Railway train brake control system test bench

By designing a test bench for railway train brake control system, including brake controllers, brake cabinets and locomotive synchronous control systems, the problem that the existing technology cannot conduct train tests of more than 10,000 tons and the synchronous control of multiple brake cabinets is solved. More realistic and persuasive test data and multiple locomotive marshalling tests were achieved.

WO2024244314A1PCT designated stage expired Publication Date: 2024-12-05MEISHAN CRRC BRAKE SCI & TECH CO LTD
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
PCT/CN2023/131309
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-05-29
Filing Date
2023-11-13
Publication Date
2024-12-05

AI Technical Summary

Technical Problem

The existing train brake test bench cannot conduct tests for trains of more than 10,000 tons, and cannot simulate the synchronous control of multiple brake cabinets and centralized traction tests of locomotives, resulting in a lack of persuasiveness in the test data.

Method used

A test bench for railway train brake control system is designed, including a brake controller, multiple brake cabinets, air source system and a locomotive synchronous control system. It can control the movement of multiple brake cabinets at the same time and simulate the braking of multiple vehicles. and implement different forms of locomotive marshalling and traction tests.

Benefits of technology

It meets the train test needs of more than 10,000 tons, provides more realistic and convincing test data, and can simulate different forms of locomotive marshalling and traction tests, including centralized traction, dispersed traction and locomotive head-to-tail exchange.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN2023131309_05122024_PF_FP_ABST
    Figure CN2023131309_05122024_PF_FP_ABST
Patent Text Reader

Abstract

The present disclosure relates to the technical field of rail transit, and in particular to a railway train brake control system test bench, comprising a brake controller, a plurality of brake cabinets, a plurality of air source systems and a plurality of locomotive synchronous control systems; each brake cabinet is configured to control, according to an instruction of the brake controller, a locomotive brake to act, each locomotive synchronous control system is configured to control the corresponding brake cabinet, to simulate to form a master control locomotive or slave control locomotive group, and cause a slave control locomotive to generate the same action along with a master control locomotive in response to an instruction of the master control locomotive, so as to simulate locomotive centralized traction and decentralized traction and locomotive head-tail interchange tests. According to the railway train brake control system test bench, a plurality of brake cabinets can be simultaneously controlled to act, thereby meeting the requirements of tests of trains having a load of ten thousand tons or more, tests of locomotive groups in different forms can be simulated, and locomotive centralized traction and decentralized traction and locomotive head-tail interchange tests can be simulated.
Need to check novelty before this filing date? Find Prior Art

Description

Railway train brake control system test bench

[0001] CROSS-REFERENCE TO RELATED APPLICATIONS

[0002] This application claims priority to the Chinese patent application with application number 202310610289.8 filed with the China Patent Office on May 29, 2023, entitled “Railway Train Braking Control System Test Bench”, the entire contents of which are incorporated by reference into this application. Technical Field

[0003] The present disclosure relates to the field of rail transportation technology, and in particular to a railway train braking control system test bench. Background Art

[0004] With the continuous development of heavy-haul railway transportation in my country, 10,000-ton and 20,000-ton heavy-haul freight trains have become a regular operation, and there is a clear demand for 30,000-ton heavy-haul trains. Before train operation, various tests are required to conduct comprehensive and systematic theoretical research and experimental verification on the relationship between the heavy-haul train's formation structure, brake system control technology, wheel-shoe relationship, and the train's braking capacity and longitudinal force. Train brake test benches are equipment specifically designed for train testing. Existing train brake test benches are only capable of testing trains of 10,000-ton and below. They have the following shortcomings: they can only test trains of 10,000-ton and below, and the number of vehicle formations and brake cabinets does not match actual operating conditions; they cannot test trains above 10,000-ton, and the fault simulation test data for trains above 10,000-ton is not convincing; they cannot simulate the simultaneous operation of multiple brake cabinets; and they cannot simulate the centralized traction test state of multiple locomotives.

[0005] Summary of the Invention

[0006] The objectives of the present disclosure include, for example, providing a railway train braking control system test bench that can simultaneously control the actions of multiple brake cabinets, simulate multiple vehicle braking systems for testing, meet the needs of testing trains of more than 10,000 tons, and make the test data more authentic and convincing; during the test process, it can simulate different forms of locomotive formation tests.

[0007] The embodiments of the present disclosure may be implemented as follows:

[0008] The present disclosure provides a railway train braking control system test bench, comprising:

[0009] A brake controller is configured to control the braking of the entire train and the braking of the locomotive alone, and the brake controller is connected to the train pipe through a pipeline;

[0010] Multiple brake cabinets, all electrically connected to a brake controller, and each brake cabinet is electrically connected to a brake display screen, and together simulate a locomotive brake, and each brake display screen is configured to display operating information of the corresponding brake cabinet; each brake cabinet is configured to change the train pipe pressure according to the command of the brake controller, control the locomotive brake to produce an action, and simultaneously produce a braking or release function of the locomotive itself;

[0011] a plurality of air source systems, each brake cabinet is connected to at least one air source system, and each air source system is configured to provide an air source to the corresponding brake cabinet; and

[0012] Multiple locomotive synchronous control systems, each locomotive synchronous control system is electrically connected to a brake cabinet, and each locomotive synchronous control system is configured to control the corresponding brake cabinet, simulating the formation of a master locomotive or a slave locomotive formation, and making the slave locomotive respond to the instructions of the master locomotive and follow the master locomotive to produce the same action, thereby simulating the locomotive to perform centralized traction, decentralized traction, and locomotive head-to-tail interchange tests.

[0013] In an optional embodiment, the brake display screen is configured to display the total air pressure value, the train pipe pressure value, the equalizing air cylinder pressure value, the front and rear brake cylinder pressure values, the charging flow value and fault information.

[0014] In an optional embodiment, a railway train brake control system test bench includes five brake cabinets, five brake display screens, and five locomotive synchronous control systems;

[0015] The five brake cabinets, five brake display screens and five locomotive synchronous control systems correspond one to one.

[0016] In an optional embodiment, the railway train braking control system test bench includes ten air source systems, and each brake cabinet is connected to two air source systems.

[0017] In an optional embodiment, the brake controller is configured on the master locomotive.

[0018] In an optional embodiment, the railway train brake control system test bench also includes a control console, which is connected to the main control locomotive, and the brake controller, brake display screen and locomotive synchronous control system are all connected to the control console.

[0019] In an optional embodiment, the railway train brake control system test bench further includes a backup brake valve and a backup brake module;

[0020] In the event of electronic control failure of the brake controller, the backup brake valve is configured to be connected to the balancing air cylinder of the brake cabinet through the backup brake module, thereby achieving air filling relief and exhaust pressure reduction braking of the balancing air cylinder.

[0021] In an optional embodiment, the backup brake valve and the backup brake module are both connected to the control console.

[0022] In an optional embodiment, the railway train braking control system test bench further includes a centralized traction hose, which is configured such that the air path is connected to the train pipe when performing a centralized traction test.

[0023] In an optional embodiment, one of the plurality of brake cabinets is located at the rear of the train consist.

[0024] The beneficial effects of the embodiments of the present disclosure include:

[0025] The railway train brake control system test bench can control the operation of multiple brake cabinets at the same time, simulate multiple vehicle brake systems for testing, meet the needs of testing trains with a capacity of more than 10,000 tons, and the test data is more authentic and convincing; during the test, due to the locomotive synchronous control system, it can simulate different forms of locomotive formation tests, including 1 master control and 4 slave controls, 1 master control and 3 slave controls, 1 master control and 2 slave controls, and 1 master control and 1 slave control, and can simulate locomotives for centralized traction, decentralized traction and locomotive head-to-tail interchange tests. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] FIG1 is a schematic diagram of a railway train braking control system test bench according to an embodiment of the present disclosure;

[0027] FIG2 is a schematic diagram of a main control locomotive brake cabinet in a railway train brake control system test bench according to an embodiment of the present disclosure;

[0028] FIG3 is a schematic diagram of a brake cabinet of a slave locomotive in a railway train brake control system test bench according to an embodiment of the present disclosure. DETAILED DESCRIPTION

[0029] To make the objectives, technical solutions, and advantages of the embodiments of the present disclosure more clear, the technical solutions of the embodiments of the present disclosure will be clearly and completely described below in conjunction with the accompanying drawings of the embodiments of the present disclosure. Obviously, the described embodiments are only some of the embodiments of the present disclosure, but not all of them. Generally, the components of the embodiments of the present disclosure described and shown in the drawings herein can be arranged and designed in various different configurations.

[0030] Therefore, the following detailed description of the embodiments of the present disclosure provided in the accompanying drawings is not intended to limit the scope of the present disclosure as claimed, but merely represents selected embodiments of the present disclosure. All other embodiments derived by persons of ordinary skill in the art based on the embodiments of the present disclosure without creative effort shall fall within the scope of protection of the present disclosure.

[0031] It should be noted that similar reference numerals and letters denote similar items in the following drawings, and therefore, once an item is defined in one drawing, it does not need to be further defined or explained in subsequent drawings.

[0032] In the description of the present disclosure, it should be noted that if the terms "upper", "lower", "inside", "outside", etc. appear, the orientation or position relationship indicated is based on the orientation or position relationship shown in the accompanying drawings, or is the orientation or position relationship in which the invented product is usually placed when used. It is only for the convenience of describing the present disclosure and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation. Therefore, it cannot be understood as a limitation on the present disclosure.

[0033] In addition, the terms “first”, “second”, etc., if used, are merely used to distinguish and describe, and should not be understood as indicating or implying relative importance.

[0034] It should be noted that, in the absence of conflict, the features in the embodiments of the present disclosure may be combined with each other.

[0035] 1 to 3 , this embodiment provides a railway train brake control system test bench, including a brake controller, multiple brake cabinets, multiple air source systems, and multiple locomotive synchronous control systems;

[0036] The brake controller is configured to control the braking of the entire train and the braking of the locomotive alone, and the brake controller is connected to the train pipe through a pipeline;

[0037] Multiple brake cabinets are electrically connected to a brake controller, and each brake cabinet is electrically connected to a brake display screen, and together simulate a locomotive brake, and each brake display screen is configured to display operating information of the corresponding brake cabinet; each brake cabinet is configured to change the train pipe pressure according to the instructions of the brake controller, control the locomotive brake to produce an action, and simultaneously make the locomotive itself produce a braking or release function;

[0038] Each brake cabinet is connected to at least one air source system, and each air source system is configured to provide an air source to the corresponding brake cabinet;

[0039] Each locomotive synchronous control system is electrically connected to a brake cabinet. Each locomotive synchronous control system is configured to control the corresponding brake cabinet, simulating the formation of a master locomotive or a slave locomotive formation, and making the slave locomotive respond to the instructions of the master locomotive and follow the master locomotive to produce the same action, thereby simulating the locomotive to perform centralized traction, decentralized traction, and locomotive head-to-tail interchange tests.

[0040] Based on the above-mentioned structural setup, the brake controller is located on the master locomotive. The railway train brake control system test bench also includes a control panel, a backup brake valve, and a backup brake module. The control panel is configured to house the brake controller, brake display, backup brake valve, backup brake module, locomotive synchronous control system, and required electrical buttons. The control panel is connected to the master locomotive, and the brake controller, brake display, and locomotive synchronous control system are all connected to the control panel. In the event of electronic failure of the brake controller, the backup brake valve is connected to the brake cabinet's balancing air cylinder via the backup brake module, thereby achieving both air filling relief and exhaust pressure relief braking. One of the multiple brake cabinets is located at the rear of the train formation.

[0041] Please refer to Figures 1 to 3. Based on the above content, when configuring the brake controller, the brake controller has two operating handles, the automatic brake control (large gate) handle and the individual brake control (small gate) handle, which are used to control the braking of the entire train and the individual braking of the locomotive. The brake controller is only configured on the master control locomotive; the brake controller is connected to the train pipe through a pipeline, which can trigger the brake cabinet to produce an emergency braking effect; it is connected to the control module in the brake cabinet through an electrical connection to exchange information and transmit instructions.

[0042] When configuring the brake display screen, the brake display screen is configured to display the total air pressure value, train pipe pressure value, equalizing air cylinder pressure value, front and rear brake cylinder pressure values, charging flow value, fault information and other contents, and the brake display screen is connected to the control module in the brake cabinet through an electrical connection to exchange information and modify control parameters.

[0043] When configuring the brake cabinet, the brake cabinet can change the train pipe pressure according to the instructions of the brake controller, control the locomotive brake to produce action, and at the same time enable the locomotive itself to produce braking and relief functions; and the brake cabinet is electrically connected to the brake display and brake controller to transmit information; it is connected to the vehicle braking system, brake controller, backup brake valve and backup brake module through the train pipe.

[0044] When configuring the air source system, the air source system is connected to the main air duct and the main air connection pipe of the brake cabinet through pipelines, providing the total air pressure for the brake cabinet and also the source of the train pipe pressure of the vehicle brake system.

[0045] When configuring the locomotive synchronous control system, the locomotive synchronous control system can control five brake cabinets to simulate the formation of master and slave locomotives. The slave locomotive can respond to the instructions of the master locomotive and follow the master locomotive to produce the same action. In addition, the response time can be set through the locomotive synchronous control system at the 0.1s level. According to the test requirements, the brake cabinet can simulate the locomotive formation of 1 master and 4 slaves, 1 master and 3 slaves, 1 master and 2 slaves, and 1 master and 1 slave.

[0046] In summary, please refer to Figures 1 to 3. The working principle of the railway train brake control system test bench is:

[0047] When all equipment is started, the air source system provides total air pressure for all master and slave locomotives;

[0048] The locomotive synchronous control system enables the locomotive brakes to form a master-controlled and slave-controlled locomotive formation;

[0049] The control brake controller is in different positions, generating different command signals. The main control brake cabinet controls the pressure change of the balancing air cylinder and the train pipe according to the command signal, and transmits the change to the vehicle formation, so that the locomotive brake produces braking, pressure holding and relief actions;

[0050] The locomotive synchronous control system transmits the command signal of the master locomotive to other slave locomotives, so that the slave locomotives follow the master locomotive to make the same pressure change in the train pipe, speeding up the propagation speed of the brake signal in the train formation and reducing the longitudinal impact force;

[0051] By controlling the opening and closing states of different ball valves in the train pipes of the master and slave locomotives, the locomotives can be tested for centralized traction, decentralized traction, and head-to-tail interchange.

[0052] As a result, the railway train brake control system test bench can simultaneously control the operation of multiple brake cabinets and simulate multiple vehicle brake systems for testing, meeting the requirements of train tests over 10,000 tons, and the test data is more authentic and convincing.

[0053] During the test, due to the locomotive synchronous control system, different forms of locomotive formation tests can be simulated, including 1 master control and 4 slave controls, 1 master control and 3 slave controls, 1 master control and 2 slave controls, and 1 master control and 1 slave control. It can also simulate locomotives for centralized traction, decentralized traction and locomotive head-to-tail interchange tests.

[0054] It should be noted that, based on the above, this railway train brake control system test bench is capable of simultaneously controlling the operation of multiple brake cabinets. Furthermore, based on the aforementioned structural configuration, this railway train brake control system test bench can be configured to perform brake tests on railway trains exceeding 30,000 tons. Therefore, in this embodiment, a railway train brake control system test bench comprising five brake cabinets, five brake display screens, five locomotive synchronous control systems, and ten air source systems is used as an example for illustration. Specifically, the five brake cabinets, five brake display screens, and five locomotive synchronous control systems correspond to each other, and each brake cabinet is connected to two air source systems.

[0055] In addition, the railway train braking control system test bench includes the above-mentioned structure and also includes centralized traction hoses, pipelines, angled plugs, ball valves (master control head, master control head tail, 1 slave control head, 2 slave control heads, 3 slave control heads, 4 slave control heads, 4 slave control tails) and other components; among them, the centralized traction hose is configured to connect the air path to the train pipe when conducting a centralized traction test; and the settings of the pipelines, angled plugs and ball valves are configured to connect the train pipes of each vehicle and realize conduction control, so as to control the actual working conditions of the train according to the specific circumstances of the implementation.

[0056] Please refer to Figures 1 to 3. When the railway train brake control system test bench is conducting a decentralized traction test, the locomotive and vehicle marshaling method is: master locomotive + 10,000-ton vehicle + slave locomotive + 10,000-ton vehicle + slave locomotive + 10,000-ton vehicle + slave locomotive + 10,000-ton vehicle + slave locomotive;

[0057] Air path direction: Master locomotive → Master head → Angle gate → Car 1 → Car 108 → Angle gate → No. 1 slave head → No. 1 slave Corner gate → 109 car → 216 car → corner gate → 2 from the control head No. 2 slave controller Corner gate → 217 cars → 324 cars → Corner gate → 3 from the control head No. 3 slave control Corner gate → 325 car → 432 car → corner gate → 4 from the control head No. 4 is in control.

[0058] Please refer to Figures 1 to 3. When the railway train brake control system test bench is conducting a centralized traction test, the locomotive and vehicle formation is: master locomotive + slave locomotive + slave locomotive + slave locomotive + 10,000-ton vehicle + 10,000-ton vehicle + 10,000-ton vehicle + 10,000-ton vehicle, and the two adjacent units are connected by centralized traction hoses.

[0059] Gas line direction: No. 1 slave control → 1 slave control head → master control head and tail → master control head; No. 2 slave control → 2 slave control head → master control head and tail → master control head; No. 3 slave control → 3 slave control head → master control head and tail → master control head; No. 4 slave control → 4 slave control head → master control head and tail → master control head; master control locomotive → master control head → corner gate → car 1 → car 108 → centralized traction hose → car 109 → car 216 → centralized traction hose → car 217 → car 324 → centralized traction hose → car 325 → car 432.

[0060] Please refer to Figures 1 to 3. When the railway train brake control system test bench is conducting the head-to-tail interchange test, the locomotive and vehicle marshaling method is as follows: the main control locomotive and the head and tail vehicles of the unit 10,000 tons, 2 units 10,000 tons, 3 units 10,000 tons, and 4 units are replaced with the air filling position;

[0061] A. Control the direction of the locomotive and the unit's 10,000-ton gas circuit:

[0062] Conventional direction: master locomotive → master head → corner gate → car 1 → car 108;

[0063] To swap the head and tail, control the locomotive → control the head and tail → corner gate → car 108 → car 1;

[0064] B. Control the direction of the locomotive and the 2-unit 10,000-ton gas circuit:

[0065] In the normal direction, master locomotive → master control head → corner gate → car 1 → car 108 → corner gate → 1 slave control head No. 1 from the corner gate → car 109 → car 216;

[0066] Swap the front and rear ends, master locomotive → master front and rear → corner gate → car 216 → car 109 → corner gate No. 1 slave controller 1. From the control head → corner gate → 108 car → 1 car;

[0067] C. Control the direction of the locomotive and the 3-unit 10,000-ton gas circuit:

[0068] In the normal direction, master locomotive → master control head → corner gate → car 1 → car 108 → corner gate → slave control head No. 1 slave controller Corner gate → 109 car → 216 car → corner gate → 2 from the control head No. 2 slave controller Corner gate → car 217 → car 324;

[0069] Swap the front and rear ends, master locomotive → master front and rear → corner gate → car 324 → car 217 → corner gate No. 2 slave controller 2 From the control head → corner gate → car 216 → car 109 → corner gate No. 1 slave controller 1. From the control head → corner gate → 108 car → 1 car;

[0070] D. Control the direction of the locomotive and the 4-unit 10,000-ton gas circuit:

[0071] In the normal direction, master locomotive → master control head → corner gate → car 1 → car 108 → corner gate → slave control head No. 1 slave controller Corner gate → 109 car → 216 car → corner gate → 2 from the control head No. 2 slave controller Corner gate → 217 cars → 324 cars → Corner gate → 3 from the control head No. 3 slave control Corner gate → 325 car → 432 car → corner gate → 4 from the control head No. 4 is in control;

[0072] Swap the front and rear ends, master locomotive → master front and rear → corner gate → car 432 → car 325 → corner gate No. 3 slave control 3. From control center → corner gate → car 324 → car 217 → corner gate No. 2 slave controller 2 From the control head → corner gate → car 216 → car 109 → corner gate No. 1 slave controller 1 from the control head → corner gate → 108 car → 1 car → corner gate → 4 from the control tail.

[0073] Please refer to Figures 1 to 3. The advantages of the railway train brake control system test bench are:

[0074] It can control the operation of 5 brake cabinets at the same time, simulate the braking systems of 432 vehicles for testing, and meet the test requirements for trains with a weight of more than 10,000 tons. The test data is more authentic and convincing.

[0075] Equipped with a locomotive synchronous control system, it can simulate different forms of locomotive marshaling tests, including 1 master control and 4 slave controls, 1 master control and 3 slave controls, 1 master control and 2 slave controls, and 1 master control and 1 slave control;

[0076] The locomotive synchronous control system can set the time for the slave locomotive to respond to the master locomotive, with the time adjustment level down to 0.1s;

[0077] One brake cabinet can be placed at the rear of the train formation, simulating a test where a real locomotive is placed at the rear of the train, thus improving train relief consistency.

[0078] It can simulate the test functions of locomotive centralized traction, decentralized traction, and head-to-tail interchange of locomotives.

[0079] It should also be noted that the brake controller, brake cabinet, and locomotive synchronous control system together constitute the brake control system, and the locomotive synchronous control system is controlled by special software, which can set the response time of the controlled locomotive; through centralized traction hoses or other methods, the train pipes of all brake cabinets are connected in series and then connected to the vehicle braking system to realize the centralized traction function.

[0080] The above are only specific embodiments of the present disclosure, but the scope of protection of the present disclosure is not limited thereto. Any changes or substitutions that can be easily conceived by a person skilled in the art within the technical scope disclosed in this disclosure should be included in the scope of protection of the present disclosure. Therefore, the scope of protection of the present disclosure should be based on the scope of protection of the claims. Industrial Applicability

[0081] The railway train brake control system test bench can control the operation of multiple brake cabinets at the same time, simulate multiple vehicle brake systems for testing, meet the needs of testing trains with a capacity of more than 10,000 tons, and the test data is more authentic and convincing; during the test, due to the locomotive synchronous control system, it can simulate different forms of locomotive formation tests, including 1 master control and 4 slave controls, 1 master control and 3 slave controls, 1 master control and 2 slave controls, and 1 master control and 1 slave control, and can simulate locomotives for centralized traction, decentralized traction and locomotive head-to-tail interchange tests.

Claims

1. A railway train braking control system test bench, It is characterized in that include: A brake controller, the brake controller is configured to control the braking of the entire train and the braking of the locomotive alone, and the brake controller is connected to the train pipe through a pipeline; A plurality of brake cabinets, each of which is electrically connected to the brake controller, and each of which is electrically connected to a brake display screen, and together simulates a locomotive brake machine, and each of which is configured to display the working information of the corresponding brake cabinet; each of which is configured to change the train pipe pressure according to the instruction of the brake controller, control the locomotive brake machine to produce an action, and at the same time make the locomotive itself produce a braking or relief function; A plurality of air source systems, each of the brake cabinets is connected to at least one of the air source systems, and each of the air source systems is configured to provide an air source to the corresponding brake cabinet; as well as Multiple locomotive synchronous control systems, each of which is electrically connected to a brake cabinet, and each of which is configured to control the corresponding brake cabinet to simulate the formation of a master locomotive or a slave locomotive, and to enable the slave locomotive to respond to the instructions of the master locomotive and follow the master locomotive to produce the same action, thereby simulating the locomotive to perform centralized traction, decentralized traction, and head-to-tail interchange tests.

2. The railway train braking control system test bench according to claim 1, Features: The brake display screen is configured to display the total air pressure value, the train pipe pressure value, the equalizing air cylinder pressure value, the front and rear brake cylinder pressure values, the charging flow value and fault information.

3. The railway train braking control system test bench according to any one of claims 1-2, Features: The railway train brake control system test bench includes a plurality of the brake cabinets, a plurality of the brake display screens and a plurality of locomotive synchronous control systems; A plurality of the brake cabinets, a plurality of the brake display screens and a plurality of locomotive synchronous control systems One to one correspondence.

4. The railway train braking control system test bench according to claim 3, Features: The railway train brake control system test bench includes five brake cabinets, five brake display screens and five locomotive synchronous control systems; The five brake cabinets, the five brake display screens and the five locomotive synchronous control systems correspond to each other one by one.

5. The railway train braking control system test bench according to claim 4, Features: The railway train brake control system test bench comprises a plurality of the air source systems, and each of the brake cabinets is connected to at least one of the air source systems.

6. The railway train braking control system test bench according to claim 5, Features: The railway train braking control system test bench includes ten air source systems, and each of the brake cabinets is connected to at least one of the air source systems.

7. The railway train braking control system test bench according to claim 6, Features: The railway train braking control system test bench comprises ten air source systems, and each of the brake cabinets is connected to two of the air source systems.

8. The railway train braking control system test bench according to any one of claims 1 to 7, Features: The brake controller is configured on the master locomotive.

9. The railway train braking control system test bench according to claim 8, Features: The railway train brake control system test bench also includes a control console, which is connected to the master control locomotive, and the brake controller, the brake display screen and the locomotive synchronous control system are all connected to the control console.

10. The railway train braking control system test bench according to claim 9, Features: The railway train brake control system test bench also includes a backup brake valve and a backup brake module; In the event of a failure of the electronic control of the brake controller, the backup brake valve is configured to The backup brake module is connected to the balancing air cylinder of the brake cabinet, thereby realizing the air filling relief and exhaust pressure reduction braking of the balancing air cylinder.

11. The railway train braking control system test bench according to claim 10, Features: The backup brake valve and the backup brake module are both connected to the control console.

12. The railway train braking control system test bench according to any one of claims 1 to 11, Features: The railway train brake control system test bench also includes a centralized traction hose, which is configured to have an air path connected to a train pipe when a centralized traction test is performed.

13. The railway train braking control system test bench according to any one of claims 1 to 12, Features: The railway train braking control system test bench also includes an angle plug door, which is configured to connect the train pipes of each vehicle and realize conduction control when performing a centralized traction test.

14. The railway train braking control system test bench according to any one of claims 1 to 13, Features: The railway train brake control system test bench also includes a ball valve, which is configured to connect the train pipes of each vehicle and realize conduction control when performing a centralized traction test.

15. The railway train braking control system test bench according to any one of claims 1 to 14, Features: One of the multiple brake cabinets is located at the tail end of the train formation.

Citation Information

Patent Citations

  • Operation control method and operation control system of combined train

    CN101497343A

  • Locomotive electronic control air brake system central control unit based on microcomputer network control

    CN107145141A

  • Train pipe synchronous control method and system for heavy-haul combination train

    CN110174868A

  • Railway train brake control system test bed

    CN116339290A

  • Locomotive synchronous manipulation communication device

    CN202035141U