Control method and control apparatuses for tunneling device and tunneling device
By obtaining the distance between the excavation equipment and the tunnel side wall, adjusting the driving direction and using the navigation system, the problem of over-excavation and under-excavation caused by the displacement deviation of the excavation equipment during operation is solved, and the accuracy of the footage and operation efficiency are improved.
Patent Information
- Application Number
- PCT/CN2024/070265
- Authority / Receiving Office
- WO · WO
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2023-04-14
- Filing Date
- 2024-01-03
- Publication Date
- 2024-10-17
AI Technical Summary
Excavation equipment is prone to displacement deviations during operation, resulting in over- and under-excavation, inaccurate footage, and inability to ensure the accuracy of the tunnel shape.
By obtaining the distance between the two sides of the excavation equipment and the side walls of the tunnel, the driving direction is adjusted so that the angle between the central axis and the tunnel central axis is smaller than the preset angle, and the maximum distance is limited. The inertial navigation system and millimeter wave radar are combined to conduct real-time Navigation and distance detection ensure that the excavation equipment runs along the preset route.
It improves the automation level of excavation equipment, reduces manual labor, improves operating efficiency, avoids over-excavation and under-excavation, and ensures the accuracy of footage.
Smart Images

Figure CN2024070265_17102024_PF_FP_ABST
Abstract
Description
Control method and device for tunneling equipment, and tunneling equipment
[0001] This application claims priority to the Chinese patent application filed with the State Intellectual Property Office of China on April 14, 2023, with application number "202310399172.X", and invention name "Control method, control device and tunneling equipment for tunneling equipment", the entire contents of which are incorporated by reference into this application. Technical Field
[0002] The present application relates to the technical field of engineering equipment, and in particular to a control method and a control device for tunneling equipment, and tunneling equipment. Background Art
[0003] In the related art, during the operation of the tunnel boring machine, it is necessary to excavate based on a preset contour line to ensure the shape of the tunnel. However, in the process of implementing this application, the applicant found that there are at least the following problems in the existing technology: displacement deviation will occur during the advancement of the tunnel boring machine, resulting in over-excavation and under-excavation during the excavation, and the accuracy of the footage cannot be guaranteed. Therefore, how to improve the accuracy of the footage during the operation of the tunnel boring machine has become a problem that needs to be solved urgently.
[0004] Summary of the Invention
[0005] The present application aims to at least solve the problem in the prior art or related art that displacement deviation occurs during the advancement of the tunnel boring machine, resulting in over-excavation and under-excavation, and the accuracy of the footage cannot be guaranteed.
[0006] To this end, a first aspect of the present application proposes a control method for tunneling equipment.
[0007] A second aspect of the present application provides a control device for tunneling equipment.
[0008] A third aspect of the present application provides a control device for tunneling equipment.
[0009] A fourth aspect of the present application provides a readable storage medium.
[0010] A fifth aspect of the present application provides a tunneling device.
[0011] In view of this, the first aspect of the present application proposes a control method for tunneling equipment, including: respectively obtaining a first distance between the first side of the body of the tunneling equipment and the first side wall of the tunnel, and a second distance between the second side of the body of the tunneling equipment and the second side wall of the tunnel; controlling the driving direction of the tunneling equipment according to the first distance and the second distance, so that the angle between the central axis of the tunneling equipment and the central axis of the tunnel is less than a preset angle, and the maximum distance between the central axis of the tunnel is less than a preset distance; controlling the tunneling equipment to perform tunneling work according to a preset footage.
[0012] The control method of the tunneling equipment provided in this application can be used to control the operation of the tunneling equipment to realize the automatic operation of the tunneling equipment, improve the degree of automation of the tunneling equipment, reduce manual labor, and improve the operating efficiency of the tunneling equipment.
[0013] Specifically, the method for controlling a tunneling device includes: first, obtaining a first distance between a first side of the tunneling device body and a first sidewall of a tunnel, and a second distance between a second side of the tunneling device body and a second sidewall of the tunnel. It is understood that during tunneling, the tunneling device advances within the tunnel in a preset direction and at a preset footage. At this point, the distances between the two sides of the tunneling device body and the two sidewalls of the tunnel can be obtained. Specifically, the first distance between the first side of the tunneling device body and the first sidewall of the tunnel, and the second distance between the second side of the tunneling device body and the second sidewall of the tunnel, can be obtained. It is understood that the tunneling device body has a first side and a second side on either side of the tunneling device's direction of travel. Accordingly, within the tunnel, the sidewall opposite the first side is the first sidewall, and the sidewall opposite the second side is the second sidewall.
[0014] Furthermore, after obtaining the first and second distances, the direction of travel of the tunneling equipment can be adjusted based on the first and second distances. This allows the angle between the extension direction of the central axis of the tunneling equipment and the extension direction of the central axis of the tunnel to be smaller than a preset angle. Preferably, the extension direction of the central axis of the tunneling equipment and the extension direction of the central axis of the tunnel are aligned, that is, the direction of travel of the tunneling equipment can be along the preset extension direction of the tunnel, thereby preventing the tunneling equipment from tilting excessively and causing over-excavation.
[0015] At the same time, while ensuring that the angle between the central axis of the tunneling equipment and the extension direction of the roadway is less than a preset angle, the maximum distance between the central axis of the tunneling equipment and the central axis of the roadway can also be less than a preset distance. It is understandable that the length of the tunneling equipment, that is, the length of the central axis of the tunneling equipment, is limited. Therefore, when viewed perpendicular to the bottom surface of the roadway, the maximum distance between the central axis of the tunneling equipment and the central axis of the roadway is the distance between one end of the central axis of the tunneling equipment and the central axis of the roadway in a direction perpendicular to the central axis of the roadway. By limiting the maximum distance between the central axis of the tunneling equipment and the central axis of the roadway, the tunneling equipment will not deviate too much from the preset tunneling route, thereby avoiding overexcavation.
[0016] Finally, after adjusting the driving direction of the tunneling equipment, the tunneling equipment can be controlled to perform tunneling work according to the preset advance amount.
[0017] Specifically, the tunneling equipment can be equipped with an inertial navigation system, which is used to guide the tunneling equipment's direction and distance of travel, thereby ensuring the tunneling equipment's progress. Furthermore, the tunneling equipment can also be equipped with a millimeter-wave radar, which can detect the distance between the tunneling equipment body and the tunnel sidewall. Specifically, the millimeter-wave radar can be respectively installed on the first and second side surfaces of the tunneling equipment body, with the millimeter-wave radar's transmission direction directed toward the first and second sidewalls of the tunnel to ensure the accuracy of the detection of the first and second distances. Furthermore, the tunneling equipment can also be equipped with a controller, which is connected to the inertial navigation system and the millimeter-wave radar. After the millimeter-wave radar acquires the first and second distances, it can transmit the data to the controller. The controller then processes the data and sends it to the inertial navigation system, which then uses the data for navigation.
[0018] The tunneling equipment control method provided in this application obtains a first distance between a first side surface of the tunneling equipment body and a first sidewall of a tunnel, and a second distance between a second side surface of the tunneling equipment body and a second sidewall of the tunnel. The tunneling equipment's travel direction is controlled based on the first and second distances, ensuring that the angle between the tunneling equipment's travel direction and the tunnel's central axis is less than a preset angle, thereby preventing the tunneling equipment from tilting and causing overbreak. Furthermore, the method ensures that the deviation between the tunneling equipment's central axis and the tunnel's central axis is not excessive, thereby preventing the tunneling equipment from deviating from the preset tunneling route and thus preventing overbreak.
[0019] In addition, the control method of the tunneling equipment in the above technical solution provided by this application may also have the following additional technical features:
[0020] In some technical solutions, optionally, the step of controlling the driving direction of the tunneling equipment according to the first distance and the second distance includes: obtaining the distance difference between the first distance and the second distance; when the distance difference is greater than the preset difference, obtaining the moving direction of the tunneling equipment according to the first distance and the second distance; obtaining the moving distance of the tunneling equipment according to the first distance and the second distance; and controlling the movement of the tunneling equipment according to the moving direction and the moving distance.
[0021] In this technical solution, after obtaining a first distance between a first side surface of the tunneling equipment body and a first sidewall of the tunnel, and a second distance between a second side surface of the tunneling equipment body and a second sidewall of the tunnel, the difference between the first and second distances can be determined based on the first and second distances, and then a determination can be made as to whether the difference is greater than a preset difference. In other words, the difference between the first and second distances is used to determine whether the tunneling equipment is currently deviating. Specifically, if the difference between the first and second distances is less than the preset difference, it indicates that the distance difference between the two sides of the tunneling equipment body and the two sidewalls of the tunnel is not excessive, meaning that the tunneling equipment is not currently deviating. Conversely, if the difference between the first and second distances is greater than the preset difference, it indicates that the distance difference between the two sides of the tunneling equipment body and the two sidewalls of the tunnel is excessive, meaning that the tunneling equipment is currently deviating and requires lateral adjustment.
[0022] Furthermore, if the difference between the first and second distances is greater than a preset difference, the direction of movement of the tunneling equipment required for lateral adjustment can be determined based on the first and second distances. Then, the distance of movement of the tunneling equipment required for lateral adjustment can be determined based on the first and second distances. Finally, once both the direction and distance of movement of the tunneling equipment are determined, the tunneling equipment can be controlled to move according to the direction and distance, thereby completing the lateral adjustment of the tunneling equipment.
[0023] In some technical solutions, optionally, the step of obtaining the moving direction of the tunneling equipment based on the first distance and the second distance includes: when the first distance is greater than the second distance, determining the moving direction as toward the first side wall; when the first distance is less than the second distance, determining the moving direction as toward the second side wall.
[0024] In this technical solution, when the difference between the first distance and the second distance is greater than a preset difference, the direction of movement of the tunneling equipment can be determined based on the magnitude relationship between the first distance and the second distance. Specifically, when the first distance is greater than the second distance, this indicates that the distance between the first side of the tunneling equipment body and the first sidewall of the tunnel is greater than the distance between the second side of the tunneling equipment body and the second sidewall of the tunnel. In other words, the tunneling equipment body is biased toward the second sidewall of the tunnel. In this case, it can be determined that the direction of movement of the tunneling equipment needs to be adjusted to be toward the first sidewall of the tunnel. Conversely, when the first distance is less than the second distance, this indicates that the distance between the first side of the tunneling equipment body and the first sidewall of the tunnel is less than the distance between the second side of the tunneling equipment body and the second sidewall of the tunnel. In other words, the tunneling equipment body is biased toward the first sidewall of the tunnel. In this case, it can be determined that the direction of movement of the tunneling equipment needs to be adjusted to be toward the second sidewall of the tunnel.
[0025] In some technical solutions, optionally, the moving distance is determined according to a preset formula: |X1-X2|÷2=X; wherein X1 is the first distance, X2 is the second distance, and X is the moving distance.
[0026] In this technical solution, the moving distance required for adjusting the tunneling equipment can be determined according to the preset formula: |X1-X2|÷2=X. Here, X1 is the first distance, X2 is the second distance, and X is the moving distance. It is understandable that when the tunneling equipment deviates, the difference between the first distance and the second distance is the distance difference between the two sides of the tunneling equipment body and the side walls of the tunnel. At this time, dividing this distance difference by 2 represents the distance that the tunneling equipment deviates from the central axis of the tunnel, which is the moving distance that the tunneling equipment needs to adjust. Finally, when the moving direction and moving distance of the tunneling equipment are determined, the tunneling equipment can be controlled to move according to the moving direction and moving distance, thereby completing the lateral adjustment of the tunneling equipment.
[0027] In some technical solutions, optionally, the control method of the tunneling equipment also includes: obtaining point cloud information of the front wall of the tunnel in front of the tunneling equipment; determining the under-excavation position on the front wall of the tunnel that has not reached a preset advance amount based on the point cloud information; and controlling the tunneling equipment to perform tunneling work on the under-excavation position.
[0028] In this technical solution, after the tunneling equipment's travel direction is adjusted, the tunneling equipment can be controlled to advance according to a preset advance rate. When the advance rate reaches the preset advance rate on the tunneling equipment's central axis, the tunneling equipment can be controlled to stop advancing. It will be understood that one end of the tunneling equipment's cantilever is mounted on the tunneling equipment's main body, and the other end of the cantilever is provided with a cutting head. Furthermore, the cantilever of the tunneling equipment rotates relative to the main body of the tunneling equipment. Furthermore, since the cantilever's length is fixed, in the tunneling equipment's travel direction, when the angle between the cantilever and the central axis of the tunneling equipment is less than the preset angle, the advance rate is maximized. On either side of the central axis of the tunneling equipment, the advance rate is relatively small.
[0029] Therefore, when the maximum footage is achieved on the central axis of the tunneling equipment, the forward movement of the tunneling equipment is stopped. This prevents overbreak, which occurs when the boom rotates to an angle less than a preset angle with the central axis of the tunneling equipment. However, at this point, the footage on the tunnel front wall on either side of the central axis of the tunneling equipment is less than the footage on the central axis, indicating underbreak on both sides of the central axis. Underbreak compensation is required on the tunnel front wall on both sides of the central axis.
[0030] Specifically, the point cloud information of the front wall of the tunnel is first obtained, and then the under-excavation position on the front wall of the tunnel that has not reached the preset advance amount is determined based on the point cloud information of the front wall of the tunnel. Finally, the excavation equipment is controlled to excavate the under-excavation position to achieve under-excavation compensation.
[0031] Specifically, millimeter-wave radar can be used to obtain point cloud data of the tunnel front wall. Millimeter-wave radars can be set on both sides of the front end of the tunneling equipment to ensure the accuracy of the point cloud data.
[0032] In some technical solutions, optionally, before the step of obtaining point cloud information of the front wall of the tunnel in front of the tunneling equipment, the step also includes: adjusting the position of the tunneling equipment so that the central axis of the tunneling equipment coincides with the central axis of the tunnel.
[0033] In this technical solution, before controlling the excavation equipment to compensate for under-excavation of the front wall of the tunnel, that is, before obtaining the point cloud data of the front wall of the tunnel, the position of the excavation equipment can be adjusted so that the central axis of the excavation equipment coincides with the central axis of the tunnel, thereby ensuring the accuracy of the acquisition of the point cloud data of the front wall of the tunnel and avoiding position deviation when obtaining the point cloud data of the front wall of the tunnel.
[0034] According to the second aspect of the present application, a control device for tunneling equipment is proposed, including: an acquisition unit for respectively acquiring a first distance between a first side surface of the main body of the tunneling equipment and a first side wall of the tunnel, and a second distance between a second side surface of the main body of the tunneling equipment and a second side wall of the tunnel; a control unit for controlling the driving direction of the tunneling equipment according to the first distance and the second distance, so that the angle between the central axis of the tunneling equipment and the central axis of the tunnel is less than a preset angle, and the maximum distance between the central axis of the tunnel and the tunnel is less than a preset distance; and for controlling the tunneling equipment to perform tunneling work according to a preset footage.
[0035] The control device for tunneling equipment provided herein uses an acquisition unit to respectively acquire a first distance between a first side surface of the tunneling equipment body and a first sidewall of a tunnel, and a second distance between a second side surface of the tunneling equipment body and a second sidewall of the tunnel. This allows the control unit to control the direction of travel of the tunneling equipment based on the first and second distances, thereby ensuring that the angle between the tunneling equipment's direction of travel and the central axis of the tunnel is less than a preset angle, thereby preventing the tunneling equipment from tilting and causing overbreak. Furthermore, the control unit ensures that the deviation between the central axis of the tunneling equipment and the central axis of the tunnel is not excessive, thereby preventing the tunneling equipment from deviating from the preset tunneling route and thus preventing overbreak.
[0036] In some technical solutions, optionally, the acquisition unit can be specifically used to: obtain the distance difference between the first distance and the second distance; the control unit is specifically used to: when the distance difference is greater than a preset difference, obtain the moving direction of the tunneling equipment according to the first distance and the second distance; obtain the moving distance of the tunneling equipment according to the first distance and the second distance; and control the movement of the tunneling equipment according to the moving direction and the moving distance.
[0037] Furthermore, the control unit is specifically configured to: determine the moving direction to be toward the first side wall when the first distance is greater than the second distance; and determine the moving direction to be toward the second side wall when the first distance is less than the second distance.
[0038] Furthermore, the control unit is specifically used to: determine the moving distance according to a preset formula: |X1-X2|÷2=X; wherein X1 is the first distance, X2 is the second distance, and X is the moving distance.
[0039] Furthermore, the acquisition unit is also used to: obtain point cloud information of the front wall of the tunnel in front of the tunneling equipment when the advancement of the tunnel reaches a preset advancement on the central axis of the tunneling equipment; determine the under-excavation position on the front wall of the tunnel that has not reached the preset advancement based on the point cloud information; the control unit is also used to: control the tunneling equipment to perform tunneling work on the under-excavation position.
[0040] Furthermore, before the step of acquiring point cloud information of the front wall of the tunnel in front of the tunneling equipment, the control unit is further configured to: adjust the position of the tunneling equipment so that the central axis of the tunneling equipment coincides with the central axis of the tunnel.
[0041] According to the third aspect of the present application, a control device for tunneling equipment is proposed, comprising: a processor and a memory, the memory storing programs or instructions that can be run on the processor, and implementing the steps of the control method for tunneling equipment as described in any one of the above technical solutions when the programs or instructions are executed by the processor.
[0042] The control device of the tunneling equipment provided in the present application includes a memory and a processor, and also includes a program or instruction stored in the memory. When the program or instruction is executed by the processor, it can implement the steps of the control method of the tunneling equipment of any one of the above-mentioned technical solutions. Therefore, the control method of the tunneling equipment has all the beneficial effects of the above-mentioned control method of the tunneling equipment, which will not be repeated here.
[0043] According to a fourth aspect of the present application, a readable storage medium is proposed, on which a program or instruction is stored. When the program or instruction is executed by a processor, the steps of the control method of the tunneling equipment as in any one of the above technical solutions are implemented.
[0044] The readable storage medium provided in this application stores a program or instruction thereon. When the program or instruction is executed by the processor, it can implement a control method for tunneling equipment such as any one of the above-mentioned technical solutions. Therefore, the readable storage medium has all the beneficial effects of the control method for tunneling equipment described above, which will not be repeated here.
[0045] According to a fifth aspect of the present application, a tunneling device is proposed, comprising the control device of the tunneling device provided in the second aspect or the control device of the tunneling device provided in the third aspect.
[0046] The tunneling equipment provided in this application includes the control device of the tunneling equipment provided in the second aspect above or the control device of the tunneling equipment provided in the third aspect above. Therefore, the tunneling equipment has all the beneficial effects of the control device of the above tunneling equipment, which will not be repeated here.
[0047] Additional aspects and advantages of the present application will become apparent in the following description or may be learned through practice of the present application. BRIEF DESCRIPTION OF THE DRAWINGS
[0048] The above and / or additional aspects and advantages of the present application will become apparent and easily understood from the description of the embodiments in conjunction with the following drawings, in which:
[0049] The above and / or additional aspects and advantages of the present application will become apparent and easily understood from the description of the embodiments in conjunction with the following drawings, in which:
[0050] FIG1 is a schematic flow chart showing a method for controlling a tunneling device according to an embodiment of the present application;
[0051] FIG2 is a schematic flow chart showing a method for controlling a tunneling device according to another embodiment of the present application;
[0052] FIG3 is a schematic flow chart showing a method for controlling tunneling equipment according to another embodiment of the present application;
[0053] FIG4 is a schematic diagram showing a tunneling device according to an embodiment of the present application located in a tunnel;
[0054] FIG5 shows a flowchart of a method for controlling tunneling equipment according to an embodiment of the present application. DETAILED DESCRIPTION
[0055] In order to more clearly understand the above-mentioned objects, features and advantages of the present application, the present application is further described in detail below in conjunction with the accompanying drawings and specific embodiments. It should be noted that the embodiments of the present application and the features therein can be combined with each other in the absence of conflict.
[0056] In the following description, many specific details are set forth to facilitate a full understanding of the present application. However, the present application may also be implemented in other ways different from those described herein. Therefore, the scope of protection of the present application is not limited to the specific embodiments disclosed below.
[0057] The following describes a control method for tunneling equipment, a control device for tunneling equipment, a readable storage medium, and tunneling equipment according to some embodiments of the present application with reference to Figures 1 to 5.
[0058] As shown in FIG1 , according to one embodiment of the present application, a control method for tunneling equipment is proposed, including:
[0059] S102, respectively obtaining a first distance between a first side surface of a main body of the tunneling device and a first side wall of the tunnel, and a second distance between a second side surface of the main body of the tunneling device and a second side wall of the tunnel;
[0060] S104, controlling the driving direction of the tunneling equipment according to the first distance and the second distance;
[0061] S106, controlling the tunneling equipment to perform tunneling work according to the preset footage.
[0062] The control method of the tunneling equipment provided in this application, as shown in Figure 1, can be used to control the operation of the tunneling equipment to achieve automatic operation of the tunneling equipment, improve the degree of automation of the tunneling equipment, reduce manual labor, and improve the operating efficiency of the tunneling equipment.
[0063] Specifically, as shown in Figure 4, taking a roadheader as an example, the control method for the roadheader includes: first, obtaining a first distance between a first side surface of the roadheader body and a first side wall of a tunnel, and a second distance between a second side surface of the roadheader body and a second side wall of the tunnel. It is understood that during tunneling, a roadheader advances within a tunnel in a predetermined direction and at a predetermined footage. At this point, the distances between the two sides of the roadheader body and the two side walls of the tunnel can be obtained. Specifically, the first distance between the first side surface of the roadheader body and the first side wall of the tunnel, and the second distance between the second side surface of the roadheader body and the second side wall of the tunnel, can be obtained. It is understood that the roadheader body has a first side surface and a second side surface on either side of the tunnel's travel direction. Accordingly, within the tunnel, the side wall opposite the first side surface is referred to as the first side wall, and the side wall opposite the second side surface is referred to as the second side wall.
[0064] Furthermore, after obtaining the first and second distances, the direction of travel of the roadheader can be adjusted based on the first and second distances. This allows the angle between the extension direction of the central axis of the roadheader and the extension direction of the central axis of the roadway to be smaller than a preset angle. Preferably, the extension direction of the central axis of the roadheader and the extension direction of the central axis of the roadway are aligned, that is, the direction of travel of the roadheader can be along the preset extension direction of the roadway, thereby preventing over-excavation caused by the tilt of the roadheader angle.
[0065] At the same time, while ensuring that the angle between the central axis of the tunnel boring machine and the extension direction of the roadway is less than a preset angle, the maximum distance between the central axis of the tunnel boring machine and the central axis of the roadway can also be less than a preset distance. It is understandable that the length of the tunnel boring machine, and therefore the length of its central axis, is limited. Therefore, as viewed perpendicular to the bottom surface of the roadway, the maximum distance between the central axis of the tunnel boring machine and the central axis of the roadway is the distance between one end of the central axis of the tunnel boring machine and the central axis of the roadway in a direction perpendicular to the central axis of the roadway. By limiting the maximum distance between the central axis of the tunnel boring machine and the central axis of the roadway, the tunnel boring machine will not deviate too much from the preset tunneling route, thereby preventing overexcavation.
[0066] Specifically, during actual operation, a preset distance can be set based on the overall size of the tunnel or the overall size of the roadheader. In other words, the error margin during tunneling can be set based on the size of the tunnel and the roadheader, so that the error margin during tunneling remains within the preset distance. Specifically, the preset distance can be set to 3 to 5 meters.
[0067] Finally, after adjusting the driving direction of the tunnel boring machine, the tunnel boring machine can be controlled to perform tunneling work according to the preset advance amount.
[0068] Specifically, the tunnel boring machine can be equipped with an inertial navigation system, which is used to navigate the machine's travel direction and distance, thereby ensuring the machine's progress. Furthermore, the tunnel boring machine can also be equipped with a millimeter-wave radar, which can detect the distance between the tunnel boring machine body and the sidewall of the tunnel. Specifically, the millimeter-wave radar can be respectively installed on the first and second side surfaces of the tunnel boring machine body, with the millimeter-wave radar's transmission direction facing the first and second sidewalls of the tunnel to ensure the accuracy of the detection of the first and second distances. Furthermore, the tunnel boring machine can also be equipped with a controller, which is respectively connected to the inertial navigation system and the millimeter-wave radar. After the millimeter-wave radar acquires the first and second distances, it can transmit the data to the controller. Simultaneously, the controller processes the data and sends it to the inertial navigation system, which then uses the data for navigation.
[0069] The tunneling equipment control method provided in this application obtains a first distance between a first side surface of the tunneling equipment body and a first sidewall of a tunnel, and a second distance between a second side surface of the tunneling equipment body and a second sidewall of the tunnel. The tunneling equipment's travel direction is controlled based on the first and second distances, ensuring that the angle between the tunneling equipment's travel direction and the tunnel's central axis is less than a preset angle, thereby preventing the tunneling equipment from tilting and causing overbreak. Furthermore, the method ensures that the deviation between the tunneling equipment's central axis and the tunnel's central axis is not excessive, thereby preventing the tunneling equipment from deviating from the preset tunneling route and thus preventing overbreak.
[0070] According to one embodiment of the present application, as shown in FIG2 , a control method for tunneling equipment is proposed, including:
[0071] S202, respectively obtaining a first distance between a first side surface of a main body of the tunneling device and a first side wall of the tunnel, and a second distance between a second side surface of the main body of the tunneling device and a second side wall of the tunnel;
[0072] S204, obtaining a distance difference between the first distance and the second distance;
[0073] S206, when the distance difference is greater than a preset difference, obtaining a moving direction of the tunneling equipment according to the first distance and the second distance;
[0074] S208, obtaining a moving distance of the tunneling equipment according to the first distance and the second distance;
[0075] S210, controlling the movement of the tunneling equipment according to the movement direction and movement distance;
[0076] S212, controlling the tunneling equipment to perform tunneling work according to a preset advance amount.
[0077] In this embodiment, after obtaining a first distance between a first side surface of the tunneling equipment body and a first sidewall of the tunnel, and a second distance between a second side surface of the tunneling equipment body and a second sidewall of the tunnel, a distance difference between the first and second distances can be determined based on the first and second distances, and then a determination can be made as to whether the distance difference is greater than a preset difference. In other words, the distance difference between the first and second distances is used to determine whether the tunneling equipment is currently deviating. Specifically, if the distance difference between the first and second distances is less than the preset difference, this indicates that the distance difference between the two sides of the tunneling equipment body and the two sidewalls of the tunnel is not excessive, meaning that the tunneling equipment is currently not deviating. Conversely, if the distance difference between the first and second distances is greater than the preset difference, this indicates that the distance difference between the two sides of the tunneling equipment body and the two sidewalls of the tunnel is excessive, meaning that the tunneling equipment is currently deviating and requires lateral adjustment.
[0078] Furthermore, if the difference between the first distance and the second distance is greater than a preset difference, the direction of movement of the tunneling equipment that requires lateral adjustment can be determined based on the first and second distances. Then, the distance of movement of the tunneling equipment that requires lateral adjustment can be determined based on the first and second distances. Finally, once both the direction and distance of movement of the tunneling equipment are determined, the tunneling equipment can be controlled to move according to the direction and distance, thereby completing the lateral adjustment of the tunneling equipment.
[0079] In some embodiments, optionally, the step of obtaining the moving direction of the tunneling equipment based on the first distance and the second distance includes: when the first distance is greater than the second distance, determining the moving direction as toward the first side wall; when the first distance is less than the second distance, determining the moving direction as toward the second side wall.
[0080] In this embodiment, as shown in FIG4 , when the difference between the first distance and the second distance is greater than a preset difference, the direction of movement of the tunneling equipment can be determined based on the magnitude relationship between the first distance and the second distance. Specifically, when the first distance is greater than the second distance, this indicates that the distance between the first side surface of the tunneling equipment body and the first sidewall of the tunnel is greater than the distance between the second side surface of the tunneling equipment body and the second sidewall of the tunnel. In other words, the tunneling equipment body is biased toward the second sidewall of the tunnel. In this case, the direction of movement of the tunneling equipment that needs to be adjusted is toward the first sidewall of the tunnel. Conversely, when the first distance is less than the second distance, this indicates that the distance between the first side surface of the tunneling equipment body and the first sidewall of the tunnel is less than the distance between the second side surface of the tunneling equipment body and the second sidewall of the tunnel. In other words, the tunneling equipment body is biased toward the first sidewall of the tunnel. In this case, the direction of movement of the tunneling equipment that needs to be adjusted is toward the second sidewall of the tunnel.
[0081] Furthermore, the moving distance is determined according to a preset formula: |X1-X2|÷2=X; wherein X1 is the first distance, X2 is the second distance, and X is the moving distance.
[0082] Specifically, the moving distance required for adjusting the tunneling equipment can be determined according to the preset formula: |X1-X2|÷2=X. Here, X1 is the first distance, X2 is the second distance, and X is the moving distance. It is understood that when the tunneling equipment deviates, the difference between the first distance and the second distance is the distance difference between the two sides of the tunneling equipment body and the sidewalls of the tunnel. At this time, dividing this distance difference by 2 represents the distance that the tunneling equipment deviates from the central axis of the tunnel, which is also the moving distance that the tunneling equipment needs to adjust. Finally, when the moving direction and moving distance of the tunneling equipment are determined, the tunneling equipment can be controlled to move according to the moving direction and moving distance, thereby completing the lateral adjustment of the tunneling equipment.
[0083] According to one embodiment of the present application, as shown in FIG3 , a control method for tunneling equipment is proposed, including:
[0084] S302, respectively obtaining a first distance between a first side surface of a main body of the tunneling device and a first side wall of the tunnel, and a second distance between a second side surface of the main body of the tunneling device and a second side wall of the tunnel;
[0085] S304, controlling the driving direction of the tunneling equipment according to the first distance and the second distance;
[0086] S306, controlling the excavation equipment to perform excavation work according to the preset footage;
[0087] S308, when the tunnel footage reaches a preset footage on the central axis of the tunneling equipment, obtaining point cloud information of the front wall of the tunnel in front of the tunneling equipment;
[0088] S310, determining, based on the point cloud information, undercut locations on the front wall of the tunnel that do not reach a preset amount of footage;
[0089] S312, controlling the excavation equipment to perform excavation work on the under-excavated position.
[0090] In this embodiment, after the tunneling equipment's travel direction is adjusted, the tunneling equipment can be controlled to advance according to a preset advance rate. When the advance rate reaches the preset advance rate on the tunneling equipment's central axis, the tunneling equipment can be controlled to stop advancing. It will be understood that one end of the tunneling equipment's cantilever is mounted on the tunneling equipment's main body, and the other end of the cantilever is provided with a cutting head. Furthermore, the cantilever of the tunneling equipment rotates relative to the main body of the tunneling equipment. Furthermore, since the cantilever's length is fixed, in the tunneling equipment's travel direction, when the angle between the cantilever and the central axis of the tunneling equipment is less than the preset angle, the advance rate is maximized. On either side of the central axis of the tunneling equipment, the advance rate is relatively small.
[0091] Therefore, when the maximum footage is achieved on the central axis of the tunneling equipment, the forward movement of the tunneling equipment is stopped. This prevents overbreak, which occurs when the boom rotates to an angle less than a preset angle with the central axis of the tunneling equipment. However, at this point, the footage on the tunnel front wall on either side of the central axis of the tunneling equipment is less than the footage on the central axis, indicating underbreak on both sides of the central axis. Underbreak compensation is required on the tunnel front wall on both sides of the central axis.
[0092] Specifically, the point cloud information of the front wall of the tunnel is first obtained, and then the under-excavation position on the front wall of the tunnel that has not reached the preset advance amount is determined based on the point cloud information of the front wall of the tunnel. Finally, the excavation equipment is controlled to excavate the under-excavation position to achieve under-excavation compensation.
[0093] Specifically, millimeter-wave radar can be used to obtain point cloud data of the tunnel front wall. Millimeter-wave radars can be set on both sides of the front end of the tunneling equipment to ensure the accuracy of the point cloud data.
[0094] Specifically, during actual operation, as shown in Figure 5, a first distance X1 between the first side of the tunneling equipment body and the first sidewall of the tunnel, and a second distance X2 between the second side of the tunneling equipment body and the second sidewall of the tunnel, are first determined. A distance difference, |X1-X2|, is then determined based on the first and second distances, and a determination is made as to whether this distance difference is greater than a preset difference SP1. If the distance difference between the first and second distances is greater than the preset difference, lateral correction of the tunneling equipment is required.
[0095] Furthermore, on the central axis of the tunneling equipment, when the advance reaches a preset advance, the tunneling equipment can be controlled to stop advancing. Point cloud information of the tunnel front wall is then acquired. Based on this point cloud information, undercut locations X3 and X4 on the tunnel front wall that do not reach the preset advance are determined. X3 represents the advance at a location on one side of the tunneling equipment's central axis, and X4 represents the advance at a location on the other side of the tunneling equipment's central axis. It is understood that in actual operation, X3 and X4 may represent more than one location. X3 and X4 are then compared with the preset advance K. If the difference between X3 or X4 and the preset advance K is less than a preset value SP2, that is, |X3-K| < SP2 or |X4-K| < SP2, undercut compensation is not required for the location X3 or X4. On the contrary, if |X3-K|≥SP2, or |X4-K|≥SP2, it is necessary to perform under-excavation compensation for the position where X3 or X4 is located, that is, to control the excavation equipment to perform advance correction to ensure the advance amount at that position.
[0096] In some embodiments, optionally, before the step of obtaining point cloud information of the front wall of the tunnel in front of the tunneling equipment, the step further includes: adjusting the position of the tunneling equipment so that the central axis of the tunneling equipment coincides with the central axis of the tunnel.
[0097] In this embodiment, before controlling the excavation equipment to compensate for under-excavation of the front wall of the tunnel, that is, before obtaining the point cloud data of the front wall of the tunnel, the position of the excavation equipment can be adjusted so that the central axis of the excavation equipment coincides with the central axis of the tunnel, thereby ensuring the accuracy of the acquisition of the point cloud data of the front wall of the tunnel and avoiding position deviation when obtaining the point cloud data of the front wall of the tunnel.
[0098] According to the second aspect of the present application, a control device for tunneling equipment is proposed, including: an acquisition unit for respectively acquiring a first distance between a first side surface of the main body of the tunneling equipment and a first side wall of the tunnel, and a second distance between a second side surface of the main body of the tunneling equipment and a second side wall of the tunnel; wherein the first side surface is opposite to the first side wall, and the second side surface is opposite to the second side wall; a control unit for controlling the driving direction of the tunneling equipment according to the first distance and the second distance, so that the angle between the central axis of the tunneling equipment and the central axis of the tunnel is less than a preset angle, and the maximum distance between the central axis of the tunnel and the tunnel is less than a preset distance; and for controlling the tunneling equipment to perform tunneling work according to a preset footage.
[0099] The control device for tunneling equipment provided herein uses an acquisition unit to respectively acquire a first distance between a first side surface of the tunneling equipment body and a first sidewall of a tunnel, and a second distance between a second side surface of the tunneling equipment body and a second sidewall of the tunnel. This allows the control unit to control the direction of travel of the tunneling equipment based on the first and second distances, thereby ensuring that the angle between the tunneling equipment's direction of travel and the central axis of the tunnel is less than a preset angle, thereby preventing the tunneling equipment from tilting and causing overbreak. Furthermore, the control unit ensures that the deviation between the central axis of the tunneling equipment and the central axis of the tunnel is not excessive, thereby preventing the tunneling equipment from deviating from the preset tunneling route and thus preventing overbreak.
[0100] In some embodiments, optionally, the acquisition unit can be specifically used to: obtain the distance difference between the first distance and the second distance; the control unit can be specifically used to: when the distance difference is greater than a preset difference, obtain the moving direction of the tunneling equipment according to the first distance and the second distance; obtain the moving distance of the tunneling equipment according to the first distance and the second distance; and control the movement of the tunneling equipment according to the moving direction and the moving distance.
[0101] Furthermore, the control unit is specifically configured to: determine the moving direction to be toward the first side wall when the first distance is greater than the second distance; and determine the moving direction to be toward the second side wall when the first distance is less than the second distance.
[0102] Furthermore, the control unit is specifically used to: determine the moving distance according to a preset formula: |X1-X2|÷2=X; wherein X1 is the first distance, X2 is the second distance, and X is the moving distance.
[0103] Furthermore, the acquisition unit is also used to: obtain point cloud information of the front wall of the tunnel in front of the tunneling equipment when the advancement of the tunnel reaches a preset advancement on the central axis of the tunneling equipment; determine the under-excavation position on the front wall of the tunnel that has not reached the preset advancement based on the point cloud information; the control unit is also used to: control the tunneling equipment to perform tunneling work on the under-excavation position.
[0104] Furthermore, before the step of acquiring point cloud information of the front wall of the tunnel in front of the tunneling equipment, the control unit is further configured to: adjust the position of the tunneling equipment so that the central axis of the tunneling equipment coincides with the central axis of the tunnel.
[0105] According to the third aspect of the present application, a control device for tunneling equipment is proposed, comprising: a processor and a memory, the memory storing programs or instructions that can be run on the processor, and implementing the steps of the control method for tunneling equipment as described in any one of the above technical solutions when the programs or instructions are executed by the processor.
[0106] The control device of the tunneling equipment provided in the present application includes a memory and a processor, and also includes a program or instruction stored in the memory. When the program or instruction is executed by the processor, it can implement the steps of the control method of the tunneling equipment of any one of the above-mentioned technical solutions. Therefore, the control method of the tunneling equipment has all the beneficial effects of the above-mentioned control method of the tunneling equipment, which will not be repeated here.
[0107] According to a fourth aspect of the present application, a readable storage medium is proposed, on which a program or instruction is stored. When the program or instruction is executed by a processor, the steps of the control method of the tunneling equipment as in any one of the above technical solutions are implemented.
[0108] Those skilled in the art will appreciate that all or part of the steps in the above-described method can be implemented by instructing related hardware through a program. The program can be stored in a computer-readable storage medium. When executed, the program includes the following steps: obtaining a first distance between a first side surface of the tunneling device body and a first sidewall of the tunnel, and a second distance between a second side surface of the tunneling device body and a second sidewall of the tunnel; controlling the direction of travel of the tunneling device based on the first and second distances so that the angle between the central axis of the tunneling device and the central axis of the tunnel is less than a preset angle, and the maximum distance between the central axis of the tunneling device and the central axis of the tunnel is less than a preset distance; and controlling the tunneling device to perform tunneling according to a preset footage. The computer-readable storage medium includes, for example, a read-only memory, a random access memory, a magnetic disk, or an optical disk.
[0109] According to a fifth aspect of the present application, a tunneling device is proposed, comprising the control device of the tunneling device provided in the second aspect or the control device of the tunneling device provided in the third aspect.
[0110] The tunneling equipment provided in this application includes the control device of the tunneling equipment provided in the second aspect above or the control device of the tunneling equipment provided in the third aspect above. Therefore, the tunneling equipment has all the beneficial effects of the control device of the above tunneling equipment, which will not be repeated here.
[0111] In this application, the term "plurality" refers to at least two or more than two, unless otherwise specified. Terms such as "installed," "connected," "connected," and "fixed" should be interpreted broadly. For example, "connected" can mean fixed, removable, or integrally connected; and "connected" can mean directly or indirectly through an intermediary. Those skilled in the art will understand the specific meanings of these terms in this application based on the specific circumstances.
[0112] Throughout this specification, terms such as "one embodiment," "some embodiments," and "specific embodiments" mean that the specific features, structures, materials, or characteristics described in conjunction with that embodiment or example are included in at least one embodiment or example of the present application. In this specification, schematic representations of the above terms do not necessarily refer to the same embodiment or example. Furthermore, the specific features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples.
[0113] The above are merely preferred embodiments of the present application and are not intended to limit the present application. Those skilled in the art will readily appreciate that various modifications and variations are possible. Any modifications, equivalent substitutions, or improvements made within the spirit and principles of the present application shall be included within the scope of protection of the present application.
Claims
1. A method for controlling a tunneling device, wherein: include: Respectively acquiring a first distance between a first side surface of a body of the excavation equipment and a first side wall of a tunnel, and a second distance between a second side surface of a body of the excavation equipment and a second side wall of the tunnel; Wherein, the first side surface is opposite to the first side wall, and the second side surface is opposite to the second side wall; Controlling the driving direction of the tunneling device according to the first distance and the second distance so that the angle between the central axis of the tunneling device and the central axis of the tunnel is less than a preset angle, and the maximum distance between the central axis of the tunneling device and the central axis of the tunnel is less than a preset distance; The excavation equipment is controlled to perform excavation work according to a preset footage.
2. The control method of excavation equipment according to claim 1, wherein: The step of controlling the driving direction of the tunneling equipment according to the first distance and the second distance comprises: Obtaining a distance difference between the first distance and the second distance; When the distance difference is greater than a preset difference, obtaining a moving direction of the tunneling equipment according to the first distance and the second distance; Acquire the moving distance of the tunneling equipment according to the first distance and the second distance; The excavation equipment is controlled to move according to the moving direction and the moving distance.
3. The control method of excavation equipment according to claim 2, wherein: The step of acquiring the moving direction of the tunneling equipment according to the first distance and the second distance comprises: When the first distance is greater than the second distance, determining the moving direction to be toward the first side wall; When the first distance is smaller than the second distance, the moving direction is determined to be toward the second side wall.
4. The control method of excavation equipment according to claim 2, wherein: Determine the moving distance according to the preset formula: |X1-X2|÷2=X; Wherein, X1 is the first distance, X2 is the second distance, and X is the moving distance.
5. The control method of the excavation equipment according to any one of claims 1 to 4, wherein: Also includes: When the footage of the tunnel reaches the preset footage on the central axis of the tunneling equipment, acquiring point cloud information of the front wall of the tunnel in front of the tunneling equipment; Determine, based on the point cloud information, an under-excavation position on the front wall of the tunnel that does not reach the preset footage amount; The excavation equipment is controlled to perform excavation work on the under-excavated position.
6. The control method of excavation equipment according to claim 5, wherein: Before the step of obtaining the point cloud information of the front wall of the tunnel in front of the tunneling equipment, the method further includes: The position of the excavation equipment is adjusted so that the central axis of the excavation equipment coincides with the central axis of the tunnel.
7. A control device for excavation equipment, wherein: include: an acquisition unit, configured to respectively acquire a first distance between a first side surface of a body of the excavation equipment and a first side wall of a tunnel, and a second distance between a second side surface of the body of the excavation equipment and a second side wall of the tunnel; Wherein, the first side surface is opposite to the first side wall, and the second side surface is opposite to the second side wall; a control unit, configured to control a travel direction of the tunneling device according to the first distance and the second distance, so that an angle between a central axis of the tunneling device and a central axis of the tunnel is smaller than a preset angle, and a maximum distance between the central axis of the tunneling device and the central axis of the tunnel is smaller than a preset distance; and Used to control the excavation equipment to perform excavation work according to the preset footage.
8. A control device for excavation equipment, wherein: include: A processor and a memory, wherein the memory stores a program or instruction that can be run on the processor, and when the program or instruction is executed by the processor, the steps of the control method of the excavation equipment according to any one of claims 1 to 6 are implemented.
9. A readable storage medium, wherein: The readable storage medium stores a program or instruction, and when the program or instruction is executed by the processor, the steps of the control method of the tunneling equipment according to any one of claims 1 to 6 are implemented.
10. A tunneling device, wherein: include: A control device for a tunneling device as claimed in claim 7 or 8.
Citation Information
Patent Citations
Automatic correction method and system for tunneling machine
CN101832136A
Mining control method and control system of underground roadway
CN108590657A
Tunneling control method and device, and tunneling machine
CN110439570A
Tunneler automatic control device based on laser scanner and control method thereof
CN110700828A
Tunneling control device and method and tunneling equipment
CN113250693A
Cited By
Fusion positioning method, device, equipment, medium and product
CN120721066A
Automatic slotting control method, device and equipment for digging and anchoring all-in-one machine and storage medium
CN121382223A