Parts mounting equipment
The part mounting device addresses the issue of multiple work units not being able to operate independently from multiple operation units by implementing a control unit that manages and allocates tasks to specific work units based on the input from each operation unit, ensuring efficient and independent operation.
Patent Information
- Application Number
- JP2021095572
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2021-06-08
- Publication Date
- 2025-04-18
- Estimated Expiration
- 2041-06-08
AI Technical Summary
Existing part mounting devices are unable to properly operate multiple work units from multiple operation units, as they display the same image on multiple operating units and do not allow different work units to operate independently from any operating unit.
The part mounting device includes a control unit that manages multiple work units and operation units, allowing each operation unit to control specific work units and preventing interference between operation units. This is achieved through a system where the input processing unit identifies the operation unit and outputs instructions accordingly, and the processing unit executes tasks based on these instructions.
This solution enables appropriate operation of multiple work units from multiple operation units, ensuring efficient and independent operation of each work unit, even when multiple operation units are active simultaneously.
Smart Images

Figure 0007664553000001 
Figure 0007664553000002 
Figure 0007664553000003
Abstract
Description
[Technical field]
[0001] The present invention relates to a component mounting device for mounting components on a substrate. [Background technology]
[0002] Among working devices such as component mounting devices for producing mounted boards, there are known ones that include a working unit that performs a component mounting operation to mount components on a board, and multiple operation units such as a touch panel having an input unit and a display unit connected to a control unit that controls the working unit (see, for example, Patent Document 1). Patent Document 1 discloses a component mounting device that includes an image signal processing circuit that displays an image signal input from a higher level on the display unit and outputs it to a lower level device, and a position signal processing circuit that transmits a position signal of the touch panel of the device to the host side when a selection switch is turned on, and transmits a position signal from the lower level to the host side when the selection switch is turned off. This allows the component mounting device to be preferentially operated from any touch panel selected from multiple touch panels connected to the host device. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2006-261237 A Summary of the Invention [Problem to be solved by the invention]
[0004] However, in the prior art including Patent Document 1, the same image is displayed on the display units of multiple operation units, and even in a component mounting device equipped with multiple work units that can perform work in parallel, there was a problem that a work unit other than a work unit that is preferentially operated from one operation unit could not be operated from any of the operation units.
[0005] SUMMARY OF THE PRESENT DISCLOSURE An object of the present invention is to provide a component mounting device that is capable of appropriately performing operations on a plurality of working units from a plurality of operating sections. [Means for solving the problem]
[0006] The component mounting device of the present invention includes a first work unit including a first board transport lane which transports boards along one axis extending in a horizontal direction, a second board transport lane which is arranged at a position separated from the first board transport lane in a direction along another axis perpendicular to the first axis in a horizontal plane and transports boards along the one axis, a first component supply unit which is arranged at a position separated from the first board transport lane in the direction along the other axis on the opposite side to the second board transport lane side and has a plurality of component supply units arranged in parallel along the one axis, a second component supply unit which is arranged at a position separated from the second board transport lane in the direction along the other axis on the opposite side to the first board transport lane side and has a plurality of component supply units arranged in parallel along the one axis, a first work head which holds components and mounts them on a board, a first work head moving mechanism which moves the first work head at least from above the first component supply unit within a first region above the second board transport lane, and a first imaging unit which moves together with the first work head by the first work head moving mechanism, and a second work unit which holds components and mounts them on a board. a second work unit including a head, a second work head moving mechanism that moves the second work head at least from above the second component supply unit within a second area above the first board transport lane, and a second imaging unit that moves together with the second work head by the second work head moving mechanism; at least one first reference point that is arranged within the first area and serves as a reference point for the first work head moving mechanism; at least one second reference point that is arranged within the second area and serves as a reference point for the second work head moving mechanism; a control unit that causes the first work unit and the second work unit to perform a component mounting operation of mounting components on a board and a specific operation;and an exclusive processing unit that permits the one operation unit to perform an operation for the one task unit but prohibits the other operation units from performing the operation for the other task units. Effect of the Invention
[0007] According to the present invention, operations can be appropriately performed on a plurality of task units from a plurality of operation sections. [Brief description of the drawings]
[0008] [Figure 1] FIG. 1 is a plan view of a main part of a mounting board manufacturing line according to an embodiment of the present invention; [Diagram 2] FIG. 1 is a plan view showing a schematic structure of a two-stage / two-head component mounting device provided in a mounting board manufacturing line according to an embodiment of the present invention; [Diagram 3] FIG. 1 is a side view showing a schematic structure of a two-stage / two-head component mounting device provided in a mounting board manufacturing line according to an embodiment of the present invention. [Figure 4] FIG. 1 is a plan view showing a schematic structure of a 4-stage / 4-head component mounting device provided in a mounting board manufacturing line according to an embodiment of the present invention. [Diagram 5] FIG. 2 is a block diagram showing the configuration of a control system of a two-stage / two-head component mounting device according to an embodiment of the present invention. [Figure 6] FIG. 2 is a flow chart showing the processing of an input processing unit of a two-stage / two-head component mounting device according to an embodiment of the present invention. [Figure 7] FIG. 1 is an explanatory diagram of an example of a display screen displayed on a display unit of an operation unit provided in a two-stage / two-head component mounting device according to an embodiment of the present invention; [Figure 8] FIG. 1 is an explanatory diagram of an example of a display screen displayed on a display unit of an operation unit provided in a two-stage / two-head component mounting device according to an embodiment of the present invention; [Figure 9] FIG. 1 is an explanatory diagram of an example of a display screen displayed on a display unit of an operation unit provided in a two-stage / two-head component mounting device according to an embodiment of the present invention; [Figure 10]FIG. 1 is a block diagram showing a configuration of a control system of a first modified example of a two-stage / two-head component mounting device according to an embodiment of the present invention; FIG. 2 is a flow diagram showing the processing of an input processing unit; [Figure 11] FIG. 13 is a block diagram showing the configuration of a control system of a second modified example of a two-stage / two-head component mounting device according to an embodiment of the present invention. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0009] An embodiment of the present invention will be described in detail below with reference to the drawings. The configurations, shapes, etc. described below are examples for the purpose of explanation, and can be modified as appropriate according to the specifications of the mounting board manufacturing line, the component mounting device, etc. In the following, the same reference numerals are used for corresponding elements in all the drawings, and duplicated explanations will be omitted.
[0010] In Fig. 1 and in some parts described later, the X-axis (the up-down direction in Fig. 1) in the substrate transport direction and the Y-axis (the left-right direction in Fig. 1) perpendicular to the substrate transport direction are shown as two axes perpendicular to each other in a horizontal plane. In Fig. 3 and in some parts described later, the Z-axis (the up-down direction in Fig. 3) is shown as a height direction perpendicular to the horizontal plane.
[0011] First, the configuration of the mounted board manufacturing line 1 will be described with reference to FIG. 1. FIG. 1 shows a schematic diagram of the main part of the mounted board manufacturing line 1. The mounted board manufacturing line 1 is configured by connecting a plurality of component mounting devices M1 to M6 in series, and has the function of manufacturing mounted boards with components mounted on the board. In each of the component mounting devices M1 to M6, a first board transport lane L1 and a second board transport lane L2 are arranged apart in the Y-axis direction to transport the board 2 along the X-axis from upstream (upper side of the paper) to downstream (lower side of the paper). Hereinafter, in the Y-axis direction, the side where the first board transport lane L1 is arranged is referred to as the front (left side of the paper), and the side where the second board transport lane L2 is arranged is referred to as the rear (right side of the paper).
[0012] The first board transport lane L1 and the second board transport lane L2 of each of the component mounting devices M1 to M6 are connected to the adjacent devices, and transport the board 2 from upstream to downstream and deliver it to the adjacent device. Thus, each of the component mounting devices M1 to M6 is equipped with a first board transport lane L1 that transports the board 2 along the X-axis (one axis) extending horizontally, and a second board transport lane L2 that is positioned away from the first board transport lane L1 in the direction along the Y-axis (another axis perpendicular to the X-axis in the horizontal plane) and transports the board 2 along the X-axis.
[0013] 1, in each of the component mounting devices M1 to M6, a first component supply section S1 is disposed in front of the first board transport lane L1, and a second component supply section S2 is disposed behind the second board transport lane L2. Furthermore, in each of the component mounting devices M5 and M6, a third component supply section S3 is disposed downstream of the first component supply section S1, and a fourth component supply section S4 is disposed downstream of the second component supply section S2. In each of the first component supply section S1, the second component supply section S2, the third component supply section S3, and the fourth component supply section S4, a plurality of component supply units 3 that supply components are disposed in parallel along the X-axis.
[0014] In this way, each of the component mounting devices M1-M6 includes a first component supply section S1 that is disposed at a position away from the first board transport lane L1 in the direction along the Y axis on the opposite side (front) to the second board transport lane L2, and has a plurality of component supply units 3 that are arranged in parallel along the X axis. Also, each of the component mounting devices M1-M6 includes a second component supply section S2 that is disposed at a position away from the second board transport lane L2 in the direction along the Y axis on the opposite side (rear) to the first board transport lane L1, and has a plurality of component supply units 3 that are arranged in parallel along the X axis.
[0015] 1, in each of component mounting devices M1 to M6, a first work unit U1 is disposed in front and a second work unit U2 is disposed behind the first board transport lane L1, the second board transport lane L2, and the component supply unit 3 above. Furthermore, in component mounting devices M5 and M6, a third work unit U3 is disposed downstream of the first work unit U1, and a fourth work unit U4 is disposed downstream of the second work unit U2.
[0016] The first work unit U1 includes a first component mounting head H1 (first work head) that holds components and mounts them on the board 2, a first work head moving mechanism F1 that moves the first component mounting head H1 at least from above the first component supply unit S1 within a first area A1 above the second board transport lane L2, and a first head camera C1 (first imaging unit) that moves together with the first component mounting head H1 by the first work head moving mechanism F1. That is, the first work unit U1 is configured to be able to mount components not only on the board 2 held on the first board transport lane L1, but also on the board 2 held on the second board transport lane L2.
[0017] 1, the second work unit U2 includes a second component mounting head H2 (second work head) that holds components and mounts them on a board, a second work head moving mechanism F2 that moves the second component mounting head H2 from at least above the second component supply unit S2 within a second area A2 above the first board transport lane L1, and a second head camera C2 (second imaging unit) that moves together with the second component mounting head H2 by the second work head moving mechanism F2. That is, the second work unit U2 is configured to be able to mount components not only on the board 2 held on the second board transport lane L2, but also on the board 2 held on the first board transport lane L1.
[0018] Similarly, the third work unit U3 includes a third component mounting head H3 (third work head), a third work head moving mechanism F3 that moves the third component mounting head H3 within the third area A3, and a third head camera C3 (third imaging unit). The fourth work unit U4 includes a fourth component mounting head H4 (fourth work head), a fourth work head moving mechanism F4 that moves the fourth component mounting head H4 within the fourth area A4, and a fourth head camera C4 (fourth imaging unit).
[0019] 1, each of component mounting devices M1 to M6 has a first operation unit P1 disposed at a position where a worker at the front can operate it, and a second operation unit P2 disposed at a position where a worker at the rear can operate it. The first operation unit P1 and the second operation unit P2 are devices such as touch panels equipped with a monitor 14 (display unit) that displays various information and screens, and a touch screen 13 (input unit) that accepts input of various information (see FIG. 5).
[0020] In this way, component mounting devices M1-M4 are two-stage / two-head component mounting devices equipped with two component supply units (first component supply unit S1, second component supply unit S2) and two working units (first working unit U1, second working unit U2). Also, component mounting devices M5 and M6 are four-stage / four-head component mounting devices equipped with four component supply units (first component supply unit S1, second component supply unit S2, third component supply unit S3, fourth component supply unit S4) and four working units (first working unit U1, second working unit U2, third working unit U3, fourth working unit U4).
[0021] 1, the mounted board manufacturing line 1 includes four 2-stage / 2-head component mounting devices M1-M4 and two 4-stage / 4-head component mounting devices M5, M6, but the mounted board manufacturing line 1 is not limited to this configuration. For example, the mounted board manufacturing line 1 may be configured to include either one of the 2-stage / 2-head component mounting devices M1-M4 or the 4-stage / 4-head component mounting devices M5, M6.
[0022] Also, the system may be configured to have two, three, five or more two-stage / two-head component mounting devices M1-M4, and three or more four-stage / four-head component mounting devices M5, M6. The arrangement order of the two-stage / two-head component mounting devices M1-M4 and the four-stage / four-head component mounting devices M5, M6 can be set arbitrarily. Furthermore, the component mounting devices M1-M6 do not need to be physically connected.
[0023] Next, the detailed configuration of the two-stage / two-head component mounting devices M1-M4 will be described with reference to Figures 2 and 3. A first board transport lane L1 is arranged at the front and a second board transport lane L2 is arranged at the rear at the center of the upper part of the base 4. The first board transport lane L1 is equipped with a pair of board transport conveyors K1 for transporting the board 2. The second board transport lane L2 is equipped with a pair of board transport conveyors K2 for transporting the board 2.
[0024] A first component supply section S1 is disposed in front of the first board transport lane L1, and a second component supply section S2 is disposed behind the second board transport lane L2. A dolly 5 with a plurality of component supply units 3 (tape feeders) already attached to the upper part is set in the first component supply section S1 and the second component supply section S2. The dolly 5 holds a reel 7 that stores a carrier tape 6 holding components in a wound state. The carrier tape 6 pulled out from the reel 7 is pitch-fed by the component supply unit 3, and the components held by the carrier tape 6 are supplied to the component supply position.
[0025] 2 and 3, at both ends of the X-axis on the top surface of the base 4, a Y-axis table 8 is disposed upstream and a Y-axis support unit 9 is disposed downstream. Guide units 10 extending along the Y-axis are disposed at opposing positions on the Y-axis table 8 and the Y-axis support unit 9. A Y-axis linear motor 11 extending along the Y-axis is disposed on the Y-axis table 8. A first beam B1 is disposed in front between the Y-axis table 8 and the Y-axis support unit 9, and a second beam B2 is disposed in the rear. The first beam B1 and the second beam B2 are driven by the Y-axis linear motor 11 to move back and forth along the guide unit 10.
[0026] A first linear motor D1 extending along the X-axis is disposed on the first beam B1. A first moving member E1 driven by the first linear motor D1 and moving left and right along the X-axis is coupled to the first beam B1. A first component mounting head H1 and a first head camera C1 are attached to the first moving member E1. A second linear motor D2 extending along the X-axis is disposed on the second beam B2. A second moving member E2 driven by the second linear motor D2 and moving left and right along the X-axis is coupled to the second beam B2. A second component mounting head H2 and a second head camera C2 are attached to the second moving member E2.
[0027] 3, the first component mounting head H1 and the second component mounting head H2 are equipped with a plurality of component holding nozzles 12 that hold components at their lower ends. The first component mounting head H1 and the second component mounting head H2 raise and lower the component holding nozzles 12 along the Z axis and rotate them around the Z axis.
[0028] 2 and 3, the first component mounting head H1 moves in the horizontal direction (X-axis direction, Y-axis direction) by the Y-axis linear motor 11 and the first linear motor D1. That is, the Y-axis table 8 and the first beam B1 constitute a first work head moving mechanism F1 that moves the first component mounting head H1 and the first head camera C1 within the first area A1. The second component mounting head H2 moves in the horizontal direction by the Y-axis linear motor 11 and the second linear motor D2. That is, the Y-axis table 8 and the second beam B2 constitute a second work head moving mechanism F2 that moves the second component mounting head H2 and the second head camera C2 within the second area A2.
[0029] The first head camera C1 and the second head camera C2 move above the board 2 held at the loading work position of the first board transport lane L1 or the loading work position of the second board transport lane L2, and capture an image of a board mark (not shown) provided on the board 2. The imaged result is subjected to image recognition to identify the position of the board 2. In addition, in the first supply position teaching, which is a specific task, the first head camera C1 (first imaging section) of the first work unit U1 captures an image of the component supply unit 3 of the first component supply section S1 to detect the component supply position. In addition, in the second supply position teaching, which is a specific task, the second head camera C2 (second imaging section) of the second work unit U2 captures an image of the component supply unit 3 of the second component supply section S2 to detect the component supply position.
[0030] 2 and 3, a first component camera G1 for capturing an image of the upper side is disposed between the first component supply unit S1 and the first board transport lane L1 on the upper surface of the base 4. A second component camera G2 for capturing an image of the upper side is disposed between the second component supply unit S2 and the second board transport lane L2. When the first component mounting head H1, which has taken out a component from the first component supply unit S1, moves above the first component camera G1, the first component camera G1 captures an image of the component held by the component holding nozzle 12. When the second component mounting head H2, which has taken out a component from the second component supply unit S2, moves above the second component camera G2, the second component camera G2 captures an image of the component held by the component holding nozzle 12. The captured image is recognized, and the posture of the component held by the component holding nozzle 12 is recognized.
[0031] When the first component mounting head H1 mounts components on the board 2, the mounting positions of the components are corrected taking into account the results of board position recognition by the first head camera C1 and the results of component recognition by the first component camera G1. Similarly, when the second component mounting head H2 mounts components on the board 2, the mounting positions of the components are corrected taking into account the results of board position recognition by the second head camera C2 and the results of component recognition by the second component camera G2.
[0032] 2 and 3, a plurality of first reference points J1 are arranged around a mounting work position in the first area A1 where the board 2 on which components are to be mounted is held by the first board transport lane L1. Here, a total of two first reference points J1 are arranged, one behind the first board transport lane L1 and one beside the first component camera G1. In this way, at least one first reference point J1 that serves as a reference point for the first work head moving mechanism F1 is arranged in the first area A1. In the first calibration, which is a specific work, the first reference point J1 is imaged by the first head camera C1 (first imaging unit), and the first work unit U1 is calibrated based on the position of the first reference point J1 identified from the image captured.
[0033] A plurality of second reference points J2 are arranged around the mounting work position in the second area A2 where the board 2 on which components are to be mounted is held by the second board transport lane L2. Here, a total of two second reference points J2 are arranged, one in front of the second board transport lane L2 and one beside the second component camera G2. In this way, at least one second reference point J2 that serves as a reference point for the second work head moving mechanism F2 is arranged in the second area A2. In the second calibration, which is a specific work, the second reference point J2 is imaged by the second head camera C2 (second imaging unit), and the second work unit U2 is calibrated based on the position of the second reference point J2 identified from the imaged image.
[0034] 2 and 3, a first operation unit P1 is disposed at the upper front part of the component mounting devices M1 to M4, and a second operation unit P2 is disposed at the upper rear part. A control unit 20 is disposed on the base 4. In addition to the first operation unit P1 and the second operation unit P2, each unit of the component mounting devices M1 to M4 is connected to the control unit 20 (see FIG. 5). This allows a plurality of operation units (first operation unit P1 and second operation unit P2) having an input unit (touch screen 13) and a display unit (monitor 14) to communicate with the control unit 20.
[0035] The control unit 20 controls the first work unit U1 and the component supply unit 3 of the first component supply unit S1 to perform a component mounting operation to mount components on a board 2 held at the mounting operation position of the first board transport lane L1 or the mounting operation position of the second board transport lane L2. The control unit 20 also controls the second work unit U2 and the component supply unit 3 of the second component supply unit S2 to perform a component mounting operation to mount components on a board 2 held at the mounting operation position of the second board transport lane L2 or the mounting operation position of the first board transport lane L1.
[0036] The control unit 20 also controls the first work unit U1 to perform a first calibration or a first supply position teaching as the specific task, and controls the second work unit U2 to perform a second calibration or a second supply position teaching as the specific task.
[0037] As described above, each of the component mounting devices M1 to M4 includes a first board transport lane L1, a second board transport lane L2, a first component supply unit S1, a second component supply unit S2, a first work unit U1 including a first component mounting head H1 (first work head), a first work head moving mechanism F1 and a first head camera C1 (first imaging unit), a second work unit U2 including a second component mounting head H2 (second work head), a second work head moving mechanism F2 and a second head camera C2 (second imaging unit), a first component camera G1, a second component camera G2, a first reference point J1, a second reference point J2, a control unit 20 and a plurality of operation units (first operation unit P1, second operation unit P2).
[0038] The first board transport lane L1, the first component supply unit S1, the first working unit U1, the first component camera G1, and the first reference point J1 constitute a first working unit W1 that performs the component mounting work and the specific work. The second board transport lane L2, the second component supply unit S2, the second working unit U2, the second component camera G2, and the second reference point J2 constitute a second working unit W2 that performs the component mounting work and the specific work. The component mounting devices M1 to M4 are working devices that include working units (first working unit W1, second working unit W2), a control unit 20 that controls the working units, and a plurality of operation units (first operation unit P1, second operation unit P2) connected to the control unit.
[0039] Next, the detailed configuration of the 4-stage / 4-head component mounting devices M5, M6 will be described with reference to FIG. 4. The component mounting devices M5, M6 are similar to the 2-stage / 2-head component mounting devices M1-M4 described above in that they have a first working unit W1 and a second working unit W2 upstream. The component mounting devices M5, M6 are different from the component mounting devices M1-M4 in that they further have a third working unit W3 before the downstream and a fourth working unit W4 after the downstream. The component mounting devices M5, M6 are also different from the component mounting devices M1-M4 in that the first operation unit P1 is disposed between the first working unit W1 and the third working unit W3, and the second operation unit P2 is disposed between the second working unit W2 and the fourth working unit W4. Hereinafter, the same parts as the component mounting devices M1-M4 are denoted by the same reference numerals, and detailed description will be omitted.
[0040] In FIG. 4, the Y-axis support section 9 extending along the Y-axis is disposed in the center of the upper surface of the base 4. A second Y-axis table 8B extending along the Y-axis is disposed at the end opposite (downstream) to the Y-axis table 8 extending along the Y-axis disposed upstream of the upper surface of the base 4. A guide section 10 extending along the Y-axis is disposed at a position facing the second Y-axis table 8B and the Y-axis support section 9. A second Y-axis linear motor 11B extending along the Y-axis is disposed on the second Y-axis table 8B. Hereinafter, the Y-axis table 8 will be referred to as the first Y-axis table 8A when distinguished from the second Y-axis table 8B. The Y-axis linear motor 11 will be referred to as the first Y-axis linear motor 11A when distinguished from the second Y-axis linear motor 11B.
[0041] Between the second Y-axis table 8B and the Y-axis support section 9, a third beam B3 is disposed in the front and a fourth beam B4 is disposed in the rear. The third beam B3 and the fourth beam B4 are driven by a second Y-axis linear motor 11B to move back and forth along the guide section 10. A third linear motor D3 extending along the X-axis is disposed on the third beam B3. A fourth linear motor D4 extending along the X-axis is disposed on the fourth beam B4.
[0042] 4, the second Y-axis table 8B and the third beam B3 constitute a third work head moving mechanism F3 that moves the third component mounting head H3 and the third head camera C3 within the third area A3. The second Y-axis table 8B and the fourth beam B4 constitute a fourth work head moving mechanism F4 that moves the fourth component mounting head H4 and the fourth head camera C4 within the fourth area A4.
[0043] The third head camera C3 and the fourth head camera C4 move above the board 2 held at the loading work position of the first board transport lane L1 or the loading work position of the second board transport lane L2, and capture an image of a board mark (not shown) provided on the board 2. The image capture result is subjected to image recognition, and the position of the board 2 is recognized. In addition, in the third supply position teaching, which is a specific task, the third head camera C3 (third imaging section) of the third work unit U3 captures an image of the component supply unit 3 of the third component supply section S3 to detect the component supply position. In addition, in the fourth supply position teaching, which is a specific task, the fourth head camera C4 (fourth imaging section) of the fourth work unit U4 captures an image of the component supply unit 3 of the fourth component supply section S4 to detect the component supply position.
[0044] 4, a third component camera G3 that captures images above is disposed between the third component supply unit S3 and the first board transport lane L1 on the upper surface of the base 4. In addition, a fourth component camera G4 that captures images above is disposed between the fourth component supply unit S4 and the second board transport lane L2.
[0045] At least one third reference point J3 is disposed within the third region A3, which serves as a reference point for the third work head moving mechanism F3. In the third calibration, which is a specific task, the third reference point J3 is imaged by the third head camera C3 (third imaging unit), and the third work unit U3 is calibrated based on the position of the third reference point J3 identified from the captured image. In addition, at least one fourth reference point J4 is disposed within the fourth region A4, which serves as a reference point for the fourth work head moving mechanism F4. In the fourth calibration, which is a specific task, the fourth reference point J4 is imaged by the fourth head camera C4 (fourth imaging unit), and the fourth work unit U4 is calibrated based on the position of the fourth reference point J4 identified from the captured image.
[0046] As described above, component mounting devices M5, M6 include a first board transport lane L1, a second board transport lane L2, a first component supply section S1, a second component supply section S2, a third component supply section S3, a fourth component supply section S4, a first work unit U1, a second work unit U2, a third work unit U3 including a third component mounting head H3 (third work head), a third work head moving mechanism F3 and a third head camera C3 (third imaging section), and a fourth work unit U4. The system includes a fourth work unit U4 including a component mounting head H4 (fourth work head), a fourth work head moving mechanism F4, and a fourth head camera C4 (fourth imaging section), a first component camera G1, a second component camera G2, a third component camera G3, a fourth component camera G4, a first reference point J1, a second reference point J2, a third reference point J3, a fourth reference point J4, a control section 20, and a plurality of operation sections (first operation section P1, second operation section P2).
[0047] The first board transport lane L1, the third component supply unit S3, the third working unit U3, the third component camera G3, and the third reference point J3 constitute a third working unit W3 that performs a component mounting operation and a specific operation. The second board transport lane L2, the fourth component supply unit S4, the fourth working unit U4, the fourth component camera G4, and the fourth reference point J4 constitute a fourth working unit W4 that performs a component mounting operation and a specific operation. In this way, the component mounting devices M5 and M6 are working devices that include working units (first working unit W1, second working unit W2, third working unit W3, fourth working unit W4), a control unit 20 that controls the working units, and a plurality of operating units (first operating unit P1, second operating unit P2) connected to the control unit.
[0048] Next, referring to Figure 5, the configuration of the control system of the two-stage / two-head component mounting device M1-M4 will be described, focusing on the function of appropriately processing operations from multiple operating parts (first operating part P1, second operating part P2) for multiple work units (first working unit U1, second working unit U2) or multiple working parts (first working part W1, second working part W2).
[0049] The control unit 20 provided in each of the component mounting devices M1 to M4 includes an input processing unit 21, a processing unit 22, an exclusive processing unit 23, an output processing unit 24, and a storage unit 25. The input processing unit 21 receives operation information from a plurality of operation units (first operation unit P1, second operation unit P2), identifies which operation unit the input came from, and outputs a command based on the operation information. The input processing unit 21 includes an input receiving unit 26, an operation unit identifying unit 27, and an output unit 28 as internal processing units.
[0050] The processing unit 22 executes various processes, which will be described later, based on commands and causes the working units (first working unit W1, second working unit W2) to perform a predetermined task (parts mounting task) and a specific task. The processing unit 22 includes, as internal processing units, a part mounting processing unit 29, a first calibration processing unit 30, a first teaching processing unit 31, a second calibration processing unit 32, and a second teaching processing unit 33. The memory unit 25 is a storage device, and stores a production program 34, teaching / calibration data 35, operation performance data 36, device status data 37, etc.
[0051] 5, a first calibration processing unit 30 controls a first working unit W1 to perform a first calibration for calibrating a first working unit U1 based on the position of a first reference point J1. A second calibration processing unit 32 controls a second working unit W2 to perform a second calibration for calibrating a second working unit U2 based on the position of a second reference point J2. Information acquired by the first calibration or the second calibration (such as correction values) is stored in the memory unit 25 as teaching / calibration data 35.
[0052] The first teaching processing unit 31 controls the first working unit W1 to execute first supply position teaching, which detects the component supply position of the first component supply unit S1 and teaches the position at which the component holding nozzle 12 of the first component mounting head H1 picks up components from the component supply unit 3. The second teaching processing unit 33 controls the second working unit W2 to execute second supply position teaching, which detects the component supply position of the second component supply unit S2 and teaches the position at which the component holding nozzle 12 of the second component mounting head H2 picks up components from the component supply unit 3. Information acquired by the first supply position teaching or the second supply position teaching (such as component suction position data) is stored in the memory unit 25 as teaching / calibration data 35.
[0053] 5, production program 34 stores information and control programs required for component mounting work, such as the size of board 2, the type of components to be mounted, and mounting positions (XY coordinates) for each type of mounting board. Component mounting processing unit 29 controls first working unit W1 and second working unit W2 based on production program 34 and teaching / calibration data 35 to transport board 2 and perform component mounting work of mounting components on the board. In the component mounting work, component mounting processing unit 29 controls the positions of first component mounting head H1 and second component mounting head H2 by referring to teaching / calibration data 35 (various correction values, component suction position data, etc.).
[0054] The processing unit 22 sequentially acquires operational results such as the remaining number of components that each component supply unit 3 can supply, the number of mounting boards produced, the number of component mounting errors, and the number of pickup errors, and stores them in the memory unit 25 as operational result data 36. The processing unit 22 also sequentially acquires the states of the working units (first working unit W1, second working unit W2), the progress of the component mounting work, the progress of specific tasks such as calibration and supply position teaching, information on the operating units (first operating unit P1, second operating unit P2) that have operated the control unit 20, and stores them in the memory unit 25 as device status data 37.
[0055] 5, the first operation unit P1 is connected to a first connection port T1 provided in the control unit 20. The second operation unit P2 is connected to a second connection port T2 provided in the control unit 20. Operation events indicating the content of an operation performed by an operator on the touch screen 13 and operation information including coordinate data indicating the position where the operation was performed are transmitted to the input processing unit 21 via the connection ports (the first connection port T1 and the second connection port T2). Examples of operation events include tap, long tap, flick, slide, pen up, pen down, pitch in, pitch out, etc.
[0056] Now, referring to Fig. 6, the processing of the input receiving unit 26 will be described. The input receiving unit 26 receives operation information (operation event, coordinate data) output from the touch screen 13 (ST1). When the input receiving unit 26 receives the operation information (Yes in ST1), the input processing unit 21 determines the command input by the worker to the touch screen 13 based on the operation information received by the input receiving unit 26 (ST2). Next, the operation unit identifying unit 27 identifies from which operation unit (first operation unit P1, second operation unit P2) the operation information was transmitted (ST3). In this example, the operation unit is identified based on which connection port (first connection port T1, second connection port T2) the operation information was transmitted via.
[0057] When the first connection port T1 is identified (the first connection port in ST3), the output unit 28 outputs the operation unit identification information of the first connection port T1 in association with a command (ST4). When the second connection port T2 is identified (the second connection port in ST3), the output unit 28 outputs the operation unit identification information of the second connection port T2 in association with a command (ST5). In this way, the output unit 28 outputs to the processing unit 22 and the output processing unit 24 the command determined by the input processing unit 21 in association with the identification result (operation unit identification information) that specifies which operation unit recognized by the operation unit identification unit 27 is the operation for.
[0058] For example, when a worker taps the stop button displayed on the monitor 14 of the first operation unit P1, operation information including the operation event "tap" and coordinate data indicating the operation position on the touch screen 13 is transmitted to the control unit 20 via the first connection port T1. Based on the operation information received by the input receiving unit 26, the input processing unit 21 recognizes that the tapped position is within the display area of the stop button displayed on the monitor 14 (ST2), associates the stop command with the identification result indicating the first operation unit P1 identified by the operation unit identification unit 27, and outputs the association result to the processing unit 22 and the output processing unit 24 (ST4).
[0059] In this way, the input processing unit 21 receives operation information from a plurality of operation units (first operation unit P1, second operation unit P2), identifies which operation unit the input came from, and outputs a command based on the operation information. The plurality of operation units are individually connected to a plurality of connection ports (first connection port T1, second connection port T2) provided in the control unit 20, and the input processing unit 21 detects which connection port the operation information passed through and identifies the operation unit that output the operation information.
[0060] 5, the exclusion processing unit 23 executes exclusion processing to permit operations from the operation unit that instructed the specific work at a work unit while prohibiting operations from other operation units, based on the identification result of the operation unit output from the input processing unit 21 and the status of the work units (first work unit W1, second work unit W2) included in the device status data 37. This makes it possible to prevent operations from other operation units that conflict with the work unit where the specific work is being performed.
[0061] For example, when the first operating part P1 is operated to perform a specific task, calibration, on the first working part W1 (or the first working unit U1), while the first calibration processing part 30 is causing the first working part W1 to perform the first calibration, the exclusive processing part 23 permits operation from the first operating part P1 but prohibits operation from the second operating part P2.
[0062] That is, the exclusive processing unit 23 refers to the identification result of the operation unit by the input processing unit 21, and when one operation unit (first operation unit P1) is assigned to one working unit in order to have one working unit (first working unit W1) or one working unit (first working unit U1) execute a specific task (calibration), the exclusive processing unit 23 permits the one operation unit to perform operations for the one working unit but prohibits the other operation unit (second operation unit P2) from performing operations for the other working unit (second working unit W2) or other working unit (second working unit U2) and permits the other operation unit to perform operations for the other working unit (second working unit W2) or other working unit (second working unit U2). This makes it possible to appropriately perform operations from each operation unit even when operations are simultaneously performed from multiple operation units on multiple working units or working units.
[0063] 5, the output processing unit 24 displays the execution result of the command executed by the processing unit 22 on the monitor 14 of the specified operation unit (first operation unit P1, second operation unit P2) based on the identification result of the operation unit specified by the input processing unit 21. For example, when the first working unit W1 is performing calibration by operation from the first operation unit P1, the output processing unit 24 displays the execution result including the progress of the calibration in the first working unit W1 on the monitor 14 of the first operation unit P1. In other words, the output processing unit 24 displays the execution result of the command on the display unit (monitor 14) of the operation unit specified by the identification by the input processing unit 21.
[0064] Next, examples of monitor screens displayed on the monitor 14 of the first operation unit P1 and the monitor 14 of the second operation unit P2 of each of the component mounting devices M1 to M4 will be described with reference to FIGS.
[0065] 7 shows a state in which the first working unit W1 and the second working unit W2 of each of the component mounting devices M1 to M4 are performing component mounting work on different types of mounting boards, and neither the first operation unit P1 nor the second operation unit P2 has been operated for a predetermined time (e.g., 5 minutes) or more. That is, based on the device status data 37, the output processing unit 24 causes the monitor 14 of the first operation unit P1 and the monitor 14 of the second operation unit P2 to display, respectively, the positions of the boards 2 being transported in the first board transport lane L1 and the second board transport lane L2, the board type of the mounting board being produced, the number of boards 2 on which the component mounting work has been completed, and the number of boards 2 for which production is planned.
[0066] Furthermore, the output processing unit 24 causes the monitor 14 of the first operation unit P1 to display information relating to the first board transport lane L1 on the lower side, and causes the monitor 14 of the second operation unit P2 to display information relating to the second board transport lane L2 on the lower side. That is, on each monitor 14, the board transport lane on the near side as viewed from the monitor 14 is displayed on the lower side. This allows an operator looking at the monitor 14 to easily grasp the status inside the component mounting devices M1-M4.
[0067] State B of FIG. 7 shows a state after the operator touches the monitor 14 of the first operation unit P1 in state A (tap anywhere on the screen). When the operator touches the monitor 14 of the first operation unit P1, operation information (tap, tapped coordinates) is output from the touch screen 13 of the first operation unit P1. The input processing unit 21 (operation unit identification unit 27) detects that the operation information has passed through the first connection port T1 and identifies that it is the first operation unit P1 that has output the operation information. The output processing unit 24 displays a main menu for receiving commands on the monitor 14 of the first operation unit P1. That is, the output processing unit 24 displays the execution result of the command (main menu display) on the monitor 14 of the first operation unit P1 specified by the identification by the input processing unit 21.
[0068] Furthermore, the output processing unit 24 causes the monitor 14 of the second operation unit P2 to display a notification indicating that an operation has been performed at the first operation unit P1. In this example, the notification is made by changing the color of the border of the screen displayed on the monitor 14. Note that the notification method is not limited to changing the color of the border of the screen, and it is also possible to change the color of the entire screen, or to display a comment on the screen indicating that an operation has been performed at the first operation unit P1.
[0069] State C in FIG. 7 shows the state after the worker selects the "Display remaining parts number" button (tap inside the display area of the "Display remaining parts number" button) from the main menu displayed on the monitor 14 of the first operation unit P1 in state B. When the worker selects the "Display remaining parts number" button, operation information (tap, tapped coordinates) is output from the touch screen 13 of the first operation unit P1. The output processing unit 24 displays a screen showing the remaining parts number on the monitor 14 of the first operation unit P1 based on the remaining number of parts that each component supply unit 3 can supply, which is included in the operation performance data 36. It should be noted that the output processing unit 24 does not change the display on the monitor 14 of the second operation unit P2.
[0070] State D in FIG. 7 shows a state after the operator selects the "Operation History Data (Suction Nozzle)" button from the main menu displayed by touching the monitor 14 of the second operation unit P2 in state C. That is, the output processing unit 24 displays a screen showing the operation history on the monitor 14 of the second operation unit P2 based on the operation history data of the component holding nozzle 12 included in the operation history data 36. Furthermore, the output processing unit 24 displays a notice indicating that an operation has been performed on the second operation unit P2 on the monitor 14 of the first operation unit P1. Note that the output processing unit 24 does not change the display on the monitor 14 of the first operation unit P1.
[0071] State E in Fig. 8 shows a state after the operator selects the "calibration" button from the main menu displayed on monitor 14 of first operation unit P1 when both first working unit W1 and second working unit W2 are capable of performing a specific task. In other words, neither first working unit W1 nor second working unit W2 is performing a component mounting task, and no information related to the component mounting task is displayed on monitor 14 of second operation unit P2.
[0072] When the "Calibration" button is selected, the output processing unit 24 displays a calibration selection menu on the monitor 14 of the first operation unit P1. The calibration selection menu displays a "Front" button and a "Back" button for selecting the working unit on which the calibration is to be performed, as well as a "Start" button and a diagram that shows a schematic representation of the working units of the component mounting devices M1 to M4.
[0073] State F of FIG. 8 shows a state after the operator taps the "Start" button in a state in which the operator has tapped the "Front" button (working unit selection button) to select the front in the calibration selection menu displayed on the monitor 14 of the first operation unit P1 in state E. That is, the first calibration processing unit 30 causes the first working unit W1 to perform the first calibration based on the operation information output from the touch screen 13 of the first operation unit P1. The output processing unit 24 causes the monitor 14 of the first operation unit P1 to display a calibration status screen. The calibration status screen displays a diagram that shows in schematic form that the calibration is being performed on the first working unit W1, characters and a graph showing the progress of the calibration (here, 5%), and a "Stop" button.
[0074] Furthermore, the output processing unit 24 causes the monitor 14 of the second operation unit P2 to display a message indicating that calibration is being performed in the first working unit W1. In this example, text information "Calibration in progress" is displayed at a position indicating the first board transport lane L1. The exclusion processing unit 23 assigns the first operation unit P1 to the first working unit W1 based on the operation information output from the touch screen 13 of the first operation unit P1, and then maintains that state until the first calibration is completed.
[0075] That is, the exclusion processing unit 23 permits the first operation unit P1 to operate the first working unit W1 but prohibits the second operation unit P2 from operating the first working unit W1 until the first calibration is completed. Therefore, a "Stop" button for stopping the calibration of the first working unit W1 is displayed on the monitor 14 of the first operation unit P1, but no buttons or the like for operating the first working unit W1 are displayed on the monitor 14 of the second operation unit P2. When the "Stop" button displayed on the monitor 14 of the first operation unit P1 is operated, the calibration of the first working unit W1 is stopped.
[0076] State G of Fig. 8 shows a state after the operator selects the "Teaching" button from the main menu displayed by touching monitor 14 of second operation unit P2 in state F. That is, in a state in which exclusion processing unit 23 assigns first operation unit P1 to first working unit W1, output processing unit 24 displays a teaching selection menu on monitor 14 of second operation unit P2. In the teaching selection menu, a "Front" button and a "Back" button for selecting a working unit to perform calibration, a "Start" button, and a diagram that typically displays the working units of component mounting devices M1 to M4 are displayed.
[0077] The first calibration is being performed in the first working unit W1, and the second operation unit P2 is prohibited from performing operations for the first working unit W1. Therefore, the output processing unit 24 displays the "Back" button in the teaching selection menu in an inoperable state. Also, in the schematic diagram, the first working unit W1 is displayed with a dotted line to clearly indicate that it cannot be selected. Also, the output processing unit 24 updates the progress of the calibration (here, 10%) displayed on the monitor 14 of the first operation unit P1 to the latest status.
[0078] State H of FIG. 8 shows a state after the operator taps the "Start" button in the teaching selection menu displayed on the monitor 14 of the second operation unit P2 in state G, in which the operator has tapped the "Front" button to select "Front." That is, based on the operation information output from the touch screen 13 of the second operation unit P2, the second teaching processing unit 33 causes the second working unit W2 to perform the second supply position teaching. The output processing unit 24 causes the monitor 14 of the second operation unit P2 to display a teaching status screen. The teaching status screen displays a diagram that shows in schematic form that the supply position teaching is being performed on the second working unit W2, characters and a graph showing the progress of the teaching (here, 0%), and a "Stop" button.
[0079] Furthermore, the output processing unit 24 updates the progress of the calibration (here, 20%) displayed on the monitor 14 of the first operation unit P1 to the latest progress. The exclusion processing unit 23 assigns the second operation unit P2 to the second working unit W2 based on the operation information output from the touch screen 13 of the second operation unit P2, and maintains this state until the second supply position teaching is completed. In other words, the exclusion processing unit 23 permits the second operation unit P2 to operate the second working unit W2 but prohibits the first operation unit P1 from doing so until the second supply position teaching is completed.
[0080] Therefore, a "Stop" button for stopping the supply position teaching of the second working unit W2 is displayed on the monitor 14 of the second operation unit P2, but no buttons or the like for operating the second working unit W2 are displayed on the monitor 14 of the first operation unit P1. When the "Stop" button displayed on the monitor 14 of the second operation unit P2 is operated, the component supply position teaching of the second working unit W2 is stopped.
[0081] 9 shows a state after a worker selects the "Calibration" button from the main menu displayed on the monitor 14 of the first operation unit P1 and another worker selects the "Calibration" button from the main menu displayed on the monitor 14 of the second operation unit P2 in a state in which both the first working unit W1 and the second working unit W2 are capable of performing a specific task. That is, the output processing unit 24 causes the monitor 14 of the first operation unit P1 to display a calibration selection menu, and also causes the monitor 14 of the second operation unit P2 to display a calibration selection menu.
[0082] 9 shows a state after a worker taps the "Front" button on monitor 14 of first operation unit P1 to select the front (first working unit W1) in state K, and another worker taps the "Front" button on monitor 14 of second operation unit P2 to select the front (second working unit W2). That is, exclusive processing unit 23 assigns first operation unit P1 to first working unit W1, and assigns second operation unit P2 to second working unit W2.
[0083] The exclusive processing unit 23 permits the first operation unit P1 to operate the first working unit W1 but prohibits the second operation unit P2 from operating the second working unit W2, and permits the second operation unit P2 to operate the second working unit W2 but prohibits the first operation unit P1 from operating the second working unit W2. The output processing unit 24 displays the "deep" button for operating the second working unit W2 on the monitor 14 of the first operation unit P1 in an inoperable state, and displays the "deep" button for operating the first working unit W1 on the monitor 14 of the second operation unit P2 in an inoperable state.
[0084] State M in Fig. 9 shows a state after an operator taps the "Start" button on the monitor 14 of the first operation unit P1 in state L, and another operator taps the "Start" button on the monitor 14 of the second operation unit P2. That is, the first calibration is performed by the first calibration processing unit 30, and the second calibration is performed by the second calibration processing unit 32. Then, the output processing unit 24 causes the monitor 14 of the first operation unit P1 to display a calibration status screen for the first working unit W1, and causes the monitor 14 of the second operation unit P2 to display a calibration status screen for the second working unit W2.
[0085] A "Stop" button for stopping the calibration of the first working unit W1 is displayed on the monitor 14 of the first operation unit P1. Also, a "Stop" button for stopping the calibration of the second working unit W2 is displayed on the monitor 14 of the second operation unit P2. That is, an exclusive state is established in which operations for the first working unit W1 are permitted from the first operation unit P1, but operations for the second working unit W2 are not permitted (prohibited). Similarly, an exclusive state is established in which operations for the second working unit W2 are permitted from the second operation unit P2, but operations for the first working unit W1 are not permitted (prohibited).
[0086] Next, a first modified example of component mounting devices M1 to M4 will be described with reference to Fig. 10(a) and Fig. 10(b). The first modified example differs from component mounting devices M1 to M4 shown in Fig. 5 in that unique operation unit identification information 15 is set for first operation unit P1 and second operation unit P2, respectively. The differences from component mounting devices M1 to M4 shown in Fig. 5 will be described below. When outputting operation information to control unit 20, first operation unit P1 and second operation unit P2 output the operation unit identification information 15 set therein. Input receiving unit 26 receives the operation information and operation unit identification information 15 (Yes in ST11).
[0087] Next, the input processing unit 21 determines the command input to the touch screen 13 based on the operation information (ST12). Next, the output unit 28 outputs the determined command in association with the received operation unit identification information 15 or the identification result by the operation unit identification unit 27 (ST13). In this way, unique operation unit identification information 15 is set for multiple operation units, and the input processing unit 21 identifies the operation unit that output the operation information based on the operation unit identification information 15 received together with the operation information. This makes it possible to correctly identify the operation unit that output the operation information even if the first operation unit P1 is mistakenly connected to the second connection port T2.
[0088] Next, a second modified example of the component mounting devices M1 to M4 will be described with reference to FIG. 11. The second modified example differs from the first modified example in that the first operation unit P1 and the second operation unit P2 and the control unit 20 transmit and receive information wirelessly. The differences from the first embodiment will be described below. The first operation unit P1 and the second operation unit P2 each include an operation unit side communication unit 16. The control unit 20 includes a control unit side communication unit 38. The operation unit side communication unit 16 and the control unit side communication unit 38 transmit and receive various information wirelessly. That is, the operation information and operation unit identification information 15 output from the first operation unit P1 are transmitted wirelessly from the operation unit side communication unit 16 to the control unit 20 via the control unit side communication unit 38.
[0089] Moreover, the execution result to be displayed on the monitor 14 of the operation unit output from the output processing unit 24 is wirelessly transmitted from the control unit side communication unit 38 to the operation unit side communication unit 16 of the operation unit (first operation unit P1 or second operation unit P2) specified by the identification result. This allows an operator carrying the first operation unit P1 or the second operation unit P2 to appropriately operate the multiple work units (working units) of the component mounting devices M1 to M4 from a position away from the component mounting devices M1 to M4. Note that instead of the control unit side communication unit 38, an access point capable of wirelessly communicating with the operation unit side communication unit 16 may be installed in the factory where the component mounting devices M1 to M4 are arranged, and the access point and the control unit 20 of the component mounting devices M1 to M4 may be connected by a wired communication network.
[0090] As described above, component mounting devices M1-M4 (working devices) of this embodiment include a control unit 20 that causes a first working unit U1 and a second working unit U2 (first working unit W1, second working unit W2) to perform a component mounting task (predetermined task) of mounting components on a board 2 and a specific task, and multiple operation units (first operation unit P1, second operation unit P2) connected to the control unit 20. The control unit 20 also includes an input processing unit 21, a processing unit 22, an exclusive processing unit 23, and an output processing unit 24. This allows appropriate operation from each operation unit even when operations are simultaneously performed from multiple operation units on multiple work units or working units.
[0091] Although the above describes the configuration of the control system of the two-stage / two-head component mounting devices M1-M4, the configuration of the control system of the four-stage / four-head component mounting devices M5, M6 is similar. That is, the component mounting devices M5, M6 (working devices) are equipped with a control unit 20 that causes the first working unit U1 (first working section W1), the second working unit U2 (second working section W2), the third working unit U3 (third working section W3), and the fourth working unit U4 (fourth working section W4) to perform a component mounting task (predetermined task) of mounting components on the board 2 and a specific task, and a plurality of operation units (first operation unit P1, second operation unit P2) connected to the control unit 20.
[0092] The control unit 20 has an input processing unit 21, a processing unit 22, an exclusive processing unit 23, and an output processing unit 24. This allows appropriate operations to be performed from multiple operation units (first operation unit P1, second operation unit P2) on multiple task units (first task unit U1, second task unit U2, third task unit U3, fourth task unit U4). [Industrial Applicability]
[0093] INDUSTRIAL APPLICABILITY The component mounting device of the present invention has the effect of being able to appropriately perform operations on a plurality of working units from a plurality of operating sections, and is useful in the field of mounting components onto a board. [Explanation of symbols]
[0094] 2. Board 3 Parts supply unit 20 Control section A1 1st area A2 2nd area C1 1st head camera (1st imaging unit) C2 2nd head camera (2nd imaging unit) F1 First working head moving mechanism F2 Second work head moving mechanism H1 1st parts mounting head (1st work head) H2 2nd parts mounting head (2nd work head) J1 1st reference point J2 2nd reference point L1 First board transport lane L2 Second board transport lane M1~M6 Parts mounting device P1 1st operation section (operation section) P2 2nd operation section (operation section) S1 1st Parts Supply Department S2 2nd parts supply section T1 1st connection port (connection port) T2 2nd connection port (connection port) U1 First working unit U2 Second working unit
Claims
1. a first board transport lane that transports boards along one axis extending in a horizontal direction; a second board transport lane that is disposed at a position away from the first board transport lane in a direction along another axis perpendicular to the one axis in a horizontal plane, and transports boards along the one axis; a first component supply section that is disposed at a position away from the first board transport lane in a direction along the other axis on an opposite side to the second board transport lane side, and that has a plurality of component supply units that are disposed in parallel along the one axis; a second component supply section that is disposed at a position away from the second board transport lane in a direction along the other axis on an opposite side to the first board transport lane side, and that has a plurality of component supply units that are disposed in parallel along the one axis; a first work unit including a first work head that holds components and places them on a board, a first work head moving mechanism that moves the first work head at least from above the first component supply unit within a first region above the second board transport lane, and a first imaging unit that moves together with the first work head by the first work head moving mechanism; a second work unit including a second work head that holds components and mounts them on a board, a second work head moving mechanism that moves the second work head at least from above the second component supply unit within a second region above the first board transport lane, and a second imaging unit that moves together with the second work head by the second work head moving mechanism; At least one first reference point that is disposed within the first region and serves as a reference point for the first work head moving mechanism; At least one second reference point that is disposed within the second region and serves as a reference point for the second work head moving mechanism; a control unit that causes the first work unit and the second work unit to perform a component mounting operation for mounting components on a board and a specific operation; A plurality of operation units each having an input unit and a display unit and capable of communicating with the control unit, The control unit is an input processing unit that receives operation information from the plurality of operation units, identifies which operation unit the input is from, and outputs a command based on the operation information; A processing unit that executes a process based on the instruction; and an exclusive processing unit that refers to the identification result of the operation unit by the input processing unit, and when an operation unit is assigned to a work unit in order to cause the work unit to perform a specific task, permits the operation unit to be performed by the one operation unit but prohibits other operation units, and permits the other operation units to be performed by the other operation units.
2. The plurality of operation units are individually connected to a plurality of connection ports provided on the control unit, 2. The component mounting device according to claim 1, wherein the input processing section detects through which connection port the operation information has passed and identifies the operation section that has output the operation information.
3. Each of the plurality of operation units has unique operation unit identification information set thereto, The component mounting device according to claim 1 , wherein the input processing unit identifies the operation unit that has output the operation information based on operation unit identification information received together with the operation information.
4. The control unit is 4. The component mounting device according to claim 1, further comprising an output processing unit that displays a result of execution of the command on a display unit of an operation unit specified by the identification result.
5. 5. The component mounting device of claim 1, wherein the identifying task includes a first calibration in which the first reference point is imaged by the first imaging unit of the first work unit and the first work unit is calibrated based on the position of the first reference point identified from the imaged image, and a second calibration in which the second reference point is imaged by the second imaging unit of the second work unit and the second work unit is calibrated based on the position of the second reference point identified from the imaged image.
6. 6. A component mounting device as described in any one of claims 1 to 5, wherein the specific task includes first supply position teaching in which the first imaging unit of the first work unit images a component supply unit of a first component supply unit to detect a component supply position, and second supply position teaching in which the second imaging unit of the second work unit images a component supply unit of a second component supply unit to detect a component supply position.
Citation Information
Patent Citations
Touch panel with manipulation selecting function and component mounting apparatus provided therewith
JP2006261237A
Component-mounting system and component-mounting method
JP2011204975A
Component mounting apparatus and model switching method of the same
JP2012129449A
Component mounting device and model switching method in component mounting device
JP2012151334A
Component mounting device and component mounting method
JP2017092273A