New energy power station grid-connection adaptability analysis method and system
Through edge computing technology, the computing tasks are distributed in the adaptive analysis system of the grid-connected new energy power station and the results are returned, which solves the problems of data processing pressure and computing resource limitations in the existing system, realizes more efficient analysis and evaluation, and improves analysis real-time and depth.
Patent Information
- Application Number
- PCT/CN2023/142382
- Authority / Receiving Office
- WO · WO
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2023-05-19
- Filing Date
- 2023-12-27
- Publication Date
- 2024-11-28
AI Technical Summary
Due to data processing pressure and computing resource limitations, the existing adaptive analysis system for grid-connected new energy power stations cannot meet the analysis needs of large-scale new energy sources to the power grid, resulting in limited real-time and depth of the analysis results.
Introduce edge computing technology, by scheduling edge gateways between the main station and the new energy sub-station for computing tasks distribution and result return, use the sub-station's computing resources for asynchronous execution, and improve the real-time analysis through real-time data acquisition and processing. and depth.
It improves the real-time, safety and economical analysis of grid-connected adaptability analysis of new energy power stations, can monitor and evaluate grid-connected adaptability indicators online, reduce data transmission losses, and improves the accuracy of grid scheduling decisions.
Smart Images

Figure CN2023142382_28112024_PF_FP_ABST
Abstract
Description
A new energy power station grid-connected adaptability analysis method and system
[0001] Cross-references to related publications
[0002] The embodiments of the present disclosure are based on the Chinese patent application with application number 202310574105.7, application date May 19, 2023, and application name “A method and system for analyzing the grid-connected adaptability of a new energy power station”, and claim the priority of the Chinese patent application. The entire content of the Chinese patent application is hereby introduced into the present disclosure as a reference. Technical Field
[0003] The embodiments of the present disclosure relate to the field of new energy grid-connected analysis and calculation, and in particular to a new energy power station grid-connected adaptability analysis method and system. Background Art
[0004] Grid-connected adaptability analysis for renewable energy power plants is a crucial tool for understanding their operational characteristics. As the proportion of renewable energy generation in the power grid continues to rise, the data required for grid-connected adaptability analysis is increasing. In recent years, grid-connected adaptability analysis has required increasingly more data. Grid-connected adaptability standards for large-scale renewable energy integration have been tightened, placing higher computational demands on various detailed renewable energy grid-connected performance indicators, further increasing data processing pressure. Existing grid-connected adaptability analysis systems are primarily deployed at dispatching master stations, collecting data from renewable energy power plants and performing centralized analysis and processing at the master station. However, as the number of renewable energy power plants connected to the grid continues to increase, this model is increasingly constrained by transmission channels and speeds, making it unable to meet the requirements of large-scale analysis and computation. Furthermore, the centralized processing model at the master station requires high data redundancy due to centralized data storage. As the number of renewable energy power plants increases, the computing resources required for evaluation and analysis increase dramatically, and the data sources collected by the master station are limited, all of which affect the real-time and in-depth analysis results of renewable energy power plant grid-connected adaptability analysis.
[0005] Summary of the Invention
[0006] In response to the shortcomings of the existing technology, the embodiments of the present disclosure provide a method and system for analyzing the grid-connected adaptability of new energy power stations. By introducing edge computing related technologies, the computing resources at the site of the new energy power station are fully utilized, the degree of multi-source data fusion is improved, and on this basis, a practical master station-substation collaborative computing model is formed, thereby improving the real-time, safety and economy of the grid-connected adaptability analysis of new energy power stations.
[0007] In order to achieve the above objectives, the present disclosure is implemented through the following technical solutions:
[0008] An embodiment of the present disclosure provides a method for analyzing the grid-connected adaptability of a new energy power station, the method comprising: a dispatching master station distributes computing tasks through an edge gateway; each new energy substation asynchronously executes the computing task according to the working conditions after receiving the computing task; after the computing task is completed, each new energy substation compresses and encrypts the computing results and cross-section information through the edge gateway and transmits them back to the dispatching master station, and the dispatching master station performs grid-connected adaptability analysis based on the transmitted results.
[0009] In some embodiments, the computing tasks include periodic timing tasks and spot-check triggering tasks.
[0010] In some embodiments, each of the new energy substations asynchronously executes the computing task according to the working conditions after receiving the computing task, including:
[0011] Step a1: collect the three-phase voltage and three-phase current analog signals of the voltage transformer and current transformer at the grid connection point of the new energy power station, and extract the grid frequency f, the fundamental positive sequence / negative sequence / zero sequence components of the three-phase voltage, the fundamental positive sequence / negative sequence / zero sequence components of the three-phase current, the active power and reactive power of the fundamental positive sequence component, and the active current and reactive current of the fundamental positive sequence component through analog-to-digital conversion and digital signal processing technology;
[0012] Step a2, based on the grid frequency extracted in step a1, the fundamental positive sequence / negative sequence / zero sequence components of the three-phase voltage, the fundamental positive sequence / negative sequence / zero sequence components of the three-phase current, the fundamental positive sequence active power, reactive power, active current and reactive current of the fundamental positive sequence component, calculate various indicators of the grid connection adaptability of the new energy power station, wherein the various indicators of the grid connection adaptability of the new energy power station include tolerance adaptability indicators and active support adaptability indicators.
[0013] In some embodiments, in step a1, extracting the fundamental positive sequence / negative sequence / zero sequence components of the three-phase voltage, the fundamental positive sequence / negative sequence / zero sequence components of the three-phase current, the active power and reactive power of the fundamental positive sequence component, and the active current and reactive current of the fundamental positive sequence component includes:
[0014] In step a11, according to formula (1), the fundamental component is extracted using Fourier transform:
[0015] Where t is time, u a (t) is the instantaneous value of phase A voltage, u a,cos with u a,sin Phase A voltage The real and imaginary parts of the complex phasor, f1 is the power frequency, T is the cycle time window corresponding to the power frequency;
[0016] Similarly, according to formula (2), we can get u b,cos 、u b,sin 、u c,cos、u c,sin 、i a,cos 、i a,sin 、i b,cos 、i b,sin 、i c,cos 、i c,sin ; Then synthesize the three-phase voltage and three-phase current phasors:
[0017] Where j is the imaginary unit of the complex phasor, and its value is is the complex phasor of the voltage of phases B and C; u b,cos with u bsin Phase B voltage The real and imaginary parts of the complex phasor; u c,cos with u c,sin is the C phase voltage Real and imaginary parts of complex phasors; is the complex phasor of the three-phase current of A, B, and C; i a,cos with i a,sin Phase A current Real and imaginary parts of complex phasors; i bcos with i bsin Phase A current Real and imaginary parts of complex phasors; i c,cos with i c,sin Phase A current Real and imaginary parts of complex phasors;
[0018] In step a12, according to formula (3), the fundamental positive sequence / negative sequence / zero sequence components of the three-phase voltage and three-phase current are extracted by positive and negative sequence transformation:
[0019] Among them, a is the basic element of the transformation matrix, and its value j is the imaginary unit of the complex number, and its value is
[0020] are the fundamental positive sequence component, negative sequence component and zero sequence component of the three-phase voltage;
[0021] is the voltage phasor of three phases A, B and C;
[0022] are the fundamental positive sequence component, negative sequence component and zero sequence component of the three-phase current;
[0023] is the current phasor of three phases A, B and C;
[0024] In step a13, the active power and reactive power of the fundamental positive sequence component are calculated according to formula (4):
[0025] Among them, the subscript "1" represents the power frequency fundamental wave, the subscript "+" represents the positive sequence, and u 1+,cos with u 1+,sin is the positive sequence component of the three-phase voltage The real and imaginary parts, i 1+,cos with i 1+,sin is the positive sequence component of the three-phase current The real and imaginary parts, P 1+ is the active power of the fundamental positive sequence component, Q 1+ is the reactive power of the fundamental positive sequence component;
[0026] In step a14, the active current and reactive current of the fundamental positive sequence component are calculated according to formula (5):
[0027] Among them, I P1+ is the active current of the fundamental positive sequence component, I Q1+ is the reactive current of the fundamental positive sequence component, is the complex modulus of the positive sequence component of the three-phase voltage.
[0028] In some embodiments, the tolerance adaptability index in step a2 includes a voltage tolerance adaptability sub-index E tol_v and frequency tolerance adaptability sub-index E tol_f ,include:
[0029] Step a21: for the voltage tolerance adaptability sub-index E tol_v , determine the following five working conditions in sequence:
[0030] Judgment condition 1: The fundamental positive sequence component of the three-phase voltage at the grid connection point of the new energy power station is between [90% and 110%] of the nominal voltage; Corresponding judgment criteria: If all new energy power generation units in the new energy power station are operating normally, then the voltage deviation tolerance adaptability is achieved, and the voltage tolerance adaptability sub-index is E tol_v_1 , E tol_v_1 The value is 1, otherwise it does not have voltage deviation tolerance adaptability, E tol_v_1 The value is 0;
[0031] Judgment condition 2: The fundamental positive sequence component of the three-phase voltage at the grid connection point of the new energy power station is as low as 20% of the nominal voltage; Corresponding judgment criteria: If all the new energy power generation units in the new energy power station can operate continuously for more than 625ms, it has low voltage tolerance adaptability, and the voltage tolerance adaptability sub-index is E tol_v_2 , E tol_v_2 The value is 1, otherwise it does not have low voltage tolerance adaptability, E tol_v_2 The value is 0;
[0032] Judgment condition 3: The fundamental positive sequence component of the three-phase voltage at the grid connection point of the new energy power station increases to between [125% and 130%] of the nominal voltage; Corresponding judgment criterion: If all power generation units in the new energy power station are guaranteed to operate continuously without disconnection for 500ms, then it has high voltage tolerance adaptability, and the voltage tolerance adaptability sub-index is E tol_v_3 , E tol_v_3 The value is 1, otherwise it does not have high pressure tolerance adaptability, E tol_v_3 The value is 0;
[0033] Judgment condition 4: The fundamental positive sequence component of the three-phase voltage at the grid connection point of the new energy power station increases to between [120%, 125%] of the nominal voltage; Corresponding criterion: If all power generation units in the new energy power station are guaranteed to operate continuously for 1 second without disconnection from the grid, then it has high voltage tolerance adaptability, and the voltage tolerance adaptability sub-index is E tol_v_4 , E tol_v_4 The value is 1, otherwise it does not have high pressure tolerance adaptability, E tol_v_4 The value is 0;
[0034] Judgment condition 5: The fundamental positive sequence component of the three-phase voltage at the grid connection point of the new energy power station increases to between [110%, 120%] of the nominal voltage; Corresponding criterion: If all power generation units in the new energy power station are guaranteed to operate continuously for 10 seconds without disconnection from the grid, then it has high voltage tolerance adaptability, and the voltage tolerance adaptability sub-index is E tol_v_5 , E tol_v_5 The value is 1, otherwise it does not have high pressure tolerance adaptability, E tol_v_5 The value is 0;
[0035] When the corresponding criterion is not satisfied in any of the working conditions 1 to 5, it is determined that the new energy power station does not have voltage tolerance adaptability; according to formula (6), the voltage tolerance adaptability sub-index E is obtained. tol_v value:
[0036] Among them, i1 is the voltage tolerance adaptability sub-index E tol_v The working condition number, n1 is the sub-index E of the voltage tolerance adaptability analysis tol_v The number of working conditions;
[0037] Step a22: frequency tolerance adaptability sub-index E tol_f , determine the following four working conditions in sequence:
[0038] Judgment condition 1: The grid frequency f at the grid connection point of the new energy power station is between [48.5Hz, 50.5Hz]; Corresponding criterion: If all power generation units in the new energy power station operate continuously, it has frequency deviation tolerance adaptability. In this case, the frequency tolerance adaptability sub-index is E tol_f_1 , Etol_f_1 The value is 1, otherwise it does not have frequency deviation tolerance adaptability, E tol_f_1 The value is 0;
[0039] Judgment condition 2: The grid frequency f at the connection point of the new energy power station is between [48Hz, 48.5Hz); the corresponding criterion is: if the frequency is lower than 48.5Hz each time, and all the power generation units in the new energy power station have the ability to operate for at least 30 minutes, then it has low-frequency tolerance adaptability, and the frequency tolerance adaptability sub-index is E tol_f_2 , E tol_f_2 The value is 1, otherwise it does not have low frequency tolerance adaptability, E tol_f_2 The value is 0;
[0040] Judgment condition 3: The grid frequency f at the connection point of the new energy power station is between (50.5Hz, 51Hz]; Corresponding criterion: If all power generation units in the new energy power station have the ability to operate for at least 3 minutes, they have high-frequency tolerance adaptability. In this case, the frequency tolerance adaptability sub-index is E tol_f_3 , E tol_f_3 The value is 1, otherwise it does not have high frequency tolerance adaptability, E tol_f_3 The value is 0;
[0041] Judgment condition 4: The grid frequency f at the connection point of the new energy power station is between (51Hz, 51.5Hz]; corresponding criterion: each time the frequency is higher than 50.5Hz, if all the power generation units in the new energy power station have the ability to operate for at least 30s, then they have high-frequency tolerance adaptability, and the frequency tolerance adaptability sub-index is E tol_f_4 , E tol_f_4 The value is 1, otherwise it does not have high frequency tolerance adaptability, E tol_f_4 The value is 0;
[0042] When the criterion is not satisfied in any of the working conditions 1 to 4, the new energy power station is judged to be not frequency tolerant and the frequency tolerant adaptability sub-index E is obtained according to formula (7). tol_f value;
[0043] Among them, i2 is the analysis frequency tolerance adaptability sub-index E tol_f The working condition number, n2 analysis frequency tolerance adaptability sub-index E tol_f The number of working conditions.
[0044] In some embodiments, the active support adaptability index E in a2 tol Including dynamic active active support type sub-index E act_p and transient reactive active support type sub-index E act_q ,include:
[0045] Step a23, analyzing the dynamic active power active support index E act_p ;
[0046] According to formula (8), the actual frequency regulation rate and actual frequency regulation rate deviation of new energy are calculated:
[0047] Among them, k δ% is the deviation of the actual adjustment rate of the new energy fast frequency response, δ% is the actual adjustment rate of the new energy fast frequency response, δ std % is the regulation rate of new energy fast frequency response, f d is the fast frequency response dead zone, in Hz, f N is the system rated frequency, in Hz, f is the grid frequency at the connection point of the new energy power station, in Hz, P N is the rated power of the new energy power station, in MW, P 1+ 0 is the initial value of active power of the fundamental positive sequence component, in MW, P 1+ is the active power of the fundamental positive sequence component, in MW;
[0048] Based on the obtained deviation of the actual modulation rate of the rapid frequency response of the new energy, the following two working conditions are analyzed:
[0049] Judgment condition 1: The grid frequency f at the grid connection point of the new energy power station is higher than 50.3Hz and the fundamental positive sequence voltage is between [90%, 110%] of the nominal voltage; Corresponding criterion: The active power of the new energy power station can be calculated according to k δ% The active power is reduced by no more than ±5%. At this time, the dynamic active power active support index is E act_p_1 , E act_p_1 The value is 1, otherwise E act_p_1 The value is 0;
[0050] Judgment condition 2: The grid frequency f at the grid connection point of the new energy power station is lower than 49.97Hz and the fundamental positive sequence voltage is between [90%, 110%] of the nominal voltage; Corresponding judgment criteria: The active power of the new energy power station is calculated according to k δ% The active power is increased by no more than ±5%. At this time, the dynamic active power active support index is E act_p_2 , E act_p_2 The value is 1, otherwise E act_p_2 The value is 0;
[0051] When the criterion is not satisfied in any of the working conditions 1 and 2, it is determined that the new energy power station does not have the adaptability of dynamic active power active support. According to formula (9), the dynamic active power active support type index E is obtained. act_p value:
[0052] Among them, i3 is the analysis of dynamic active active support index E act_p The working condition number, n3 is the analysis of dynamic active active support type index E act_p The number of working conditions;
[0053] Step a24, analyzing the transient reactive active support index E act_q ;
[0054] According to formula (10), the actual deviation of the reactive power support coefficient of new energy is calculated as:
[0055] Among them, k λ is the actual deviation of the reactive power support coefficient of new energy, λ is the actual reactive power support coefficient, λ std is the standard recommended value of reactive support coefficient, I Q1+ is the reactive current of the fundamental positive sequence component, I Q1+ 0 is the initial value of the reactive current of the fundamental positive sequence component before the fault occurs, I N is the fundamental positive sequence reactive current rating, is the complex modulus value of the fundamental positive sequence component of the three-phase voltage;
[0056] According to the actual deviation of the reactive power support coefficient of new energy, the following two working conditions are analyzed:
[0057] Judgment condition 1: The fundamental positive sequence component of the three-phase voltage at the grid connection point of the new energy power station is [60%, 80%) of the nominal voltage; Corresponding judgment criterion: The actual deviation of the reactive support coefficient of the new energy power station is 0≤k λ ≤5%, E act_q_1 The value is 1, otherwise E act_q_1 The value is 0;
[0058] Judgment condition 2: The fundamental positive sequence component of the three-phase voltage at the grid connection point of the new energy power station is (110%, 130%] of the nominal voltage; corresponding judgment criterion: the actual deviation of the reactive support coefficient of the energy power station is 0≤k λ ≤5%, E act_q_2 The value is 1, otherwise E act_q_2 The value is 0;
[0059] When the criterion is not satisfied under any of the working conditions 1 and 2, it is determined that the new energy power station does not have the adaptability of transient reactive active support. According to formula (11), the transient reactive active support type index E is obtained. act_q value;
[0060] Among them, i4 is the active support index E for analyzing transient reactive poweract_q The working condition number, n4 is the transient reactive active support type index E act_q The number of working conditions.
[0061] The embodiment of the present disclosure provides a new energy power station grid-connected adaptability analysis system, the system comprising a dispatching master station, multiple new energy substations, and an edge gateway, wherein the edge gateway is deployed between the dispatching master station and the new energy substations;
[0062] The dispatching master station distributes computing tasks to multiple new energy substations via the edge gateway, and aggregates the computing results sent back by multiple new energy substations to perform grid adaptability analysis;
[0063] The new energy substation asynchronously executes the assigned computing tasks according to the working conditions;
[0064] The edge gateway distributes the computing tasks assigned by the dispatching master station to each new energy substation, collects the computing results and cross-section information of each new energy substation, compresses and encrypts them, and transmits them back to the dispatching master station.
[0065] In some embodiments, the new energy substation includes a measurement and control module, a communication module, a cache module, a storage module, and a computing module;
[0066] The measurement and control module is configured to collect three-phase voltage and three-phase current analog signals of the voltage transformer and the current transformer at the grid connection point of the new energy power station, extract the electrical quantity information of the grid connection point of the new energy power station through analog-to-digital conversion and digital signal processing technology, and store the results in the cache module, wherein the electrical quantity information of the grid connection point of the new energy power station includes the grid frequency, the fundamental positive sequence / negative sequence / zero sequence components of the three-phase voltage, the fundamental positive sequence / negative sequence / zero sequence components of the three-phase current, the fundamental positive sequence active power, the reactive power, the active current of the fundamental positive sequence component and the reactive current;
[0067] The cache module is configured to cache the electrical quantity information of the new energy power station grid connection point within the calculation cycle output by the measurement and control module, on the one hand, for use by the calculation module, and on the other hand, output the data to the storage module for long-term storage;
[0068] The calculation module is configured to receive the electrical quantity information of the new energy power station grid connection point cached in the high-speed cache module, and calculate various indicators of the new energy power station grid connection adaptability. The various indicators of the new energy power station grid connection adaptability include tolerance adaptability indicators and active support adaptability indicators. The tolerance adaptability indicators include voltage tolerance adaptability sub-indicators E tol_v and frequency tolerance adaptability sub-index E tol_f The active support type adaptability index includes the dynamic active active support type sub-index E act_p and transient reactive active support type sub-index E act_q ;
[0069] The communication module is configured for information exchange between the new energy substation and other systems, including a monitoring system, a power prediction system, a remote terminal control system (RTU), and an edge gateway.
[0070] In some embodiments, the measurement and control module is configured to extract the fundamental positive sequence / negative sequence / zero sequence components of the three-phase voltage, the fundamental positive sequence / negative sequence / zero sequence components of the three-phase current, the active power, reactive power of the fundamental positive sequence component, and the active current and reactive current of the fundamental positive sequence component.
[0071] In some embodiments, the tolerance adaptability index includes a voltage tolerance adaptability sub-index Etol_v and a frequency tolerance adaptability sub-index Etol_f. The calculation module is configured to calculate the voltage tolerance adaptability sub-index Etol_v. tol_v , determine the following five working conditions in sequence:
[0072] Judgment condition 1: The fundamental positive sequence component of the three-phase voltage at the grid connection point of the new energy power station is between [90% and 110%] of the nominal voltage; Corresponding judgment criteria: If all new energy power generation units in the new energy power station are operating normally, then the voltage deviation tolerance adaptability is achieved, and the voltage tolerance adaptability sub-index is E tol_v_1 , E tol_v_1 The value is 1, otherwise it does not have voltage deviation tolerance adaptability, E tol_v_1 The value is 0;
[0073] Judgment condition 2: The fundamental positive sequence component of the three-phase voltage at the grid connection point of the new energy power station is as low as 20% of the nominal voltage; Corresponding judgment criteria: If all the new energy power generation units in the new energy power station can operate continuously for more than 625ms, it has low voltage tolerance adaptability, and the voltage tolerance adaptability sub-index is E tol_v_2 , E tol_v_2 The value is 1, otherwise it does not have low voltage tolerance adaptability, E tol_v_2 The value is 0;
[0074] Judgment condition 3: The fundamental positive sequence component of the three-phase voltage at the grid connection point of the new energy power station increases to between [125% and 130%] of the nominal voltage; Corresponding judgment criteria: If all power generation units in the new energy power station are guaranteed to operate continuously without disconnection for 500ms, then it has high voltage tolerance adaptability, and the voltage tolerance adaptability sub-index is E tol_v_3 , E tol_v_3 The value is 1, otherwise it does not have high pressure tolerance adaptability, E tol_v_3 The value is 0;
[0075] Judgment condition 4: The fundamental positive sequence component of the three-phase voltage at the grid connection point of the new energy power station increases to between [120%, 125%] of the nominal voltage; Corresponding criterion: If all power generation units in the new energy power station are guaranteed to operate continuously for 1 second without disconnection from the grid, then it has high voltage tolerance adaptability, and the voltage tolerance adaptability sub-index is E tol_v_4 , E tol_v_4 The value is 1, otherwise it does not have high pressure tolerance adaptability, E tol_v_4 The value is 0;
[0076] Judgment condition 5: The fundamental positive sequence component of the three-phase voltage at the grid connection point of the new energy power station increases to between [110%, 120%] of the nominal voltage; Corresponding criterion: If all power generation units in the new energy power station are guaranteed to operate continuously for 10 seconds without disconnection from the grid, then it has high voltage tolerance adaptability, and the voltage tolerance adaptability sub-index is E tol_v_5 , E tol_v_5 The value is 1, otherwise it does not have high pressure tolerance adaptability, E tol_v_5 The value is 0;
[0077] When the corresponding criterion is not satisfied in any of the working conditions 1 to 5, it is determined that the new energy power station does not have voltage tolerance adaptability; the voltage tolerance adaptability sub-index E is obtained. tol_v value:
[0078] The calculation module is further configured to calculate the frequency tolerance adaptability sub-index E tol_f , determine the following four working conditions in sequence:
[0079] Judgment condition 1: The grid frequency f at the grid connection point of the new energy power station is between [48.5Hz, 50.5Hz]; Corresponding criterion: If all power generation units in the new energy power station operate continuously, it has frequency deviation tolerance adaptability. In this case, the frequency tolerance adaptability sub-index is E tol_f_1 , E tol_f_1 The value is 1, otherwise it does not have frequency deviation tolerance adaptability, E tol_f_1 The value is 0;
[0080] Judgment condition 2: The grid frequency f at the connection point of the new energy power station is between [48Hz, 48.5Hz); the corresponding criterion is: if the frequency is lower than 48.5Hz each time, and all the power generation units in the new energy power station have the ability to operate for at least 30 minutes, then it has low-frequency tolerance adaptability, and the frequency tolerance adaptability sub-index is E tol_f_2 , E tol_f_2 The value is 1, otherwise it does not have low frequency tolerance adaptability, E tol_f_2 The value is 0;
[0081] Judgment condition 3: The grid frequency f at the connection point of the new energy power station is between (50.5Hz, 51Hz]; Corresponding criterion: If all power generation units in the new energy power station have the ability to operate for at least 3 minutes, they have high-frequency tolerance adaptability. In this case, the frequency tolerance adaptability sub-index is E tol_f_3 , E tol_f_3 The value is 1, otherwise it does not have high frequency tolerance adaptability, E tol_f_3 The value is 0;
[0082] Judgment condition 4: The grid frequency f at the connection point of the new energy power station is between (51Hz, 51.5Hz]; corresponding criterion: each time the frequency is higher than 50.5Hz, if all the power generation units in the new energy power station have the ability to operate for at least 30s, then they have high-frequency tolerance adaptability, and the frequency tolerance adaptability sub-index is E tol_f_4 , E tol_f_4 The value is 1, otherwise it does not have high frequency tolerance adaptability, E tol_f_4 The value is 0;
[0083] When the criterion is not satisfied in any of the working conditions 1 to 4, it is determined that the new energy power station does not have frequency tolerance adaptability, and the frequency tolerance adaptability sub-index E is obtained. tol_f value;
[0084] The calculation module is further configured to determine the following two operating conditions based on the actual modulation rate deviation of the fast frequency response of the new energy:
[0085] Judgment condition 1: The grid frequency f at the grid connection point of the new energy power station is higher than 50.3Hz and the fundamental positive sequence voltage is between [90%, 110%] of the nominal voltage; Corresponding criterion: The active power of the new energy power station can be calculated according to k δ% The active power is reduced by no more than ±5%. At this time, the dynamic active power active support index is E act_p_1 , E act_p_1 The value is 1, otherwise E act_p_1 The value is 0;
[0086] Judgment condition 2: The grid frequency f at the grid connection point of the new energy power station is lower than 49.97Hz and the fundamental positive sequence voltage is between [90%, 110%] of the nominal voltage; Corresponding judgment criteria: The active power of the new energy power station is calculated according to k δ% The active power is increased by no more than ±5%. At this time, the dynamic active power active support index is E act_p_2 , E act_p_2 The value is 1, otherwise E act_p_2 The value is 0;
[0087] When the criterion is not satisfied in any of the working conditions 1 and 2, it is determined that the new energy power station does not have the adaptability of dynamic active power active support, and the dynamic active power active support type index E is obtained. act_p value:
[0088] The calculation module is further configured to determine the following two working conditions based on the actual deviation of the reactive power support coefficient of the new energy:
[0089] Judgment condition 1: The fundamental positive sequence component of the three-phase voltage at the grid connection point of the new energy power station is [60%, 80%) of the nominal voltage; Corresponding judgment criterion: The actual deviation of the reactive support coefficient of the new energy power station is 0≤k λ ≤5%, E act_q_1 The value is 1, otherwise E act_q_1 The value is 0;
[0090] Judgment condition 2: The fundamental positive sequence component of the three-phase voltage at the grid connection point of the new energy power station is (110%, 130%] of the nominal voltage; corresponding judgment criterion: the actual deviation of the reactive support coefficient of the energy power station is 0≤k λ ≤5%, E act_q_2 The value is 1, otherwise E act_q_2 The value is 0;
[0091] When the criterion is not satisfied in any of the working conditions 1 and 2, it is determined that the new energy power station does not have the adaptability of transient reactive active support, and the transient reactive active support type index E is obtained. act_q value.
[0092] The beneficial effects of the disclosed embodiments are as follows: the new energy power station grid-connected adaptability analysis system can analyze online the grid-connected adaptability of each grid-connected new energy power station in the grid area under the jurisdiction of the master station, and can carry out refined monitoring, analysis and comprehensive evaluation of passive tolerance type grid-connected adaptability indicators and active support type grid-connected adaptability indicators. By combining the distributed computing architecture based on edge computing with the traditional communication architecture of new energy power stations, the problem of large amount of monitoring data and difficulty in centralized processing in the case of grid-connected large-scale new energy power stations is effectively solved. The system has a strong engineering practice guidance value, can greatly improve the grid-connected adaptability analysis capability of the existing large-scale new energy access power grid, provide decision-making information in a timely and accurate manner, and assist grid dispatching and operation personnel in optimizing scheduling. The grid-connected adaptability analysis method of new energy power stations combines network computing, data storage and advanced applications, can effectively reduce various losses caused by data transmission, and has certain engineering application value.
[0093] It should be understood that the above general description and the following detailed description are merely exemplary and explanatory, and are not intended to limit the technical solutions of the present disclosure. BRIEF DESCRIPTION OF THE DRAWINGS
[0094] FIG1 is a schematic diagram of an implementation flow of a method for analyzing the adaptability of a new energy power station to the grid provided by an embodiment of the present disclosure;
[0095] FIG2 is a schematic diagram of a gateway-based task distribution and compression return process provided by an embodiment of the present disclosure;
[0096] FIG3 is a schematic diagram of an information transmission process of a single new energy power station provided by an embodiment of the present disclosure;
[0097] FIG4 is a schematic diagram of a fault ride-through (tolerance index) provided by an embodiment of the present disclosure;
[0098] FIG5 is a schematic diagram of a fast frequency response (active support type indicator) provided by an embodiment of the present disclosure;
[0099] FIG6 is a schematic diagram of a calculation flow of an active support indicator provided in an embodiment of the present disclosure. DETAILED DESCRIPTION
[0100] In order to make the objectives, technical solutions, and advantages of the present disclosure more clearly understood, the present disclosure is further described in detail below with reference to the accompanying drawings and examples. It should be understood that the specific embodiments described herein are intended only to illustrate the present disclosure and are not intended to limit the present disclosure. In addition, the technical features involved in the various embodiments of the present disclosure described below may be combined with each other as long as they do not conflict with each other.
[0101] The embodiment of the present disclosure provides a new energy power station grid-connected adaptability analysis system, comprising a dispatching master station, a plurality of new energy substations, and an edge gateway, wherein the edge gateway is deployed between the dispatching master station and the new energy substations;
[0102] The dispatching master station distributes computing tasks to multiple new energy substations via the edge gateway, and aggregates the computing results sent back by multiple new energy substations to perform grid adaptability analysis;
[0103] The new energy substation asynchronously executes the assigned computing tasks according to the working conditions;
[0104] The edge gateway distributes the computing tasks assigned by the dispatching master station to each new energy substation, collects the computing results and cross-section information of each new energy substation, compresses and encrypts them, and transmits them back to the dispatching master station.
[0105] The present disclosure provides a method for analyzing the adaptability of a new energy power station to the grid, as shown in FIG1 . The method includes the following steps:
[0106] Step S1, the scheduling master station distributes computing tasks through the edge gateway;
[0107] A gateway layer is deployed between the dispatching master station and the edge computing terminals at the new energy substations to facilitate task distribution. Traditional dispatching master stations typically communicate with new energy substations using RTUs, a telecontrol unit. However, due to the large volume of interactive data involved in grid-connected adaptability analysis for new energy power plants, the cost of occupying or modifying existing telecontrol unit communication channels is high. Deploying edge gateways at the new energy aggregation station to facilitate task transfer effectively reduces the management burden on the dispatching master station. Computing tasks can be divided into two categories: periodic scheduled tasks and spot-check triggered tasks. After periodic scheduled tasks are distributed, the edge computing terminals at each new energy substation regularly report monitoring and analysis results to the backend. After spot-check triggered tasks are distributed, the edge computing terminals at each new energy substation immediately enter the corresponding analysis mode, testing specific indicators and providing feedback on the analysis results.
[0108] Step S2: After receiving the computing task, each new energy substation asynchronously executes the computing task according to the working conditions;
[0109] After receiving computing tasks, the edge computing terminals at each new energy substation will categorize and execute them according to their characteristics. For periodic, scheduled tasks, the edge computing terminals at each new energy substation will initiate a new computing process service, collecting data through the communication and measurement and control modules for long-term monitoring. For spot-check trigger tasks, the edge computing terminals will determine whether the operating conditions of each power generation unit within the power station meet the test conditions. If the conditions are met, the test will be performed. Since the operating conditions of each new energy substation vary, the computing tasks of each substation cannot be guaranteed to complete simultaneously. In other words, the tasks of each new energy substation are generally executed asynchronously.
[0110] Figure 3 shows the information transmission process for a single renewable energy power station. This figure includes the communication connections between the renewable energy substation's edge computing terminal, the station's dispatching telecontrol RTU, the station's power prediction system, the station's monitoring system, the station's fast frequency device, and the station's power management unit (PMU).
[0111] The edge computing terminal of the new energy substation includes a measurement and control module E1, a communication module E2, a cache module E3, a storage module E5 and a computing module E4.
[0112] The measurement and control module is configured to collect the three-phase voltage and three-phase current analog signals of the voltage transformer and current transformer at the grid connection point of the new energy power station, and extract the fundamental components of the three-phase voltage and three-phase current and the grid frequency by performing discrete Fourier Transformation (DFT) on the instantaneous values of the three-phase voltage and three-phase current; extract the fundamental positive sequence / negative sequence / zero sequence components of the three-phase voltage and three-phase current by performing sequence component transformation on the fundamental components of the three-phase voltage and three-phase current; and obtain the fundamental positive sequence active power and reactive power by multiplying the fundamental positive sequence voltage with the fundamental positive sequence current.
[0113] The measurement and control module acquires electrical quantity information at the grid connection point faster and more accurately than grid connection point information obtained through a monitoring system. This makes it suitable for calculating metrics such as fault ride-through and fast-frequency response that require high data sampling resolution. For new energy power plants unsuitable for measurement and control module installation, a PMU can be used in place of the measurement and control module if the power management unit (PMU) in the new energy power plant maintains clock synchronization with the edge computing terminal in the new energy substation.
[0114] The cache module is configured to cache the grid-connected point electrical quantity information output by the measurement and control module within the calculation cycle. This information is used by the calculation module and is also output to the storage module for long-term storage. The cache module can be implemented using a large-capacity memory as a hardware carrier, while the storage module can be implemented using a large-capacity solid-state drive as a hardware carrier.
[0115] The calculation module is configured to calculate various indicators of the grid-connected adaptability of new energy power stations, including tolerance adaptability indicators and active support adaptability indicators. Among them, the tolerance adaptability indicator E tol Including voltage tolerance adaptability sub-index E tol_v and frequency tolerance adaptability sub-index E tol_f Active support adaptability index E act Including dynamic active active support type sub-index E act_p and transient reactive active support type sub-index E act_q Based on the technical regulations for connecting new energy power stations to the power system (GB / T 19963 for wind power and GB / T 19964 for photovoltaics), the operating conditions of the new energy power station (new energy substation) are determined, and various indicators are analyzed through identification criteria. The calculation module can be implemented using a central processing unit (CPU) as the hardware carrier.
[0116] The communication module is configured for information exchange between the new energy substation and other systems within the station. The data input of the tolerance-type adaptability index and the active support-type adaptability index includes not only the electrical quantity information of the grid connection point obtained through the measurement and control module, but also the operating status of each new energy power generation unit obtained through the monitoring system, the theoretical output of the current power grid obtained through the power prediction system, and the automatic generation control (AGC) / automatic voltage control (AVC) dispatching instructions of the dispatching master station obtained through the telecontrol RTU. In addition, the communication module sends the calculation results to the edge gateway. The communication module needs to support multiple industrial communication protocols including IEC104, Modbus, and PMU.
[0117] The measurement and control module is one of the key modules of the edge computing terminal. Its output accuracy largely determines the accuracy of the grid-connected adaptability analysis results of the new energy power station. The measurement and control module can obtain the three-phase instantaneous voltage and current analog signals at the grid connection point, generate digital signals through analog-to-digital conversion, and then extract the basic electrical quantity information of the grid connection point through digital signal processing algorithms such as Fourier transform and sequence matrix transformation. The specific implementation process is as follows:
[0118] The steps to calculate the fundamental positive sequence component are as follows:
[0119] Step 1: According to formula (1), use Fourier transform to extract the fundamental component:
[0120] Where t is time, u a (t) is the instantaneous value of phase A voltage, u a,cos with u a,sin Phase A voltage The real and imaginary parts of the complex phasor; f1 is the power frequency (i.e. 50 Hz), and T is the cycle time window corresponding to the power frequency (i.e. 0.02 seconds).
[0121] Similarly, according to formula (2), we can get u b,cos 、u b,sin 、u c,cos 、u c,sin 、i a,cos 、i a,sin 、i b,cos 、i b,sin 、i c,cos 、i c,sin . Then synthesize the three-phase voltage and three-phase current phasors:
[0122] Where j is the imaginary unit of the complex phasor, and its value is is the complex phasor of the three-phase voltage of B and C; ubcos with u bsin Phase B voltage The real and imaginary parts of the complex phasor; u c,cos with u c,sin is the C phase voltage Real and imaginary parts of complex phasors; is the complex phasor of the three-phase current of A, B, and C; i acos with i asin Phase A current Real and imaginary parts of complex phasors; i b,cos with i b,sin Phase A current Real and imaginary parts of complex phasors; i c,cos with i c,sin Phase A current Real and imaginary parts of a complex phasor.
[0123] Step 2: According to formula (3), extract the fundamental positive sequence / negative sequence / zero sequence components of the three-phase voltage and three-phase current through positive and negative sequence transformation:
[0124] Among them, a is the basic element of the transformation matrix, and its value j is the imaginary unit of the complex number, and its value is
[0125] are the fundamental positive sequence component, negative sequence component and zero sequence component of the three-phase voltage;
[0126] is the voltage phasor of three phases A, B and C;
[0127] are the fundamental positive sequence component, negative sequence component and zero sequence component of the three-phase current;
[0128] is the current phasor of three phases A, B and C;
[0129] The amount of data collected by measurement and control modules is generally large. When performing indicator analysis, downsampling can be used to improve computational efficiency. A sampling rate of 1000-2000Hz can better meet analysis accuracy while significantly improving computational efficiency.
[0130] Step 3: Calculate the active power and reactive power of the fundamental positive sequence component according to formula (4):
[0131] Among them, the subscript "1" represents the power frequency fundamental wave, the subscript "+" represents the positive sequence, and u 1+ ,cos with u 1+,s i n is the positive sequence component of the three-phase voltage The real and imaginary parts, i 1+,cos with i 1+,sin is the positive sequence component of the three-phase current The real and imaginary parts, P 1+ is the active power of the fundamental positive sequence component, Q 1+ is the reactive power of the fundamental positive sequence component.
[0132] Step 4: Calculate the active current and reactive current of the fundamental positive sequence component according to formula (5):
[0133] Among them, I P1+ is the active current of the fundamental positive sequence component, I Q1+ is the reactive current of the fundamental positive sequence component, is the complex modulus of the positive sequence component of the three-phase voltage.
[0134] The computing module is another key module of the edge computing terminal. The tolerance index includes the voltage tolerance adaptability sub-index E tol_v and frequency tolerance adaptability sub-index E tol_f . Based on the voltage tolerance adaptability sub-index E tol_v For example, the adaptability index is further divided into steady-state voltage deviation and transient voltage adaptability. The steady-state voltage deviation adaptability index refers to the ability of a new energy power station to operate normally for a long period of time within a ±10% deviation from the rated voltage. The transient voltage adaptability index refers to whether the new energy power station can maintain grid operation for a short period of time during transient voltage drops or increases, meaning it must have a certain level of fault voltage ride-through capability. Figure 4 shows that when a grid fault causes a voltage drop, a new energy power station must maintain continuous operation for at least 625ms without disconnecting from the grid.
[0135] For the voltage tolerance adaptability sub-index E tol_v , determine the following five working conditions in sequence:
[0136] Judgment condition 1: The fundamental positive sequence component of the three-phase voltage at the grid connection point of the new energy power station is between [90% and 110%] of the nominal voltage; Corresponding judgment criteria: If all new energy power generation units in the new energy power station are operating normally, then the voltage deviation tolerance adaptability is achieved, and the voltage tolerance adaptability sub-index is E tol_v_1 , E tol_v_1 The value is 1, otherwise it does not have voltage deviation tolerance adaptability, E tol_v_1 The value is 0;
[0137] Judgment condition 2: The fundamental positive sequence component of the three-phase voltage at the grid connection point of the new energy power station is as low as 20% of the nominal voltage; Corresponding judgment criteria: If all the new energy power generation units in the new energy power station can operate continuously for more than 625ms, it has low voltage tolerance adaptability, and the voltage tolerance adaptability sub-index is E tol_v_2 , E tol_v_2 The value is 1, otherwise it does not have low voltage tolerance adaptability, E tol_v_2 The value is 0;
[0138] Judgment condition 3: The fundamental positive sequence component of the three-phase voltage at the grid connection point of the new energy power station increases to between [125% and 130%] of the nominal voltage; Corresponding judgment criterion: If all power generation units in the new energy power station are guaranteed to operate continuously without disconnection for 500ms, then it has high voltage tolerance adaptability, and the voltage tolerance adaptability sub-index is E tol_v_3 , E tol_v_3 The value is 1, otherwise it does not have high pressure tolerance adaptability, E tol_v_3 The value is 0;
[0139] Judgment condition 4: The fundamental positive sequence component of the three-phase voltage at the grid connection point of the new energy power station increases to between [120%, 125%] of the nominal voltage; Corresponding criterion: If all power generation units in the new energy power station are guaranteed to operate continuously for 1 second without disconnection from the grid, then it has high voltage tolerance adaptability, and the voltage tolerance adaptability sub-index is E tol_v_4 , E tol_v_4 The value is 1, otherwise it does not have high pressure tolerance adaptability, E tol_v_4 The value is 0;
[0140] Judgment condition 5: The fundamental positive sequence component of the three-phase voltage at the grid connection point of the new energy power station increases to between [110%, 120%] of the nominal voltage; Corresponding criterion: If all power generation units in the new energy power station are guaranteed to operate continuously for 10 seconds without disconnection from the grid, then it has high voltage tolerance adaptability, and the voltage tolerance adaptability sub-index is E tol_v_5 , E tol_v_5 The value is 1, otherwise it does not have high pressure tolerance adaptability, E tol_v_5 The value is 0;
[0141] When the corresponding criterion is not satisfied in any of the working conditions 1 to 5, it is determined that the new energy power station does not have voltage tolerance adaptability; according to formula (6), the voltage tolerance adaptability sub-index E is obtained. tol_v value:
[0142] Among them, i1 is the voltage tolerance adaptability sub-index E tol_v The working condition number, n1 is the sub-index E of the voltage tolerance adaptability analysis tol_v The number of working conditions;
[0143] For the frequency tolerance adaptability sub-index E tol_f , determine the following four working conditions in sequence:
[0144] Judgment condition 1: The grid frequency f at the grid connection point of the new energy power station is between [48.5Hz, 50.5Hz]; Corresponding criterion: If all power generation units in the new energy power station operate continuously, it has frequency deviation tolerance adaptability. In this case, the frequency tolerance adaptability sub-index is E tol_f_1 , E tol_f_1 The value is 1, otherwise it does not have frequency deviation tolerance adaptability, E tol_f_1 The value is 0;
[0145] Judgment condition 2: The grid frequency f at the connection point of the new energy power station is between [48Hz, 48.5Hz); the corresponding criterion is: if the frequency is lower than 48.5Hz each time, and all the power generation units in the new energy power station have the ability to operate for at least 30 minutes, then it has low-frequency tolerance adaptability, and the frequency tolerance adaptability sub-index is E tol_f_2 , E tol_f_2 The value is 1, otherwise it does not have low frequency tolerance adaptability, E tol_f_2 The value is 0;
[0146] Judgment condition 3: The grid frequency f at the connection point of the new energy power station is between (50.5Hz, 51Hz]; Corresponding criterion: If all power generation units in the new energy power station have the ability to operate for at least 3 minutes, they have high-frequency tolerance adaptability. In this case, the frequency tolerance adaptability sub-index is E tol_f_3 , E tol_f_3 The value is 1, otherwise it does not have high frequency tolerance adaptability, E tol_f_3 The value is 0;
[0147] Judgment condition 4: The grid frequency f at the connection point of the new energy power station is between (51Hz, 51.5Hz]; corresponding criterion: each time the frequency is higher than 50.5Hz, if all the power generation units in the new energy power station have the ability to operate for at least 30s, then they have high-frequency tolerance adaptability, and the frequency tolerance adaptability sub-index is E tol_f_4 , E tol_f_4 The value is 1, otherwise it does not have high frequency tolerance adaptability, E tol_f_4 The value is 0;
[0148] When the criterion is not satisfied in any of the working conditions 1 to 4, the new energy power station is judged to be not frequency tolerant and the frequency tolerant adaptability sub-index E is obtained according to formula (7). tol_f value;
[0149] Among them, i2 is the analysis frequency tolerance adaptability sub-index E tol_fThe working condition number, n2 analysis frequency tolerance adaptability sub-index E tol_f The number of working conditions.
[0150] Analysis of dynamic active active support index E act_p :
[0151] New energy power stations (photovoltaic power stations, wind farms) use corresponding active power control systems, single units or independent control devices to complete active power-frequency droop characteristic control, so that they have the ability to participate in the rapid adjustment of grid frequency at the grid connection point. Their active power injection support capability is reflected by the modulation rate. According to formula (8), the actual modulation rate and actual modulation rate deviation of the new energy fast frequency response are calculated:
[0152] Among them, k δ% is the deviation of the actual adjustment rate of the new energy fast frequency response; δ% is the actual adjustment rate of the new energy fast frequency response; δ std % is the regulation rate for fast frequency response of new energy (3% for photovoltaic power plants and 2% for wind farms). d The fast frequency response dead zone is in Hz (the photovoltaic power station is set to ±0.06Hz, and the wind farm is set to ±0.10Hz); f N is the system rated frequency, in Hz; P N is the rated power of the new energy power station, in MW; P 1+ 0 is the initial value of active power of the fundamental positive sequence component, in MW; P 1+ It is the active power of the fundamental positive sequence component, in MW.
[0153] Based on the obtained deviation of the actual modulation rate of the rapid frequency response of the new energy, the following two working conditions are analyzed:
[0154] Judgment condition 1: The grid frequency at the connection point of the new energy power station is higher than 50.3Hz and the fundamental positive sequence voltage is between [90%, 110%] of the nominal voltage; Corresponding judgment criteria: The active power of the new energy power station can be adjusted according to a certain adjustment rate (k δ% No more than ±5%) fast (response lag time t hx No more than 2s; response time t 0.9 Wind power does not exceed 12s, photovoltaic does not exceed 5s; adjustment time t s No more than 15s) reduce active power, E act_p_1 The value is 1, otherwise E act_p_1 The value is 0;
[0155] Judgment condition 2: The grid frequency at the connection point of the new energy power station is lower than 49.97Hz and the fundamental positive sequence voltage is between [90%, 110%] of the nominal voltage; Corresponding judgment criteria: The active power of the new energy power station is adjusted according to a certain adjustment rate (k δ% No more than ±5%) fast (response lag time t hx No more than 2s; response time t 0.9 Wind power does not exceed 12s, photovoltaic does not exceed 5s; adjustment time t s No more than 15s) increase the active power, E act_p_2 The value is 1, otherwise E act_p_2 The value is 0;
[0156] When the criterion is not satisfied in any of the working conditions 1 and 2, it is determined that the new energy power station does not have the adaptability of dynamic active power active support. According to formula (9), the dynamic active power active support type index E is obtained. act_p value:
[0157] Among them, i3 is the analysis of dynamic active active support index E act_p The working condition number, n3 is the analysis of dynamic active active support type index E act_p The number of working conditions.
[0158] Analysis of transient reactive active support index E act_q :
[0159] When a fault occurs in the power system and the three-phase voltage at the grid connection point drops, and the positive sequence component of the voltage is at [60%, 80%] or [110%, 130%] of the nominal voltage, the actual deviation of the reactive power support coefficient of the new energy source is calculated according to formula (10):
[0160] Among them, k λ is the actual deviation of the reactive power support coefficient of new energy; λ is the actual reactive power support coefficient; std is the standard recommended value of reactive support factor (generally within the range of 1.5 to 3); I Q1+ is the fundamental positive sequence reactive current; I Q1+ 0 is the initial value of the fundamental positive sequence reactive current before the fault occurs; I N is the fundamental positive sequence reactive current rating; is the complex modulus of the fundamental positive sequence component of the three-phase voltage.
[0161] According to the actual deviation of the reactive power support coefficient of new energy, the following two working conditions are analyzed:
[0162] Judgment condition 1: The fundamental positive sequence voltage of the three-phase voltage at the grid connection point of the new energy power station is [60%, 80%) of the nominal voltage; Corresponding judgment criteria: The actual deviation of the reactive support coefficient of the new energy power station is 0≤k λ ≤5%, E act_q_1 The value is 1, otherwise E act_q_1 The value is 0;
[0163] Judgment condition 2: The fundamental positive sequence voltage of the three-phase voltage at the grid connection point of the new energy power station is (110%, 130%] of the nominal voltage; corresponding judgment criterion: the actual deviation of the reactive support coefficient of the energy power station is 0≤k λ ≤5%, E act_q_2 The value is 1, otherwise E act_q_2 The value is 0;
[0164] When the criterion is not satisfied under any of the working conditions 1 and 2, it is determined that the new energy power station does not have the adaptability of transient reactive active support. According to formula (11), the transient reactive active support type index E is obtained. act_q value:
[0165] Among them, i4 is the active support index E for analyzing transient reactive power act_q The working condition number, n4 is the transient reactive active support type index E act_q The number of working conditions.
[0166] Dynamic active active support type sub-index E act_p Take the example to illustrate, the calculation flow chart is shown in Figure 6, specifically:
[0167] First, the dispatching master station generates a frequency test sequence f to simulate the power grid frequency disturbance. moc , frequency test sequence f moc The task is sent to the new energy substation through the edge gateway in the form of a computing task. After receiving the computing task, the new energy substation adjusts the control mode of the fast frequency device in the station to the test state through the communication module, and sets the frequency test sequence f moc It is sent to the fast frequency device in the station to trigger the fast frequency control, and the triggering moment is recorded at the same time, and then fed back to the dispatching master station in the form of 104 messages; on the other hand, the active power of the fundamental positive sequence component is obtained through the measurement and control module (such as formula (3)), and the dynamic active active support type sub-index E is calculated based on Figure 5. act_p Analysis, Figure 5 includes the response lag time t hx : The time required from the frequency crossing the dead zone of the new energy power station frequency regulation to the reliable power output starting to change in the frequency regulation direction; response time t 0.9 : The time from when the frequency exceeds the frequency regulation dead zone to when the active power regulation reaches 90% of the difference between the frequency regulation target value and the initial power; regulation time ts The analysis process also requires power forecast information from new energy power plants and grid dispatch AGC instructions, which are obtained through communication modules interacting with the station's dispatch telecontrol RTU and power forecasting system.
[0168] Online analysis of tolerance-type adaptability indicators requires long-term operational monitoring of the new energy substation, analyzing its adaptability through statistical analysis of monitoring data under various operating conditions. Active support-type adaptability indicators, in addition to long-term operational monitoring, can also be regularly analyzed and evaluated through detection by the dispatching master station. Figure 6 illustrates online analysis and calculations achieved through interaction with the new energy substation under the dispatching master station detection method.
[0169] Step S3: After the calculation task is completed, each new energy substation compresses and encrypts the calculation results and cross-section information through the edge gateway and transmits them back to the dispatching master station;
[0170] The edge gateway is located between the new energy substation and the dispatching main station, providing a convenient and fast data transmission mode. Due to the introduction of the edge gateway, the entire system architecture is divided into three levels, namely the new energy substation, the edge gateway and the dispatching main station as the centralized data processing center.
[0171] Each new energy substation packages the grid-connection adaptability analysis results and key operational characteristics of the current new energy substation (including total active power, total reactive power, theoretical power forecast data, voltage and frequency at the grid connection point on the high-voltage side of the main transformer, and the operating status of each power generation unit) and sends them to the edge gateway. The edge gateway waits for the results from all new energy substations within a computing task cycle before compressing and transmitting the data sent by the multiple new energy substations under its jurisdiction. The edge gateway aggregates data at the aggregation station level, effectively alleviating the data aggregation pressure on the dispatching master station. The edge computing terminal at the new energy substation stores raw data at the power station level, effectively alleviating the data storage pressure on the dispatching master station. Raw data is not transmitted on a large scale across the network, reducing communication transmission pressure and also ensuring data security. To ensure comprehensive and convenient data access, while distinguishing it from other grid data and ensuring safe grid operation, the real-time operating data of each new energy substation is compressed and encrypted by the gateway before being transmitted to the master station to meet information security requirements. Data encryption is performed using a key to prevent information leakage or tampering.
[0172] Step S4: The dispatching master station performs grid-connection adaptability analysis based on the feedback results.
[0173] The dispatching master station is configured to exchange information with each edge gateway to perform grid-connected adaptability analysis of each new energy substation within the dispatching master station's jurisdiction. On the one hand, the dispatching master station obtains the calculation results of each new energy substation from each edge gateway. On the other hand, the dispatching master station obtains the PMU monitoring data of each new energy substation through the main dispatching wide area measurement system (WAMS). PMU data generally has a longer storage period than the data collected by the measurement and control module. After the dispatching master station detects a new energy substation with poor adaptability based on the edge gateway's online monitoring, it can conduct a post-evaluation by tracing back the PMU data saved in the WAMS system, which can improve the accuracy of the analysis of the grid-connected adaptability of the new energy power station.
[0174] The dispatching master station aggregates the calculation results transmitted via the edge gateway from edge computing terminals at multiple renewable energy substations within its jurisdiction and performs categorized statistics on each sub-indicator of grid-connection adaptability. This system ranks the grid-connection adaptability calculation results of different power stations at the renewable energy base level. Based on the ranking results, it identifies and marks those with poor adaptability. If anomalies are detected, targeted emergency measures are implemented for each renewable energy station, improving grid frequency control. This system also provides decision-making support for dispatching operators.
[0175] The task distribution and compression return process based on the edge gateway is shown in Figure 2. The dispatching master station sends the computing tasks to the edge computing terminals of each new energy substation through the edge gateway. The edge computing terminals of the new energy substations perform grid-connected adaptability monitoring and analysis of the new energy power station based on the computing tasks and the current operating conditions of the power station, and return the calculation results to the edge gateway. Since the operating conditions of each new energy power station are different, the task execution may not be completed at the same time. Therefore, the gateway needs to collect all the computing tasks of this round, and then uniformly compress and encrypt the data, and finally return the calculation results to the dispatching master station for comprehensive evaluation.
[0176] Those skilled in the art will appreciate that all or part of the processes in the above-described method embodiments can be implemented by instructing related hardware through a computer program. The program can be stored in a computer-readable storage medium, and when executed, the program can include the processes in the above-described method embodiments. The storage medium can be a magnetic disk, an optical disk, a read-only memory (ROM), or a random access memory (RAM).
[0177] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present disclosure and not to limit them. Although the present disclosure has been described in detail with reference to the above embodiments, ordinary technicians in the relevant field should understand that the specific implementation methods of the present disclosure can still be modified or replaced by equivalents, and any modifications or equivalent replacements that do not depart from the spirit and scope of the present disclosure should be included in the scope of the claims.
Claims
1. A method for analyzing the adaptability of a new energy power station to a grid, the method comprising: The scheduling master station distributes computing tasks through the edge gateway; After receiving the computing task, each new energy substation executes the computing task asynchronously according to the working conditions; After the calculation task is completed, each new energy substation compresses and encrypts the calculation results and cross-section information through the edge gateway and transmits them back to the dispatching master station. The dispatching master station performs grid-connected adaptability analysis based on the transmitted results.
2. The method for analyzing the adaptability of a new energy power station to the grid according to claim 1, wherein: The computing tasks include periodic timing tasks and sampling trigger tasks.
3. The method for analyzing the adaptability of a new energy power station to the grid according to claim 1, wherein: After receiving the computing task, each new energy substation asynchronously performs the computing task according to the working conditions, including: Step a1, collecting the three-phase voltage and three-phase current analog signals of the voltage transformer and the current transformer at the grid connection point of the new energy power station, and extracting the grid frequency f, the fundamental positive sequence / negative sequence / zero sequence components of the three-phase voltage, the fundamental positive sequence / negative sequence / zero sequence components of the three-phase current, the active power and reactive power of the fundamental positive sequence component, and the active current and reactive current of the fundamental positive sequence component through analog-to-digital conversion and digital signal processing technology; Step a2, based on the grid frequency extracted in step a1, the fundamental positive / negative / zero-sequence components of the three-phase voltage, the fundamental positive / negative / zero-sequence components of the three-phase current, the fundamental positive-sequence active power, reactive power, active current and reactive current of the fundamental positive-sequence component, various indicators of the grid-connected adaptability of the new energy power station are calculated, and the various indicators of the grid-connected adaptability of the new energy power station include tolerance-type adaptability indicators and active support-type adaptability indicators.
4. The method for analyzing the adaptability of a new energy power station to the grid according to claim 3, wherein: In the step a1, extracting the fundamental positive sequence / negative sequence / zero sequence components of the three-phase voltage, the fundamental positive sequence / negative sequence / zero sequence components of the three-phase current, the active power and reactive power of the fundamental positive sequence component, and the active current and reactive current of the fundamental positive sequence component include: Step a11, according to formula (1), use Fourier transform to extract the fundamental component: Where t is time, u a (t) is the instantaneous value of phase A voltage, u a,cos with u a,sin A phase voltage The real and imaginary parts of the complex phasor, f1 is the power frequency, T is the cycle time window corresponding to the power frequency; Similarly, according to formula (2), we can obtain u b,cos 、u b,sin 、u c,cos 、u c,sin 、i a,cos 、i a,sin 、i b,cos 、i b,sin 、i c,cos 、i c,sin ; Then synthesize the three-phase voltage and three-phase current phasors: Where j is the imaginary unit of the complex phasor and its value is is the complex phasor of the B and C phase voltages; u b,cos with u b,sin is the voltage of phase B The real and imaginary parts of a complex phasor; u c,cos with u c,sin is the C phase voltage Real and imaginary parts of complex phasors; is the complex phasor of the three-phase current of A, B, and C; i a,cos with i a,sin A phase current The real and imaginary parts of a complex phasor; i b,cos with i b,sin A phase current The real and imaginary parts of a complex phasor; i c,cos with i c,sin A phase current Real and imaginary parts of complex phasors; Step a12, according to formula (3), extract the fundamental positive sequence / negative sequence / zero sequence components of the three-phase voltage and three-phase current through positive and negative sequence transformation: Among them, a is the basic element of the transformation matrix, and its value j is the imaginary unit of the complex number, and its value is are the fundamental positive sequence component, negative sequence component and zero sequence component of the three-phase voltage; is the voltage phasor of three phases A, B and C; are the fundamental positive sequence component, negative sequence component and zero sequence component of the three-phase current; is the current phasor of three phases A, B and C; Step a13, calculate the active power and reactive power of the fundamental positive sequence component according to formula (4): The subscript "1" indicates the power frequency fundamental wave, the subscript "+" indicates the positive sequence, and u 1+,cos with u 1+,sin is the positive sequence component of the three-phase voltage The real and imaginary parts of 1+,cos with i 1+,sin is the positive sequence component of the three-phase current The real and imaginary parts, P 1+ is the active power of the fundamental positive sequence component, Q 1+ is the reactive power of the fundamental positive sequence component; Step a14, calculate the active current and reactive current of the fundamental positive sequence component according to formula (5): Among them, I P1+ is the active current of the fundamental positive sequence component, I Q1+ is the reactive current of the fundamental positive sequence component, is the complex modulus of the positive sequence component of the three-phase voltage.
5. The method for analyzing the adaptability of a new energy power station to the grid according to claim 3, wherein: The tolerance adaptability index in step a2 includes the voltage tolerance adaptability sub-index E tol_v and frequency tolerance adaptability sub-index E tol_f ,include: Step a21, for the voltage tolerance adaptability sub-index E tol_v , determine the following five working conditions in sequence: Judgment condition 1: The fundamental positive sequence component of the three-phase voltage at the grid connection point of the new energy power station is between [90%, 110%] of the nominal voltage; Corresponding criterion: If all the new energy power generation units in the new energy power station are operating normally, they have voltage deviation tolerance adaptability, and the voltage tolerance adaptability sub-index is E tol_v_1 , E tol_v_1 The value is 1, otherwise it does not have voltage deviation tolerance adaptability, E tol_v_1 The value is 0; Judgment condition 2: The fundamental positive sequence component of the three-phase voltage at the grid connection point of the new energy power station is as low as 20% of the nominal voltage; Corresponding criterion: If all the new energy power generation units in the new energy power station can operate continuously for more than 625ms, they have low voltage tolerance adaptability, and the voltage tolerance adaptability sub-index is E tol_v_2 , E tol_v_2 The value is 1, otherwise it does not have low voltage tolerance adaptability, E tol_v_2 The value is 0; Judgment condition 3: The fundamental positive sequence component of the three-phase voltage at the grid connection point of the new energy power station increases to between [125%, 130%] of the nominal voltage; Corresponding criterion: If all the power generation units in the new energy power station are guaranteed to operate continuously for 500ms without disconnection from the grid, they have high voltage tolerance adaptability, and the voltage tolerance adaptability sub-index is E at this time tol_v_3 , E tol_v_3 The value is 1, otherwise it does not have high pressure tolerance adaptability, E tol_v_3 The value is 0; Judgment condition 4: The fundamental positive sequence component of the three-phase voltage at the grid connection point of the new energy power station increases to between [120%, 125%) of the nominal voltage; Corresponding criterion: If all the power generation units in the new energy power station are guaranteed to operate continuously for 1s without disconnection from the grid, they have high voltage tolerance adaptability, and the voltage tolerance adaptability sub-index is E tol_v_4 , E tol_v_4 The value is 1, otherwise it does not have high pressure tolerance adaptability, E tol_v_4 The value is 0; Judgment condition 5: The fundamental positive sequence component of the three-phase voltage at the grid connection point of the new energy power station increases to between [110%, 120%) of the nominal voltage; Corresponding criterion: If all the power generation units in the new energy power station are guaranteed to operate continuously for 10 seconds without disconnection from the grid, they have high voltage tolerance adaptability, and the voltage tolerance adaptability sub-index is E tol_v_5 , E tol_v_5 The value is 1, otherwise it does not have high pressure tolerance adaptability, E tol_v_5 The value is 0; When the corresponding criterion is not satisfied in any of the judgment conditions 1 to 5, it is determined that the new energy power station does not have voltage tolerance adaptability; according to formula (6), the voltage tolerance adaptability sub-index E is obtained. tol_v value: Among them, i1 is the voltage tolerance adaptability sub-index E tol_v The working condition number, n1 is the sub-index E of the voltage tolerance adaptability analysis tol_v The number of working conditions; Step a22: frequency tolerance adaptability sub-index E tol_f , determine the following four working conditions in sequence: Judgment condition 1: The grid frequency f of the new energy power station grid connection point is between [48.5Hz, 50.5Hz]; Corresponding criterion: If all power generation units in the new energy power station operate continuously, they have frequency deviation tolerance adaptability, and the frequency tolerance adaptability sub-index is E tol_f_1 , E tol_f_1 The value is 1, otherwise it does not have frequency deviation tolerance adaptability, E tol_f_1 The value is 0; Judgment condition 2: The grid frequency f of the new energy power station grid connection point is between [48Hz, 48.5Hz); Corresponding criterion: Each time the frequency is lower than 48.5Hz, if all the power generation units in the new energy power station have the ability to operate for at least 30 minutes, they have low-frequency tolerance adaptability, and the frequency tolerance adaptability sub-index is E tol_f_2 , E tol_f_2 The value is 1, otherwise it does not have low-frequency tolerance adaptability, E tol_f_2 The value is 0; Judgment condition 3: The grid frequency f of the new energy power station grid connection point is between (50.5Hz, 51Hz]; Corresponding criterion: If all the power generation units in the new energy power station have the ability to operate for at least 3 minutes, they have high-frequency tolerance adaptability. At this time, the frequency tolerance adaptability sub-index is E tol_f_3 , E tol_f_3 The value is 1, otherwise it does not have high frequency tolerance adaptability, E tol_f_3 The value is 0; Judgment condition 4: The grid frequency f of the new energy power station grid connection point is between (51Hz, 51.5Hz]; corresponding criterion: When the secondary frequency is higher than 50.5Hz, if all the power generation units in the new energy power station have the ability to operate for at least 30s, they have high-frequency tolerance adaptability. At this time, the frequency tolerance adaptability sub-index is E tol_f_4 , E tol_f_4 The value is 1, otherwise it does not have high frequency tolerance adaptability, E tol_f_4 The value is 0; When the criterion is not satisfied in any of the judgment conditions 1 to 4, the new energy power station is judged to be not frequency tolerant and the frequency tolerant adaptability sub-index E is calculated according to formula (7). tol_f value; Among them, i2 is the analysis frequency tolerance adaptability sub-index E tol_f The working condition number, n2 analysis frequency tolerance type adaptability sub-index E tol_f The number of working conditions.
6. A method for analyzing the adaptability of a new energy power station to the grid according to claim 3, wherein: The active support adaptability index E in a2 tol Including dynamic active active support type sub-index E act_p and transient reactive active support type sub-index E act_q ,include: Step a23, analyzing the dynamic active active support index E act_p ; According to formula (8), the actual modulation rate and actual modulation rate deviation of the fast frequency response of new energy are calculated: Among them, k δ% is the actual adjustment rate deviation of the new energy fast frequency response, δ% is the actual adjustment rate of the new energy fast frequency response, δ std % is the regulation rate of new energy fast frequency response, f d is the fast frequency response dead zone, in Hz, f N is the rated frequency of the system, in Hz, f is the grid frequency of the new energy power station grid connection point, in Hz, P N is the rated power of the new energy power station, in MW, P 1+ 0 is the initial value of active power of the fundamental positive sequence component, in MW, P 1+ is the active power of the fundamental positive sequence component, in MW; According to the obtained actual regulation rate deviation of the fast frequency response of new energy, the following two working conditions are analyzed: Judgment condition 1: The grid frequency f at the grid connection point of the new energy power station is higher than 50.3Hz and the fundamental positive sequence voltage is between [90%, 110%] of the nominal voltage; Corresponding criterion: The active power of the new energy power station can be calculated according to k δ% The active power is reduced by no more than ±5%, and the dynamic active active support index is E act_p_1 , E act_p_1 The value is 1, otherwise E act_p_1 The value is 0; Judgment condition 2: The grid frequency f at the grid connection point of the new energy power station is lower than 49.97Hz and the fundamental positive sequence voltage is between [90%, 110%] of the nominal voltage; Corresponding criterion: The active power of the new energy power station is calculated according to k δ% The active power is increased by no more than ±5%, and the dynamic active active support index is E act_p_2 , E act_p_2 The value is 1, otherwise E act_p_2 The value is 0; When the criterion is not satisfied in any of the judgment conditions 1 and 2, it is determined that the new energy power station does not have the adaptability of dynamic active active support; according to formula (9), the dynamic active active support type index E is obtained. act_p value: Among them, i3 is the active support index E for analyzing dynamic active power act_p The working condition number, n3 is the analysis of dynamic active active support index E act_p The number of working conditions; Step a24, analyzing transient reactive active support index E act_q ; According to formula (10), the actual deviation of the reactive power support coefficient of new energy is obtained: Among them, k λ is the actual deviation of the reactive power support coefficient of new energy, λ is the actual reactive power support coefficient, λ std is the standard recommended value of reactive support factor, I Q1+ is the reactive current of the fundamental positive sequence component, I Q1+ 0 is the initial value of reactive current of the fundamental positive sequence component before the fault occurs, I N is the fundamental positive sequence reactive current rating, is the complex modulus value of the fundamental positive sequence component of the three-phase voltage; According to the actual deviation of the reactive power support coefficient of new energy, the following two working conditions are analyzed: Judgment condition 1: The fundamental positive sequence component of the three-phase voltage at the grid connection point of the new energy power station is [60%, 80%) of the nominal voltage; Corresponding criterion: The actual deviation of the reactive support coefficient of the new energy power station is 0≤k λ ≤5%, E act_q_1 The value is 1, otherwise E act_q_1 The value is 0; Judgment condition 2: The fundamental positive sequence component of the three-phase voltage at the grid connection point of the new energy power station is (110%, 130%] of the nominal voltage; Corresponding criterion: The actual deviation of the reactive support coefficient of the energy power station is 0≤k λ ≤5%, E act_q_2 The value is 1, otherwise E act_q_2 The value is 0; When the criterion is not satisfied in any of the judgment conditions 1 and 2, it is determined that the new energy power station does not have the adaptability of transient reactive active support; according to formula (11), the transient reactive active support type index E is obtained. act_q value; Among them, i4 is the active support index E for analyzing transient reactive power act_q The working condition number, n4 is the transient reactive active support type index E act_q The number of working conditions.
7. A new energy power station grid-connected adaptability analysis system, the system comprising a dispatching master station, a plurality of new energy substations and an edge gateway, the edge gateway being deployed between the dispatching master station and the new energy substation; The dispatching master station distributes computing tasks to multiple new energy substations via the edge gateway, and aggregates the computing results returned by multiple new energy substations to perform grid-connected adaptability analysis; The new energy substation asynchronously executes the assigned computing tasks according to the working conditions; The edge gateway distributes the computing tasks assigned by the dispatching master station to each new energy substation, collects the computing results and cross-section information of each new energy substation, compresses and encrypts them, and transmits them back to the dispatching master station.
8. The new energy power station grid-connected adaptability analysis system according to claim 7, wherein: The new energy substation includes a measurement and control module, a communication module, a cache module, a storage module, and a computing module; The measurement and control module is configured to collect three-phase voltage and three-phase current analog signals of voltage transformers and current transformers at the grid connection point of the new energy power station, extract electrical quantity information of the grid connection point of the new energy power station through analog-to-digital conversion and digital signal processing technology, and store the results in the cache module, wherein the electrical quantity information of the grid connection point of the new energy power station includes grid frequency, fundamental positive sequence / negative sequence / zero sequence components of the three-phase voltage, fundamental positive sequence / negative sequence / zero sequence components of the three-phase current, fundamental positive sequence active power, reactive power, active current and reactive current of the fundamental positive sequence component; The cache module is configured to cache the electrical quantity information of the new energy power station grid connection point within the calculation period output by the measurement and control module, on the one hand, for use by the calculation module, and on the other hand, output the data to the storage module for long-term storage; The calculation module is configured to receive the electrical quantity information of the new energy power station grid connection point cached in the high-speed cache module, and calculate various indicators of the new energy power station grid connection adaptability, the various indicators of the new energy power station grid connection adaptability include tolerance type adaptability indicators and active support type adaptability indicators, the tolerance type adaptability indicators include voltage tolerance type adaptability sub-indicators E tol_v and frequency tolerance adaptability sub-index E tol_f The active support type adaptability index includes the dynamic active active support type sub-index E act_p and transient reactive active support type sub-index E act_q ; The communication module is configured for information exchange between the new energy substation and other systems, and the other systems include a monitoring system, a power prediction system, a telecontrol RTU, and an edge gateway.
9. The new energy power station grid-connected adaptability analysis system according to claim 8, wherein: The measurement and control module is configured to extract the fundamental positive / negative / zero sequence components of the three-phase voltage, the fundamental positive / negative / zero sequence components of the three-phase current, the active power and reactive power of the fundamental positive sequence component, and the active current and reactive current of the fundamental positive sequence component.
10. A new energy power station grid-connected adaptability analysis system according to claim 9, wherein: The tolerance adaptability index includes the voltage tolerance adaptability sub-index E tol_v and frequency tolerance adaptability sub-index E tol_f The calculation module is configured to calculate the voltage tolerance adaptability sub-index E tol_v , determine the following five working conditions in sequence: Judgment condition 1: The fundamental positive sequence component of the three-phase voltage at the grid connection point of the new energy power station is between [90%, 110%] of the nominal voltage; Corresponding criterion: If all the new energy power generation units in the new energy power station are operating normally, they have voltage deviation tolerance adaptability, and the voltage tolerance adaptability sub-index is E tol_v_1 , E tol_v_1 The value is 1, otherwise it does not have voltage deviation tolerance adaptability, E tol_v_1 The value is 0; Judgment condition 2: The fundamental positive sequence component of the three-phase voltage at the grid connection point of the new energy power station is as low as 20% of the nominal voltage; Corresponding criterion: If all the new energy power generation units in the new energy power station can operate continuously for more than 625ms, they have low voltage tolerance adaptability, and the voltage tolerance adaptability sub-index is E tol_v_2 , E tol_v_2 The value is 1, otherwise it does not have low voltage tolerance adaptability, E tol_v_2 The value is 0; Judgment condition 3: The fundamental positive sequence component of the three-phase voltage at the grid connection point of the new energy power station increases to between [125%, 130%] of the nominal voltage; Corresponding criterion: If all the power generation units in the new energy power station are guaranteed to operate continuously for 500ms without disconnection from the grid, they have high voltage tolerance adaptability, and the voltage tolerance adaptability sub-index is E at this time tol_v_3 , E tol_v_3 The value is 1, otherwise it does not have high pressure tolerance adaptability, E tol_v_3 The value is 0; Judgment condition 4: The fundamental positive sequence component of the three-phase voltage at the grid connection point of the new energy power station increases to between [120%, 125%) of the nominal voltage; Corresponding criterion: If all the power generation units in the new energy power station are guaranteed to operate continuously for 1s without disconnection from the grid, they have high voltage tolerance adaptability, and the voltage tolerance adaptability sub-index is E tol_v_4 , E tol_v_4 The value is 1, otherwise it does not have high pressure tolerance adaptability, E tol_v_4 The value is 0; Judgment condition 5: The fundamental positive sequence component of the three-phase voltage at the grid connection point of the new energy power station increases to between [110%, 120%) of the nominal voltage; Corresponding criterion: If all the power generation units in the new energy power station are guaranteed to operate continuously for 10 seconds without disconnection from the grid, they have high voltage tolerance adaptability, and the voltage tolerance adaptability sub-index is E tol_v_5 , E tol_v_5 The value is 1, otherwise it does not have high pressure tolerance adaptability, E tol_v_5 The value is 0; When the corresponding criterion is not satisfied in any of the judgment conditions 1 to 5, it is determined that the new energy power station does not have voltage tolerance adaptability; the voltage tolerance adaptability sub-index E is obtained. tol_v value: The calculation module is also configured to calculate the frequency tolerance adaptability sub-index E tol_f , determine the following four working conditions in sequence: Judgment condition 1: The grid frequency f of the new energy power station grid connection point is between [48.5Hz, 50.5Hz]; Corresponding criterion: If all power generation units in the new energy power station operate continuously, they have frequency deviation tolerance adaptability, and the frequency tolerance adaptability sub-index is E tol_f_1 , E tol_f_1 The value is 1, otherwise it does not have frequency deviation tolerance adaptability, E tol_f_1 The value is 0; Judgment condition 2: The grid frequency f of the new energy power station grid connection point is between [48Hz, 48.5Hz); Corresponding criterion: Each time the frequency is lower than 48.5Hz, if all the power generation units in the new energy power station have the ability to operate for at least 30 minutes, they have low-frequency tolerance adaptability, and the frequency tolerance adaptability sub-index is E tol_f_2 , E tol_f_2 The value is 1, otherwise With low frequency tolerance adaptability, E tol_f_2 The value is 0; Judgment condition 3: The grid frequency f of the new energy power station grid connection point is between (50.5Hz, 51Hz]; Corresponding criterion: If all the power generation units in the new energy power station have the ability to operate for at least 3 minutes, they have high-frequency tolerance adaptability. At this time, the frequency tolerance adaptability sub-index is E tol_f_3 , E tol_f_3 The value is 1, otherwise it does not have high frequency tolerance adaptability, E tol_f_3 The value is 0; Judgment condition 4: The grid frequency f of the new energy power station grid connection point is between (51Hz, 51.5Hz]; Corresponding criterion: Every time the frequency is higher than 50.5Hz, if all the power generation units in the new energy power station have the ability to operate for at least 30s, they have high-frequency tolerance adaptability, and the frequency tolerance adaptability sub-index is E tol_f_4 , E tol_f_4 The value is 1, otherwise it does not have high frequency tolerance adaptability, E tol_f_4 The value is 0; When the criterion is not satisfied in any of the judgment conditions 1 to 4, it is determined that the new energy power station does not have frequency tolerance adaptability, and the frequency tolerance adaptability sub-index E is obtained. tol_f value; The calculation module is further configured to make judgments on the following two working conditions according to the actual modulation rate deviation of the rapid frequency response of the new energy: Judgment condition 1: The grid frequency f at the grid connection point of the new energy power station is higher than 50.3Hz and the fundamental positive sequence voltage is between [90%, 110%] of the nominal voltage; Corresponding criterion: The active power of the new energy power station can be calculated according to k δ% The active power is reduced by no more than ±5%, and the dynamic active active support index is E act_p_1 , E act_p_1 The value is 1, otherwise E act_p_1 The value is 0; Judgment condition 2: The grid frequency f at the grid connection point of the new energy power station is lower than 49.97Hz and the fundamental positive sequence voltage is between [90%, 110%] of the nominal voltage; Corresponding criterion: The active power of the new energy power station is calculated according to k δ% The active power is increased by no more than ±5%, and the dynamic active active support index is E act_p_2 , E act_p_2 The value is 1, otherwise E act_p_2 The value is 0; When the criterion is not satisfied in any of the judgment conditions 1 and 2, it is determined that the new energy power station does not have the adaptability of dynamic active active support, and the dynamic active active support type index E is obtained. act_p value: The calculation module is also configured to make judgments on the following two working conditions based on the actual deviation of the reactive power support coefficient of the new energy: Judgment condition 1: The fundamental positive sequence component of the three-phase voltage at the grid connection point of the new energy power station is [60%, 80%) of the nominal voltage; Corresponding criterion: The actual deviation of the reactive support coefficient of the new energy power station is 0≤k λ ≤5%, E act_q_1 The value is 1, otherwise E act_q_1 The value is 0; Judgment condition 2: The fundamental positive sequence component of the three-phase voltage at the grid connection point of the new energy power station is (110%, 130%] of the nominal voltage; Corresponding criterion: The actual deviation of the reactive support coefficient of the energy power station is 0≤k λ ≤5%, E act_q_2 The value is 1, otherwise E act_q_2 The value is 0; When the criterion is not satisfied in any of the judgment conditions 1 and 2, it is determined that the new energy power station does not have the adaptability of transient reactive active support, and the transient reactive active support type index E is obtained. act_q value.
Citation Information
Patent Citations
Wind and light storage AGC / AVC coordination control system and method based on edge calculation
CN112421695A
Wind-solar storage primary frequency modulation coordination control system and method based on edge calculation
CN112583030A
New energy power station grid connection adaptability analysis method and system
CN116667530A
Electrical power grid interconnections
US20210406425A1
Cited By
Network construction power supply capacity configuration optimization method and system
CN119401573A
Method and device for detecting reactive current response time of new energy grid-connected equipment
CN120405305A
Frequency modulation method for new energy station
CN120914834A