Construction device implementing ex-situ solidification and Anti-scouring of fluidized solidified soil in offshore wind power

By designing offshore wind current-state solidified soil off-shortification anti-short construction device including mixing module, feeding module, mixing module, feeding module and transportation module, continuous stirring and transportation are achieved, and construction efficiency is improved. Quality solves the existing construction efficiency and poor results.

WO2024230323A1PCT designated stage expired Publication Date: 2024-11-14CCCC HARBOUR (SHANGHAI) SCI & TECH CO LTD +3
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
PCT/CN2024/082295
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-05-09
Filing Date
2024-03-18
Publication Date
2024-11-14

AI Technical Summary

Technical Problem

The mixing efficiency and effect of the existing offshore wind current-state solidified soil anti-short construction device is not ideal, and the construction efficiency is low, and there is a lack of mature complete sets of construction equipment.

Method used

A construction device including the first stirring module, the feeding module, the second stirring module, the small feeding module and the transportation module are designed. Through continuous stirring and continuous transportation, the offshore wind current-state solidified soil difference is realized. The construction of anti-shrinking and anti-shrinking has improved construction efficiency and quality.

Benefits of technology

Through continuous, standardized and efficient construction methods, the existing construction problem is solved, the on-site construction window period is saved, the construction quality is ensured, and the construction is completed smoothly during a period of high tide and low tide.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN2024082295_14112024_PF_FP_ABST
    Figure CN2024082295_14112024_PF_FP_ABST
Patent Text Reader

Abstract

The present application discloses a construction device implementing ex-situ solidification and anti-scouring of fluidized solidified soil in offshore wind power, comprising: a first stirring module, a feeding module, a second stirring module, an auxiliary material feeding module, and a transportation module. The feeding module is connected to the first stirring module and the second stirring module, the auxiliary material feeding module is connected to the second stirring module, and the transportation module is connected to the second stirring module. The present application can make the construction method continuous, standardized, efficient, etc., and effectively solves the problem that existing construction is rough; and by means of continuous stirring and continuous transportation, the field construction window period is shortened.
Need to check novelty before this filing date? Find Prior Art

Description

Construction device for off-site solidification and anti-scouring of offshore wind power dynamic solidified soil Technical Field

[0001] The present application belongs to the technical field of offshore wind power foundation anti-scour construction, and specifically relates to a construction device for ex-situ solidification and anti-scour of offshore wind power dynamic solidified soil. Background Art

[0002] In recent years, protection against scour pits caused by scour on existing offshore wind turbine foundations and against scour on foundations of new offshore wind turbine projects has attracted increasing attention from owners, designers, and contractors in the offshore wind turbine industry. Among existing scour prevention solutions, riprap, sand blankets, and gangway systems are the most commonly used, but their effectiveness is poor. Underwater riprap and sand blankets create gaps between stones and sand blankets, which, over time, can re-form under the influence of currents and tidal currents, resulting in poor protection and a short lifespan. Fluidized soil ex-situ solidification scour prevention technology, a recently emerging technology for preventing scour on offshore wind turbine pile foundations, has been applied in numerous offshore wind turbine projects in China, primarily encompassing in-situ and ex-situ solidification solutions. As a representative ex-situ solidification method, solidified soil fill construction primarily involves soil transportation, on-site mixing, and pumping. However, there is no complete set of mature construction equipment currently available in China. While existing assembly equipment can meet construction requirements, its mixing efficiency and effectiveness need to be further improved.

[0003] Based on this, there is an urgent need to improve, integrate and research the existing ex-situ solidification construction equipment for solidified soil, so as to improve the on-site construction efficiency while ensuring good mixing effect.

[0004] Utility Model Content

[0005] In view of the shortcomings or deficiencies of the above-mentioned prior art, the technical problem to be solved by the present application is to provide a construction device for ex-situ solidification and scouring prevention of offshore wind power dynamic solidified soil.

[0006] To solve the above technical problems, this application is implemented through the following technical solutions:

[0007] The present application proposes a construction device for ex-situ solidification and anti-scouring of offshore wind power dynamic solidified soil, including: a first mixing module, a loading module, a second mixing module, a small material feeding module and a transportation module. The loading module is connected to the first mixing module and the second mixing module, the small material feeding module is connected to the second mixing module, and the transportation module is connected to the second mixing module.

[0008] Optionally, in the above-mentioned offshore wind power dynamic solidified soil ex-situ solidification and anti-scour construction device, the first stirring module includes: a box body and a stirring structure, and the stirring structure is arranged in the box body.

[0009] Optionally, in the above-mentioned offshore wind power dynamic solidified soil ex-situ solidification and anti-scour construction device, the feeding module includes: a spiral feeding structure, the feeding port of the spiral feeding structure is connected to the first stirring module, and the discharge port of the spiral feeding structure is connected to the second stirring module.

[0010] Optionally, in the above-mentioned offshore wind power dynamic solidified soil ex-situ solidification and anti-scour construction device, the second mixing module includes: a vertical shaft mixer.

[0011] Optionally, in the above-mentioned offshore wind power dynamic solidified soil ex-situ solidification and anti-scouring construction device, the vertical shaft mixer includes: a single-layer type or a double-layer type.

[0012] Optionally, in the above-mentioned offshore wind power dynamic solidified soil ex-situ solidification and anti-scour construction device, the small material feeding module includes: a storage bin and a material delivery pipe, and the material delivery pipe connects the storage bin and the second stirring module.

[0013] Optionally, in the above-mentioned offshore wind power dynamic solidified soil ex-situ solidification and anti-scour construction device, the small material feeding module also includes: a meter.

[0014] Optionally, in the above-mentioned offshore wind power dynamic solidified soil ex-situ solidification and anti-scour construction device, the transportation module includes: a pipeline and a pump, and the pipeline connects the pump and the second stirring module.

[0015] Optionally, the above-mentioned offshore wind power dynamic solidified soil ex-situ solidification and anti-scour construction device also includes: a control module, which is electrically connected to the first stirring module, the feeding module, the second stirring module, the small material feeding module and the transportation module.

[0016] Compared with the existing technology, this application has the following technical effects:

[0017] The first mixing module of the present application pre-mixes the raw materials and transfers the pre-mixed materials to the second mixing module through the feeding module. The small material feeding module adds small materials such as curing agent to the second mixing module. The second mixing module continuously mixes and blows the mixed materials to the construction site through the transportation module to carry out the off-site solidification and anti-scouring operation of offshore wind power dynamic solidified soil. Through the above settings, the present application can achieve continuous, standardized, high-efficiency construction, etc., effectively solving the problem of relatively rough existing construction. Through continuous mixing and continuous transportation, the on-site construction window period is saved and the construction quality is guaranteed. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Other features, objects and advantages of the present application will become more apparent upon reading the detailed description of non-limiting embodiments made with reference to the following drawings:

[0019] FIG1 is a schematic diagram of a construction device for ex-situ solidification and scour prevention of offshore wind power dynamic solidified soil according to an embodiment of the present application;

[0020] Figure 2: A front view of the structure shown in Figure 1;

[0021] Figure 3: A side view of the structure shown in Figure 1;

[0022] Figure 4: A flow chart of the construction process in one embodiment of the present application;

[0023] Figure 5: Schematic diagram of on-site positioning of a construction vessel in one embodiment of the present application;

[0024] In the figure: single pile 0, box 1, loading module 2, second mixing module 3, small material feeding module 4, transportation module 5, control module 6. DETAILED DESCRIPTION

[0025] The following will be combined with the drawings in the embodiments of this application to clearly and completely describe the technical solutions in the embodiments of this application. Obviously, the embodiments described are only part of the embodiments of this application, not all of the embodiments. Based on the embodiments in this application, all other embodiments obtained by ordinary technicians in this field without making creative efforts are within the scope of protection of this application.

[0026] As shown in Figures 1 to 3, the construction device for ex-situ solidification and anti-scouring of offshore wind power dynamic solidified soil includes: a first mixing module, a loading module 2, a second mixing module 3, a small material feeding module 4 and a transportation module 5. The loading module 2 is connected to the first mixing module and the second mixing module 3, the small material feeding module 4 is connected to the second mixing module 3, and the transportation module 5 is connected to the second mixing module 3.

[0027] In this embodiment, the first mixing module pre-mixes the raw materials and transfers the pre-mixed materials to the second mixing module 3 through the feeding module 2. The small material feeding module 4 adds small materials such as curing agents to the second mixing module 3. The second mixing module 3 continuously mixes and blows the mixed materials to the construction site through the transportation module 5 to perform the off-site solidification and anti-scouring operation of offshore wind power dynamic solidified soil. Through the above settings, the continuous, standardized, and high-efficiency construction characteristics of this application effectively solve the problem of the relatively rough existing construction. Through continuous mixing and continuous transportation, the on-site construction window period is saved and the construction quality is guaranteed.

[0028] Specifically, the first stirring module includes: a box body 1 and a stirring structure, and the stirring structure is arranged in the box body 1.

[0029] In this embodiment, a mixing structure is provided in the box 1 to pre-mix raw materials such as soil, cement and water.

[0030] Optionally, the box body 1 is made of steel plates, or is modified from a ship.

[0031] Optionally, the solid raw materials among the raw materials are loaded by a crane and / or a ship-mounted excavator; and the liquid raw materials among the raw materials are added by a pump.

[0032] Optionally, the stirring structure includes but is not limited to a spiral stirring structure.

[0033] Optionally, the feeding module 2 includes: a spiral feeding structure, the feeding port of the spiral feeding structure is connected to the first stirring module, and the discharging port of the spiral feeding structure is connected to the second stirring module 3.

[0034] In this embodiment, the feeding module 2 includes but is not limited to a spiral feeding structure. The feeding function satisfies the stirring function of the mixer and the pumping function of on-site construction, and transports the material pre-mixed by the first stirring module to the second stirring module 3. Of course, in addition to the spiral feeding structure, technical personnel in this field can also use mud pumps, mud suction pumps and other equipment.

[0035] Optionally, the second stirring module 3 includes but is not limited to a vertical shaft mixer, and the stirring power and stirring capacity of the vertical shaft mixer meet the pumping efficiency and construction efficiency of on-site construction.

[0036] Optionally, the vertical shaft mixer includes but is not limited to a single-layer type or a double-layer type, and those skilled in the art can make an adaptive selection based on actual construction efficiency.

[0037] Specifically, the small material feeding module 4 includes: a storage bin and a material delivery pipe, and the material delivery pipe connects the storage bin and the second stirring module 3 .

[0038] In this embodiment, small materials, such as curing agent, are stored in the storage bin and fed into the second stirring module 3 through the feeding pipe.

[0039] Optionally, the small material feeding module 4 further includes: a meter, so that the amount of small material added is accurate, ensuring that the mixed curing agent reaches the design requirement, which is conducive to standardized and precise operation.

[0040] Optionally, the meter includes but is not limited to a gravity metering device, a time metering device or a flow metering device.

[0041] Specifically, the transport module 5 includes: a pipeline and a pump, and the pipeline connects the pump and the second stirring module 3 .

[0042] In this embodiment, the pipeline, with the assistance of the pump, transports the solidified soil mixed by the second mixing module 3 to the filling construction site. The motor that provides power for the pump has a power that meets the efficiency requirements of the actual construction.

[0043] Optionally, the pump includes but is not limited to a pump truck or a mud pump.

[0044] Optionally, the construction device for ex-situ solidification and anti-scouring of offshore wind power dynamic solidified soil also includes: a control module 6, which is electrically connected to the first stirring module, the feeding module 2, the second stirring module 3, the small material feeding module 4 and the transportation module 5.

[0045] In this embodiment, by providing a control module 6, the automation, integration and digital operation of the construction device for ex-situ solidification and anti-scouring of offshore wind power dynamic solidified soil is realized, thereby improving the construction efficiency.

[0046] As shown in FIG4 , the construction method of the construction device for ex-situ solidification and anti-scour of offshore wind power dynamic solidified soil in this embodiment includes the following steps:

[0047] Pile foundations are scanned and measured to determine the volume of blown fill. After the installation of offshore wind turbines is completed, regular pile foundation scans should be conducted on the surrounding scouring conditions of the single pile 0 foundation according to the design requirements. When the scouring reaches the design requirements and anti-scouring construction is required, the volume of solidified soil blown fill should be determined based on the specific scouring conditions.

[0048] Determine the soil excavation plan and the mix ratio of solidified soil; before on-site solidified soil filling construction, the source of the soil should be determined first, and after the source of the soil is determined, preliminary index tests should be carried out to determine the final mix ratio of solidified soil.

[0049] The construction vessel carrying the construction equipment enters the point for positioning; the construction vessel's positioning position is determined in advance according to the specific scouring conditions, and the positioning system and the anchor boat are used to assist in anchoring and positioning, and the final position of the outlet end of the solidified soil filling hose is determined, as shown in Figure 5.

[0050] Before construction equipment is put into operation, it is necessary to conduct equipment commissioning to ensure that the equipment is running normally during the trial operation. At the same time, spare parts and equipment that are easily damaged should be equipped with backup devices to solve the construction interruption caused by sudden equipment damage on site.

[0051] The first mixing module adds soil, cement and water for pre-mixing; the pre-prepared soil and cement are added to the box 1 of the first mixing module through lifting equipment such as a crane, an excavator or a cantilever crane, and water is added to the box 1 through an automatic metering water supply system to pre-mix the mixture added to the pre-mixing box 1.

[0052] The feeding module 2 feeds the material; the pre-mixed mud in the box 1 of the first mixing module is continuously transported to the second mixing module 3 through a spiral feeding structure or a mud pump.

[0053] The small material feeding module 4 adds material, and the second stirring module 3 stirs; when the feeding module 2 continuously feeds material, the curing agent is continuously added to the second stirring module 3 through the small material feeding module 4 according to the determined mix ratio, and the second stirring module 3 continuously transports the stirred solidified soil to the transport module 5.

[0054] Transporting slurry and solidifying soil by blow-filling. The mixed solidifying soil is continuously transported to the periphery of the pile foundation through the pipeline of the transport module 5. The transport pressure is dynamically monitored during the transport process to ensure that the transport pressure is normal.

[0055] Monitor the solidified soil blowing and filling operation to determine the end time of the blowing and filling operation; dynamically monitor the solidified soil blowing and filling situation, and stop the blowing and filling construction after the scouring pit is filled.

[0056] Clean the construction equipment; after the solidified soil filling construction is completed, clean the construction equipment as a whole to prepare for the next machine position construction.

[0057] After the construction is completed, the construction vessel moves to the next construction site; an anchor boat is used to anchor the construction vessel, and then the vessel is withdrawn and moved to the next machine position for solidified soil filling construction.

[0058] This embodiment features a simple construction method and well-connected construction steps, effectively addressing the relatively crude nature of existing construction techniques. It boasts specialized, refined, and highly efficient construction. Through continuous mixing and transportation, it reduces on-site construction time and ensures construction quality. Furthermore, this embodiment's efficiency ensures that the ex-situ curing and anti-scouring construction of a single offshore wind turbine foundation using fluidized solidified soil can be successfully completed during a single high and low tide period.

[0059] Optionally, the pile foundation scanning is performed by using a multi-beam depth sounder to perform regular pile foundation scanning.

[0060] Optionally, the determined soil excavation plan includes but is not limited to a plan of transporting soil to shore by a transport ship or a plan of excavating soil from the sea by a cutter suction vessel.

[0061] Specifically, the factors to be considered in the plan of transporting onshore soil by transport ship include but are not limited to the analysis of onshore soil resources and economic factors; the staff will conduct a thorough investigation and analysis of the soil resources selected onshore, and determine the details of the final plan by comparing the efficiency and economic plans in terms of transportation distance, freight and soil source.

[0062] Specifically, the considerations for the cutter suction vessel to extract soil from the sea include, but are not limited to, determining the final details of the plan based on the conditions of the construction sea area, the window period for soil extraction operations, soil extraction efficiency, and the amount of soil stored in the cutter suction vessel.

[0063] Specifically, the raw materials include but are not limited to soil, cement, water and curing agent.

[0064] In this embodiment, after determining the source of the soil, the soil is pre-tested to determine the indicators and the final mix ratio is determined. It is necessary to conduct experiments to determine the mix ratio of soil, cement, water and curing agent to ensure that the technical indicators of the mixed and formed solidified soil meet the design requirements.

[0065] Optionally, the monitoring is carried out by underwater cameras, underwater robots or underwater divers, so as to dynamically understand the underwater filling situation.

[0066] Optionally, the cleaning is performed simultaneously with the construction vessel raising the anchor, thereby saving the offshore operation window period, improving construction efficiency, and enabling the construction equipment to operate efficiently.

[0067] In the description of this application, unless otherwise expressly specified or limited, the terms "connected," "connect," and "fixed" should be understood in a broad sense. For example, they can refer to fixed connections, detachable connections, or integration; mechanical connections or electrical connections; direct connections or indirect connections through an intermediate medium; and can refer to internal communication between two components or interaction between two components. Those skilled in the art will understand the specific meanings of the above terms in this application based on specific circumstances.

[0068] In this application, unless otherwise expressly specified or limited, a first feature being "above" or "below" a second feature may include the first and second features being in direct contact, or may include the first and second features being in contact not directly but through another feature between them. Moreover, a first feature being "above," "above," and "above" a second feature may include the first feature being directly above or obliquely above the second feature, or may simply mean that the first feature is higher in level than the second feature. A first feature being "below," "below," and "below" a second feature may include the first feature being directly below or obliquely below the second feature, or may simply mean that the first feature is lower in level than the second feature.

[0069] In the description of this embodiment, the terms "upper," "lower," "left," "right," and other orientations or positional relationships are based on the orientations or positional relationships shown in the accompanying drawings and are intended solely for ease of description and simplified operation. They do not indicate or imply that the devices or components referred to must have a specific orientation, be constructed, or operate in a specific orientation. Therefore, they should not be construed as limitations on this application. Furthermore, the terms "first" and "second" are used solely for descriptive purposes and have no special meanings.

[0070] The above embodiments are intended only to illustrate the technical solutions of the present application and are not intended to limit the present application. The present application is described in detail with reference to the preferred embodiments. It should be understood by those skilled in the art that the technical solutions of the present application may be modified or replaced by equivalents without departing from the spirit and scope of the technical solutions of the present application and should be included within the scope of the claims of the present application.

Claims

1. A construction device for off-site solidification and anti-scouring of offshore wind power dynamic solidified soil, characterized in that: include: A first stirring module, a feeding module, a second stirring module, a small material feeding module and a transport module, wherein the feeding module is connected to the first stirring module and the second stirring module, the small material feeding module is connected to the second stirring module, and the transport module is connected to the second stirring module.

2. The construction device for off-site solidification and anti-scouring of offshore wind power dynamic solidified soil according to claim 1 is characterized in that: The first stirring module comprises: a box body and a stirring structure, and the stirring structure is arranged in the box body.

3. The construction device for off-site solidification and anti-scouring of offshore wind power dynamic solidified soil according to claim 1 is characterized in that: The feeding module comprises: a spiral feeding structure, a feeding port of the spiral feeding structure is connected to the first stirring module, and a discharging port of the spiral feeding structure is connected to the second stirring module.

4. The construction device for off-site solidification and anti-scouring of offshore wind power dynamic solidified soil according to claim 1 is characterized in that: The second stirring module comprises: a vertical shaft mixer.

5. The construction device for off-site solidification and anti-scouring of offshore wind power dynamic solidified soil according to claim 4 is characterized in that: The vertical shaft mixer includes: a single-layer type or a double-layer type.

6. The construction device for off-site solidification and anti-scouring of offshore wind power dynamic solidified soil according to claim 1 is characterized in that: The small material feeding module comprises: a storage bin and a material delivery pipe, and the material delivery pipe connects the storage bin and the second stirring module.

7. The construction device for off-site solidification and anti-scouring of offshore wind power dynamic solidified soil according to claim 6 is characterized in that: The small material feeding module also includes: a meter.

8. The construction device for off-site solidification and anti-scouring of offshore wind power dynamic solidified soil according to claim 1 is characterized in that: The transport module comprises: a pipeline and a pump, and the pipeline connects the pump and the second stirring module.

9. The construction device for off-site solidification and anti-scouring of offshore wind power dynamic solidified soil according to any one of claims 1 to 8, characterized in that: Also includes: A control module is electrically connected to the first stirring module, the feeding module, the second stirring module, the small material feeding module and the transport module.

Citation Information

Patent Citations

  • Construction method for preparing engineering bag by curing marine sludge

    CN113024057A

  • Wind power single pile sludge in-situ solidification construction process

    CN113073642A

  • Anti-scour construction device and method for ex-situ solidification of offshore wind power flow-state solidified soil

    CN116378036A

  • Offshore wind power solidified soil anti-scouring workboat

    CN217679051U

  • Solidified soil preparation system for scouring protection of underwater pile foundation of offshore wind turbine

    CN217923763U