Three-dimensional forward design method for shield tunnel

Through the three-dimensional forward design method, a three-dimensional geological model and digital model are established, which solves the problem of the separation of shield tunnel design and BIM modeling, realizes the synchronous update and efficiency improvement of the design, and enhances the designer's tunnel line position and structural form. ability to choose.

WO2024244347A1PCT designated stage expired Publication Date: 2024-12-05SHANGHAI TONGYAN CIVIL ENGINEERING TECHNOLOGY CORP LTD

Patent Information

Application Number
PCT/CN2023/135346
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-05-26
Filing Date
2023-11-30
Publication Date
2024-12-05

AI Technical Summary

Technical Problem

The existing shield tunnel design is separated from BIM modeling, resulting in an out-of-synchronization of the design and low change efficiency, and the two-dimensional design leads to unclear relationship between geology and structural space and low design efficiency.

Method used

Using the three-dimensional forward design method, a three-dimensional geological model is established by obtaining geological exploration data, a three-dimensional line position is generated in the tunnel, a pipe segment structure is designed and a digital model is established, and it is automatically converted into a numerical calculation model, and a load verification structure is applied to realize the synchronous update of the design and Improve efficiency.

Benefits of technology

The synchronous update and efficiency improvement of the design have been achieved, the designers' choice of tunnel line positions and structural forms have been improved, and the geological distribution state and spatial relationship can be better reflected, and the data gap between the design and construction units has been reduced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN2023135346_05122024_PF_FP_ABST
    Figure CN2023135346_05122024_PF_FP_ABST
Patent Text Reader

Abstract

A three-dimensional forward design method for a shield tunnel, the method comprising the following steps: 1) acquiring geological exploration data, and establishing a three-dimensional geological model with surrounding environment data; 2) generating a three-dimensional tunnel alignment according to a stratum distribution and the surrounding environment data; 3) designing segment structure parameters, establishing a segment ring model, arranging segment rings along the three-dimensional tunnel alignment to form a three-dimensional digital model of a tunnel, and deleting a geological region within a tunnel range, wherein the three-dimensional digital model of the tunnel is integrated with segment structure design parameters; 4) automatically transforming the three-dimensional digital model of the tunnel into a numerical calculation model; and 5) applying to the numerical calculation model a load distribution along a tunnel axis, verifying whether a segment structure meets a design requirement, if the segment structure meets the design requirement, storing a design result and outputting same, and if the segment structure does not meet the design requirement, redesigning the segment structure design parameters, and returning to step 3). The method improves the design efficiency and rationality, and facilitates design changes.
Need to check novelty before this filing date? Find Prior Art

Description

A three-dimensional forward design method for shield tunnels Technical Field

[0001] The invention relates to the technical field of shield tunnel structure design, in particular to a three-dimensional forward design method for a shield tunnel. Background Art

[0002] BIM technology is increasingly being used in subway tunnel projects. However, shield tunnel design and BIM modeling are currently separate, with different processes and tools (software). BIM models still rely on first completing the structural design and then remodeling the model based on the 2D design drawings, a process known as "reverse design." The basic design process for BIM reverse design is as follows:

[0003] (1) The survey and design unit conducts geological surveys and draws a geological longitudinal profile of the tunnel site;

[0004] (2) The design unit shall carry out shield tunnel alignment design and preliminary structural design based on the geological conditions and the plan of the surrounding environment;

[0005] (3) Select an unfavorable section, establish a two-dimensional or three-dimensional calculation model, and verify whether the structural design parameters meet the design requirements;

[0006] (4) If the design requirements are not met, modify the structural design parameters and repeat step (3); if the requirements are met, draw two-dimensional drawings (longitudinal section, cross section, reinforcement drawing, etc.) according to the design plan;

[0007] (5) The design unit or other units shall establish a three-dimensional BIM model based on the above two-dimensional design drawings.

[0008] The above methods can lead to BIM models being out of sync with the design and low efficiency in design changes for the following reasons: 1) Current design analysis software does not have BIM modeling capabilities, so design verification and BIM modeling need to be completed in two sets of software. The calculation model is usually in design software such as Midas or finite element analysis software, and the BIM model is in BIM modeling software such as Revit. This requires file format conversion, and data is easily lost during the import and export process, resulting in incomplete attribute data in the BIM model and inability to synchronize updates with design calculations, which does not conform to the concept of BIM information transmission and sharing. Alternatively, designers directly build models in BIM modeling software according to drawings. The BIM model is just a replica of the design drawings. The design is completed first and then the BIM model is built. Once the design plan changes, the BIM model needs to be rebuilt, which is labor-intensive and extremely inefficient. 2) Even if the design software uses a three-dimensional calculation model, other tools are still needed to convert the design software's three-dimensional calculation model into a BIM model. On the one hand, once the design changes, the calculation model and BIM model need to be repeatedly converted, which is not efficient. On the other hand, problems such as model information loss may occur. 3) The BIM model created by the design unit based on the drawings may not necessarily be used by the construction unit. Currently, it is common for the design and construction units to each create and use a separate BIM model, with data not being interoperable. This separate set of BIM models for design and construction not only results in duplicated work but also violates the concept of BIM collaborative design. The BIM model only serves the purpose of 3D visualization and design verification. 4) Tunnel alignment and structural design is based on 2D geological profiles and surrounding environment plans. The spatial relationship between geology and structure is unclear, requiring designers to have a certain level of spatial imagination and reducing design efficiency.

[0009] Combined with the research on relevant design software and cases, the basic process of current shield tunnel design and BIM modeling is two-dimensional parameter design, establishment of two-dimensional or three-dimensional calculation and analysis models for structural verification, and "re-molding" according to the two-dimensional design drawings to obtain the BIM three-dimensional model. There are problems such as the need to build the model twice, data conversion between different software, and the unintuitive relationship between the stratum and the tunnel.

[0010] Summary of the Invention

[0011] The purpose of the present invention is to overcome the defects of the above-mentioned prior art and provide a three-dimensional forward design method for shield tunnels that improves design efficiency and rationality and facilitates design changes.

[0012] The purpose of the present invention can be achieved by the following technical solutions:

[0013] A three-dimensional forward design method for a shield tunnel comprises the following steps:

[0014] 1) Obtain geological exploration data and build a geological 3D model with surrounding environment data;

[0015] 2) Generate the three-dimensional tunnel alignment based on stratum distribution and surrounding environment data;

[0016] 3) Designing segment structure parameters and establishing a segment ring model, arranging the segment rings along the three-dimensional line of the tunnel to form a three-dimensional digital model of the tunnel, deleting the geological areas within the tunnel range, and integrating the segment structure design parameters into the three-dimensional digital model of the tunnel;

[0017] 4) automatically converting the three-dimensional digital model of the tunnel into a numerical calculation model;

[0018] 5) Apply a load distribution along the tunnel axis to the numerical calculation model to verify whether the segment structure meets the design requirements. If so, save and output the design results, drawings, and digital model. If not, redesign the segment structure design parameters and return to step 3).

[0019] Furthermore, the establishment of the geological three-dimensional model specifically includes:

[0020] Select several points for drilling and collect geological exploration data at the drilling sites;

[0021] Generate geological exploration data outside the borehole using spatial interpolation combined with simulated annealing method;

[0022] A geological three-dimensional model is constructed based on the geological exploration data, and surrounding environment data is loaded into the geological three-dimensional model.

[0023] Furthermore, the geological exploration data includes stratum distribution and the strength, elastic modulus and elevation of each stratum.

[0024] Furthermore, the generation of geological exploration data outside the borehole by using spatial interpolation combined with simulated annealing specifically includes:

[0025] The geological exploration data at each borehole is discretized into multiple points according to depth. Each discrete point is represented by a fourth-order tensor representing the stratigraphic information of the discrete point. In the fourth-order tensor, the first three order components are the three-dimensional coordinates of the discrete point, and the fourth order component is the stratigraphic code.

[0026] Set the geological model area and generate a spatial coordinate grid based on the drilling location through spatial interpolation method;

[0027] Taking each discrete point of the borehole as a sample point, a spatial interpolation method is used to obtain stratigraphic information of all grid points in the spatial coordinate grid, and grid points other than the sample points are defined as interpolation points;

[0028] For each interpolation point, a normal distribution with the stratigraphic code of the point as the average value and the user-specified standard deviation is established and a cumulative distribution function is obtained. Based on the cumulative distribution function, new stratigraphic information is randomly assigned to each interpolation point.

[0029] The set [S X0] consisting of the stratigraphic information tensor set S of the sample points and the stratigraphic information tensor set X0 of the current interpolation point is taken as the initial solution. The sum of the squares of the variance functions of any two points in the set [SX] consisting of the stratigraphic information tensor set S of the sample points and the stratigraphic information tensor set X of the interpolation point is taken as the objective function. The stratigraphic information of each interpolation point is optimized by the simulated annealing method.

[0030] Based on the stratigraphic information of all grid points of the spatial coordinate grid, a geological three-dimensional model of the entire region is established.

[0031] Furthermore, when establishing a geological three-dimensional model of the entire region, model corrections are performed for special geological locations.

[0032] Furthermore, generating the three-dimensional tunnel position specifically includes:

[0033] Generating a horizontal curve on the plane projection of the geological three-dimensional model, and automatically cutting and unfolding the geological three-dimensional model along the horizontal curve to obtain a geological longitudinal section;

[0034] Generating a vertical curve on the geological longitudinal profile, and obtaining a three-dimensional position of the tunnel according to the horizontal curve and the vertical curve;

[0035] Generate a preliminary tunnel design model based on the set inner and outer diameters of the tunnel and the concrete strength;

[0036] Determining whether the obtained three-dimensional tunnel alignment satisfies a collision check based on the relationship between the three-dimensional tunnel alignment and the preliminary design model of the tunnel;

[0037] The three-dimensional tunnel alignment that meets the collision check is evaluated by combining single and multiple indicators to determine whether it meets the control requirements;

[0038] Save the 3D tunnel alignment that meets collision checks, control requirements, and receives qualified feedback from manual inspection.

[0039] Furthermore, the tunnel alignment evaluation combining single and multiple indicators specifically includes:

[0040] The obtained single indicators of the three-dimensional tunnel alignment are judged in sequence to see whether they meet the control requirements. If any single indicator is not met, a line design rejection instruction is generated. The single indicators include the longitudinal slope of the straight line segment, the plane curvature radius of the curved line segment, the anti-floating safety factor of the tunnel, and the settlement deformation of the tunnel.

[0041] A multi-index comprehensive scoring is performed on the three-dimensional alignment of the tunnel that meets all single indicators to determine whether the obtained multi-index comprehensive evaluation score is less than the set value. If so, a line design rejection instruction is generated; otherwise, it is determined that the control requirements are met. The multi-index comprehensive evaluation is divided into a weighted sum of the settlement curvature radius score, the surrounding environment score, and the construction cost score.

[0042] Furthermore, the segment structure design parameters include the segment form, segment geometric dimensions and material properties of the tunnel cross section.

[0043] Furthermore, the formation of the three-dimensional digital model of the tunnel specifically includes:

[0044] Based on the segment structure design parameters, construct a segment model, a bolt model, and a steel bar model;

[0045] Embed the steel bar model into the segment model to form a segment group;

[0046] According to the segment blocks, each segment group is combined into a segment ring according to the position of each segment block, and the circumferential bolt model is embedded in the segment joint seam to form a segment ring group;

[0047] The segment rings are arranged along the tunnel axis, and longitudinal bolt models are embedded in the gaps between the rings to form a three-dimensional digital model of the tunnel.

[0048] Furthermore, the automatic conversion of the three-dimensional digital model of the tunnel into a numerical calculation model is specifically as follows:

[0049] The segment model is set as solid elements and meshed, the reinforcement model is set as rod elements and meshed, and the bolt model is replaced by spring elements to form a numerical calculation model. The segment structure design parameters of this numerical calculation model are consistent with those of the tunnel 3D digital model.

[0050] Furthermore, the load distribution along the tunnel axis is obtained by:

[0051] At any section of the tunnel, cut along the direction perpendicular to the tunnel axis to obtain the geological cross-section of the section;

[0052] According to the stratum distribution on the geological cross-section, the structural model on the geological cross-section is replaced by a simplified two-dimensional numerical calculation model. In the two-dimensional numerical calculation model, the segments are simplified into beam elements, and the two beam elements are in elastic contact with each other.

[0053] The two-dimensional stratigraphic structure method is used to extract the force between the geological model and the structural model as the load on the current tunnel cross section. The direction of the force is radially toward the center of the tunnel and distributed circumferentially along the outer side of the tunnel.

[0054] The loads on multiple tunnel cross sections are obtained repeatedly, and the load distribution along the tunnel axis is obtained using the spatial interpolation method.

[0055] Furthermore, the design results include two-dimensional design drawings, calculation reports and BIM models.

[0056] Compared with the prior art, the present invention has the following beneficial effects:

[0057] 1. The present invention uses three-dimensional forward design to carry out tunnel structure design calculations directly on a three-dimensional geological model, unifying the calculation model and the digital model, facilitating design changes and improving design efficiency. Compared with existing patents and commonly used technical means, it is innovative and superior.

[0058] 2. The present invention carries out tunnel alignment and structural design on a three-dimensional geological model, visually displaying the spatial relationship between the tunnel and the geology and environment, which helps designers to rationally select tunnel alignment, structural form, parameters, etc.

[0059] 3. The three-dimensional geological modeling methods based on spatial interpolation used in general literature, such as the Kriging method, attempt to make optimal and unbiased estimates of the unknown values ​​of the estimated points and smooth the discreteness of the actual observation data, but they tend to ignore subtle changes caused by geological uncertainty. The geological modeling in the present invention combines simulated annealing with spatial interpolation, further considering the global spatial correlation of the geology of each point, which can better reflect the fluctuation of the geological distribution state and reflect the geological uncertainty while ensuring that the prediction accuracy meets the design requirements.

[0060] 4. The present invention can score the rationality of the line position when designing the line position, integrating factors such as construction risk, structural safety, and construction cost. It can allow designers to have a clear understanding of the tunnel construction environment and possible problems that may occur during design verification in advance, playing the role of preliminary design.

[0061] 5. The present invention directly establishes a three-dimensional digital and numerical model of the structure through parametric design, which can be used for structural design verification and can also be used as a BIM model to integrate various attribute data, avoiding repeated conversion between different modeling formats and software. In particular, when the structural verification does not meet the design conditions, the three-dimensional model is automatically updated and re-verified by adjusting the tunnel structure design parameters, and the BIM model is also updated synchronously, greatly improving design efficiency.

[0062] 6. During the design verification, the general two-dimensional design software simplifies the stratum into a homogeneous one, and the three-dimensional design software mostly uses a three-dimensional finite element model and the user applies a uniformly distributed or linearly changing load on the model. Both methods are not based on actual geology, and the calculation results and actual construction conditions are somewhat different, resulting in the calculation structure being inaccurate. In the three-dimensional finite element calculation software, a three-dimensional geological and structural numerical model can be established to accurately calculate the structural force, but the contact between the geological model and the structural model is complex, and the slow speed during modeling can easily lead to non-convergence of the calculation. The present invention combines the refined digital model with the numerical calculation, realizes the transformation from digital to numerical model through grid conversion, and spatially interpolates the real stress distribution obtained based on the two-dimensional stratum structure method and applies it to the three-dimensional load structure method calculation model in a continuous distribution manner, taking into account the efficiency, stability and accuracy of the modeling calculation, which can reflect the actual geological conditions, meet the design accuracy requirements, and avoid tedious modeling and contact settings. BRIEF DESCRIPTION OF THE DRAWINGS

[0063] FIG1 is a schematic diagram of the forward design process of the present invention;

[0064] FIG2 is a schematic diagram of the three-dimensional geological modeling process of the present invention;

[0065] FIG3 is a schematic diagram of a flat curve element of the present invention;

[0066] FIG4 is a schematic diagram of a vertical curve element of the present invention;

[0067] FIG5 is a schematic diagram of the line position evaluation process combining single-index and multi-index line positions according to the present invention;

[0068] FIG6 is a schematic diagram showing calculation of a settlement curve and a settlement curvature radius according to an embodiment of the present invention;

[0069] FIG7 is a simplified numerical calculation model for calculating the settlement curve and settlement curvature radius in an embodiment of the present invention;

[0070] FIG8 is a schematic diagram of load calculation of a cross-sectional view according to an embodiment of the present invention;

[0071] In the figure, 1 is beam element, 2 is contact elastic element, 3 is uniformly distributed load, 4 is geological model, 4-1 to 4-3 represent different soil layers, and 5 is the force between the geological model and the structural model. DETAILED DESCRIPTION

[0072] The present invention is described in detail below with reference to the accompanying drawings and specific embodiments. This embodiment is implemented based on the technical solution of the present invention, and provides a detailed implementation method and specific operation process, but the protection scope of the present invention is not limited to the following embodiments.

[0073] Explanation of terms

[0074] BIM: Building Information Modeling, a computer-aided design based on three-dimensional graphics, object-oriented, and architecture, can help realize the integration of building information. From the design, construction, operation to the end of the building's life cycle, various information is always integrated in a three-dimensional model information database. Design teams, construction units, facility operation departments, owners and other parties can work together based on BIM.

[0075] Geological drilling: A drill rig is used to drill downward from the surface, creating a cylindrical borehole in the ground to identify and delineate the strata. Core, ore, and soil samples can be obtained from different depths in the borehole for analysis and research to determine the physical and mechanical properties and indicators of the rock and soil layers, providing information for design needs.

[0076] GIS: Geographic Information System, a technical system that, with the support of computer hardware and software systems, collects, stores, manages, calculates, analyzes, displays and describes relevant geographical distribution data in the entire or part of the earth's surface (including the atmosphere).

[0077] Geological section: An actual (or inferred) section along a certain direction that shows the geological structure of the surface or within a certain depth.

[0078] Spatial interpolation methods use data from known points to infer data from unknown points in the same area, converting measured data from discrete points into a continuous data surface. Geostatistical interpolation methods are commonly used in geological engineering. This method uses the statistical laws of sample points to quantify the spatial autocorrelations between them, thereby constructing a spatial structural model of the sample points around the point to be predicted.

[0079] Simulated Annealing (SAA) is a general probabilistic algorithm used to find the optimal solution to a problem within a large search space. Its principle is similar to that of metal annealing: applying the theory of thermodynamics to statistics, each point in the search space is imagined as a molecule in air. The energy of a molecule is its kinetic energy. Similarly, each point in the search space, like an air molecule, carries an "energy" that represents its suitability for the problem. The algorithm begins with an arbitrary point in the search space. At each step, a "neighbor" is selected and the probability of reaching that neighbor from the current position is calculated.

[0080] Load-structure method: The effect of the stratum on the underground building structure is simplified to the load acting on the underground building structure (including active stratum pressure and passive stratum resistance). The structure generates internal forces and deformations under the action of the load, and the corresponding calculation method is used.

[0081] Stratum-structure method: The underground building structure and the stratum are regarded as an organic whole, and the self-stabilizing performance of the stratum and its supporting role on the structure are fully considered. The internal forces of the structure and the stratum are calculated separately on the premise of meeting the deformation coordination conditions, and the stability of the stratum and the cross-section design of the components are verified based on this.

[0082] The present invention provides a three-dimensional forward design method for a shield tunnel, comprising: acquiring geological exploration data, establishing a geological three-dimensional model with surrounding environment data; generating a three-dimensional tunnel line position according to stratum distribution and surrounding environment data; designing segment parameters and establishing a segment ring model, laying out the segment rings along the three-dimensional tunnel line position to form a three-dimensional digital model of the tunnel, deleting geological areas within the tunnel range, the three-dimensional digital model of the tunnel integrating segment structure design parameters; automatically converting the three-dimensional digital model of the tunnel into a numerical calculation model; applying a load distribution along the tunnel axis to the numerical calculation model to verify whether the segment structure meets the design requirements, and if so, saving and outputting the design results; if not, redesigning the segment structure design parameters.

[0083] The above-mentioned three-dimensional forward design method of shield tunnel, through three-dimensional forward design, carries out the line position and structural design of the shield tunnel on the three-dimensional geological model, directly obtains the three-dimensional BIM model and calculation model, performs preliminary design inspection in the BIM model, and performs design verification such as section strength and reinforcement ratio in the calculation model. When the structural design changes, the BIM model attribute parameters are changed together with the calculation model parameters, avoiding data and format conversion between different models, realizing the use of three-dimensional modeling from the scheme design stage, and continuously transmitting, continuing and updating the geological and structural three-dimensional model information, effectively improving the efficiency of collaborative design, and finally outputting drawings based on the BIM model.

[0084] As shown in FIG1 , the above-mentioned three-dimensional forward design method for shield tunnels specifically includes the following steps:

[0085] S1. Select several points for drilling and collect geological exploration data at the drilling locations.

[0086] The geological exploration data is obtained by the survey unit. Due to technical and cost limitations, a project cannot accurately survey the stratigraphic parameters at every location. Several points will be selected for drilling to obtain the stratigraphic distribution in the geological boreholes and the properties of each stratigraphic parameter such as strength, elastic modulus, and elevation.

[0087] S2. Based on the address data of the borehole, spatial interpolation combined with simulated annealing is used to generate the stratum distribution at other locations outside the borehole, a geological three-dimensional model of each stratum is established, and the aforementioned stratum property parameters are associated with the geological three-dimensional model.

[0088] In a specific implementation, the spatial interpolation method may adopt methods such as Kriging method, triangulation method, inverse distance weighted method, minimum curvature method, nearest neighbor method, etc.

[0089] In a specific embodiment, as shown in FIG2 , the generation of stratum distribution at other locations outside the borehole by using spatial interpolation combined with simulated annealing method specifically includes the following steps:

[0090] S201. Discretize the borehole into multiple points according to depth. The stratum type is digitally coded, such as 001 for fill, 002 for sand, etc. The stratum information of each discrete point in the borehole is represented by a 4th-order tensor, where the first 3 order components are the 3D coordinates of the point and the 4th order component is the stratum code.

[0091] S202: Set the geological model area range, and automatically select interpolation points in other areas based on the drilling positions using a spatial interpolation method such as Kriging to form a spatial coordinate grid.

[0092] S203 , using the discrete points of the drilling positions as sample points, sequentially adopting a spatial interpolation method to obtain the stratigraphic codes of all grid points, thereby obtaining stratigraphic information tensors of all grid points.

[0093] S204, take any interpolation point other than the sample point in the spatial grid, take the stratum code of the point as the average value μ, and the user-specified standard deviation σ, and establish the normal distribution X~N(μ,σ 2 ), its cumulative distribution function is:

[0094] For each interpolation point, a normal distribution is established and the cumulative distribution function is obtained according to the above method. Generally, the standard deviation of the interpolation point should be less than 1. When the user determines that there may be a special geological condition of a fault at a certain location, the standard deviation of the normal distribution of the interpolation point at that location can be greater than 1.

[0095] S205. Take any interpolation point other than the sample point in the spatial grid, take a random number y in the range of (0,1), set F(x) = y at the point, and use the obtained x value as the new stratigraphic code for the point; use the same method to obtain the new stratigraphic codes for all interpolation points and obtain a new stratigraphic information tensor.

[0096] S206. Taking the set [S X0] consisting of the stratum information tensor set S of the sample points and the stratum information tensor set X0 of the current interpolation point as the initial solution, the stratum information of each interpolation point is optimized by the simulated annealing method. The objective function of the simulated annealing method is:

[0097] In the above formula, γ(h) is the variogram of any two points in the set [SX] consisting of the stratigraphic information tensor set S of the sample points and the stratigraphic information tensor set X of the interpolation points. In other words, the objective function is the sum of the squares of the variograms obtained by pairwise combinations of all points in the above set.

[0098] The set [S X0] consisting of the formation information tensor set S of the sample point and the formation information tensor set X0 of the current interpolation point is used as the initial solution of the simulated annealing method, and is substituted into formula (2) to obtain the initial objective function O0; the user sets the initial temperature T0, the annealing coefficient η (0 < η < 1), and the upper limit m of the number of consecutive rejections of new solutions under each temperature condition. max , upper limit of cooling times n max ; Currently, the number of times new solutions are not accepted continuously is m=0, and the number of times the temperature is lowered is n=0.

[0099] S207, generate new solution: at the current interpolation point, the formation information tensor set X k Choose any two points in , and swap their stratigraphic codes, for example, the following three sets of tensors:

[0100] Point 1: [x1, y1, z1, d1];

[0101] Point 2: [x2, y2, z2, d2];

[0102] Point 3: [x3,y3,z3,d3].

[0103] Points 1 and 3 are randomly selected to exchange the stratum encoding, and the new tensor set is:

[0104] New point 1: [x1, y1, z1, d3];

[0105] Point 2: [x2, y2, z2, d2];

[0106] New point 3: [x3,y3,z3,d1].

[0107] Through the above exchange, we can obtain the new interpolation point formation information tensor set X k+1 , and calculate the objective function O k+1 .

[0108] S208, determine whether there is O k+1 ≤O k If so, then accept the above new solution, the new set [SX k+1 ] replaces [SX k ], and let m=0, if not, execute step S209.

[0109] S209. Calculate the probability of accepting the new solution according to the Boltzman probability distribution:

[0110] Randomly generate a random number p in the range (0,1). If P{accept}>p, then accept the new solution. The new set [SX k+1 ] replaces [SX k ], and let m=0; otherwise, do not accept the new solution and still use [SX k ]Collect and return to step S207, and let m=m+1.

[0111] S210, inner loop: repeat steps S207 to S209 until m=m max .

[0112] S211, external circulation: reduce the temperature, set n = n + 1, T n+1 =ηT n Repeat steps S207 to S211 until n=n max .

[0113] S212. Decode and obtain the stratigraphic type of each interpolation point based on the finally obtained stratigraphic information tensor set of the interpolation points, and establish a geological model for the entire region.

[0114] S213. The user manually modifies the model at locations where special geological conditions may exist. The method is as follows:

[0115] (13.1) Set special address types for correction, such as faults, pinch-outs, etc.

[0116] (13.2) Specify the spatial location and extent of special geological features in a three-dimensional geological model;

[0117] (13.3) In the 3D geological model, the original geological model is deleted through Boolean operations, and a special geological model is established, and special geological attributes are marked.

[0118] Compared with most two-dimensional design software that simplifies the formation into a uniformly distributed layer, this method is more practical in that it uses spatial interpolation combined with simulated annealing to generate a geological model based on drilling data. Compared with the spatial interpolation method used in general literature, this method further considers the uncertainty of geological distribution.

[0119] S3. Import GIS data of the surrounding environment, such as buildings, roads, and pipelines, into the geological 3D model and mark them at the corresponding spatial locations on the geological 3D model.

[0120] S4. On the 3D geological model, control points for the tunnel alignment are selected based on the distribution of strata and the surrounding environment. Generally, unfavorable geology and structures that need to be avoided should be avoided. The 3D tunnel alignment is automatically generated using these control points, and preliminary collision checks and deformation prediction analysis are automatically performed. If the conditions are not met, the alignment will be rejected.

[0121] Generating the three-dimensional position of the tunnel specifically includes: generating a horizontal curve on the plane projection of the geological three-dimensional model, automatically cutting and unfolding the geological three-dimensional model along the horizontal curve to obtain a geological longitudinal profile; generating a vertical curve on the geological longitudinal profile, and obtaining the three-dimensional position of the tunnel according to the horizontal curve and the vertical curve; generating a preliminary design model of the tunnel based on the set inner and outer diameters of the tunnel and the concrete strength; judging whether the obtained three-dimensional position of the tunnel meets the collision check based on the relationship between the three-dimensional position of the tunnel and the preliminary design model of the tunnel; evaluating the three-dimensional position of the tunnel that meets the collision check by combining single indicators and multiple indicators to judge whether it meets the control requirements; and saving the three-dimensional position of the tunnel that meets the collision check, meets the control requirements and receives qualified feedback from manual inspection.

[0122] In a specific implementation, the 3D tunnel line selection includes horizontal curve coordinate solution, longitudinal curve coordinate solution, and line position check. The specific steps are as follows:

[0123] (1) First, the horizontal curve is designed on the plane projection of the geological model. The designer selects the control nodes and horizontal curve elements according to the surrounding environment, as shown in Figure 3, including the intersection coordinates, straight and slow point coordinates, radius R, angle value α, slow curve length Ls1, Ls2, tangent length T1, T2, and external distance E.

[0124] (2) Discrete these parameters into a set of line elements connected end to end to form a flat curve.

[0125] (3) The three-dimensional geological model is automatically cut and unfolded along the tunnel plane curve to obtain a geological longitudinal profile.

[0126] (4) Design the vertical curve on the geological longitudinal profile. Designers select control nodes and vertical curve elements based on the stratum distribution, as shown in Figure 4. The design content includes the intersection coordinates, the foresight slope i1, the backsight slope i2, the curvature radius R, the tangent length T, and the outer distance E.

[0127] (5) These parameters are discretized into a set of line elements connected end to end to form a vertical curve.

[0128] (6) Obtain the three-dimensional position of the tunnel based on the horizontal curve and vertical curve.

[0129] (7) The user sets the inner and outer diameters of the tunnel and the concrete strength as the preliminary structural design, generates a preliminary design model of the tunnel, and displays it in the three-dimensional geological model. By highlighting the semi-transparent three-dimensional geological model and the tunnel model, the relationship between the line position and the geology can be visualized.

[0130] (8) Collision check of tunnel alignment: The user sets the minimum distance l between the tunnel structure and special geological features such as faults, pinch-outs, underground pipelines, and building pile foundations in the geological model. The model collision check is used to determine whether the preliminary design model of the tunnel overlaps with the above objects, i.e., their minimum spacing range. If an overlap occurs, the user is prompted to reject the current alignment design plan, and the overlapping section is highlighted in red, and the user is asked to modify and redesign it.

[0131] (9) For the alignment design that meets the requirements of the collision check, a tunnel alignment evaluation combining single and multiple indicators is performed. If the control requirements are not met, the user is prompted to reject the current alignment design plan, and the section that does not meet the requirements is highlighted in red, and the user is required to modify and redesign it.

[0132] (10) When the line position assessment score is low, the line position is manually checked: select key locations, such as locations with poor geology, other construction roads, and locations with large differential settlements, specify a straight line, and cut the three-dimensional geological section along this line. The user manually checks the geological distribution, tunnel location, and surrounding environment on the section surface, and can modify it by the user.

[0133] (11) When the collision check, line position assessment and manual inspection all meet the requirements, the three-dimensional line selection design is completed.

[0134] As shown in FIG5 , in the above step (9), the tunnel alignment evaluation combining single and multiple indicators specifically includes:

[0135] 901) Determine in sequence whether each single indicator of the obtained three-dimensional tunnel alignment meets the control requirements. If any single indicator is not met, a line design rejection instruction is generated. The single indicators include the longitudinal slope of the straight line segment, the plane curvature radius of the curved line segment, the anti-floating safety factor of the tunnel, and the settlement deformation of the tunnel. The control requirements for each single indicator are as follows:

[0136] 1) Calculate the longitudinal slope of the straight line segment. When the slope of any segment is less than 0.3% or greater than 5%, the line design will be rejected and the section with unreasonable longitudinal slope will be highlighted.

[0137] 2) Calculate the plane curvature radius of the line curve segment. When the plane curvature radius of any segment is less than 40D (D is the outer diameter of the tunnel), the line design is rejected and the section with unreasonable plane curvature radius is highlighted.

[0138] 3) Calculate the anti-floating safety factor of the tunnel using the following formula:

[0139] Where γ f is the anti-floating safety factor, G 自 and G 覆They represent the standard values ​​of the deadweight of the tunnel structure and the effective weight of the overburden on the tunnel, respectively, and are calculated according to formula (5) and formula (6). 浮 is the standard value of buoyancy, calculated according to formula (7). F 浮 =γ w V (7)

[0140] where γ c , γ s , γ w They represent the weight of concrete material, weight of tunnel covering soil, and weight of water respectively. D and d represent the outer diameter and inner diameter of the tunnel respectively. H represents the thickness of tunnel covering soil. V represents the closed outer contour of the tunnel structure below the calculated water level, that is, the drainage volume of the tunnel.

[0141] When the anti-buoyancy coefficient at any position in the tunnel is less than 1.05, the line design will be rejected and the position where the anti-buoyancy coefficient is insufficient will be highlighted.

[0142] 4) Calculate the settlement deformation of the tunnel using the following formula:

[0143] Where s is the total settlement, σ zi 、E ei 、H i are the additional stress, compression modulus and soil thickness of the i-th soil layer, ψ s is the settlement correction factor.

[0144] When the differential settlement between two points in the tunnel is greater than 0.04% L i (L i When the distance between two points is less than 2 points, the line design is rejected and the sections where the differential settlement exceeds the limit value are highlighted.

[0145] 902) A multi-index comprehensive evaluation is performed on the three-dimensional tunnel alignments that meet all individual indicators. A determination is made as to whether the resulting multi-index comprehensive evaluation score is less than a set value. If so, a rejection instruction is issued for the alignment design; otherwise, the alignment design is determined to meet the control requirements. The multi-index comprehensive evaluation is a weighted sum of the settlement curvature radius score, the surrounding environment score, and the construction cost score. In a specific embodiment, a alignment is rejected if the evaluation score is less than 60. A alignment with an evaluation score of 60-80 is considered good, and an alignment with a score of 80-100 is considered excellent.

[0146] The specific calculation process of the multi-indicator comprehensive evaluation score includes:

[0147] 1) Settlement curvature radius score

[0148] Calculate the settlement curvature radius. As shown in Figure 6, A, B, and C are three consecutive points on the settlement curve, with coordinates of (x1, y1), (x2, y2), and (x3, y3), respectively. The settlement curvature radius of point B is calculated according to formula (9):

[0149] The control value of the settlement curvature radius is obtained by a simplified numerical calculation model as follows:

[0150] (1.1) The user sets the segment ring width and joint stiffness (preliminary design).

[0151] (1.2) The segment ring is simplified into a beam element. The length of the beam element is equal to the width of the segment ring, and the cross-sectional stiffness of the beam element is consistent with the cross-sectional stiffness of the segment ring:

[0152] Where E c is the elastic modulus of concrete.

[0153] There is elastic contact between the two beam elements, and the elastic modulus of the contact elastic element is consistent with the set joint stiffness. Multiple beam elements are connected in this way. The total length of the model is equal to the AC distance in Figure 7, and the left and right sides are hinged.

[0154] (1.3) Apply a uniformly distributed load to the model and gradually increase the uniformly distributed load until the deformation of the contact elastic unit at point B reaches 0.3 mm. Calculate the curvature radius R1 of the model deformation at this time; and the curvature radius R2 until the stress of the contact elastic unit reaches the preliminary designed bolt yield strength.

[0155] (1.4) Obtain the settlement curvature radius score V according to the table below s .

[0156] Table 1 Curvature radius scores

[0157] When a tunnel is divided into multiple sections, the settlement curvature radius score for each section is obtained according to formula (9) and Table 1. After removing the two sections at the beginning and end, the average value of the remaining sections is calculated. It is generally recommended that the denser the section division, the more accurate the score, but the greater the calculation workload. It is recommended to use each 100m section as one section.

[0158] (2) Surrounding environment score

[0159] The above steps have set the minimum distance l between the line position and the surrounding environment (geology, buildings, pipelines, etc.). d The difference between the minimum spacing l and the set value is used to obtain the surrounding environment score V according to the following table. d .

[0160] Table 2 Surrounding environment scores

[0161] When there are many surrounding environments, calculate the score for each environment and take the minimum value.

[0162] (3) Construction cost score

[0163] The user sets the construction cost per kilometer p km And the total construction budget P, the construction cost per kilometer is recommended to be calculated according to the following formula:

[0164] Where p c is the market price of concrete (yuan / cubic meter), and α is recommended to be 1.5 to 2.5.

[0165] The tunnel design length L is obtained from the line position design z (km), calculate the construction cost score V according to the following formula p :

[0166] (4) Comprehensive evaluation

[0167] Set the weight coefficient ω for the settlement curvature radius score, surrounding environment score, and construction cost score s 、ω d 、ω p The setting method can adopt expert scoring or fuzzy comprehensive evaluation method, and the multi-index comprehensive evaluation score V can be calculated according to the following formula:

[0168] The tunnel alignment scoring method combining single and multiple indicators mentioned above in the present invention fully considers factors such as construction risk and cost, and can quickly and quantitatively evaluate the rationality of alignment design during the alignment design stage.

[0169] S5. Set the tunnel cross-section segment form, segment geometry, material properties and other structural design parameters, and establish a segment ring model.

[0170] The segment form parameters of the tunnel cross section include: ordinary lining ring and standard lining ring. Ordinary lining ring includes straight ring, left-turn ring and right-turn ring.

[0171] Segment geometry design parameters include: segment ring size parameters, segment number and angle between segments, bolt distribution position, bolt number and length, reinforcement position, and reinforcement size.

[0172] The linear ring size parameters include: outer ring diameter, inner ring diameter, and single ring width.

[0173] The size parameters of left-turn ring, right-turn ring and standard lining ring include: outer ring diameter, inner ring diameter, single ring width, wedge angle or wedge amount.

[0174] According to the above parameters, the three-dimensional digital model and calculation model of the shield tunnel segment structure are automatically established, and the calculation units of the three-dimensional calculation model are automatically divided.

[0175] Segment material parameters include: concrete, steel bars, and bolts. Among them:

[0176] Concrete material design parameters include: axial compressive strength standard value f ck , standard value of axial tensile strength f tk , design value of axial compressive strength f c , design value of axial tensile strength f t , elastic modulus E c , shear deformation modulus G c , Poisson's ratio ν c .

[0177] Steel bar material design parameters include: yield strength standard value f yk , ultimate strength standard value f stk , tensile strength design value f y , design value of compressive strength f y ′, elastic modulus E s .

[0178] Bolt material design parameters include: tensile strength design σ b , yield point σ s or yield strength σ 0.2 .

[0179] Assign the above material parameters to the structural three-dimensional model.

[0180] S6. Carry out three-dimensional layout design of the segment ring.

[0181] S7. Arrange the segment rings along the tunnel alignment to form a 3D digital model of the tunnel. Use Boolean operations to delete the geological model within the tunnel area. The aforementioned segment structure design parameters are integrated into the 3D digital model. A semi-transparent geological model is used to visualize the tunnel structure and stratum distribution.

[0182] In a specific implementation, the preliminary design model of the tunnel is first deleted, and then a three-dimensional digital model is established. The specific process is as follows:

[0183] (1) Based on the segment form parameters and segment ring size parameters, a planar expansion diagram of each segment is formed and set as the segment plane.

[0184] (2) Bend the segment plane according to the inner diameter of the segment ring.

[0185] (3) The segment surface is stretched outward by cylindrical coordinate radial stretching operation. The stretching distance is the outer diameter minus the inner diameter to generate the segment model.

[0186] (4) Generate a circular cross section according to the bolt number and stretch the bolt length along the axial direction to form a bolt model;

[0187] (5) Similarly, a circular cross section is generated according to the diameter of the steel bar, and the steel bar model is generated by stretching the bolt length along the axial direction.

[0188] (6) Rebar position: The rebar model is embedded in the segment model. The volume of the segment model that overlaps with the rebar model is deleted through Boolean operation. The segment model and the rebar model form a segment group.

[0189] (7) According to the segment blocks, each segment group is combined into a segment ring according to the position of each block.

[0190] (8) The circumferential bolt model is embedded into the segment joint according to the bolt position. The volume overlapping with the bolt model in the segment model is deleted through Boolean operation to generate the circumferential bolt hole. The segment group and the circumferential bolt model form a segment ring group.

[0191] (9) The segment ring groups are arranged along the tunnel axis, and the longitudinal bolt model is embedded in the gap between the rings. The volume overlapping with the bolt model in the segment model is deleted through Boolean operation to generate the longitudinal bolt holes. The segment ring group and the longitudinal bolt model constitute the three-dimensional digital model of the tunnel.

[0192] (10) Associate the concrete material design parameters to the segment model, the steel bar material design parameters to the steel bar model, and the bolt material parameters to the bolt model.

[0193] S8. Automatically convert the three-dimensional digital model of the tunnel into a numerical calculation model. The specific method is as follows:

[0194] (1) The segment model is simplified, the circumferential bolt holes and the longitudinal bolt holes are filled, the segment model is set as a solid unit and meshed, and the physical and mechanical properties of the segment unit are calculated according to material mechanics using the segment geometric parameters and concrete material design parameters;

[0195] (2) The steel bar model is set as a rod unit and divided into grids. The contact mode between the steel bar unit and the segment unit is embedded. The physical and mechanical properties of the steel bar unit are calculated according to the material mechanics using the steel bar geometric parameters and steel bar material design parameters;

[0196] (3) Simplify the bolt model. In the calculation model, delete the solid model of the bolt. Set a spring unit at the bolt position on the segment joint surface to connect the two segment solid models. The spring unit has no geometric dimensions, and its stiffness is calculated according to the geometric parameters and material design parameters of the bolt according to material mechanics.

[0197] (4) The numerical calculation model conversion is completed, and the numerical calculation model is automatically reconverted whenever the geometric dimensions or associated material parameters of the digital model change.

[0198] The method of automatically converting and updating a three-dimensional digital model of a tunnel into a numerical calculation model according to the present invention effectively solves the low efficiency problem of the current reverse design that requires the establishment of a digital model and a numerical calculation model separately.

[0199] S9. Based on the distribution of strata in the geological model, the load distribution along the tunnel is automatically calculated and applied to the tunnel model to perform three-dimensional verification of the segment structure. The specific steps are as follows:

[0200] (1) At any section of the tunnel, cut the geological model along the direction perpendicular to the tunnel axis to obtain the geological cross-section of the section.

[0201] (2) Based on the stratum distribution on the cross-section, this method uses a simplified two-dimensional numerical calculation model to calculate the load on the tunnel, unlike conventional design software that uses standard calculations for vertical and lateral earth pressures:

[0202] (2.1) The segments are simplified into beam elements. The shape of the beam elements is consistent with the cross section of the segment. The cross-sectional stiffness of the beam elements is calculated according to the specifications based on the concrete cross section and reinforcement conditions: there is elastic contact between two beam elements, and the elastic modulus of the contact elastic element is consistent with the stiffness of the ring bolt. In this way, multiple beam elements are connected into a ring.

[0203] (2.2) The structural model on the geological section is replaced by the simplified two-dimensional structural numerical calculation model mentioned above.

[0204] (2.3) The two-dimensional stratigraphic structure method is used to calculate the above geological plus structural numerical calculation model and extract the interaction force between the geological model and the structural model, as shown in Figure 8.

[0205] (2.4) The direction of the above force points to the center of the tunnel along the tunnel radial direction and is distributed circumferentially along the outer side of the tunnel.

[0206] (3) Calculate the load on the tunnel cross section every 5 to 10 m according to the above method. In locations with special geology, large changes in the strata passed through, or large changes in the tunnel curvature, it is necessary to select the cross section and calculate the load.

[0207] (4) Based on the multiple sections calculated above, the spatial interpolation method is used to calculate the stress state at any other position in the tunnel, thereby obtaining the load distribution along the tunnel axis and applying it to the three-dimensional numerical calculation model of the tunnel.

[0208] (5) Carry out three-dimensional finite element calculation and analysis, including cross-sectional strength, segment joint strength, anti-floating verification and other verification items required by the specification.

[0209] S10. If the calculation does not meet the design requirements, return to step S5 to reset the segment design parameters. The tunnel model is automatically updated, converted, and recalculated until it meets the design requirements. If it meets the design requirements, the two-dimensional design drawings and calculation reports are automatically output, and the aforementioned geological three-dimensional model and tunnel three-dimensional model and the attribute parameters integrated on the model are automatically exported as a BIM model.

[0210] The loads used in the structural design verification are calculated based on the three-dimensional geological model and are distributed longitudinally in the tunnel. Because the three-dimensional geological model is more consistent with actual engineering than the uniformly distributed strata simplified to thick and thin layers used in general two-dimensional design software, the calculated loads are also more accurate. Furthermore, the calculation uses a method of spatial interpolation after two-dimensional calculation to convert the three-dimensional geological model into a load applied to the structural model. This avoids the difficulty in setting the contact method and unclear force when calculating the geological model and structural model in three-dimensional finite element software.

[0211] If the above method is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present invention, or the part that contributes to the prior art, or the part of the technical solution, can be embodied in the form of a software product. The computer software product is stored in a storage medium and includes several instructions for enabling a computer device (which can be a personal computer, server, or network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present invention. The aforementioned storage medium includes: various media that can store program code, such as a USB flash drive, a mobile hard disk, a read-only memory (ROM), a random access memory (RAM), a magnetic disk, or an optical disk.

[0212] The above describes in detail the preferred embodiments of the present invention. It should be understood that those skilled in the art can make numerous modifications and variations based on the concepts of the present invention without inventive effort. Therefore, any technical solutions that can be derived by those skilled in the art through logical analysis, reasoning, or limited experimentation based on the concepts of the present invention and the prior art should be within the scope of protection defined by the claims.

Claims

1. A three-dimensional forward design method for a shield tunnel, characterized in that: The following steps are involved: 1) Obtain geological exploration data and establish a geological three-dimensional model with surrounding environment data; 2) Generate the three-dimensional position of the tunnel based on the stratum distribution and surrounding environment data; 3) Designing the segment structure parameters and establishing the segment ring model, arranging the segment rings along the three-dimensional line position of the tunnel to form a three-dimensional digital model of the tunnel, deleting the geological area within the tunnel range, and the three-dimensional digital model of the tunnel is integrated with the segment structure design parameters; 4) automatically converting the three-dimensional digital model of the tunnel into a numerical calculation model; 5) Apply load distribution along the tunnel axis to the numerical calculation model to verify whether the segment structure meets the design requirements. If so, save and output the design results. If not, redesign the segment structure design parameters and return to step 3).

2. The three-dimensional forward design method for shield tunnel according to claim 1 is characterized in that: The establishment of the geological three-dimensional model specifically includes: Select several points for drilling and collect geological exploration data at the drilling locations; Generate geological exploration data outside the borehole by using spatial interpolation combined with simulated annealing method; A geological three-dimensional model is constructed based on the geological exploration data, and surrounding environment data is loaded into the geological three-dimensional model.

3. The three-dimensional forward design method for shield tunnel according to claim 2 is characterized in that: The method of using spatial interpolation combined with simulated annealing to generate geological exploration data outside the borehole specifically includes: The geological exploration data at each borehole is discretized into multiple points according to the depth, and each discrete point is represented by a 4th-order tensor to represent the stratigraphic information of the discrete point. In the 4th-order tensor, the first 3th-order components are the 3D coordinates of the discrete point, and the 4th-order component is the stratigraphic code; Set the geological model area range, and generate a spatial coordinate grid through spatial interpolation method according to the drilling position; Taking each discrete point of the borehole as a sample point, a spatial interpolation method is used to obtain the stratigraphic information of all grid points in the spatial coordinate grid, and grid points other than the sample points are defined as interpolation points; For each interpolation point, a normal distribution with the stratigraphic code of the point as the average value μ and the standard deviation σ specified by the user is established and a cumulative distribution function is obtained, and new stratigraphic information is randomly assigned to each interpolation point based on the cumulative distribution function; The set [S X0] consisting of the stratigraphic information tensor set S of the sample points and the stratigraphic information tensor set X0 of the current interpolation point is taken as the initial solution, and the square sum of the variance functions of any two points in the set [SX] consisting of the stratigraphic information tensor set S of the sample points and the stratigraphic information tensor set X of the interpolation point is taken as the objective function, and the stratigraphic information of each interpolation point is optimized by the simulated annealing method; Based on the stratigraphic information of all grid points of the spatial coordinate grid, a geological three-dimensional model of the entire region is established.

4. The three-dimensional forward design method for shield tunnel according to claim 3 is characterized in that: When establishing a geological three-dimensional model of the entire area, the model is modified for special geological locations.

5. The three-dimensional forward design method for shield tunnel according to claim 1 is characterized in that: The generating of the three-dimensional line position of the tunnel specifically comprises: Generate a horizontal curve on the plane projection of the geological three-dimensional model, and automatically cut and unfold the geological three-dimensional model along the horizontal curve to obtain a geological longitudinal section; Generating a vertical curve on the geological longitudinal profile, and obtaining a three-dimensional line position of the tunnel according to the horizontal curve and the vertical curve; Generate a preliminary tunnel design model based on the set inner and outer diameters of the tunnel and the concrete strength; Based on the relationship between the three-dimensional tunnel position and the preliminary design model of the tunnel, it is determined whether the obtained three-dimensional tunnel position satisfies the collision check; The three-dimensional tunnel alignment that meets the collision check is evaluated by combining single and multiple indicators to determine whether it meets the control requirements; Save the tunnel 3D data that meets the collision check, control requirements and receives the manual inspection qualified feedback. Line position.

6. The three-dimensional forward design method for shield tunnel according to claim 5 is characterized in that: The tunnel alignment evaluation combining single index and multiple indexes specifically includes: It is judged in turn whether the obtained single indicators of the three-dimensional line position of the tunnel meet the control requirements. If any single indicator is not satisfied, a line position design rejection instruction is generated. The single indicators include the longitudinal slope of the straight line segment, the plane curvature radius of the curved line segment, the anti-floating safety factor of the tunnel, and the settlement deformation of the tunnel; A multi-index comprehensive scoring is performed on the three-dimensional line position of the tunnel that meets all single indicators, and it is determined whether the multi-index comprehensive evaluation score is less than the set value. If so, a line position design rejection instruction is generated; if not, it is determined that the control requirements are met. The multi-index comprehensive evaluation is divided into a weighted sum of the settlement curvature radius score, the surrounding environment score and the construction cost score.

7. The three-dimensional forward design method for shield tunnel according to claim 1, characterized in that: The formation of the three-dimensional digital model of the tunnel specifically includes: Based on the segment structure design parameters, construct a segment model, a bolt model and a steel bar model; Embed the steel bar model into the segment model to form a segment group; According to the segment blocks, each segment group is combined into a segment ring according to the position of each segment block, and the annular bolt model is embedded in the segment connection seam to form a segment ring group; The segment ring groups are arranged along the tunnel axis, and longitudinal bolt models are embedded in the gaps between the rings to form a three-dimensional digital model of the tunnel.

8. The three-dimensional forward design method for shield tunnel according to claim 7 is characterized in that: The automatic conversion of the three-dimensional digital model of the tunnel into a numerical calculation model is specifically as follows: The segment model is set as solid unit and meshed, the reinforcement model is set as rod unit and meshed, and the bolt model is replaced by spring unit to form a numerical calculation model. The segment structure design parameters of the numerical calculation model are consistent with those of the tunnel 3D digital model.

9. The three-dimensional forward design method for shield tunnel according to claim 1, characterized in that: The load distribution along the tunnel axis is obtained as follows: At any section of the tunnel, cut along the direction perpendicular to the tunnel axis to obtain the geological cross-section of the section; According to the stratum distribution on the geological cross-section diagram, a simplified two-dimensional numerical calculation model is used to replace the structural model on the geological cross-section diagram. In the two-dimensional numerical calculation model, the pipe segment is simplified into a beam unit, and the two beam units are in elastic contact. The two-dimensional stratigraphic structure method is used to extract the force between the geological model and the structural model as the load on the current tunnel cross section. The direction of the force points to the center of the tunnel along the radial direction of the tunnel and is distributed circumferentially along the outer side of the tunnel. The loads on multiple tunnel cross sections are obtained repeatedly, and the load distribution along the tunnel axis is obtained using the spatial interpolation method.

10. The three-dimensional forward design method for shield tunnel according to claim 1, characterized in that: The design results include two-dimensional design drawings, calculation reports and BIM models.

Citation Information

Patent Citations

  • Design method and system of cast-in-place reinforced concrete pipe ditch

    CN106815424A

  • Data transmission method for three-dimensional geological BIM model and finite element model

    CN113627053A

  • Foundation pit three-dimensional forward design and calculation integration method

    CN114547741A

  • Shield tunnel excavation process and earth surface deformation three-dimensional finite difference numerical simulation method

    CN114969884A

  • Automatic construction method and application of shield construction risk analysis model

    CN115344915A

Cited By

  • Geometric import zero-distortion method for three-dimensional complex curve modeling of pumped storage power station

    CN119918346A

  • Method and equipment for forecasting geological structure in front of tunnel face and storage medium

    CN119962269A

  • Modeling method for three-dimensional potential instability surface of foundation under action of complex foundation load

    CN120030809A

  • Shield construction path optimization method and device considering shield tail gap constraint and duct piece arrangement

    CN120180563A

  • A shield construction path optimization method and device considering shield tail gap constraint and segment arrangement

    CN120180563B