Heat supply network peak regulation system and control method therefor
By using multi-level heating network peak-shaving paths and cascade utilization of exhaust steam and steam, the problem of low efficiency in existing thermoelectric decoupling technology has been solved, realizing an efficient and flexible heating system and reducing operating costs.
Patent Information
- Application Number
- PCT/CN2024/079566
- Authority / Receiving Office
- WO · WO
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2023-05-25
- Filing Date
- 2024-03-01
- Publication Date
- 2024-11-28
AI Technical Summary
Existing thermoelectric decoupling technology has low efficiency and low energy efficiency ratio, resulting in limited application and high cost. In addition, there is a phenomenon of directly using high-grade electrical energy for heating water supply.
The system adopts a heat network peak-shaving system, which includes a boiler, a high-pressure/medium-pressure cylinder of a steam turbine, a low-pressure cylinder, and a generator. It utilizes the waste heat of exhaust steam and steam for heating through a multi-stage heat network peak-shaving path. Combined with a steam injection device and a composite heater, it realizes the cascade utilization of exhaust steam and steam.
This technology improves the energy efficiency ratio of thermoelectric decoupling, reduces operating costs, meets heating load demands under different cold conditions, and enhances the flexibility and efficiency of the heating system.
Smart Images

Figure CN2024079566_28112024_PF_FP_ABST
Abstract
Description
Heat network peak regulation system and control method thereof Technical Field
[0001] The embodiments of the present disclosure relate to the field of power generation and heat supply, and in particular to a heat network peak-shaving system and a control method thereof. Background Art
[0002] The total heated area of urban and rural buildings in northern my country is approximately 20.6 billion square meters, 83% of which uses coal as a heat source, resulting in an annual consumption of approximately 400 million tons of standard coal. As urban areas continue to expand, heating demand is growing. Existing thermoelectric decoupling technology suffers from low efficiency and limited application, with some even using high-quality electricity directly for water heating. This leads to energy efficiency that is approximately 60% lower than that of conventional hot water boilers. This contributes to the low efficiency, limited application, high cost, and low energy efficiency of current thermoelectric decoupling technology.
[0003] Summary of the Invention
[0004] The present invention is proposed to solve or alleviate at least one aspect of the problems in the prior art.
[0005] An embodiment of the present invention relates to a heat network peak shaving system, comprising:
[0006] Boilers, steam turbine high-pressure / medium-pressure cylinders, steam turbine low-pressure cylinders, generators;
[0007] Heat network,
[0008] The heating network peak-shaving system includes at least two levels of heating network peak-shaving paths in the following heating network peak-shaving loop:
[0009] The first heating network peak shaving path: the first exhaust steam branch connected to the low-pressure cylinder is connected to the first heater, and the heating cycle return water is suitable for being heated in the first heater and then returned to the heating network;
[0010] The second heat network peak shaving path: the second exhaust steam branch connected to the low-pressure cylinder is connected to the steam injection device, and the first steam branch connected to the high-pressure / intermediate-pressure cylinder of the steam turbine is connected to the steam injection device to carry the exhaust steam from the second exhaust steam branch into the second heater. The heat supply cycle return water is suitable for being heated in the second heater and then returned to the heat network;
[0011] The third heating network peak-shaving path: the second steam branch connected to the high-pressure / medium-pressure cylinder of the turbine is connected to the third heater, and the heating cycle return water is suitable for being heated in the third heater and then returned to the heating network.
[0012] An embodiment of the present invention further relates to a control method for the above-mentioned heating network peak-shaving control system, comprising at least one of the following steps:
[0013] Utilize exhaust steam for heating based on the peak load regulation path of the first heating network;
[0014] Utilize exhaust steam and steam for heating based on the peak-shaving path of the second heating network;
[0015] Steam heating is used based on the peak-shaving path of the third heating network. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] FIG1 is a schematic diagram of a heating network peak-shaving system according to an exemplary embodiment of the present invention. DETAILED DESCRIPTION
[0017] The following description of the embodiments of the present invention with reference to the accompanying drawings is intended to explain the overall inventive concept of the present invention and should not be construed as limiting the present invention.
[0018] As shown in Figure 1, the heat network peak-shaving system includes:
[0019] Boiler, which may be a coal-fired boiler, a biomass boiler, a waste incineration boiler, a gas boiler or other power generation boiler;
[0020] Steam turbine high-pressure / medium-pressure cylinder, steam turbine high-back-pressure low-pressure cylinder, steam turbine low-back-pressure low-pressure cylinder, generator;
[0021] Cold end equipment, such as an air cooling island or condenser, is shown as an air cooling island in Figure 1;
[0022] Composite heater 1, steam jet upgrading device, heater 2, heater 3;
[0023] Electricity and heat networks.
[0024] In the embodiment shown in FIG1 , a three-level heat network peak shaving path is shown:
[0025] The first-level heating network peak-shaving path: includes the high back-pressure low-pressure cylinder of the unit, the composite heater 1 (i.e., the first heater), the thermal system, the heating network, and the associated pipelines. In the first-level heating network peak-shaving path, the exhaust steam-heating cycle return water heat exchange and the condensate-heating cycle return water heat exchange are used in the heater 1 to heat the heating cycle return water by recovering the waste heat of the turbine exhaust steam. After the heat exchange, the condensate formed by the exhaust steam drops below 60°C and then enters the thermal system. Specifically, referring to Figure 1, the first exhaust steam branch connected to the high back-pressure low-pressure cylinder is connected to the composite heater 1, and the heating cycle return water is suitable for being heated in the composite heater 1 and then returned to the heating network. After the heating cycle return water is heated by exhaust steam in the composite heater 1 based on the first heating network peak-shaving path, the temperature can be in the range of 50-69°C.
[0026] The secondary heating network peak-shaving path includes the unit's high-pressure / intermediate-pressure cylinders, a steam injection upgrading device (i.e., a steam injection device), heater 2 (i.e., a second heater), a thermal system, a heating network, and associated piping. In this secondary heating network peak-shaving path, exhaust steam from the high-pressure / intermediate-pressure cylinders, such as intermediate-pressure steam, is injected into heater 2 via the steam injection upgrading device to utilize the waste heat of the exhaust and exhaust steam for heat supply. After heat exchange, the working medium (which can be steam or condensate) enters the thermal system. Specifically, referring to Figure 1, the second exhaust steam branch connected to the high-back-pressure low-pressure cylinders is connected to the steam injection upgrading device. The first steam branch connected to the high-pressure / intermediate-pressure cylinders of the steam turbine is connected to the steam injection upgrading device to carry exhaust steam from the second exhaust steam branch into heater 2. The heat supply cycle return water is heated in heater 2 and then returned to the heating network. After being heated in heater 2 using exhaust steam and steam based on the secondary heating network peak-shaving path, the heat supply cycle return water can reach a temperature of 70-85°C.
[0027] The three-stage heat network peak-shaving path includes the unit's high-pressure / medium-pressure cylinder, heater 3 (i.e., the third heater), thermal system, heat network, and associated pipelines. In the three-stage heat network peak-shaving path, the exhaust steam from the unit's high-pressure / medium-pressure cylinder is used to further heat the circulating return water, greatly improving the heating capacity and ensuring heating safety. After heat exchange, the working medium (which can be steam or condensate) enters the thermal system. Specifically, referring to Figure 1, the second steam branch connected to the turbine's high-pressure / medium-pressure cylinder is connected to heater 3 (i.e., the third heater), and the heat circulation return water is suitable for being heated in heater 3 and then returned to the heat network. After the heat circulation return water is heated by steam in heater 3 based on the third heat network peak-shaving path, the temperature can be in the range of 85-95°C.
[0028] Based on the above-mentioned heating network peak-shaving paths, different heating network peak-shaving paths can be selected based on the heating demand (assuming it is measured by temperature). When the required temperature is relatively low, only the first-level heating network peak-shaving path can be used; when the required temperature is higher, the first-level and second-level heating network peak-shaving paths can be used at the same time; when the required temperature is even higher, the first-level, second-level and third-level heating network peak-shaving paths can be used at the same time. As can be understood, only the third-level and second-level heating network peak-shaving paths can be used at the same time, or only the second-level or third-level heating network peak-shaving paths can be used, all of which are within the scope of protection of the present invention.
[0029] As previously described, composite heater 1 utilizes a combination of exhaust steam-heating cycle return water and condensate-heating cycle return water to heat the return water, thereby recovering waste heat from turbine exhaust steam for heating. However, the present invention is not limited to this. Heater 1 need not be a composite heater, as long as it is suitable for exchanging heat from exhaust steam to return water from the heating cycle.
[0030] In addition, the heater 1 can also be in the form of a peak cooler. Coal-fired power air-cooled units generally have high back pressure during the high temperature period in summer, which leads to increased coal consumption for power generation and poor operating economy. Therefore, during the high temperature season in summer, the composite heater 1 can be changed to the operating mode of a peak cooler, and the operating back pressure of the unit can be reduced by adding a mechanical ventilation cooling device, thereby improving the power generation efficiency of the unit and reducing the coal consumption for power generation during the peak peak shaving operation of the unit in summer. That is, the composite heater 1 is also provided with a cooling air inlet and a cooling air outlet, so that the exhaust steam can be cooled by gas when the return water of the heating cycle is not passed into the composite heater 1. In this way, in the non-heating case, the high back pressure low pressure cylinder is in operation, and the exhaust steam of the high back pressure low pressure cylinder is connected to the heater 1. The heater 1 is also provided with a cooling air inlet and a cooling air outlet, so that the exhaust steam can be cooled by gas when the return water of the heating cycle is not passed into the heater 1.
[0031] In the embodiment shown in FIG1 , the back-pressure low-pressure cylinder of the steam turbine includes a high back-pressure low-pressure cylinder and a low back-pressure low-pressure cylinder, but the present invention is not limited thereto. Although not shown, it is also possible to provide only a high back-pressure low-pressure cylinder without providing a low back-pressure low-pressure cylinder. In the case where a high back-pressure low-pressure cylinder is provided, as described above, in the first heat network peak-shaving path, the first exhaust steam branch is connected to the high back-pressure low-pressure cylinder, and in the second heat network peak-shaving path, the second exhaust steam branch is connected to the high back-pressure low-pressure cylinder. In addition, in the present invention, for exhaust steam to be drawn out from the low-pressure cylinder, it may not be a back-pressure low-pressure cylinder, but other types of steam turbine low-pressure cylinders, which is also within the scope of protection of the present invention.
[0032] As shown in FIG1 , the exhaust steam of the high back-pressure low-pressure cylinder is also suitable for communicating with the air-cooling island 1 (i.e., the first air-cooling island).
[0033] As shown in Figure 1, the exhaust steam from the low-back-pressure, low-pressure cylinder is also suitable for communication with air-cooling island 2 (i.e., the second air-cooling island). Although not shown, the exhaust steam from the low-back-pressure, low-pressure cylinder is also suitable for communication with the condenser. When air-cooling islands 1 and 2 are configured, a balancing device, such as a balancing pump, can be installed between them, as shown in Figure 1, to address the problem of uneven water levels in the cold-end device caused by different operating backpressures in the low-pressure cylinders.
[0034] In the present invention, in the embodiment shown in Figure 1, during the heating season, the low-pressure cylinder of the unit operates in high / low dual back pressure to improve the heating capacity, and the exhaust steam pressure range of the high back pressure low-pressure cylinder is 25~35kPa, and the exhaust steam pressure range of the low back pressure low-pressure cylinder is 13~18kPa; during the non-heating season, the unit switches to air-cooled pure condensing condition low back pressure (13~18kPa) operation, for example, only the low back pressure low-pressure cylinder is operated, the exhaust steam pressure range of the low back pressure low-pressure cylinder is 13~18kPa, and the exhaust steam of the low back pressure low-pressure cylinder is connected to the air-cooled island 2 or another condenser.
[0035] Based on the above, this invention proposes a heat network peak-shaving system that utilizes exhaust steam from a single steam turbine in a cascaded manner, combining steam and exhaust steam to meet heating load requirements under varying cold conditions. Based on primary, secondary, and tertiary heat network peak-shaving paths, this system can achieve cascaded utilization of exhaust steam and steam, flexibly meeting the heating load requirements of coal-fired power units under varying cold conditions.
[0036] Based on the above, the present invention proposes the following technical solutions:
[0037] 1. A heat network peak-shaving system, comprising:
[0038] Boilers, steam turbine high-pressure / medium-pressure cylinders, steam turbine low-pressure cylinders, generators;
[0039] Heat network,
[0040] The heating network peak-shaving system includes at least two levels of heating network peak-shaving paths in the following heating network peak-shaving loop:
[0041] The first heating network peak shaving path: the first exhaust steam branch connected to the low-pressure cylinder is connected to the first heater, and the heating cycle return water is suitable for being heated in the first heater and then returned to the heating network;
[0042] The second heat network peak shaving path: the second exhaust steam branch connected to the low-pressure cylinder is connected to the steam injection device, and the first steam branch connected to the high-pressure / intermediate-pressure cylinder of the steam turbine is connected to the steam injection device to carry the exhaust steam from the second exhaust steam branch into the second heater. The heat supply cycle return water is suitable for being heated in the second heater and then returned to the heat network;
[0043] The third heating network peak-shaving path: the second steam branch connected to the high-pressure / medium-pressure cylinder of the turbine is connected to the third heater, and the heating cycle return water is suitable for being heated in the third heater and then returned to the heating network.
[0044] 2. The heat network peak-shaving system according to item 1, wherein:
[0045] The first heater is a composite heater that utilizes exhaust steam-heating cycle return water heat exchange and condensed water-heating cycle return water heat exchange.
[0046] 3. The heating network peak-shaving system according to 2, wherein:
[0047] The first heater is further provided with a cooling air inlet and a cooling air outlet, so as to utilize gas to cool the exhaust steam when the return water of the heating cycle is not passed into the first heater.
[0048] 4. The heating network peak-shaving system according to item 1, wherein:
[0049] The low-pressure cylinder of the steam turbine includes a high back-pressure low-pressure cylinder;
[0050] In the first heat network peak-shaving path, the first exhaust steam branch is connected to the high back-pressure low-pressure cylinder;
[0051] In the second heating network peak-shaving path, the second exhaust steam branch is connected to the high back-pressure low-pressure cylinder.
[0052] 5. The heating network peak-shaving system according to 4, wherein:
[0053] The exhaust steam of the high back pressure low pressure cylinder is also suitable for communicating with the first air cooling island or the first condenser.
[0054] 6. The heating network peak-shaving system according to 4, wherein:
[0055] The low-pressure cylinder of the steam turbine also includes a low-back-pressure low-pressure cylinder, and the exhaust steam of the low-back-pressure low-pressure cylinder is suitable for communicating with the second air-cooling island or the second condenser.
[0056] 7. The heating network peak-shaving system according to 6, wherein:
[0057] The exhaust steam of the high back pressure low pressure cylinder is suitable for communicating with the first air cooling island, and the exhaust steam of the low back pressure low pressure cylinder is suitable for communicating with the second air cooling island. A balancing device is provided between the first air cooling island and the second air cooling island.
[0058] 8. A control method for the heat network peak-shaving system according to item 1, comprising at least one of the following steps:
[0059] Utilize exhaust steam for heating based on the peak load regulation path of the first heating network;
[0060] Utilize exhaust steam and steam for heating based on the peak-shaving path of the second heating network;
[0061] Steam heating is used based on the peak-shaving path of the third heating network.
[0062] 9. The method according to 8, wherein:
[0063] The low-pressure cylinder of the steam turbine includes a high-back-pressure low-pressure cylinder and a low-back-pressure low-pressure cylinder;
[0064] In the first heat network peak-shaving path, the first exhaust steam branch is connected to the high back-pressure low-pressure cylinder;
[0065] In the second heat network peak-shaving path, the second exhaust steam branch is connected to the high back-pressure low-pressure cylinder;
[0066] The method comprises the steps of:
[0067] During the heating season, the high back pressure low pressure cylinder and the low back pressure low pressure cylinder operate with dual back pressure. The exhaust pressure range of the high back pressure low pressure cylinder is 25~35kPa, and the exhaust pressure range of the low back pressure low pressure cylinder is 13~18kPa.
[0068] 10. The method according to 9, further comprising the following steps:
[0069] Utilize exhaust steam for heating based on the peak load regulation path of the first heating network;
[0070] Utilize exhaust steam and steam for heating based on the peak-shaving path of the second heating network;
[0071] Steam heating is used based on the peak-shaving path of the third heating network.
[0072] 11. The method according to 8, wherein:
[0073] The low-pressure cylinder of the steam turbine includes a high-back-pressure low-pressure cylinder and a low-back-pressure low-pressure cylinder;
[0074] In the first heat network peak-shaving path, the first exhaust steam branch is connected to the high back-pressure low-pressure cylinder;
[0075] In the second heat network peak-shaving path, the second exhaust steam branch is connected to the high back-pressure low-pressure cylinder;
[0076] The method comprises the steps of:
[0077] In non-heating conditions, only the low back pressure low pressure cylinder is in operation, the exhaust steam pressure range of the low back pressure low pressure cylinder is 13 ~ 18kPa, and the exhaust steam of the low back pressure low pressure cylinder is connected to the second air cooling island or the second condenser.
[0078] 12. The method according to 8, wherein:
[0079] The low-pressure cylinder of the steam turbine includes a high-back-pressure low-pressure cylinder and a low-back-pressure low-pressure cylinder;
[0080] In the first heat network peak-shaving path, the first exhaust steam branch is connected to the high back-pressure low-pressure cylinder;
[0081] In the second heat network peak-shaving path, the second exhaust steam branch is connected to the high back-pressure low-pressure cylinder;
[0082] The method comprises the steps of:
[0083] In non-heating conditions, the high back pressure low pressure cylinder is in operation, and the exhaust steam of the high back pressure low pressure cylinder is connected to the first heater. The first heater is also provided with a cooling air inlet and a cooling air outlet to use gas to cool the exhaust steam when the heating cycle return water does not pass into the first heater.
[0084] 13. The method according to 8, wherein:
[0085] The return water of the heating cycle is heated by exhaust steam in the first heater based on the peak-shaving path of the first heating network, and the temperature is in the range of 50-69°C;
[0086] The return water of the heating cycle is heated by exhaust steam and steam in the second heater based on the peak regulation path of the second heating network, and the temperature is in the range of 70-85℃;
[0087] The return water of the heating cycle is heated by steam in the third heater based on the peak regulation path of the third heating network, and the temperature is in the range of 85-95°C.
[0088] Although the embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes may be made to the embodiments and combinations of elements may be made without departing from the principles and spirit of the invention, the scope of which is defined by the appended claims and their equivalents.
Claims
1. A heat network peak load regulation system, comprising: Boiler, steam turbine high pressure / medium pressure cylinder, steam turbine low pressure cylinder, generator, The heat network peak shaving system includes at least two heat network peak shaving paths in the following paths: The first heat network peak load path: the first exhaust steam branch connected to the low-pressure cylinder is connected to the first heater, and the return water of the heating cycle is suitable for returning to the heat network after being heated in the first heater; The second heat network peak load path: the second exhaust steam branch connected to the low pressure cylinder is connected to the steam injection device, the first steam branch connected to the high pressure / medium pressure cylinder of the steam turbine is connected to the steam injection device to carry the exhaust steam from the second exhaust steam branch into the second heater, and the heat supply cycle return water is suitable for being heated in the second heater and then returned to the heat network; The third heating network peak-shaving path: the second steam branch connected to the high-pressure / medium-pressure cylinder of the steam turbine is connected to the third heater, and the heating cycle return water is suitable for being heated in the third heater and then returned to the heating network.
2. The heating network peak load regulation system according to claim 1, wherein: The first heater is a composite heater that utilizes exhaust steam-heating cycle return water heat exchange and condensate water-heating cycle return water heat exchange.
3. The heating network peak load regulation system according to claim 2, wherein: The first heater is also provided with a cooling air inlet and a cooling air outlet, so as to utilize gas to cool the exhaust steam when the return water of the heating cycle is not passed into the first heater.
4. The heating network peak load regulation system according to claim 1, wherein: The steam turbine low-pressure cylinder includes a high back-pressure low-pressure cylinder; In the first heat network peak load regulation path, the first exhaust steam branch is connected to the high back pressure low pressure cylinder; In the second heating network peak-shaving path, the second exhaust steam branch is connected to the high back-pressure low-pressure cylinder.
5. The heating network peak load regulation system according to claim 4, wherein: The exhaust steam of the high back pressure low pressure cylinder is also suitable for communicating with the first air cooling island or the first condenser.
6. The heating network peak load regulation system according to claim 4, wherein: The steam turbine low-pressure cylinder also includes a low back-pressure low-pressure cylinder, and the exhaust steam of the low back-pressure low-pressure cylinder is suitable for communicating with the second air-cooling island or the second condenser.
7. The heating network peak load regulation system according to claim 6, wherein: The exhaust steam of the high back pressure low pressure cylinder is suitable for communicating with the first air cooling island, and the exhaust steam of the low back pressure low pressure cylinder is suitable for communicating with the first air cooling island. The first air-cooling island is connected to the second air-cooling island, and a balancing device is arranged between the first air-cooling island and the second air-cooling island.
8. A control method for a heat network peak load regulation system according to claim 1, comprising at least one of the following steps: Utilize exhaust steam for heating based on the peak load regulation path of the first heat network; Utilize exhaust steam and steam for heating based on the peak load regulation path of the second heat network; Steam heating is used based on the peak-shaving path of the third heating network.
9. The method according to claim 8, wherein: The low-pressure cylinder of the steam turbine includes a high-back-pressure low-pressure cylinder and a low-back-pressure low-pressure cylinder; In the first heat network peak load regulation path, the first exhaust steam branch is connected to the high back pressure low pressure cylinder; In the second heat network peak load regulation path, the second exhaust steam branch is connected to the high back pressure low pressure cylinder; The method comprises the steps of: During the heating season, the high back pressure low pressure cylinder and the low back pressure low pressure cylinder operate with dual back pressure. The exhaust pressure range of the high back pressure low pressure cylinder is 25-35kPa, and the exhaust pressure range of the low back pressure low pressure cylinder is 13-18kPa.
10. The method according to claim 9, further comprising the steps of: Utilize exhaust steam for heating based on the peak load regulation path of the first heat network; Utilize exhaust steam and steam for heating based on the peak load regulation path of the second heat network; Steam heating is used based on the peak-shaving path of the third heating network.
11. The method according to claim 8, wherein: The low-pressure cylinder of the steam turbine includes a high-back-pressure low-pressure cylinder and a low-back-pressure low-pressure cylinder; In the first heat network peak load regulation path, the first exhaust steam branch is connected to the high back pressure low pressure cylinder; In the second heat network peak load regulation path, the second exhaust steam branch is connected to the high back pressure low pressure cylinder; The method comprises the steps of: Under non-heating conditions, only the low back pressure low pressure cylinder is in operation, the exhaust steam pressure range of the low back pressure low pressure cylinder is 13-18 kPa, and the exhaust steam of the low back pressure low pressure cylinder is connected to the second air cooling island or the second condenser.
12. The method according to claim 8, wherein: The low-pressure cylinder of the steam turbine includes a high-back-pressure low-pressure cylinder and a low-back-pressure low-pressure cylinder; In the first heat network peak load regulation path, the first exhaust steam branch is connected to the high back pressure low pressure cylinder; In the second heat network peak load regulation path, the second exhaust steam branch is connected to the high back pressure low pressure cylinder; The method comprises the steps of: In non-heating conditions, the high back pressure low pressure cylinder is in operation, and the exhaust steam of the high back pressure low pressure cylinder is The first heater is connected to the first heater, and the first heater is also provided with a cooling air inlet and a cooling air outlet, so as to utilize gas to cool the exhaust steam when the return water of the heating cycle is not passed into the first heater.
13. The method according to claim 8, wherein: The return water of the heating cycle is heated by exhaust steam in the first heater based on the peak load path of the first heating network, and the temperature is in the range of 50-69°C; The return water of the heating cycle is heated by exhaust steam and steam in the second heater based on the peak load path of the second heating network, and the temperature is in the range of 70-85℃; The return water of the heating cycle is heated by steam in the third heater based on the peak-shaving path of the third heating network, and the temperature is in the range of 85-95°C.
Citation Information
Patent Citations
Thermal power plant thermoelectric decoupling system
CN108301883A
Indirect air cooling unit high back pressure heat supplying system and adjusting method
CN109990362A
Heat supply system combining steam compressor with high-back-pressure heat supply and adjusting method
CN112228940A
Heat supply network peak regulation system and control method thereof
CN116906962A
Power grid peak regulation system and control method thereof
CN117404148A