Abstract

Provided is a monitoring control system capable ofimproving efficiency of duties from the start instructionto the end of on-site operations. The monitoring controlsystem is provided with at Ieast one transmissionmonitoring control subsystem that performs monitoringcontrol of a power transmission system; and at least onedistribution monitoring control subsystem that performsmonitoring control of a power distribution system. Thetransmissj-on monitoring control subsystem and thedistribution monitorj-ng control subsystem are respectivelyprovided with an operation procedure creation unit thatcreates an operation procedure that defines a procedure ofan operation for a facility installed in an electric powersystem including the power transmission system and thepower distribution system, and an operation unit that, in acase where an on-site operation that cannot be remotelyperformed on the facility is included in the operationprocedure, transmits, to an on-site terminal associatedwith the on-site operation, a start confirmationinstruction to confirm whether or not the on-site operationcan be started and the operation procedure for the on-siteoperation. The monitoring control system performsmonitoring control of the power transmission system and thepower distribution system on the basis of the operatj-onprocedure
Need to check novelty before this filing date? Find Prior Art

Description

Monitoring and Control Systems

[0001] The present invention relates to a monitoring and control system.

[0002] An electric power system that supplies electric power from a power plant to consumer loads is divided into a transmission system and a distribution system. The transmission system transmits electric power generated at a power plant to a transmission substation via a primary transmission line, and transmits the power stepped down in the transmission substation to a distribution substation via a secondary transmission line. The distribution system supplies the power stepped down in the distribution substation to consumer loads via a distribution line. Monitoring and control systems that monitor and control the above-mentioned electric power system are known. The monitoring and control system includes a system monitoring and control system that monitors and controls the transmission system, a distribution monitoring and control system that monitors and controls the distribution system, and an equipment status monitoring system that monitors the status of facility equipment and supports maintenance work.

[0003] In a power system, work such as the addition of equipment or maintenance inspections may be performed. In this case, work such as system switching in a power transmission system or section switching in a power distribution system is performed to eliminate or minimize power outages to consumer loads. Prior to the execution of these work, an outage plan is first created, and then a procedure chart defining individual operations of facilities or equipment is created based on the outage plan (see, for example, Patent Document 1 listed below).

[0004] Depending on the type and condition of the equipment, the operations of the above-mentioned equipment may be performed from a control center located away from the equipment, or may require an operator to go to the site to perform the operations. When remote operations are performed from a control center, the progress can be checked on a control terminal at the control center. However, when an operator performs on-site operations, for example, a printed copy of the procedure table described above is brought to the site, and the control center communicates the start command and operation procedure for the on-site operation to the operator by telephone, and also communicates the start of the on-site operation to the control center by telephone.

[0005] Japanese Unexamined Patent Publication No. 7-163052

[0006] When performing the above-described operations, it is inefficient to transmit the command to start the on-site operation, the operation procedure, and the start of work by telephone, and to bring a printed procedure sheet to the site. Furthermore, verbal communication requires time and cost for safety management to prevent electric shock and other hazards caused by starting the on-site operation before the previous remote operation is completed. Furthermore, printed operation procedures may lead to misunderstandings due to confusion about the operation procedure or the work subject. The present invention has been developed in consideration of the above circumstances, and aims to provide a monitoring and control system that can streamline work from issuing a command to start on-site operations to their completion.

[0007] The monitoring and control system of the present invention comprises at least one system monitoring and control subsystem that monitors and controls a power transmission system, and at least one distribution monitoring and control subsystem that monitors and controls a power distribution system, and the system monitoring and control subsystem and the distribution monitoring and control subsystem each comprise an operation procedure creation unit that creates an operation procedure that defines the procedures for operating equipment installed in a power system including the power transmission system and the power distribution system, and an operation unit that, when the operation procedure includes an on-site operation that cannot be operated remotely on the equipment, sends to an on-site terminal associated with the on-site operation a start confirmation command that confirms whether the on-site operation can be started and the operation procedure for the on-site operation, and monitors and controls the power transmission system and the power distribution system based on the operation procedures.

[0008] In addition, in the above-mentioned monitoring and control system, when the operation procedure includes a remote operation that allows operation of the equipment from a distance, the operation unit may send a start confirmation command to the control terminal associated with the remote operation to confirm whether the remote operation can be started, and may send a remote operation command to the equipment to operate the equipment from a distance.

[0009] In the above-described monitoring and control system, the operation unit of one of the power grid monitoring and control subsystem and the power distribution monitoring and control subsystem may transmit an execution instruction request to the other subsystem based on completion of execution of the operation procedure.

[0010] In addition, in the above-described monitoring and control system, the operation procedure creation unit may convert the operation procedure that defines the procedure for operating the equipment into a common data format that can be used by both the power system monitoring and control subsystem and the power distribution monitoring and control subsystem.

[0011] According to the present invention, it is possible to provide a monitoring and control system that can improve the efficiency of operations from issuing a command to start on-site operations to their completion.

[0012] 1 is a conceptual diagram showing operations in a power system to which a monitoring and control system according to an embodiment is applied. FIG. 1 is a diagram showing a power system to which a monitoring and control system according to an embodiment is applied. FIG. 2 is a diagram showing the monitoring and control system according to an embodiment. FIG. 3 is a block diagram showing an LJ1 system, a data linkage server, and a monitoring and control system. FIG. 4 is a block diagram showing the functional configuration of the monitoring and control system according to an embodiment. FIG. 5 is a conceptual diagram showing shutdown plan subjects. FIG. 6 is a conceptual diagram showing operation subjects. FIG. 7 is a diagram showing operations related to shutdown plans of the monitoring and control system according to an embodiment. FIG. 8 is a diagram showing operations related to system operations of the monitoring and control system according to an embodiment. FIG. 9 is a flowchart showing operations of the monitoring and control system related to switchover feasibility determination. FIG. 10 is a conceptual diagram showing operation procedures according to an embodiment. FIG. 11 is a flowchart showing operations of a system operation unit according to an embodiment. FIG. 12 is a flowchart showing operations of the system operation unit according to an embodiment. FIG. 13 is a diagram showing processing for combining operation subjects for distribution monitoring and control according to operation subjects for system monitoring and control. A sequence diagram showing cooperation between a power system monitoring and control subsystem and a power distribution monitoring and control subsystem. A conceptual diagram showing examples of equipment and procedures for performing operations. A flowchart showing a method for performing operations by the monitoring and control system according to an embodiment. A flowchart showing a method for performing operations by the monitoring and control system according to an embodiment.

[0013] Hereinafter, an embodiment will be described with reference to the drawings. First, an overview of a monitoring and control system according to an embodiment will be described. FIG. 1 is a conceptual diagram showing operations in a power system to which a monitoring and control system according to an embodiment is applied. The power system 1 includes a server base 2, and the server base 2 is provided with a monitoring and control system SYS. Note that in FIG. 2 and subsequent figures, the monitoring and control system SYS may be represented by the reference numeral 14 (monitoring and control system 14), and the reference numerals SYS and 14 are also used in FIG. 1.

[0014] The monitoring and control system SYS is supplied with system shutdown plan information for the power transmission system and distribution shutdown plan information for the power distribution system from an external system. The monitoring and control system SYS centrally manages the system shutdown plan information and the distribution shutdown plan information. The monitoring and control system SYS includes an operation procedure creation unit (shown later in FIG. 4 ) and an operation unit (shown later in FIG. 5 ). The operation procedure creation unit creates operation procedures that define procedures for operating equipment installed in a power system including the power transmission system and the distribution system. For example, the operation procedure creation unit of the system monitoring and control subsystem in the monitoring and control system SYS automatically creates operation subjects that define operations for equipment based on the system shutdown plan information. Furthermore, the distribution monitoring and control subsystem automatically creates operation subjects in a format similar to the system shutdown plan information based on the distribution shutdown plan information for the power distribution system. The monitoring and control system SYS (operation procedure creation unit) creates operation procedures that define the content and order of operations (steps) based on the operation subjects. The monitoring and control system SYS (operation procedure creation unit) creates, in the same format, an operation procedure for the equipment based on the grid outage plan information and an operation procedure for the equipment based on the power distribution outage plan information. The operation procedure creation unit is, for example, a part of the operation unit, but may be provided in a device separate from the operation unit.

[0015] The operation procedure may include remote operations that can be performed remotely and local operations that cannot be performed remotely and must be performed locally. Remote operations are automatically performed, for example, using a control terminal C1 provided at a control station and a control terminal C2 provided at a power supply station. The control terminals C1 and C2 are, for example, stationary devices such as control consoles. The control terminals C1 and C2 are connected to each other via a network (NW) so that they can communicate with each other via wired or wireless means. The control terminals C1 and C2 are associated with each other by, for example, registering the IP addresses of the control terminals C1 and C2 in the monitoring and control system SYS.

[0016] Also, symbols Q1 and Q2 in the figure respectively denote facilities to be operated on-site in the power transmission system or the power distribution system. Facilities Q1 and Q2 are, for example, line switches in the power transmission system and section switches installed on utility poles in the power distribution system. A worker carrying a local terminal M1 visits the facility Q1 and performs on-site operations. A worker carrying a local terminal M2 visits the facility Q2 and performs on-site operations. The local terminal M1 and the local terminal M2 each include a display screen and an input unit. The local terminal M1 and the local terminal M2 are each an information terminal portable by the worker, such as a smartphone, tablet, or laptop computer. The local terminal M1 and the local terminal M2 are wirelessly connected to each other via a network (NW) so as to be able to communicate with each other. The local terminal M1 and the local terminal M2 are associated with each other, for example, by registering the IP addresses of the local terminal M1 and the local terminal M2 in the monitoring and control system SYS.

[0017] The monitoring and control system SYS (operation unit) executes the above-described remote operations and local operations in the order defined in the operation procedure. When starting a series of operations, the monitoring and control system SYS transmits a start confirmation command to each of the local terminals M1 and M2 via the network (NW). The worker at the facility Q1 can view the start confirmation command on the local terminal M1. In response to the start confirmation command, the worker transmits a start confirmation notification from the local terminal M1 to the monitoring and control system SYS, indicating that preparations to start the operation are complete. Similarly, the local terminal M2 also receives the start confirmation command and transmits a start confirmation notification.

[0018] When the next operation defined in the operation procedure is a remote operation, the system monitoring and control subsystem of the monitoring and control system SYS transmits a command (remote operation command) to execute the remote operation to the control terminal C1 via the network (NW). When the control terminal C1 receives the remote operation command, it executes the remote operation defined in the remote operation command. Furthermore, when the remote operation is completed, the control terminal C1 transmits a notification indicating the completion of the operation (operation completion notification) to the monitoring and control system SYS. Upon receiving the operation completion notification, the monitoring and control system SYS proceeds to execute the next operation defined in the operation procedure.

[0019] Furthermore, when the next operation defined in the operation procedure is a local operation (e.g., an operation at facility Q1), the grid monitoring and control subsystem of the monitoring and control system SYS transmits a command (local operation command) to execute the local operation to the local terminal M1 via the network (NW). The worker at facility Q1 confirms that the local terminal M1 has received the local operation command and executes the local operation defined in this local operation command. Furthermore, when the worker at facility Q1 completes the local operation, he / she transmits a notification indicating the completion of the operation (operation completion notification) to the grid monitoring and control subsystem of the monitoring and control system SYS. Upon receiving the operation completion notification, the grid monitoring and control subsystem proceeds to execute the next operation defined in the operation procedure. The same applies to the local operation at facility Q2.

[0020] Furthermore, when the system monitoring and control subsystem and the distribution system subsystem in the monitoring and control system SYS receive an operation completion notification, they transmit information indicating that they have received the operation completion notification to the substation equipment maintenance subsystem. The substation equipment maintenance subsystem transmits the operation completion notification to the maintenance terminal C3. The maintenance terminal C3 is, for example, a maintenance desk, and is communicatively connected to the substation equipment maintenance subsystem of the monitoring and control system SYS via wired or wireless communication. The maintenance terminal C3 stores information on the operation procedures created by the monitoring and control system SYS, and displays the scheduled operations on its display screen. Based on the information on the operation completion notification received from the monitoring and control system SYS, the maintenance terminal C3 indicates the completed operations with marks or the like on the display screen. A worker can check the progress of the series of operations using the maintenance terminal C3.

[0021] In this way, the monitoring and control system SYS according to the embodiment centrally manages the grid outage plan information and the power distribution outage plan information, creates operation procedures, and executes the operations in cooperation with the on-site terminal, thereby making it possible to improve the efficiency of work from issuing a command to start the on-site operation to its completion. Below, the components of the power grid 1 and the monitoring and control system SYS will be described with reference to Figures 2 to 15, and then the execution of the operation using the on-site terminal will be described with reference to Figures 16 to 18.

[0022] FIG. 2 is a diagram showing a power system to which a monitoring and control system according to an embodiment is applied. In this embodiment, "network" is abbreviated as "NW," "firewall" as "FW," and "database" as "DB," as appropriate. The power system 1 shown in FIG. 2 includes multiple server bases 2, an inter-base NW 3, a wide area NW 4, and multiple local systems 5. A monitoring and control system 14 according to an embodiment (shown later in FIG. 3, etc.) is provided at the server base 2.

[0023] Each of the multiple server bases 2 has the functions of a monitoring and control system. The multiple server bases 2 are installed in geographically distant locations in preparation for natural disasters such as earthquakes. The multiple server bases 2 are communicatively connected to each other via an inter-base network 3 and provide backup for each other. Furthermore, if the load on one server base 2 is heavy, the load can be distributed among multiple server bases 2. The number of server bases 2 can be set arbitrarily taking into account redundancy and the like, and does not have to be three.

[0024] The local system 5 is communicatively connected to the server base 2 via the wide area network 4. The local system 5 is a system provided for each area jurisdiction, such as the Chiba area, the Kanagawa area, the Saitama area, etc. (administrative districts, etc.). The local system 5 includes a power supply station 6, a branch network 7, and multiple control centers 8. The power supply station 6 (power supply control center) is connected to the wide area network 4 and communicatively connected to the server base 2 via the wide area network 4. The branch network 7 is connected to the wide area network 4, and the multiple control centers 8 are each communicatively connected to the server base 2 via the branch network 7 and the wide area network 4. The multiple control centers 8 are each provided for each regional area jurisdiction.

[0025] Each of the control centers 8 is communicatively connected to power transmission facilities 9 within the jurisdiction of the corresponding regional area. The power transmission facilities 9 include, for example, equipment provided in a power transmission substation, and equipment provided on a power transmission line or a power transmission tower. Furthermore, each of the control centers 8 is communicatively connected to power distribution facilities 10 within the jurisdiction of the corresponding regional area. The power distribution facilities 10 include, for example, equipment provided in a power distribution substation (e.g., a line switch, a circuit breaker) and equipment provided on a power distribution line or a utility pole (e.g., a section switch, a smart meter).

[0026] The inter-base network 3 is multiplexed, so that if a failure occurs in one network, operation can be continued using other networks. The wide-area network 4 and the branch network 7 are also multiplexed, like the inter-base network 3. The communication lines between the wide-area network 4 and the power supply station 6 are provided in multiple systems, so that if a failure occurs in one communication line (e.g., a wired communication line), communication can be continued using other communication lines (e.g., a wireless communication line). The communication lines between the branch network 7 and the control center 8, the communication lines between the control center 8 and the power transmission equipment 9, and the communication lines between the control center 8 and the power distribution equipment 10 are also provided in multiple systems, like the communication lines between the wide-area network 4 and the power supply station 6.

[0027] 3 is a diagram showing a monitoring and control system according to an embodiment. The server base 2 includes a data link server 11, a firewall 12, a data bus 13, a monitoring and control system 14, a file server 15, a firewall 16, and a firewall 17.

[0028] The data linkage server 11 is communicably connected to a system (hereinafter referred to as an external system) external to the server base 2 via the business network. The data linkage server 11 performs data linkage with the external system via the business network. The data linkage server 11 is provided, for example, in only one of the multiple server bases 2. For example, one server base 2 is provided with multiple physical computers (physical hardware devices), and the data linkage server 11 is multiplexed across the multiple physical computers.

[0029] The data linkage server 11 is connected to an LJ1 system 18 (work shutdown coordination system) and a power distribution information management system 19 as external systems. The LJ1 system 18 supplies shutdown plan information (system monitoring and control shutdown plan information) related to shutdown plans for the power transmission system to the data linkage server 11. The power distribution information management system 19 supplies shutdown plan information (distribution monitoring and control shutdown plan information) related to shutdown plans for the power distribution system to the data linkage server 11. The data linkage server 11 is connected to a data bus 13. In the following description, when system monitoring and control shutdown plan information and distribution monitoring and control shutdown plan information are handled in the same way, they will be referred to as shutdown plan information as appropriate.

[0030] The monitoring and control system 14 monitors and controls the transmission system and the distribution system based on the shutdown plan subject. The application configuration of the monitoring and control system 14 is divided into subsystems according to business purposes. The monitoring and control system 14 includes a system monitoring and control subsystem, a distribution monitoring and control subsystem, and a substation equipment maintenance subsystem. Each of the above subsystems is realized by an application provided by the following servers provided in the monitoring and control system 14.

[0031] The monitoring and control system 14 includes a grid monitoring and control server 21, a power distribution monitoring and control server 22, and a calculation server 23. The grid monitoring and control server 21, the power distribution monitoring and control server 22, and the calculation server 23 are each connected to a data bus 13. The data bus 13 is connected to the wide area network 4 via a firewall 16. The data bus 13 is also connected to the inter-base network 3 via a firewall 17.

[0032] The grid monitoring and control subsystem is realized by an application provided by the grid monitoring and control server 21, and monitors and controls the power transmission grid. The grid monitoring and control subsystem is functionally divided and logically separated for each jurisdiction (area jurisdiction). One power supply station 6 is provided in each area jurisdiction, and a control terminal 25 is provided in the power supply station 6. The control terminal 25 is, for example, a control console. The control terminal 25 is communicably connected to the grid monitoring and control server 21 via the wide area network 4. The control terminal 25 functions as the grid monitoring and control subsystem by the application provided by the grid monitoring and control server 21.

[0033] The power distribution monitoring and control subsystem is realized by an application provided by the power distribution monitoring and control server 22, and monitors and controls the power distribution system and maintains the controlled equipment in the power distribution system. The power distribution monitoring and control subsystem is functionally divided by jurisdiction (regional area jurisdiction) and is also logically divided.

[0034] Each regional area jurisdiction belongs to one area jurisdiction and does not overlap with multiple area jurisdictions. One control center 8 is provided in each regional area jurisdiction, and a control terminal 26 is provided in the control center 8. The control terminal 26 is, for example, a control desk. The control terminal 26 is communicatively connected to the distribution monitoring and control server 22 via the branch network 7 and the wide area network 4. The control terminal 26 functions as a distribution monitoring and control subsystem using an application provided by the distribution monitoring and control server 22.

[0035] The substation equipment maintenance subsystem performs maintenance on the equipment managed by the system monitoring and control subsystem. The substation equipment maintenance subsystem is realized by an application provided by the system monitoring and control server 21. The substation equipment maintenance subsystem performs monitoring and control of equipment within the monitoring and control range of the system monitoring and control subsystem. The substation equipment maintenance subsystem is a system with some of the functions of the system monitoring and control subsystem limited. The substation equipment maintenance subsystem is capable of equipment shutdown operations like the system monitoring and control subsystem, but differs from the system monitoring and control subsystem in that it is unable to perform system change operations.

[0036] A maintenance terminal 27 is provided in the control center 8. The maintenance terminal 27 is, for example, a maintenance desk. The maintenance terminal 27 is communicably connected to the system monitoring and control server 21 and the distribution monitoring and control server 22 via the branch network 7 and the wide area network 4. The maintenance terminal 27 functions as a substation equipment maintenance subsystem by an application provided by the system monitoring and control server 21.

[0037] As described above, the monitoring and control system 14 has a configuration in which each server is consolidated at the server base 2, and is a system that is less dependent on the organization, location, etc. to which each power supply station 6 or each control station 8 belongs. Access to each server from the power supply station 6 and / or the control station 8, etc., is performed via a thin client (for displaying a screen, operating equipment, etc.).

[0038] The system monitoring control server 21 is the main server of the system monitoring control subsystem and the substation equipment maintenance subsystem. The system monitoring control server 21 monitors and controls various states and collects information. The system monitoring control server 21 utilizes a physical computer installed at each server base 2. A physical computer that operates as the system monitoring control server 21 is provided at each server base 2. For example, there are three server bases 2, and one system monitoring control server 21 is provided at each server base 2, for a total of three. These three system monitoring control servers 21 are synchronized, with one in regular operation and two in standby operation, ensuring redundancy.

[0039] Furthermore, a logical computer is configured for each area jurisdiction in the physical computer operating as the grid monitoring and control server 21. A logical computer is a virtual machine that runs on the physical computer, and multiple guest operating systems (logical computers) can be implemented in the host operating system of the physical computer. Multiple logical computers are implemented according to the number of area jurisdictions, and these multiple logical computers can be executed on the physical computer operating as the grid monitoring and control server 21. This makes it possible to level the calculation load within the physical computer.

[0040] The power distribution monitoring and control server 22 is the main server of the power distribution monitoring and control subsystem. The power distribution monitoring and control server 22 monitors and controls various states and collects information. The power distribution monitoring and control server 22 utilizes a physical computer installed at each server base 2. A physical computer that operates as the power distribution monitoring and control server 22 is provided at each server base 2. For example, there are three server bases 2, and one power distribution monitoring and control server 22 is provided at each server base 2, for a total of three. These three power distribution monitoring and control servers 22 are synchronized, with one in regular operation and two in standby operation, ensuring redundancy.

[0041] Furthermore, a logical computer is configured for each regional area jurisdiction in the physical computer operating as the power distribution monitoring and control server 22. A plurality of logical computers are implemented according to the number of regional areas jurisdiction, and these plurality of logical computers can be executed on the physical computer operating as the power distribution monitoring and control server 22. This makes it possible to level the calculation load within the physical computer.

[0042] The calculation server 23 stores shutdown plan subjects related to the shutdown of the power transmission system and the shutdown of the power distribution system. The calculation server 23 manages the subjects of the shutdown plan. The calculation server 23 saves the shutdown plan subjects. The calculation server 23 uses a physical computer installed at each server base 2. In addition, a file server 15 is provided at the server base 2. The file server 15 is, for example, a data warehouse. The file server 15 stores the shutdown plan subjects and operation subjects for a long period of time.

[0043] Figure 4 is a block diagram showing the LJ1 system, data linkage server, and monitoring and control system. As shown in Figure 3, the monitoring and control system 14 includes a grid monitoring and control server 21 and a power distribution monitoring and control server 22. The grid monitoring and control subsystem (shown later in Figure 8) is a subsystem executed on the computer of the grid monitoring and control server 21. The grid monitoring and control subsystem performs grid monitoring and control of, for example, one local system 5. By executing multiple grid monitoring and control subsystems on one grid monitoring and control server 21, grid monitoring and control of multiple local systems is realized by the single grid monitoring and control server 21.

[0044] The power distribution monitoring and control subsystem is one power distribution monitoring and control subsystem executed on the computer of the power distribution monitoring and control server 22. The power distribution monitoring and control subsystem performs, for example, power distribution monitoring and control of one local system 5. By executing multiple power distribution monitoring and control subsystems on one power distribution monitoring and control server 22, power distribution monitoring and control of multiple local systems is realized by one power distribution monitoring and control server 22.

[0045] The power distribution monitoring and control subsystem and the system monitoring and control subsystem each include a shutdown plan management unit 31 and an operation unit 32. The shutdown plan management unit 31 of the system monitoring and control subsystem manages shutdown plan subjects and operation subjects for the power transmission system. The operation unit 32 of the system monitoring and control subsystem manages operations for the power transmission system. The shutdown plan management unit 31 of the power distribution monitoring and control subsystem manages shutdown plan subjects and operation subjects for the power distribution system. The operation unit 32 of the power distribution monitoring and control subsystem manages operations for the power distribution system.

[0046] The LJ1 system 18 transfers the grid shutdown plan information to the data linkage server 11. The grid shutdown plan information is information registered by the operator when shutting down power facilities such as electric power stations and transmission lines, indicating shutdown plans such as shutdown equipment and shutdown periods. The grid shutdown plan information is data in a predetermined format (e.g., CSV format). The LJ1 linked data reception processing unit 33 of the calculation server 23 imports the grid shutdown plan information from the data linkage server 11 at a predetermined interval. The LJ1 linked data reception processing unit 33 converts, edits, and associates the grid shutdown plan information with the equipment DB. For example, the LJ1 linked data reception processing unit 33 converts (modifies) the imported grid shutdown plan information into setting data using pre-registered definition information (e.g., maintenance dictionary definitions). The LJ1 linked data reception processing unit 33 also determines whether there are any errors in the grid shutdown plan information.

[0047] The calculation server 23 requests the shutdown plan management unit 31 of the monitoring and control system 14 to register the shutdown plan subject acquired by the LJ1 linked data reception processing unit 33. The shutdown plan management unit 31 (a shutdown plan subject registration unit 34 shown later in FIG. 8 ) registers, in the calculation server 23, a shutdown plan subject based on the system shutdown plan information acquired by the LJ1 linked data reception processing unit 33. If there is no error in the shutdown plan subject acquired by the LJ1 linked data reception processing unit 33, the shutdown plan management unit 31 registers the shutdown plan subject in the calculation server 23. Furthermore, if there is an error in the system shutdown plan information acquired by the LJ1 linked data reception processing unit 33, the shutdown plan management unit 31 corrects the system shutdown plan information. Furthermore, the shutdown plan management unit 31 registers, in the calculation server 23, a shutdown plan subject based on the corrected system shutdown plan information. Furthermore, the shutdown plan management unit 31 (an operation subject registration unit 38 shown later in FIG. 8 ) registers the shutdown plan subject as an operation subject in the monitoring and control system 14.

[0048] Furthermore, the shutdown plan management unit 31 manages the status of shutdown decisions or work suspensions, etc., based on the system shutdown plan information, and hands over the information to the operation unit 32. The shutdown plan management unit 31 creates shutdown plan subjects based on information input by the operator regarding scheduled work shutdown operations, operation shutdown operations, or system change operations. The scheduled work shutdown operations are operations associated with scheduled work such as construction and inspection. The operation shutdown operations are operations that suspend the operation of power equipment for a certain period of time. The system change operations are operations that change the connection of power equipment. The shutdown plan subjects are centrally managed using subject data for system monitoring and control and power distribution monitoring and control, allowing the operator to refer to all subjects regardless of the operation location.

[0049] 5 is a block diagram showing the monitoring and control system. The shutdown plan management unit 31 includes a shutdown plan subject registration unit 34, a shutdown plan subject edit / delete unit 35, a shutdown plan subject display unit 36, a shutdown decision work cancellation unit 37, an operation subject registration unit 38, an equipment DB inconsistency determination unit 39, a planned power outage operation unit 40, a work item management unit 41, a report printing unit 42, and an operator setting unit 43.

[0050] The shutdown plan subject registration unit 34 converts the shutdown plan subject into a common data format that can be used by both the power system monitoring and control subsystem and the power distribution monitoring and control subsystem. The shutdown plan subject registration unit 34 creates a shutdown plan subject that corresponds to the identification information of the shutdown plan subject information, based on at least one of the information on the shutdown plan input by the operator, the power system shutdown plan information imported from the LJ1 system 18, and the information supplied from the power distribution information management system 19.

[0051] 6 is a conceptual diagram showing shutdown plan subjects and shutdown plan information. A "plan number" serving as identification information is assigned to the shutdown plan information. The "plan number" is assigned according to the power supply station classification, operation classification, shutdown type, month, sequential number, branch number, etc. For ease of explanation, the "plan number" is represented here by a positive integer such as 1, 2, 3, etc.

[0052] The shutdown plan information includes information on the "business establishment" and the "facility name." For example, the shutdown plan information having a "plan number" of "1" has an "business establishment" of "area A" and an "facility name" of "substation A, transformer No. 1." The shutdown plan subject registration unit 34 generates, for example, "Transformer No. 1 shutdown plan" as a "shutdown plan subject" based on the shutdown plan information having a "plan number" of "1." The shutdown plan subject registration unit 34 associates and registers "Plan No. 1" and the "shutdown plan subject."

[0053] The shutdown plan subject editing / deletion unit 35 edits or deletes registered shutdown plan subjects in response to a request from an operator. The shutdown plan subject display unit 36 ​​outputs various information, such as a list of registered shutdown plan subjects or individual detailed information display, to the display unit, and causes the display unit to display an image showing the various information.

[0054] The shutdown decision work cancellation unit 37 sets a status (state), such as shutdown decision or work cancellation, for a registered shutdown plan subject in response to a request from the operator. The operation subject registration unit 38 registers the shutdown plan subject as an operation subject in response to a request from the operator. The operation subject registration unit 38 registers the operation subject in a database separate from the shutdown plan subject registered by the shutdown plan subject registration unit 34. When system equipment is changed due to maintenance, the equipment DB inconsistency determination unit 39 detects whether or not there is an impact on registered shutdown plan subjects, and if there is an impact, suppresses operations for the shutdown plan subject. The planned power outage operation unit 40 executes shutdown operations, power transmission operations, or monitoring operations for the specified shutdown plan subject. When a planned power outage is implemented, the planned power outage operation unit 40 sets a group of switches to be operated that has been registered in advance for the planned power outage subject and the post-power transmission monitoring subject, and executes the above processing.

[0055] The work item management unit 41 creates work items based on the shutdown plan subject. The work item management unit 41 also displays a work schedule and sets the work content. The form printing unit 42 outputs various information, such as the shutdown plan subject or planned power outage information, to a printer and causes the printer to print the various information. The operator setting unit 43 displays or edits definition data used in the monitoring and control system 14 in response to requests from the operator.

[0056] The operation unit 32 creates an operation subject based on the shutdown plan subject notified by the shutdown plan management unit 31. An operation subject is, for example, a subject that summarizes (combines) each shutdown plan subject as a series of operations. An operation subject may be generated for one shutdown plan subject. Furthermore, multiple operation subjects may be combined within the same subsystem, or may be combined between different subsystems. Operation subjects related to the monitoring and control of a power transmission system (system monitoring and control) include types such as "scheduled shutdown operation," "operation shutdown operation," "system operation operation," "occasional operation," and "direct selection operation."

[0057] The operation subject of "scheduled shutdown operation" is a subject for creating an operation procedure based on the shutdown plan subject determined by the shutdown plan. The operation procedure is information that defines a series of operations for operating and controlling power system equipment through operation commands from the power dispatching station 6 in each area's jurisdiction. The operation subject of "operational shutdown operation" is a subject for creating the above operation procedure based on the operational shutdown operation determined by the shutdown plan. The operation subject of "system change operation" is a subject for creating the above operation procedure based on the shutdown plan subject and system change subject determined by the system change plan.

[0058] The operation subject of "system operation" is a subject for creating operation procedures and carrying out operations as required for system operation, such as power retransmission in the event of an accident, voltage adjustment operations, protective relay operations, and the use or locking of local automatic operation devices. Operations related to "system operation" can be carried out even without approval from the system. The operation subject of "on-demand operations" is a subject for carrying out unplanned, sudden operations such as operations in the event of an accident. "Direct selection operations" is a subject for directly controlling equipment that can be operated online by selecting equipment from a system diagram without creating operation procedures and individual equipment operation procedures in advance.

[0059] Furthermore, operation subjects related to the monitoring and control of distribution systems (distribution monitoring and control) include "scheduled shutdown operation," "operational shutdown operation," "system change operation," "distribution equipment operation," "direct selection operation," and "fault recovery operation." "Scheduled shutdown operation," "operational shutdown operation," "system change operation," and "direct selection operation" are the same as those for the above-mentioned system monitoring and control. The operation subject of "distribution equipment operation" is a subject for operating distribution line equipment based on power line shutdown or switching plan information. "Fault recovery operation" is a subject for restoring power by switching distribution lines in distribution sections that have lost power due to an accident but are not affected by the accident.

[0060] In addition, operation subjects related to the maintenance of facilities managed by the monitoring and control system 14 include "scheduled shutdown operation," "operation shutdown operation," "as needed operation," and "direct selection operation," which are similar to the system monitoring and control described above.

[0061] The operation unit 32 creates operation procedures for work stoppage or restoration work on busbars, transmission lines, etc., for each subject, and automatically executes the subject. The operation unit 32 includes an operation subject management unit 45, an initial system creation unit 46, an operation procedure creation unit 47, a simulation execution unit 48, an actual execution unit 49, and an operation setting unit 50.

[0062] The operation subject management unit 45 creates an operation subject upon notification from the shutdown plan management unit 31. FIG. 7 is a conceptual diagram showing an operation subject. An "operation number," which is identification information, is assigned to the operation subject. The "operation number" is assigned according to the system identification number, month, serial number, etc. For ease of explanation, the "operation number" is represented here by a positive integer such as 1, 2, 3, etc.

[0063] The operation subject management unit 45 associates and manages the "plan number" (see FIG. 6 ), which is identification information of the shutdown plan subject notified from the shutdown plan management unit 31, with the "operation number" created by the operation unit 32. For example, the operation subject management unit 45 assigns "1" as the "operation number" to the shutdown plan subject whose "plan number" is "1." The operation subject management unit 45 generates "operation subject A" as the "operation subject" for which the "operation number" is "1." The operation subject management unit 45 associates and manages the "operation number," "operation subject," "plan number," and "operation procedure." For example, the operation subject management unit 45 associates and manages various information, such as when the "operation number" is "2," the "operation subject" is "operation subject C," the "plan number" is "3," and the "operation procedure" is "TH."

[0064] The operation subject also includes a "subject status" that indicates the administrative status of the operation subject, such as editing, created, applying for review, applying for approval, approved, waiting for operation, in progress, suspended, and completed.

[0065] The operation subject management unit 45 receives a notification from the shutdown plan management unit 31 of a shutdown decision or work cancellation and updates the operation subject. The operation subject management unit 45 also accepts, copies, combines, reverts, deletes, reviews, approves, and searches for manually created operation subjects. Review and approval are actions in which a supervisor or other high-ranking person confirms the operation subject (a confirmation action for registering it as an operation procedure). The operation subject management unit 45 also prints the operation subject. The operation subject management unit 45 also switches the online system diagram to a direct selection operation mode, and when an individual operation is performed, saves the control content as a directly selected operation subject. The operation subject management unit 45 also updates the subject status upon notification for each operation subject. The operation subject management unit 45 also receives a notification from the actual execution unit 49 when the operation is completed, and registers information indicating the operation completion in the file server 15.

[0066] The operation subject management unit 45 also determines whether the equipment DB information associated with the operation subject notified by the maintenance work matches the contents of the equipment DB. When the screen is cleared due to an accident or other reason while editing a procedure, the operation subject management unit 45 saves the procedure being edited in a waiting area. The operation subject management unit 45 also receives a request from the power distribution information management system 19 (see FIG. 3 ) via the data linkage server 11 to determine whether switching is possible, and responds to this notification by returning the determination result.

[0067] The initial system creation unit 46 creates initial system information. The initial system information is system status information that serves as the basis for creating and checking operation procedures. The initial system information includes equipment status and load status. The initial system creation unit 46 reads outage plan subjects up to the scheduled date and time from the calculation server 23, performs simulations using the simulation execution unit 48 (described later), and creates the outage plan by accumulating the system status. The operation procedure creation unit 47 is notified of a request for automatic procedure creation and automatically creates an operation procedure based on the information about the shutdown equipment included in the outage plan subject. The operation procedure creation unit 47 is also notified of a request for manual procedure creation and accepts editing of the operation procedure.

[0068] The simulation execution unit 48 is notified of the request to start the simulation execution and starts the simulation execution. The simulation execution is a process of expanding the created operation procedures one by one in a simulated system and checking them. The simulation execution unit 48 performs a simulation execution check (affected subject search check or procedure check) for each operation procedure and operates it in a simulated system. The simulation execution unit 48 performs a simulation execution based on the approved operation subject data prior to the actual execution described below. The simulation execution unit 48 may also perform a simulation execution based on a user's specification.

[0069] The actual execution unit 49 receives a request to start actual execution and starts the actual execution. The actual execution involves performing a pre-operation check, then checking each operation procedure and executing each procedure one by one according to the operation procedure. Furthermore, during the actual execution, the actual execution unit 49 determines whether to stop the actual execution if an automatic state change occurs in the equipment to be operated (e.g., a substation or a switchgear) (e.g., if a state change is automatically detected). Upon completion of the actual execution, the actual execution unit 49 counts up the number of executions as post-processing and stores the count value for a long period of time. Furthermore, the actual execution unit 49 switches to a system operation mode from the online system diagram and creates and executes procedures. The operation setting unit 50 stores operation setting information related to the operation unit 32 and outputs it when the operation setting information is changed.

[0070] Next, the operation of the monitoring and control system 14 regarding shutdown planning will be described. FIG. 8 is a diagram showing the operation of the monitoring and control system according to the embodiment. The data linkage server 11 (see FIG. 3) acquires system shutdown plan information from the LJ1 system 18. The LJ1 linked data reception processing unit 33 imports the system shutdown plan information stored in the data linkage server 11 into the calculation server 23 at a predetermined interval. The LJ1 linked data reception processing unit 33 converts (modifies) the setting data for the imported system shutdown plan information using dictionary definitions. The LJ1 linked data reception processing unit 33 also associates the equipment information included in the system shutdown plan information with information stored in the equipment DB. In this way, the LJ1 linked data reception processing unit 33 converts the received system shutdown plan information into a data format that can be used by the operation unit 32. The shutdown plan management unit 31 generates a shutdown plan subject by editing the system shutdown plan information, for example.

[0071] The shutdown plan management unit 31 also changes the shutdown plan subject in response to requests from operators, etc., and creates a new document with the changed subject data. The shutdown plan management unit 31 also registers the subject data included in the shutdown plan information received from the LJ1 system 18 and the created subject data in DB 51 as "shutdown plan subject A," "shutdown plan subject B," etc. The shutdown plan management unit 31 also performs check processing and extracts related parts when registering.

[0072] Furthermore, the shutdown plan management unit 31 sends a notification to the operation unit 32. This notification is, for example, a notification requesting that the shutdown plan subject be registered as an operation subject in the DB 52, a notification requesting that the shutdown plan subject that has already been registered as an operation subject be changed, a notification requesting that a shutdown decision be reflected, a notification requesting that a cancellation of a shutdown decision be reflected, a notification requesting that a work stoppage be reflected, or the like.

[0073] In response to a notification from the shutdown plan management unit 31, the operation unit 32 registers the shutdown plan subject as an operation subject in the DB 52. The operation subject is generated in association with the shutdown plan subject. For example, shutdown plan subjects registered in the DB 51 include "Transformer No. 1 shutdown plan" and "Distribution line section 1 shutdown plan," and operation subjects registered in the DB 52 include "Transformer No. 1 shutdown operation" and "Distribution line section 1 shutdown operation."

[0074] 8, reference numerals 21-1, 21-2, ..., 21-n each denote a system monitoring and control subsystem on the system monitoring and control server 21. The system monitoring and control subsystems 21-1, 21-2, ..., 21-n each correspond to a logical computer configured on the system monitoring and control server 21. The LJ1 linked data reception processing unit 33 of the calculation server 23 acquires system shutdown plan information. The calculation server 23 requests the shutdown plan management unit 31 of the system monitoring and control subsystem 21-1 to register a shutdown plan subject based on the shutdown plan information acquired by the LJ1 linked data reception processing unit 33. The shutdown plan subject registration unit 34 of the system monitoring and control subsystem 21-1 registers a shutdown plan subject based on the shutdown plan information acquired by the LJ1 linked data reception processing unit 33 in the DB 51 of the calculation server 23. In addition, the operation subject registration unit 38 of the system monitoring and control subsystem 21-1 registers the shutdown plan subject as an operation subject in the DB 52 of the system monitoring and control subsystem 21-1.

[0075] Furthermore, in the system monitoring and control subsystem 21-1, when the operation unit 32 receives a notification regarding a decision to shut down or a notification regarding the suspension of work from the shutdown plan management unit 31, it notifies the relevant parties. Furthermore, in the system monitoring and control subsystem 21-1, the operation unit 32 notifies the shutdown plan management unit 31 by performing an operation subject change and deletion process. This notification may be, for example, a notification that the operation unit 32 of the system monitoring and control subsystem 21-1 has changed the shutdown plan subject, a notification that an operation for the operation subject has been performed, a notification that an operation for the operation subject has been completed, or a notification that an operation subject has been deleted automatically or manually due to the passage of time. In the system monitoring and control subsystem 21-1, the shutdown plan management unit 31, in response to a notification from the operation unit 32, reflects the content of the notification in the shutdown plan subject stored in DB 51 or the operation subject stored in DB 52.

[0076] 8 denote power distribution monitoring and control subsystems on the power distribution monitoring and control server 22. The power distribution monitoring and control subsystems 22-1, 22-2, ..., 22-n correspond to logical computers configured on the power distribution monitoring and control server 22.

[0077] The distribution information management system linked data processing unit 53 of the calculation server 23 acquires distribution shutdown plan information from the distribution information management system 19. The distribution information management system linked data processing unit 53 converts, edits, and associates the distribution shutdown plan information with the equipment DB through processing similar to that of the LJ1 linked data reception processing unit 33. The calculation server 23 requests the shutdown plan management unit 31 of the distribution monitoring and control subsystem 22-1 to register a shutdown plan subject. The shutdown plan subject registration unit 34 of the distribution monitoring and control subsystem 22-1 registers a shutdown plan subject based on the shutdown plan information acquired by the distribution information management system linked data processing unit 53 in the DB 51 of the calculation server 23 via the shutdown plan management unit 31 of the distribution monitoring and control subsystem 22-1. In addition, the operation subject registration unit 38 of the distribution monitoring and control subsystem 22-1 registers the shutdown plan subject as an operation subject in the DB 52 of the distribution monitoring and control subsystem 22-1 via the shutdown plan management unit 31 of the distribution monitoring and control subsystem 22-1.

[0078] Next, the operation of the monitoring and control system 14 related to grid operation will be described. FIG. 9 is a diagram showing the operation related to grid operation of the monitoring and control system according to the embodiment. When creating new shutdown plan information, the power distribution information management system 19 transmits a switchover determination request to the data linkage server 11, requesting a switchover determination as to whether the shutdown plan information is executable. The switchover determination is a process of determining whether an operation procedure based on the new shutdown plan subject is executable. In other words, the switchover determination is a process of determining whether an operation of equipment in the power distribution system is executable. For example, the switchover determination is a determination as to whether a power supply path can be switched for a specified distribution section in the power distribution system. Note that the LJ1 system 18 may also transmit a switchover determination request to the data linkage server 11, requesting a switchover determination as to whether the new shutdown plan information is executable.

[0079] FIG. 10 is a flowchart showing the operation of the monitoring and control system related to the switchover determination. In step S21, the operation subject management unit 45 of the operation unit 32 receives a switchover determination request from the data linkage server 11. The switchover determination request includes a shutdown plan subject. In step S22, the operation unit 32 creates a planned system based on the scheduled date and time of the new shutdown plan subject included in the switchover determination request. The planned system is created by the initial system creation unit 46 (see FIG. 4 ) in the same manner as the initial system. In step S23, the operation unit 32 automatically creates an operation procedure (distribution equipment procedure) indicating the procedure for operating the equipment installed in the distribution system based on the new shutdown plan subject included in the switchover determination request. In step S24, the operation subject management unit 45 of the operation unit 32 determines whether or not there is a voltage deviation or an overload based on the operation procedure created from the planned system and the new shutdown plan subject. The operation subject management unit 45 of the operation unit 32 creates a switchover determination response indicating the determination result. In step S25 , the operation subject management unit 45 of the operation unit 32 transmits a switching possibility determination response to the power distribution information management system 19 via the data linking server 11 .

[0080] In addition, the operation unit 32 automatically creates an operation procedure for the specified operation subject. FIG. 11 is a conceptual diagram showing an operation procedure according to the embodiment. The operation procedure HT includes a "target procedure" and an "individual procedure." The "target procedure" is a procedure that indicates the purpose of the operation and includes the following items: The "target command procedure" is a procedure for performing the target operation. The "contact procedure" is a procedure for contacting the relevant business establishments. The "comment procedure" is a procedure for displaying confirmation items or supplementary information. The "break procedure" is a procedure for increasing the visibility of the operation procedure. The "end of procedure" is a procedure that indicates the end position of the operation procedure. The "main registration procedure" is a procedure for performing DB switching. The "voltage adjustment procedure" is a procedure for adjusting voltage when loop switching is performed in the power distribution monitoring control management control subsystem.

[0081] In addition, "individual procedures" are procedures for operating equipment individually and include the following items: "general operating procedures" are procedures for directly controlling various equipment such as circuit breakers (CBs) and line switches (LSs). "tap operating procedures" are procedures for controlling tap paralleling, tap changes, and voltage matching. "confirmation procedures" are procedures for automatically or manually checking SV or TM values. "standby procedures" are procedures that indicate the standby time (seconds). "status setting procedures" are procedures for setting or canceling in-work, in-test, operation prohibited, and status change mask. "memory procedures" are procedures for saving the status of specified equipment and are called up by confirmation procedures and operating procedures. "limit procedures" are procedures for lowering the tap until the limit display appears. "delimitation procedures" are procedures for improving the visibility of operating procedures. "comment procedures" are procedures for displaying content such as confirmation items or supplementary information.

[0082] Returning to the explanation of Figure 9, the monitoring and control system 14 creates and executes operation subjects in cooperation with multiple logical computers (A system operation unit 32A, B system operation unit 32B) according to the range of operation targets. Here, the A system operation unit 32A is a management system that issues instructions when creating and executing operation subjects that cooperate with the B system operation unit 32B. Also, the B system operation unit 32B is an associated system that receives instructions from the management system when creating and executing operation subjects that cooperate with the A system operation unit 32A.

[0083] The management system and related systems are, for example, a local system 5 corresponding to an area jurisdiction including one power supply station 6 (see FIG. 3 ), or a system corresponding to a regional area jurisdiction including one control center 8. The number of related systems is determined depending on the area to be operated, and may be two or more.

[0084] The monitoring and control system 14 configures the management system and related systems based on the shutdown plan information. The monitoring and control system 14 requests the A system operation unit 32A (management system) to register a subject, but does not request the B system operation unit 32B (related system) to register a subject. The A system operation unit 32A creates an operation subject and operation procedure based on the received shutdown plan subject. The A system operation unit 32A performs a simulation run, review, and approval based on the created operation procedure. The monitoring and control system 14 may also be configured so that the operator can manually change the management system.

[0085] After the review is complete, the A system operation unit 32A notifies the B system operation unit 32B, and the operation subject created by the A system operation unit 32A can be referenced or edited by the B system operation unit 32B. The A system operation unit 32A and the B system operation unit 32B then work together to edit the procedures of the related systems and perform a mock execution or review and approval. After approval is complete in all related systems, actual execution becomes possible. The monitoring and control system 14 sends the created operation procedures to the file server 15 (data warehouse). The A system operation unit 32A and the B system operation unit 32B also work together to execute the operation procedures.

[0086] Next, the operation of the operation unit will be described. Figures 12 and 13 are flowcharts showing the operation of the operation unit according to the embodiment. In step S1, the operation unit 32 creates an operation subject. If a related system has been set, the operation unit 32 transmits an operation procedure to the related system. From step S2 onwards in Figure 12, it is assumed that a related system has not been set. The case where a related system has been set will be described with reference to Figure 13.

[0087] In step S2, the operation unit 32 creates an initial system. In step S3, the operation unit 32 creates an operating procedure. In step S4, the operation unit 32 performs a simulation run. In step S5, the operation unit 32 accepts review and approval. In step S6, the operation unit 32 performs a preliminary simulation run under the reviewed and approved conditions. In step S7, the operation unit 32 performs an actual run.

[0088] Next, a case where an associated system has been set will be described. In step S31, the operation unit 32 of the associated system creates an operation subject. In step S32, the operation unit 32 of the associated system receives an operation procedure for the power transmission system from the management system. In step S33, the operation unit 32 of the associated system creates an initial system. In step S34, the operation unit 32 of the associated system creates an operation procedure that combines operation procedures from the management system based on the initial system. In step S35, the operation unit 32 of the associated system performs a simulation of the operation procedure. In step S36, the operation unit 32 of the associated system accepts review and approval of the operation procedure. In step S37, the operation unit 32 of the associated system performs a preliminary simulation of the operation procedure under the reviewed and approved conditions. In step S38, the operation unit 32 of the associated system actually executes the combined operation procedure.

[0089] The operation unit 32 can also combine (adjust) the operation subject of the equipment (operation subject of the power system monitoring and control) created based on the shutdown plan information and the operation subject of the equipment (operation subject of the power distribution monitoring and control) created based on the operation information. Fig. 14 is a diagram showing an example of the processing of the power system monitoring and control subsystem and the power distribution monitoring and control subsystem when the operation subject of the power system control subsystem and the operation subject of the power distribution control subsystem are combined. In the example of Fig. 14, the management system is the power system monitoring and control subsystem (monitoring and control of power system equipment in its jurisdiction), and the related system is the power distribution monitoring and control subsystem (monitoring and control of power distribution equipment in its jurisdiction).

[0090] FIG. 14(A) is a diagram showing the state before the operation subject is executed. Symbols Tr1 and Tr2 are transformers. Symbols LS1 and LS2 are line switches connected to transformer Tr1. Symbol LS3 is a line switch connected to transformer Tr that cannot be remotely controlled. Line switches LS1, LS2, and LS3 are all in a power-on state (closed state). Symbols SW1, SW2, SW3, and SW4 are section switches. The section switches are indicated by solid black when power is on and by white when power is off. In the state shown in FIG. 14(A), power is supplied to both distribution sections SC1 and SC2 from transformer Tr2.

[0091] Here, it is assumed that "operation subject A" shown in Fig. 7 is the No. 1 transformer shutdown operation (an operation to shut down transformer Tr1 in Fig. 14(A)). Also, it is assumed that "operation subject C" shown in Fig. 7 is the distribution line section 1 shutdown operation (an operation to shut down distribution section SC2 in Fig. 14(A)). In Fig. 14(B), symbol SH denotes the operation procedure for system monitoring control, and symbol TH1 denotes the operation procedure for distribution monitoring control when the operation subject of system monitoring control is not combined.

[0092] 14(B), the system monitoring and control operation procedure SH includes an operation to remotely open line switch LS1 and line switch LS2, and an operation to open line switch LS3 on-site. Also, the distribution monitoring and control operation procedure TH1 includes an operation to remotely open section switch SW1, an operation to remotely open section switch SW2 on-site, and an operation to remotely open section switch SW3.

[0093] Here, let us assume that the scheduled operation time of operation procedure SH precedes the scheduled operation time of operation procedure TH1. If operation procedure SH of the grid monitoring control is not scheduled, power distribution section SC1 will be supplied with power from transformer Tr1 when section switch SW1 is closed. However, if operation procedure SH is scheduled, power distribution section SC1 will not be supplied with power because line switch LS2 will be opened.

[0094] In Figure 14(B), symbol TH2 denotes an operation subject of distribution monitoring control adjusted according to the operation subject of grid monitoring control. The operation procedure TH2 of distribution monitoring control includes an operation of remotely turning on section switch SW4 instead of turning on section switch SW1 in the above-mentioned operation procedure TH1. At the time of completing the execution of operation procedure TH2, distribution section SC1 receives power supply from a system different from both transformer Tr1 and transformer Tr2 by closing section switch SW4 and opening section switch SW3. Therefore, it is possible to minimize power outages to only distribution section SC2.

[0095] When combining operation subjects in this manner, the operation unit 32 of the related system receives an operation procedure SH related to system monitoring and control from the management system in step S32 of FIG. 13. The operation unit 32 of the related system performs a simulation of the operation procedure SH and generates a candidate operation procedure TH2 based on the initial system after the simulation (step S34 of FIG. 13). The operation unit 32 of the related system performs a simulation of the candidate operation procedure TH2 (step S35 of FIG. 13). In the simulation of the candidate operation procedure TH2, the operation unit 32 determines whether all of the processes corresponding to the operation procedure TH2 have been executed. If the operation unit 32 determines that all of the processes corresponding to the operation procedure TH2 have been executed in the simulation of the candidate operation procedure TH2, it adopts the candidate operation procedure TH2 as the regular operation procedure TH2.

[0096] In this way, the operation unit 32 of one of the system monitoring and control subsystems (the operation unit 32 of the related system) creates an operation procedure (e.g., operation procedure TH2) based on the system state when the other subsystem (management system) executes an operation procedure (e.g., operation procedure SH).

[0097] In this way, the operation unit 32 can combine operation subjects of different management systems (e.g., "Operation Subject A" and "Operation Subject C" in Figure 7) and generate a single operation subject that encompasses the procedures included in the two operation subjects.

[0098] Furthermore, the system monitoring and control subsystem and the power distribution monitoring and control subsystem cooperate with each other so that their respective operation units can execute operation procedures. The operation unit of the system monitoring and control subsystem cooperates with the power distribution monitoring and control subsystem that does not have control authority and can execute operation procedures corresponding to the operation subject.

[0099] 15 is a sequence diagram showing cooperation between the power system monitoring and control subsystem and the power distribution monitoring and control subsystem. In step S11, the power system monitoring and control subsystem starts execution of operation subject A. In step S12, the power system monitoring and control subsystem sends an execution instruction request to the power distribution monitoring and control subsystem, requesting execution of processing corresponding to operation subject A.

[0100] In step S13, the distribution monitoring control subsystem receives the execution instruction request of step S12. In step S14, the distribution monitoring control subsystem starts execution of operation subject C related to operation subject A. After the execution of operation subject C is completed, in step S15, the distribution monitoring control subsystem transmits a notification of the completion of execution of operation subject C to the grid monitoring control subsystem. In step S16, the grid monitoring control subsystem receives the notification of the completion of execution of step S15.

[0101] Next, a method of performing operations using a monitoring and control system will be described. Fig. 16 is a conceptual diagram showing an example of equipment and procedures to be operated. Here, the equipment and procedures (SH, TH2) shown in Fig. 14 will be used as an example for description. Fig. 16(A) is a conceptual diagram showing equipment to be operated. Line switch LS3 is equipment (equipment) that cannot be operated (controlled) from a distance, and a worker has traveled to the installation location (site) of line switch LS3, and this worker has a site terminal M1. Furthermore, section switch SW2 is equipment (equipment) that cannot be operated (controlled) from a distance, and a worker has traveled to the installation location (site) of section switch SW2, and this worker has a site terminal M2.

[0102] FIG. 16(B) is a table showing a series of operations, and the "number" indicates the order in which the operations are performed. For example, the operation numbered "1" is the first operation performed, and the "target facility line" is "LS1," the "operation content" is "open," the "remote field division" is "remote," and the "communication target" is "facility." In other words, the operation numbered "1" represents an operation to open the line switch LS1 by remote operation through communication with the facility via a communication line. The operations numbered "2," "4," and "6," like operation "1," represent remote operations performed through communication with the facility via a communication line.

[0103] The operation numbered "3" has a "target facility line" of "LS3," an "operation content" of "open," a "remote field division" of "field," and a "communication target" of "field terminal M1." That is, the operation numbered "3" represents an operation of communicating with the field terminal M1 via a communication line and opening the line switch LS3 by field operation.

[0104] The operation numbered "5" has a "target facility line" of "SW2," an "operation content" of "off," a "remote field division" of "field," and a "communication target" of "field terminal M2." That is, the operation numbered "5" represents an operation of communicating with the field terminal M2 via a communication line and opening the field switch SW2 by field operation.

[0105] Fig. 17 is a flowchart showing a method for performing operations using the monitoring and control system according to the embodiment. Fig. 18 is a flowchart continuing from Fig. 17. The operation procedure is automatically created by the process of step S3 (operation procedure creation) shown in Fig. 12, and the process shown in Fig. 17 corresponds to the process of step S7 (actual execution) in Fig. 12.

[0106] In step S41, the system monitoring and control subsystem starts execution of the operation procedure SH of the operation subject A. In step S42, the operation unit of the system monitoring and control subsystem sends a start confirmation command to the control terminal C1. After the control terminal C1 provided at the power supply station receives the start confirmation command, the worker operating the control terminal C1 confirms that the work can be started, and then in step S43 operates the control terminal C1 to send a start confirmation notification to the operation unit of the system monitoring and control subsystem.

[0107] The processing of step S44 corresponds to the operation numbered "1" in FIG. 16. The operation unit of the system monitoring and control subsystem acquires information about the next operation (target facility, operation content, remote site classification, communication target) and executes the processing of step S44. In step S44, the operation unit of the system monitoring and control subsystem transmits a remote operation command to the facility that is the communication target numbered 1 to release the target facility LS1. LS1, the facility that is the object of operation, receives this remote operation command via the communication line and executes the release of LS1, which is the operation specified in the remote operation command. After the release is completed, LS1 transmits an operation completion notification to the operation unit of the system monitoring and control subsystem.

[0108] After the processing of step S44, the operation unit of the system monitoring and control subsystem monitors whether the operation is completed. The operation unit of the system monitoring and control subsystem determines whether an operation completion notice has been received from the destination (facility) of the command in step S44. If the operation unit of the system monitoring and control subsystem determines that an operation completion notice has not been received from the destination, it performs the determination process at predetermined time intervals. Furthermore, if the operation unit of the system monitoring and control subsystem determines that an operation completion notice has been received from the destination, it sets a flag numbered "1" indicating that the operation has been completed, and proceeds to the next process.

[0109] The processing of step S45 corresponds to the operation numbered "2" in Fig. 16. The operation unit of the grid monitoring control subsystem executes the processing of step S45 in the same manner as the processing of step S44. In step S46, the operation unit of the grid monitoring control subsystem transmits a start confirmation command to the on-site terminal M1. After the on-site terminal M1 receives the start confirmation command, the worker carrying the on-site terminal M1 confirms that the on-site terminal M1 is in a state where work can be started, and then in step S47, operates the on-site terminal M1 to transmit a start confirmation notification to the operation unit of the grid monitoring control subsystem.

[0110] The processing of step S48 corresponds to the operation with "number" "3" shown in FIG. 16 . In step S48, the operation unit of the grid monitoring and control subsystem transmits a local operation command to the local terminal M1, which is the communication target with number 3, to open the target facility, LS3. The worker carrying the local terminal M1 receives this local operation command and performs the operation of opening LS3, which is specified in the local operation command. After completing the opening of LS3, the worker transmits an operation completion notice indicating the completion of the operation from the local terminal M1 to the operation unit of the grid monitoring and control subsystem in step S49. The operation unit of the grid monitoring and control subsystem determines whether or not the operation completion notice has been received, as in the post-processing of step S42. In step S50, the operation unit of the grid monitoring and control subsystem transmits an execution instruction request to the distribution monitoring and control subsystem to instruct the execution of operation subject C, which is the subject combined with operation subject A.

[0111] When the power distribution monitoring and control subsystem receives the execution instruction request, it starts execution of the operation procedure TH2 of the operation subject C in step S51 of Fig. 18. In step S52, the operation unit of the power distribution monitoring and control subsystem sends a start confirmation command to the control terminal C2 provided at the power supply station. After the control terminal C2 receives the start confirmation command, the worker operating the control terminal C2 confirms that the work can be started, and then in step S53, operates the control terminal C2 to send a start confirmation notice to the operation unit of the power distribution monitoring and control subsystem.

[0112] The processing of step S54 corresponds to the operation numbered "4" in FIG. 16. The operation unit of the power distribution monitoring and control subsystem acquires information about the next operation (target equipment, operation content, remote site classification, communication target) and executes the processing of step S54. In step S54, the operation unit of the power distribution monitoring and control subsystem transmits a remote operation command to the equipment that is the communication target numbered 4, instructing it to open SW4, which is the target equipment. SW4, which is the equipment to be operated, receives this remote operation command via the communication line and executes the opening of SW4, which is the operation specified in the remote operation command. After the opening of SW4 is completed, SW4 transmits an operation completion notification to the operation unit. The operation unit determines whether or not the operation completion notification has been received, similar to the processing of step S44.

[0113] In step S55, the operation unit of the power distribution monitoring and control subsystem transmits a start confirmation command to the local terminal M2. After the local terminal M2 receives the start confirmation command, the worker carrying the local terminal M2 confirms that the work can be started, and then in step S56, operates the local terminal M2 to transmit a start confirmation notice to the operation unit of the power distribution monitoring and control subsystem.

[0114] The processing of step S57 corresponds to the operation numbered "5" shown in FIG. 16 . In step S57, the operation unit of the power distribution monitoring and control subsystem transmits a local command to the local terminal M2, which is the communication target numbered 5, to open SW2, which is the target equipment. The worker carrying the local terminal M2 receives this local operation command and performs the operation of opening SW2, which is specified in the local operation command. After completing the opening of SW2, the worker transmits an operation completion notification from the local terminal M2 to the operation unit of the power distribution monitoring and control subsystem in step S58. The operation unit of the power distribution monitoring and control subsystem determines whether or not the operation completion notification has been received, similar to the post-processing of step S48.

[0115] The processing of step S59 corresponds to the operation numbered "6" in Fig. 16. The operation unit of the power distribution monitoring control subsystem executes the processing of step S59 in the same manner as the processing of step S54. After completing the execution of operation subject C, the power distribution monitoring control subsystem transmits a notification of the completion of execution of operation subject C to the power grid monitoring control subsystem in step S60. The power grid monitoring control subsystem receives the notification of the completion of execution of step S50.

[0116] The technical scope of the present invention is not limited to the aspects described in the above-mentioned embodiments. One or more of the requirements described in the above-mentioned embodiments may be omitted. Furthermore, the requirements described in the above-mentioned embodiments may be combined as appropriate. Furthermore, to the extent permitted by law, the disclosures of Japanese Patent Application No. 2017-087105 and all documents cited in the embodiments of this specification are incorporated by reference into this specification.

[0117] 21-1: System monitoring and control subsystem 22-2: Power distribution monitoring and control subsystem 32: Operation unit 47: Operation procedure creation unit M1: Local terminal M2: Local terminal 14, SYS: Monitoring and control system

Claims

1. A monitoring and control system comprising at least one system monitoring and control subsystem that monitors and controls a power transmission system, and at least one distribution monitoring and control subsystem that monitors and controls a power distribution system, wherein the system monitoring and control subsystem and the distribution monitoring and control subsystem each comprise: an operation procedure creation unit that creates operation procedures that define procedures for operating equipment installed in a power system including the power transmission system and the power distribution system, and an operation unit that, when the operation procedures include an on-site operation that cannot be operated remotely for the equipment, sends a start confirmation command to an on-site terminal associated with the on-site operation to confirm whether the on-site operation can be started, and the operation procedure for the on-site operation, and wherein the monitoring and control system monitors and controls the power transmission system and the power distribution system based on the operation procedures.

2. The monitoring and control system of claim 1, wherein, when the operation procedure includes a remote operation that allows remote operation of the equipment, the operation unit sends a start confirmation command to a control terminal associated with the remote operation to confirm whether the remote operation can be started, and sends a remote operation command to the equipment to operate the equipment remotely.

3. A monitoring and control system as described in claim 1 or claim 2, wherein the operation unit of one of the power system monitoring and control subsystem and the power distribution monitoring and control subsystem transmits an execution instruction request to the other subsystem based on completion of execution of the operation procedure.

4. The monitoring and control system according to claim 3, wherein the operation procedure creation unit converts the operation procedure, which defines the procedure for operating the equipment, into a common data format that can be used by both the power system monitoring and control subsystem and the power distribution monitoring and control subsystem.