Production management method and system based on hanging and sewing devices

By integrating data from sewing equipment and hanging systems on the garment production line, we can obtain time data for each process, identify bottleneck processes and make adjustments, solving the problem of low efficiency caused by independent data and improving the production of the garment production line. efficiency and productivity.

WO2024198030A1PCT designated stage expired Publication Date: 2024-10-03JACK SEWING MASCH CO LTD
View PDF 8 Cites 0 Cited by

Patent Information

Application Number
PCT/CN2023/091201
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-03-31
Filing Date
2023-04-27
Publication Date
2024-10-03

AI Technical Summary

Technical Problem

The data between the hanging system and the sewing equipment of the existing clothing production line are independent, making it difficult to obtain intuitive production data and detect abnormalities in the production line, which in turn affects production efficiency.

Method used

By integrating data from sewing equipment and hanging systems, we can obtain the current time and average time used at each process station, identify bottleneck processes, make reasonable reallocation and adjustments, and optimize the balance of the production line.

Benefits of technology

It achieves effective data integration and intuitive display of production line status, quickly locates bottleneck processes, and improves production efficiency and capacity.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN2023091201_03102024_PF_FP_ABST
    Figure CN2023091201_03102024_PF_FP_ABST
Patent Text Reader

Abstract

Provided are a production management method and system based on hanging and sewing devices, which method and system aim to solve the problem in the prior art of it being difficult to exert the maximum utility of a production line due to data of a garment hanging system of a garment production line being not registered and fused. The system comprises several process stations. The method comprises: acquiring the current process time of each process station; calculating the average time of each process station; confirming a bottleneck process according to the difference in the average time of each process station; performing production rescheduling on the bottleneck process; and confirming the state of a production line according to the difference between the current process time and the average time. Confirming the state of a production line comprises: according to the difference, determining the difference in the degree of proficiency of a machine operator or whether the production line is abnormal; and rapidly locating the bottleneck process on the basis of the difference between the time of the process station and the average time, and taking adjustment measures in a timely manner. A balanced production state of a production line is optimized by means of subdividing a bottleneck process of the production line and combining processes having short working time, thereby improving the production efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

A production management method and system based on hanging and sewing equipment Technical Field

[0001] The present invention relates to the field of production automation, and in particular to a production management method and system based on hanging and sewing equipment. Background Art

[0002] The clothing hanging system hangs the cut pieces of a whole piece of clothing on a hanger and automatically sends them to the sewing equipment for the next process according to the pre-entered process steps, greatly reducing non-production time such as transportation, binding and folding. When the production staff completes a process, they only need to send the process end information, and the hanging system will automatically transfer the hanger to the next process station.

[0003] Existing clothing manufacturers are increasingly using hanging systems to manage production lines and improve production efficiency. However, the sewing equipment and hanging systems under the hanging production line are two independent systems. The production data of the hanging system and the production data of the sewing equipment are independent of each other, making it difficult for workshop personnel to obtain intuitive production data and thus difficult to detect production line anomalies in a timely manner. As a result, although automated production equipment has been introduced, data alignment and integration have not been achieved. Human judgment and scheduling are still required, making it difficult to maximize the effectiveness of the production line.

[0004] Summary of the Invention

[0005] The present invention aims to solve the problem in the prior art that the data of the clothing hanging system of the clothing production line is not aligned and integrated, making it difficult to maximize the effectiveness of the production line. It provides a production management system and method based on hanging and sewing equipment, which optimizes the balance of the production line by realizing the data fusion of sewing equipment and hanging system to form process data and energy efficiency data.

[0006] To achieve the above object, the present invention adopts the following technical solutions:

[0007] A production management method based on hanging and sewing equipment is applied to several process stations. The method obtains the current process time at each station and calculates the average time for each process station. Based on the difference in the average time of each process station, bottleneck processes are identified and rescheduled. The status of the production line is determined based on the difference between the current process time and the average time. This includes determining the proficiency of the sewing operators or whether there are any anomalies in the production line based on the difference. Based on the difference between the process station time and the average time, the bottleneck process is quickly located. By rationally reallocating the bottleneck processes along the production line, the production balance of the production line is optimized, thereby improving production efficiency.

[0008] Preferably, the acquisition of the current process time of each process station includes: setting the time when the hanging enters the process station as the first communication flag between the hanging system and the IoT sewing device, setting the time when the hanging leaves the process station as the second communication flag between the hanging system and the IoT sewing device, acquiring the time interval between the first communication flag and the start of the current process of the IoT sewing device as the material picking time; acquiring the time interval between the start and end time of the current process of the IoT sewing device as the sewing time, and acquiring the time interval between the end time of the current process of the IoT sewing station and the second communication flag as the material unloading time. The process time of the process station is recorded by the duration of the action between the first communication flag and the second communication flag, realizing automatic acquisition of the process time and intelligent monitoring of the production line process time.

[0009] Preferably, identifying the bottleneck process based on the difference in average time taken by each process station includes: creating a work time balance chart based on the current process time taken by each process station and the average time taken by each process station, wherein the process in the work time balance chart where the difference between the time taken by each process station and the average time taken by each process station is greater than a preset time length is identified as a bottleneck process. The horizontal axis of the work time balance chart represents the process stations to which each IoT sewing device belongs, and the vertical axis of the work time balance chart represents the time axis. The average time taken by each process station is displayed as a straight line perpendicular to the vertical axis, intuitively displaying the difference in time taken by each process station to which each IoT sewing device belongs, thereby facilitating rapid identification of the bottleneck process and timely implementation of adjustment measures.

[0010] Preferably, scheduling bottleneck processes includes: breaking down bottleneck processes that occur more than a preset number of times within a preset time period into several sub-processes and redistributing them; and adding sub-processes to processes that have a lower-than-average process duration within the preset time period by a difference greater than a preset duration. By rationally redistributing bottleneck processes and merging processes with shorter durations, the production line's production balance is optimized, thereby improving production efficiency.

[0011] Preferably, the method of identifying the bottleneck process based on the difference in average time spent at each process station further includes determining whether the subdivisions of the bottleneck process meet a preset time range, specifically determining whether the material collection time, sewing time, and material discharge time meet the preset material collection time range, sewing time range, and material discharge time range, respectively. If the subdivision does not meet the preset time range, a reminder signal is sent to the server. By monitoring and reminding the subdivision process time, the production enthusiasm of the operators is improved. At the same time, the management personnel receive reminders through the server, which facilitates the understanding of the production line status and thus improves production capacity.

[0012] Preferably, the data in the work-hour balance chart is processed to produce a capacity calculation table; the data in the capacity calculation table includes bottleneck work hours, production line hourly capacity, and production line balance rate. The production line balance rate = measured total work hours / (bottleneck work hours * number of processes), which facilitates the understanding of production line production status, allows for real-time adjustment of production processes, improves intelligent production line management, and enhances production efficiency.

[0013] A production management system based on hanging and sewing equipment, using the production management method based on hanging and sewing equipment, includes several process stations, each of which is provided with an IoT sewing device and a hanging system, wherein the IoT sewing device is communicatively connected to the hanging system, and the IoT sewing device is communicatively connected to a server; the IoT sewing device is provided with a visualization terminal; the visualization terminal is communicatively connected to the IoT sewing device; the hanging system is used to transport hangings according to hanging movement instructions, store hanging information of each hanging, and send the corresponding hanging information to the IoT sewing device when the hanging is transported to the operating area of ​​each IoT sewing device;

[0014] The IoT sewing device receives hanging information and control information from a server, executes sewing operations to generate job information, and transmits this information to the server. The server generates production capacity information based on the received hanging and operation information. The server feeds this information back to the IoT sewing system, where it can be displayed on a visual terminal or directly on the IoT sewing device for operator convenience.

[0015] Furthermore, the IoT sewing equipment includes, but is not limited to, lockstitch machines, overlock machines, interlock machines, heavy-duty sewing machines, pattern machines, buttonhole machines, bartacking machines, and automatic sewing units. The server can be a cloud server or a local server; the visualization terminal can be, but is not limited to, a mobile phone, tablet, or computer; the hanging information includes the hanging group, the station number of the IoT sewing equipment, the hanging style number, and the process. By integrating data from the IoT sewing equipment with the hanging system, production capacity information can be intuitively displayed, facilitating the factory's rational optimization and prediction of production line capacity.

[0016] Preferably, the hanging system includes a first information sending module, which is used to send hanging entry information and hanging information to the corresponding IoT sewing equipment and / or server when the hanging enters the process station, and send hanging exit information to the corresponding IoT sewing equipment and / or server when the hanging exits. The corresponding IoT sewing equipment is the IoT sewing equipment at the process station where the hanging enters. Establishing a communication connection between the hanging system and the IoT sewing equipment facilitates the coordinated operation of the hanging equipment and the IoT sewing equipment through control of communication signals, thereby improving work efficiency;

[0017] Furthermore, the IoT sewing equipment sends hanging control instructions to the hanging system, thereby controlling the mechanical actions of hanging at the process station, including hanging in, hanging out and lighting switches.

[0018] Preferably, the IoT sewing device includes a timing module for recording the material collection time between the time the device enters the process station and the start of operation, the sewing time between the start of operation and the end of operation, and the material discharge time between the end of operation and the time the device leaves the process station. The IoT sewing device also includes a second sending module for sending the hanging information, material collection time, sewing time, and material discharge time of each process to the server. By refining the process flow and accurately locating process anomalies based on the time spent at each stage of the process, production enthusiasm is improved and production line capacity is increased.

[0019] Preferably, the server includes a third sending module configured to feed back the operation information and production capacity information to a corresponding IoT sewing device, wherein the IoT sewing device includes a first receiving unit configured to receive the operation information and production capacity information; and the visual terminal is configured to display the hanging information and production capacity information. The visual terminal can also display operation information. By visually displaying the operation information, hanging information, and production capacity information on the visual terminal of the IoT sewing device, operators can be reminded to perform their operations, while also facilitating managers to intuitively understand the production line status and rationally optimize and predict production line performance.

[0020] Therefore, the present invention has the following beneficial effects: (1) By establishing a communication connection between the hanging system and the IoT sewing equipment, data fusion is established between the IoT sewing equipment and the hanging system, which facilitates the coordinated operation of the hanging equipment and the IoT sewing equipment through control of communication signals, thereby improving work efficiency; (2) A working time balance chart and a production capacity calculation table are constructed to intuitively display the working status of the production line, facilitating rapid location of abnormalities and timely adoption of adjustment measures. (3) Based on the difference between the station time and the average time of the process, the bottleneck process is quickly located. By subdividing the bottleneck processes of the production line and merging the processes with short working hours, the production balance state of the production line is optimized, thereby improving production efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] FIG1 is a schematic diagram of communication connections of a production management system based on hanging and sewing equipment according to an embodiment of the present invention.

[0022] FIG2 is a schematic diagram of subdividing the process of a production management system based on hanging and sewing equipment according to an embodiment of the present invention.

[0023] FIG3 is a working time balance diagram of a production management method based on hanging and sewing equipment according to an embodiment of the present invention.

[0024] FIG4 is a production capacity calculation table based on a production management method for hanging and sewing equipment according to an embodiment of the present invention.

[0025] In the figure: 1. First communication flag 2. Sewing equipment start operation time 3. Sewing equipment end operation time 4. Second communication flag 5. Material picking time 6. Sewing time 7. Material unloading time 8. Hanging system 9. IoT sewing equipment 10. Server 11. Average time. DETAILED DESCRIPTION

[0026] The present invention will be further described below with reference to the accompanying drawings and specific embodiments.

[0027] Example:

[0028] A production management system based on hanging and sewing equipment includes several process stations. As shown in Figure 1, the process stations are equipped with IoT sewing equipment 9 and a hanging system 8. The IoT sewing equipment 9 is in communication with the hanging system 8, and the IoT sewing equipment 9 is in communication with a server 10. The IoT sewing equipment includes but is not limited to lockstitch sewing machines, overlock sewing machines, interlock sewing machines, heavy-duty sewing machines, pattern sewing machines, buttonhole sewing machines, bartacking machines, and automatic sewing units. The server is a cloud server or a local server; the visual terminal can be, but is not limited to, a mobile phone, tablet, or computer.

[0029] The IoT sewing device is provided with a visualization terminal; the visualization terminal is in communication with the IoT sewing device; the hanging system is used to transport the hanging according to the hanging movement instruction, store the hanging information of each hanging, and send the corresponding hanging information to the IoT sewing device when the hanging is transported to the operating area of ​​each IoT sewing device; the hanging information includes the hanging group, the station number of the IoT sewing device, the hanging style number, and the process;

[0030] The hanging system includes a first information sending module, which is used to send hanging entry information and hanging information to the corresponding IoT sewing equipment and / or server when the hanging enters the process station, and send hanging exit information to the corresponding IoT sewing equipment and / or server when the hanging exits. The corresponding IoT sewing equipment is the IoT sewing equipment at the process station where the hanging enters. A communication connection is established between the hanging system and the IoT sewing equipment to facilitate the coordinated operation of the hanging equipment and the IoT sewing equipment through control of communication signals, thereby improving work efficiency;

[0031] The IoT sewing device is configured to receive hanging information and control information from a server, execute sewing operations to generate operation information, and transmit the hanging information and operation information to the server. The IoT sewing device includes a timing module for recording the material collection time 5 between the time the hanging enters the process station and the start time 2 of the IoT sewing device, the sewing time 6 between the start time 2 of the IoT sewing device and the end time 3 of the IoT sewing device, and the material discharge time 7 between the end time 3 of the IoT sewing device and the leaving of the process station. The IoT sewing device also includes a second information sending module for transmitting the hanging information, material collection time, sewing time, and material discharge time of each process to the server. By refining the process flow and accurately locating process anomalies based on the time taken at each stage of the process, production enthusiasm is improved and production line capacity is increased.

[0032] The server generates production capacity information based on the received hanging information and operation information. The server includes a third sending module, which is used to feed back the operation information and production capacity information to the corresponding IoT sewing device. The IoT sewing device includes a first receiving unit for receiving the operation information and production capacity information; the visual terminal is used to display the hanging information, operation information and production capacity information. The operation information can also be directly displayed through the IoT sewing device for the convenience of operators. The server feeds back the operation information and production capacity information to the IoT sewing system, and the IoT sewing system displays the operation information and production capacity information through the visual terminal. The visual display of hanging information through the visual terminal reminds operators to work; the intuitive display of operation information and production capacity information allows managers to intuitively understand the production line situation and reasonably optimize and predict production line performance.

[0033] This embodiment also discloses a production management method based on hanging and sewing equipment, which is applied to the above-mentioned production management system based on hanging and sewing equipment, including obtaining the current process time of each process station, calculating the average time of each process station, identifying the bottleneck process based on the difference in the average time of each process station; rescheduling the bottleneck process, and judging the difference in the proficiency of the sewing workers or whether there is any abnormality in the production line based on the difference between the current process time and the average time;

[0034] Among them, obtaining the current process time of each process station includes: as shown in Figure 2, setting the time for hanging to enter the process station as the first communication flag between the hanging system and the IoT sewing device, setting the time for hanging to leave the process station as the second communication flag between the hanging system and the IoT sewing device, obtaining the time interval between the first communication flag and the start of the current process of the IoT sewing device as the material picking time; obtaining the time interval between the start time and the end time of the current process of the IoT sewing device as the sewing time, and obtaining the time interval between the end time of the current process of the IoT sewing station and the second communication flag as the material discharge time.

[0035] Identifying bottleneck processes based on the difference in average time spent at each process station includes: creating a work time balance chart based on the current process time spent at each process station and the average time spent at each process station, as shown in Figure 3. Processes in the work time balance chart where the difference between the time spent at each process station and the average time spent at each process station is greater than a preset time are considered bottleneck processes. The horizontal axis of the work time balance chart represents the process stations to which each IoT sewing device belongs, and the vertical axis represents time. The average time spent at each process station is displayed as a straight line perpendicular to the vertical axis, visually displaying the difference in time spent at each process station to which each IoT sewing device belongs, facilitating rapid identification of bottleneck processes and timely implementation of adjustment measures.

[0036] Determine whether the sub-processes of the bottleneck process meet the preset time thresholds. Specifically, this includes determining whether the material collection time, sewing time, and material discharge time are within the preset time ranges, respectively. If the sub-process does not meet the preset time range, a reminder signal is sent to the server. By monitoring and reminding the sub-process time, the production enthusiasm of the operators is improved. At the same time, the server sends reminders to managers, allowing them to better understand the production line status and thus improve production capacity.

[0037] The data in the balance diagram is processed into a capacity calculation table; as shown in FIG4 , the data in the capacity calculation table includes:

[0038] Bottleneck working hours: the longest working hours among all current process hours;

[0039] Production line hourly capacity: 60 / bottleneck working hours;

[0040] Production line balance rate: measured total working hours / (bottleneck working hours * number of processes). This helps to quickly identify bottleneck processes and abnormal processes in the production line.

[0041] Scheduling bottleneck processes involves breaking down bottleneck processes that occur more than a preset number of times within a preset time period into several sub-processes and redistributing them. Furthermore, sub-processes are added to processes that have a lower than average duration by a greater than a preset amount within the preset time period. By rationally redistributing bottleneck processes and merging shorter processes, the production line's balance is optimized, thereby improving production efficiency.

[0042] The specific embodiments described herein are merely illustrative of the spirit of the present invention. Persons skilled in the art may make various modifications, additions, or substitutions to the described specific embodiments without departing from the spirit of the present invention or exceeding the scope of the appended claims.

[0043] Although this document frequently uses terms such as "interconnected sewing equipment," "work time balance chart," "bottleneck process," and "capacity calculation table," the use of other terms is not excluded. These terms are used solely to more conveniently describe and explain the essence of the present invention; interpreting them as any additional limitations would be contrary to the spirit of the present invention.

Claims

1. A production management method based on hanging and sewing equipment, applied to several process stations, characterized in that: It includes obtaining the current process time of each process station, calculating the average time of each process station, confirming the bottleneck process according to the difference in the average time of each process station, rescheduling the bottleneck process, and confirming the production line status according to the difference between the current process time and the average time.

2. A production management method based on hanging and sewing equipment according to claim 1, characterized in that: The method for obtaining the current process time of each process station includes: setting the time for hanging to enter the process station as the first communication flag between the hanging system and the IoT sewing device, setting the time for hanging to leave the process station as the second communication flag between the hanging system and the IoT sewing device, obtaining the time interval between the first communication flag and the start of the current process of the IoT sewing device as the material picking time; obtaining the time interval between the start time and the end time of the current process of the IoT sewing device as the sewing time, and obtaining the time interval between the end time of the current process of the IoT sewing station and the second communication flag as the material discharge time.

3. A production management method based on hanging and sewing equipment according to claim 2, characterized in that: The method of confirming the bottleneck process based on the difference in average time of each process station includes: preparing a work time balance chart based on the current process time of each process station and the average time of each process station, and the process in the work time balance chart where the difference between the time of each process station and the average time is greater than a preset time length compared with the average time is a bottleneck process.

4. A production management method based on hanging and sewing equipment according to claim 3, characterized in that: Scheduling the bottleneck process includes: breaking down the bottleneck process that occurs more than a preset number of times within a preset time period into several sub-processes and redistributing them, and adding sub-processes to the processes that are lower than the average process time within the preset time period and the difference is greater than the preset duration.

5. A production management method based on hanging and sewing equipment according to claim 4, characterized in that: The method of confirming the bottleneck process according to the average time difference of each process station also includes: judging whether the subdivided process of the bottleneck process meets the preset time range, specifically including: judging whether the material picking time, sewing time and material releasing time meet the preset material picking time range, sewing time range and material releasing time range respectively; if the subdivided process does not meet the preset time range, a reminder signal is sent to the server.

6. A production management method based on hanging and sewing equipment according to claim 3 or 5, characterized in that: It also includes processing the data in the working time balance chart into a capacity calculation table; the data in the capacity calculation table includes: bottleneck working hours, production line hourly capacity and production line balance rate.

7. A production management system based on hanging and sewing equipment, adopting the production management method based on hanging and sewing equipment according to any one of claims 1 to 6, characterized in that: It comprises several process stations, wherein the process stations are provided with IoT sewing equipment and hanging systems, the IoT sewing equipment is communicatively connected with the hanging system, and the IoT sewing equipment is communicatively connected with a server; the IoT sewing equipment is provided with a visualization terminal; the visualization terminal is communicatively connected with the IoT sewing equipment; the hanging system is used to transport the hanging according to the hanging movement instruction, store the hanging information of each hanging, and send the corresponding hanging information to the IoT sewing equipment when the hanging is transported to the working area of ​​each IoT sewing equipment; The IoT sewing device is used to receive the hanging information and the control information of the server, perform the sewing operation to form the operation information, and transmit the hanging information and the operation information to the server; The server generates capacity information according to the received hanging information and operation information.

8. A production management system based on hanging and sewing equipment according to claim 7, characterized in that: The hanging system includes a first information sending module, which is used to send hanging entry information and hanging information to the corresponding IoT sewing equipment and / or server when the hanging enters the process station, and send hanging exit information to the corresponding IoT sewing equipment and / or server when the hanging exits the station.

9. A production management system based on hanging and sewing equipment according to claim 8, characterized in that: The IoT sewing equipment includes a timing module, which is used to record the material picking time between the hanging entering the process station and the starting of the operation of the IoT sewing equipment, the sewing time between the starting of the operation of the IoT sewing equipment and the ending of the operation of the IoT sewing equipment, and the material discharge time between the ending of the operation of the IoT sewing equipment and the hanging leaving the process station; the IoT sewing equipment includes a second sending module, which is used to send the hanging information, material picking time, sewing time and material discharge time of each process to the server.

10. A production management system based on hanging and sewing equipment according to claim 9, characterized in that: The server includes a third sending module, which is used to feed back the operation information and production capacity information to the corresponding IoT sewing device, and the IoT sewing device includes a first receiving unit for receiving the operation information and production capacity information; the visualization terminal is used to display the hanging information and production capacity information.

Citation Information

Patent Citations

  • Discrete production line bottleneck detection method based on Internet of Things technology

    CN105809307A

  • Intelligent control hanging system based on Internet of Things technology

    CN108594773A

  • Productivity bottleneck detection method and device and computer readable storage medium

    CN111489079A

  • Hanging system and destination station change control method

    CN111792301A

  • Intelligent production scheduling method for clothing hanging production line

    CN112009975A