Aligner for dumbell-type piles, position and installation

The dumbbell-type driving aligner addresses the issue of twisted piles in photovoltaic parks by applying tension to maintain alignment, reducing maintenance time and environmental impact, and ensuring long-term operation efficiency.

WO2024219957A1PCT designated stage expired Publication Date: 2024-10-24BRAVO PEREZ JUAN CARLOS
View PDF 8 Cites 0 Cited by

Patent Information

Application Number
PCT/MX2024/050025
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-04-20
Filing Date
2024-04-19
Publication Date
2024-10-24

AI Technical Summary

Technical Problem

In photovoltaic parks, the piles in the mechanical structures tend to twist due to the weights of solar panels, torque-tube movement, follower movement, wind forces, and loads, leading to misalignment and requiring frequent maintenance, which is time-consuming and costly, and existing repair methods like replacing piles with concrete footings are inefficient and environmentally impactful.

Method used

A dumbbell-type driving aligner device is designed with precision-cut and bent metal pieces that apply tension to maintain the piles' alignment, using 90° angled pieces joined by 12 mm screws to secure the torque-tube alignment without welding, allowing for quick installation and resistance to environmental forces.

Benefits of technology

The aligner permanently maintains pile alignment, reducing maintenance time to under two hours, minimizing production loss, and is environmentally friendly by avoiding concrete use, thus extending the lifespan of solar park operations while adhering to environmental regulations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure MX2024050025_24102024_PF_FP_ABST
    Figure MX2024050025_24102024_PF_FP_ABST
Patent Text Reader

Abstract

The present invention relates to an industrial model for joining and aligning piles of trackers in photovoltaic farms. The invention is completely unique and is characterised by its special proprietary design. In addition to the design, the invention relates to a method for installation in order to harness sunlight that takes less that 120 minutes, and to the position, complying with environmental regulations.
Need to check novelty before this filing date? Find Prior Art

Description

[0001] DUMBBELL-TYPE DRIVING ALIGNER, POSITION AND INSTALLATION.

[0002] TECHNICAL FIELD OF THE INVENTION.

[0003] This invention relates to mechanical structures and driving for panels in photovoltaic parks.

[0004] OBJECT OF THE INVENTION.

[0005] The purpose of this invention was to develop a device that aligns the pilings from the twist, keeping them permanently aligned and perpendicular to the axis of the torque tube, in the upper part of the Tracker drive, in the mechanical structures of photovoltaic parks. Completely and uniquely characterized by its special and unique design. In addition to its design and position, it also includes an installation process.

[0006] BACKGROUND

[0007] The present invention was developed due to the need to align the top-mounted piles' bend. The designer and manufacturer of the piles and mechanical structures was asked to provide a repair procedure for said piles.

[0008] The manufacturer provided a repair manual, which indicated replacing the piles and adding a concrete footing. The repair time is 7 days, due to the construction and setting times of the concrete with accelerator. Furthermore, the execution time is very slow. This repair of the fault is medium-term, as the faults will twist or buckle again within a period of no more than 4 years.

[0009] The pile driver aligns the piles directly at the top where needed. The idea arose from the need to extend the repair time and optimize execution times, as they depend on the time the solar panels stop following the sun's path, which impacts the solar farm's production loss.

[0010] The process for creating this aligner device included four phases: Design, Manufacturing, Inspection, and Monitoring. Each phase required an evaluation of the results of the previous process, ensuring a functional, high-quality, robust, and durable product. High-precision equipment is required to manufacture each of the components that make up this device, as the formed parts require precise laser cutting and bending.

[0011] Design: Using computerized precision, our design was laser-cut from a plate and flat-planar laser-cut. To prevent thermal changes, the metal was cold-bent, avoiding heating with welding and assembly with multiple pieces. The idea worked, resulting in a high-quality, well-presented piece.

[0012] Manufacturing: This phase was simpler, with the extended plan design resulting in sequential manufacturing, which is: cutting, bending, assembly, welding, and galvanizing.

[0013] Inspection: Starting with a visual inspection, we then checked its angles and measurements, and the result was perfect.

[0014] Monitoring: It was installed to monitor the actions and reactions to stresses caused by wind, loads, and weather. The dumbbell-type pile driver performed reliably, firmly, and solidly, despite the stresses it was subjected to.

[0015] TECHNICAL PROBLEM TO BE SOLVED.

[0016] Piles experience movement, in addition to the weight of the panels, the pipe torque, the movement of the follower, wind forces, and the side-to-side loads from their mechanical movement. All of these factors cause the piles to twist or bend outside their tolerance. The pile aligner keeps the piles in their correct position, permanently and maintenance-free.

[0017] BRIEF DESCRIPTION OF THE FIGURES

[0018] Figure 1: is an isometric view of the left aligner for dumbbell driving. Figure 2: is an isometric view of the right aligner for dumbbell driving.

[0019] Figure 3: is a REAR view of the Left Aligner for dumbbell type driving.

[0020] Figure 4: is a REAR view of the Right Aligner for Dumbbell-Type Driving

[0021] Figure 5: is a RIGHT SIDE view of the Left Aligner for Dumbbell Type Driving

[0022] Figure 6: is a RIGHT SIDE view of the Right Aligner for Dumbbell Type Driving

[0023] Figure 7: is a LEFT SIDE view of the Right Aligner for Dumbbell Type Driving

[0024] Figure 8: is a LEFT SIDE view of the Left Aligner for Dumbbell Type Driving

[0025] Figure 9: is a REAR view of the Right Aligner for Dumbbell Type Driving.

[0026] Figure 10: is a REAR view of the Left Aligner for Dumbbell Type Driving

[0027] Figure 1 1: is a COMPLETE AND EXPLODED VIEW OF ALL THE PARTS SURROUNDING THE Dumbbell-type Driving Aligner

[0028] Figure 12: is a COMPLETE AND ASSEMBLED view WITH ALL THE PARTS SURROUNDING the Dumbbell-type Driving Aligner

[0029] Figure 13: is a COMPLETE ISOMETRIC VIEW AND ASSEMBLY OF ALL THE PARTS SURROUNDING the Dumbbell-type Driving Aligner. DETAILED DESCRIPTION OF THE INVENTION

[0030] The Dumbbell type Driving Aligner consists of 2 Pieces. PIECE “C1” is on the Left side (Figure 1, 3, 5, 7, 10, 1 1, 12, 13). PIECE “B” on the Right side (Figure 2, 4, 6, 8, 9, 11, 12, 13). PIECES “A” and “B” (Figure 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 1 1, 12, 13) are designed with 90° angles which align with the clocks which transmit the center of the torque-tube in addition to the tension and weight, as a result the driving is aligned. The PIECES “A” and “B” (Figure 1,2,3,4,5,6,7,8,9,10,1 1,12,13) ​​are joined to the pile, with 6 screws of 12 mm grade 5, to a Torque of 77 Nm each screw. The 2 Pieces exert a tension and achieve the transverse alignment to the torque-tube aligning the turn of the pile.

[0031] The pile driver is very beneficial because the pile driver manufacturer offers pile replacement and the construction of a reinforced concrete footing with a compressive strength of 250 kilos per square inch. This solution is time-consuming and more expensive to implement. It wastes the time spent on the pile driver replacement and civil works. Its construction also takes a long time. The construction of the cast footing will take an average of 7 days, which represents poor performance for the tracker and does not provide a permanent solution.

[0032] Considering the ENVIRONMENTAL IMPACT MANIFEST and the TECHNICAL SUPPORTING STUDY, our aligner adheres to the commitments to environmental compliance by not dumping concrete, and thus no modification would be required from the authority.

[0033] Since the solar park was built, the piles have not worked properly and are bending torsionally. This is due to the movement of the actuator, which shifts loads from one side to the other depending on the position of the sun, and the wind forces, causing the top of the pile to twist out of tolerance.

[0034] The pile driver supports these movements and forces, and without replacing the pile, it solves the problem because this invention applies tension to the upper part of the pile. In addition, its shape and assembly do not impede its operation. Another advantage is that it can be installed in less than two hours and does not affect production. The solution is healthy, permanent, solid, and environmentally friendly.

[0035] THE ASSEMBLY AND INSTALLATION PROCESS

[0036] The following assembly sequence of the Dumbbell-type Driving Aligner and its installation of THE DEVICE CALLED “DUMBBELL-TYPE DRIVING ALIGNER” is described below, which consists of the following sequence:

[0037] 1. Identify the Tracker and the driving from the theoretical list of the plan, to the physical one in the field.

[0038] 2. Cordon off the area.

[0039] 3. Set to 0 o or attack position the Tracker.

[0040] 4. Take photographs and evidence of the degrees and averages of current conditions.

[0041] 5. Measure the height of the torque-tube, with an optical level.

[0042] 6. Place the support to hold the Tracker at its correct height and position.

[0043] 7. Unscrew the clock, (place the screws in the tank or jar)

[0044] 8. Unscrew the mechanical stop to move it and make room.

[0045] 9. Remove the watch.

[0046] 10. Place the 2-piece alignment device in place, leaving the drive in the middle, and placing the narrower piece inside the drive channel.

[0047] 1 1. Screw it with 6 screws of 12 mm to 77 Nm of torque

[0048] 12. Adding an extra clock and giving space to be screwed,

[0049] 13. Use a lever to straighten the pile.

[0050] 14. Taking advantage of the force exerted, the 2 clocks are screwed together with 4 screws.

[0051] 12 mm at a torque of 77 Nm on each clock.

[0052] 15. Lower the support tower.

[0053] 16. Check alignment with the torque-tube.

[0054] 17. Take stockings and photographs as evidence for the report

[0055] 18. Raise the signage and remove the cordon.

Claims

CLAIMS Having described my invention, I consider as novelty and therefore claim as my exclusive property the contents of the following clauses: 1 DUMBBELL-TYPE DRIVING ALIGNER I claim that it not be reproduced, copied, partially, totally, similar, or in the way it solves the turn of the piles, because this device keeps them from continuing to function transversely to the Tracker axis, aligning so that it works even, firm, solid and complying with environmental standards. The device consists of 2 side pieces screwed to the pile, designed with 90 ° angles that align with the clocks which transmit the center of the torque-tube in addition to the tension and weight, as a result the pile is aligned, this gives useful life to the high-density polyurethane bearings that are directly coupled to the clocks, resulting in the reduction of loads on the clocks and the pressure exerted on the mechanical stop, less wear on the actuator, motor and bearings, prolonging their useful life. 2.- THE ASSEMBLY AND INSTALLATION PROCESS: I claim that the assembly and placement process of the device called "dumbbell-type driving aligner" is my authorship and must not be copied in part, in whole or in a similar way without my authorization, which consists of the following sequence:

1. Identify the Tracker and the driving from the theoretical list of the plan, to the physical one in the field.

2. Cordon off the area.

3. Set to 0 o or attack position the Tracker.

4. Take photographs and evidence of the degrees and averages of current conditions.

5. Measure the height of the torque-tube, with an optical level.

6. Place the support to hold the Tracker at its correct height and position.

7. Unscrew the clock, (place the screws in the tank or jar) 8. Unscrew the mechanical stop to move it and make room.

9. Remove the watch.

10. Place the 2-piece alignment device in that location, leaving the drive in the middle, placing the narrowest piece inside the drive channel. 1 1. Screw it with 6 screws of 12 mm at 77 Nm 12. Adding an extra clock and giving space to be screwed, 13. Use a shovel to straighten the pile.

14. Taking advantage of the force exerted, the 2 clocks are screwed together with 4 screws. 12 mm at a torque of 77 Nm at each stop.

15. Lower the support tower.

16. Check alignment with the torque-tube.

17. Take measurements and photographs of evidence for the report 18. Raise the signage and remove the cordon. 3.- POSITION OF THE DEVICE: I claim the position and height where it is placed and screwed to the top of the Inca as part of my invention.

Citation Information

Patent Citations

  • Multi-point driving flat single-shaft tracking support adaptive to complex terrains

    CN115313990A

  • Spindle connection structure of solar uniaxial tracker

    CN203788228U

  • Locking device for solar tracker

    ES1285444U

  • Rolling to hold axes on support pillars

    ES1293486U

  • Support system for rotation axes and solar tracker with such system

    ES1297897U