Method for pre-fabricating insulated concrete walls for casco's of prefab houses

The method of spraying foam insulation within a mould before pouring concrete for prefab house walls addresses inefficiencies and irregularities in existing methods, resulting in improved insulation and reduced production time and costs.

WO2024213712A1PCT designated stage expired Publication Date: 2024-10-17CALDURAN KALKZANDSTEEN
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
PCT/EP2024/059983
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-04-13
Filing Date
2024-04-12
Publication Date
2024-10-17

AI Technical Summary

Technical Problem

Existing methods for pre-fabricating insulated concrete walls for prefab houses are time-consuming, prone to irregularities, and may result in suboptimal thermal and acoustic insulation due to slow concrete hardening and the need for complex and expensive insulation panels, as well as potential cold-bridges and condensation issues.

Method used

A method involving a mould with a base and sides where facade elements are placed, followed by spraying foam insulation material to form an intermediate layer, and then pouring a concrete mixture on top, which adheres to the foam layer and fills gaps, ensuring a strong and evenly spread concrete layer with improved insulation properties.

Benefits of technology

This method allows for efficient, high-quality pre-fabricated insulated concrete walls with enhanced thermal and acoustic insulation, preventing cold-bridges and ensuring a flat, strong facade layer, while reducing production time and costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure EP2024059983_17102024_PF_FP_ABST
    Figure EP2024059983_17102024_PF_FP_ABST
Patent Text Reader

Abstract

A method for pre-fabricating an insulated concrete wall for a casco of a house comprises the steps preparing a mould having a base and upwardly projecting sides that together delimit an upwardly open moulding space (4), placing façade elements (7) inside the moulding space on top of the base to form a façade layer of the insulated concrete wall, and pouring concrete mixture into the moulding space to form a concrete layer of the insulated concrete wall, wherein the method further comprises an intermediate step of spraying foam insulation material (15) inside the moulding space on top of the façade layer to adhere and connect thereto and form an intermediate foam insulation layer (FIL) of the insulated concrete wall, wherein the concrete mixture is poured on top of the intermediate foam insulation layer to adhere and connect thereto.
Need to check novelty before this filing date? Find Prior Art

Description

[0001] Title: Method for pre-fabricating insulated concrete walls for casco's of prefab houses.

[0002] FIELD OF THE INVENTION

[0003] The present invention relates to a method for pre-fabricating insulated concrete walls for casco's of prefab houses, as well as to such pre-fabricated insulated concrete walls themselves.

[0004] BACKGROUND TO THE INVENTION

[0005] Insulated concrete walls for houses are known to be manufactured in various manners. Due to large shortages on the housing market, a strong demand for building large numbers of houses in short periods of time has arisen. With that it is important nowadays that those houses not only get build quickly and economically, but at a same time well insulated, both in terms of acoustics and thermally. Finally, it is important that the walls of those houses also immediately aid in fulfilling certain aesthetic demands.

[0006] One possible solution for this is to manufacture pre-fabricated insulated concrete walls in a factory that also already are pre-fabricated with a decorative fagade layer at their outwardly directed side. Those pre-fabricated walls thus are manufactured with a strong weight carrying concrete layer at their inwardly directed side, with an insulation layer connected thereto, and with some kind of decorative fagade layer on top of that insulation layer. The big advantage hereof is that they only need to be transported towards a building site where they can be erected and connected to other pre-fabricated walls for forming the casco of a prefab house.

[0007] In the field a fully robotized system is known for directly pre-fabricating such decorative insulated concrete walls for casco's of prefab houses that comprise a concrete layer, an insulation layer and a ceramic fagade layer of brick slips. This system is referred to as 'Gevelklaar' and is introduced by Spaansen B.V. and Vandersanden Steenfabrieken N.V. With this system as a first step a layer of concrete is poured into a mould directly on top of a base of the mould. Then, as a second step, a plurality of pre-fabricated plate-shaped insulation panels are laid by a robotic pick-and-place unit directly on top of this layer of concrete. Subsequently, glue patterns are extruded on upper faces of the laid insulation panels by means of a controlled extrusion head while a robotic brick layer each time positions and firmly pushes decorative brick slips for a certain amount of time and in a pre-programmed pattern against the top faces of those laid insulation panels in order to adhere them thereto.

[0008] A disadvantage hereof is that the thus performed method is rather time-consuming. The entire mould remains occupied for as long as the robotic brick layer is still busy in adhering brick slips to the wall. Furthermore the hardening of the concrete layer is prone to be rather slow because the poured in layer of concrete, as soon as the insulation panels have been laid on top of it, is locked up on all sides, making it difficult for water to evaporate from out of the concrete mixture into the air. This deteriorates the required hardening of the concrete before the thus pre-fabricated decorative insulated concrete wall is strong enough to get de-moulded out of the mould.

[0009] Another disadvantage is that the system is relative vulnerable in that, for each brick slip to be adhered on top of its respective laid insulation panel, the robotic brick layer needs to exert a firm downwards directed local pushing pressure on that respective brick slip. At that time the concrete mixture however has not sufficiently hardened yet. Thus the firm downwards directed local pushing pressures may locally push respective ones of the laid insulation panels somewhat further into the layer of concrete than others, or may cause them to slightly tilt. This then may lead to irregularities in the outer layer of brick slips. Even worse, concrete mixture may escape upwards via play between neighbouring edge sections of the laid insulation panels. This then may form cold-bridges of concrete all the way through the wall from the inner layer of concrete itself, in between the laid insulation panels, and from there connecting to the outer layer of adhered brick slips. This, may lead to problems of condensation.

[0010] Yet another disadvantage is that the acoustic and thermal insulation values of the prefabricated decorative insulated concrete walls for casco's of prefab houses may be less than expected. This for example can be caused by said play between neighbouring edge sections of the laid insulation panels.

[0011] BE-898.346 shows a method for manufacturing pre-fabricated insulated concrete building blocks. The method starts with a step of placing a plate-shaped insulation panel on top of a base inside a mould. The insulation panel is of a type that comprises a series of parallel undercut dovetail-shaped grooves / channels in its upper face. The method subsequently comprises a step of pouring a concrete mixture on top of the insulation panel into the mould. The poured in concrete mixture then not only forms a layer of concrete on top of the insulation panel but also penetrates into the undercut dovetail-shaped grooves / channels. During drying and curing, the hardened concrete layer advantageously also makes form-connections with the insulation panel at the locations of the undercut dovetail-shaped grooves / channels. After the concrete has had sufficient time to dry and cure, the thus formed insulated concrete building block gets removed from out the mould. After being removed from the mould, the outwardly directed face of the insulation panel can be coated with a decorative or fire retardant paint.

[0012] A disadvantage of this known method is that the insulation panels that are required for it are relative complex and expensive to make. This is caused by the fact that the undercut dovetail-shaped grooves / channels need to be machined therein, since not providing the insulation panels with such undercut dovetail-shaped grooves / channels would result in too weak connection strength between the insulation panels and the concrete layer.

[0013] Another disadvantage is that, in contrast to the abovementioned 'Gevelklaar' system, the decorative coating on the building blocks can only be applied after the building block has been de-moulded from out of its mould and turned around.

[0014] BRIEF DESCRIPTION OF THE INVENTION

[0015] The present invention aims to overcome those disadvantages at least partly or to provide a usable alternative. In particular the present invention aims to provide an economic and efficient method for manufacturing insulated concrete walls for building prefab houses.

[0016] According to the present invention this aim is achieved by a method for pre-fabricating an insulated concrete wall for a casco of a prefab house according to claim 1. The method comprises the steps:

[0017] • preparing a mould having a base and upwardly projecting sides that together delimit an upwardly open moulding space;

[0018] • placing fagade elements inside the moulding space on top of the base to form a fagade layer of the insulated concrete wall; and

[0019] • pouring concrete mixture into the moulding space to form a concrete layer of the insulated concrete wall.

[0020] According to the inventive thought the method further comprises an intermediate step of:

[0021] • spraying foam insulation material inside the moulding space on top of the fagade layer to adhere and connect thereto and form an intermediate foam insulation layer of the insulated concrete wall, wherein the concrete mixture is poured on top of the intermediate foam insulation layer to adhere and connect thereto.

[0022] Thus advantageously a time-saving method is obtained by means of which superb quality pre-fabricated insulated concrete walls for casco's of prefab houses can be manufactured inside well-controllable conditions of a factory. According to the inventive thought an additional intermediate step is now performed of spraying foam insulation material inside the moulding space directly on top of a fagade layer of fagade elements. The sprayed foam insulation material advantageously automatically shall adhere to the fagade elements, and if necessary at a same time fill up any gaps or play between neighbouring edge sections of the laid fagade elements. This filling up of any gaps or plays in the layer of laid fagade elements results in a guaranteed closed intermediate insulation layer of sprayed foam insulation material, preventing cold-bridges to be able to occur between the concrete layer and the fagade layer. This, increases the thermal and acoustic insulation values of the prefabricated wall and prevents problems with condensation.

[0023] The poured in concrete mixture advantageously automatically shall adhere and connect to the sprayed intermediate foam insulation layer, while at a same time levelling out any irregularities that may be present in the sprayed intermediate foam insulation layer.

[0024] Owing to the fact that the poured layer of concrete mixture now gets to lie directly on top of the freshly made layer of sprayed foam insulation material as well as above the layer of laid fagade elements, the entire upper surface of the concrete layer stays in direct contact with the air, such that water can easily and quickly evaporate from out of the concrete mixture for it to cure and harden and quickly become strong enough for the pre-fabricated wall to get de-moulded.

[0025] Furthermore, it can now be guaranteed that the layer of fagade elements gets to be perfectly flat after de-moulding of the pre-fabricated wall out of the mould. The same goes for the layer of hardened concrete, that after being poured on top of the freshly sprayed layer of foam insulation material, shall evenly spread out over the mould, and make it level. The pouring in of the concrete mixture and letting it harden can be the last step before demoulding. Vibrational forces may get exerted on the poured in concrete mixture in order to have it densified and spread out evenly. No other (local) actions need to take place that may disturb the layer of concrete.

[0026] The fagade elements in a preferred embodiment may comprise plate-shaped insulation panels that already have decorative pieces, like brick slips, connected to one side thereof, such that they can immediately be placed upside-down inside the moulding space on top of the base. The decorative pieces, that preferably are made out of ceramic material, like said brick slips, then face down towards the base of the mould, whereas the plate-shaped insulation panels face up. Performing the method with this type of combined decorative insulation panels, brings the advantage that a double insulation gets obtained for the to be manufactured pre-fabricated wall. On the one hand the plate-shaped insulation panels of the fagade elements, and on the other hand the intermediate foam insulation layer that has been formed by the freshly spraying of foam insulation material against those plate-shaped panels of insulation material. An additional advantage with this is that the freshly sprayed foam insulation material shall be able to obtain a truly good adhesive connection with the plateshaped insulation panels of the fagade elements, due to the similar nature of their materials. Yet another advantage is that the decorative pieces, like the brick slips, can be reliably connected to the plate-shaped insulation panels up front, for example by means of a suitable adhesive or mechanically. The mould according to the invention is not needed for this, thus saving time and costs. Also the connecting of the decorative pieces to the plate-shaped insulation panels then advantageously is unable to interfere with the forming of the intermediate foam insulation layer and / or of the concrete layer.

[0027] In the alternative the fagade elements also may be formed merely by decorative pieces, that is to say without plate-shaped insulation panels to which they are connected. The decorative pieces then may directly be laid in a desired pattern inside the moulding space on top of the base. In that case the above-mentioned important advantages of the invention can also already be achieved due to the fact that the extra intermediate step according to the invention of freshly spraying foam insulation material inside the moulding space directly on top of those decorative pieces gets performed.

[0028] In yet another alternative the fagade elements also may be formed merely by plateshaped panels of insulation material, that is to say without decorative pieces connected thereto. The plate-shaped insulation panels then may directly be laid inside the moulding space on top of the base. In that case the above-mentioned important advantages of the invention can also already be achieved due to the fact that the extra intermediate step according to the invention of freshly spraying foam insulation material inside the moulding space directly on top of those plate-shaped insulation panels gets performed.

[0029] In a preferred embodiment anchoring elements can be fixedly connected to the fagade elements in such a way that they get to protrude upwardly into the moulding space. In particular this is done before placing the fagade elements inside the moulding space on top of the base. The foam insulation material then can be sprayed on top of the fagade layer while embedding and connecting to first sections of the upwardly protruding fixedly connected anchoring elements, after which the concrete mixture can be poured on top of the intermediate foam insulation layer while embedding and connecting to second sections of the upwardly protruding fixedly connected anchoring elements. Thus advantageously a strong and reliable anchoring can automatically be achieved of the fagade layer to the rest of the pre-fabricated wall, including to the strongest layer thereof, that is to say to the concrete layer.

[0030] All kinds and shapes of anchoring elements can be used as long as they are long enough to extend all the way up in a direction perpendicular to the wall through the fagade layer and into the concrete layer. In addition thereto the anchoring elements may be pin-shaped. In particular the anchoring elements then may comprise assemblies of metal screws and plastic plug bodies, preferably barbed plug bodies. The metal screws then can be screwed from a front side through the fagade elements to at a back side thereof grip into the plastic plug bodies. The metal screws then form reliable fixed connections with the fagade elements, whereas the plastic plug bodies covering their upwardly protruding sections prevent cold bridges to be formed between the fagade layer and the concrete layer.

[0031] In a preferred further or alternative embodiment coupling elements can be freely placed inside the moulding space above the fagade layer to come to lie with first portions at an intermediate level and with second portions at an upper level of the moulding space. The foam insulation material then can be sprayed on top of the fagade layer while embedding and connecting to the first portions of the coupling elements, after which the concrete mixture can be poured on top of the intermediate foam insulation layer while embedding and connecting to the second portions of the coupling elements. Thus advantageously a strong and reliable coupling can automatically be achieved between the respective intermediate foam insulation layer and concrete layer by means of the coupling elements that only need to be freely placed inside the moulding space without having to fixedly connect them to the fagade elements.

[0032] In addition thereto the spraying of the foam insulation material may take place in primary and secondary foam insulation sub-layers. This makes it possible to firstly spray the primary foam insulation sub-layer on top of the fagade layer, to then freely place the coupling elements with their first portions on top of this primary foam insulation sub-layer, after which the secondary foam insulation sub-layer can be sprayed on top of the primary foam insulation sub-layer while embedding and connecting to the first portions of the coupling elements. Thus it can be guaranteed that the entire first portions of the coupling elements get surrounded by the foam insulation material, which in turn helps to prevent cold bridges to be formed between the fagade layer and the concrete layer, and which may help to prevent problems due to oxidation of the coupling elements. Furthermore, this two-step spraying of the foam insulation material can be used to take care that depending on the height of the coupling elements, their second portions come to lie at exactly the aimed height position at the upper level inside the mould, which in particular is at an intermediate center height position of the concrete layer to be formed inside this upper level at a later stage.

[0033] All kinds of coupling elements can be used as long as they are high enough to reach all the way up in a direction perpendicular to the wall from the intermediate foam insulation layer into the concrete layer.

[0034] In addition thereto or in the alternative the coupling elements may comprise elongate metal lattice girders of which elongate parallel bars form said first and second portions thereof, wherein the elongate metal lattice girders are placed inside the moulding space with longitudinal axis of their bars extending parallel to the base of the mould. The elongate metal lattice girders then may form reliable couplings between the intermediate foam insulation layer and the concrete layer, whereas the embedding of their first portions by the foam insulation material being sprayed all over them and of their second portions by the concrete mixture being poured all over them prevent cold bridges to be formed between the outwardly directed fagade layer and the inwardly directed concrete layer, and prevent problems to arise due to oxidation or the like.

[0035] In a preferred further or alternative embodiment concrete-reinforcement elements can be freely placed inside the moulding space above the fagade layer to come to lie at an upper level of the moulding space, which in particular is at an intermediate center height position of the concrete layer to be formed at a later stage. The concrete mixture then can be poured on top of the intermediate foam insulation layer while embedding and connecting to the concretereinforcement elements. Thus advantageously a strong and reliable concrete layer can automatically be achieved by means of the concrete-reinforcement elements that only need to be placed inside the moulding space at the aimed upper level where the concrete layer is to be formed.

[0036] In addition thereto the concrete-reinforcement elements may comprise planar metal wire screens, wherein the planar metal wire screens are to be placed inside the moulding space with their planar axes extending parallel to the base of the mould. The planar metal lattice girders then form reliable reinforcements of the concrete layer, whereas the embedding of them by the concrete mixture being poured all over them prevent problems to arise due to oxidation or the like.

[0037] In an advantageous combination of the concrete-reinforcement elements with the coupling elements, the concrete-reinforcement elements can be placed upon and if desired also connected to the second portions of the coupling elements that already lie at the upper level of the moulding space where the concrete layer is to be formed. Thus it can be obtained that the concrete-reinforcement elements automatically get positioned at the right height inside the moulding space, that is to say somewhere in the center of the concrete layer to be formed there. More importantly however, the concrete-reinforcement elements then may help to couple the intermediate foam insulation layer with the concrete layer. This is obtained due to the fact that not only the second portions of the coupling elements but also the entire concrete-reinforcement elements connected thereto get locked up in the hardened concrete layer.

[0038] It is noted that with this the abovementioned two-step spraying of the foam insulation material can be used to take care that depending on the height of the coupling elements, not only the second portions, but also the entire concrete-reinforcement elements that get placed upon the coupling elements come to lie at exactly the aimed height position at the upper level inside the mould, which in particular is at an intermediate center height position of the concrete layer to be formed inside this upper level at a later stage.

[0039] In a preferred embodiment the sides of the mould can be covered with a anti-sticking coating or foil, in particular plastic foil, at least preceding the step of spraying the foam insulation material on top of the fagade layer. This may help to prevent that the foam insulation material that gets sprayed into the moulding space also gets to adhere to those sides of the mould.

[0040] The invention also relates to a pre-fabricated insulated concrete wall for a casco of a prefab house according to claims 12-15.

[0041] Further preferred embodiments of the invention are stated in the dependent subclaims.

[0042] DETAILED DESCRIPTION OF THE DRAWINGS

[0043] The invention shall now be explained in more detail below by means of describing some exemplary embodiments in a non-limiting way with reference to the accompanying drawings, in which:

[0044] - Fig. 1 shows a step of preparing of a mould to be used for the method according to the invention, in which part of the sides are left away for increased visibility;

[0045] - Fig. 2 shows a step of providing a pre-assembled fagade element with anchoring elements;

[0046] - Fig. 3 and 4 show steps of placing fagade elements into the mould;

[0047] - Fig. 5 shows a step of wrapping the sides and inserts with plastic foil;

[0048] - Fig. 6 shows a step of spraying a first sub-layer of foam insulation material;

[0049] - Fig. 7 shows a step of placing lattice girders;

[0050] - Fig. 8 shows a step of spraying a second sub-layer of foam insulation material;

[0051] - Fig. 9 shows a step of placing wire screens;

[0052] - Fig. 10 shows a step of pouring concrete mixture;

[0053] - Fig. 11 shows a step of demoulding;

[0054] - Fig. 12-17 shows cross-sectional views through the mould after subsequent steps of the method have been performed; and

[0055] - Fig. 18a-i show photographs of the respective steps. In fig. 1 an entire mould has been indicated with the reference numeral 1. The mould 1 has a base 2 and upwardly projecting sides 3 that together delimit an upwardly open moulding space 4.

[0056] The mould 1 is used for performing the inventive method for pre-fabricating an insulated concrete wall W such that it can simply be transported towards a building site to be erected there for forming part of a casco of a house. In the shown example, inserts 5 have been placed on top of the base 2 inside the moulding space 4, for keeping free a window and door opening in the wall W.

[0057] After the mould 1 has been prepared, the method goes on with providing a plurality of pre-assembled fagade elements 7. An example of such a pre-assembled fagade element 7 is shown in fig. 2, where it comprises a rectangular plate-shaped insulation panel 8, for example formed by a layer of EPS or Pll, with stone strips / brick slips 9 at a front side of the panel 8. A plurality of pin-shaped anchoring elements 10 have been fixedly connected to the fagade elements 7 such that they protrude away from a back side of the panel 8.

[0058] Fig. 3 shows that the fagade elements 7 are placed one by one inside the moulding space 4, with the brick slips 9 facing down and coming to lie on top of the base 2, with the back sides of the insulation panels facing upwards, and with the plurality of anchoring elements 10 protruding upwardly into the moulding space 4.

[0059] Fig. 4 shows that the entire base 2 in between the sides 3 and the inserts 5 have been covered with the fagade elements 7. Thus a lower fagade layer FL of the to be pre-fabricated insulated concrete wall W is formed at a lower level inside the moulding space 4. See also fig. 12. This lower fagade layer FL for example may have a thickness of for example approximately 40mm.

[0060] Fig. 5 shows that the sides 3 and the inserts 5 of the mould 1 are covered with plastic foil 14.

[0061] The method then goes on with a step of spraying foam insulation material 15, for example EPS or PU, inside the moulding space 4 on top of the back sides of the insulation panels 8. During this spraying foam enters the moulding space 4 and expands and sets itself in there to form a firm strong closed additional insulation layer on top of the insulation panels 8 of the fagade elements. The spraying of the foam insulation material 15 here takes place in two phases, such that two sub-layers get formed on top of each other. The plastic foil 14 helps to prevent that the sprayed foam insulation material 15 may stick to the sides 3 and inserts 5 of the mould 1.

[0062] Fig. 6 shows the situation after a first phase of the spraying of the foam insulation material 15 has taken place. All back sides of the insulation panels 8 have then been covered with a primary foam insulation sub-layer PFISL of this sprayed foam insulation material 15. During this, the primary foam insulation sub-layer PFISL then has adhered and connected to those back sides of the insulation panels 8 and at a same time also has embedded and connected to first sections of the anchoring elements 10. See also fig. 13.

[0063] Subsequently, elongate metal lattice girders 18 are freely placed inside the moulding space 4 on top of the primary foam insulation sub-layer PFISL. This is shown in fig. 7. Each elongate metal lattice girder 18 comprises two lower longitudinal elongate steel bars 181 and one upper longitudinal elongate steel bar 18u, that are connected with each other through welded stirrups. The lattice girders 18 are placed with their lower steel bars 181 resting on top of the primary foam insulation sub-layer PFISL. See also fig. 14.

[0064] The method then goes on with the spraying of a secondary foam insulation sub-layer SFISL of the foam insulation material 15 inside the moulding space 4 on top of the primary foam insulation sub-layer PFISL.

[0065] Fig. 8 shows the situation after the second phase of the spraying of the foam insulation material 15 has taken place. The entire primary foam insulation sub-layer PFISL in between the sides 3 and the inserts 5 has then been covered with the secondary foam insulation sub-layer SFISL of this sprayed foam insulation material 15. During this, the secondary foam insulation sub-layer SFISL then has adhered and connected to the primary foam insulation sub-layer PFISL, at a same time also has embedded and connected to first section of the anchoring elements 10, and at a same time also has embedded and connected to the two lower longitudinal elongate steel bars 181 of the lattice girder 18. See also fig. 15.

[0066] Thus the two sub-layers together form an intermediate foam insulation layer FIL of the to be pre-fabricated insulated concrete wall W at an intermediate level inside the moulding space 4. At that time second sections of the anchoring elements 10 as well as the upper longitudinal elongate steel bar 18u of the lattice girder 18 still lie freely above the intermediate foam insulation layer FIL at an upper level inside the mould 1. This intermediate foam insulation layer FIL for example may have a thickness of for example approximately 100mm.

[0067] Subsequently, planar metal wire screens 20 are freely placed inside the moulding space 4. This is shown in fig. 9. Each planar metal wire screen 20 comprises two perpendicular sets of longitudinal elongate steel bars that are welded to each other at their crossings. The wire screens 20 are placed resting on top of the upper longitudinal elongate steel bars 18u of the lattice girders 18. At that time the entire wire screens 20 lies freely above the intermediate foam insulation layer FIL at an upper level inside the mould 1. See also fig. 16.

[0068] The method then goes on with the pouring of concrete mixture 24 inside the moulding space 4 on top of the secondary foam insulation sub-layer SFISL.

[0069] Fig. 10 shows the situation after this has taken place. The entire secondary foam insulation sub-layer SFISL in between the sides 3 and the inserts 5 has then been covered with the concrete mixture 24. Thus an upper concrete layer CL of the to be pre-fabricated insulated concrete wall W is formed at an upper level inside the moulding space 4. During this, the concrete mixture 24 then has adhered and connected to this secondary foam insulation sub-layer SFISL, at a same time also has embedded and connected to the second sections of the anchoring elements 10, at a same time also has embedded and connected to the upper longitudinal elongate steel bar 18u of the lattice girder 18, and at a same time also has embedded and connected to the wire screen 20. See also fig. 17. This upper concrete layer CL for example may have a thickness of for example approximately 100mm.

[0070] As soon as the concrete mixture 24 has hardened sufficiently, the thus pre-fabricated double insulated concrete wall W can be taken out of the mould 1. This is shown in fig. 11. The only thing that then needs to be done is to adhere brick slips 9 at missing positions at vertically extending transitions between the respective fagade elements 7.

[0071] Fig. 18 shows some photographs of the various steps of the invention.

[0072] In fig. 18a it can be seen that part of a base of a mould has already been covered with brick slip cladded insulation panels. It can also be seen there that barbed plug bodies of anchoring elements project upwardly into the moulding space.

[0073] In fig. 18b it can be seen that inserts have been wrapped with plastic foil and that a first sub-layer of foam insulation material has been sprayed and expanded on top of the brick slip cladded insulation panels while adhering thereto and while embedding lower parts of the plug bodies.

[0074] In fig. 18c it can be seen that lattice girders have been placed on top of this first expanded sub-layer of foam insulation material.

[0075] In fig. 18d it can be seen that a second sub-layer of foam insulation material has been sprayed and expanded on top of the first expanded sub-layer of foam insulation material while adhering thereto and while embedding lower parts of the lattice girders and while embedding intermediate parts of the plug bodies.

[0076] In fig. 18e it can be seen that wire screens are placed on top of the lattice girders.

[0077] In fig. 18f it can be seen that concrete mixture has been poured on top of the second expanded sub-layer of foam insulation material while adhering thereto and while embedding upper parts of the lattice girders and while embedding upper parts of the plug bodies and while embedding the wire screens.

[0078] In fig. 18g part of the inner concrete layer side is shown of the thus pre-fabricated insulated concrete wall after it has been demoulded from the manufacturing mould, whereas in fig. 18h part of the outer brick slip cladded fagade layer side is shown of the thus prefabricated insulated concrete wall after it has been demoulded from the manufacturing mould. It can be seen there that at transitions between adjacent ones of the fagade elements still some missing brick slips need to be put in place and adhered or otherwise connected to the insulation panels of the fagade elements.

[0079] Finally in fig. 18i the various layers of the thus pre-fabricated insulated concrete wall can be seen after it has been demoulded from the manufacturing mould.

[0080] Besides the shown and described embodiments, numerous variants are possible. For example the dimensions and shapes of the various parts can be altered. The insulation panels of the fagade elements preferably are made out of the same or substantially the same material as the foam insulation material that is to be sprayed on top thereof. This material for example can be the mentioned expanded polystyrene (EPS) or polyurethane (Pll). It is however also possible to use other kinds of insulation materials for the plate-shaped panels of the fagade elements and / or the foam insulation material to be sprayed on top thereof. Instead of using brick slips also other kinds of decorative pieces can be adhered to the plate-shaped panels of the fagade elements.

[0081] It is noted that during manufacturing it is also possible to first make a sub-assembly of the fagade layer and foam insulation layer in a first mould, including the anchoring elements and / or coupling elements and / or concrete-reinforcement elements being partly embedded in the sprayed foam insulation material of the intermediate foam insulation layer, then place this sub-assembly in its entirety into a second mould, after which only concrete has to be poured on top of it for partly embedding the anchoring elements and / or coupling elements and / or concrete-reinforcement elements and for forming the concrete layer, and thus finishing the pre-fabricated insulated concrete wall for a casco of a house.

[0082] In yet another alternative it is then also possible to first make a sub-assembly of the fagade layer and foam insulation layer in a first mould, including the anchoring elements and / or coupling elements and / or concrete-reinforcement elements being partly embedded in the sprayed foam insulation material of the intermediate foam insulation layer, then pour a layer of concrete in a second mould, after which said sub-assembly can be placed in its entirety upside down, that is to say with the portions of the anchoring elements and / or coupling elements and / or concrete-reinforcement elements that are not embedded in the intermediate foam insulation layer, and thus project downwards from out of this intermediate foam insulation layer, into the still wet concrete to get embedded and locked-up therein after hardening of the concrete.

[0083] It should be understood that various changes and modifications to the presently preferred embodiments can be made without departing from the scope of the invention, and therefore will be apparent to those skilled in the art. It is therefore intended that such changes and modifications be covered by the appended claims.

Claims

CLAIMS1. Method for pre-fabricating an insulated concrete wall (W) for a casco of a house, comprising the steps:• preparing a mould (1) having a base (2) and upwardly projecting sides (3) that together delimit an upwardly open moulding space (4);• placing fagade elements (7) inside the moulding space (4) on top of the base (2) to form a fagade layer (FL) of the insulated concrete wall (W); and• pouring concrete mixture (24) into the moulding space (4) to form a concrete layer (CL) of the insulated concrete wall (W), characterized in that, the method further comprises an intermediate step of:• spraying foam insulation material (15) inside the moulding space (4) on top of the fagade layer (FL) to adhere and connect thereto and form an intermediate foam insulation layer (FIL) of the insulated concrete wall (W), wherein the concrete mixture (24) is poured on top of the intermediate foam insulation layer (FIL) to adhere and connect thereto.

2. Method according to claim 1, wherein the fagade elements (7) comprise plate-shaped insulation panels (8) with decorative pieces, in particular brick slips (9), connected to one side thereof, and wherein the fagade elements (7) are placed inside the moulding space (4) on top of the base (2) such that the decorative pieces face down towards the base (2) of the mould (1), and wherein the foam insulation material (15) is sprayed on top of the plate-shaped insulation panels (8) to adhere and connect thereto and form a double insulation layer of the insulated concrete wall (W).

3. Method according to claim 1 or 2, wherein anchoring elements (10) are fixedly connected to the fagade elements (7) such that they get to protrude upwardly into the moulding space (4), wherein the foam insulation material (15) is sprayed on top of the fagade layer (FL) while embedding and connecting to first sections of the anchoring elements (10), and wherein the concrete mixture (24) is poured on top of the intermediate foam insulation layer (FIL) while embedding and connecting to second sections of the anchoring elements4. Method according to claim 3, wherein the anchoring elements (10) are pin-shaped, and in particular comprise assemblies of metal screws and plastic plug bodies, preferably barbed plug bodies, wherein the metal screws are screwed from a front side through the fagade elements (7) to at a back side thereof grip into the plastic plug bodies.

5. Method according to one of the preceding claims, wherein coupling elements are freely placed inside the moulding space (4) above the fagade layer (FL) to come to lie with first portions at an intermediate level and with second portions at an upper level of the moulding space (4), wherein the foam insulation material (15) is sprayed on top of the fagade layer (FL) while embedding and connecting to the first portions of the coupling elements, and wherein the concrete mixture (24) is poured on top of the intermediate foam insulation layer (FIL) while embedding and connecting to the second portions of the coupling elements.

6. Method according to claim 5, wherein the spraying of the foam insulation material (15) takes place in primary and secondary foam insulation sub-layers, wherein the primary foam insulation sub-layer is sprayed on top of the fagade layer (FL), wherein the coupling elements are freely placed with their first portions on top of the primary foam insulation sub-layer, and wherein the secondary foam insulation sub-layer is sprayed on top of the primary foam insulation sub-layer while embedding and connecting to the first portions of the coupling elements.

7. Method according to claim 5 or 6, wherein the coupling elements comprise elongate metal lattice girders (18) of which elongate parallel bars form said first and second portions thereof, wherein the elongate metal lattice girders (18) are placed inside the moulding space (4) with longitudinal axis of their bars extending parallel to the base (2) of the mould (1).

8. Method according to one of the preceding claims, wherein concrete-reinforcement elements are freely placed inside the moulding space (4) above the fagade layer (FL) to come to lie at an upper level of the moulding space (4), wherein the concrete mixture (24) is poured on top of the intermediate foam insulation layer (FIL) while embedding and connecting to the concrete-reinforcement elements.

9. Method according to claim 8, wherein the concrete-reinforcement elements comprise planar metal wire screens (20), wherein the planar metal wire screens (20) are placed inside the moulding space (4) with their planar axes extending parallel to the base (2) of the mould (1).

10. Method according to one of claims 5-7 in combination with one of claims 8-9, wherein the concrete-reinforcement elements are placed upon and connected to the second portions of the coupling elements.

11. Method according to one of the preceding claims, wherein the sides (3) of the mould (1) are covered with a anti-sticking coating or foil, in particular plastic foil (14), preceding the step of spraying the foam insulation material (15) on top of the fagade layer (FL).

12. Insulated concrete wall (W) for a casco of a prefab house, in particular premanufactured with the method according to one of the preceding claims, comprising:• a fagade layer (FL) of fagade elements (7); and• a concrete layer (CL) of hardened concrete mixture (10), characterized in that, it further comprises:• an intermediate foam insulation layer (FIL) of foam insulation material (15) that has been sprayed and set against the fagade layer (FL) to adhere and connect thereto, wherein the concrete layer (CL) has hardened against the intermediate foam insulation layer (FIL) to adhere and connect thereto.

13. Insulated concrete wall according to claim 12, wherein anchoring elements (10) are provided that fixedly connect to the fagade elements (7), of which first sections extend through the intermediate foam insulation layer (FIL) that has been sprayed and set around them, and of which second sections extend into the concrete layer (CL) that has hardened around them.

14. Insulated concrete wall according to claim 12 or 13, wherein coupling elements are provided, of which first portions lie inside the intermediate foam insulation layer (FIL) that has been sprayed and set around them, and of which second portions lie inside the concrete layer (CL) that has hardened around them.

15. Insulated concrete wall according to claim 14, wherein concrete-reinforcement elements are provided, that are connected to the coupling elements and that lie inside the concrete layer (CL) that has hardened around them.

Citation Information

Patent Citations

  • method for joining small facing elements, panels obtained by this method and construction resulting therefrom

    FR1439196A

  • Outer wall panel for building and wall face construction method for building

    JP1996209825A

  • Wall Panel and building wall panel manufacturing method

    KR1020030002618A

  • Prefabricated composite wall panel and method and apparatus for manufacture and installation thereof

    US20100325993A1