An earthing interface and method for providing functional earthing

The earthing interface with a controller and switchable circuit addresses the limitations of conventional earthing by generating a functional earth return and monitoring insulation, reducing fault impact and damage in electrical systems with both positive and negative systems.

WO2024199672A1PCT designated stage expired Publication Date: 2024-10-03HUAWEI DIGITAL POWER TECH CO LTD +1
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
PCT/EP2023/058500
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-03-31
Publication Date
2024-10-03

AI Technical Summary

Technical Problem

Conventional earthing methods, such as TN earthing, can increase fault impact on electrical systems and do not allow for insulation monitoring, especially in installations with both positive and negative systems, leading to potential voltage issues and damage from ground leakage.

Method used

An earthing interface with a controller and switchable earthing circuit that generates a functional earth return, adjusts voltage differences, measures currents, and disconnects if thresholds are exceeded, providing flexible earthing and isolation monitoring to limit damage from faults.

Benefits of technology

The solution reduces fault impact and damage by controlling voltages and currents, allowing for timely shutdowns and efficient prevention of system failures, while maintaining systems within safe voltage limits, thus enhancing the reliability and safety of electrical installations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure EP2023058500_03102024_PF_FP_ABST
    Figure EP2023058500_03102024_PF_FP_ABST
Patent Text Reader

Abstract

The disclosure relates to earthing of a power installation. The disclosure proposes, an electrical installation, an earthing interface, and corresponding methods for operating said devices / systems. The earthing interface comprises a controller and an earthing circuit. In a first switching state of the earthing circuit, an output of the earthing interface is electrically connected to a protective earth (PE) through the earthing circuit forming an electrical connection to generate a functional earth return (FER) at the output of the earthing interface. In a second switching state of the earthing circuit, the electrical connection is disconnected. In the first switching state, the controller is configured to adjust the earthing circuit to reduce a voltage difference between the FER and the PE, measure a current flowing from the FER to the PE, and switch the earthing circuit to the second switching state, if the current exceeds a current threshold.
Need to check novelty before this filing date? Find Prior Art

Description

[0001] AN EARTHING INTERFACE AND METHOD FOR PROVIDING FUNCTIONAL EARTHING

[0002] TECHNICAL FIELD

[0003] The present disclosure relates to earthing of a power installation. The disclosure proposes an electrical installation, an earthing interface, and methods for operating the electrical installation and the earthing interface, respectively. The earthing interface provides functional earthing for the electrical installation.

[0004] BACKGROUND

[0005] In general, earthing (or grounding) of power installations is done in compliance with the International Electrotechnical Commission (IEC) Low Voltage (LV) definition and the EU LV Directive.

[0006] Hard earthing (TN earthing) of electrical installations is generally possible and LV compliant. However, TN earthing can increase the fault impact of insulation faults on the electrical systems and insulation monitoring is not possible.

[0007] Conventionally, IT earthing is not possible in electrical installations that comprise, for example, a positive system and a negative system, which are electrically connected, as in the case of a ground leakage failure more voltage than considered to be LV compliant can exist between DC lines of the electrical installation and the earth potential.

[0008] Notably, the first letter of TN and IT indicates the connection between earth and the powersupply equipment (generator or transformer), wherein:

[0009] "T" — Direct connection of a point with earth.

[0010] "I" — All points are isolated from earth or connected via a high impedance.

[0011] The second letter of TN and IT indicates the connection between earth or a network and the electrical device being supplied, wherein:

[0012] "T" — Earth connection is by a local direct connection to earth, usually via a ground rod. "N" — the earth connection is supplied by the electricity supply network, either separately to the neutral conductor (TN-S), combined with the neutral conductor (TN-C), or both (TN-C-S).

[0013] SUMMARY

[0014] In view of the above, an objective of this disclosure is to provide functional earthing for an electrical installation, for example, an electrical installation comprising a positive and a negative system. Another objective is to control and limit voltages and currents of the electrical installation to prevent damages. Another objective is to analyze and / or locate faults of the electrical installation and provide isolation monitoring.

[0015] These and other objectives are achieved by this disclosure as described in the enclosed independent claims. Advantageous implementations are further defined in the dependent claims.

[0016] A first aspect of this disclosure provides an earthing interface for a power installation, the earthing interface comprising a controller and an earthing circuit, wherein the earthing circuit is configured to be switchable between a first switching state and a second switching state, wherein, in the first switching state of the earthing circuit, an output of the earthing interface is electrically connected to a protective earth (PE) through the earthing circuit forming an electrical connection to generate a functional earth return (FER) at the output of the earthing interface, wherein, in the second switching state of the earthing circuit, the electrical connection is disconnected, and wherein, in the first switching state of the earthing circuit, the controller is configured to: adjust the earthing circuit to reduce, for example, minimize, a voltage difference between the FER and the PE, measure a current flowing from the FER through the earthing circuit, for example, through the electrical connection and / or the entire earthing circuit, to the PE, and switch the earthing circuit from the first switching state to the second switching state, if the current exceeds a current threshold.

[0017] The output of the earthing interface may be electrically connectable to the power installation.

[0018] The earthing interface may be configured to limit the current between the FER and the PE to reduce the fault impact and damage caused by excessive earth leakage currents. Damage obtained by the power installation as a result of system failures may be reduced, for example, compared to damages obtained by conventional power systems that are based on hard earthing. For example, it may take more time for damages to occur in the power installation, as, in the case of system failures, an electrical potential associated with functional earthing may change slower compared to an electrical potential associated with hard earthing. Thus, requirements for the response time to shut off parts of the electrical installation can be reduced.

[0019] The FER may be associated with a functional earth potential. The functional earth potential may be substantially equal to the PE.

[0020] In an implementation form of the first aspect, the earthing circuit comprises a controllable voltage source, an adjustable impedance element, and a first switch, and wherein, in the first switching state of the earthing circuit, the output of the earthing interface is electrically connected to the PE through the adjustable impedance element electrically connected in series with the first switch and the controllable voltage source.

[0021] For example, the controller may be configured to adjust the controllable voltage source and the variable impedance element to generate the FER.

[0022] Thus, the FER potential can be flexibly generated.

[0023] In a further implementation form of the first aspect, the controller is further configured to provide a shutdown message to the power installation indicating to shut down at least a part of the power installation, if the current exceeds the current threshold for a first duration.

[0024] Alternatively or additionally, the controller may be configured to shut down at least a part of the power installation itself, if the current exceeds the current threshold for a first duration.

[0025] In a further implementation form of the first aspect, in the second switching state of the earthing circuit, the controller is further configured to: measure a first direct current, DC, voltage between the output of the earthing interface and the PE, and provide a shutdown message to the power installation indicating to shut down at least a part of the power installation, if an absolute value of the first voltage is above a first voltage threshold for a second duration.

[0026] Alternatively or additionally, the controller may be configured to shut down at least a part of the power installation itself, if an absolute value of the first voltage is above a first voltage threshold for a second duration.

[0027] For example, the power installation may comprise power conversion equipment (PCE), which may be shut down at least partly. Alternatively or additionally, a power generation source of the power installation may be shut down.

[0028] Thus, damages to the power installation and / or earthing interface can be efficiently prevented.

[0029] In a further implementation form of the first aspect, the earthing interface further comprises a hardware backup circuitry configured to keep a voltage relative to the PE of the FER above a third voltage threshold and / or below a fourth voltage threshold.

[0030] A second aspect of this disclosure provides an electrical installation for power generation and power conversion comprising: a first system associated with a first electrical potential, a second system associated with a second electrical potential, and the earthing interface according to the first aspect or an implementation form of the first aspect, wherein the output of the earthing interface is electrically connected to the first system and / or the second system.

[0031] The electrical installation may be a combined electrical installation. For example, the combined electrical installation may comprise two or more systems, each system being associated with a respective electrical potential. For example, the electrical installation may be a bipolar electrical installation.

[0032] In an implementation form of the second aspect, the controller is further configured to: measure a second DC voltage between the first electrical potential and the PE, and shut down the first system and / or the second system, if an absolute value of the second DC voltage is above a second voltage threshold, for example, 1500 V, for a third duration. Alternatively or additionally, the controller may be configured determine and / or shut down at least a part, for example, faulty parts, of the power installation. For example, the controller may be configured to shut down a power generation subsystem of the first system and / or a power generation subsystem of the second system.

[0033] In a further implementation form of the second aspect, the earthing interface further comprises a measurement circuit configured to be switchable between a first state and a second state, wherein, in the first state of the measurement circuit, the output of the earthing interface is electrically connected to the PE through the measurement circuit forming another electrical connection, wherein, in the second state of the measurement circuit, the another electrical connection is disconnected, and wherein, in the second state of the measurement circuit, the controller is further configured to, for example, if the earthing circuit is in the second switching state, and / or in predetermined intervals, and / or during the night: inject one or more voltage transients and / or one or more current transients into the measurement circuit at the output of the earthing interface, and measure a voltage response and / or a current response of the first system and / or the second system associated with respectively the one or more injected voltage transients and / or the one or more injected current transients.

[0034] For example, the controller may be configured to control a voltage transient generating device and / or a current transient generating device.

[0035] The measurement circuit may comprise a second switch for switching between the first state and the second state.

[0036] If the earthing circuit is in the first switching state, the measurement circuit may be in the second state or may be switched with the controller into the second state. The controller may be configured to switch the measurement circuit to the first state, if the earthing circuit is in the second switching state or is switched into the second switching state.

[0037] The controller may further be configured to switch to the second state of the earthing circuit before injecting the one or more voltage transients and / or the one or more current transients. For example, diagnostics can be created to analyze and / or monitor the electrical installation. Thus, damages to the electrical installation may be anticipated, prevented, and / or reduced.

[0038] In a further implementation form of the second aspect, the controller is further configured to determine an isolation impedance of the first system and / or the second system based on at least one of the measured voltage response of respectively the first system and / or the second system; and the measured current response of respectively the first system and / or the second system; and / or wherein the controller is further configured to: determine an earth leakage resistance of the first system and / or the second system based on at least one of the measured voltage response of respectively the first system and / or the second system; and the measured current response of respectively the first system and / or the second system.

[0039] For example, measured voltage response of the first system, the measured current response of the first system, and the isolation impedance of the first system are each associated with the first system. Thus, the isolation impedance of the first system may be determined based on the measured voltage response of the first system and / or the measured current response of the first system.

[0040] In a further implementation form of the second aspect, the controller is further configured to at least one of disconnect at least some components of the first system based on the determined isolation impedance of the first system and / or the determined earth leakage resistance of the first system; and disconnect at least some components of the second system based on the determined isolation impedance of the second system and / or the determined earth leakage resistance of the second system.

[0041] In a further implementation form of the second aspect, the controller is further configured to repeat at least three of the steps of: injecting one or more voltage transients and / or one or more current transients; measuring a voltage response and / or a current response; determining an isolation impedance; determining an earth leakage resistance; disconnecting at least some components to determine one or more faulty components of the first system and / or the second system, for example, PCE and / or PV strings. In a further implementation form of the second aspect, wherein, after determining the one or more faulty components of the first system and / or the second system, the controller is further configured to: disconnect the one or more faulty components of the first system and / or the second system, and switch from the first state of the measurement circuit to the second state of the measurement circuit, and / or switch from the second switching state of the earthing circuit to the first switching state of the earthing circuit.

[0042] In a further implementation form of the second aspect, the earthing interface is configured to monitor and / or control the first system, wherein the electrical installation further comprises another earthing interface configured to monitor and / or control the second system like the earthing interface according to any one of the first aspect, the second aspect, the implementation forms of the first aspect, and the implementation forms of the second aspect.

[0043] In a further implementation form of the second aspect, the first system further comprises a first power conversion device, and wherein the earthing interface is embedded with the first power conversion device; and / or wherein the second system further comprises a third power conversion device, and wherein another earthing interface is embedded with the third power conversion device.

[0044] For example, the first power conversion device may be DC combiner for a first power generation subsystem. The third power conversion device may be DC combiner for a second power generation subsystem.

[0045] In a further implementation form of the second aspect, wherein the controller of the earthing interface is further configured to communicate monitoring information and / or coordination information with the first power conversion device and / or the second power conversion device.

[0046] In a further implementation form of the second aspect, the controller of the earthing interface and the controller of another earthing interface are further configured to communicate monitoring information and / or coordination information with each other.

[0047] In a further implementation form of the second aspect, the electrical installation comprises a connector circuit, wherein further: the output of the earthing interface is electrically connected to the first system through the connector circuit; the first system comprises a first power conversion device and a second power conversion device; and the first power conversion device is electrically connected to the second power conversion device through at least the connector circuit; and / or wherein further: the output of the another earthing interface is electrically connected to the second system through the connector circuit; the second system comprises a third power conversion device and a fourth power conversion device; and the third power conversion device is electrically connected to the fourth power conversion device through at least the connector circuit.

[0048] The first system may comprise a first power generation subsystem. The first power conversion device may be configured to convert a first power generated with the first power generation subsystem. The second system may comprise a second power generation subsystem. The third power conversion device may be configured to convert a second power generated with the second power generation subsystem.

[0049] For example, the first power generation subsystem and / or the second power generation subsystem may comprise solar cells.

[0050] A third aspect of this disclosure provides a method of operating an earthing interface for a power installation, the earthing interface comprising a controller and an earthing circuit, wherein the earthing circuit is switchable between a first switching state and a second switching state, wherein, in the first switching state of the earthing circuit, an output of the earthing interface is electrically connected to a PE through the earthing circuit forming an electrical connection to generate a FER at the output of the earthing interface, wherein, in the second switching state of the earthing circuit, the electrical connection is disconnected, and wherein, in the first switching state of the earthing circuit, the method comprises: adjusting, with the controller, the earthing circuit to reduce, for example, minimize, a voltage difference between the FER and the PE, measuring, with the controller, a current flowing from the FER through the earthing circuit to the PE, and switching, with the controller, the earthing circuit from the first switching state to the second switching state, if the current exceeds a current threshold.

[0051] The method of the third aspect may have implementation forms that correspond to the implementation forms of the earthing interface of the first aspect. The method of the third aspect and its implementation forms achieve the advantages and effects described above for the earthing interface of the first aspect and its respective implementation forms.

[0052] A fourth aspect of this disclosure provides a method of operating an electrical installation for power generation and power conversion, wherein the electrical installation comprises: a first system associated with a first electrical potential, a second system associated with a second electrical potential, and the earthing interface according to the third aspect, wherein the method comprises operating the earthing interface according to the method of the third aspect, and wherein the output of the earthing interface is electrically connected to the first system and / or the second system.

[0053] The method of the fourth aspect may have implementation forms that correspond to the implementation forms of the electrical installation of the second aspect. The method of the fourth aspect and its implementation forms achieve the advantages and effects described above for the electrical installation of the second aspect and its respective implementation forms.

[0054] A fifth aspect of this disclosure provides a computer program product comprising a program code for performing, when the program code is executed on a computer, the method according to the third aspect or the fourth aspect.

[0055] For example, the first duration, the second duration, and / or the third duration may be between 1 ms and 10 s. For example, the first duration, the second duration, and / or the third duration may be between 10 ms and 1 s.

[0056] The electrical installation may be a power installation.

[0057] It has to be noted that all devices, elements, units and means described in the disclosure could be implemented in the software or hardware elements or any kind of combination thereof. All steps which are performed by the various entities described in the disclosure as well as the functionalities described to be performed by the various entities are intended to mean that the respective entity is adapted to or configured to perform the respective steps and functionalities. Even if, in the following description of specific embodiments, a specific functionality or step to be performed by external entities is not reflected in the description of a specific detailed element of that entity which performs that specific step or functionality, it should be clear for a skilled person that these methods and functionalities can be implemented in respective software or hardware elements, or any kind of combination thereof.

[0058] BRIEF DESCRIPTION OF DRAWINGS

[0059] The above described aspects and implementation forms will be explained in the following description of specific embodiments in relation to the enclosed drawings, in which

[0060] FIG. 1 shows an earthing interface according to this disclosure.

[0061] FIG. 2 shows an electrical installation according to this disclosure.

[0062] FIG. 3 shows a block diagram of a power installation including voltage power conversion modules and inverters according to this disclosure.

[0063] FIG. 4 shows an earthing circuit in the first switching state and the second switching state and associated voltages of the power installation according to this disclosure.

[0064] FIG. 5 shows an earthing circuit and a measurement circuit according to this disclosure.

[0065] FIG. 6 shows voltage and current wave forms at different power installation running modes according to this disclosure.

[0066] FIG. 7 shows a multipurpose earthing interface according to this disclosure.

[0067] FIG. 8 shows two multipurpose earthing interfaces that are respectively embedded into a first power conversion device and a third power conversion device according to this disclosure.

[0068] FIG. 9 shows a method according to this disclosure. DETAILED DESCRIPTION OF EMBODIMENTS

[0069] FIG. 1 shows an earthing interface 100 according to this disclosure. The earthing interface 100 comprises a controller 101 and an earthing circuit 102. The earthing circuit 102 is configured to be switchable between a first switching state and a second switching state. FIG. la shows the earthing interface in the first switching state and FIG. lb shows the earthing interface in the second switching state.

[0070] In the first switching state of the earthing circuit 102, an output 103 of the earthing interface 100 is electrically connected to a PE 104 through the earthing circuit 102, thereby forming an electrical connection 105. The output 103 is electrically connected to PE 104 to generate a FER at the output 103 of the earthing interface 100.

[0071] In the second switching state of the earthing circuit 102, the electrical connection 105 is disconnected or opened. Thus, in said second switching state the output 103 of the earthing interface 100 may not be electrically connected to the PE 104 through the earthing circuit 102. However, the output 103 of the earthing interface 100 may or may not be electrically connected to PE 104 through another circuit, for example, a measurement circuit 108.

[0072] Generally, the earthing interface 100 is for a power installation. For example, the output 103 of the earthing interface 100 may be electrically connectable to the power installation. The power installation may be a combined power installation. For example, the combined power installation may comprise two or more systems, each system being associated with a respective electrical potential. For example, the power installation may be a bipolar power installation.

[0073] Further, if the earthing circuit 102 is in the first switching state, the controller 101 is configured to adjust the earthing circuit 102 to reduce a voltage difference between the FER and the PE 104, measure (indicated by the dashed line in FIG. la) a current 106 flowing from the FER through the earthing circuit 102 to the PE 104, and switch the earthing circuit 102 from the first switching state to the second switching state, if the current 106 exceeds a current threshold. When switching to the second switching state of the earthing circuit 102, the earthing interface 100 may enter a monitoring mode. When being in the first switching state of the earthing circuit 102, the earthing interface 100 may be in a functional earthing mode. FIG. 2 shows a power installation according to this disclosure. The power installation 200 comprises a first system 201 associated with a first electrical potential 203, a second system 202 associated with a second electrical potential 204, and the earthing interface 100, wherein the output 103 of the earthing interface 100 is electrically connected to the first system 201 and / or the second system 202 (indicated by the dash-dotted line).

[0074] In this disclosure the power installation may be referred to as an electrical installation 200. Generally, the electrical installation 200 may be for power generation and power conversion.

[0075] For example, the first electrical potential 203 may be positive and may be referred to as DC+. The second electrical potential 204 may be negative and may be referred to as DC-.

[0076] The earthing interface 100 may be a multi-purpose earthing interface (MPEI).

[0077] The earthing interface 100 may be configured to perform at least one of

[0078] • Maintain the first system 201 and / or the second system 202 earthed / grounded at a common potential, which may be referred to as Functional Earth Return (FER). Thus, it can be ensured that, for example, the outer lines DC+ (up to +1500 V) and DC- (down to -1500 V) of said systems are fixed with respect to the PE 104.

[0079] • Provide a flexible connection, for example, a connector circuit, between the common potential of the two systems (the first system 201 and the second system 202).

[0080] • Connect the FER with the PE 104 across a link comprising a voltage source, an impedance, and a switch.

[0081] • Control the voltage across the connection 105 and keep it as low as possible, for example, zero volt. This is referred to as “functional earthed” and a respective power conductor may be called a FER. For example, the controller 101 may be configured to control the voltage source and the variable impedance such that the voltage between FER and PE 104 is reduced, for example, to zero.

[0082] • Measure, control, and / or limit a current 106 through the connection 105. For example, detect earth leakage current by measuring a return current 106 through the FER - PE 104 connection 105. • Disconnect the FER from the PE 104 if a pre-defined threshold value is exceeded and shut down immediately at least a part of at least one of the two systems, in which a ground leakage failure exists. For example, the first system 201 and / or second system 202 may be shut down entirely.

[0083] • Open the FER - PE 104 connection 105 and providing I / V transients into the FER potential in order to check the isolation status of the system (RiS0monitor function).

[0084] • Protecting the electrical installation 200 from leaving the LV defined voltage area by pre-emptive, selective or global turn off of PCE or by disconnection of certain system components. For example, supervise the voltages DC+ and DC- with respect to PE 104 and turn off one or both systems, if, for example, a 1500 V potential difference is exceeded.

[0085] • Turn off times may be adapted to the requirements from applicable standards.

[0086] FIG. 3 shows a block diagram of a power installation including voltage power conversion modules and inverters according to this disclosure. In this example, the inverters are DC / AC Inverters.

[0087] For example, the first system 201 and the second system 202 may be two electrically connected photovoltaic (PV) systems.

[0088] The overall structure may be designed for a large scale, industrial power plant application, for example, a so-called utility scale PV power installation. Alternatively, the power installation may be for a lower scale application.

[0089] The overall installation may be based on two connected LV systems, one positive system and one negative system. The two systems may be connected via a common connection that is denoted in this example as a FER. Both systems may be operating at DC voltages up to 1500 V. Power conversion functions may be split into a DC / DC part connected to a power source, for example, a PV power source, and into a DC / AC inverter part. The DC / DC part may comprise a first power conversion device and / or a third power conversion device, for example, which may respectively be a smart string combiner. The DC / AC inverter part may comprise a second power conversion device and / or a fourth power conversion device, for example, which may respectively be a DC / AC inverter and / or a smart PV inverter. Optionally the second power conversion device and / or the fourth power conversion device may further comprise an additional DC / DC converter.

[0090] The first power conversion device and the second power conversion device may be connected via DC cables having a voltage up to 1500 V DC (LVDC). The third power conversion device and the fourth power conversion device may be connected via DC cables having a voltage up to 1500 V DC (LVDC). The first power generation system and / or the second power generation system may be PV systems. For example, each smart string combiner may comprise inputs for many PV strings made out of several PV panels in series.

[0091] An earthing interface 100 may electrically connect the FER potential to PE 104 to enable the electrical installation 200 to run in a safe and controlled way with functional earthing. In addition, the earthing interface 100 can provide several protection functions to keep the PV installation within safe limits according to the IEC LV definition. For example, during inactive / night time or at any pre-defined moment, the MPEI can perform isolation resistance measurements, for example, equivalent to an insulation monitor.

[0092] The earthing interface 100 may comprise electronically controlled earthing equipment. The earthing circuit 102 (as shown in Fig. 4) may comprise an actively controlled connection / disconnection 105 between the FER potential and the PE 104 potential. The connection may be a link comprising a controlled voltage source, a switch and an impedance. The connection 105 may include voltage protection circuits between the FER and the PE 104.

[0093] The first system 201 and the second system 202 may respectively comprise PCE. The controller 101 (as shown in Fig. 4) may be configured to measure and control the current 106 between FER and PE 104, and turn off at least a part of the PCE of the first system 201 and / or the second system 202 once the current 106 exceeds a pre-defined limit.

[0094] The PCE of the first system 201 may comprise the first power conversion device and / or the second power conversion device. The PCE of the second system 202 may comprise the third power conversion device and / or the fourth power conversion device. The earthing interface 100 may be configured to supervise the DC+ and DC- line voltages versus the PE 104 and may provide automatic turn off.

[0095] The earthing interface 100 may be configured to provide Transient I / V generation and FER voltage monitoring to perform insulation resistance measurements.

[0096] For example, as shown in Fig. 4, the controller 101 of the earthing interface 100 may be configured to disconnect FER from PE 104, inject voltage (V) and current (I) transients, measure the system response based on the I / V transients, compute system isolation impedance, and compute system earth leakage resistance. Further, the controller 101 may be configured to disconnect system components, e.g., PV strings and PCE and re-run the above steps to narrow down a faulty area, eventually localizing one or more faulty spots in the power installation.

[0097] The earthing interface 100 may be configured to provide communication and control to other earthing interfaces 100 and PCE via, for example, communication bus systems and hardware control lines (HW I / O).

[0098] FIG. 4 shows an earthing circuit 102 in the first switching state and the second switching state and associated voltages of the power installation according to this disclosure. FIGs. 4a and 4c show an exemplary earthing circuit 102 in the first switching state and the second switching state, respectively.

[0099] FIG. 4a shows a potential of the FER being fixed to the earth / ground potential via an impedance. For example, the voltage of said node may be zero up to a deviation of a few volts. The current 106 flowing through the earthing circuit 102 may be permanently measured and limited to a programmable value.

[0100] FIG. 4b shows that as long as the earthing interface 100 can keep the FER node functionally grounded, neither the DC+ nor the DC- move beyond an absolute value of 1500 V DC, and each positive / negative system is operating according to the IEC LV defined area.

[0101] FIG. 4c shows that once a current threshold (him) level is exceeded the impedance connection 105 to the PE 104 is opened and after a certain settable potential to the PE 104 is reached, at least a part of one system, for example, a PV source of said system, is switched off and said system enters an alarm state.

[0102] FIG. 4d shows that if the DC+ or the DC- line exceeds 1500 V, at least a part of a respective system, for example, a respective PV source, is switched off and the system enters an alarm state.

[0103] FIG. 4e shows that there may further be a safeguard mechanism by hardware circuitry that limits the PE 104 to the FER voltage as such that the two systems are both kept within the LV defined areas.

[0104] FIG. 5 shows an earthing circuit 102 and a measurement circuit 108 according to this disclosure.

[0105] During the night time or from time to time during the day with settable interval, the earthing interface 100 may separate the electrical connection 105 between the FER and the PE 104 to enter the monitoring mode. For example, the earthing interface may apply a set of transient measurement voltages and monitor the system response.

[0106] FIG. 5c shows a controller 101 of the earthing interface 100 and the earthing circuit 102. In this example, the electrical connection 105 through the earthing circuit 102 is opened such that the FER is electrically isolated from the PE 104. FIG. 5c corresponds to FIG. 4c.

[0107] FIG. 5f shows the measurement circuit 108 and the earthing circuit 102 in the monitoring mode. In the monitoring mode the earthing interface 100 may apply a set of transient measurement voltages, and monitor the system response. Upon reaction of the system an earth leakage resistance can be calculated (RiS0measurement). Fault localization may be performed by sequentially switching off one or many system components.

[0108] Once the fault is traced down to a particular location, faulty components may remain off and the rest of the system can resume normal operation while switching the earthing interface 100 back to the functional earthing mode, as shown in FIG. 5a. FIG. 5a corresponds to FIG. 4a. FIG. 6 shows voltage and current wave forms at different power installation running modes according to this disclosure.

[0109] For example, in functional earthing mode, the first electrical potential 203, the second electrical potential 204, and the current (I-FER) 106 flowing between the FER and the PE 104 are within predetermined thresholds.

[0110] If the earth leakage of the current 106 increases above the threshold the power installation may be configured to shut off at parts of the power installation and at least one earthing interface 100 may enter a monitoring mode.

[0111] In the monitoring mode the at least one earthing interface 100 may be configured to apply I / V transients to check system insolation conditions. Based on said system isolation checks, the at least one earthing interface 100 may locate and / or shut off faulty components in the power installation.

[0112] If the power installation has a voltage control problem, for example, if the second potential exceeds a predetermined threshold, the second power system may be shut off.

[0113] If at least a part of the power installation is shut off, the power installation or at least a respective power system may enter an alarm mode.

[0114] FIG. 7 shows a multipurpose earthing interface 100 according to this disclosure. During any of the two operational modes (monitoring mode and functional earthing mode), the earthing interface 100 may supervise the voltage between DC+ to the FER and to the PE 104, and / or from DC- to the FER and the PE 104.

[0115] The MPEI comprises an earthing circuit 102 and may comprise a measurement circuit 108.

[0116] There may be two earthing interfaces 100 in service, one being configured to control and / or monitor the positive system of the two combined systems between the DC+ line, the PE 104, and the FER, and the other one being configured to control and / or monitor the negative system between DC-, the PE 104, and the FER. Alternatively, there may be one earthing interface in service to control and / or monitor both systems.

[0117] If any of the DCx (DC- or DC+) voltage may exceed, for example, 1500 V for more than a transient moment (duration may be predetermined), a respective PV source can be commanded to switch off.

[0118] If the FER reaches a critical voltage with respect to PE 104 for more than a transient moment, a hardware based, hard fixation to earth may be triggered. Such a hardware may contain electronic switches, mechanical contacts, gas discharge tubes, or a combination thereof. Thus, it can be ensured that functional earthing keeps the voltages of the positive / negative systems in the LV defined voltage window.

[0119] FIG. 8 shows two MPEIs that are respectively embedded into a first power conversion device and a third power conversion device according to this disclosure.

[0120] In this example, the first system 201 is associated with a positive first potential 203 and the second system 202 is associated with a negative second potential 204. The first system comprises a first power conversion device and the second system comprises a third power conversion device. Said power conversion devices may be DC combiners and / or may be referred to as power conversion subsystems.

[0121] The first power conversion device and the third power conversion device respectively comprise a power conversion equipment module, measurement and protection modules, and an embedded MPEI, wherein said two embedded MPEIs are configured to communicate with each other. An earthing interface 103 may form a MPEI and another earthing interface 107 may form another MPEI of the electrical installation. Each MPEI generates the FER at a connector circuit, wherein the connector circuit electrically connects the first system 201 and the second system 202. The FER provides earthing for the first system 201 and the second system 202.

[0122] For example, the earthing interface 100 may be built into a PV string combiner. The earthing interface 100 may be configured to communicate with other devices or components of the power installation, for example, another earthing interface 107, via a communication link. The controller 101 (not shown) of the earthing interface 100, 103 may be a first processor 101. The controller 101 (not shown) of another earthing interface 107 may be a second processor 101. The first processor 101 and the second processor may be the same processor or different processors.

[0123] Generally, the first processor and / or the second processor 101 may be configured to perform, conduct or initiate the various operations of the earthing interface 100 and / or the electrical installation 200 described herein. The first processor and / or the second processor 101 may comprise hardware and / or may be controlled by software. The hardware may comprise analog circuitry or digital circuitry, or both analog and digital circuitry. The digital circuitry may comprise components such as application-specific integrated circuits (ASICs), field- programmable arrays (FPGAs), digital signal processors (DSPs), or multi-purpose processors. The earthing interface 100 and / or the electrical installation 200 may further comprise memory circuitry, which stores one or more instruction(s) that can be executed by the first processor and / or the second processor 101, in particular under control of the software. For instance, the memory circuitry may comprise a non-transitory storage medium storing executable software code which, when executed by the first processor and / or the second processor 101, causes the various operations of the earthing interface 100 and / or the electrical installation 200 to be performed. In one embodiment, the earthing interface 100 and / or the electrical installation 200 may comprises one or more processors 101 and a non-transitory memory connected to the one or more processors 101. The non-transitory memory may carry executable program code which, when executed by the one or more processors 101, causes the earthing interface 100 and / or the electrical installation 200 to perform, conduct or initiate the operations or methods described herein.

[0124] FIG. 9 shows a method 300 according to this disclosure. The method 300 may be performed by the earthing interface 100 and / or the electrical installation 200. The method 300 comprises, in a first switching state of the earthing circuit 102, a step 301 of adjusting, with a controller 101, an earthing circuit 102 to reduce a voltage difference between a FER and a PE 104. Further, the method 300 comprises, in the first switching state of the earthing circuit 102, a step 302 of measuring, with the controller 101, a current flowing from the FER through the earthing circuit 102 to the PE 104. Further, the method 300 comprises, in the first switching state of the earthing circuit 102, a step 303 of switching, with the controller 101, the earthing circuit 102 from the first switching state to a second switching state, if the current 106 exceeds a current threshold.

[0125] Generally, the earthing interface 100 comprises the controller 101 and the earthing circuit 102, wherein the earthing circuit 102 is switchable between the first switching state and a second switching state, wherein, in the first switching state of the earthing circuit 102, an output 103 of the earthing interface 100 is electrically connected to the PE 104 through the earthing circuit 102 forming an electrical connection 105 to generate the FER at the output 103 of the earthing interface 100, and wherein, in the second switching state of the earthing circuit 102, the electrical connection 105 is disconnected.

[0126] The disclosure has been described in conjunction with various embodiments as examples as well as implementations. However, other variations can be understood and effected by those persons skilled in the art and practicing the claimed matter, from the studies of the drawings, this disclosure and the independent claims. In the claims as well as in the description the word “comprising” does not exclude other elements or steps and the indefinite article “a” or “an” does not exclude a plurality. A single element or other unit may fulfill the functions of several entities or items recited in the claims. The mere fact that certain measures are recited in the mutual different dependent claims does not indicate that a combination of these measures cannot be used in an advantageous implementation.

Claims

CLAIMS1. An earthing interface (100) for a power installation, the earthing interface (100) comprising a controller (101) and an earthing circuit (102), wherein the earthing circuit (102) is configured to be switchable between a first switching state and a second switching state, wherein, in the first switching state of the earthing circuit (102), an output (103) of the earthing interface (100) is electrically connected to a protective earth, PE, (104) through the earthing circuit (102) forming an electrical connection (105) to generate a functional earth return, FER, at the output (103) of the earthing interface (100), wherein, in the second switching state of the earthing circuit (102), the electrical connection (105) is disconnected, and wherein, in the first switching state of the earthing circuit (102), the controller (101) is configured to: adjust the earthing circuit (102) to reduce a voltage difference between the FER and the PE (104), measure a current (106) flowing from the FER through the earthing circuit (102) to the PE (104), and switch the earthing circuit (102) from the first switching state to the second switching state, if the current (106) exceeds a current threshold.

2. The earthing interface (100) according to claim 1, wherein the earthing circuit (102) comprises a controllable voltage source, an adjustable impedance element, and a first switch, and wherein, in the first switching state of the earthing circuit (102), the output (103) of the earthing interface (100) is electrically connected to the PE (104) through the adjustable impedance element electrically connected in series with the first switch and the controllable voltage source.

3. The earthing interface (100) according to claim 1 or 2, wherein the controller (101) is further configured to provide a shutdown message to the power installation indicating to shut down at least a part of the power installation, if the current (106) exceeds the current threshold for a first duration.

4. The earthing interface (100) according to any one of the preceding claims, wherein, in the second switching state of the earthing circuit (102), the controller (101) is further configured to: measure a first direct current, DC, voltage between the output (103) of the earthing interface (100) and the PE (104), and provide a shutdown message to the power installation indicating to shut down at least a part of the power installation, if an absolute value of the first voltage is above a first voltage threshold for a second duration.

5. The earthing interface (100) according to any one of the preceding claims, wherein the earthing interface (100) further comprises a hardware backup circuitry configured to keep a voltage relative to the PE (104) of the FER above a third voltage threshold and / or below a fourth voltage threshold.

6. An electrical installation (200) for power generation and power conversion comprising: a first system (201) associated with a first electrical potential (203), a second system (202) associated with a second electrical potential (204), and the earthing interface (100) according to one of the claims 1 to 5, wherein the output (103) of the earthing interface (100) is electrically connected to the first system (201) and / or the second system (202).

7. The electrical installation (200) according to claim 6, wherein the controller (101) is further configured to:measure a second DC voltage between the first electrical potential (203) and the PE (104), and shut down the first system (201) and / or the second system (202), if an absolute value of the second DC voltage is above a second voltage threshold for a third duration.

8. The electrical installation (200) according to claim 6 or 7, wherein the earthing interface (100) further comprises a measurement circuit (108) configured to be switchable between a first state and a second state, wherein, in the first state of the measurement circuit (108), the output (103) of the earthing interface (100) is electrically connected to the PE (104) through the measurement circuit (108) forming another electrical connection (105), wherein, in the second state of the measurement circuit (108), another electrical connection (105) is disconnected, and wherein, in the second state of the measurement circuit (108), the controller (101) is further configured to: inject one or more voltage transients and / or one or more current transients into the measurement circuit (108) at the output (103) of the earthing interface (100), and measure a voltage response and / or a current response of the first system (201) and / or the second system (202) associated with respectively the one or more injected voltage transients and / or the one or more injected current transients.

9. The electrical installation (200) according to claim 8, wherein the controller (101) is further configured to determine an isolation impedance of the first system (201) and / or the second system (202) based on at least one of the measured voltage response of respectively the first system (201) and / or the second system (202); and the measured current response of respectively the first system (201) and / or the second system (202); and / or wherein the controller (101) is further configured to:determine an earth leakage resistance of the first system (201) and / or the second system (202) based on at least one of: the measured voltage response of respectively the first system (201) and / or the second system (202); and the measured current response of respectively the first system (201) and / or the second system (202).

10. The electrical installation (200) according to claim 9, wherein the controller (101) is further configured to at least one of: disconnect at least some components of the first system (201) based on the determined isolation impedance of the first system (201) and / or the determined earth leakage resistance of the first system (201); and disconnect at least some components of the second system (202) based on the determined isolation impedance of the second system (202) and / or the determined earth leakage resistance of the second system (202).

11. The electrical installation (200) according to claim 9 or 10, wherein the controller (101) is further configured to repeat at least three of the steps of: injecting one or more voltage transients and / or one or more current transients; measuring a voltage response and / or a current response; determining an isolation impedance; determining an earth leakage resistance; disconnecting at least some components to determine one or more faulty components of the first system (201) and / or the second system (202).

12. The electrical installation (200) according to claim 11, wherein, after determining the one or more faulty components of the first system (201) and / or the second system (202), the controller (101) is further configured to: disconnect the one or more faulty components of the first system (201) and / or the second system (202), andswitch from the first state of the measurement circuit (108) to the second state of the measurement circuit (108), and / or switch from the second switching state of the earthing circuit (102) to the first switching state of the earthing circuit (102).

13. The electrical installation (200) according to any one of the preceding claims, wherein the earthing interface (100) is configured to monitor and / or control the first system (201), wherein the electrical installation (200) further comprises another earthing interface (100) configured to monitor and / or control the second system (202) like the earthing interface (100) according to any one of the preceding claims.

14. The electrical installation (200) according to any one of the claims 6 to 13, wherein the first system (201) further comprises a first power conversion device, and wherein the earthing interface (100) is embedded with the first power conversion device; and / or wherein the second system (202) further comprises a third power conversion device, and wherein another earthing interface (100) is embedded with the third power conversion device.

15. The electrical installation (200) according to claim 14, wherein the controller (101) of the earthing interface (100) is further configured to communicate monitoring information and / or coordination information with the first power conversion device and / or the second power conversion device.

16. The electrical installation (200) according to any one of the claims 13 to 15,wherein the controller (101) of the earthing interface (100) and the controller (101) of another earthing interface (107) are further configured to communicate monitoring information and / or coordination information with each other.

17. The electrical installation (200) according to any one of the claims 6 to 16, wherein the electrical installation (200) comprises a connector circuit, wherein further: the output (103) of the earthing interface (100) is electrically connected to the first system (201) through the connector circuit; the first system (201) comprises a first power conversion device and a second power conversion device; and the first power conversion device is electrically connected to the second power conversion device through at least the connector circuit; and / or wherein further: the output (103) of another earthing interface (100) is electrically connected to the second system (202) through the connector circuit; the second system (202) comprises a third power conversion device and a fourth power conversion device; and the third power conversion device is electrically connected to the fourth power conversion device through at least the connector circuit.

18. A method (300) of operating an earthing interface (100) for a power installation, the earthing interface (100) comprising a controller (101) and an earthing circuit (102), wherein the earthing circuit (102) is switchable between a first switching state and a second switching state, wherein, in the first switching state of the earthing circuit (102), an output (103) of the earthing interface (100) is electrically connected to a PE (104) through the earthing circuit (102) forming an electrical connection (105) to generate a functional earth return, FER, at the output (103) of the earthing interface (100),wherein, in the second switching state of the earthing circuit (102), the electrical connection (105) is disconnected, and wherein, in the first switching state of the earthing circuit (102), the method (300) comprises: adjusting (301), with the controller (101), the earthing circuit (102) to reduce a voltage difference between the FER and the PE (104), measuring (302), with the controller (101), a current (106) flowing from the FER through the earthing circuit (102) to the PE (104), and switching (303), with the controller (101), the earthing circuit (102) from the first switching state to the second switching state, if the current (106) exceeds a current threshold.

19. A computer program product comprising a program code for performing, when the program code is executed on a computer, the method according to claim 18.

Citation Information

Patent Citations

  • Resistance switching device and method in low-current line selection parallel connection

    CN112103934A

  • System of monitoring a earth line by measuring the impedance

    EP2551981A1

  • Grid-connected inverter system

    JP5520722B2

  • Transmission system

    US20090316446A1