Thermoelectric control system and thermoelectric control simulation program
The thermoelectric control system addresses the challenge of managing load fluctuations by automatically constructing control logic for diverse equipment configurations, ensuring efficient and reliable power and heat supply through a control section and load following priority setting section, effectively addressing the limitations of existing systems.
Patent Information
- Application Number
- PCT/JP2024/004342
- Authority / Receiving Office
- WO · WO
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2023-05-08
- Filing Date
- 2024-02-08
- Publication Date
- 2024-11-14
AI Technical Summary
Current thermoelectric control systems face challenges in efficiently managing load fluctuations across diverse equipment configurations, particularly in matching power and heat supply demands in real-time, as they lack a generalized method for automatically constructing control logic that accounts for the unique characteristics of various thermoelectric equipment.
A thermoelectric control system with a control section and load following priority setting section that adjusts planned loads based on input correction values, allowing for automatic construction of control logic across multiple types of thermoelectric equipment, including power generation and heat supply facilities, to ensure seamless load following.
The system enables efficient and automatic construction of control logic for load following across diverse thermoelectric equipment, reducing engineering costs and time, while ensuring reliable power and heat supply by prioritizing load adjustments based on equipment characteristics.
Smart Images

Figure JP2024004342_14112024_PF_FP_ABST
Abstract
Description
Thermoelectric control system and thermoelectric control simulation program
[0001] The present invention relates to a control system that supplies electric power and heat using a plurality of electric power facilities and heat supply facilities, and a simulation program for simulating the operation of this control system.
[0002] With the recent trend toward decarbonization, the equipment used to supply thermoelectric power is becoming more diverse. Examples of such equipment include traditional thermoelectric power generation equipment such as gas engines and boilers, renewable energy equipment such as solar power generation equipment and wind power generation equipment, storage batteries that are often used in combination to absorb fluctuations in renewable energy, hydrogen co-firing engines that use hydrogen as a fuel without emitting carbon dioxide, hydrogen boilers and fuel cells, and hydrogen production equipment such as water electrolysis devices. As the equipment used becomes more diverse in response to customer demands, the systems for controlling that equipment also become more complex. In the following, renewable energy will also be referred to as "renewable energy."
[0003] Controlling heat and power supply requires changing the load of the equipment (for example, the amount of electricity or heat supplied) in response to demand, which changes in real time. In the case of heat supply, there is a margin for supply and demand mismatch because heat can be stored in the header. In contrast, in the case of electricity supply, if a mismatch occurs between supply and demand, the power supply equipment may cut off power, which could result in a blackout. For this reason, load following in electricity supply (operating the equipment load to follow demand so that the power supply matches demand) is more important than in heat supply.
[0004] Load response characteristics differ depending on the heat and power equipment. For example, storage batteries have a faster response than gas engines and can handle high-frequency fluctuations in power demand. However, storage batteries have a limit to the amount of electricity they can store, so they cannot be used for load following at all times. In addition, since the power generation and heat supply capacities differ depending on the equipment, the range in which they can handle load following also differs from equipment to equipment. For this reason, the control logic that determines load distribution must be built taking into account the characteristics of each equipment.
[0005] As mentioned above, in recent years, facilities have become more diverse and facility configurations vary greatly depending on the customer, so the control logic for heat and power facilities is often created each time the facility is configured. This has resulted in higher costs and longer delivery times due to the increased engineering work.
[0006] To address these issues, there is a need for technology that can generalize control methods for load following while taking into account the characteristics of each piece of equipment, and automatically build control logic.
[0007] An example of a conventional control method for supplying power using multiple types of power generation facilities is described in Patent Document 1. In the control method described in Patent Document 1, the load fluctuation to be compensated for is divided into multiple frequency bands through frequency analysis, and the load fluctuation in each frequency band is assigned to one of the distributed power sources (e.g., a gas engine, a micro gas turbine, and a secondary battery) for compensation. This method makes it possible to compensate for load fluctuations by comprehensively controlling multiple types of power generation facilities that have different load fluctuation tracking capabilities.
[0008] Furthermore, conventional technologies include an operation method that determines load allocation to multiple power generation facilities through optimization. This method determines the load that minimizes costs and CO2 emissions by using predicted values of power demand and power generation capacity of renewable energy facilities as conditions, and operates the power generation facilities based on this load (planned load).
[0009] Japanese Patent Application Laid-Open No. 2006-246584
[0010] In conventional technologies such as the control method described in Patent Document 1, the load fluctuation to be compensated for can be allocated to each power generation facility according to the frequency of the load fluctuation, but the magnitude of the load fluctuation is not compensated for. For example, renewable energy facilities such as solar power generation facilities and wind power generation facilities experience large fluctuations in the amount of power generated depending on weather conditions, so other power generation facilities must adjust their power generation amounts to compensate for these fluctuations. However, conventional technologies do not take into account compensation for the magnitude of such load fluctuations.
[0011] Furthermore, the operational method of optimizing load distribution to multiple power generation facilities sets conditions based on predicted values of electricity demand and the amount of power generated by renewable energy facilities. Therefore, if fluctuations occur in which these predicted values deviate significantly from the actual values, it becomes necessary to readjust the planned load, which is an issue.
[0012] As mentioned above, when controlling multiple power generation facilities, a control method must be adopted that can compensate not only for the frequency included in the load fluctuations, but also for the magnitude of the load fluctuations (fluctuations in power demand and fluctuations in the amount of power generated by renewable energy facilities). Furthermore, as mentioned above, such load following technology requires generalized control methods and the ability to automatically construct control logic that can accommodate a variety of facility configurations.
[0013] An object of the present invention is to provide a system that can automatically construct control logic for the entire facility to perform load following for multiple types of heat and power generation facilities with different control characteristics, and a simulation program for this system.
[0014] A thermoelectric control system according to the present invention includes a control unit that controls a plurality of facilities including at least one of power generation facilities and heat supply facilities, and a load following priority setting unit that stores a priority for load following for each of the facilities. The control unit includes a plurality of control modules that control each of the facilities. The control module receives a planned load value, which is a planned load for the facility, and receives a load correction value, which is a value for correcting the load, from a control module that controls the facility with a higher priority. The control module corrects the planned load value using the load correction value to obtain an adjusted load, performs range limiting processing to adjust the adjusted load to fit the load range of the facility controlled by the control module, and outputs the adjusted load after the range limiting processing as a load request value for the facility. A value at which the adjusted load exceeds the load range is output as the load correction value to the control module that controls the facility with a lower priority.
[0015] The thermoelectric control simulation program according to the present invention causes a computer to realize the functions of the control unit, the load following priority setting unit, and the control module of the thermoelectric control system according to the present invention.
[0016] According to the present invention, it is possible to provide a system that can automatically construct control logic for the entire facility to perform load following for multiple types of heat and power generation facilities with different control characteristics, and a simulation program for this system.
[0017] 1 is a diagram showing the configuration of a thermoelectric control system according to a first embodiment of the present invention. FIG. 1 is a diagram showing the internal configuration of a power generation facility control unit and the relationship between the power generation facility control unit and devices that directly exchange data with the power generation facility control unit. FIG. 2 is a diagram showing an example of the configuration of planned load data acquired by a data acquisition unit. FIG. 3 is a diagram showing an example of the configuration of load following priority data stored by a load following priority setting unit. FIG. 4 is a diagram showing the internal configuration of a control module of a power generation facility. FIG. 5 is a diagram explaining the partitioning process of load correction values executed by a partitioning process unit. FIG. 6 is a diagram schematically showing an example of the operation of a power generation facility under load distribution control. FIG. 7 is a diagram showing an example of a screen displayed on a display device by a thermoelectric control system. FIG. 8 is a diagram showing the configuration of a thermoelectric control system according to a second embodiment of the present invention. FIG. 9 is a diagram explaining an example of the process by which a load following priority setting unit determines a load following priority. FIG. 10 is a diagram explaining an example of the process by which a load following priority setting unit changes a load following priority according to the amount of electricity stored in a storage battery. FIG. 11 is a diagram showing an example of a screen displayed on a display device by a thermoelectric control system according to the second embodiment. FIG. 12 is a diagram explaining another example of the process by which a load following priority setting unit determines a load following priority. FIG. 13 is a diagram showing an example of a screen displayed on a display device by a thermoelectric control system according to the second embodiment. FIG. 1 is a diagram for explaining an example of a process in which a load following priority setting unit determines a load following priority according to the accumulated time for which load following operation of a power generation facility has been performed. FIG. 2 is a diagram showing an example of a screen displayed on a display device by a thermoelectric control system according to a second embodiment. FIG. 3 is a diagram showing a configuration realized by a thermoelectric control simulation program according to a third embodiment of the present invention. FIG. 4 is a diagram showing an example of a screen displayed on a display device by a thermoelectric control simulation program according to the third embodiment. FIG. 5 is a diagram showing a configuration of a thermoelectric control system according to a fourth embodiment of the present invention. FIG. 6 is a diagram showing an example of the configuration of planned load data output by a thermoelectric planning unit. FIG. 7 is a diagram showing an example of the configuration of load following priority data output by a load following priority setting unit to a power generation facility control unit and a heat supply facility control unit.
[0018] The thermoelectric control system of the present invention is a system that controls multiple thermoelectric facilities (e.g., power generation facilities, heat supply facilities, and combined heat and power supply facilities) that supply at least one of electricity and heat, and can automatically construct control logic for the entire facility to perform load tracking for multiple types of thermoelectric facilities with different control characteristics, and can compensate for the magnitude of load fluctuations.
[0019] A thermoelectric control system according to the present invention includes a load following priority setting unit that sets a priority for load following for each piece of thermoelectric power generation equipment, and a control module that controls each piece of thermoelectric power generation equipment. The control module receives a planned load for the equipment and a load correction value from a control module that controls equipment with a higher priority, corrects the planned load to determine an adjusted load, performs range limiter processing to align the adjusted load with a load range of the equipment, and outputs the adjusted load after range limiter processing as a load request value, and also outputs a value when the adjusted load exceeds the load range of the equipment as a load correction value to a control module that controls equipment with a lower priority.
[0020] The thermoelectric control simulation program according to the present invention is a computer program for simulating the operation of the thermoelectric control system according to the present invention, and can cause a computer to execute the control processing performed by the thermoelectric control system according to the present invention.
[0021] A thermoelectric control system and a thermoelectric control simulation program according to an embodiment of the present invention will be described below with reference to the drawings. In the following embodiments, renewable energy is also referred to as "renewable energy." In the drawings used in this specification, identical or corresponding components are designated by the same reference numerals, and repeated explanations of these components may be omitted.
[0022] A thermoelectric control system according to a first embodiment of the present invention will be described.
[0023] 1 is a diagram showing the configuration of a thermoelectric control system according to this embodiment. The thermoelectric control system according to this embodiment includes a power generation facility control unit 1, a load following priority setting unit 6, and a display device 7, and is connectable to a power generation planning unit 2, local control devices 41 to 43, a local control device 44, and a power measurement facility 5, and controls a plurality of power generation facilities 31 to 33 and a renewable energy facility 34.
[0024] The power generation facilities 31 to 33 are, for example, gas engines and storage batteries. The renewable energy facility 34 is, for example, a renewable energy facility such as a solar power generation facility or a wind power generation facility. FIG. 1 shows three power generation facilities, a power generation facility (A) 31, a power generation facility (B) 32, and a power generation facility (C) 33, as an example. Note that the renewable energy facility 34 can be included in the power generation facilities, but is depicted separately from the power generation facilities 31 to 33 in FIG. 1 (and FIG. 2).
[0025] The power generation facility control unit 1 is a main component of the thermoelectric control system, and controls a plurality of power generation facilities 31 to 33 and a renewable energy facility 34. The power generation facility control unit 1 is connected to a load following priority setting unit 6, a display device 7, a power generation planning unit 2, local control devices 41 to 43, a local control device 44, and a power measurement facility 5.
[0026] The load following priority setting unit 6 stores data on the priority (load following priority) for load following that is set in advance for each of the power generation facilities 31 to 33, and outputs this data to the power generation facility control unit 1. The load following priority is the priority for performing load following operation, and power generation facilities with higher load following priorities are given priority in performing load following operation.
[0027] The display device 7 displays the operating states of the power generation facilities 31 to 33 and the renewable energy facility 34 controlled by the power generation facility control unit 1, and information related to the control by the power generation facility control unit 1. For example, the display device 7 can display the current load following priority for each of the power generation facilities 31 to 33.
[0028] The power generation planning unit 2 determines, through optimization, the loads of the power generation facilities 31 to 33 that minimize the operating costs and CO2 emissions, and outputs the determined loads (planned loads) to the power generation facility control unit 1. The planned loads are loads that are planned to optimize the operation of the power generation facilities 31 to 33, and are determined for each of the power generation facilities 31 to 33.
[0029] The local control devices 41 to 44 control the power generation facilities 31 to 33 and the renewable energy facility 34, respectively. FIG. 1 shows four local control devices 41 to 44 as an example. The local control devices 41 to 44 control only the power generation facilities connected to them. In the example shown in FIG. 1, the local control device 41 controls the power generation facility (A) 31, the local control device 42 controls the power generation facility (B) 32, the local control device 43 controls the power generation facility (C) 33, and the local control device 44 controls the renewable energy facility 34. The local control device 44 outputs a measurement value of the amount of power generated by the renewable energy facility 34 to the power generation facility control unit 1.
[0030] The power measurement equipment 5 measures the amount of power consumption, which is the power demand.
[0031] The power generation facility control unit 1 is positioned above the local control devices 41 to 43 and the local control device 44, and performs control such as load allocation that integrates the power generation facilities 31 to 33 and the renewable energy facility 34. The power generation facility control unit 1 controls each of the facilities 31 to 34 so that the total amount of power generated by the power generation facilities 31 to 33 and the renewable energy facility 34 follows the amount of power consumption input from the power measurement facility 5.
[0032] FIG. 2 is a diagram showing the internal configuration of the power generation facility control unit 1 and the relationship between the power generation facility control unit 1 and devices that directly exchange data with each other.
[0033] The power generation facility control unit 1 includes a data acquisition unit 11 , a control logic unit 12 , and a control module priority setting unit 13 .
[0034] The data acquisition unit 11 acquires data on the planned loads of the power generation facilities 31 to 33 and the renewable energy facility 34 from the power generation planning unit 2, and also acquires data on the power consumption of the facilities 31 to 34 from the power measurement facility 5.
[0035] Here, the processing of the data acquisition unit 11 will be described with reference to FIG.
[0036] Fig. 3 is a diagram showing an example of the structure of planned load data acquired by the data acquisition unit 11 from the power generation planning unit 2. Fig. 3 shows, as an example, planned load data for power generation facilities 31 to 33. In this embodiment, the power generation facilities 31 to 33 are also referred to as power generation facility A, power generation facility B, and power generation facility C, respectively.
[0037] As shown in Fig. 3, the planned load data shows the planned loads of power generation facilities A to C in time series. In the example of planned load data shown in Fig. 3, the planned loads of power generation facilities A to C are shown as time-series data for one day at 30-minute intervals.
[0038] The power generation planning unit 2 determines the load of each of the power generation facilities A to C through optimization, and outputs the planned load as shown in Fig. 3 to the power generation facility control unit 1. This optimization process can use an existing method, so a detailed description will be omitted, but a general process will be described below.
[0039] The power generation planning unit 2 stores the operating characteristics of each power generation facility in advance. The operating characteristics of a power generation facility include power generation efficiency, the unit price of the fuel used, CO2 emissions per unit fuel, and the load range in which the facility can operate (rated load and minimum operable load). Power generation efficiency is the amount of fuel consumed per 1 kW of unit load. In most power generation facilities, power generation efficiency varies depending on the load, becoming higher as the facility approaches the rated load. For this reason, it is preferable to store the power generation efficiency as an efficiency curve versus load. Furthermore, if the power generation facility is a storage battery, the load range is the upper limit of the charge amount and the upper limit of the discharge amount. Furthermore, in the case of a storage battery, the upper and lower limits of the amount of stored electricity are also included in the operating characteristics.
[0040] The power generation planning unit 2 determines the load of each power generation facility for one day through optimization using 48 predicted power demand values and predicted photovoltaic power generation values for one day, i.e., at 30-minute intervals. The target functions in the optimization process are operating cost and CO2 emissions (the target function is often defined as the sum of the two using a weighting coefficient). In other words, the power generation planning unit 2 determines the planned load so that operation minimizes both operating cost and CO2 emissions. As mentioned above, power generation efficiency varies depending on the load, so operating at a state as close to rated load as possible can reduce operating costs.
[0041] Considering the characteristics of storage batteries, it is preferable to calculate the planned load using time-series data for one day. Storage batteries are operated so that they charge during times when there is a surplus in the power supply and discharge during times when there is a surplus to compensate for the amount of power generated. Optimization that takes such operations into account is difficult to achieve using only instantaneous values, and it is necessary to perform optimization over at least one day.
[0042] As mentioned above, the input conditions for optimization are the predicted values of power demand and solar power generation for one day. The constraint condition for optimization is that the sum of the loads of each power generation facility must match the power demand. However, the load of each power generation facility is calculated so that it falls within the load range, which is one of the operating characteristics of the power generation facility mentioned above.
[0043] Furthermore, in the case of renewable energy facilities such as solar power generation facilities, it is not possible to control the amount of power generated. Therefore, when determining the planned load, the power generation planning unit 2 inputs the amount of solar power generation for one day and plans operation so that the shortfall in power demand is made up for by other power generation facilities. In this case, if the amount of solar power generation exceeds the power demand, the surplus generated power is charged into a storage battery, and the storage battery is discharged during other time periods, thereby planning operation that minimizes operating costs while also taking into account CO2 emissions.
[0044] The power generation planning unit 2 performs the above-described processing, determines one day's worth of planned load data as shown in FIG. 3 as a power generation plan, and outputs it to the data acquisition unit 11 of the power generation facility control unit 1.
[0045] Returning to the description of FIG.
[0046] The data acquisition unit 11 of the power generation equipment control unit 1 inputs a measurement value of current power consumption (power measurement value) from the power measurement equipment 5. This power measurement value is the current power demand. The data acquisition unit 11 also acquires a measurement value of the power generation amount of the renewable energy equipment 34 (renewable energy equipment power generation amount measurement value) from the local control device 44. Although the renewable energy equipment 34 is also a type of power generation equipment, it is distinguished from the other power generation equipment 31 to 33 in the processing by the power generation equipment control unit 1. This is because the renewable energy equipment 34, such as a solar power generation equipment, cannot adjust the amount of power generation. The local control device 44 that controls the renewable energy equipment 34 can only perform limited measures for the renewable energy equipment 34, such as cutting off power in an emergency.
[0047] Here, we will explain the processing of the load following priority setting unit 6. As described above, the load following priority setting unit 6 stores data on the load following priorities set for each of the power generation facilities 31 to 33.
[0048] First, the concept of priority for load following, which is important in this embodiment, will be explained. Load following is a control that adjusts the amount of power generation supply so that it matches the power demand (power consumption) that changes in real time. When a mismatch between power supply and demand (a supply-demand gap) occurs, the power supply equipment cuts off the power, resulting in a power outage. The allowable time for a power supply-demand gap is less than one second, and the stability of load following is important in terms of control.
[0049] When multiple power generation facilities are used for load following, in most cases, one power generation facility is responsible for the load following function. In other words, only one power generation facility monitors power consumption and adjusts power generation in real time to match it. This is because if multiple power generation facilities control load following, there is a possibility of interference between the power generation facilities. One of the multiple power generation facilities performs load following and changes its power generation amount in real time, while the other power generation facilities change their power generation amount at long intervals. In other words, the roles of the multiple power generation facilities are divided so that one power generation facility set to operate in load following responds to small fluctuations in power demand, while the other power generation facilities respond to larger fluctuations in power demand.
[0050] In this embodiment, when controlling such load following, a priority (load following priority) for load following operation is set in advance for the power generation facilities 31 to 33, and the load of each power generation facility 31 to 33 is determined based on this priority.
[0051] 4 is a diagram showing an example of the configuration of load following priority data stored in the load following priority setting unit 6. The load following priority setting unit 6 outputs the load following priority data to the power generation facility control unit 1.
[0052] In the load following priority data, a load following priority (the order in which load following operation is performed) is set in advance for each of the power generation facilities A to C. In the example shown in FIG. 4 , the load following priorities are set as 1, 2, and 3 for the power generation facilities A, B, and C, respectively. The load following priorities are assumed to be higher in the order of 1, 2, and 3. A power generation facility with a load following priority set to 1 performs load following. A power generation facility with a load following priority of 2 or higher basically does not perform load following operation, but when it becomes difficult for a power generation facility with a load following priority of 1 to perform load following operation, it performs load following operation as a backup.
[0053] Such backup-like load following operation is performed in order from highest to lowest load following priority. That is, the power generation equipment with priority 1 performs the load following operation, and if the power generation equipment with priority 1 has difficulty performing the load following operation, the power generation equipment with priority 2 performs the load following operation, and if the power generation equipment with priority 2 has difficulty performing the load following operation, the power generation equipment with priority 3 performs the load following operation, and so on. The details of this process will be described later.
[0054] Returning to the description of FIG.
[0055] The load following priority setting unit 6 outputs the load following priority data ( FIG. 4 ) to the control module priority setting unit 13 of the power generation facility control unit 1 .
[0056] The control module priority setting unit 13 acquires the load following priority data from the load following priority setting unit 6 and outputs the load following priority information to the control logic unit 12 .
[0057] The control logic unit 12 includes control modules 121 to 123 that control the power generation facilities A to C, respectively, and performs control processing that integrates the control modules 121 to 123. In this embodiment, the control logic unit 12 includes individual control modules 121 to 123 that correspond to the power generation facilities A to C (power generation facilities 31 to 33), respectively, and these control modules 121 to 123 are combined to form the control logic for the entire power generation facility. The load following priority data is used in processing that uses the control modules 121 to 123.
[0058] The power generation facility control modules 121 to 123 control the power generation facilities A to C by transmitting control signals to the local control devices 41 to 43, respectively. The control modules 121 to 123 have the same configuration, but the control they perform can be changed depending on parameters set within the modules.
[0059] Control modules 121 to 123 control the power generation facilities A to C, respectively. Control module 121 is a control module corresponding to power generation facility (A) 31. Control module 122 is a control module corresponding to power generation facility (B) 32. Control module 123 is a control module corresponding to power generation facility (C) 33. Note that power generation facility A has a load following priority of 1 as shown in FIG. 4 and is a power generation facility that performs load following. As described above, control modules 121 to 123 have the same configuration, but can handle the control of each power generation facility by parameters for each power generation facility that are set within the module. Control modules 121 to 123 will be described later.
[0060] Here, an outline of the control method that the control logic unit 12 performs on the plurality of power generation facilities A to C (power generation facilities 31 to 33) will be described.
[0061] The power generation facility A has a load following priority of 1 (FIG. 4). Therefore, the control method of the power generation facility A is different from that of the other power generation facilities B and C.
[0062] The control logic unit 12 outputs a control signal (a control signal indicating that the load following mode is ON) to the local control device 41 of the power generation facility A to cause the facility A to perform load following operation. The local control device 41 of the power generation facility A receives this control signal and performs control in load following operation. The power generation facility A performs load following operation without following the planned load (power generation plan) determined by the power generation planning unit 2.
[0063] In other words, the local control device 41 inputs the measured value of current power consumption (power measurement value) from the power metering facility 5 and adjusts the amount of power generated by power generation facility A so that the amount of power supply matches the power measurement value, which is the demand. The power supply and demand gap is reflected in the power frequency. When supply is insufficient compared to demand, the frequency drops below a predetermined value, and when supply is excessive, the frequency increases above this predetermined value. The local control device 41 of power generation facility A performs load-following operation by adjusting the amount of power generated by power generation facility A based on these power frequency characteristics.
[0064] On the other hand, power generation facilities B and C, which are power generation facilities with a priority of 2 or higher, do not perform load following operation like power generation facility A, which has a priority of 1, but operate in accordance with the planned load (power generation plan) calculated by the power generation planning unit 2. The control logic unit 12 outputs the planned load value (load request value) as a control signal to the local control devices 42 and 43 of power generation facilities B and C. The local control devices 42 and 43 input the load request value and adjust the power generation amounts of power generation facilities B and C, respectively, so that they match the load request value. Unlike the load value of power generation facility A, which performs load following operation, the load request value of power generation facilities B and C does not change frequently.
[0065] The above is the flow of the process in which the control logic unit 12 transmits control signals to the local control devices 41 to 43 of the power generation facilities A to C and controls the power generation facilities A to C.
[0066] Next, the process by which the control logic unit 12 generates a control signal will be described in detail.
[0067] As described above, the operation method is different between power generation equipment A (power generation equipment that performs load following operation) with a priority of 1 and power generation equipment B and C with a priority of 2 or higher. As described above, the control modules 121 to 123 corresponding to each of power generation equipment A to C have the same configuration, and can handle the control of each power generation equipment by parameters for each power generation equipment that are set inside the module.
[0068] 5 is a diagram showing the internal configuration of the power generation facility control modules 121 to 123. Each of the control modules 121 to 123 includes a load following mode setting unit 21, a load estimation unit 22, a range deviation amount calculation unit 24, a load correction value addition unit 23, a range setting unit 26, a segmentation processing unit 25, and a start / stop determination unit 27.
[0069] The load following mode setting unit 21 receives information on the load following priority of the power generation equipment to be controlled from the control module priority setting unit 13 ( FIG. 2 ). As described above, the processing of the control modules 121 to 123 differs between power generation equipment A (power generation equipment performing load following operation) with a priority of 1 and power generation equipment B and C with a priority of 2 or higher. When the priority of the power generation equipment to be controlled is 1, the load following mode setting unit 21 transmits a control signal to the local control device 41 to cause the local control device 41 to perform load following operation (a control signal indicating that the load following mode is ON), and operates the load estimating unit 22. On the other hand, when the priority of the power generation equipment to be controlled is 2 or higher, the load following mode setting unit 21 determines that the load following mode is OFF and operates the load correction value adding unit 23. The load correction value adding unit 23 will be described later.
[0070] First, we will explain the processing during load following operation in power generation equipment with priority 1. Note that the control modules 121 to 123 do not output a control signal of the planned load value (load request value) to power generation equipment performing load following operation.
[0071] The local control device 41 receives the power measurement value from the power measurement facility 5 and adjusts the amount of power generated by the power generation facility so that the amount of power generated matches the power measurement value (i.e., so that the power frequency is constant), thereby performing load following operation. This control is feedback control performed outside the control modules 121 to 123.
[0072] The load estimation unit 22 estimates the power generation amount (load) of the power generation equipment performing load following operation using the following formula (1): Load estimation value of power generation equipment A = Measured power value - Total planned load of power generation equipment excluding power generation equipment A = Measured power value - (Total planned load of all planned loads - Planned load value of power generation equipment A) (1) However, formula (1) assumes that the power generation equipment performing load following operation is the power generation equipment A.
[0073] As shown in equation (1), the estimated value of the power generation amount (load estimated value) of power generation facility A is the value obtained by subtracting the total planned load of the other power generation facilities excluding power generation facility A from the measured power value, which is the value of the power actually being used. In other words, the load estimator 22 can calculate the load estimated value of power generation facility A from three pieces of data: the measured power value, the total planned load of all power generation facilities, and the planned load of power generation facility A. The load estimator 22 inputs these three pieces of data from the data acquiring unit 11, as shown in FIG. 2 . The data acquiring unit 11 inputs the measured power value from the power measuring facility 5 and the planned load of each power generation facility from the power generation planning unit 2.
[0074] Next, the range deviation calculation unit 24 receives the load estimate of the power generation facility (e.g., power generation facility A) that performs load following operation from the load estimator 22. The range deviation calculation unit 24 then compares the received load estimate with the load range (power generation range) set as an operating characteristic of each power generation facility (e.g., power generation facility A), and calculates the amount of deviation of the load estimate from the load range (range deviation). Generally, the upper limit of the load range is set to the rated load, and the lower limit is set to the minimum operable load (because some power generation facilities cannot operate at loads near zero).
[0075] The range deviation is zero when the load estimate is within the load range, a positive value when the load estimate is above the upper limit of the load range, and a negative value when the load estimate is below the lower limit of the load range. This is calculated by the following equation (2): Range deviation = MAX (load estimate - upper limit of load range, 0) + MIN (load estimate - lower limit of load range, 0) (2) where the function MAX gives the maximum value among the arguments, and the function MIN gives the minimum value among the arguments.
[0076] A positive value of the range deviation calculated by the range deviation calculation unit 24 means that the power generation facility that is supposed to perform load following operation cannot respond to load following. In other words, this power generation facility has a large shortage of power generation relative to the power demand (measured power value), and even if the power generation amount is increased to the upper limit of the load range, it cannot keep up with the power demand, i.e., the power supply is insufficient.
[0077] Such a situation occurs when the predicted value of power demand or the predicted value of solar power generation deviates significantly from the actual value. For example, as described above, the power generation planning unit 2 determines the load of each power generation facility so as to match the given predicted value of power demand. Therefore, if the actual power demand significantly exceeds the predicted value, a power supply shortage occurs. When determining the load of the power generation facility, the load is determined taking into account a margin for such fluctuations. In other words, if the power demand fluctuates to an extent that exceeds this margin, it becomes difficult for the power generation facility to operate at the planned load determined by the power generation planning unit 2. The same applies to the amount of solar power generation. The power generation planning unit 2 determines the load of the power generation facility based on the predicted value of solar power generation estimated using weather information, etc., but if the actual amount of solar power generation falls significantly below the predicted value, a power supply shortage occurs.
[0078] On the other hand, if the range deviation amount calculated by the range deviation amount calculation unit 24 is a negative value, the power supply is excessive. This situation occurs when the actual value of power demand is less than the predicted value or the actual value of solar power generation is greater than the predicted value.
[0079] The range deviation calculation unit 24 calculates the range deviation (i.e., the shortage or excess of the load of the power generation equipment) using equation (2) and outputs the range deviation as a load correction value to the control module of the power generation equipment with a lower load following priority. The load correction value is the shortage or excess of the load of the power generation equipment and is a value for correcting the load of the power generation equipment.
[0080] The above is the processing performed by the control module of the power generation facility (for example, power generation facility A) that performs load following operation.
[0081] Next, a description will be given of processing for power generation facilities other than those performing load following operation, i.e., power generation facilities with a load following priority of 2 or higher. In these power generation facilities, the load correction value adder 23 shown in FIG. 5 operates.
[0082] The load correction value adding unit 23 receives the planned load value from the data acquiring unit 11, and also receives the load correction value from the control module that controls the power generation equipment with the higher load following priority through the division processing unit 25 (details of which will be described later). As described above, the load correction value is the range deviation amount, that is, the shortage or excess amount of power supply that deviates from the load range of the higher-ranking power generation equipment.
[0083] Then, the load correction value adding unit 23 obtains the adjusted load by correcting the value of the planned load using the load correction value, and outputs the obtained adjusted load to the range setting unit 26. The load correction value adding unit 23 obtains the adjusted load by adding the load correction value to the value of the planned load.
[0084] If the load correction value is zero, the load correction value adding unit 23 outputs the input planned load value as is to the range setting unit 26. The power generation facility controlled by the control module performing such processing operates according to the plan determined by the power generation planning unit 2.
[0085] If the load correction value is a value other than zero, the load correction value adder 23 performs unplanned load adjustment. If the power supply is insufficient, the load correction value (range deviation amount) is a positive value, and the planned load value increases by the load correction value. In other words, the load of the power generation equipment to be controlled is increased above the plan. On the other hand, if the power supply is excessive, the load correction value is a negative value, and the planned load value decreases by the load correction value. In other words, the load of the power generation equipment to be controlled is decreased below the plan. The load correction value adder 23 performs this processing to determine the adjusted load from the planned load value and the load correction value.
[0086] This processing by the load correction value adding unit 23 makes it possible to eliminate an operating state in which the power supply from the power generation facilities A to C is insufficient or excessive. The load correction value adding unit 23 outputs the calculated adjusted load to the range setting unit 26.
[0087] The range setting unit 26 inputs the adjusted load calculated by the load correction value adding unit 23 and executes range limiter processing to adjust the range of the adjusted load to the load range of the power generation equipment (the power generation equipment) controlled by the control module including the range setting unit 26. That is, the range setting unit 26 executes range limiter processing to adjust the upper and lower limits of the adjusted load range to the upper and lower limits of the load range of the power generation equipment so that the adjusted load does not exceed the load range of the power generation equipment. The range setting unit 26 outputs the adjusted load value after processing by the range limiter to the local control device as a load request value.
[0088] In the range limiter processing of the range setting unit 26, the adjusted load output by the load correction value adding unit 23 may exceed the load range of the power generation equipment. This means that the load correction value input from the control module of the power generation equipment with a higher load following priority is too large, and the power supply cannot be adjusted by matching the adjusted load range to the load range of the power generation equipment.
[0089] In such a case, similar to the processing in the load following operation described above, the range deviation calculation unit 24 calculates the value (range deviation) at which the adjusted load exceeds the load range of the power generation equipment, and outputs this range deviation as a load correction value to the control module of the power generation equipment with a lower load following priority.
[0090] In this embodiment, the power generation facilities 31 to 33 can perform load following operation in a backup manner in accordance with preset load following priorities through the processing of the multiple control modules 121 to 123. That is, if a power generation facility with a load following priority of 1 cannot adjust its power supply (if load following becomes difficult), a power generation facility with a load following priority of 2 backs up and adjusts its power supply, and if the power generation facility with a load following priority of 2 also cannot adjust its power supply, a power generation facility with a load following priority of 3 backs up and adjusts its power supply.
[0091] As described above, the load correction value adding unit 23 calculates the adjusted load by adding the load correction value input from the control module of the power generation equipment with the higher load following priority to the planned load. This load correction value is preferably added to the planned load after a numerical value classification process has been performed. This classification process is a process of classifying (converting) the load correction value into one of a plurality of discrete values, and is executed by the classification processing unit 25 shown in FIG. 5.
[0092] The details and purpose of the segmentation process performed by the segmentation processor 25 will be described below.
[0093] 6 is a diagram illustrating the segmentation process of the load correction value executed by the segmentation processing unit 25. In the example shown in FIG. 6, the segmentation processing unit 25 segments the load correction value in units of 10. For example, when the load correction value is 0, the segmented load correction value is set to 0; when the load correction value is greater than 0 and equal to or less than 10, the segmented load correction value is set to 10; and when the load correction value is greater than 10 and equal to or less than 20, the segmented load correction value is set to 20. Through this segmentation process, the load correction value takes on discrete values such as -20, -10, 0, +10, and +20.
[0094] The purpose of this sorting process is to reduce the frequency of power generation adjustments for power generation equipment with a load following priority of 2 or higher. As mentioned above, there is only one power generation equipment that performs load following operation, which changes power generation in real time according to power demand. By performing the sorting process by the sorting processor 25, the frequency of power generation adjustments can be reduced for power generation equipment with a load following priority of 2 or higher. In other words, power generation equipment performing load following operation can be fixed to power generation equipment with a load following priority of 1 as much as possible. Furthermore, during this sorting process, it is preferable to provide a hysteresis function to the sorting threshold so that the threshold changes depending on the load correction value. By providing a hysteresis function to the sorting threshold, the frequency of power generation adjustments for the power generation equipment can be reduced even when the load correction value fluctuates across the threshold.
[0095] So far, the processing related to the control for adjusting the load (power generation amount) of the power generation facility has been described.
[0096] It may be preferable to control the start or stop of the power generation equipment depending on the planned load calculated by the power generation planning unit 2 and output to the power generation equipment control unit 1. This control to start or stop the power generation equipment is executed by a start / stop determination unit 27 shown in FIG.
[0097] The start / stop determination unit 27 refers to the time-series data of the planned load ( FIG. 3 ), and when the value of the planned load changes from 0 to a positive value, outputs a start signal to the local control device to start the power generation equipment at the time when this change occurs. Also, when the value of the planned load changes from a positive value to 0, the start / stop determination unit 27 outputs a stop signal to the local control device to stop the power generation equipment at the time when this change occurs.
[0098] The above is the control of load distribution to a plurality of power generation facilities in this embodiment. As described above, the thermoelectric control system according to this embodiment can automatically construct a control logic for performing load following.
[0099] 7 is a diagram showing an example of the operation of power generation facilities under the load distribution control of this embodiment. As an example, Fig. 7 shows an example of the operation of three power generation facilities A to C. Power generation facility A has a load following priority of 1 and is performing load following operation.
[0100] For example, at time t1, when the load (power generation amount) of power generation facility A reaches the upper limit of the load range, the load of power generation facility B, which has a load following priority of 2, is corrected from the planned load and increases. The load correction value, which is the correction amount at this time, is changed into a rectangular wave-like shape by the segmentation processing of the segmentation processing unit 25. Power generation facility A, which has a load following priority of 1, is always performing load following operation. Note that the load of power generation facility C always follows the planned load.
[0101] Fig. 8 is a diagram showing an example of a screen displayed on the display device 7 by the thermoelectric control system according to this embodiment. In the example shown in Fig. 8, the trends (time changes) of the actual value (measured value) of power demand and the planned value (planned load value) are shown for comparison at the top of the screen. Below this power demand trend, the trend of the actual value of the power generation amount of each power generation facility when load distribution control is performed on multiple power generation facilities so that the power generation amount matches the actual value of the power demand is shown.
[0102] 8, as an example, the power generation facility with a load following priority of 1 is a gas engine A, the power generation facility with a load following priority of 2 is a storage battery, and the power generation facility with a load following priority of 3 is a gas engine B. Note that a load following priority is not set for a renewable energy facility 34 such as a solar power generation facility because the amount of power generation cannot be adjusted.
[0103] In the trend of power demand, there is a time period when the actual power demand value significantly exceeds the planned value. During this time period, the power generation amount of gas engine A, which has a load following priority of 1, reaches its upper limit, so the storage battery, which has a load following priority of 2, corrects its planned load and increases its power generation amount (discharge amount) from the planned load (planned discharge amount) to supply power. In Figure 8, in the trend of the power generation amount (charge / discharge amount) of the storage battery, the unplanned change in power generation amount (increase in discharge amount) due to the correction of the planned load (addition of the load correction value) is shown by shading.
[0104] As described above, the thermoelectric control system according to this embodiment includes control modules 121 to 123 that have the same configuration and can execute common processes, and can automatically configure control logic for the entire facility to perform load following for multiple types of power generation facilities 31 to 33 with different control characteristics by using the load ranges of the power generation facilities 31 to 33 controlled by the control modules 121 to 123 and the load following priorities set for the power generation facilities 31 to 33. This makes it easy to configure control logic for the power generation facilities even for power generation systems that combine a variety of power generation facilities, thereby reducing engineering man-hours, lowering development costs, and shortening delivery times.
[0105] Furthermore, in the thermoelectric control system according to this embodiment, multiple power generation facilities can perform load following operation according to load following priority, and can adjust the power supply by performing load following operation in a backup manner, so that it is possible to compensate for the magnitude of load fluctuations.
[0106] A thermoelectric control system according to a second embodiment of the present invention will be described. The thermoelectric control system according to this embodiment differs from the thermoelectric control system according to the first embodiment in the processing of the load following priority setting unit 6. The following mainly describes the differences between this embodiment and the first embodiment.
[0107] 9 is a diagram showing the configuration of a thermoelectric power control system according to this embodiment. The load following priority setting unit 6 can acquire the operating states of the power generation facilities 31 to 33 via the local control devices 41 to 43, respectively. The load following priority setting unit 6 can also acquire the planned load from the power generation planning unit 2.
[0108] In the first embodiment, the load following priority setting unit 6 stores data of the load following priority that is set in advance for each of the power generation facilities 31 to 33. That is, in the first embodiment, the load following priority is fixed.
[0109] In this embodiment, the load following priority setting unit 6 can dynamically change the load following priority according to the operating state of the power generation facilities 31 to 33 .
[0110] 10 is a diagram illustrating an example of the process by which the load following priority setting unit 6 determines the load following priority. The load following priority setting unit 6 can change the load following priority depending on the operation modes (1) to (3) of the power generation equipment (including renewable energy equipment). In the example shown in FIG. 10, the power generation equipment includes a small gas engine A, a large gas engine B, and a storage battery.
[0111] Operation mode (1) is a normal mode, i.e., a mode in which the power generation facility is operating normally. In operation mode (1), the load following priority setting unit 6 sets the load following priority of the small gas engine A to 1, the load following priority of the storage battery to 2, and the load following priority of the large gas engine B to 3.
[0112] Operation mode (2) is a power supply shortage mode, i.e., a mode when the power supply is insufficient. In operation mode (2), the load following priority setting unit 6 switches the load following priorities of gas engine A (small) and gas engine B (large), setting the load following priority of gas engine B to 1 and the load following priority of gas engine A to 3. The load following priority setting unit 6 determines that the operation mode is (i.e., the power supply is insufficient) when the difference obtained by subtracting the total planned load of each power generation facility (planned power demand) from the measured power value (actual power demand) exceeds a predetermined threshold.
[0113] The setting of the load following priority in operation mode (2) is based on the following idea, for example: Because gas engines that perform load following operation have parts that wear out quickly, an inexpensive gas engine (small gas engine A) is usually used. However, when the power supply shortage exceeds a predetermined threshold, the load following priority is changed so that large gas engine B, which generates more power, can perform load following operation.
[0114] Operation mode (3) is an excess solar power generation mode, i.e., a mode when the amount of solar power generation is excessive. In operation mode (3), the load following priority setting unit 6 sets the load following priority of the storage battery to 1. When the difference obtained by subtracting the measured power value (actual value of power demand) from the amount of solar power generation exceeds a predetermined threshold, the load following priority setting unit 6 determines that the operation mode is (i.e., the amount of solar power generation is excessive).
[0115] The load following priority setting in operation mode (3) aims to operate the system so that when the amount of solar power generation exceeds the actual power demand, the excess power generation is preferentially charged to the storage battery. The power supply facility also cuts off power when there is an excess power supply. Therefore, when there is excess solar power generation, charging the solar power generation to the storage battery can reduce operating costs rather than forcibly stopping power generation by disconnecting the solar power generation from the power line.
[0116] 11 is a diagram illustrating an example of a process in which the load following priority setting unit 6 changes the load following priority according to the amount of power stored in the storage battery. The load following priority setting unit 6 can change the load following priority according to the operation modes (4) to (6).
[0117] Operation mode (4) is a power supply shortage mode and a low storage amount mode, i.e., an operation mode when the power supply is insufficient and the storage amount of the storage battery is low. In operation mode (4), the load following priority setting unit 6 sets the load following priority of the storage battery to the lowest in order to suppress an increase in the unplanned discharge amount of the storage battery and ensure the storage amount. The load following priority setting unit 6 determines whether the power supply is insufficient in the same manner as operation mode (2). Furthermore, the load following priority setting unit 6 determines that the storage amount of the storage battery is low when the storage amount of the storage battery is below a predetermined threshold.
[0118] Operation mode (5) is an excess power supply mode and a high storage mode, i.e., an operation mode in which the power supply is excessive and the storage battery has a large amount of stored power. In operation mode (5), the load following priority setting unit 6 sets the storage battery's load following priority to the lowest in order to suppress an unplanned increase in the storage battery's charge amount and prevent overcharging. The load following priority setting unit 6 determines that the power supply is excessive when the difference obtained by subtracting the total planned load of each power generation facility (planned power demand) from the measured power value (actual power demand) is below a predetermined threshold. Furthermore, the load following priority setting unit 6 determines that the storage battery has a large amount of stored power when the storage battery's storage amount exceeds a predetermined threshold.
[0119] Operation mode (6) is a night mode, i.e., a mode in which the power generation equipment operates during nighttime hours. The load following priority can also be changed depending on the time period in which the power generation equipment operates. In operation mode (6), the load following priority setting unit 6 sets the load following priority of the storage battery to the lowest. This is intended to suppress unplanned charging and discharging operations of the storage battery during nighttime hours when solar power generation is stopped, when the storage battery is operated to absorb fluctuations in solar power generation amount. Note that the nighttime hours can be determined arbitrarily in advance.
[0120] FIG. 12 is a diagram showing an example of a screen displayed on the display device 7 by the thermoelectric control system according to this embodiment. In FIG. 12, as an example, data representing the operating state used to determine the load following priority is displayed in the upper part of the screen. Also, as an example, information on the current load following priority is displayed in the lower part of the screen. The data representing the operating state is, for example, the difference between the measured and planned values of power consumption, the difference between the measured and predicted values of photovoltaic power generation, the measured value of the amount of electricity stored in the storage battery, and the set nighttime time period. The information on the load following priority is, for example, the operating mode and the equipment for which a load following priority of 1 to 3 is set.
[0121] 12, the power generation facility is operating in operation mode (4), i.e., power supply shortage mode and low storage mode. Therefore, the load following priority setting unit 6 sets the load following priority of the storage battery to the lowest in the power supply shortage mode. That is, the load following priority of the large gas engine B is set to 1, the load following priority of the small gas engine A is set to 2, and the load following priority of the storage battery is set to 3.
[0122] Next, an example of a process for determining load following priority that is different from the process described above will be described.
[0123] 13 is a diagram illustrating another example of the process by which the load following priority setting unit 6 determines the load following priority. The load following priority setting unit 6 can dynamically change the load following priority depending on the power generation efficiency of the power generation facility. As an example, the following will be described in which the power generation facility includes a gas engine A that performs load following operation, a gas engine B that has high power generation efficiency, and a gas engine C that has lower power generation efficiency than gas engine B, and the load following priorities of gas engine B and gas engine C are changed.
[0124] 13 shows an example in which the load following priority setting unit 6 changes the load following priority between a power shortage mode and a power excess mode. As described above, the power shortage mode is a mode in which the difference obtained by subtracting the total planned load of each power generation facility (planned power demand) from the measured power value (actual power demand) exceeds a predetermined threshold. The power excess mode is a mode in which the difference is equal to or less than this predetermined threshold.
[0125] In the power supply shortage mode, when a correction is made to the planned load for a power generation facility with a load following priority of 2 or higher (i.e., when the load correction value is other than 0), the difference is always a positive value, and the power generation amount is increased. For this reason, the load following priority setting unit 6 sets the load following priority of the high-efficiency gas engine B higher than the load following priority of the low-efficiency gas engine C. This is because increasing the power generation amount of the high-efficiency gas engine B can keep the increase in operating costs low.
[0126] In the power excess supply mode, the opposite operation to the power shortage mode is performed. That is, the load following priority setting unit 6 sets the load following priority of the low-efficiency gas engine C higher than the load following priority of the high-efficiency gas engine B. This is because preferential use of the low-efficiency gas engine C reduces the amount of power generated, thereby further reducing operating costs.
[0127] FIG. 14 is a diagram showing an example of a screen displayed on the display device 7 by the thermoelectric control system according to this embodiment. In FIG. 14, as an example, data representing the operating state used to determine the load following priority is displayed in the upper part of the screen. Also, as an example, information on the load following priority is displayed in the lower part of the screen. The data representing the operating state is, for example, the difference between the measured value and the planned value of the power consumption. The information on the load following priority is, for example, the operating mode and the equipment for which a load following priority of 1 to 3 is set.
[0128] 14, the power generation facility is operating in a power supply shortage mode, so the load following priority setting unit 6 sets the load following priority of gas engine A, which is performing load following operation, to 1, the load following priority of gas engine B, which is highly efficient, to 2, and the load following priority of gas engine C, which is less efficient, to 3.
[0129] Next, an example of a process for determining the load following priority that is different from the process described above will be described. The load following priority setting unit 6 sets the accumulated time that each power generation facility has performed load following operation as an operating state, and can dynamically change the load following priority according to this accumulated time.
[0130] In load following operation, the load changes frequently, which causes thermal stress in combustion engines such as gas engines, resulting in rapid wear of parts. For this reason, when there are multiple power generation facilities of the same model, rather than performing load following operation on only one facility, the load following operation is performed equally on the multiple facilities, thereby causing parts of the multiple facilities to wear out to the same extent. The load following priority setting unit 6 changes the load following priority according to the cumulative time that each power generation facility has performed load following operation, and by performing load following operation equally on the multiple facilities, the lifespan of the entire power generation facility can be extended.
[0131] 15 is a diagram illustrating an example of a process in which the load following priority setting unit 6 determines load following priorities according to the accumulated time for which the power generation equipment has been operating in load following mode. As an example, FIG. 15 shows the accumulated load following operating time and the set load following priorities for three gas engines A to C.
[0132] The load following priority setting unit 6 acquires and stores data on the cumulative operation time in load following from the control logic unit 12 (FIG. 2). In the example shown in FIG. 15, the cumulative operation time in load following is 2000 hours for gas engines A and B, and 1000 hours for gas engine C. Therefore, the load following priority setting unit 6 sets the load following priority of gas engine C, which has a shorter cumulative operation time, higher than that of gas engines A and B, which have a longer cumulative operation time, and sets the load following priority of gas engine C to 1.
[0133] FIG. 16 is a diagram showing an example of a screen displayed on the display device 7 by the thermoelectric control system according to this embodiment. In FIG. 16, as an example, data representing the operating state used to determine the load following priority is displayed in the upper part of the screen. Also, as an example, information on the load following priority is displayed in the lower part of the screen. The data representing the operating state is, for example, the cumulative operating time in load following. The information on the load following priority is, for example, equipment to which a load following priority of 1 to 3 has been set. In the example shown in FIG. 16, gas engine C has the shortest cumulative operating time in load following and its load following priority is set to 1, the highest priority.
[0134] In this embodiment, the display device 7 can display values and information (operating states of the power generation facilities) used by the load following priority setting unit 6 to change the load following priorities of the power generation facilities. The display device 7 can also display the current load following priorities for each of the power generation facilities. Furthermore, the display device 7 can display the operating modes of the power generation facilities. The operating modes of the power generation facilities can be determined from the operating states of the power generation facilities, i.e., the values and information used by the load following priority setting unit 6 to change the load following priorities of the power generation facilities.
[0135] As described above, in the thermoelectric control system according to this embodiment, the load following priority setting unit 6 can dynamically and appropriately set the load following priority of the power generation equipment according to the operating state of the power generation equipment. As a result, in the thermoelectric control system according to this embodiment, even if the power supply becomes insufficient or excessive relative to the plan, the load can be appropriately distributed according to the operating state of the power generation equipment, thereby improving the reliability of operation.
[0136] A thermoelectric control simulation program according to a third embodiment of the present invention will be described. In the first and second embodiments, a thermoelectric control system for actually controlling a power generation facility has been described. In this embodiment, a program for performing a simulation aimed at verifying the operation of this thermoelectric control system will be described. The thermoelectric control simulation program according to this embodiment is a program for verifying the operation of a thermoelectric control system, and therefore can cause a computer to execute the control processing performed by an actual thermoelectric control system (for example, the thermoelectric control system according to the first or second embodiment). Note that, hereinafter, the simulation program will also be referred to as a "simulator."
[0137] FIG. 17 is a diagram showing a configuration realized by a thermoelectric control simulation program according to this embodiment. The thermoelectric control simulation program according to this embodiment is executed by a computer, and realizes the configuration of the actual thermoelectric control system in Embodiments 1 and 2 in software. That is, the simulator according to this embodiment is a computer program for causing a computer to realize the functions of the thermoelectric control system according to Embodiment 1 or 2. The configuration realized by the simulator according to this embodiment is almost the same as the configurations shown in FIG. 1 (Embodiment 1) and FIG. 9 (Embodiment 2), except that control response models 51 to 53 that output control responses are used instead of hardware such as power generation facilities 31 to 33 and local control devices 41 to 43.
[0138] The control response models 51 to 53 output, as control responses, the responses of the power generation facilities 31 to 33 to inputs such as load request values (or planned load values) and control signals (e.g., control signals for starting and stopping) of the power generation facilities 31 to 33. The control response models 51 to 53 output responses to load request values for changes in load using first-order lags and dead time. Furthermore, the control response models 51 to 53 store data in advance on start-up times (start-up preparation times and load increase times) and stop times (load decrease times) for starting and stopping the power generation facilities 31 to 33, and output responses based on this data.
[0139] In this embodiment, the renewable energy facility 34 (for example, the solar power generation facility) in the first and second embodiments (FIGS. 1 and 9) uses, instead of hardware, a solar power generation amount condition setting unit 54, which is a module that outputs the amount of solar power generation set as a condition in advance. The power measurement facility 5 (FIGS. 1 and 9) also uses, instead of hardware, a power consumption amount condition setting unit 55, which is a module that outputs the amount of power consumption set as a condition in advance.
[0140] The simulator according to this embodiment is a computer program that uses as input values the responses output by the control response models 51 to 53, the amount of solar power generation output by the solar power generation condition setting unit 54, and the amount of power consumption output by the power consumption condition setting unit 55.
[0141] As described above, the simulator according to this embodiment performs a simulation by executing all of the operations of an actual thermoelectric control system using software, and verifies the control operation of the thermoelectric control system. The simulation results of the amount of power generated in each power generation facility are then stored in the result storage unit 56, which is a module that stores calculation results. The simulation results of the amount of power generated include, for example, the trend in the amount of power generated in each power generation facility.
[0142] The simulator according to this embodiment can display the results of the executed simulation on the display device 7. The user of the simulator can refer to the simulation results on the display device 7.
[0143] Fig. 18 is a diagram showing an example of a screen displayed on the display device 7 by the thermoelectric control simulation program according to this embodiment. In the example shown in Fig. 18, the power demand trend (power demand given as a simulation condition) is shown at the top of the screen, and below this power demand trend, the trend of the power generation amount of each power generation facility is shown as a simulation result executed by the simulator according to this embodiment.
[0144] In this simulation, data corresponding to the actual value of power demand and data corresponding to the actual value of solar power generation are input conditions. These data are set by the power consumption condition setting unit 55 and the solar power generation condition setting unit 54 shown in FIG.
[0145] In this thermoelectric control simulation, it is checked whether power supply is possible when the power demand and the amount of solar power generation deviate from the planned values (predicted values). Fig. 18 shows an example of a simulation under the condition that the value of power demand is greater than the planned value and the amount of solar power generation is less than the planned value. This simulation checks whether power supply is possible under the condition that the power supply is insufficient.
[0146] As a result of the simulation, the power generation capacity of gas engine A, which was set to load following priority 1, reached the upper limit of the load. As a result, the load of the storage battery, which was set to load following priority 2, was corrected, and the amount of discharge increased more than planned. However, as time passed, the amount of stored power in the storage battery decreased, and the increase in the amount of discharge stopped (note that the amount of stored power in the storage battery is not shown in Figure 18). As a result, the load of gas engine B, which was set to load following priority 3, was corrected, and the amount of power generation increased more than planned. However, the amount of power generation of gas engine B also reached the upper limit of the load, and these power generation facilities could no longer supply power that met the power demand set as a condition, and became inoperable.
[0147] From the results of such simulations, the user can determine that measures are needed to increase the power generation capacity of gas engines A and B or to increase the capacity of the storage battery.
[0148] As described above, by using the thermoelectric control simulation program according to this embodiment, it is possible to check whether power can be supplied to a power generation facility under current conditions. Furthermore, the simulator according to this embodiment can not only verify operation under the condition that a deviation occurs between the predicted value of power demand or the amount of solar power generation and the actual value, as described in this embodiment, but also check whether power can be supplied using other operable facilities under the condition that a facility exists that has broken down and is no longer operational.
[0149] A thermoelectric control system according to a fourth embodiment of the present invention will be described. The thermoelectric control system according to this embodiment differs from the thermoelectric control system according to the second embodiment (FIG. 9) in the controlled object. The controlled object of the thermoelectric control system according to this embodiment is not only the power generation facility, but also the power generation facility and the heat supply facility. The following description of this embodiment will mainly focus on the differences from the second embodiment.
[0150] 19 is a diagram showing the configuration of a thermoelectric control system according to this embodiment. The thermoelectric control system according to this embodiment includes a power generation facility control unit 1, a heat supply facility control unit 4, a load following priority setting unit 6, and a display device 7, and is connectable to a thermoelectric planning unit 3, local control devices 71-72, local control devices 74-75, and a power / heat measurement facility 8, and controls a plurality of cogeneration facilities 61-62 and heat supply facilities 64-65.
[0151] The controlled objects of the thermoelectric control system according to this embodiment are cogeneration facilities 61-62 and heat supply facilities 64-65. The cogeneration facilities 61-62 are combined heat and power supply facilities capable of supplying both heat and electricity, and will also be referred to as cogeneration facilities 61-62 hereinafter. A typical example of the cogeneration facilities 61-62 is a combined heat and power supply facility equipped with a gas engine for power generation and a device that generates steam in a heat exchanger using high-temperature exhaust gas, which is the controlled object in Examples 1 and 2. A typical example of the heat supply facilities 64-65 is a boiler.
[0152] The power generation facility control unit 1 is connected to local control devices 71 to 72 and controls the cogeneration facilities 61 to 62. The local control devices 71 to 72 respectively control the cogeneration facilities 61 to 62. The local control device 71 controls the cogeneration facility (A) 61, and the local control device 72 controls the cogeneration facility (B) 62.
[0153] The heat supply facility control unit 4 is connected to local control devices 74 to 75 and controls the heat supply facilities 64 to 65. The local control devices 74 to 75 respectively control the heat supply facilities 64 to 65. The local control device 74 controls the heat supply facility (A) 64, and the local control device 75 controls the heat supply facility (B) 65.
[0154] The thermoelectric planning unit 3 corresponds to the power generation planning unit 2 in Example 2, and determines through optimization the loads (power generation amount and heat supply amount) of the cogeneration equipment 61-62 and the loads (heat supply amount) of the heat supply equipment 64-65 that minimize operating costs and CO2 emissions, and outputs the determined loads (planned loads) to the power generation equipment control unit 1 and the heat supply equipment control unit 4, respectively.
[0155] The power / heat measurement equipment 8 corresponds to the power measurement equipment 5 in the second embodiment, and measures the amount of power consumption, which is the power demand, and the amount of heat consumption, which is the heat demand.
[0156] 20 is a diagram showing an example of the configuration of planned load data output by the thermoelectric power planning unit 3. The planned load data in this embodiment differs from the planned load data in embodiments 1 and 2 (FIG. 3) in that the planned load includes both power and heat data.
[0157] In this embodiment, the heat and power planning unit 3 determines the load of each facility by optimization using the predicted value of heat demand as a condition in addition to the predicted value of power demand.
[0158] 21 is a diagram showing an example of the configuration of load following priority data that the load following priority setting unit 6 outputs to the power generation facility control unit 1 and the heat supply facility control unit 4. The load following priority data in this embodiment differs from the load following priority data (FIG. 4) in embodiments 1 and 2 in that it includes load following priorities for the cogeneration facilities 61 and 62 (cogeneration facilities A to B) and the heat supply facilities 64 and 65 (heat supply facilities A to B).
[0159] In this embodiment, the cogeneration facilities 61-62 are controlled to generate electricity in amounts that match the load requirement, but the amount of heat generated is not controlled. Heat is generated additionally from the waste heat after power generation. This control method is called power-driven control. For this reason, among the facilities that supply heat, it is the heat supply facilities 64-65, such as boilers, that perform load-following operation, rather than the cogeneration facilities 61-62.
[0160] The power generation equipment control unit 1 and the heat supply equipment control unit 4 each receive input of the planned loads and load following priorities for power and heat, as well as input of the measured values of power consumption and heat consumption from the power / heat measurement equipment 8, and generate control signals for the cogeneration equipment 61-62 and the heat supply equipment 64-65. The heat supply equipment control unit 4 performs the same processing as the power generation equipment control unit 1 described in the first and second embodiments, and controls the heat supply equipment 64-65 as a whole by combining and using the control modules set for each of the heat supply equipment 64-65.
[0161] As described above, the thermoelectric control system according to this embodiment controls both the power generation equipment (cogeneration equipment 61-62) and the heat supply equipment 64-65, and even if the power supply or heat supply is insufficient or excessive compared to the plan, the load can be appropriately distributed according to the operating status of the power generation equipment and the heat supply equipment, thereby improving the reliability of operation.
[0162] Furthermore, the thermoelectric control system according to this embodiment can also control only the heat supply facilities 64 to 65. That is, the thermoelectric control system according to this embodiment includes the heat supply facility control unit 4 but does not include the power generation facility control unit 1, and controls only the heat supply facilities 64 to 65, so that even if the heat supply is insufficient or excessive relative to the plan, the load can be appropriately distributed according to the operating state of the heat supply facilities.
[0163] It should be noted that the present invention is not limited to the above-described embodiments, and various modifications are possible. For example, the above-described embodiments have been described in detail to clearly explain the present invention, and the present invention is not necessarily limited to embodiments that include all of the described configurations. Furthermore, it is possible to replace part of the configuration of one embodiment with the configuration of another embodiment. It is also possible to add the configuration of another embodiment to the configuration of one embodiment. It is also possible to delete part of the configuration of each embodiment, or to add or replace other configurations.
[0164] 1...power generation equipment control unit, 2...power generation planning unit, 3...thermoelectric power planning unit, 4...heat supply equipment control unit, 5...power measurement equipment, 6...load following priority setting unit, 7...display device, 8...power / heat measurement equipment, 11...data acquisition unit, 12...control logic unit, 13...control module priority setting unit, 21...load following mode setting unit, 22...load estimation unit, 23...load correction value addition unit, 24...range deviation amount calculation unit, 25...division processing unit, 26...range setting unit, 27 ...Start / stop judgment unit, 31-33...power generation equipment, 34...renewable energy equipment, 41-43...local control device, 44...local control device, 51-53...control response model, 54...solar power generation amount condition setting unit, 55...power consumption amount condition setting unit, 56...result storage unit, 61-62...cogeneration equipment, 64-65...heat supply equipment, 71-72...local control device, 74-75...local control device, 121-123...control module.
Claims
1. A thermoelectric control system comprising: a control unit that controls a plurality of facilities including at least one of power generation facilities and heat supply facilities; and a load following priority setting unit that stores a priority for load following for each of the facilities, wherein the control unit comprises a plurality of control modules that control each of the facilities, wherein the control module: inputs a planned load value that is a planned load of the facilities, and inputs a load correction value that is a value for correcting the load from the control module that controls the facilities with the higher priority, obtains an adjusted load by correcting the planned load value using the load correction value, performs range limiter processing to match the adjusted load to a load range of the facilities controlled by the control module, and outputs the adjusted load after the range limiter processing as a load request value of the facilities, and outputs a value at which the adjusted load exceeds the load range as the load correction value to the control module that controls the facilities with the lower priority.
2. The thermoelectric control system of claim 1, wherein the load following priority setting unit changes the priority depending on at least one of the following information: a difference between the actual value of the load demand and the planned load value; a difference between the amount of power generated by the facility and the actual value of the load demand when the facility is a renewable energy facility; the amount of power stored in the facility when the facility is a storage battery; a time period during which the facility is operating; a power generation efficiency of the facility when the facility is a power generation facility; and a cumulative time for which the facility has performed the load following operation.
3. The thermoelectric control system according to claim 1, further comprising a display device, the display device displaying the current priority for each of the pieces of equipment.
4. A thermoelectric control system as described in claim 2, further comprising a display device which displays values of the information used by the load following priority setting unit to change the priority, and which displays an operation mode of the equipment determined from at least one of the information.
5. A thermoelectric control simulation program for causing a computer to realize the functions of the control unit, the load following priority setting unit, and the control module of the thermoelectric control system described in claim 1.
6. The thermoelectric control simulation program according to claim 5, wherein a control response model outputs a response of the equipment to the load request value and a control signal of the equipment, and the response output by the control response model is used as an input value.
Citation Information
Patent Citations
Energy management system, energy management method, and computer program
JP2016131434A
Power generation system, method for controlling power generation system, and power generation device
WO2017131094A1