Determining Formation Breakdown Pressure for Wells with Cemented Liners
By accounting for the stress induced by cemented casing in the hoop-stress, the method accurately predicts formation breakdown pressure, addressing inaccuracies in existing methods and optimizing hydraulic fracturing operations for efficient hydrocarbon production.
Patent Information
- Application Number
- US19/205534
- Authority / Receiving Office
- US · United States
- Patent Type
- Applications(United States)
- Current Assignee / Owner
- Filing Date
- 2025-05-12
- Publication Date
- 2026-11-12
Smart Images

Figure US20260357685A1-D00000_ABST
Abstract
Description
TECHNICAL FIELD
[0001] This specification generally relates to determining formation breakdown pressure for wells with cemented liners.BACKGROUND
[0002] Predicting formation breakdown pressure involves determining the minimum pressure needed to create fractures in a rock formation, typically during hydraulic fracturing operations. This pressure is influenced by various factors, including in-situ stresses, rock strength, and fluid properties. The determined minimum pressure can be used for designing safe and efficient hydraulic fracturing treatments.SUMMARY
[0003] This specification describes an approach to determining formation breakdown pressures (i.e., the pressure at which the formation will break) for wells with cemented liners (sometimes referred to as wells with cased-hole completions). This approach takes into account the effect of the stress induced by the cemented casing, which is usually placed around the targeted production zone in cemented liners. Despite its engineering benefits in protecting the targeted production zone, the cemented casing sometimes increases the formation breakdown pressure since the elastic modulus of the casing is usually greater than that of the rock and the cement sheath. Incorporating the stress induced by the cemented casing on the hoop-stress around the wellbore provides a unified approach to predicting breakdown pressure that can be applied to both open-hole and cased-hole completions. Tests of this approach on a cemented liner well demonstrated the ability to predict the formation breakdown pressure accurately by taking into account the effect of the stress induced by the cemented casing.
[0004] Hydraulic fracturing (or simply fracking) is an intervention technique that can be performed on a well to enhance its hydrocarbon productivity. During a normal fracking job, a stimulating fracturing fluid is injected into the wellbore at an extremely high pressure to frack the formation. By accurately estimating the formation breakdown pressure, this approach can avoid the expenditure losses that can result from overestimating the formation breakdown pressure and the operational failures that can result from underestimating the formation breakdown pressure.
[0005] The details of one or more embodiments of these systems and methods are set forth in the accompanying drawings and the description below. Other features, objects, and advantages of these systems and methods will be apparent from the description and drawings, and from the claims.DESCRIPTION OF DRAWINGS
[0006] FIG. 1 is a schematic illustrations of hydraulic fracking in a cased, cemented wellbore.
[0007] FIG. 2 is a schematic cross-section of the cased, cemented wellbore of FIG. 1.
[0008] FIG. 3 is a schematic of stress transformations for a deviated well.
[0009] FIG. 4 is a flow chart illustrating a method of determining formation breakdown pressure.
[0010] FIGS. 5A and 5B are plots of well breakdown pressure determined, respectively, without a cemented liner correction and with the cemented liner correction.
[0011] FIG. 6 illustrates hydrocarbon production operations that include both one or more field operations and one or more computational operations, which exchange information and control exploration for the production of hydrocarbons.
[0012] FIG. 7 is a block diagram illustrating an example computer system used to provide computational functionalities associated with described algorithms, methods, functions, processes, flows, and procedures according to some implementations of the present disclosure.
[0013] Like reference symbols in the various drawings indicate like elements.DETAILED DESCRIPTION
[0014] This specification describes an approach to determining formation breakdown pressures (i.e., the pressure at which the formation will break) for wells with cemented liners (sometimes referred to as wells with cased-hole completions). This approach takes into account the effect of the stress induced by the cemented casing, which is usually placed around the targeted production zone in cemented liners. Despite its engineering benefits in protecting the targeted production zone, the cemented casing sometimes increases the formation breakdown pressure since the elastic modulus of the casing is usually greater than that of the rock and the cement sheath. Incorporating the stress induced by the cemented casing on the hoop-stress around the wellbore provides a unified approach to predicting breakdown pressure that can be applied to both open-hole and cased-hole completions. Tests of this approach on a cemented liner well demonstrated the ability to predict the formation breakdown pressure accurately by taking into account the effect of the stress induced by the cemented casing.
[0015] Hydraulic fracturing (or simply fracking) is an intervention technique that can be performed on a well to enhance its hydrocarbon productivity. During a normal fracking job, a stimulating fracturing fluid is injected into the wellbore at an extremely high pressure to frack the formation. By accurately estimating the formation breakdown pressure, this approach can avoid the expenditure losses that can result from overestimating the formation breakdown pressure and the operational failures that can result from underestimating the formation breakdown pressure.
[0016] FIG. 1 is a schematic of hydraulic fracking in a well 100. The well 100 has a deviated wellbore 110 in which a casing 112 extends downhole from ground surface 114. Cement 116 fills the annular space between the casing 112 and walls of the wellbore 110. Fracking fluid (e.g., slick water, containing proppants) is pumped downhole at high pressure with the fracking fluid flowing through perforations 118 to create fractures 119 in the reservoir. After fractures are created, the proppants will hold the fractures open after hydraulic pressure declines or hydraulic fluid flows back.
[0017] Fracturing occurs whenever effective stress in the formation is overcome by the fluid pressure within the fractures. The minimum principal stress becomes tensile and exceeds the tensile strength of the rock. Hydraulic fractures are generally oriented in the direction perpendicular to the minimum principal stress and propagate along the maximum horizontal stress direction in subsurface. For cased hole / perforation hydraulic fracturing treatment, the breakdown pressure refers to the internal casing pressure when fracture initiates from the perforations 118.
[0018] For hydraulic fracturing treatment, accurately estimating the breakdown pressure of formation is critical, facilitating control in selecting the right tubing size and grade, wellhead grade and burst pressure limiting requirement as well as pump schedule design. The best practice of hydraulic fracturing design is to estimate the breakdown pressure as accurately as possible in the first place, and select the right treatment tubing, and wellhead thereafter.
[0019] A control center 120 can be operatively coupled to a pump 122 and other data acquisition and wellsite systems. The control center 120 may have computer facilities for receiving, storing, processing, and analyzing data from the pump 120 and other data acquisition and wellsite systems that provide additional information about the subsurface formation.
[0020] A computer systems 124 in the control center 120 can be configured to analyze, model, control, optimize, or perform management tasks of field operations associated with development and production of resources such as oil and gas from the subsurface formation. Based on data gathered by the exploratory field operations, the computer systems 124 can generate models for portions of the subsurface formation 100. These models can simulate the effects of production field operations (e.g., injecting fracking fluid through the well 100). The simulations can be used to plan and, in some instances, control field operations (e.g., the operation of the pump 122).
[0021] The computer systems 124 can be located in a different location than the control center 120. Some computer systems are provided with functionality for manipulating and analyzing the data, such as performing seismic interpretation or borehole resistivity image log interpretation to identify geological surfaces in the subsurface formation or performing simulation, planning, and optimization of production operations of the wellsite systems. In some embodiments, results generated by the computer systems 124 may be displayed for user viewing using local or remote monitors or other display units.
[0022] FIG. 2 is a schematic cross-section of the wellbore 110 of the well 100 of FIG. 1 subject to in-situ stresses and induced fracture 119 during hydraulic fracturing, according to some implementations. As shown in FIG. 1, the in-situ stresses include a minimum horizontal stress Sh and a maximum horizontal stress SH, where |SH|>|Sh|.
[0023] FIG. 3 is a schematic illustration of stress transformations for a deviated and horizontal well, according to some implementations. In FIG. 3, Sh and SH are the minimum and maximum horizontal stresses (|SH|>|Sh|), Sv is the vertical (overburden) stress, ab is the inclination angle of the well (from the vertical axis), β is the azimuth angle of the well relative to the SH direction, and θ is the wellbore circumferential angle.
[0024] The breakdown pressure (Pf) is the pressure at which the fracture initiates and can be defined as the pressure at which the tensile strength of the rock, given by (σf), reaches the maximum tensile stress around the wellbore. The upper and lower bounds of the formation breakdown pressure are given by:Pf-Upper Bound=σf−(3Sh−SH) (1)The breakdown pressure lower bound can be computed as:Pf-Lower Bound=Pf-Upper Bound1-2α(1-2v1-v)(2)where Sh and SH are the minimum and maximum horizontal stresses (|SH|>|Sh|), v is the Poisson ratio, and α is the Biot coefficient.For vertical wells, and at a given depth, the breakdown pressure can be computed as:Pf=σf-(3Sh-SH)-Sθ(3)-Pp(3)where σf is the tensile strength of the rock (σf) at the wellbore, Pp is the pore pressure, andSθ(3) is the poroelastic stress (which is the stress induced by the fluid permeation into the rock), and is given by:Sθ(3)=α(1-2v1-v)(1r2∫arPpρdρ-Pp)(4)where α is the Biot Poroelastic Parameter, and v is the Poisson ratio, a is the wellbore radius, and r is the radial distance away from the wellbore. In Equations (3) and (4), the pore pressure Pp is computed by:Pp=ln(2)τ∑i=1n (ciP0K0(iln(2)tcr)iln(2)tK0(iln(2)tca))(5)whereci=(-1)i+n2∑k=⌊i+12⌋min(i,n2) (kn2(2k)!(n2-k)!k!(k-1)!(i-k)!(2k-1)!)(6)andc=Kμ∅cf.In Equation (5), K denotes the rock permeability, P0 denotes the initial wellbore pressure, Ø denotes the porosity, μ denotes the injection fluid viscosity, cf denotes the injection fluid compressibility, t denotes the time at which the fracture opens, a denotes the wellbore radius, r denotes the radial distance away from the wellbore, and K0(x) denotes the modified Bessel function of the second kind of order 0.For deviated and horizontal wells using a generalized stress model (as shown in FIG. 2), the upper bound for the formation breakdown pressure can be computed by:Pf-UpperBound= Min0≤θ≤π[1(-σf-σz)((σθ′-σz2)2+σθz2-(σf+(σθ′+σz)2)2)](7)where:σθ′=σxx+σyy−2(σxx−σyy)cos(2θ)−4σxy sin(2θ) (8)and σr, σθ, σz, σθz, σrθ, and σrθ denote the stress distribution at the wellbore wall in polar coordinates (r, θ, z), and are given by:σr=pw−δφ(pw−pp)σθ=σxx+σyy−2(σxx−σyy)cos(2θ)−4σxy sin(2θ)+K1(pw−pp)−pw θz=σzz−2υ[(σxx−σyy)cos(2θ)+2σxy sin(2θ)]+K1(pw−pp)σθz=2(σyz cos(θ)−σxz sin(θ))σrθ=σrz=0 (9)and σxx, σyy, σzz, σxy, σyz, and σxz denote the stress distribution at the wellbore wall in the rotated Cartesian local coordinate system, and are given by:{σxx=SHcos2(αb)cos2(β)+Shcos2(αb)sin2(β)+Svsin2(αb)σyy=SHsin2(β)+Shcos2(β)σzz=SHsin2(αb)cos2(β)+Shsin2(αb)sin2(β)+Svcos2(αb)σxy=-SHcos(αb)cos(β)sin(β)+Shcos(αb)cos(β)sin(β)σyz=-SHsin(αb)cos(β)sin(β)+Shsin(αb)cos(β)sin(β)σxz=SHcos(αb)sin(αb)cos2(β)+Shcos(αb)sin(αb)sin2(β)-Svcos(αb)sin(αb)(10)In the above,K1=δ[α(1-2v)1-v-ϕ],δ denotes the wellbore permeability coefficient, φ denotes the porosity, Sv denotes the vertical (overburden) stress, pw denotes the wellbore pressure (pressure inside the well), a denotes the Biot Poroelastic Parameter, υ denotes the Poisson ration, αb denotes the inclination (or drift) angle of the well (from the vertical axis), β denotes the azimuth angle of the well relative to the SH direction, and θ denotes the wellbore circumferential angle as shown in FIG. 1). We note here that when computing the upper bound of the Formation breakdown pressure, we set δ=0, therefore, K1=0. Once the upper bound is computed, the lower bound can be computed as shown in Equation (2) by:Pf- Lower Bound=Pf- Upper Bound1-2 α(1-2v1-v)(11)To incorporate the effect of the cemented casing into the model, the casing factor effect on the radial (σr), and hoop (σθ) stresses are given by:σrc=βcpw(12)andσθc=-βcpw(13)whereβc=-TFRo2r2(14)TF is the transmission coefficient, which represents the wellbore pressure transmitted to the formation rock. The transmission coefficient is given by:TF =[2(1+vc)(1-vc)Ec(Ro2-Ri2)Ri2][1+vE+(1+vc)(Ri2+(1-2vc))Ec(Ro2-Ri2)Ro2](15)where E is the Young's modulus of the rock, Ec is the Young's modulus of the casing, v is the Poisson ratio of the rock, vc is the Poisson ratio of the casing, Ri is the internal radius of the casing, Ro is the external radius of the casing, and r is the radial distance away from the wellbore as shown in FIG. 2. As outlined in [8], the elastic modulus of the rock and the elastic modulus of the cement sheath are generally of the same order of magnitude, while the elastic modulus of the casing greater than both. Therefore, in this work, we will mainly focus on the casing factor effect and not the cement sheath effect (as the cement sheath can be considered part of the rock, with the same rock properties (i.e., Young's modulus and Poisson ratio)).Setting δ=0, the stress distribution at the wellbore wall in polar coordinates (r, θ, z) is given by:{σr=pw+βc pwσθ+σxx+σyy-2(σxx-σyy) cos(2θ)-4 σxy sin(2θ)-pw-βcpwσz=σzz-2υ[(σxx-σyy) cos(2θ)+2 σxy sin(2θ)]σθz=2(σyz cos(θ)-σxz sin(θ))σrθ=σrz=0(16)The cementing factor term is included in both the radial and hoop stresses. To compute the upper bound, the maximum principal stress component acting on the θz-plane is balanced with the tensile strength of the rock. By solving a 2D plane stress problem in which σr=σrθ=σrz=0, the 2D stress tensor on the θz-plane can be written as:σ=[0000σθσθz0σzθσz](17)To compute the principal stress acting on the θz-plane, the eigenvalues of σ are found such thatdet(σ−λI)=0 (18)This translates to:det([-λ000σθ-λσθz0σzθσz -λ])=0(19)Expanding the determinant leads to−λ((σθ−λ)(σz−λ)−σθz2)=0 (20)Accordingly, either λ=0 (which corresponds to the principal stress acting on the r-direction) or ((θθ−λ)(σz−λ)−σθz2)=0. This leads to:λ2−(σθ+σz)λ+σθσz− (21)This is a quadratic equation in the unknown A which admits the following general solution (recall the quadratic formula):λ1,2=(σθ+σz)±(σθ+σz)2-4(σθσz-σθz2)2=(σθ+σz)±σθ2+2σθσz+σz2-4(σθσz-σθz2)2=(σθ+σz)±(σθ-σz)2+4 σθz22=(σθ+σz)2±(σθ-σz2)2+σθz2(22)This gives the two eigenvalues of the stress tensor σ. Now, the maximum eigenvalue is the maximum principal stress σ2 acting on the θz-plane, and:σ2=(σθ+σz)2+(σθ-σz2)2+σθz2(23)To find the upper bound, pw is found such that σ2=−σf, where (σf) is the tensile strength of the rock. This translates to:-σf=(σθ+σz)2+(σθ-σz2)2+σθz2(24)This leads to:-σf=(σθ′+σz)2-(1+βc)pw2+(σθ′-σz2-(1+βc)pw2)2+σθz2(25)whereσθ=σθ′−(1+βc)pw (26)andσθ′=σxx+σyy−2(σxx−σyy)cos(2θ)−4θxy sin(2θ) (27)This can be written as:(-σf-(σθ′+σz)2+(1+βc)pw2)2=(σθ′-σz2-(1+βc)pw2)2+σθz2(28)Expanding both sides provides:(29)(σf+(σθ′+σz)2)2-(1+βc)pw(σf+(σθ′+σz)2)+(1+βc)24pw2=(σθ′-σz2)2-(1+βc)(σθ′-σz2) pw+(1+βc)24pw2+σθz2Which can be simplified to:(σf+(σθ′+σz)2)2-(1+βc)pw(σf+(σθ′+σz)2)=(σθ′-σz2)2-(1+βc)(σθ′-σz2) pw+σθz2(30)This can be rearranged to:(31)(1+βc)pw(-σf-(σθ′+σz)2+σθ′-σz2)=(σθ′-σz2)2-(σf+(σθ′+σz)2)2+σθz2This leads to:(32)(1+βc)pw(-σf-σz)=(σθ′-σz2)2-(σf+(σθ′+σz)2)2+σθz′Therefore,pw=1(1+βc)(-σf-σz)((σθ′-σz2)2-(σf+(σθ′+σz)2)2+σθz2)(33)The upper bound for the breakdown pressure with the cementing factor effect is given by:Pf-UpperBound=Min0≤θ≤π[1(1+βc)(-σf-σz)((σθ′-σz2)2+σθz2- (σf+(σθ′+σz)2)2)](34)where:βc=-TFRo2r2(35)andTF=[2(1+vc)(1-vc)Ec(Ro2-Ri2)Ri2][1+vE+(1+vc)(Ri2+(1-2vc))Ec(Ro2-Ri2)Ro2](36)Since (1+βc) does not depend on the circumferential angle θ, this leads to:Pf-UpperBound=1(1+βc)Min0≤θ≤π [1(-σf-σz)((σθ′-σz2)2+σθz2- (σf+(σθ′+σz)2)2)](37)FIG. 4 is a flow chart illustrating a method 400 of fracking a well with a cemented liner. Initially, well and formation properties are obtained (step 410). These properties typically include initial wellbore pressure (P0), rock permeability (K), rock porosity (Ø), injection fluid compressibility (cf), and injection fluid viscosity (μ), minimum and maximum horizontal stresses (Sh) and (SH), overburden vertical stress (Sv), tensile strength of the rock (σf), Biot poroelastic parameter (α), inclination angle of the well (αb), azimuth angle of the well relative to the SH direction (β), wellbore radius (a), at a particular depth, Young's modulus of the rock (E), Young's modulus of the casing (Ec), Poisson ratio of the rock (v), Poisson ratio of the casing (vc), internal radius of the casing (Ri), and external radius of the casing (Ro). These properties may be measured as part of the method 400 or, in some circumstances, they may be previously measured properties obtained, for example, from a database of a computing system used in implementation of the method.The pore pressure p(t, r) is then computed (step 412). For example, the pore pressure can be computed as:p(t,r)=ln(2)t∑i=1n(ciP0K0(iln(2)tcr)iln(2)2K0(iln(2)tca))(38)whereci=(-1)i+n2∑k=⌊i+12⌋min(i,n2)(kn2(2k)!(n2-k)!k!(k-1)!(i-k)!(2k-i)!)(39)withc=Kμ∅cf, and n=8. The time and radius are chosen based typical values observed in the field. More specifically, the time “t” represents the time at which the fracture initiates, and the formation will break (i.e., the fracturing fluid penetrates the formation after starting pumping it at an extremely high pressure, which can reach up to 15,000 psi pressure ratings). Based on field experience, and after performing more than 20 frack jobs, the formation usually breaks after around 1000 seconds (around 16.6 minutes) after starting pumping the hydraulic fracturing fluid. The radius “r” represents the radial distance away from the wellbore. Several experiments reported in related literature indicate that the fracture initiation occurs when the effective stress reaches a rock-dependent characteristic value at a point away from the borehole wall, and this point is referred to as the “characteristic distance”, denoted by d0 in Ito, T. 2008. Effect of pore pressure gradient on fracture initiation in fluid saturated porous media: Rock. Engineering Fracture Mechanics 75, 1753-1762. This reference also indicated that, for the Weber sandstone, d0=7.5 mm, for a wellbore with radius a=3 mm. Therefore, d0=2.5a. The same value was observed numerically by calibrating the described breakdown pressure algorithm with measured field data. Therefore, tests of the prototype system set t=1000 seconds and r=2.5 a.The poroelastic stress(Sθ(3)(t,r))is then computed (step 414). For example, the poroelastic can be computed asSθ(3)(t,r)=α(1-2v1-v)(1r2∫arp(t,ρ)ρdρ-p(t,r))(40)The prototype system used the Composite Simpson's Rule for numerical integration.The breakdown pressure upper bound is then computed (step 416). For example, the breakdown pressure upper bound can be computed as:Pf-UpperBound=Min0≤θ≤π[1(-σf-σz)((σθ′-σz2)2+σθz2-(σf+ (σθ′+σz)2)2)](41)whereσθ′=σxx+σyy−2(σxx−σyy)cos(2θ)−4σxy sin(2θ)σz=σzz−2υ[(σxx−σyy)cos(2θ)+2σxy sin(2θ)]σθz=2(σyz cos(θ)−σxz sin(θ))σxx=SH cos2(αb)cos2(β)+Sh cos2(αb)sin2(β)+Sv sin2(αb)σyy=SH sin2(β)+Sh cos2(β)σzz=SH sin2(αb)cos2(β)+Sh sin2(αb)sin2(β)+Sv cos2(αb)σxy=−SH cos(αb)cos(β)sin(β)+Sh cos(αb)cos(β)sin(β)σyz=−SH sin(αb)cos(β)sin(β)+Sh sin(αb)cos(β)sin(β)σxz=SH cos(αb)sin(αb)cos2(β)+Sh cos(αb)sin(αb)sin2(β)−Sv cos(αb)sin(αb) (42)Effective stress and cemented liner corrections are then computed and applied (step 418). For open hole wells, the breakdown pressure upper bound is updated as:Pf-UpperBound=Pf-UpperBound-(2-α(1-2v1-v))P0(43)For wells with cemented liners, the breakdown pressure upper bound is updated as:Pf-UpperBound=1(1+βc)Pf-UpperBound-αP0(44)whereTF=[2(1+vc)(1-vc)Ec(Ro2-Ri2)Ri2][1+vE+(1+vc)(Ri2+(1-2vc))Ec(Ro2-Ri2)Ro2](45)andβc=-TFRo2r2(46)The breakdown pressure is then computed (step 420). For example, the breakdown pressure can be computed as:Pf=Pf-UpperBound-Sθ(3)(t,r)-p(t,r)(47)Fracking fluid is then applied to the formation based, at least in part, on computed breakdown pressure (step 422). More specifically, during a typical hydraulic fracturing process, a fracking fluid is pumped into the formation at an extremely high pressure, which can reach up to 15,000 psi pressure ratings. This approach provides a prior estimation of the breakdown pressure that is needed to determine the operational requirements and specifications of the multi-stage well completion system on site, and the corresponding pressure ratings. Two multi-stage completions systems are usually used in practice: a 10,000 psi-rated multistage completion system or a 15,000 psi-rated multistage completion system. Determining which one to use depends on the predicted formation breakdown pressure. If the predicted breakdown pressure is higher than 15,000 psi, a 15,000 psi-rated well completion system is needed to frack the formation. If the predicted breakdown pressure is less than 15,000 psi, then a 10,000 psi-rated well completion system can be used to frack the formation. Moreover, in some cases, if the predicted formation breakdown pressure is very high, then other chemical additives (such as special chemical-based viscoelastic surfactants) can be added to the fracking fluid to improve its efficiency, and lower the actual breakdown pressure. On the other hand, if the predicted formation breakdown pressure is low, then other additives can be used when needed. For example, when the formation is under pressured, dirty, or damaged, Liquid Carbon Dioxide CO2 can be used as an additive as it can easily penetrates the pores and create a network of microfractures.A prototype implementation was applied to a test scenario to illustrate the significance and accuracy of including the cemented liner correction.FIGS. 5A and 5B are plots of well breakdown pressure determined, respectively, without a cemented liner correction and with the cemented liner correction. The method 400 was implemented in Matlab, and tested against a cemented liner well with measured breakdown pressure. Three perforation zones within one frac-stage of the cemented liner were considered. The measured breakdown pressure for the frac-stage is 20711.00 psi. To show the effect of the cemented liner correction (as given in Step (5) of the algorithm), two cases were considered and compared against the measured breakdown pressure.FIG. 5A displays the results without incorporating the cemented liner correction. The plot on the left shows the formation permeability values (in log scale), and the plot on the right shows the corresponding breakdown pressure values computed in three different ways: the blue curve uses the lower bound formula (Equation (1.11)), and the yellow curve uses the upper bound formula (Equation (1.7)), and the orange curve uses Algorithm (1) but without the cemented liner correction. The actual (measured) Breakdown Pressure values are shown in black dots (for the three perforation intervals) and do not match the orange curve.FIG. 5B displays the results incorporating the cemented liner correction. The plot on the left shows the formation permeability values (in log scale), and the plot on the right shows the corresponding breakdown pressure values computed in three different ways: the blue curve uses the lower bound formula (Equation (1.11)), and the yellow curve uses the upper bound formula (Equation (1.7)), and the orange curve uses Algorithm (1) with the cemented liner correction. The actual (measured) Breakdown Pressure values are shown in black dots (for the three perforation intervals) and match the predictions of Algorithm (1) very closely.FIG. 6 illustrates hydrocarbon production operations 600 that include both one or more field operations 610 and one or more computational operations 612, which exchange information and control exploration for the production of hydrocarbons. In some implementations, outputs of techniques of the present disclosure can be performed before, during, or in combination with the hydrocarbon production operations 600, specifically, for example, either as field operations 610 or computational operations 612, or both.Examples of field operations 610 include forming / drilling a wellbore, hydraulic fracturing, producing through the wellbore, injecting fluids (such as water) through the wellbore, to name a few. In some implementations, methods of the present disclosure can trigger or control the field operations 610. For example, the methods of the present disclosure can generate data from hardware / software including sensors and physical data gathering equipment (e.g., seismic sensors, well logging tools, flow meters, and temperature and pressure sensors). The methods of the present disclosure can include transmitting the data from the hardware / software to the field operations 610 and responsively triggering the field operations 610 including, for example, generating plans and signals that provide feedback to and control physical components of the field operations 610. Alternatively or in addition, the field operations 610 can trigger the methods of the present disclosure. For example, implementing physical components (including, for example, hardware, such as sensors) deployed in the field operations 610 can generate plans and signals that can be provided as input or feedback (or both) to the methods of the present disclosure.Examples of computational operations 612 include one or more computer systems 620 that include one or more processors and computer-readable media (e.g., non-transitory computer-readable media) operatively coupled to the one or more processors to execute computer operations to perform the methods of the present disclosure. The computational operations 612 can be implemented using one or more databases 618, which store data received from the field operations 610 and / or generated internally within the computational operations 612 (e.g., by implementing the methods of the present disclosure) or both. For example, the one or more computer systems 620 process inputs from the field operations 610 to assess conditions in the physical world, the outputs of which are stored in the databases 618. For example, seismic sensors of the field operations 610 can be used to perform a seismic survey to map subsurface features, such as facies and faults. In performing a seismic survey, seismic sources (e.g., seismic vibrators or explosions) generate seismic waves that propagate in the earth and seismic receivers (e.g., geophones) measure reflections generated as the seismic waves interact with boundaries between layers of a subsurface formation. The source and received signals are provided to the computational operations 612 where they are stored in the databases 618 and analyzed by the one or more computer systems 620.In some implementations, one or more outputs 622 generated by the one or more computer systems 620 can be provided as feedback / input to the field operations 610 (either as direct input or stored in the databases 618). The field operations 610 can use the feedback / input to control physical components used to perform the field operations 610 in the real world.For example, the computational operations 612 can process the seismic data to generate three-dimensional (3D) maps of the subsurface formation. The computational operations 612 can use these 3D maps to provide plans for locating and drilling exploratory wells. In some operations, the exploratory wells are drilled using logging-while-drilling (LWD) techniques which incorporate logging tools into the drill string. LWD techniques can enable the computational operations 612 to process new information about the formation and control the drilling to adjust to the observed conditions in real-time.The one or more computer systems 620 can update the 3D maps of the subsurface formation as information from one exploration well is received and the computational operations 612 can adjust the location of the next exploration well based on the updated 3D maps. Similarly, the data received from production operations can be used by the computational operations 612 to control components of the production operations. For example, production well and pipeline data can be analyzed to predict slugging in pipelines leading to a refinery and the computational operations 612 can control machine operated valves upstream of the refinery to reduce the likelihood of plant disruptions that run the risk of taking the plant offline.In some implementations of the computational operations 612, customized user interfaces can present intermediate or final results of the above-described processes to a user. Information can be presented in one or more textual, tabular, or graphical formats, such as through a dashboard. The information can be presented at one or more on-site locations (such as at an oil well or other facility), on the Internet (such as on a webpage), on a mobile application (or app), or at a central processing facility.The presented information can include feedback, such as changes in parameters or processing inputs, that the user can select to improve a production environment, such as in the exploration, production, and / or testing of petrochemical processes or facilities. For example, the feedback can include parameters that, when selected by the user, can cause a change to, or an improvement in, drilling parameters (including drill bit speed and direction) or overall production of a gas or oil well. The feedback, when implemented by the user, can improve the speed and accuracy of calculations, streamline processes, improve models, and solve problems related to efficiency, performance, safety, reliability, costs, downtime, and the need for human interaction.In some implementations, the feedback can be implemented in real-time, such as to provide an immediate or near-immediate change in operations or in a model. The term real-time (or similar terms as understood by one of ordinary skill in the art) means that an action and a response are temporally proximate such that an individual perceives the action and the response occurring substantially simultaneously. For example, the time difference for a response to display (or for an initiation of a display) of data following the individual's action to access the data can be less than 1 millisecond (ms), less than 1 second(s), or less than 5 s. While the requested data need not be displayed (or initiated for display) instantaneously, it is displayed (or initiated for display) without any intentional delay, taking into account processing limitations of a described computing system and time required to, for example, gather, accurately measure, analyze, process, store, or transmit the data.Events can include readings or measurements captured by downhole equipment such as sensors, pumps, bottom hole assemblies, or other equipment. The readings or measurements can be analyzed at the surface, such as by using applications that can include modeling applications and machine learning. The analysis can be used to generate changes to settings of downhole equipment, such as drilling equipment. In some implementations, values of parameters or other variables that are determined can be used automatically (such as through using rules) to implement changes in oil or gas well exploration, production / drilling, or testing. For example, outputs of the present disclosure can be used as inputs to other equipment and / or systems at a facility. This can be especially useful for systems or various pieces of equipment that are located several meters or several miles apart, or are located in different countries or other jurisdictions.FIG. 7 is a block diagram of an example data processing system 700 used to provide computational functionalities associated with described algorithms, methods, functions, processes, flows, and procedures described in the present disclosure. For example, the data processing system 700 can be configured for controlling fracking systems and pumps based, at least in part, on formation breakdown pressure corrected for the effects of cemented liners. The data processing device 702 can include input devices such as keypads, keyboards, and touch screens that can accept user information. Also, the data processing device 702 can include output devices that can convey information associated with the operation of the data processing device 702. The information can include digital data, visual data, audio information, or a combination of information. The information can be presented in a graphical user interface (UI) (or GUI).The data processing device 702 can serve in a role as a client, a network component, a server, a database, a persistency, or components of a computer system for performing the subject matter described in the present disclosure. The illustrated data processing device 702 is communicably coupled with a network 724. In some implementations, one or more components of the data processing device 702 can be configured to operate within different environments, including cloud-computing-based environments, local environments, global environments, and combinations of environments.The data processing device 702 can receive requests over network 724 from a client application (for example, executing on another data processing device 702). The data processing device 702 can respond to the received requests by processing the received requests using software applications. Requests can also be sent to the data processing device 702 from internal users (for example, from a command console), external (or third) parties, automated applications, entities, individuals, systems, and computers.Each of the components of the data processing device 702 can communicate using a system bus 704. In some implementations, any or all of the components of the data processing device 702, including hardware or software components, can interface with each other or the interface 706 (or a combination of both), over the system bus 704. Interfaces can use an application programming interface (API) 714, a service layer 716, or a combination of the API 714 and service layer 716. The API 714 can include specifications for routines, data structures, and object classes. The API 714 can be either computer-language independent or dependent. The API 714 can refer to a complete interface, a single function, or a set of APIs.The service layer 716 can provide software services to the data processing device 702 and other components (whether illustrated or not) that are communicably coupled to the data processing device 702. The functionality of the data processing device 702 can be accessible for all service consumers using this service layer. Software services, such as those provided by the service layer 716, can provide reusable, defined functionalities through a defined interface. For example, the interface can be software written in JAVA, C++, or a language providing data in extensible markup language (XML) format. While illustrated as an integrated component of the data processing device 702, in alternative implementations, the API 714 or the service layer 716 can be stand-alone components in relation to other components of the data processing device 702 and other components communicably coupled to the data processing device 702. Moreover, any or all parts of the API 714 or the service layer 716 can be implemented as child or sub-modules of another software module, enterprise application, or hardware module without departing from the scope of the present disclosure.The data processing device 702 includes an interface 706. Although illustrated as a single interface 706 in FIG. 7, two or more interfaces 706 can be used according to implementations of the data processing device 702 and the described functionality. The interface 706 can be used by the data processing device 702 for communicating with other systems that are connected to the network 724 (whether illustrated or not) in a distributed environment. Generally, the interface 706 can include, or be implemented using, logic encoded in software or hardware (or a combination of software and hardware) operable to communicate with the network 724. More specifically, the interface 706 can include software supporting one or more communication protocols associated with communications. As such, the network 724 or the interface's hardware can be operable to communicate physical signals within and outside of the illustrated data processing device 702.The data processing device 702 includes a processor 708. Although illustrated as a single processor 708 in FIG. 7, two or more processors 708 can be used according to implementations of the data processing device 702 and the described functionality. Generally, the processor 708 can execute instructions and can manipulate data to perform the operations of the data processing device 702, including operations using algorithms, methods, functions, processes, flows, and procedures as described in the present disclosure.The data processing device 702 also includes a database 720 that can hold data (such as well and formation property data 722) for the data processing device 702 and other components connected to the network 724 (whether illustrated or not). For example, database 720 can be in-memory or a database storing data consistent with the present disclosure. In some implementations, database 720 can be a combination of two or more different database types (for example, hybrid in-memory and conventional databases) according to implementations of the data processing device 702 and the described functionality. While database 720 is illustrated as an internal component of the data processing device 702, in alternative implementations, database 720 can be external to the data processing device 702.The data processing device 702 also includes a memory 710 that can hold data for the data processing device 702 or a combination of components connected to the network 724 (whether illustrated or not). In some implementations, memory 710 can be a combination of two or more different types of memory (for example, a combination of semiconductor and magnetic storage) according to implementations of the data processing device 702 and the described functionality. While memory 710 is illustrated as an internal component of the data processing device 702, in alternative implementations, memory 710 can be external to the data processing device 702.The application 712 can be an algorithmic software engine providing functionality according to implementations of the data processing device 702 and the described functionality. For example, application 712 can serve as one or more components, modules, or applications.The data processing device 702 can also include a power supply 718. The power supply 718 can include a rechargeable or non-rechargeable battery that can be configured to be either user- or non-user-replaceable.There can be any number of computers 702 associated with, or external to, a computer system including the data processing device 702, with each data processing device 702 communicating over network 724. Further, the terms “client,”“user,” and other appropriate terminology can be used interchangeably, as appropriate, without departing from the scope of the present disclosure. Moreover, the present disclosure contemplates that many users can use one data processing device 702 and one user can use multiple computers 702.Implementations of the subject matter and the functional operations described in this specification can be implemented in digital electronic circuitry, in tangibly embodied computer software or firmware, in computer hardware, including the structures disclosed in this specification and their structural equivalents, or in combinations of one or more of them. Software implementations of the described subject matter can be implemented as one or more computer programs. Each computer program can include one or more modules of computer program instructions encoded on a tangible, non-transitory, computer-readable computer-storage medium for execution by, or to control the operation of, data processing apparatus. Alternatively, or additionally, the program instructions can be encoded in / on an artificially generated propagated signal. The example, the signal can be a machine-generated electrical, optical, or electromagnetic signal that is generated to encode information for transmission to suitable receiver apparatus for execution by a data processing apparatus. The computer-storage medium can be a machine-readable storage device, a machine-readable storage substrate, a random or serial access memory device, or a combination of computer-storage mediums.The terms “data processing apparatus,”“computer,” and “electronic computer device” (or equivalent as understood by one of ordinary skill in the art) refer to data processing hardware. For example, a data processing apparatus can encompass all kinds of apparatus, devices, and machines for processing data, including by way of example, a programmable processor, a computer, or multiple processors or computers. The apparatus can also include special purpose logic circuitry including, for example, a central processing unit (CPU), a field programmable gate array (FPGA), or an application specific integrated circuit (ASIC). In some implementations, the data processing apparatus or special purpose logic circuitry (or a combination of the data processing apparatus or special purpose logic circuitry) can be hardware- or software-based (or a combination of both hardware- and software-based).The methods, processes, or logic flows described in this specification can be performed by one or more programmable computers executing one or more computer programs to perform functions by operating on input data and generating output. The methods, processes, or logic flows can also be performed by, and apparatus can also be implemented as, special purpose logic circuitry, for example, a CPU, an FPGA, or an ASIC.Computer readable media (transitory or non-transitory, as appropriate) suitable for storing computer program instructions and data can include all forms of permanent / non-permanent and volatile / non-volatile memory, media, and memory devices. Computer readable media can include, for example, semiconductor memory devices such as random-access memory (RAM), read only memory (ROM), phase change memory (PRAM), static random-access memory (SRAM), dynamic random-access memory (DRAM), erasable programmable read-only memory (EPROM), electrically erasable programmable read-only memory (EEPROM), and flash memory devices. Computer readable media can also include, for example, magnetic devices such as tape, cartridges, cassettes, and internal / removable disks.EXAMPLESA system of one or more computers can be configured to perform particular operations or actions by virtue of having software, firmware, hardware, or a combination of them installed on the system that in operation causes or cause the system to perform the actions. One or more computer programs can be configured to perform particular operations or actions by virtue of including instructions that, when executed by data processing apparatus, cause the apparatus to perform the actions. One general aspect includes a method of fracking a formation using a wellbore with a cemented liner. The method also includes obtaining well and formation properties. The method also includes computing pore pressure at a set time (t) and radius (r) from an axis of the wellbore. The method also includes computing the poroelastic stress of the formation. The method also includes computing a breakdown pressure upper bound. The method also includes applying effective stress and cemented liner corrections to the breakdown pressure upper bound. The method also includes computing a breakdown pressure. The method also includes applying fracking fluid to the formation based, at least in part, on computed breakdown pressure. Other embodiments of this aspect include corresponding computer systems, apparatus, and computer programs recorded on one or more computer storage devices, each configured to perform the actions of the methods.Implementations may include one or more of the following features. The method where obtaining well and formation properties may include measuring at least some of the well and formation properties. Obtaining well and formation properties further may include obtaining previously measured well and formation properties. Applying fracking fluid to the formation may include installing and using a 10,000 psi-rated multistage completion system in response to determining the computed breakdown pressure is less than 10,000 psi. Applying fracking fluid to the formation may include installing and using a 15,000 psi-rated multistage completion system in response to determining the computed breakdown pressure is more than 15,000 psi. Implementations of the described techniques may include hardware, a method or process, or computer software on a computer-accessible medium.One general aspect includes a method of fracking a formation using a wellbore with a cemented liner. The method also includes obtaining well and formation properties where obtaining well and formation properties may include obtaining previously measured well and formation properties. The method also includes computing pore pressure at a set time (t) and radius (r) from an axis of the wellbore. The method also includes computing the poroelastic stress of the formation. The method also includes computing a breakdown pressure upper bound. The method also includes applying effective stress and cemented liner corrections to the breakdown pressure upper bound. The method also includes computing a breakdown pressure. The method also includes applying fracking fluid to the formation based, at least in part, on computed breakdown pressure. Other embodiments of this aspect include corresponding computer systems, apparatus, and computer programs recorded on one or more computer storage devices, each configured to perform the actions of the methods.Implementations may include one or more of the following features. The method where obtaining well and formation properties further may include measuring at least some of the well and formation properties. The method where the radius (r) is set as between 2 and 3 times the radius of the wellbore. Computing the poroelastic stress may include using composite Simpson's rule for numerical integration. Implementations of the described techniques may include hardware, a method or process, or computer software on a computer-accessible medium.Implementations may include one or more of the following features. The method where the radius (r) is set as between 2 and 3 times the radius of the wellbore. Computing the poroelastic stress may include using composite Simpson's rule for numerical integration. Implementations of the described techniques may include hardware, a method or process, or computer software on a computer-accessible medium.A number of embodiments of the systems and methods have been described. Nevertheless, it will be understood that various modifications may be made without departing from the spirit and scope of this specification. Accordingly, other embodiments are within the scope of the following claims.
Claims
1. A method of fracking a formation using a wellbore with a cemented liner, the method comprising:obtaining well and formation properties;computing pore pressure at a set time (t) and radius (r) from an axis of the wellbore;computing a poroelastic stress of the formation;computing a breakdown pressure upper bound;applying effective stress and cemented liner corrections to the breakdown pressure upper bound;computing a breakdown pressure; andapplying fracking fluid to the formation based, at least in part, on computed breakdown pressure.
2. The method of claim 1, wherein obtaining well and formation properties comprises measuring at least some of the well and formation properties.
3. The method of claim 2, wherein obtaining well and formation properties further comprises obtaining previously measured well and formation properties.
4. The method of claim 1, wherein pore pressure p(t, r) is computed as:p(t,r)=ln(2)t∑ i=1n(ciP0K0(iln(2)tcr)iln(2)tK0(iln(2)tca))whereci=(-1)i+n2∑ k=⌊i+i2⌋min(i,n2) (kn2(2k)!(n2-k)!k!(k-1)!(i-k)!(2k-i)!).withc=Kμ∅cf, n=8 and, K denotes rock permeability, P0 denotes an initial wellbore pressure, Ø denotes porosity, μ denotes injection fluid viscosity, cf denotes injection fluid compressibility, and K0(x) denotes a modified Bessel function of the second kind of order 0.
5. The method of claim 4, wherein the radius (r) is set as between 2 and 3 times the radius of the wellbore.
6. The method of claim 1, wherein the poroelastic stress (S_θ{circumflex over ( )}((3))(t, r)) of the formation is computed asSθ(3)(t,r)=α (1-2v1-v) (1r2∫arp(t,ρ) ρ dρ-p(t,r)),where α is a Biot Poroelastic Parameter, v is a Poisson ratio, a is a wellbore radius, p is a pore pressure.
7. The method of claim 6, wherein computing the poroelastic stress comprises using Composite Simpson's Rule for numerical integration.
8. The method of claim 1, wherein the breakdown pressure upper bound is computed as:Pf-UpperBound=Min0≤θ≤π [1(-σf-σz) ((σθ ′-σz2)2+σθz 2-(σf+(σθ ′+σz)2)2)]whereσθ′=σxx+σyy−2(σxx−σyy)cos(2θ)−4σxy sin(2θ)σz=σzz−2υ[(σxx−σyy)cos(2θ)+2σxy sin(2θ)]σθz=2(σyz cos(θ)−σxz sin(θ))σxx=SH cos2(αb)cos2(β)+Sh cos2(αb)sin2(β)+Sv sin2(αb)_Hsin{circumflex over ( )}2(β)+S_hcos{circumflex over ( )}2(β)σzz=SH sin2(αb)cos2(β)+Sh sin2(αb)sin2(β)+Sv cos2(αb)_H cos(α_b)cos(β)sin(β)+S_h cos(α_b)cos(β)sin(β)σyz=−SH sin(αb)cos(β)sin(β)+Sh sin(αb)cos(β)sin(β)σxz=SH cos(αb)sin(αb)cos2(β)+Sh cos(αb)sin(αb)sin2(β)−Sv cos(αb)sin(αb)where σz, σθz denote a stress distribution at the wellbore wall in polar coordinates (r,θ, z), σxx, σyy, σzz, σxy, σyz, and σxz denote the stress distribution at the wellbore wall in a rotated Cartesian local coordinate system, Sv, denotes a vertical stress, Sh denotes a minimum horizontal stress, SH denotes a maximum horizontal stress, υ denotes a Poisson ratio, αb denotes an inclination angle of the well from the vertical axis, β denotes an azimuth angle of the well relative to a horizontal direction, and θ denotes a wellbore circumferential angle.
9. The method of claim 1, wherein applying effective stress and cemented liner corrections to the breakdown pressure upper bound comprises updating the breakdown pressure upper bound as:Pf-UpperBound=1(1+βc)Pf-UpperBound-α P0whereTF=[2(1+vc) (1-vc) Ec (Ro2-Ri2)Ri2][1+vE+(1+vc) (Ri2+(1-2 vc) )Ec (Ro2-Ri2)Ro2]andβc= -TFRo2r2where E is a Young's modulus of the rock, Ec is a Young's modulus of the casing, μ is a Poisson ratio of the rock, vc is a Poisson ratio of the casing, Ri is an internal radius of the casing, Ro is an external radius of the casing, P0 denotes an initial wellbore pressure, and α is a Biot Poroelastic Parameter.
10. The method of claim 9, wherein the breakdown pressure Pf is computed as:Pf=Pf-UpperBound-Sθ(3)(t,r)-p(t,r)whereSθ(3) is the poroelastic stress, and p is a pore pressure.
11. The method of claim 1, wherein applying fracking fluid to the formation comprises installing and using a 10,000 psi-rated multistage completion system in response to determining the computed breakdown pressure is less than 10,000 psi.
12. The method of claim 11, wherein applying fracking fluid to the formation comprises installing and using a 15,000 psi-rated multistage completion system in response to determining the computed breakdown pressure is more than 15,000 psi.
13. A method of fracking a formation using a wellbore with a cemented liner, the method comprising:obtaining well and formation properties wherein obtaining well and formation properties comprises obtaining previously measured well and formation properties;computing pore pressure at a set time (t) and radius (r) from an axis of the wellbore;computing a poroelastic stress of the formation;computing a breakdown pressure upper bound;applying effective stress and cemented liner corrections to the breakdown pressure upper bound;computing a breakdown pressure; andapplying fracking fluid to the formation based, at least in part, on computed breakdown pressure.
14. The method of claim 13, wherein obtaining well and formation properties further comprises measuring at least some of the well and formation properties.
15. The method of claim 14, wherein the poroelastic stress(Sθ(3)(t,r))of the formation is computed asSθ(3)(t,r)=α (1-2v1-v) (1r2∫arp(t,ρ) ρ dρ-p(t,r))where α is a Biot Poroelastic Parameter, v is a Poisson ratio, a is a wellbore radius, p is a pore pressure.
16. The method of claim 15, wherein the breakdown pressure upper bound is computed as:Pf-UpperBound=Min0≤θ≤π [1(-σf-σz) ((σθ ′-σz2)2+σθz 2-(σf+(σθ ′+σz)2)2)]whereσθ′=σxx+σyy−2(σxx−σyy)cos(2θ)−4σxy sin(2θ)σz=σzz−2υ[(σxx−σyy)cos(2θ)+2σxy sin(2θ)]σθz=2(σyz cos(θ)−σxz sin(θ))σxx=SH cos2(αb)cos2(β)+Sh cos2(αb)sin2(β)+Sv sin2(αb)_Hsin{circumflex over ( )}2(β)+S_hcos{circumflex over ( )}2(β)σzz=SH sin2(αb)cos2(β)+Sh sin2(αb)sin2(β)+Sv cos2(αb)_H cos(α_b)cos(β)sin(β)+S_h cos(α_b)cos(β)sin(β)σyz=−SH sin(αb)cos(β)sin(β)+Sh sin(αb)cos(β)sin(β)σxz=SH cos(αb)sin(αb)cos2(β)+Sh cos(αb)sin(αb)sin2(β)−Sv cos(αb)sin(αb)where σz, σθz denote a stress distribution at the wellbore wall in polar coordinates (r, θ, z), σxx, σyy, σzz, σxy, σyz, and σxz denote the stress distribution at the wellbore wall in a rotated Cartesian local coordinate system, Sv, denotes a vertical stress, Sh denotes a minimum horizontal stress, SH denotes a maximum horizontal stress, υ denotes a Poisson ratio, αb denotes an inclination angle of the well from the vertical axis, β denotes an azimuth angle of the well relative to a horizontal direction, and θ denotes a wellbore circumferential angle.
17. The method of claim 16, wherein applying effective stress and cemented liner corrections to the breakdown pressure upper bound comprises updating the breakdown pressure upper bound as:Pf-UpperBound=1(1+βc)Pf-UpperBound-α P0whereTF=[2(1+vc) (1-vc) Ec (Ro2-Ri2)Ri2][1+vE+(1+vc) (Ri2+(1-2 vc) )Ec (Ro2-Ri2)Ro2]andβc= -TFRo2r2where E is a Young's modulus of the rock, Ec is a Young's modulus of the casing, v is a Poisson ratio of the rock, vc is a Poisson ratio of the casing, Ri is an internal radius of the casing, Ro is an external radius of the casing, P0 denotes an initial wellbore pressure, and α is a Biot Poroelastic Parameter.
18. The method of claim 17, wherein the breakdown pressure is computed as:Pf=Pf-UpperBound-Sθ(3)(t,r)-p(t,r)whereSθ(3) is the poroelastic stress, and p is a pore pressure.
19. The method of claim 18, wherein applying fracking fluid to the formation comprises installing and using a 10,000 psi-rated multistage completion system in response to determining the computed breakdown pressure is less than 10,000 psi.
20. The method of claim 19, wherein applying fracking fluid to the formation comprises installing and using a 15,000 psi-rated multistage completion system in response to determining the computed breakdown pressure is more than 15,000 psi.
