structure and the conversion information.
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to an energy management system, an energy management method, and an energy management program. [Background technology]

[0002] Conventionally, various efforts have been made in companies to manage their CO2 emissions.

[0003] Patent Document 1 discloses an environmental information aggregation system that utilizes an organizational hierarchy and a side hierarchy (such as power consumption) to determine in which areas of a hierarchical organization energy consumption should be reduced, enabling efficient energy usage management. [Prior art documents] [Patent documents]

[0004] [Patent Document 1] JP 2013-186771 A Summary of the Invention [Problem to be solved by the invention]

[0005] Incidentally, a company has branches, factories, etc. scattered across various regions. Patent Document 1 does not take into consideration accurately grasping the CO2 emissions from these scattered organizations.

[0006] The present invention has been made in consideration of the problems with the prior art described above, and its purpose is to provide an electricity management system that can simply and accurately manage CO2 emissions in an organizational structure scattered across various locations. [Means for solving the problem]

[0007] In order to solve the above problems, the present invention provides an energy management system for managing an amount of energy, The power management system includes a storage unit, an acquisition unit, and a calculation unit. The storage unit stores a hierarchical structure indicating a hierarchy among a plurality of locations and conversion information for converting the amount of electricity for each electricity classification based on a predetermined condition into a CO2 emission amount, the acquiring unit acquiring a power classification and an amount of power for each power classification at each location, and storing the acquired power classification and the amount of power for each power classification in the storage unit in association with the hierarchical structure; The calculation unit calculates the amount of CO2 emissions in a specific dependent range designated by a user in the hierarchical structure, based on the amount of power associated with the hierarchical structure and the conversion information.

[0008] The present invention also provides a power management method executed by a power management system that manages power, comprising: The power management system includes a storage unit, an acquisition unit, and a calculation unit. The storage unit stores a hierarchical structure indicating a hierarchy among a plurality of locations and conversion information for converting the amount of electricity for each electricity classification based on a predetermined condition into a CO2 emission amount; the acquiring unit acquiring a power classification and an amount of power for each power classification at each location, and storing the power classification and the amount of power for each power classification in the storage unit in association with the hierarchical structure; The method includes a step in which the calculation unit calculates the CO2 emission amount of a specific dependent range specified by a user in the hierarchical structure based on the amount of power associated with the hierarchical structure and the conversion information.

[0009] The present invention also provides a power management program for managing power, comprising: A computer is configured to function as a storage unit, an acquisition unit, and a calculation unit; The storage unit stores a hierarchical structure indicating a hierarchy among a plurality of locations and conversion information for converting the amount of electricity for each electricity classification based on a predetermined condition into a CO2 emission amount, the acquiring unit acquiring a power classification and an amount of power for each power classification at each location, and storing the acquired power classification and the amount of power for each power classification in the storage unit in association with the hierarchical structure; The calculation unit calculates the amount of CO2 emissions in a specific dependent range designated by a user in the hierarchical structure, based on the amount of power associated with the hierarchical structure and the conversion information.

[0010] By adopting such a configuration, CO2 emissions can be easily and accurately managed in an organizational structure that is scattered across various locations. For example, CO2 emissions can be managed by focusing on a specific range (specific subordinate range) specified by a user as needed in an organization.

[0011] In a preferred embodiment of the present invention, the power classification includes a power plan defined for each power supplier, The calculation unit calculates the CO2 emission amount in the specific dependent range based on conversion information including a CO2 conversion coefficient for each power plan.

[0012] With this configuration, it is possible to accurately calculate the CO2 emissions for each power plan in a specific dependent range. As a result, a user such as an administrator in an organization can accurately grasp the CO2 emissions related to the hierarchical structure of the organization.

[0013] In a preferred embodiment of the present invention, the calculation unit calculates the CO2 emission amount of a specific power category in the specific dependent range based on an power category designated by a user.

[0014] With this configuration, it is possible to calculate the amount of CO2 emissions for a specific power plan or for a power classification based on predetermined conditions. For example, among multiple branches under the jurisdiction of the head office or business sites under the jurisdiction of the branches, it is possible to identify locations that have contracted with a specific power plan and calculate the amount of CO2 emissions.

[0015] In a preferred embodiment of the present invention, the calculation unit calculates the CO2 emission amount of a specific power type in the specific dependent range based on the power type designated by a user.

[0016] This configuration makes it possible to calculate the CO2 emissions for a specific type of electricity. For example, it is possible to selectively calculate the CO2 emissions for three-phase 200V electricity at a certain branch office and the business premises under the jurisdiction of that branch office.

[0017] In a preferred embodiment of the present invention, the power management system further includes a display processing unit, The display processing unit displays the CO2 emission amount of the specific dependent range and the CO2 emission amount of each location that constitutes the specific dependent range based on the calculation result by the calculation unit, and transmits the display processing result.

[0018] With this configuration, it is possible to quickly check, on the same screen, the CO2 emission amount in the specific dependent range and the CO2 emission amount for each location that belongs to this range.

[0019] In a preferred embodiment of the present invention, the power management system further includes a display processing unit, The power classification includes a power type defined according to a voltage supply condition, The display processing unit displays a breakdown of the CO2 emissions by power type in the specific dependent range based on a calculation result by the calculation unit, and transmits the display processing result.

[0020] With this configuration, the user can easily and accurately check the breakdown of the power type. For example, the user can easily and accurately check the CO2 emissions of each type of power, such as single-phase three-wire 200V, single-phase two-wire 100V (lighting), and three-phase three-wire 200V (power), in a certain dependent range.

[0021] In a preferred embodiment of the present invention, the power management system further includes a display processing unit, The display processing unit displays the amount of CO2 emissions at a location of a selected hierarchical layer in the hierarchical structure based on a result of the calculation by the calculation unit, and transmits the display processing result.

[0022] With this configuration, the user can check and compare the CO2 emissions at a plurality of locations (for example, branch office A and branch office B) belonging to a particular hierarchy (for example, branch office hierarchy).

[0023] In a preferred embodiment of the present invention, the power management system further includes a specific processing unit, The acquisition unit acquires contract information related to an electricity contract for supplying power to each location, and stores the contract information in the storage unit in association with the hierarchical structure; The specific processing unit performs specific processing on the basis of the contract information to determine the number of electricity contracts in the specific dependent range and the usage status of the electricity contracts.

[0024] With this configuration, it is possible to easily identify the number of electricity contracts and usage status at business premises or construction sites where usage status can change from month to month. Effect of the Invention

[0025] According to the present invention, a novel technique for an energy management system can be provided by executing a predetermined process using a hierarchical structure and specific conversion information. [Brief description of the drawings]

[0026] [Figure 1] 1 shows a block diagram of a system configuration according to an embodiment of the present invention. [Diagram 2] 1A and 1B are schematic diagrams illustrating an example of a hardware configuration of an information processing device and a terminal according to an embodiment of the present invention. [Diagram 3] 2 shows a flowchart of a processing procedure of an energy management system according to an embodiment of the present invention. [Figure 4] 4 shows an example of each piece of information used in the power management system according to one embodiment of the present invention. [Diagram 5] FIG. 2 shows a schematic image diagram of a hierarchical structure used in an energy management system according to an embodiment of the present invention. [Figure 6]4 shows an example of conversion information and power amount information used in a power amount management system according to an embodiment of the present invention. [Figure 7] 1 shows a schematic image diagram of conversion information managed by an electric energy management system according to an embodiment of the present invention. [Figure 8] 11 shows an example of a display processing result in the terminal according to an embodiment of the present invention. [Figure 9] 11 shows an example of a display processing result in the terminal according to an embodiment of the present invention. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0027] The present invention will now be described more fully with reference to the accompanying drawings, in which preferred embodiments are shown, but which may be embodied in many different forms and are not limited to the embodiments set forth herein.

[0028] For example, although the configuration, operation, etc. of the power management system will be described in this embodiment, the same effects can be achieved by an executed method (steps), device, computer program, etc. The program in this embodiment may be provided as a non-transitory computer-readable recording medium, or may be provided so as to be downloadable from an external server.

[0029] In addition, in this embodiment, the term "unit" may include, for example, a combination of hardware resources implemented by circuits in a broad sense and software information processing that can be specifically realized by these hardware resources.

[0030] In this embodiment, "information" is represented by, for example, the physical value of a signal representing a voltage or current, the high or low value of a signal as a collection of binary bits consisting of 0 or 1, or a quantum superposition (so-called quantum bit), and communication and calculations can be performed on a circuit in a broad sense.

[0031] A circuit in the broad sense is a circuit realized by appropriately combining a circuit, circuitry, a processor, memory, etc. In other words, it includes a CPU (Central Processing Unit), a GPU (Graphics Processing Unit), an LSI (Large Scale Integration), an ASIC (Application Specific Integrated Circuit), an FPGA (Field-Programmable Gate Array), etc.

[0032] <System configuration> Fig. 1 is a block diagram showing a system configuration according to an embodiment of the present invention. As shown in Fig. 1, the energy management system 1 includes an information processing device 10 and a database DB. The energy management system 1 is configured to be able to communicate with a plurality of user terminals 2 (reference numerals 2(a) to 2(c) in Fig. 1) and various types of energy DB 3 (reference numerals 3(a) to 3(c)) via a network NW. For example, in this system, the user terminal 2 can also be communicatively connected to the various types of energy DB 3 via the information processing device 10.

[0033] The information processing device 10 operates as a server, the user terminal 2 is a terminal used by managers of companies and organizations to view CO2 emissions, and the power DB3 (power management organization DB3(a), consumer company power DB(b), electric utility DB(c)) is a DB (database) from which the information processing device 10 acquires the power amounts of companies and organizations. In this specification, companies and organizations that use electricity are referred to as consumer companies.

[0034] In this embodiment, the network NW is an IP (Internet Protocol) network, but there is no restriction on the type of communication protocol, and further, there is no restriction on the type and scale of the network.

[0035] It should be noted that a general-purpose server computer, a personal computer, or the like can be used as the information processing device 10. It is also possible to configure the power energy management system 1 by implementing the functional components described below in a plurality of computers.

[0036] The user terminal 2 is a terminal used by a consumer company that uses electricity (and the consumer company's management personnel), etc. A smartphone, a tablet terminal, a personal computer, a wearable device, etc. can be used as the user terminal 2. The user terminal 2 stores an electric power management application program for the user, and this application program is configured to have a function for the user to view the amount of electric power, CO2 emissions, etc.

[0037] The power DB 3 is a DB for managing the power usage of the consumer company. A tablet terminal, a personal computer, etc. can be used as the power DB 3. The power DB 3 is configured to store an energy management application program for management and to have a function for sending the power usage of the consumer company to the information processing device 10.

[0038] The user terminal 2 and the power DB 3 may be configured not to have the respective power management application programs. In this case, the user terminal 2 and the power DB 3 can view and transmit each piece of information by a web browser or the like (or by acquisition processing from the information processing device 10).

[0039] <Hardware configuration> 2(a) is a diagram showing an example of a hardware configuration of the information processing device 10. The information processing device 10 includes a control unit 11, a storage unit 12, and a communication unit 13 as the hardware configuration.

[0040] The control unit 11 includes one or more processors such as a CPU, and controls the overall operation and processing of the information processing device 10 by executing the power management program according to the present invention, an OS, and other applications.

[0041] The storage unit 12 is an HDD, SSD, ROM, RAM, etc., and stores the power management program according to the present invention and data used when the control unit 11 executes processing based on the program. The control unit 11 executes processing based on the power management program stored in the storage unit 12, thereby realizing a functional configuration described below.

[0042] The communication unit 13 executes communication control with the network NW, and performs input required to operate the information processing device 10 and output related to the operation results.

[0043] 2(b) is a diagram showing an example of a hardware configuration of a terminal 90 (user terminal 2 in FIG. 1). The terminal 90 includes, as its hardware configuration, a control unit 91, a storage unit 92, a communication unit 93, an input unit 94, and an output unit 95.

[0044] The control unit 91 of the terminal 90 includes one or more processors such as a CPU, and controls the overall operation processing of the terminal 90. The storage unit 92 of the terminal 90 is an HDD, SSD, ROM, RAM, or the like, and stores the above-mentioned power management application program, as well as data and the like used when the control unit 91 executes processing based on the program.

[0045] A communication unit 93 of the terminal 90 controls communication with the network. An input unit 94 of the terminal 90 is a touch panel, a mouse, a keyboard, or the like, and inputs operation requests from a user to the control unit 91. An output unit 95 of the terminal 90 is a display, or the like, and displays the results of processing by the control unit 91, etc.

[0046] <Functional configuration> 2(a), the information processing device 10 includes, as functional components, an acquisition unit 101, a calculation unit 102, a specific processing unit 103, and a display processing unit 104. These are information processing performed by software (stored in the storage unit 12) specifically realized by hardware (such as the control unit 11).

[0047] The acquisition unit 101 acquires (accepts) various information from a user terminal, the power DB 3, etc. The acquisition unit 101 acquires user information and company information. In this embodiment, the acquisition unit 101 acquires power classifications and power amounts for each power classification at each location, and stores them in the storage unit 12 in association with the hierarchical structure. The acquisition unit 101 also acquires hierarchical structure information and conversion information, and stores them in the storage unit 12.

[0048] The calculation unit 102 calculates the amount of CO2 emissions. In this embodiment, the calculation unit 102 calculates the amount of CO2 emissions of a specific dependent range specified by a user in the hierarchical structure of a demand company (organization) based on the amount of power associated with the hierarchical structure and the conversion information. The calculation unit 102 calculates the amount of CO2 emissions of the specific dependent range based on the conversion information including a CO2 conversion coefficient for each power plan defined for each power supplier.

[0049] Furthermore, the calculation unit 102 calculates the CO2 emission amount of a specific power class in a specific dependent range based on the power class specified by the user. For example, the calculation unit 102 can calculate the CO2 emission amount of a specific power plan in a specific dependent range based on the power plan (e.g., AAA plan) specified by the user.

[0050] The specific processing unit 103 identifies information related to power supply. In this embodiment, the specific processing unit 103 performs specific processing on the number of electricity contracts (and / or the number of power circuits such as breakers) in a specific dependent range and the usage status of the electricity contracts based on contract information related to electricity contracts for supplying electricity to each location.

[0051] The display processing unit 104 performs display processing on the display screen of the user terminal 2. In this embodiment, the display processing unit 104 performs display processing on the CO2 emission amount of the specific dependent range and the CO2 emission amount for each location constituting the specific dependent range based on the calculation result by the calculation unit 102, and transmits the display processing result.

[0052] The display processing unit 104 also processes and displays the breakdown of the CO2 emissions by power type in the specific dependent range based on the calculation result by the calculation unit 102, and transmits the display processing result. The display processing unit 104 can also process and display the CO2 emissions at a selected hierarchical location in the hierarchical structure based on the calculation result by the calculation unit 102, and transmit the display processing result.

[0053] <Database> 1 stores user information on users such as management personnel of demand companies, company information on demand companies, hierarchical structure information showing the subordinate relationships between multiple locations, conversion information for converting the amount of power into CO2 emissions, power information on the amount of power used by each demand company, and various other information necessary for power management. Some or all of these may be stored in the storage unit 12, etc., or some of these may be stored in another database, etc.

[0054] The power energy management system 1 and the processing contents of each functional component will be described below with reference to FIGS.

[0055] <Outline of the power management system> The power energy management system 1 of this embodiment is a system for simply and accurately managing CO2 emissions based on the amount of power consumed in each location at a power demand company having an organizational structure with bases scattered around the country.

[0056] That is, in the energy management system 1 according to this embodiment, in an organizational structure in which various bases are scattered across various locations, a specific range (specific location or subordinate range) can be freely set according to the user's wishes, and further, as necessary, CO2 emissions can be managed for each type of power determined by the power plan and voltage supply conditions of each electric utility (power supply company).The flow of processing in the energy management system 1 according to this embodiment will be described in detail below.

[0057] <Registering various information> 3 shows a flowchart of a processing procedure in the power energy management system 1 according to one embodiment of the present invention. In S201, a user, such as a person in charge of a demand company that uses electricity, registers user information in advance. In addition, the user (or the person in charge of the power energy management system 1) also registers company information related to the demand company to which the user belongs in advance. The acquisition unit 101 of the information processing device 10 acquires various information used for power energy management and registers it in the memory unit 12.

[0058] In addition to the management personnel of the demand company, the users in this embodiment also include, for example, on-site personnel of the prime contractor or cooperating company at the construction site, workers of the cooperating company, etc. (people related to the construction work). Some of the demand company personnel (management personnel) belong to the head office, while others belong to a branch office or a business site.

[0059] As shown in Fig. 4(a), user information includes information such as the user's name, contact information, company ID (described later), job title such as manager or section manager, duties such as administrator or site supervisor, affiliation such as head office or branch office, registration date, etc., and is managed by the user ID. Also, as shown in Fig. 4(b), company information includes information such as the company name, company contact information, company address, type such as prime contractor or partner company, etc., and is managed by the company ID. In this embodiment, CO2 emissions can be viewed, etc., based on the user information, company information, etc. For example, the viewing range of CO2 emissions can be limited based on attributes such as the user's job title and duties.

[0060] In the energy management system 1 of this embodiment, in addition to user information and company information, information regarding a hierarchical structure showing the subordinate relationships between multiple locations in a company (hierarchical structure information), and conversion information for converting the amount of energy for each energy classification based on specified conditions into CO2 emissions are also pre-registered.

[0061] A schematic image diagram of a hierarchical structure used in an energy management system according to an embodiment of the present invention is shown in Fig. 5. As shown in the figure, hierarchical structure information is information indicating the subordinate relationships at each location (base), such as branch office A and branch office B linked to the head office, business site 1 and business site 2 linked to branch office A, and business site 3 and business site 4 linked to branch office B.

[0062] In this specification, multiple bases such as a head office, a branch office, and a business site may be referred to as a location in a broad sense. Business sites include factories, offices, stores, and construction sites managed by prime contractors. Locations in the hierarchical structure of a demand company also include non-business sites (and unlinked locations) that are not directly linked to a head office or a branch office. For example, specific construction sites that are not linked to a head office or a branch office are also included.

[0063] As shown in FIG. 4(c), the hierarchical structure information includes company IDs, location names (hierarchical relationships), and other information necessary to express the hierarchical structure of the demand company, and is managed by a hierarchical structure ID. For example, the hierarchical structure information can be configured using a construction system at a construction site. More specifically, the hierarchical structure information can be configured using the hierarchical structure of the demand company included in the construction system. In this embodiment, this hierarchical structure information can be used to calculate the CO2 emissions of multiple locations having a dependency relationship of a specific range selected by the user (specific dependency range).

[0064] As shown in Fig. 6(a), the conversion information includes information such as electric power suppliers (and retail electric power suppliers) that share electric power with consumer companies such as XX Electric Power (XX Electric Power Co., Ltd.) and XX Power Co., Ltd., multiple electric power plans (contract plans) defined for each electric power supplier, CO2 conversion coefficients for each electric power plan, and menu descriptions of public organizations notified by each electric power supplier to the Ministry of the Environment and other public organizations, and is managed by a conversion ID. In this embodiment, this conversion information and the above-mentioned hierarchical structure information are used to realize a simple and accurate calculation of CO2 emissions.

[0065] FIG. 7 shows a schematic image of conversion information managed by an energy management system according to one embodiment of the present invention. Each electricity retailer is obligated to notify which of the plans set by the public body corresponds to its own electricity plan (contract plan). As shown in the schematic image of FIG. 7, for example, it is possible to associate the electricity plans provided by each electricity retailer to each consumer company with the plans notified to the public body, and to determine a CO2 conversion coefficient according to the correspondence between them. Naturally, it is also possible to obtain electricity plans from general electricity suppliers regardless of the schematic image of FIG. 7.

[0066] <Acquisition of power data> 3, the acquisition unit 101 of the information processing device 10 acquires the amount of power used by the demand company from the power DB 3, and stores the amount of power used by the demand company in association with the hierarchical structure of the demand company in the storage unit 12. In the power DB 3, power classifications (power plans and power types) at each location of the demand company and the amount of power for each power classification are stored in the storage unit 12 as power amount information.

[0067] As shown in Fig. 6(b), the power amount information includes information such as a company ID, a hierarchical structure ID, a power plan for each power company, a power type such as low-voltage lighting (e.g., single-phase 100-200V), low-voltage power (e.g., three-phase 200V), high voltage, and special high voltage, power amount (kWh) and a period during which the power amount was actually measured (not shown), the number of contracts (and / or the number of power lines) in an electricity contract for supplying power to each location, and the usage status of the number of contracts, and is managed by an electricity amount ID. The electricity contract in this embodiment is a contract for each plan with each electricity retailer (a contract for each power meter or smart meter). Note that in this specification, the number of contracts and the usage status of electricity contracts may be collectively referred to as contract information.

[0068] In this embodiment, the acquisition unit 101 can acquire the power consumption (and power classification such as power plan and power type) of the target demand company from the power management organization DB 3(a) managed by a power management organization such as the Power Data Management Association, or directly acquire the power consumption from the demand company DB managed by the demand company. Further, as shown in FIG. 1, the acquisition unit 101 can also acquire the power consumption of the target demand company from the electric utility DB 3(c) managed by an electric utility such as an electric power company.

[0069] <Calculation of CO2 emissions> In S203, the calculation unit 102 of the information processing apparatus 10 receives a specific subordinate range from the user terminal 2. The specific subordinate range here means that, for example, when the user (user terminal 2) designates (selects) the subordinate range of branch A in FIG. 5, the three bases (three locations), namely branch A, workplace 1 subordinate to branch A, and workplace 2 also subordinate to branch A, become the specific subordinate range. The calculation unit 102 can calculate the CO2 emissions in the designated specific subordinate range.

[0070] Also, in FIG. 5, when the user designates the subordinate range of the head office, all locations including the head office, branch A subordinate to the head office, branch B, and workplaces 1 to 4 subordinate to branch A and branch B become the specific subordinate range. In this case, the CO2 emissions of all bases in the demand company are calculated.

[0071] In S204, the calculation unit 102 calculates the CO2 emissions of the specific subordinate range designated by the user terminal 2. Specifically, based on the power consumption associated with the hierarchical structure and the conversion information, the CO2 emissions of the specific subordinate range designated by the user in the hierarchical structure are calculated.

[0072] For example, when the user designates the subordinate range of branch A in the schematic image diagram of FIG. 5, the power consumption (kWh) of hierarchical structure IDs 20011 (head office), 20012 (branch A), 20014 (workplace 1), and 20015 (workplace 2) in the hierarchical structure information of FIG. 4(c) is extracted from the power consumption information in FIG. 6(b), and the CO2 emissions are calculated based on the total power consumption obtained by adding these up.

[0073] According to this example, as can be seen from the power consumption information in Figure 4(c), the head office is under the jurisdiction of XX Electric Power, branch office A is under the jurisdiction of △△ Electric Power, and business site 1 and business site 2 are under the jurisdiction of XX Power Co., Ltd. In other words, each location is under the jurisdiction of a different electric power company, and each electric power company has different contract plans. In this case, since the CO2 emissions actually differ for each contract plan, calculating the CO2 emissions using the location-based CO2 conversion coefficient will not actually provide accurate results.

[0074] Therefore, in this embodiment, the CO2 emissions are calculated using more detailed conversion information (CO2 conversion coefficients) based on each contract of each electric power company according to market standards. In this embodiment, for a specific dependent range selected by the user from locations scattered throughout the country, the CO2 emissions can be calculated simply and accurately by using the detailed CO2 conversion coefficients based on each contract of each electric power company.

[0075] In addition, in this embodiment, in addition to calculating detailed CO2 emissions in a specific dependent range, hierarchical structure information, conversion information, and power information can be appropriately combined and used to calculate CO2 emissions in a range that meets the user's needs.

[0076] For example, the calculation unit 102 (or the acquisition unit 101) can receive a designation of a specific power plan from a user, and selectively calculate the CO2 emissions of a specific power plan in a specific dependent range based on the power plan designated by the user. In other words, the user can freely set the dependent range in the hierarchical structure of demand companies and the power plan to be used within that dependent range, and selectively calculate the CO2 emissions desired by the user based on the set conditions.

[0077] Furthermore, in this embodiment, the calculation unit 102 (or the acquisition unit 101) can selectively calculate the CO2 emission amount of a specific power type in a specific dependent range based on the power type (low-voltage lighting, low-voltage power, high-voltage, special high-voltage, etc.) specified by the user. In other words, the user can freely set the dependent range in the hierarchical structure of the demand companies and the power type, such as three-phase 200V, used within the dependent range, and selectively calculate the CO2 emission amount desired by the user based on the set conditions.

[0078] <Specific processing of electricity contracts> In S205, the identification processing unit 103 performs identification processing of the number of electricity contracts and their usage status. Specifically, the acquisition unit 101 acquires contract information related to electricity contracts for supplying power to each location, associates it with a hierarchical structure (electric energy information), and stores it in the storage unit 12. Then, the identification processing unit 103 performs identification processing of the number of electricity contracts in the specific dependent range and the usage status of the electricity contracts based on the contract information.

[0079] For example, at construction sites involving large-scale construction work, a single location (the construction site) is divided into multiple areas and managed (according to the construction period or by type of electricity), and a power meter is installed for each of the multiple areas, and an electricity contract is made.

[0080] In this case, even if a power meter is contracted and in operation in a certain area during a certain period of time, it is possible that the power supply operation has been stopped in a specific area because construction has already been completed at the present time. Also, one contract may be made in one area, but multiple contracts may be made in another area (or another period). In other words, in this embodiment, in addition to being able to grasp the amount of power (CO2 emissions) for each business or construction site, the user can also grasp more detailed information such as the number of electricity contracts and usage status.

[0081] <Display processing> In S206, the display processing unit 104 performs display processing of various information of the specific dependent range. Fig. 8 shows an example of a display processing result in the user terminal 2 according to an embodiment of the present invention. The display processing unit 104 performs display processing of the CO2 emission amount of the specific dependent range according to an input instruction from the user based on the calculation result by the calculation unit 102, and transmits the display processing result to the user terminal 2.

[0082] As shown in Fig. 8, a search area W20 showing a screen for searching for CO2 emission status and a result area W30 showing a screen for the search results are displayed on the display screen W10 of the user terminal 2. The search area W20 displays the organizational classification such as head office, branch office, or business establishment, the organization name, the display method for the search results such as monthly display or daily display, the power plan for selecting the power company or a plan available for contract with the power company, the power type for selecting low voltage or high voltage, and the aggregation period for selecting a specific period. The display processing unit 104 processes and displays information regarding the CO2 emission amount desired by the user based on the calculation results calculated using the hierarchical structure information, conversion information, power amount information, etc. in response to various selection inputs from the user terminal 2.

[0083] In the organization classification of the search area W20, the user can select locations such as the head office or branch office according to their wishes. In the organization name, a portion of the locations selected in the organization classification (if the organization classification is branch office, then branch office A) can be selected. For example, by selecting the head office, the CO2 emissions related to the head office are displayed, and by selecting a branch office, the CO2 emissions related to the branch office are displayed. In addition, by selecting the organization name (by scrolling or entering the name to select), a portion of multiple business locations can be selected and displayed. For example, the CO2 emissions of non-business locations that are not directly subordinate to the head office or unlinked locations, such as base F, can also be displayed.

[0084] Furthermore, as shown in Figure 9, when branch office A in the organizational classification is selected from the user terminal 2 and a subordinate relationship is selected, the display processing unit 104 displays the total CO2 emissions of all locations subordinate to branch office A (specific subordinate range) and the CO2 emissions of each of those locations in the result area W30.

[0085] In this embodiment, as shown in FIG. 8 (and FIG. 9), a power plan can be selected in the search area W20. The power plan is, for example, the power plan of each electric power supplier shown in the conversion information of FIG. 6(a). The display processing unit 104 can display the details of the power plans in the CO2 emissions of the specific dependent range based on the calculation result by the calculation unit 102, and transmit the display processing result to the user terminal 2. The display processing unit 104 can also selectively display the power plan selected by the user in the CO2 emissions of the specific dependent range.

[0086] In this embodiment, the power type can be selected in the search area W20. The power types include low voltage, high voltage, special high voltage, etc. For example, when selecting the power type, it is possible to select a detailed classification such as single-phase 100V to 200V (lighting) or three-phase 200V (power) for low voltage (not shown).

[0087] The display processing unit 104 can display the breakdown of the power types in the CO2 emissions in the specific dependent range based on the calculation result by the calculation unit 102, and transmit the display processing result. The display processing unit 104 can also selectively display the power type selected by the user in the CO2 emissions in the specific dependent range. The user can easily and accurately check the CO2 emissions and their breakdown for each power type, such as single-phase 200V (lighting) and three-phase 200V (power), high voltage, and special high voltage, in a certain specific dependent range.

[0088] In this manner, in this embodiment, the hierarchical structure of the organization and the power classifications such as power plans and power types can be freely set, so that the user can view and manage CO2 emissions with high accuracy in various ways.

[0089] As described above, the power management system 1 of the present invention can easily and accurately manage CO2 emissions in the organizational structure of consumer companies scattered across various locations by executing predetermined processing using a hierarchical structure showing the subordinate relationships between multiple locations, as well as characteristic conversion information and power classifications.

[0090] In addition, in this embodiment, the energy management of a consumer company having an organizational structure with bases and construction sites scattered across various locations has been described, but the same effects as the present invention can be obtained when the energy management system 1 is used in fields other than construction sites. [Explanation of symbols]

[0091] 1. Power management system 2. User terminal 3 Electricity DB 10. Information processing device 11 Control section 12 Storage section 13. Communications Department 90 Terminal (User Terminal 2) 91 Control Unit 92 Memory section 93 Communications Department 94 Input section 95 Output section 101 Acquisition Department 102 Calculation section 103 Specific Processing Department 104 Display processing unit NW Network W10 display screen W20 Search Area W30 Results Area

Claims

1. An energy management system for managing energy, The power management system includes a storage unit, an acquisition unit, and a calculation unit, The storage unit stores a hierarchical structure indicating a hierarchy among a plurality of locations and conversion information for converting the amount of electricity for each electricity classification based on a predetermined condition into a CO2 emission amount, the acquiring unit acquiring a power classification and an amount of power for each power classification at each location, and storing the acquired power classification and the amount of power for each power classification in the storage unit in association with the hierarchical structure; The calculation unit calculates a CO2 emission amount of a specific dependent range designated by a user in the hierarchical structure based on the power amount associated with the hierarchical structure and the conversion information. Power management system.

2. The power classification includes a power plan defined for each power supplier, The calculation unit calculates the CO2 emission amount of the specific dependent range based on conversion information including a CO2 conversion coefficient for each power plan. The power management system according to claim 1 .

3. The calculation unit calculates the CO2 emission amount of a specific power class in the specific dependent range based on the power class specified by the user. The power management system according to claim 1 .

4. The calculation unit calculates the CO2 emission amount of a specific power plan in the specific dependent range based on the power plan specified by the user. The power management system according to claim 2 .

5. The power classification includes a power type defined according to a voltage supply condition, The calculation unit calculates the CO2 emission amount of the specific power type in the specific dependent range based on the power type specified by the user. The power management system according to claim 3 .

6. The power management system further includes a display processing unit, The display processing unit displays the CO2 emission amount of the specific dependent range and the CO2 emission amount of each location constituting the specific dependent range based on the calculation result by the calculation unit, and transmits the display processing result. The power management system according to claim 1 .

7. The power management system further includes a display processing unit, The power classification includes a power type defined according to a voltage supply condition, The display processing unit displays a breakdown of the CO2 emissions by power type in the specific dependent range based on the calculation result by the calculation unit, and transmits the display processing result. The power management system according to claim 1 .

8. The power management system further includes a display processing unit, The display processing unit displays the CO2 emission amount at a location of a selected hierarchical structure based on the calculation result by the calculation unit, and transmits the display processing result. The power management system according to claim 1 .

9. The power management system further includes a specific processing unit, The acquisition unit acquires contract information related to an electricity contract for supplying power to each location, and stores the contract information in the storage unit in association with the hierarchical structure; The specific processing unit performs specific processing on the number of electricity contracts in the specific dependent range and the usage status of the electricity contracts based on the contract information. The power management system according to claim 1 .

10. A power management method executed by a power management system that manages power, The power management system includes a storage unit, an acquisition unit, and a calculation unit, The storage unit stores a hierarchical structure indicating a hierarchy among a plurality of locations and conversion information for converting the amount of electricity for each electricity classification based on a predetermined condition into a CO2 emission amount; the acquiring unit acquiring a power classification and an amount of power for each power classification at each location, and storing the acquired power classification and the amount of power for each power classification in the storage unit in association with the hierarchical structure; The calculation unit calculates a CO2 emission amount of a specific dependent range specified by a user in the hierarchical structure based on the power amount associated with the hierarchical structure and the conversion information. Electric energy management method.

11. An electric power management program for managing an amount of electric power, A computer is configured to function as a storage unit, an acquisition unit, and a calculation unit; The storage unit stores a hierarchical structure indicating a hierarchy among a plurality of locations and conversion information for converting the amount of electricity for each electricity classification based on a predetermined condition into a CO2 emission amount, the acquiring unit acquiring a power classification and an amount of power for each power classification at each location, and storing the acquired power classification and the amount of power for each power classification in the storage unit in association with the hierarchical structure; The calculation unit calculates a CO2 emission amount of a specific dependent range designated by a user in the hierarchical structure based on the power amount associated with the hierarchical structure and the conversion information. Energy management program.

Citation Information

Patent Citations

  • Carbon dioxide discharge amount calculation system

    JP2012003472A

  • Energy management system and method

    JP2013050754A

  • Inter-organization energy use warning device

    JP2013186771A

  • Data management method, program, and data management system

    JP2019121094A