The use of adjustable buoyancy elements allows for efficient and safe installation of large monopiles by pivoting them from a horizontal to a vertical orientation, addressing the challenges of size and weight, and enhancing the installation process with precise control and reduced equipment requirements.
Patent Information
- Application Number
- PCT/DK2024/050108
- Authority / Receiving Office
- WO · WO
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2023-06-22
- Filing Date
- 2024-05-10
- Publication Date
- 2024-11-21
AI Technical Summary
The installation of large monopiles for offshore wind turbines poses challenges due to their size and weight, requiring specialized vessels and cranes, and existing methods are complex and weather-dependent, with issues such as leaky end caps and complicated upending processes.
A method involving buoyancy elements mounted on the monopile to float it horizontally, then pivot to a vertical orientation using adjustable buoyancy forces, allowing for easier transportation and installation without oversized cranes, utilizing a differential control system and remote-controlled valves for precise buoyancy adjustments.
Enables efficient and weather-resistant installation of large monopiles by reducing the need for oversized equipment and simplifying the installation process, with improved control and safety through precise buoyancy management.
Smart Images

Figure DK2024050108_21112024_PF_FP_ABST
Abstract
Description
[0001] Monopile manoeuvring method, apparatus and system
[0002] Field
[0003] The technology relates to the field of offshore installation, specifically the manoeuvring and installation of monopiles for offshore wind turbines and other marine structures.
[0004] Offshore wind turbine generators are becoming increasingly popular as a source of renewable energy. These wind turbines are typically installed on large monopiles, which are cylindrical steel structures driven into the seabed to provide a stable foundation for the wind turbine. As the demand for offshore wind energy grows, the size and weight of these monopiles have also increased, posing significant challenges in their transportation and installation.
[0005] The installation of large monopiles typically requires the use of specialized offshore installation vessels equipped with heavy-lift cranes. However, the lifting capacity of these cranes is often limited, making it difficult to handle and install very large monopiles. Additionally, the size and weight of the monopiles can also pose challenges for the installation vessels themselves, as they must be able to safely transport and manoeuvre the monopiles to the installation site.
[0006] Various methods have been proposed in the prior art to address these challenges. One such method, disclosed in N020101529, involves floating the monopile to the installation site using end caps that seal the monopile. This method requires two cranes to lift the monopile and remove the end caps once the monopile is positioned at the offshore installation site. Water is then poured into the monopile to upend it before installation on the seabed. However, this method has several drawbacks. The end caps must be watertight against the monopile but also removable, which can be challenging to achieve. If the end caps leak during transportation, the monopile may sink. Furthermore, the upending process is complicated and may be difficult to carry out in bad weather conditions. Another prior art solution, disclosed in WO2021259822, involves using a cylindrical universal buoyant body mounted on the monopile to float it to the installation site. However, this method also presents challenges in removing the buoyant body and upending the monopile once it has been floated to the installation site.
[0007] Summary
[0008] According to a first aspect of the disclosure, a method of manoeuvring a monopile for installation at an offshore site is provided. The method includes mounting a plurality of buoyancy elements to an outer surface of the monopile or inside the monopile, arranging the buoyancy elements such that the monopile floats in a horizontal orientation, positioning the floating monopile at the offshore installation site, selectively adjusting an upwards buoyancy force of the buoyancy elements on the monopile by deballasting or deflating the one or more buoyancy elements, and pivoting the monopile from the floating horizontal orientation to a vertical installation orientation. The method may further include attaching a lifting cable to either side of the monopile before adjusting the upwards buoyancy force and pivoting as a result of deballasting or deflating the buoyancy elements.
[0009] Optionally, the method comprises attaching a lifting cable to either side of the monopile before the step of adjusting the upwards buoyancy force and the step of pivoting.
[0010] Optionally, the step of attaching the plurality of buoyancy elements to the outer surface of the monopile comprises attaching an attachment mechanism to a monopile coupling element on the monopile.
[0011] Optionally, the step of selectively adjusting the upwards buoyancy force of the buoyancy elements on the monopile comprises deballasting one or more buoyancy element ballast tanks.
[0012] Optionally, the method further comprises the step of activating a remote-controlled valve to release air from the buoyancy elements ballast tanks or introduce water into the buoyancy elements ballast tanks and decreasing the buoyancy force. Optionally, the method further comprises the step of using a differential control system to adjust the buoyancy of different buoyancy elements independently, thereby creating a desired turning moment about a centre of gravity of the monopile.
[0013] Optionally, the method further comprises the step of detaching the attachment mechanism from the monopile after pivoting the monopile to the vertical installation orientation.
[0014] Optionally, the method further comprises the step of removing the buoyancy elements from the outer surface of the monopile after installation on the seabed. Optionally, the method further comprises the step of removing the buoyancy elements from the outer surface of the monopile before installation on the seabed.
[0015] Optionally, the method further comprises the step of lifting the buoyancy elements up with the lifting cable of a crane after detaching the attachment mechanism from the monopile.
[0016] Optionally, the step of attaching the plurality of buoyancy elements to the outer surface of the monopile comprises positioning the buoyancy elements either side of a centre of gravity of the monopile.
[0017] Optionally, the step of attaching the lifting cable to either side of the monopile comprises connecting the lifting cable to a first trunnion and a second trunnion mounted on the outer surface of the monopile.
[0018] According to a second aspect of the disclosure, a buoyancy apparatus for manoeuvring a monopile for offshore installation is provided. The apparatus includes a plurality of buoyancy elements configured to be mounted on an outer surface of the monopile such that the monopile floats in a horizontal orientation, an attachment mechanism for attaching the buoyancy elements to the outer surface of the monopile, and at least one valve for selectively adjusting an upwards buoyancy force of one or more of the buoyancy elements on the monopile, enabling the monopile to pivot from the floating horizontal orientation to a vertical installation orientation. Optionally, the attachment mechanism is configured to engage with a monopile fixing on the monopile).
[0019] Optionally, the at least one valve is a remote-controlled valve.
[0020] Optionally, the buoyancy apparatus further comprises one or more buoyancy element ballast tanks configured to receive water or release air to adjust the buoyancy force of the buoyancy elements.
[0021] Optionally, the buoyancy apparatus further comprises a differential control system configured to adjust the buoyancy of different buoyancy elements independently, thereby creating a desired turning moment about a centre of gravity of the monopile.
[0022] Optionally, the buoyancy elements are configured to be positioned either side of a centre of gravity of the monopile.
[0023] Optionally, the plurality of buoyancy elements comprises a plurality of buoyancy body elements coupled together in each buoyancy element and a flexible connection that connects each buoyancy body element to each other.
[0024] Brief Description of the Drawings
[0025] The disclosure will now be described in more detail with reference to the accompanying drawings, in which:
[0026] Figure 1 is a schematic side view of a monopile floating in a horizontal orientation towards an offshore installation site according to an example;
[0027] Figure 2 is a schematic plan view of a monopile floating in a horizontal orientation towards an offshore installation site according to an example;
[0028] Figure 3a is a perspective view of floating monopile with a plurality of buoyancy elements according to a first example;
[0029] Figure 3b is a perspective view of floating monopile with a plurality of buoyancy elements according to a second example; Figure 4a shows a side view of the monopile pivoting from a horizontal orientation to a vertical orientation according to a first example;
[0030] Figures 4b and 4c shows a side view of the monopile pivoting from a horizontal orientation to a vertical orientation according to a second example;
[0031] Figure 5a shows a side view of the monopile pivoting from a horizontal orientation to a vertical orientation according to a first example;
[0032] Figure 5b shows a side view of the monopile pivoting from a horizontal orientation to a vertical orientation according to a second example;
[0033] Figures 6a and 6b are respectively a cross-sectional view and a close-up cross- sectional view of the monopile and an attachment mechanism and monopile fixing according to a first example;
[0034] Figures 6c and 6d are respectively a cross-sectional view and a close-up cross- sectional view of the monopile and an attachment mechanism and monopile fixing according to a second example;
[0035] Figures 7a and 7b respectively show a side cross-sectional view and a perspective view of an attachment mechanism according to an example;
[0036] Figures 7c and 7d respectively show a side cross-sectional view and a perspective view of an attachment mechanism according to an example;
[0037] Figure 8 shows a perspective view of a monopile gripper according to an example;
[0038] Figure 9 shows the monopile in different orientations according to an example; and Figure 10 shows a flow diagram of a method according to an example.
[0039] Detailed Description
[0040] The detailed description set forth below provides information and examples of the disclosed technology with sufficient detail to enable those skilled in the art to practise the disclosure.
[0041] Figure 1 shows a schematic side view of a monopile 100 floating in a horizontal orientation towards an offshore installation site 124 according to an example. According to an example shown in Figure 1 , a monopile 100 is floating in a horizontal orientation towards the offshore installation site 124. The monopile 100 is supported by a plurality of buoyancy elements 130 (e.g., as shown in Figure 3a) arranged inside the monopile 100. The buoyancy elements 130 are configured to provide sufficient buoyancy force to keep the monopile 100 floating in the horizontal orientation. The monopile 100 is towed towards the offshore installation site 124 by a towing vessel 114.
[0042] The offshore installation site 124 as shown in Figure 1 is adjacent to an offshore jackup vessel 110 according to an example. The offshore jack-up vessel 110 is a jack-up rig 110. However, the methods and apparatus discussed below can be used with other offshore installations and other forms of jack-up equipment such as jack-up vessels or jack-up barges. In some other examples, the offshore jack-up vessel 110 is an offshore installation vessel such as a semisubmersible or a wind turbine installation vessel. In the examples where the offshore installation site 124 does not comprise an offshore jack-up vessel 110, the wind turbine installation vessel is kept in position with a dynamic positioning system. Hereinafter the term offshore jack-up vessel 110 will be used to describe any suitable apparatus at an offshore installation site 124 including an offshore jack-up vessel 110, a wind turbine installation vessel, or any other suitable equipment for installing offshore structures.
[0043] The offshore jack-up vessel 110 as shown in Figure 1 comprises a hull 102 and a plurality of moveable legs 104a, 104b, 104c, 104d. In the example as shown in Figure 1 , there are four moveable legs 104a, 104b, 104c, 104d, but in other examples there can be three moveable legs or more than four moveable legs 104a, 104b, 104c, 104d. In some examples as shown in Figure 1 , the moveable legs 104a, 104b, 104c, 104d, are open truss legs, but in other examples the moveable legs 104a, 104b, 104c, 104d, are solid cylindrical legs.
[0044] The moveable legs 104a, 104b, 104c, 104d extend downward through the hull 102 via respective jacking mechanisms (not shown). The jacking mechanisms, in some examples, are hydraulically operated rack and pinion mechanisms. The operation of an offshore jack-up vessel 110 is known and will not be discussed in further detail.
[0045] In Figure 1 the offshore jack-up vessel 110 is illustrated with the moveable legs 104a, 104b, 104c, 104d in an extended position engaged with the seabed 106. The moveable legs 104a, 104b, 104c, 104d are moveable between the extended position and a retracted position, such that the hull 102 may float on the surface 108 of a body of water 112 and may be transported to a desired location.
[0046] Figure 1 shows the offshore jack-up vessel 110 in an operational configuration where the hull 102 has been raised above the surface 108 of the body of water 112.
[0047] The hull 102 comprises a deck 116 for storing equipment for the offshore installation operation. The hull 102 optionally comprises a cut-out portion 118 at one end of the offshore jack-up vessel 110.
[0048] This means the hull 102 comprises a cut-out portion 118 whereby the floating monopile 100 is accessible from above when at least a portion of the monopile 100 is underneath the hull 102 of the offshore jack-up vessel 110. This means that floating monopile 100 can be manoeuvred close to the deck 116. In some examples, the monopile 100 is lifted through the cut-out portion 118 in the hull 102.
[0049] Figure 1 shows a towing vessel 114 which is configured to move the floating monopile 100. The towing vessel 114 may be in some examples an anchor handling vessel 114 which is arranged to transport the monopile 100 into the vicinity of the offshore jack-up vessel 110. The towing vessel 114 may be in some examples configured to tow the monopile 100 to the offshore jack-up vessel 110. In some examples the anchor handling vessel 114 is instead another powered vessel such as platform supply vessel (PSV), multipurpose support vessel (MSV) tugboats, ice breaker, patrol boat, coast guard vessel, navy vessel, fire-fighting vessel, or any other suitable vessel for managing the movement the monopile 100.
[0050] In one example, the towing vessel 114 may be configured to tow the floating monopile 100 towards the offshore installation site 124. The towing process may involve positioning the floating monopile 100 at a first site remote from the offshore jack-up vessel 110 e.g., a dock and attaching one or more towing lines 122 to the floating monopile 100. In some examples, more than one towing vessel 114 may be used to tow the monopile 100 to the offshore jack-up vessel 110 via a plurality of towing lines 122. The towing line 122 may be connected to floating monopile 100 via first and second trunnions 380, 390. Accordingly, the towing vessel 114, may facilitate the manoeuvring and installation of the monopile 100.
[0051] Figure 2 shows a schematic plan view of the monopile 100 floating in a horizontal orientation towards the offshore jack-up vessel 110.
[0052] The offshore jack-up vessel 110 may comprise various components and systems to facilitate the manoeuvring and installation of the monopile 100. In some examples, the offshore jack-up vessel 110 may include a crane 120 and a lifting cable 190 for attaching to the monopile 100. The crane 120 may be mounted on the deck 116 of the offshore jack-up vessel 110 and may comprise various components and functionalities to facilitate the lifting and manoeuvring of the monopile 100. As shown in Figure 2, the crane 120 is moveable within a working area defined by circle C.
[0053] In some examples, the offshore jack-up vessel 110 may comprise additional optional features. For example, the crane 120 comprises various components and functionalities, such as a crab and hoist assembly, a main beam 340, a counterweight system, a load monitoring system, a hydraulic power unit, an electrical system, and a heave compensator 200.
[0054] The heave compensator 200 may include components such as a piston, a cylinder, a valve, an accumulator, a spring, a sensor, and a controller, and may provide passive or active heave compensation for the lifting cable 190. Accordingly, when the lifting cable 190 is connected to the monopile 100, the relative motion due to the heave of the monopile 100 with respect to the offshore jack-up vessel 110 is eliminated or reduced. The heave compensator 200 may be connected to a winch for the lifting cable 190 of the crane 120.
[0055] In some other examples, the heave compensator 200 is additionally or alternatively, an in-line heave compensator. In this case, the in-line heave compensator is attached between the monopile 100 and the lifting cable 190 or between the monopile 100 and a crane hook connected to the lifting cable 190. The in-line heave compensator is a passive heave compensator and reduces the effect of the wave motion on the lifting cable 190 and crane 120. The lifting cable 190 may be configured to be connected to the monopile 100. In some examples, the lifting cable 190 is configured to be connected to a first trunnion 380 and a second trunnion 390 mounted on the outer surface 360 of the monopile wall 350. One or more loops of the lifting cable 190 can be placed over the first and second trunnion 380, 390. The monopile 100 may pivot about the first and second trunnions 380, 390 as the buoyancy force of the buoyancy elements 130 is adjusted. Whilst the examples described in reference to the drawings disclose that the lifting cable 190 may be configured to be connected to the monopile 100 via a first trunnion 380 and a second trunnion 390, other connection solutions can be used. For example, the monopile 100 can be attached to the lifting cable 190 via a yoke (not shown) or another connection tool. In other examples any suitable handling and connection mechanism e.g., brackets, clamps, etc. can be used to connect the lifting cable 190 to the monopile 100. In some examples, the lifting cable 190 can lift a portion of the weight of the monopile 100. In other examples the lifting cable 190 allows the monopile 100 to rest and secure the monopile 100 before the upending operation as described herein. In some examples, the lifting cable 190 does not lift the entire weight of the monopile 100 out of the water. In this way, the lifting cable 190 does not have to take the full weight of the monopile 100 during the upending operation due to the buoyancy force of the buoyancy elements 130 and the force of gravtiy. In this way, the lifting cable 190, may not perform much lifting of the monopile 100 if any in some examples. Accordingly the lifting cable 190 is configured to partially support the weight of the monopile 100 during the selective adjustment of the upwards buoyancy force of the buoyancy elements 130.
[0056] In some examples, the offshore jack-up vessel 110 may comprise a monopile gripper 140 configured to grip the monopile 100 in the vertical orientation before the monopile 100 is installed into the seabed 106. The monopile gripper 140 may include gripper arms 400 that are movable between a gripping position, where the gripper arms 400 are clamped against the monopile wall 350, and a release position, where the gripper arms 400 do not engage the monopile wall 350.
[0057] The gripper arms 400 may pivot about a gripper joint 410 when moving between the gripping position and the release position. In some examples, the monopile gripper 140 may include multiple sets of gripper arms 400 to grip the monopile 100 at different locations.
[0058] In some examples, the monopile gripper 140 may be movable in a direction parallel to the plane of the deck 116. The directions of movement of the monopile gripper 140 with respect to the deck 116 are shown in Figure 2 and labelled A and B. The direction A is in a direction parallel with the longitudinal axis of the offshore jack-up vessel 110. The direction B is perpendicular to the direction A and in a direction across the longitudinal axis of the offshore jack-up vessel 110. The monopile gripper 140 may comprise various mechanisms for movement in the plane of the deck 116, such as a vertical rail or track on the deck 116, a scissor lift mechanism, a hydraulic piston and cylinder system, a pneumatic actuator, an electric motor and linear actuator, a cable and pulley system for vertical movement, a screw or worm gear system for linear motion, a sliding track or rail on the deck 116, or a swivelling pivot point on the deck 116. By moving the monopile gripper 140 with respect to the deck 116, the monopile 100 can be positioned above the installation location on the seabed 106.
[0059] The monopile gripper 140 may be additionally or alternatively, moveable in a direction perpendicular to the deck 116 of the offshore jack-up vessel 110, for example, by moving up and down along a vertical rail or track on the deck 116, using a scissor lift mechanism, a hydraulic actuator 420 (e.g. as shown in Figure 8) comprising a piston and cylinder system, a pneumatic actuator, an electric motor and linear actuator, a cable and pulley system for vertical movement, or a screw or worm gear system for linear motion. Any other suitable mechanism can be used to lift or lower the monopile gripper 140. This means that the monopile gripper 140 can be adjusted to grip at different heights on the monopile 100. For example, it may be advantageous to grip the monopile 100 closer to the centre of gravity 440 of the monopile 100. This will limit the turning moment of the monopile 100 when secured in the vertical orientation by the monopile gripper 140.
[0060] Additionally, the monopile gripper 140 can move in a direction perpendicular to the deck 116 of the offshore jack-up vessel 110 when gripping the monopile 100. This means that the monopile 100 can be raised and lowered with respect to the seabed 106 when secured by the monopile gripper 140. This means that the monopile gripper 140 can lift the monopile 100 above installation infrastructure that may be preinstalled on the seabed 106 prior to installation of the monopile 100. Optionally, the lifting cable 190 and the crane 120 can be used to assist the monopile gripper 140 to lift the monopile 100 when secured by the monopile gripper 140 in the vertical orientation.
[0061] Furthermore, the monopile gripper 140 can be configured to grip the monopile 100 and rotate whilst gripping the monopile 100. In this way, the monopile gripper 140 is configured to rotate the monopile 100 whilst the monopile 100 is being upended and the buoyancy of the buoyancy elements 130 are being selectively adjusted as described in reference the examples herein.
[0062] Additionally or alternatively, the monopile gripper 140 or the lifting cable 190 can be replaced or supplemented with lifting arms (not shown). The lifting arms can lift the monopile 100 such that the monopile 100 rests on the lifting arms before the upending of the monopile 100. The lifting arms can be mounted to the offshore jack-up vessel 110. The lifting arms are configured to lift the monopile 100 between a first position and a second position. The second position can be in the water or out of the water. Accordingly, the lifting arms can lift the monopile 100 under water, partially out of the water of fully out of the water when the monopile 100 is in the horizontal orientation. The lifting arms can lift one end of the monopile 100 so that one end of the monopile 100 is lifted. This may be done at the same time or before the step of selectively adjusting an upwards buoyancy force of the buoyancy elements in order to start or aid the upending process.
[0063] Figure 3a shows a perspective view of the floating monopile 100 with a plurality of buoyancy elements 130 according to a first example. In one example, the buoyancy elements 130 are configured and arranged to provide sufficient buoyancy to the monopile 100, allowing it to float in a horizontal orientation e.g., as shown in Figure 3a.
[0064] The buoyancy elements 130 are mounted on the outer surface 360 of the monopile 100. The buoyancy elements 130 are each connected via an attachment mechanism 210 (best shown in Figures 6a and 6b), which is configured to engage with a monopile fixing 220 on the monopile 100. In some examples the monopile fixing 220 is permanently mounted on the outer surface 360 of the monopile 100. In some other examples, and as discussed below the monopile fixing 220 is removable. The arrangement of the buoyancy elements 130 around the monopile 100 provides a balanced distribution of buoyancy forces, enabling the monopile 100 to float in a stable horizontal orientation. This configuration facilitates easier transportation and installation of the monopile 100 at the offshore site.
[0065] In some examples, the buoyancy elements 130 comprise a plurality of buoyancy body elements 510 coupled together in each buoyancy element 130. The buoyancy body elements 510 can be formed from various materials, such as rigid or semi-rigid materials, providing the necessary buoyancy force to support the monopile 100. The coupling of the buoyancy body elements 510 allows for flexibility in the arrangement of the buoyancy elements 130 around the monopile 100, accommodating different monopile 100 sizes and shapes.
[0066] In one example, the buoyancy body elements 510 are connected to each other using flexible connections 520. The flexible connections 520 may comprise various types of connectors, such as nylon straps, high-strength ropes, steel cables, or chain links. The flexible connections 520 enable the buoyancy body elements 510 to be easily adjusted and positioned around the outer surface 360 of the monopile 100, providing a secure and adaptable attachment of the buoyancy elements 130 to the monopile 100.
[0067] For the purposes of clarity, only one flexible connection 520 and two buoyancy body elements 510 are labelled in Figure 3a. There can be any suitable number of buoyancy body elements 510 which are connected together via the flexible connections 520 to form the buoyancy elements 130. Each buoyancy element 130 is configured to be mounted on the outer surface 360 of the monopile 100. In this case, the buoyancy elements 130 can be easily attached and detached from the monopile 100.
[0068] Furthermore, Figure 3a shows four buoyancy elements 130, but there can be any suitable number of buoyancy elements 130 mounted on the monopile 100. Indeed, the number of buoyancy elements 130 can be adjusted to the size, shape, and weight of the monopile 100. In some examples, the buoyancy elements 130 are positioned either side of the centre of gravity 440 of the monopile 100. This arrangement ensures that the buoyancy forces provided by the buoyancy elements 130 are balanced around the centre of gravity 440, allowing the monopile 100 to float in a stable horizontal orientation. The positioning of the buoyancy elements 130 can be adjusted to accommodate different monopile 100 sizes, shapes, and weights, providing a versatile solution for various monopile 100 installations.
[0069] In one example, the buoyancy elements 130 are arranged to balance the turning moments of different buoyancy elements 130 either side of the centre of gravity 440 of the monopile 100. This balanced arrangement ensures that the monopile 100 remains stable during transportation and installation, reducing the risk of unwanted movement or rotation. The balancing of turning moments can be achieved by adjusting the position, size, and buoyancy force of the buoyancy elements 130 around the monopile 100.
[0070] In some examples, the buoyancy elements 130 may be constructed from various materials, such as rigid or semi-rigid materials, providing the necessary buoyancy force to support the monopile 100. The materials used for the buoyancy elements 130 may include, but are not limited to, rubberized fabric, PVC-coated nylon, high-performance thermoplastic polyurethane (TPU), neoprene, polyvinyl chloride (PVC), silicone-coated fibreglass, polyethylene (PE) foam, ethylene-vinyl acetate (EVA) foam, and closed-cell polyurethane foam. The choice of material for the buoyancy elements 130 may depend on factors such as durability, puncture resistance, and environmental considerations. The construction of the buoyancy elements 130 may also include reinforcement ribs or bars (not shown) to provide additional structural support and maintain the shape of the buoyancy elements 130 during transportation and installation of the monopile 100.
[0071] In one example, the method of manoeuvring a monopile 100 for installation at an offshore site involves positioning the floating monopile 100 at the offshore installation site 124. The monopile 100 is provided with a plurality of buoyancy elements 130 mounted on its outer surface 360, which are arranged such that the monopile 100 floats in a horizontal orientation. This horizontal orientation of the monopile 100 facilitates easier towing and positioning at the offshore installation site 124. As mentioned above, in some examples, the floating monopile 100 is towed to the offshore installation site 124 by a towing vessel 114 using towing lines 122. The towing vessel 114 may be specifically designed for towing large structures, such as monopiles 100, to offshore installation sites 124. The use of towing lines 122 allows for controlled and stable towing of the floating monopile 100 to the offshore installation site 124. This towing process reduces the need for oversized cranes 120 and vessels, providing a simpler and more weather-resistant process compared to prior art methods.
[0072] The use of an offshore jack-up vessel 110 with a crane 120 allows for precise positioning and installation of the monopile 100 at the offshore installation site 124. This method provides a more efficient and weather-resistant process for installing large monopiles 100 compared to prior art methods.
[0073] Figure 4a schematically shows a side view of the monopile 100 pivoting from a horizontal orientation to a vertical orientation according to a first example. In Figure 4a the monopile 100 has just started pivoting from the horizontal orientation. In some examples, the lifting cable 190 of the crane 120 is attached to either side of the monopile 100 at the first and second trunnions 380, 390. The buoyancy force of the buoyancy elements 130 is selectively adjusted to generate a turning moment about the centre of gravity 440 of the monopile 100. This turning moment causes the monopile 100 to pivot from the horizontal orientation to the vertical installation orientation.
[0074] Whilst Figure 4a schematically shows that each buoyancy element 130 comprises a separate remote-controlled valve 320. However, in some other examples, all the buoyancy elements 130 can be in fluid communication and ballast or deballast by a single remote-controlled valve 320. This may provide a simpler arrangement. However, a plurality of remote-controlled valves 320 may be preferable to increase the resilience and control in the upending operation.
[0075] The term “ballast” means adjusting the buoyancy force such that the upwards buoyancy force is decreased. This means that air can be removed from the buoyancy elements 130 or additional weight can be added to the buoyancy elements 130. The term “deballast” means adjusting the buoyancy force such that the upwards buoyancy force is increased. This means that air can be introduced into the buoyancy elements 130 or additional weight can be removed from the buoyancy elements 130.
[0076] Similarly, Figure 5a shows a side view of the monopile 100 pivoting from a horizontal orientation to a vertical orientation according to a first example. In Figure 5a the monopile 100 has nearly finished pivoting into the vertical orientation. Once the monopile 100 is in the vertical orientation, the monopile 100 optionally secured in a monopile gripper 140 mounted on the deck 116 of the offshore jack-up vessel 110 as discussed.
[0077] In one example, a ballasting mechanism 480 is configured to selectively adjust the buoyancy of the buoyancy elements 130 mounted on the outer surface 360 of the monopile 100. This allows for precise control of the buoyancy force exerted on the monopile 100, enabling the monopile 100 to pivot from a floating horizontal orientation to a vertical installation orientation.
[0078] In some examples, the ballasting mechanism 480 may comprise one or more buoyancy element ballast tanks 460 mounted in one or more buoyancy body elements 510. This is best shown in Figure 4a. The buoyancy element ballast tanks 460 are configured to selectively receive water or release air to adjust the buoyancy force of the buoyancy elements 130. This allows for precise control over the buoyancy force exerted on the monopile 100, enabling the monopile 100 to pivot from a floating horizontal orientation to a vertical installation orientation. As can be seen from Figure 4a a first buoyancy element ballast tank 460a is empty and contains air only and a second buoyancy element ballast tank 460b is full and contains water. In some examples, one or more other buoyancy element ballast tanks 460 can be empty, full or partially full of water as required to selectively adjust the buoyancy force.
[0079] In some examples, the ballasting mechanism 480 may further comprise a ballast pump 490 for adding or removing water from the buoyancy element ballast tanks 460. The ballast pump 490 may be integral with one of the buoyancy elements 130 or may be remote from the buoyancy elements 130 and connectable to the buoyancy element ballast tanks 460 when the monopile 100 is at the installation site. The ballast pump 490 allows for rapid and precise adjustment of the buoyancy force of the buoyancy elements 130, providing increased control over the installation process. The ballast pump 490 is configured to pump the water 112 immediately surrounding the monopile 100 into the buoyancy element ballast tanks 460. Each of the buoyancy element ballast tanks 460 is in fluid communication with the ballast pump 490. This is schematically shown in Figure 4a with dotted lines between the ballast pump 490 and the remote-controlled valves 320.
[0080] In some examples, the ballasting mechanism 480 may comprise a manually controlled or remote-controlled valve 320 in fluid communication with the buoyancy element ballast tanks 460. The remote-controlled valve 320 may include a valve body, an actuator, a controller 330, a sensor input, data processing circuitry, output circuitry, a remote-control receiver, and a power supply. The remote-controlled valve 320 allows for selective release of air from the buoyancy element ballast tanks 460 or introduction of water into the buoyancy element ballast tanks 460, thereby adjusting the buoyancy force of the buoyancy elements 130. In some examples, the controller 330 is configured to send control instructions to the ballast pump 490 and I or the remote- controlled valve 320. The controller 330 is shown in Figure 4a as being adjacent to the buoyancy elements 130, however in other examples the controller 330 can be remote from the buoyancy elements 130. For example, the controller 330 can be on the offshore jack-up vessel 110 and the controller 330 communicates wirelessly or via wired connection to the ballast pump 490 and I or the remote-controlled valve 320.
[0081] In some examples, the buoyancy elements 130 as shown in Figure 4a may be designed with integrated ballasting mechanisms 480, such as buoyancy element ballast tanks 460, ballast pumps 490, or remote-controlled valves 320, to provide a compact arrangement which does not need to be assembled at the installation site. This may help to improve the accuracy and stability of the monopile 100 pivoting and positioning process and reduce the risk of errors or misalignments.
[0082] The remote-controlled valve 320 provides several advantages, including increased control over the buoyancy force exerted on the monopile 100, reduced risk of damage to the monopile 100 during installation, and the ability to handle very large monopiles 100 without the need for oversized cranes 120 and vessels. Additionally, the remote- controlled valve 320 allows for precise control over the buoyancy force of the buoyancy elements 130, enabling the monopile 100 to pivot from a floating horizontal orientation to a vertical installation orientation.
[0083] In some examples, the ballasting mechanism 480 may comprise a differential control system controlled by the controller 330 configured to adjust the buoyancy of different buoyancy elements 130 independently. This allows for the creation of a desired turning moment about the centre of gravity 440 of the monopile 100, enabling the monopile 100 to pivot from a floating horizontal orientation to a vertical installation orientation. The differential control system provides increased control over the installation process, reduced risk of damage to the monopile 100 during installation, and the ability to handle very large monopiles 100 without the need for oversized cranes and vessels.
[0084] In some alternative examples, the buoyancy elements 130 may comprise inflatable material, such as air-filled bladders, rubberized fabric, PVC-coated nylon, high- performance thermoplastic polyurethane (TPU), neoprene, polyvinyl chloride (PVC), silicone-coated fibreglass, polyethylene (PE) foam, ethylene-vinyl acetate (EVA) foam, or closed-cell polyurethane foam. The inflatable material may be durable and punctureresistant to withstand the harsh offshore environment and installation process. In this case, the buoyancy elements 130 do not contain a buoyancy element ballast tank 460.
[0085] Instead in some examples, the buoyancy elements 130 may be inflated or deflated to adjust the buoyancy force exerted on the monopile 100. This may be achieved by introducing air into the buoyancy elements 130 to increase the buoyancy force. Similarly, this may be achieved by deflating one or more buoyancy elements 130 to decrease the buoyancy force.
[0086] In one example, the monopile 100 pivoting and installation process involves a series of steps and components that work together to pivot the monopile 100 from a floating horizontal orientation to a vertical installation orientation, and subsequently secure the monopile 100 in the monopile gripper 140 before installing it into the seabed 106. This process is advantageous as it allows for the installation of very large monopiles 100 without the need for oversized cranes and vessels, providing a simpler and more weather-resistant process compared to prior art methods.
[0087] In some examples, the monopile 100 pivoting process involves the use of first and second trunnions 380, 390 mounted on the outer surface 360 of the monopile 100. The first and second trunnions 380, 390 are connectable to the lifting cable 190 and serve as pivot points for the monopile 100 during the pivoting process. The use of the first and second trunnions 380, 390 provides a secure and stable connection between the monopile 100 and the lifting cable 190, ensuring a controlled and safe pivoting process.
[0088] In one example, the lifting cable 190 is attached to either side of the monopile 100 by connecting it to the first and second trunnions 380, 390. This connection allows the monopile 100 to pivot about the trunnions as the lifting cable 190 is manipulated by the crane 120. The lifting cable 190 and the first and second trunnion 380, 390 connection ensures a secure and stable pivoting process, reducing the risk of accidents or damage to the monopile 100 during installation. In some examples, the lifting cable 190 may not actually raise the monopile 100 during the up-ending process. The optional heave compensator 200 ensures that the variation in the wave height does not overload the crane 120.
[0089] In some examples, once the monopile 100 has been pivoted to the vertical installation orientation, it is secured in a monopile gripper 140 mounted on the deck 116 of the offshore jack-up vessel 110. The monopile gripper 140 is configured to grip the monopile 100 in the vertical orientation before the monopile 100 is installed into the seabed 106. The gripper may comprise gripper arms 400, a gripper joint 410, and a gripper arm hydraulic actuator 420. The gripper arms 400 are movable between a gripping position, where the gripper arms 400 are clamped against the monopile wall 350, and a release position, where the gripper arms 400 do not engage the monopile wall 350.
[0090] Once the monopile 100 is secured in the monopile gripper 140, it is hammered into the seabed 106 using a suitable installation method, such as a hydraulic hammer or a vibratory hammer. The use of the gripper ensures a stable and secure installation process, reducing the risk of accidents or damage to the monopile 100 during installation.
[0091] In conclusion, the monopile 100 pivoting and installation process described in this section provides a safe, efficient, and controlled method for installing large monopiles 100 in offshore environments. The use of buoyancy elements 130, the first and second trunnions 380, 390, lifting cables 190, and grippers, along with the ability to selectively adjust the buoyancy force of the buoyancy elements 130, ensures a precise and stable pivoting process, ultimately leading to a successful installation of the monopile 100 into the seabed 106.
[0092] In some examples, the detachment and removal of buoyancy elements 130 from the monopile 100 are steps in the installation process. These steps ensure that the buoyancy elements 130 do not interfere with the final installation of the monopile 100 into the seabed 106 and allow for the reuse of the buoyancy elements 130 in subsequent installations.
[0093] In one example, after pivoting the monopile 100 from the floating horizontal orientation to the vertical installation orientation and securing the monopile 100 in the monopile gripper 140, the attachment mechanism 210 is detached from the monopile 100. The detachment of the attachment mechanism 210 may be achieved by remotely controlling the release line 310 connected to the moveable locking element 300 as discussed below in reference to Figures 7a and 7b. The moveable locking element 300 disengages from the outer surface 360 of the monopile wall 350, allowing the attachment mechanism 210 to be released from the monopile 100.
[0094] In some examples, the buoyancy elements 130 may be removed from the outer surface 360 of the monopile 100 before the monopile 100 is installed into the seabed 106. This may be possible if the monopile 100 weight is below the crane 120 lifting capacity. Alternatively in some examples, the buoyancy elements 130 may be removed from the outer surface 360 of the monopile 100 after the monopile 100 is installed into the seabed 106. This may be preferable if the monopile 100 weight is above the crane 120 lifting capacity and the upwards buoyancy force generated by the buoyancy elements 130 attached to the monopile 100 keeps the total weight exerted on the lifting cable 190 below the lifting capacity of the crane 120. This removal may be achieved by lifting the buoyancy elements 130 up with the lifting cable 190 of the crane 120 after detaching the attachment mechanism 210 from the monopile 100. Alternatively, the buoyancy elements 130 may be floated away from the monopile 100 after detaching the attachment mechanism 210 from the monopile fixings 220.
[0095] The detachment and removal of the buoyancy elements 130 provide several advantages. First, it ensures that the buoyancy elements 130 do not interfere with the final installation of the monopile 100 into the seabed 106. Second, it allows for the reuse of the buoyancy elements 130 in subsequent installations, reducing the overall cost and environmental impact of the installation process. Third, it provides a safer and more controlled installation process, as the buoyancy elements 130 are no longer exerting forces on the monopile 100 during the installation process.
[0096] In some examples, the detachment and removal of the buoyancy elements 130 may be performed manually by personnel on the offshore jack-up vessel 110. In other examples, the detachment and removal of the buoyancy elements 130 may be performed automatically using robotic or automated systems. In yet other examples, the detachment and removal of the buoyancy elements 130 may be performed using a combination of manual and automated methods.
[0097] In some examples, the detachment and removal of the buoyancy elements 130 may be performed using alternative methods, such as clamping mechanisms, magnetic clamps or adapters, or other suitable means for securing and releasing the buoyancy elements 130 from the monopile 100. These alternative methods may provide additional flexibility and adaptability in the detachment and removal process, allowing for the use of different types of buoyancy elements 130 and attachment mechanisms 210, as well as accommodating various monopile 100 sizes and configurations.
[0098] In some examples, the detachment and removal of the buoyancy elements 130 may be performed in a staged or sequential manner, with different buoyancy elements 130 being detached and removed at different times during the installation process. This staged or sequential removal may provide additional control and stability during the installation process, as well as allowing for the efficient use of the crane 120 and other installation equipment.
[0099] In some examples, the detachment and removal of the buoyancy elements 130 may be performed in conjunction with other installation steps, such as the securing of the monopile 100 in the monopile gripper 140 or the hammering of the monopile 100 into the seabed 106. This concurrent removal may provide additional efficiency and coordination in the installation process, reducing the overall installation time and cost.
[0100] In some examples, alternative materials and designs for the buoyancy elements 130 may be used to provide different properties and characteristics, such as durability, puncture resistance, flexibility, and buoyancy force. These alternative materials and designs may be selected based on specific requirements and constraints of a particular monopile 100 installation project.
[0101] In some examples, the buoyancy elements 130 may be optionally designed with integrated sensors or monitoring systems to detect and report any issues or changes in the buoyancy force, pressure, or integrity of the buoyancy elements 130. This may help to provide real-time feedback and control during the monopile 100 installation process and enable timely adjustments or interventions if necessary.
[0102] Indeed, in some examples, the buoyancy elements 130 may be optionally designed with integrated communication or control systems, such as wireless transmitters, receivers, or controllers, to enable remote monitoring and control of the buoyancy elements 130 during the monopile 100 installation process. This may help to provide greater flexibility and convenience in the operation and management of the buoyancy elements 130 and reduce the need for manual interventions or adjustments.
[0103] In some examples, the buoyancy elements 130 may optionally be designed with integrated power sources, such as batteries, solar panels, or energy harvesting systems, to provide autonomous or self-sufficient operation of the buoyancy elements 130 during the monopile 100 installation process. In some examples, the buoyancy elements 130 may be designed with integrated lighting, signalling, or marking systems, such as LED lights, reflective materials, or flags, to enhance the visibility and safety of the buoyancy elements 130 during the monopile 100 installation process and transportation of the monopile 100 to the installation site. This may help to reduce the risk of collisions or accidents and improve the overall safety and efficiency of the installation process.
[0104] Figures 6a and 6b show a cross-sectional view and a close-up cross-sectional view of the monopile 100 and an attachment mechanism 210 according to a first example. The attachment mechanism 210 is configured to selectively secure the buoyancy elements 130 the monopile 100. This means that the buoyancy elements 130 are removable and reusable. Figure 6b is a close-up of the portion of Figure 6a as indicated by the dotted box labelled D in Figure 6a.
[0105] The attachment mechanism 210 as shown in Figure 6a includes a monopile fixing 220 and a buoyancy element fixing 230. The monopile fixing 220 is in some examples removably connectable to the monopile wall 350, while the buoyancy element fixing 230 is coupled to one or more buoyancy elements 130 using a fastening cable 250. In some examples, the monopile fixing 220 is alternatively permanently fixed to the outer surface 360 of the monopile 100.
[0106] In one example, the attachment mechanism 210 for securing the buoyancy elements 130 to the inner surface 370 of the monopile wall 350 may comprise a monopile fixing 220 and a buoyancy element fixing 230. The monopile fixing 220 may be removably connectable to the monopile wall 350, allowing for easy removal and repositioning of the buoyancy elements 130 as needed. This feature provides the advantage of enabling the reuse of the buoyancy elements 130 for multiple monopile 100 installations, thus reducing costs and increasing efficiency. The buoyancy element fixing 230 may be coupled to one or more buoyancy elements 130 using a fastening cable 250, which may be a rope, wire, chain, or strap.
[0107] In some examples, the monopile fixing 220 may include various types of removable connections, such as bolts, clamps or clips, rivets or pins, interlocking flanges or grooves, or keyed or keyed slot connections. These removable connections allow for a secure attachment of the buoyancy elements 130 to the monopile wall 350 while still being easily removable when necessary. The monopile fixing 220 may be configured to be inserted through the monopile wall 350 or alternatively fixed to an internal structure mounted on the monopile wall 350 such as an eyelet, loop, rail socket etc.
[0108] The buoyancy element fixing 230 may be coupled to one or more buoyancy elements 130 using a fastening cable 250. The fastening cable 250 may be made of various materials, such as rope, wire, chain, or strap, and may be connected to the buoyancy elements 130 using various types of coupling mechanisms, such as clamping mechanisms or magnetic clamps or adapters. This feature allows for a secure connection between the buoyancy elements 130 and the monopile fixing 220, ensuring that the buoyancy elements 130 remain in place during the monopile 100 installation process. In some examples, one or more buoyancy element fixing 230 may be permanently fixed to the buoyancy elements 130. The buoyancy element fixing 230 as shown in Figure 6b is an eyelet which secures the fastening cable 250 thereto. The buoyancy element fixing 230 can be any suitable fastening means such as e.g., bolts, clamps or clips, rivets or pins etc.
[0109] In some examples, the attachment mechanism 210 may be configured to connect multiple buoyancy elements 130 together, providing additional stability and support for the monopile 100 during the installation process. This feature may be advantageous to keep the buoyancy elements 130 in position within the monopile 100 when the monopile 100 is in the floating horizontal position. Furthermore, by connecting all the buoyancy elements 130 together via a plurality buoyancy element fixing 230 and fastening cables 250, all the buoyancy elements 130 can be removed together in one go when lifting by the lifting cable 190 and the crane 120.
[0110] Figure 6b shows the monopile fixing 220 comprising a central fixing bolt 600 and the buoyancy element fixing 230 is attached thereto. Figure 6b shows the buoyancy element fixing 230 having a bolt eyelet 610 configured to connected to the fastening cable 250. The central fixing bolt 600 comprises an outer locking nut 620 configured to engage the central fixing bolt 600 on the outer surface 360 of the monopile wall 350. The outer locking nut 620 is threaded and threadedly engageable with a threaded portion 650 of the central fixing bolt 600. The monopile fixing 220 further comprises an outer wall engaging portion 630 and an inner wall engaging portion 640. In this way, when the outer locking nut 620 is screwed onto the threaded portion 650, the outer wall engaging portion 630 and the inner wall engaging portion 640 clamp against the monopile wall 350. Optionally, the monopile fixing 220 comprises a connection rod 660 which mechanically connects monopile fixings 220 on opposite sides of the monopile wall 350.
[0111] Each buoyancy element 130 can be fixed to the monopile wall 350 via one or monopile fixings 220. In some examples a pair of monopile fixings 220 mounted on opposite sides of the monopile wall 350 secure the buoyancy element 130 to the monopile 100. Each buoyancy element 130 can be secured to the monopile wall 350 via additional monopile fixings 220 as required. Alternatively, in other examples a single monopile fixing 220 is provided to secure a buoyancy element 130 to the monopile wall 350. In some other examples, a plurality of buoyancy elements 130 can be secured to the monopile wall 350 via a single monopile fixing 220. Furthermore, a plurality of buoyancy elements 130 can be secured to the monopile wall 350 via a plurality of common monopile fixings 220.
[0112] Figures 7a and 7b show a side cross-sectional view and a perspective view of an attachment mechanism 210 according to a first example. The attachment mechanism 210 includes a monopile fixing 220 and a buoyancy element fixing 230, as described in the previous example.
[0113] The monopile fixing 220 as shown in Figures 7a and 7b is removable from the monopile wall 350, similar to the arrangement as shown in Figure 6b. However, advantageously, the monopile fixing 220 as shown in Figures 7a and 7b is remotely actuatable. Advantageously, this means that the monopile fixing 220 can be removed from the monopile wall 350 without requiring divers or other personnel manually removing the monopile fixing 220 from the monopile wall 350.
[0114] In one embodiment, the monopile fixing 220 includes a fixing body 260 that is configured to engage with the outer surface 360 and the inner surface 370 of the monopile wall 350. The fixing body 260 may comprise an upper groove 700 on a top side 710 of the fixing body 260 to receive a portion of the monopile wall 350 and a lower groove 720 on a bottom side 730 of the fixing body 260 to receive a portion of the monopile wall 350. This configuration allows for a secure and adjustable connection between the monopile fixing 220 and the monopile wall 350.
[0115] In some embodiments, the monopile fixing 220 includes a locking mechanism 290 that is configured to lock the attachment mechanism 210 to the monopile wall 350. The locking mechanism 290 may comprise a moveable locking element 300 that engages the inner surface 370 of the monopile wall 350 and moves between a locking position, which secures the attachment mechanism 210 to the monopile 100, and an unlocked position, which releases the attachment mechanism 210 from the monopile 100. Alternatively, the moveable locking element 300 engages the outer surface 360 of the monopile wall 350 instead. The moveable locking element 300 is configured to move within a locking element channel 740 for constraining the movement of the moveable locking element 300 when it moves between the locking position and the release position. Figures 7a and 7b show the locking mechanism 290 in the locked position.
[0116] In some examples, the locking mechanism 290 may be manually actuated, automatically actuated, or remotely controlled, providing flexibility in the installation and removal process. Indeed, in one example, the monopile fixing 220 includes a release line 310 that is connected to the moveable locking element 300. The release line 310 may be manually actuated, automatically actuated, or remotely controlled, allowing for easy and efficient adjustment of the locking mechanism 290 during the installation and removal process. The release line 310 may be connected to the moveable locking element 300 in various ways, such as through a direct connection, a pulley system, or any other suitable connection mechanism. In other examples, the release line 310 is replaced with a servo (not shown) controlled by a remote controller and the servo is mechanically connected to the moveable locking element 300 and configured to move the moveable locking element 300 between the locked position and the release position.
[0117] In some examples the locking element channel 740 is also used for guiding the release line 310 away from the monopile fixing 220. Figure 8 shows a perspective view of a monopile gripper 140 according to an example which can be used with the first or second examples as discussed. The monopile gripper 140 is configured to grip the monopile 100 in the vertical orientation before the monopile 100 is installed into the seabed 106. The monopile gripper 140 includes gripper arms 400 that are movable between a gripping position, where the gripper arms 400 are clamped against the monopile wall 350, and a release position, where the gripper arms 400 do not engage the monopile wall 350. The monopile gripper 140 as shown in Figure 8 is mountable on the deck 116 of the offshore jack-up vessel 110. Alternatively, the monopile gripper 140 is mountable in the cut-out portion 118 of the deck 116. The monopile gripper 140 projects out from the deck 116 and over the water 112. In contrast to the monopile gripper 140 disclosed previously, the gripper arms 400 are not pivotable with respect to each other. Instead, the gripper arms 400 are hydraulically actuated by a hydraulic actuator 420 and configured to linearly move towards each other with the monopile 100 disposed therebetween. The monopile gripper 140 further comprises hydraulic actuators 420 to move the secured monopile 100 in the directions A and B and perpendicular thereto.
[0118] Figure 9 shows the monopile 100 in different orientations according to an example as implemement with the first or second examples as discussed. The monopile 100 is shown in a floating horizontal orientation, a pivoted vertical orientation, and a final installed position in the seabed 106.
[0119] Figure 9 shows the monopile 100 in the floating horizontal orientation, and then in the pivoted vertical orientation. In some examples, the monopile 100 is floating in the water 112 at a depth of 60 metres. The depth of the water 112 can be any suitable depth and the method and apparatus discussed herein can work with any size of monopile 100. The monopile 100 comprises a pivot point in order to let the monopile 100 passively upend into the pivoted vertical orientation. As mentioned above, the pivot point is the first and second trunnions 380, 390. Whilst the previous examples have been discussed with reference to the lifting cable 190 connected to the first and second trunnions 380, 390, in other examples, the first and second trunnions 380, 390 can be engaged with a cup element 900. The cup element 900 is configured to engage with the first and second trunnions 380, 390 and allow the first and second trunnions 380, 390 to pivot therein. The cup element 900 is fixed with respect to the offshore jack-up vessel 110 e.g., the hull 102. The cup element 900 is configured to support the weight of the monopile 100 as it passively upends into the vertical orientation. In some examples, the first and second trunnions 380, 390 can be positioned approximately 10 metres above the surface 108 of the water 112. Accordingly, the monopile 100 can be lifted 5 metres above the seabed 106 and then stabbed 5 metres into the seabed 106. The distances can vary according to the size of the monopile 100 and the conditions in the vicinity of the offshore jack-up vessel 110 at the seabed 106. In some examples, the lifting cable 190 can be used only as a pivoting point in order to allow the monopile 100 to passively upend into the pivoted vertical orientation from the horizontal orientation.
[0120] Figure 10 shows a flow diagram of a method according to an example with the first or second examples as discussed.
[0121] The method includes the steps of arranging a plurality of buoyancy elements 130 in the monopile 100 as shown in step 1000. Here the buoyancy elements 130 are arranged around the outer surface 360 of the monopile 100 or inserted in to the interior of the monopile 100. As mentioned above this can be so that the buoyancy elements 130 are evenly distributed in the monopile 100 and equally either side of the centre of gravity 440. Furthermore, the buoyancy elements 130 are wrapped circumferentially around the monopile 100. When the buoyancy elements 130 are arranged on the outer surface 360 the monopile 100 or inside the monopile 100, the buoyancy elements 130 are secured to the monopile 100 as shown in step 1010. This can be achieved with the attachment mechanism 210 as discussed above. The buoyancy elements 130 are then deballasted or inflated as shown in step 1020.
[0122] Steps 1000, 1010 and 1020 can be done on the dockside before the monopile 100 has been lowered into the water 112 or alternatively after the monopile 100 is in the water 112. The monopile 100 then floats in the water 112 as shown in step 1030 such that the monopile 100 floats in a horizontal orientation.
[0123] The towing vessel 114 then tows the floating monopile 100 to the offshore jack-up vessel 110 as shown in step 1040 and positions the floating monopile 100 at an offshore jack-up vessel 110 as shown in step 1050. The step of attaching a lifting cable 190 to the monopile 100 is shown in step 1060. The buoyancy elements 130 are ballast or deflated in order to selectively adjust an upwards buoyancy force of one or more of the buoyancy elements 130 on the monopile 100 as shown in step 1065. For example, only the buoyancy elements 130 on one side of the centre of gravity 440 are deflated (as previously shown in Figure 4a). This causes the monopile 100 to passively upend and the step of pivoting the monopile 100 from the floating horizontal orientation to a vertical installation orientation is shown in step 1070. The monopile 100 is now in the correct orientation for installation.
[0124] If the buoyancy elements 130 are reusable, then the buoyancy elements 130 are ballast or deflating and detached as shown in steps 1080 and 1090 respectively. The lifting cable 190 and crane 120 then remove the buoyancy elements 130 by lifting them out of the interior of the monopile 100 as shown in step 1100. Alternatively, once detached, the buoyancy elements 130 can be deballasted again and floated away or towed away by the towing vessel 114. Step 1100 can be achieved in a single operation if all the buoyancy elements 130 are connected together.
[0125] The monopile 100 is then ready for installation into the seabed 106. The monopile 100 is then stabbed or hammered into the seabed 106 as shown in step 1110. The buoyancy elements 130 may be removed from the outer surface 360 of the monopile 100 before the monopile 100 is installed into the seabed 106 if the monopile 100 weight is below the crane 120 lifting capacity. The step 1110 of stabbing or hammering the monopile 100 into the seabed 106 after the buoyancy elements 130 been removed is shown as a box with a dotted line in Figure 10.
[0126] In some examples the step 1110 of stabbing and I or hammering the monopile 100 into the seabed 106 can occur before the step 1080 of ballasting the buoyancy elements 130, the step 1090 detaching the buoyancy elements 130 and the step 1100 of removing the buoyancy elements 130. This may be preferable if the monopile 100 weight is above the crane 120 lifting capacity and the upwards buoyancy force generated by the buoyancy elements 130 attached to the monopile 100 keeps the total weight exerted on the lifting cable 190 below the lifting capacity of the crane 120. The advantages of the arrangement of buoyancy elements 130 in the monopile 100 include a simpler and more weather-resistant process, allowing for the installation of very large monopiles 100 without the need for oversized cranes and vessels. The use of buoyancy elements 130 and the selective adjustment of their buoyancy force enables the monopile 100 to pivot from a floating horizontal orientation to a vertical installation orientation, reducing the complexity and risk associated with traditional installation methods. Furthermore, the removable and reusable nature of the buoyancy elements 130 and their attachment mechanism 210 allows for greater flexibility and cost savings in the installation process.
[0127] The use of buoyancy elements 130 and the offshore jack-up vessel 110 may allow for the installation of very large monopiles 100 without the need for oversized cranes and vessels.
[0128] This is because the buoyancy elements 130 reduce the net downwards force due to the weight of the monopile 100 exerted on the lifting cable 190 and the crane 120. This means that the weight of the monopile 100 can exceed the lifting capacity of the crane 120 when using the buoyancy elements 130 in the upending process. In some examples the weight of the monopile 100 is 5000 tonnes and the lifting capacity of the crane 120 is 2000 tonnes. Accordingly, smaller cranes 120 and a smaller offshore jack-up vessel 110 can be used to install the monopiles 100. This approach allows for the installation of very large monopiles 100 without the need for oversized cranes 120 and vessels, thereby potentially reducing the costs and complexity associated with offshore monopile 100 installations.
[0129] In some examples, the buoyancy elements 130 may be lifted up with the lifting cable 190 of the crane 120, allowing for easy removal of the buoyancy elements 130 from the monopile 100. This feature may be particularly advantageous for reducing the time and effort required to remove the buoyancy elements 130 from the monopile 100, further increasing the efficiency of the installation process. As mentioned above, if the plurality of buoyancy elements 130 are connected together via the buoyancy element fixing 230, then all the buoyancy elements 130 can be lifted out of the monopile 100 in a single lifting operation. The monopile installation process may further comprise the step of removing the buoyancy elements 130 from the inside of the monopile 100 before or after (similar to the previously discussed examples) installation on the seabed 106. This removal may be achieved by lifting the buoyancy elements 130 up with the lifting cable 190 of the crane 120. The buoyancy elements 130 may be removed from the monopile 100 after the monopile 100 has been pivoted to the vertical installation orientation and secured in the monopile gripper 140. Alternatively, the buoyancy elements 130 may be removed from the monopile 100 after the monopile 100 has been stabbed and hammered into the seabed 106.
[0130] In one example, the removal of buoyancy elements 130 and final installation of the monopile 100 involve detaching the buoyancy elements 130 from the monopile 100 and hammering the monopile 100 into the seabed 106. This process ensures that the monopile 100 is securely installed in the seabed 106, providing a stable foundation for the offshore structure.
[0131] The advantages of the removal of buoyancy elements 130 and final installation process described in the examples include a simpler and more efficient installation process, reduced time and effort required for the installation, and improved accuracy and stability of the installed monopile 100. The use of removable buoyancy elements 130 and optional attachment mechanisms 210, as well as optional remote-controlled valves 320 and optional differential control systems, provide greater flexibility and control during the installation process, allowing for the installation of very large monopiles 100 without the need for oversized cranes and vessels. This innovative method and apparatus for manoeuvring a monopile 100 for offshore installation provide significant benefits and improvements over traditional installation methods, making it a valuable and advantageous solution for the offshore industry.
[0132] In another embodiment two or more embodiments are combined. Features of one embodiment can be combined with features of other embodiments.
[0133] Embodiments of the present invention have been discussed with particular reference to the examples illustrated. However, it will be appreciated that variations and modifications may be made to the examples described within the scope of the invention.
[0134] A second example will now be discussed.
[0135] In the example shown in Figure 3b, the floating monopile 100 includes a plurality of buoyancy elements 130 attached to the inside of the monopile 100 using an attachment mechanism 210. The attachment mechanism 210 secures the buoyancy elements 130 to the inner surface 370 of the monopile wall 350. The buoyancy elements 130 are positioned either side of the centre of gravity 430 of the monopile 100, balancing the turning moments of different buoyancy elements 130.
[0136] Figure 3b shows a plurality of buoyancy elements 130 and specifically shows five buoyancy elements 130. However, in other examples, there are 2, 3, 4, 6, 7, 8 or any other suitable number of buoyancy elements 130. For example, Figures 4b and 4c show four buoyancy elements 130 secured inside the monopile 100.
[0137] In one example, the arrangement of buoyancy elements 130 in the monopile 100 involves positioning a plurality of buoyancy elements 130 within the monopile 100 such that the monopile 100 floats in a horizontal orientation. The buoyancy elements 130 are configured to provide sufficient buoyancy force to keep the monopile 100 floating in the horizontal orientation, allowing for easier transportation and installation at the offshore jack-up vessel 110. For example, the buoyancy elements 130 permit the towing vessel 114 to tow the floating monopile 100 to the offshore jack-up vessel 110.
[0138] As shown in Figure 3b, the monopile 100 is hollow and the water 112 is inside the monopile 100 whilst floating. This means that the monopile 100 does not have to be sealed and made watertight with additional components such as end caps.
[0139] In some examples, the buoyancy elements 130 are positioned to achieve a desired floating horizontal orientation of the monopile 100. In some examples, the buoyancy elements 130 may be positioned either side of the centre of gravity 430 of the monopile 100. By positioning the buoyancy elements 130 either side of the centre of gravity 430 of the monopile 100, the turning moments caused by the different forces on the monopile 100 can be balanced. For example, the buoyancy force from the different buoyancy elements 130 and the force of gravity on the monopile 100 can be balanced. This arrangement ensures that the monopile 100 remains stable and level during transportation and installation, reducing the risk of accidents and damage to the monopile 100 or surrounding structures.
[0140] The buoyancy elements 130 can have a cross-sectional area which is similar or the same as the cross-section area inside the monopile 100. This means that the buoyancy elements 130 can have a snug fit within the monopile 100. In some examples, (which may be less preferred), the buoyancy elements 130 can be held within the monopile 100 due to frictional forces exerted between the buoyancy elements 130 and the monopile 100. In other examples an attachment mechanism 210 may be provided to secure the buoyancy elements 130 to the monopile 100. The attachment mechanism 210 will be discussed in more detail below.
[0141] In some examples, the buoyancy elements 130 are inflatable. That is, the buoyancy elements 130 are inflated having been inserted into the inside of the monopile 100. However, in other examples, the buoyancy elements 130 are not inflatable. The examples as shown in the Figures, the buoyancy elements 130 comprise an inflatable structure.
[0142] The material and construction of the buoyancy elements 130 may comprise various types of inflatable materials, such as air-filled bladders, rubberized fabric, PVC-coated nylon, high-performance thermoplastic polyurethane (TPU), Hypalon, neoprene, polyvinyl chloride (PVC), silicone-coated fiberglass, polyethylene (PE) foam, ethylenevinyl acetate (EVA) foam, or closed-cell polyurethane foam. These materials may be selected based on their durability, puncture resistance, and ability to provide the necessary buoyancy force for the monopile 100.
[0143] Whilst the examples as shown in reference to the Figures show the buoyancy elements 130 as removable and inflatable components, in other examples other constructions are provided. For in some alternative arrangements the buoyancy elements 130 are integral with the monopile 100. That is, the buoyancy elements 130 are not reusable. Furthermore, in some examples, the monopile 100 may comprise integral airtight pockets or chambers for housing the buoyancy elements 130. These integral pockets or chambers may be formed by bulkheads, reinforcement ribs or bars, flanges, or connection points within the monopile 100. This configuration may provide additional structural support and protection for the buoyancy elements 130 during transportation and installation.
[0144] Moving the monopile 100 from the horizontal orientation to the vertical orientation will now be discussed in more detail. Figures 4b and 4c respectively show a side view and a perspective view of the monopile 100 pivoting from a horizontal orientation to a vertical orientation. Figures 5a and 5b are respectively a side view and a perspective view of the monopile 100 pivoting from a horizontal orientation to a vertical orientation.
[0145] Moving the monopile 100 from the horizontal orientation to the vertical orientation is achieved by selectively adjusting the upwards buoyancy force of one or more of the buoyancy elements 130 on the monopile 100. The process of moving the monopile 100 from the horizontal orientation to the vertical orientation is also known as “upending”. The term upending will be used hereinafter to refer to manoeuvring the monopile 100 from the floating horizontal position to the vertical installation position.
[0146] Optionally, the monopile 100 is connected to a lifting cable 190 during the upending process. Attaching the lifting cable 190 to the monopile 100 during the upending process steadies the monopile 100 during the upending process. Furthermore, the lifting force provided by the lifting cable 190 and the crane 120 aids the upending process.
[0147] The lifting cable 190 as mentioned above is attached to the crane 120 mounted on the deck 116 of the offshore jack-up vessel 110. The lifting cable 190 is connected to a first trunnion 380 and a second trunnion 390 mounted on the outer surface 360 of the monopile wall 350. During the upending process, the monopile 100 pivots about the first and second trunnions 380, 390 as the buoyancy force of the buoyancy elements 130 is adjusted. Once the buoyancy force of the buoyancy elements 130 so that the buoyancy forces are no longer balanced about the centre of gravity 430, the monopile 100 may passively upend due to the gravitational forces and the buoyancy forces acting on the monopile 100. Figures 4b and 4c show the monopile 100 starting to upend and pivot about the first trunnion 380 and the second trunnion 390.
[0148] In the example shown in Figures 5b and 5c, the monopile 100 is pivoted from a horizontal orientation to a vertical orientation by generating a turning moment about the centre of gravity 430 of the monopile 100 through selectively adjusting the upwards buoyancy force of the buoyancy elements 130. The monopile 100 is then secured in a monopile gripper 140 and hammered into the seabed 106 for installation.
[0149] In one example, the process of pivoting the monopile 100 from a horizontal orientation to a vertical orientation involves selectively adjusting the upwards buoyancy force of one or more of the buoyancy elements 130 on the monopile 100. This selective adjustment of buoyancy force allows for the generation of a turning moment about the centre of gravity 430 of the monopile 100, which in turn enables the monopile 100 to pivot from the floating horizontal orientation to the desired vertical installation orientation.
[0150] In some examples, the step of selectively adjusting the upwards buoyancy force of one or more of the buoyancy elements 130 may comprise inflating or deflating the buoyancy elements 130. This can be achieved by introducing or releasing air or another suitable gas into or from the buoyancy elements 130, thereby increasing or decreasing the buoyancy force exerted by the buoyancy elements 130 on the monopile 100.
[0151] In one example, the step of selectively adjusting the upwards buoyancy force of one or more of the buoyancy elements 130 may comprise activating a remote-controlled valve 320 to release air from the buoyancy elements 130. The remote-controlled valve 320 may be configured to control the flow of air or another suitable gas into or out of the buoyancy elements 130, thereby allowing for precise control over the buoyancy force exerted by the buoyancy elements 130 on the monopile 100.
[0152] Each buoyancy element 130 can comprise a separate remote-controlled valve 320. However, in some other examples which are less preferred, each buoyancy element 130 can comprise a manual valve 320 control the flow of air or another suitable gas into or out of the buoyancy elements 130. In this case, the manual valve 320 must be adjusted by a person e.g., a diver to adjust the buoyancy of the buoyancy elements 130.
[0153] Figure 4b schematically shows that each buoyancy element 130 comprises a separate remote-controlled valve 320. However, in some other examples, all the buoyancy elements 130 can be in fluid communication and inflated or deflated by a single remote- controlled valve 320. This may provide a simpler arrangement. However, a plurality of remote-controlled valves 320 may be preferable to increase the resilience and control in the upending operation.
[0154] In some examples, the upending of the monopile 100 is optionally achieved when all of the buoyancy elements 130 are simultaneously deflated. In this case, the upwards buoyancy force provided by the buoyancy elements 130 is removed. Accordingly, the monopile 100 experiences a turning moment of the centre of gravity 430 about the first and second trunnions 380, 390. In this case, the monopile 100 passively upends into the vertical orientation. It may be preferable to selectively deflate some of the buoyancy elements 130 because this will mean the upending process is quicker and more controlled.
[0155] In some examples, the pivoting of the monopile 100 from the horizontal orientation to the vertical orientation may be facilitated by using a differential control system to adjust the buoyancy of different buoyancy elements 130 independently. This differential control system may allow for the creation of a desired turning moment about the centre of gravity 430 of the monopile 100 by selectively adjusting the buoyancy force of individual buoyancy elements 130, thereby enabling the monopile 100 to pivot from the floating horizontal orientation to the vertical installation orientation. For example, on or more of the remote-controlled valves 320 as shown in Figure 4b are actuated. Furthermore, the upwards buoyancy force generated by the different buoyancy elements 130 can be adjusted during the towing of the floating monopile 100. For example, by adjusting the buoyancy of one or more different buoyancy elements 130 during transport, the trim of the floating monopile 100 could be adjusted. This could be advantageous if the weather conditions change when the monopile 100 is being towed. The differential control system for independent buoyancy adjustment, may allow for precise control of the buoyancy force of the buoyancy elements 130 during the pivoting process. This differential control system may provide greater flexibility and control during the installation process, allowing for more accurate positioning and alignment of the monopile 100 in the seabed 106. The differential control system can comprise a controller in communication with the remote-control valves 320 and is configured to selectively actuate the remote-control valves 320.
[0156] As mentioned above, the buoyancy elements 130 can be held in the monopile 100 via frictional forces alone. However, it may be preferable to secure the buoyancy elements 130 to the monopile 100 via additional mechanisms.
[0157] The process of pivoting the monopile 100 from the horizontal orientation to the vertical orientation may provide several advantages. For example, the ability to selectively adjust the buoyancy force of the buoyancy elements 130 allows for precise control over the pivoting process, which may result in a more efficient and accurate installation of the monopile 100. Additionally, the use of a remote-controlled valve 320 and a differential control system may enable the pivoting process to be carried out remotely, thereby reducing the need for manual intervention and potentially increasing the safety of the installation process.
[0158] The arrangement as shown in Figures 6c and 6d is the same as shown in Figures 6a and 6b respectively. One difference is that the buoyancy elements 130 as shown in Figure 6c are deflated. Furthermore, the monopile fixing 220 is configured to engage an internal surface of a wall of the monopile 100 instead of an outer surface.
[0159] The arrangement as shown in Figures 7c and 7d is the same as shown in Figures 7a and 7b respectively. Once difference is the routing of the locking element channel 740.
[0160] Figures 8, 9 10 are applicable to both the first and second examples as discussed herein.
[0161] Examples Example 1 : A method of manoeuvring a monopile for offshore installation, comprising arranging a plurality of buoyancy elements in the monopile such that the monopile floats in a horizontal orientation, positioning the floating monopile at an offshore installation site, attaching a lifting cable to the monopile, selectively adjusting an upwards buoyancy force of one or more of the buoyancy elements on the monopile, and pivoting the monopile from the floating horizontal orientation to a vertical installation orientation.
[0162] Example 2: The method of example 1 , further comprising inflating or deflating the buoyancy elements to selectively adjust the upwards buoyancy force of one or more of the buoyancy elements.
[0163] Example 3: The method of example 1 or 2, further comprising activating a remote- controlled valve to release air from the buoyancy elements to selectively adjust the upwards buoyancy force of one or more of the buoyancy elements.
[0164] Example 4: The method of any one of examples 1 to 3, wherein the pivoting comprises generating a turning moment about the centre of gravity of the monopile through selectively adjusting the upwards buoyancy force of the buoyancy elements.
[0165] Example 5: The method of any one of examples 1 to 4, further comprising using a differential control system to adjust the buoyancy of different buoyancy elements independently.
[0166] Example 6: The method of any one of examples 1 to 5, further comprising removing the buoyancy elements from the inside of the monopile before installation on the seabed.
[0167] Example 7 : The method of any one of examples 1 to 6, wherein the buoyancy elements are positioned either side of a centre of gravity of the monopile.
[0168] Example 8: The method of any one of examples 1 to 7, wherein the lifting cable is attached to a first trunnion and a second trunnion mounted on an outer surface of a monopile wall of the monopile. Example 9: The method of any one of examples 1 to 8, further comprising attaching the buoyancy elements to the inside of the monopile using an attachment mechanism.
[0169] Example 10: The method of example 9, wherein the attachment mechanism comprises a monopile fixing and a buoyancy element fixing.
[0170] Example 11 : The method of example 10, wherein the monopile fixing is removably connectable to a monopile wall of the monopile.
[0171] Example 12: The method of examples 10 or 11 , wherein the buoyancy element fixing is coupled to one or more buoyancy elements using a fastening cable.
[0172] Example 13: A buoyancy apparatus for manoeuvring a monopile for offshore installation, comprising a plurality of buoyancy elements configured to be arranged in the monopile such that the monopile floats in a horizontal orientation, an attachment mechanism for attaching the buoyancy elements to the inside of the monopile, and a remote-controlled valve for selectively adjusting an upwards buoyancy force of one or more of the buoyancy elements on the monopile such that the monopile is configured to pivot from the floating horizontal orientation to a vertical installation orientation.
[0173] Example 14: The buoyancy apparatus of example 13, wherein the plurality of buoyancy elements are a plurality of inflatable buoyancy elements.
[0174] Example 15: The buoyancy apparatus of example 13, wherein the plurality of buoyancy elements are a plurality of chambers integral with the monopile.
[0175] Example 16: The buoyancy apparatus of any one of examples 13 to 15, wherein the remote-controlled valve is configured to release air from the buoyancy elements to decrease the buoyancy force.
[0176] Example 17: A system for manoeuvring a monopile for offshore installation, comprising a buoyancy apparatus according to any one of examples 13 to 16, a lifting cable and crane for attaching to the monopile via a first trunnion and a second trunnion, wherein the monopile is configured to pivot about the first trunnion and the second trunnion from a floating horizontal orientation to a vertical installation orientation.
[0177] Example 18: The system of example 17, further comprising a monopile gripper configured to grip the monopile in the vertical orientation before the monopile is installed into the seabed.
Claims
Claims1. A method of manoeuvring a monopile (100) for installation at an offshore site, the method comprising the steps of: mounting a plurality of buoyancy elements (130) to an outer surface (360) of the monopile (100) or inside the monopile (100); arranging the plurality of buoyancy elements (130) such that the monopile (100) floats in a horizontal orientation; positioning the floating monopile (100) at the offshore installation site (124); selectively adjusting an upwards buoyancy force of the buoyancy elements (130) on the monopile (100) by deballasting or deflating the buoyancy elements; and pivoting the monopile (100) from the floating horizontal orientation to a vertical installation orientation as a result of deballasting or deflating the buoyancy elements.
2. The method according to claim 1 , wherein the method comprises attaching a lifting cable (190) to either side of the monopile (100) before the step of adjusting the upwards buoyancy force and the step of pivoting.
3. The method according to any of the preceding claims, wherein the step of attaching the plurality of buoyancy elements (130) to the outer surface (360) of the monopile (100) comprises attaching an attachment mechanism (210) to a monopile fixing (220) on the monopile (100).
4. The method according to any of the preceding claims, further comprising the step of activating a remote-controlled valve (320) to release air from the buoyancy elements ballast tanks (460) or introduce water (112) into the buoyancy elements ballast tanks (460) and decreasing the buoyancy force.
5. The method according to any of the preceding claims further comprising the step of using a differential control system to adjust the buoyancy of different buoyancy elements (130) independently, thereby creating a desired turning moment about a centre of gravity (440) of the monopile (100).
6. The method according to any of the preceding claims, further comprising the step of detaching the attachment mechanism (210) from the monopile (100) after pivoting the monopile (100) to the vertical installation orientation.
7. The method according to any of the preceding claims, further comprising the step of removing the buoyancy elements (130) from the outer surface (360) of the monopile (100) before or after installation on the seabed (106).
8. The method according to any of the preceding claims, further comprising the step of lifting the buoyancy elements (130) up with the lifting cable (190) of a crane (120) after detaching the attachment mechanism (210) from the monopile (100).
9. The method according to any of the preceding claims, wherein the step of attaching the plurality of buoyancy elements (130) to the outer surface (360) of the monopile (100) comprises positioning the buoyancy elements (130) either side of a centre of gravity (440) of the monopile (100).
10. The method according to claim 2, wherein the step of attaching the lifting cable (190) to either side of the monopile (100) comprises connecting the lifting cable (190) to a first trunnion (380) and a second trunnion (390) mounted on the outer surface (360) of the monopile (100).
11. The method according to any of claims 1 to 10 wherein the step of pivoting comprises passively upending the monopile from the horizontal position to the vertical position.
12. A buoyancy apparatus for manoeuvring a monopile (100) for offshore installation comprising: a plurality of buoyancy elements (130) configured to be mounted on an outer surface (360) of the monopile (100) such that the monopile (100) floats in a horizontal orientation; an attachment mechanism (210) for attaching the buoyancy elements (130) to the outer surface (360) of the monopile (100);at least one valve (320) for selectively adjusting an upwards buoyancy force of one or more of the buoyancy elements (130) on the monopile (100) by deballasting or deflating the buoyancy elements such that the monopile (100) is configured to pivot from the floating horizontal orientation to a vertical installation orientation as a result of deballasting or deflating the buoyancy elements.
13. The buoyancy apparatus according to claim 12, wherein the attachment mechanism (210) is configured to engage with a monopile fixing (220) on the monopile (100).
14. The buoyancy apparatus according to claim 12 or 13, wherein the at least one valve (320) is a remote-controlled valve (320).
15. The buoyancy apparatus according to any one of claims 12 to 14, further comprising one or more buoyancy element ballast tanks (460) configured to receive water (112) or release air to adjust the buoyancy force of the buoyancy elements (130).
16. The buoyancy apparatus according to any one of claims 12 to 15 further comprising a differential control system configured to adjust the buoyancy of different buoyancy elements (130) independently, thereby creating a desired turning moment about a centre of gravity (440) of the monopile (100).
17. The buoyancy apparatus according to any one of claims 12 to 16, wherein the buoyancy elements (130) are configured to be positioned either side of a centre of gravity (440) of the monopile (100).
18. The buoyancy apparatus according to any one of claims 12 to 17, wherein the plurality of buoyancy elements (130) comprises a plurality of buoyancy body elements (510) coupled together in each buoyancy element (130) and a flexible connection (520) that connects each buoyancy body element (510) to each other.
Citation Information
Patent Citations
Method for installing an offshore structure
EP2568082A1
Auxiliary buoyancy for off-shore operations
GB2199290A
Spar-type offshore wind turbine assembly and methods relating thereto
NO20220736A
Deepwater jacket design method
US20150093202A1
Floating wind turbine
WO2013048257A1
Cited By
Floating type single pile foundation and mounting method thereof
CN115652977A
Method of installing a monopile in a seabed using a transportation barge or vessel
US20250179753A1