Method for pre-operational processing or post-operational processing of a concrete pump

By using a puncture-resistant substance like a bentonite suspension to adapt to changing delivery line cross-sections, the method addresses the challenges of cleaning and preparing concrete pumps, ensuring consistent concrete output and efficient operation in diverse pump configurations.

WO2024245608A1PCT designated stage expired Publication Date: 2024-12-05PUTZMEISTER ENG GMBH
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
PCT/EP2024/056805
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-05-31
Filing Date
2024-03-14
Publication Date
2024-12-05

AI Technical Summary

Technical Problem

Concrete pumps with varying delivery line cross-sections pose challenges for traditional sponge-like body cleaning and wetting methods, as these methods are ineffective when there are protrusions or changes in the cross-section, particularly in 3D printing applications.

Method used

Conveying a puncture-resistant substance along the delivery line, which adapts to changing cross-sections, allows for operational preparation and post-operational processing without moving a body, ensuring effective cleaning and consistency maintenance by using a substance that is plastically deformable, non-reactive, and suitable for pumping, such as a bentonite suspension.

Benefits of technology

Enables efficient operational preparation and post-operational processing in concrete pumps with varying cross-sections, ensuring the desired consistency of liquid concrete and effective separation of liquids, even in complex pump configurations like 3D printing setups, while maintaining environmental compatibility.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure EP2024056805_05122024_PF_FP_ABST
    Figure EP2024056805_05122024_PF_FP_ABST
Patent Text Reader

Abstract

The invention relates to a method for pre-operational processing or post-operational processing of a concrete pump (15), in which the concrete pump (15) is designed to convey liquid concrete (41) between an inlet end and an outlet end of a conveying line (17) using a pump device (29). For the purpose of pre-operational processing or post-operational processing, a substance that is different from liquid concrete (41) is conveyed along the conveying line (17). The substance is a semi-solid substance (41), in particular a bentonite suspension. The invention also relates to a concrete pump for carrying out the method.
Need to check novelty before this filing date? Find Prior Art

Description

[0001] Procedure for the preparation or post-operational preparation of a concrete pump

[0002] The invention relates to a method for preparing for or post-operational preparation of a concrete pump.

[0003] Concrete pumps require cleaning after use to remove any remaining liquid concrete from the concrete pump's delivery line. A common method for cleaning a concrete pump's delivery line is to move a sponge-like body through the delivery line, displacing the liquid concrete. The movement of the sponge-like body can be driven, for example, by pumping a liquid through the delivery line, which propels the sponge-like body forward. The sponge-like body prevents the liquid from mixing with the liquid concrete.

[0004] Before using a concrete pump, it is often necessary to wet the wall of the delivery line to prevent excessive liquid from being extracted from the initially pumped liquid concrete, which would then no longer have the desired consistency when it exits the delivery line. A sponge-like body can also be moved along the delivery line for this purpose.

[0005] Moving a sponge-like body along the delivery line works best when there are no significant fluctuations in the cross-section of the delivery line along its length. This is not always the case. Some concrete pumps have structures extending into the delivery line along the length of the delivery line or near the outlet end that alter the cross-section. With such concrete pumps, the use of a sponge-like body to clean or wet the delivery line is not readily possible.

[0006] The invention is based on the object of presenting a method for preparing for or post-operational operation of a concrete pump, with which these disadvantages can be avoided. This object is achieved by the features of the independent claims. Advantageous embodiments are specified in the subclaims.

[0007] In the method according to the invention for preparing for or post-operational preparation of a concrete pump, a concrete pump is designed to convey liquid concrete between an inlet end and an outlet end of a delivery line using a pumping device. For the purpose of preparing for or post-operational preparation, a substance other than liquid concrete is conveyed along the delivery line. The substance is a puncture-resistant substance.

[0008] The invention has recognized that it is possible to carry out the steps required for preparation or post-operational processing without moving a body along the delivery line. It is proposed to convey a puncture-resistant substance along the delivery line. Unlike a body, a puncture-resistant substance adapts readily to changing cross-sections of the delivery line. The invention therefore makes it possible to carry out the steps required for preparation or post-operational processing even if there are changes in the cross-section of the delivery line. Such changes occur in particular in concrete pumps suitable for 3D printing, which have a print head and / or an inline pump at the distal end of the delivery line.

[0009] A substance is described as being plastically deformable and having a consistency that is firm enough to be tapped out with a spade or trowel. Parameters that can be used to identify a substance that is firm to the touch are the slump and / or the viscosity and / or the yield point. Within the scope of the invention, the slump can be determined in accordance with DIN EN 12350-5, whereby the substance that is firm to the touch can be in slump class Fl or F2. The standardized slump table method originally defined for concrete is applied in the same way for the substance that is firm to the touch. The substance that is firm to the touch can have a slump that is less than or equal to 41 cm, preferably less than or equal to 34 cm. The consistency of the substance that is firm to the touch can be determined additionally or alternatively using a flow funnel test in accordance with DIN EN 12350-9, which is commonly used for concrete.The consistency of the compact substance can be such that the compact substance does not leak from the discharge hopper within a period of one day. The compact substance should have a pumpable consistency so that it can be conveyed with a concrete pump. According to the invention, the substance is compact at the time it is fed to the concrete pump.

[0010] Liquid concrete is concrete that has a pumpable consistency. For the invention, it is advantageous to use a solid substance that does not chemically react with the liquid concrete. This means that, during the period for which the solid substance remains in the delivery line during the process according to the invention, no significant chemical reaction takes place that would change the consistency of the liquid concrete.

[0011] Mixtures of mineral substances and water are particularly suitable for use as puncture-resistant substances. It is also possible for the puncture-resistant substance to be formed from a mixture of water and a polymer material, particularly a mixture of water and a superabsorbent. One advantage of the mineral substance is its better environmental compatibility.

[0012] The puncture-resistant substance can be a bentonite suspension. The bentonite suspension can be produced by adding a bentonite material, for example in powder, granular, or pellet form, to water. The bentonite material can be, for example, calcium bentonite or sodium bentonite, the latter having a stronger swelling behavior. Bentonite is a substance made of various clay materials and has a high water absorption capacity as well as a high swelling capacity. The grain density of the puncture-resistant substance can be greater than 1.8 g / cm3 , preferably greater than 2.4 g / cm 3 and thus not far from the density of concrete, which is in the order of 2 , 3 g / cm 3 The proportion of the bentonite suspension made up of water and bentonite material together may be greater than 60 wt.%, preferably greater than 80 wt.%, more preferably greater than 95 wt.%.

[0013] The puncture resistance of the bentonite mixture required for the process according to the invention can result from adding a higher proportion of bentonite material to the water than usual. Based on the amount of water in the bentonite suspension, the bentonite material can have a proportion of at least 14 wt.%, preferably a proportion of at least 16 wt.%. This value can apply in particular to a mixture of water and sodium bentonite.

[0014] The quantity of the puncture-resistant substance can be such that a section of the conveying line of at least 0.5 m in length, preferably of at least 1 m in length, more preferably of at least 2 m in length is filled with the puncture-resistant substance. In this way, different media on the two sides of the puncture-resistant substance can be reliably kept separate from one another. It is generally not necessary for a section of the conveying line of more than 10 m in length, preferably of more than 7 m in length, to be filled with the puncture-resistant substance.

[0015] For the purpose of operational preparation, the process can be carried out by introducing the compact substance into an empty conveyor line, followed by liquid concrete being pumped into the conveyor line so that the compact substance is pushed along the conveyor line by the liquid concrete. The wall of the conveyor line is wetted by the compact substance, thus preventing any impairment of the subsequent liquid concrete through contact with the dry wall of the conveyor line. The liquid concrete has the desired consistency right from the start when it exits the conveyor line.

[0016] For post-operational purposes, the process can be carried out by introducing the solid substance into a delivery line filled with liquid concrete and then conveying the solid substance along the delivery line to force the liquid concrete out of the delivery line. The solid substance can be conveyed along the delivery line using water pressure. The solid substance ensures a separation between the water and the liquid concrete, preventing the water from mixing with the liquid concrete. The water pressure can be maintained until the solid substance exits the delivery line at the opposite end of the delivery line.

[0017] The puncture-resistant substance can be conveyed along the conveyor line together with a body, whereby the body can follow the puncture-resistant substance, be embedded in the puncture-resistant substance, or be pushed ahead by the substance. The body can, for example, be a sponge-like body or a pig. A pig is a body that is more rigid than a sponge-like body. The pig can, for example, be made of rubber and be sized to fit the cross-section of the conveyor line.

[0018] To remove the water from the conveying line, a body, for example in the form of a sponge-like body or a pig, can be introduced into the conveying line and moved along the conveying line so that the water is forced out of the conveying line. The body can be moved along the conveying line using compressed air, for example. The movement of the body can be driven until the body exits the conveying line at the opposite end of the conveying line. The direction of movement of the body can be the same as or opposite to the direction of movement of the puncture-resistant substance.

[0019] The concrete pump can comprise a pre-filling container from which the pumping device sucks in the liquid concrete when the concrete pump is in operation and pumps it towards the delivery line. The method can be carried out in such a way that the solid substance is introduced into the pre-filling container and from there into the delivery line. If the method is carried out as a cleaning process, the pumping device can initially be kept in operation until all of the liquid concrete has been sucked out of the pre-filling container and the pre-filling container is empty. The solid mass can then be introduced into the empty pre-filling container and from there pumped into the delivery line. The pumping device can comprise a first delivery cylinder and a second delivery cylinder, each of which is designed to suck in liquid concrete from the pre-filling container and pump it towards the delivery line.The first delivery cylinder and the second delivery cylinder can be operated in a push-pull manner, so that the first delivery cylinder sucks liquid concrete from the priming tank while the second delivery cylinder delivers liquid concrete towards the delivery line, and vice versa. To switch between the first delivery cylinder and the second delivery cylinder, a pipe switch, for example in the form of an S-pipe switch, can be provided which connects the first delivery cylinder to the delivery line in a first state and connects the second delivery cylinder to the delivery line in a second state. The puncture-resistant substance can be delivered in the same way as the liquid concrete.

[0020] An inline pump and / or a pressure head can be arranged between the inlet and outlet ends of the delivery line. A substance conveyed along the delivery line can pass through the inline pump before leaving the delivery line. While it is possible to keep the cross-section essentially constant over the length of a delivery line designed as a pipe or hose, the delivery line is subject to significant changes in cross-section in the area of ​​the inline pump. Unlike a body moved along the delivery line for preparation or post-operational processing, the puncture-resistant substance can pass through an inline pump and displace any liquid concrete that may remain there.

[0021] An outlet end of the delivery line can be formed by the print head, so that the liquid concrete emerges from the delivery line as a strand with a predetermined cross-sectional profile. The cross-sectional profile can be designed so that predetermined structures can be created using 3D printing. Such a print head also generally has a cross-section that differs significantly from a delivery line designed as a pipe or hose. The puncture-resistant substance can pass through the print head and displace any liquid concrete remaining there.

[0022] The conveying line can be provided with a pigging gate through which a body can be introduced into the interior of the conveying line. The pigging gate can comprise a pipe section that is accessible from the outside in a first state and that is integrated into the conveying line in a second state.

[0023] The delivery line, which may comprise one or more tubular sections, one or more hose-shaped sections, an in-line pump, a pig gate and / or a pressure head, may be designed as a closed section, while the puncture-resistant substance passes through the delivery line. The puncture-resistant substance can enter the delivery line at an inlet end and, after passing the in-line pump and / or the pressure head, exit at an outlet end of the delivery line. The inlet end of the delivery line can be connected to the pumping device of the concrete pump. For final cleaning, after the puncture-resistant substance has exited the delivery line, the delivery line can be disconnected so that the in-line pump and / or the pressure head are separate from other components of the delivery line. When disconnected, the in-line pump and the pressure head are easier to clean.

[0024] It is possible to introduce the puncture-resistant substance into the concrete pump via the prefill container. Unlike thinner materials, the puncture-resistant substance does not easily sink to the bottom of the prefill container where it can be sucked in. Tools can be used to assist this, but this is not a good solution from an occupational safety perspective.

[0025] The method can therefore be carried out in such a way that the concrete pump has a connection opening and that the puncture-resistant substance is fed to the concrete pump through the connection opening. A connection, for example of a hose or a pipe, through which the puncture-resistant substance is fed can be connected to the connection opening. The connection opening can be arranged in a lower section of the pre-filling container so that the puncture-resistant substance is fed to the area of ​​the pre-filling container where it can be sucked in directly by the pumping device and conveyed in the direction of the delivery line. It is also possible for the connection opening to be arranged in a section of the delivery line so that the puncture-resistant substance can be introduced directly into the interior of the delivery line.The connection opening can be arranged in a distal section of the delivery line or in a proximal section of the delivery line. The distal section is adjacent to the outlet end of the delivery line. The proximal section of the delivery line can connect to the pumping device.

[0026] In one embodiment, the connection opening is arranged on the pumping device so that the puncture-resistant substance can be introduced directly into the interior of the pump. In particular, the connection opening can be arranged in a cylinder wall of a delivery cylinder of the pumping device. A first delivery cylinder of the pumping device can be provided with a first connection opening so that the puncture-resistant substance can be introduced into the interior of the first delivery cylinder. In order to avoid the normal operation of the concrete pump, in which liquid concrete is delivered in the direction of the delivery line, being impaired, the first connection opening can be arranged in a section of the first delivery cylinder which is not used during normal operation, i.e. into which no liquid concrete enters during normal operation.In order to make the interior of the first delivery cylinder accessible via the first connection opening, the first delivery cylinder can be brought into a first overstroke position. The overstroke position is a position in which the piston within the first delivery cylinder assumes a position outside of normal operation. In particular, the first delivery cylinder can be brought into an overstroke position in which the piston is retracted far back. In the first overstroke position, the piston can still be flush with the cylinder wall of the first delivery cylinder. The first connection opening can be the only opening in the first delivery cylinder, in addition to the openings used during normal operation of the concrete pump.

[0027] The concrete pump can include a supply pump to pump the solid substance through the connection opening. In one embodiment, the supply pump is also used to move the solid substance introduced through the connection opening along the delivery line. For this purpose, the supply pump can pump water through the connection opening so that the water displaces the solid substance and moves it along the delivery line. Once the solid substance has left the delivery line at the opposite end, water usually remains in the delivery line. The supply pump can be used to suck the water out again.

[0028] It is also possible that the puncture-resistant substance with the

[0029] The pumping device of the concrete pump is moved along the delivery line. For this purpose, the first connection opening can be closed. The piston of the first delivery cylinder can be moved forward so that the puncture-resistant substance is delivered in the direction of the delivery line. In one embodiment, the first connection opening is closed by moving the piston from an overstroke position to a position used in normal operation. In order to move the puncture-resistant substance along the delivery line, the pumping device of the concrete pump can be used to pump water in the direction of the delivery line. The water can be fed to the pumping device via the prefill tank.

[0030] The first delivery cylinder can comprise a second overstroke position in which the piston is moved backwards beyond the first overstroke position. In the second overstroke position the piston can be moved into a position outside the cylinder wall of the first delivery cylinder so that it is possible to introduce a body into the interior of the first delivery cylinder from the axial direction. For example a sponge-like body can be introduced into the interior of the first delivery cylinder. The sponge-like body can be moved out of the first delivery cylinder in the direction of the delivery line and if necessary along the delivery line for final cleaning. If the pumping device comprises an S-pipe, the sponge-like body can pass through the S-pipe before entering the delivery line so that this too is cleaned.

[0031] A concrete pump with a first delivery cylinder and a second delivery cylinder, the first delivery cylinder being equipped with a first connection opening, has independent inventive content. The concrete pump can be developed with further features that are described in connection with the pumping device according to the invention. The connection opening is suitable for connecting a line to the connection opening, so that a puncture-resistant substance can be supplied to the concrete pump through the line and through the connection opening.

[0032] A second delivery cylinder of the pumping device can be provided with a second connection opening through which the puncture-resistant substance can be introduced into the interior of the second delivery cylinder. The second delivery cylinder and the second connection opening can have the same features that are described in connection with the first delivery cylinder and the first connection opening. The method for cleaning the concrete pump can be carried out in such a way that, at a time when there is no more liquid concrete in the pre-fill container, the puncture-resistant substance is introduced into the interior of the first delivery cylinder via the first connection opening. The piston of the first delivery cylinder can be moved forward so that the puncture-resistant substance is conveyed in the direction of the delivery line.At the same time, the piston of the second delivery cylinder can be moved backward so that the interior of the second delivery cylinder is empty and the piston is in a rear position. The piston of the second delivery cylinder can now be moved forward to convey the puncture-resistant substance toward the delivery line. Water can then be pumped toward the delivery line as described above to move the puncture-resistant substance along the delivery line.

[0033] In one embodiment, the concrete pump comprises a mixing device with which the puncture-resistant substance used in the method according to the invention can be produced. The mixing device can have a mixing pump and a mixing line, wherein the mixing pump is designed to promote the flow of a pumped medium in a circuit along the mixing line. A water supply from which water can be supplied to the mixing line can be connected to the mixing line. Starting from a state in which the mixing line is empty, water can be supplied to the mixing line until the mixing line is filled with water. The mixing line can comprise a vent valve so that air can escape from the interior of the mixing line. If the mixing line is completely filled with water, the water supply can be separated from the mixing line.A substance can be added to the water in the mixing line so that the water and the substance form a puncture-resistant substance. The substance can be supplied from a storage container. The substance can be a powdered substance, particularly bentonite powder.

[0034] In one embodiment, the mixing line is provided with a Venturi nozzle in the area of ​​the reservoir connection, so that the powdered substance is sucked out of the reservoir by the flowing liquid. The mixture in the mixing line can be circulated until the water is sufficiently enriched with the substance. In the case of bentonite powder, the mixture can be circulated until the bentonite powder makes up at least 14% by weight, preferably at least 16% by weight, based on the amount of water.

[0035] Once the mixture is sufficiently enriched with the substance, the mixing pump can be switched off to give the mixture time to expand. The expansion time can, for example, be between 30 and 60 minutes, during which a significant portion of the expansion process takes place. A longer expansion time of, for example, a day or more is generally harmless. After the expansion time has elapsed, the desired puncture-resistant substance will have formed from the mixture in the mixing line.

[0036] A mixing device for producing a puncture-resistant substance and an associated mixing method, in which a mixture of water and a second substance is conveyed along a mixing line in a circuit to produce a puncture-resistant substance, have independent inventive content, even without the puncture-resistant substance being used for the operational preparation or post-operational processing of a concrete pump. One idea of ​​the invention lies in using the mixing line at the same time as a storage device for producing the puncture-resistant substance. The measuring device and the mixing method can be developed with further features of the disclosure, in particular with features that are described in connection with the production of the puncture-resistant substance.

[0037] Once the solid substance has formed in the mixing line, an outlet valve of the mixing line can be opened to pump the solid substance out of the mixing line. At the same time, water can be admitted into the mixing line, which gradually displaces the solid substance. The outlet valve can be connected to a connection opening of the concrete pump, so that the solid substance displaced from the mixing line enters the concrete pump. The mixing pump can act as a supply pump for feeding the solid substance to the concrete pump.

[0038] In one embodiment, the mixing pump can be used to suck in dirty water from the concrete pump. In particular, this can be dirty water that was used to clean the concrete pump or that was used to move the puncture-proof substance along the delivery line. The dirty water can be sucked in from the interior of the pumping device, the pre-fill tank and / or the delivery line. Sucking in dirty water with the mixing pump can be helpful if it is not possible to dispose of the dirty water on the construction site. The mixing device can comprise a dirty water collection tank in which the sucked-in dirty water is collected. In one embodiment, the dirty water from the dirty water collection tank serves as a water supply from which water is sucked in for the production of the puncture-proof substance in a later process.

[0039] The invention further relates to a concrete pump with a pre-filling tank, a delivery line, and a pumping device. The pumping device is designed to suck liquid concrete from the pre-filling tank and convey it along the delivery line. The concrete pump is designed to carry out the method according to the invention.

[0040] The invention also relates to a concrete pump with a pre-filling tank, a delivery line, and a pumping device. The pumping device is designed to suck liquid concrete from the pre-filling tank and convey it along the delivery line. The concrete pump comprises a connection opening, wherein the puncture-resistant substance is fed to the concrete pump through the connection opening. The connection opening can be arranged in a cylinder wall of a delivery cylinder of the pumping device.

[0041] The invention also relates to a concrete pump with a pre-filling tank, a delivery line, and a pumping device. The pumping device is designed to suck liquid concrete from the pre-filling tank and convey it along the delivery line. The concrete pump comprises a mixing device with a mixing pump and a mixing line. The puncture-resistant substance is produced by the mixing pump conveying a liquid along the mixing line in a circuit and by adding another substance to the liquid.

[0042] The disclosure includes further developments of the concrete pump with features described in connection with the method according to the invention. The disclosure includes further developments of the method described in connection with the concrete pump according to the invention.

[0043] The invention is described below by way of example with reference to the accompanying drawings using advantageous embodiments. They show:

[0044] Fig. 1: a concrete pump vehicle with a boom arm in the folded state;

[0045] Fig. 2: the concrete pump vehicle from Fig. 1 with the boom arm unfolded;

[0046] Fig. 3: a schematic representation of a first delivery cylinder of the pumping device of a concrete pump according to the invention;

[0047] Fig. 4: a schematic representation of a second delivery cylinder of the pumping device of a concrete pump according to the invention;

[0048] Fig. 5: the sequence of a method according to the invention for preparing for operation;

[0049] Fig. 6: the sequence of a method according to the invention for post-operational preparation;

[0050] Fig. 7: the feed cylinder from Fig. 3 in a first overstroke position;

[0051] Fig. 8: the feed cylinder from Fig. 3 in a second overstroke position.

[0052] Fig. 9: a first embodiment of a mixing device according to the invention; Fig. 10: a second embodiment of a mixing device according to the invention.

[0053] A truck 14 shown in Fig. 1 is equipped with a concrete pump 15 which pumps liquid concrete from a hopper 16 through a delivery line 17. The delivery line 17 extends along a boom arm 18 which is rotatably mounted on a slewing ring 19. The boom arm 18 comprises three boom arm segments 20, 21, 22 which are connected to one another in an articulated manner. By pivoting the boom arm segments 20, 21, 22 relative to one another via the joints, the boom arm 18 can be moved between a folded state (Fig. 1) and an unfolded state (Fig. 2). The delivery line 17 extends beyond the distal end of the third boom arm segment 22 so that the liquid concrete can be applied in an area remote from the concrete pump 15.

[0054] The concrete pump 15 is designed for 3D printing, so that a mold can be directly constructed using the concrete exiting the delivery line 17, without the need for formwork. For this purpose, the concrete pump 15 includes an inline pump 36 (not shown in Figs. 1 and 2), which pumps the liquid concrete so that it exits the delivery line 17 as a continuous strand. The distal end of the delivery line 17 is formed by a printing head 37, from which the strand emerges with a predetermined cross-sectional profile.

[0055] The concrete pump 15 comprises a pumping device 29 which is designed as a double-piston pump. The pumping device 29 comprises a first delivery cylinder 31 (Fig. 3) and a second delivery cylinder 32 (Fig. 4) which, during normal operation, suck in liquid concrete from the pre-filling container 16 in an alternating cycle and deliver it along the delivery line 17. The pumping device 29 is equipped with an S-pipe (not shown in the figures), which in a first switching state establishes a connection between the first delivery cylinder 31 and an outlet of the pumping device 29 and which in a second switching state establishes a connection between the second delivery cylinder 32 and an outlet of the pumping device 29.A proximal end of the delivery line 17 is connected to the outlet of the pumping device 29, so that the liquid concrete conveyed through the S-pipe passes into the delivery line 17 and is moved from the proximal end of the delivery line 17 to the distal end of the delivery line 17.

[0056] The first delivery cylinder 31 and the second delivery cylinder 32 each comprise a cylinder wall 23 which encloses an interior space. A piston 24 is guided within the cylinder wall 23 and is connected to a drive unit 26 via a piston rod 25. The piston rod 25 extends through a water tank 27. The drive 26 allows the piston 24 to be moved forwards and backwards, whereby the space enclosed between the cylinder wall 23 and the piston 24 is reduced or increased, respectively.

[0057] A working cycle of the pumping device 29 comprises the steps that, in a state in which the S-pipe forms a connection between the first delivery cylinder 31 and the outlet of the pumping device 29, the first delivery cylinder 31 delivers liquid concrete from the interior of the first delivery cylinder 31 into the S-pipe with a forward movement 33. In parallel, the second delivery cylinder 32 sucks liquid concrete from the pre-filling container 16 with a backward movement 34. The backward movement 34 extends to a rear position of normal operation which corresponds to the position of the piston 24 shown in Fig. 3. After switching over the S-pipe to the second delivery cylinder 32, the second delivery cylinder 32 then delivers liquid concrete into the S-pipe with a forward movement 33, while the first delivery cylinder 31 sucks liquid concrete from the pre-filling container 16.The first delivery cylinder 31 is equipped with a first connection opening 28, and the second delivery cylinder 32 is equipped with a second connection opening 29. The connection openings 28, 29 are located behind the rearmost position occupied by the piston 24 during normal operation of the pumping device 29. During normal operation of the pumping device 29, in which liquid concrete is sucked from the pre-filling container 16 and conveyed in the direction of the delivery line 17, the connection openings 28, 29 are not used.

[0058] When a concrete pump is started up, for example at the start of a working day, the pre-filling tank 16, the pumping device 29, and the delivery line 17 are empty. If, starting from this state, liquid concrete were to be fed directly via the pre-filling tank 16, water would be extracted from the liquid concrete through contact with the dry walls of the pumping device 29 and the delivery line 17, so that the liquid concrete that initially emerges from the delivery line 17 does not have the desired consistency. The invention proposes a method for operation preparation, which is carried out before liquid concrete is fed to the concrete pump 15.

[0059] 5, the concrete pump 15 is shown schematically as a sequence of the pre-filling container 16, the pumping device 29, a tubular section 38 of the delivery line 17, the in-line pump 36, a hose-shaped section 39 of the delivery line 17 and the pressure head 37. At the beginning of the process, in phase 1, all components of the concrete pump 15 are empty. In a preceding preparatory phase 0, a puncture-resistant substance in the form of a bentonite suspension 40 is produced. For this purpose, bentonite powder is mixed with water until the bentonite makes up about 16 wt. % based on the amount of water. This proportion of bentonite powder is higher than in usual bentonite suspensions and means that the bentonite suspension is puncture-resistant after a swelling time.In phase 1 of the operational preparation process, the bentonite suspension 40 is filled into the prefilling container 16, and the pumping device 29 is started until the prefilling container 16 is emptied. At the beginning of phase 2, the bentonite suspension is located in the interior of the pumping device 29 and in a proximal section of the delivery line 17.

[0060] Beginning with phase 2, liquid concrete 41 is fed to the pre-filling tank 16. The pumping device 29 sucks the liquid concrete 41 from the pre-filling tank 16 and conveys it toward the delivery line 17. The liquid concrete 41 advancing in the delivery line 17 displaces the bentonite suspension 40, so that the bentonite suspension 40 moves along the delivery line 17 and finally exits the delivery line 17 at the distal end. The operation preparation process is concluded with a phase 5, in which the delivery line is completely filled with liquid concrete 41.

[0061] The bentonite suspension 40 does not react with the liquid concrete 41 and does not mix with the liquid concrete 41, so that the bentonite suspension 40 forms a type of plug that is pushed forward along the delivery line. The bentonite suspension 40 is in contact with the surrounding wall at all times, so that the wall is completely wetted with the bentonite suspension 40 and is thus brought into a state in which no more water is extracted from the subsequent liquid concrete 41. The liquid concrete 41 emerges from the delivery line 17 in the desired consistency right from the start.

[0062] Normal operation of the concrete pump can then follow, in which liquid concrete is sucked from the pre-filling tank 16 and discharged at the distal end of the delivery line 17. Normal operation can, for example, extend over the length of a working day.

[0063] At the end of normal operation, for example at the end of a working day, the pre-filling tank 16 is empty, while the remainder of the concrete pump 15 is filled with liquid concrete 41. This state corresponds to phase 1 of the post-operational preparation process shown in Fig. 6. Again, in a preparation phase 0, a bentonite suspension is produced, which is filled into the pre-filling tank 16 in phase 2 and pumped until the end of phase 3 until the pre-filling tank 16 is empty.

[0064] Starting in phase 4, water 42 is sucked from the pre-filling tank 16 and pumped into the delivery line 17. The bentonite suspension 40 is displaced by the water 42 and moves in the form of a plug along the delivery line 17, which in turn displaces the liquid concrete 41. In phase 5, the bentonite suspension 40 and the liquid concrete 41 have exited the distal end of the delivery line 17, and the delivery line 17 is completely filled with water 42.

[0065] A final cleaning may follow, comprising phases 6 to 9. At the beginning of the cleaning process, the components of the delivery line 17 are separated from each other, so that the inline pump 36, the tubular section 39 of the delivery line 17, and the pressure head 37 are present as separate components. These components can be conventionally rinsed with a water jet.

[0066] A sponge-like body in the form of a first sponge ball 43 can be introduced into the pumping device 29. By subsequently pumped water 42, the first sponge ball

[0067] 43 along the tubular section 38 of the delivery line 17 until the first sponge ball 43 emerges at the distal end of the tubular section 38. Subsequently, a second sponge ball 44 can be introduced into the pumping device 29 and moved forward along the tubular section 38 using compressed air, so that the water 42 is displaced towards the distal end of the tubular section 38. At the end of the cleaning process, the second sponge ball 44 emerges from the tubular section 38. The entire delivery line 17 is then empty and cleaned.

[0068] Instead of feeding the bentonite suspension 40 via the pre-filling container 16, it is alternatively also possible to feed the bentonite suspension 40 directly to the feed cylinders 31, 32 of the pumping device 29. This requires a modification of the feed cylinders 31, 32, which is shown in Figs. 3, 4, 7. The first feed cylinder 31 is shown in Fig. 7 in a first overstroke position, in which the piston 24 has moved into a retracted position which is further back than the rearmost position of normal operation. In the first overstroke position, the first connection opening 28 is free, so that the bentonite suspension 40 can be introduced into the interior of the first feed cylinder 31 via the first connection opening 28. The introduction of the bentonite suspension 40 into the first conveying cylinder 31 should take place at a time when the pre-filling container 16 is empty.With a forward movement 33 of the piston 24, the bentonite suspension 40 can be conveyed into the conveying line 17. The second conveying cylinder 32 can be operated in a similar manner. The subsequent steps of pre-operational or post-operational preparation can be carried out as described.

[0069] The medium with which the bentonite suspension is moved along the delivery line 17 is, in one variant, supplied via the connection opening 28. The piston 24 can be held in the first overstroke position for this purpose. In Fig. 8, the piston 24 is shown in a second overstroke position in which the piston 24 has moved even further rearward than in the first overstroke position. The piston 24 is pulled rearward over the rear end of the cylinder wall 23 so that the interior of the first delivery cylinder 31 is accessible from the rear end of the cylinder wall 23. It is possible to introduce a sponge ball 43 from behind into the interior of the first delivery cylinder 31 via the water tank 27. With a forward movement of the piston 24, the sponge ball 43 can be moved in the direction of the delivery line 17. The second delivery cylinder 32 can be designed in a corresponding manner for the introduction of a sponge ball 43.

[0070] The sponge ball 43 cleans the first delivery cylinder 31 and the S-pipe arranged between the delivery cylinders 31, 32 and the delivery line 17. The sponge ball 43 can be moved forward along the delivery line 17 by the delivery cylinders 31, 32 sucking water from the pre-fill container 16 and conveying it along the delivery line 17. Alternatively, the piston 24 can be brought into an overstroke position so that water can be supplied via the connection opening 28, which moves along the delivery line 17 and displaces the sponge ball 43. It is also possible to move the sponge ball 43 forward using compressed air.

[0071] The bentonite suspension 40 can be produced using a mixing device as shown by way of example in Fig. 9. The mixing device comprises a mixing pump 45 and a mixing line 46 which forms a closed circuit with the mixing pump 45. Water can be admitted into the mixing line 46 from a water supply 47 via a first switching valve 48. Air contained in the mixing line 46 can escape via a vent valve 49. When the mixing pump 45 is put into operation, the water flows in the mixing line 46 in a closed circuit. When the mixing line 46 is completely filled with water and the air has escaped, the first switching valve 48 and the vent valve 49 are closed.

[0072] A second switching valve 51 is opened so that bentonite powder can be fed from a storage container 50 to the mixing line 46. A Venturi nozzle 54 is formed at the transition between the mixing line 46 and the supply line to the storage container 50, so that the passing water creates a vacuum, which draws the bentonite powder into the water.

[0073] The mixing pump 45 remains in operation until the water is sufficiently enriched with bentonite powder that the bentonite powder makes up, for example, 16% by weight based on the amount of water. The mixing pump 45 is then switched off for a swelling time during which a firm bentonite suspension forms from the water and the bentonite powder. The swelling time can be, for example, between 30 minutes and 60 minutes or longer. The mixing device can be provided with a compensation tank in order to be able to absorb any increase in volume associated with the addition of the bentonite powder or with the swelling process.

[0074] After the swelling process has been completed, a three-way valve 52 can be switched which, in a first switching state, closes the circuit of the mixing line 46 and which, in a second switching state, connects the mixing line 46 to an outlet line 53. If the three-way valve 52 is brought into the second switching state and the mixing pump 45 is started up, the bentonite suspension passes from the mixing line 46 into the outlet line 53. If the outlet line 53 is connected to the connection openings 28, 29 of the delivery cylinders 31, 32, the mixing pump 45 can serve as a supply pump with which the bentonite suspension is conveyed into the interior of the delivery cylinders 31, 32.If the first switching valve 48 is opened so that water can flow from the water supply 47, the mixing pump can be used to convey the bentonite suspension further along the delivery line 17 of the concrete pump 15 until the bentonite suspension exits at the distal end of the delivery line 17.

[0075] Alternatively, the outlet line 53 can also be connected directly to the delivery line 17 near the concrete pump 15.

[0076] Fig. 10 shows an alternative embodiment of a mixing device according to the invention. The mixing device additionally comprises a collecting container 58 which is connected to the mixing line 46 via a three-way valve 57. The three-way valve 57 has a first switching state in which the circuit within the mixing line 46 is closed, and a second switching state in which the outlet of the mixing pump 45 opens into the collecting container 58. The connection between the mixing line 46 and the outlet line 53 is established via two switching valves 55, 56 which replace the three-way valve 52 from Fig. 9. In addition to the two switching states of the three-way valve 52 from Fig. 9 the two switching valves 55 , 56 provide the possibility of sucking in a liquid via the outlet line 53 and conveying it in the direction of the collecting container 58 .

[0077] This option can be used to suck in dirty water and collect it in the collecting tank 58. This can be dirty water that has accrued when cleaning the concrete pump. For example, dirty water can be sucked in from the pre-filling tank 16 or from the delivery line 17. The mixing device can be designed so that in a subsequent step the dirty water from the collecting tank 58 is used to produce the bentonite suspension. The dirty water in the collecting tank 58 can therefore be used as a water supply with which the mixing line 46 is fed during the production of a bentonite suspension.

Claims

Patent claims 1. Method for preparing for or post-operational preparation of a concrete pump (15), in which the concrete pump (15) is designed to convey liquid concrete (41) between an inlet end and an outlet end of a conveying line (17) by means of a pumping device (29), wherein for the purpose of preparing for or post-operational preparation a substance other than liquid concrete (41) is conveyed along the conveying line (17) and wherein the substance is a puncture-resistant substance (41).

2. The method according to claim 1, wherein a puncture-resistant substance (41) is conveyed along the conveying line (17), which does not react chemically with the liquid concrete (41).

3. Method according to claim 1 or 2, wherein the puncture-resistant substance is a bentonite suspension (40).

4. Method according to one of claims 1 to 3, wherein the puncture-resistant substance (40) is introduced into an empty conveyor line (17) and wherein liquid concrete (41) is subsequently conveyed into the conveyor line (17).

5. Method according to one of claims 1 to 3, wherein the puncture-resistant substance (40) is conveyed along the conveying line (17) in order to force liquid concrete (41) out of the conveying line (17).

6. Method according to claim 5, wherein the puncture-resistant substance (40) is conveyed by water pressure along the conveying line (17).

7. The method according to claim 5 or 6, wherein the puncture-resistant substance (40) is conveyed together with a body along the conveying line (17).

8. Method according to one of claims 1 to 7, wherein an inline pump (36) and / or a pressure head (37) are arranged between the inlet end and the outlet end of the conveying line (17).

9. Method according to one of claims 1 to 8, wherein the concrete pump (15) has a connection opening (28, 29) and wherein the puncture-resistant substance (40) is supplied to the concrete pump (15) through the connection opening (28, 29).

10. The method according to claim 9, wherein the connection opening (28, 29) is arranged in a cylinder wall (23) of a conveyor cylinder (31, 32).

11. The method according to any one of claims 1 to 10, wherein the puncture-resistant substance (40) is produced by circulating a liquid along a mixing line (46) and by adding a further substance to the liquid flowing in the circuit.

12. Concrete pump, comprising a pre-filling container (16), a delivery line (17) and a pumping device (29), wherein the pumping device (29) is designed to suck liquid concrete from the pre-filling container (16) and to convey it along the delivery line (17), wherein the concrete pump is designed to carry out the method according to one of claims 1 to 11.

13. Concrete pump according to claim 12, comprising a connection opening (28, 29), wherein the puncture-resistant substance (40) is supplied to the concrete pump (15) through the connection opening (28, 29).

14. Concrete pump according to claim 13, wherein the connection opening (28, 29) is arranged in a cylinder wall (23) of a delivery cylinder (31, 32) of the pumping device (29).

15. Concrete pump according to one of claims 12 to 14, comprising a mixing device with a mixing pump (45) and a Mixing line (46), wherein the puncture-resistant substance (40) is produced by conveying a liquid along the mixing line (46) in a circuit using the mixing pump (45) and by adding a further substance to the liquid.

Citation Information

Patent Citations

  • Cleaning valve, pumping system and pumping system construction method

    CN110657261A

  • Pump for viscous fluid

    DE19514750A1

  • Method of removing residual concrete from hopper and delivery pipe of piston type pump - involves running pump empty to create air pressure expelling part of residual concrete and then pumping water behind sponge to expel remainder

    DE4323796A1

  • High pressure slurry plunger pump

    US20080193299A1