Power supply distribution method and apparatus for base station, and computer readable storage medium
By predicting the power consumption demand and green power generation of the base station, determining the power distribution strategy based on the power supply parameters, and dynamically adjusting the power supply, the problem of high energy costs for mobile base stations is solved, and the operating costs of base stations and efficient energy utilization is achieved.
Patent Information
- Application Number
- PCT/CN2024/071846
- Authority / Receiving Office
- WO · WO
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2023-06-29
- Filing Date
- 2024-01-11
- Publication Date
- 2025-01-02
AI Technical Summary
The high energy costs of mobile base stations lead to excessive operating costs. The existing technology lacks an effective power consumption strategy to comprehensively consider real-time power consumption demand, mains electricity prices, renewable energy generation and power storage factors.
By predicting the power consumption demand and green power generation of the base station, the optimal power distribution strategy is determined based on the power supply parameters of the power supply, and the power supply of the mains, green power and power storage is dynamically adjusted to minimize the base station operation consumption.
It has achieved optimization of base station energy expenditure, reduced operating costs, and improved power supply efficiency and sustainability.
Smart Images

Figure CN2024071846_02012025_PF_FP_ABST
Abstract
Description
Power supply distribution method, device and computer-readable storage medium for base station
[0001] Related applications
[0002] This application claims priority to Chinese patent application No. 202310793307.0 filed on June 29, 2023, the entire contents of which are incorporated by reference into this application. Technical Field
[0003] The present application relates to the technical field of communication base stations, and in particular to a power supply distribution method, device and computer-readable storage medium for a base station. Background Art
[0004] With the introduction of more spectrum and greater bandwidth, the energy costs of mobile base stations are increasing. At the same time, with the advancement of smart grids, the introduction of renewable energy, and the use of local power storage devices at base stations, mobile base stations can be flexibly powered by mains electricity, renewable energy, and stored electricity.
[0005] Currently, base stations are typically supplied with power from utility power, green power, or stored power according to pre-allocated time periods or power quantities. For example, utility power may provide x hours, green power may provide y hours, and stored power may provide z hours; or utility power may provide x kilowatts, green power may provide Y kilowatts, and stored power may provide Z kilowatts. However, utility power prices and green power generation vary based on time and environment. If utility power, green power, and stored power are supplied according to a fixed allocation, this could result in higher energy costs for mobile base stations and excessive operating costs.
[0006] Summary of the Invention
[0007] In response to the above technical problems, the present application provides a base station power supply distribution method, device and computer-readable storage medium, which aims to optimize (minimize) the energy consumption of the mobile base station while adjusting the power supply strategy of each power supply source to the mobile base station so that the mobile base station can be powered normally, thereby reducing the operating cost of the mobile base station.
[0008] In a first aspect, the present application provides a power distribution method for a base station, comprising:
[0009] Predicting the electricity demand of the base station in at least one future cycle, and predicting the power generation of the green power equipment deployed at the base station in at least one future cycle;
[0010] Determining, based on the power generation amount and the power supply parameters of the power supply source, a power supply allocation strategy that minimizes the operation consumption of the base station while meeting the power demand;
[0011] The power supply of each of the power supply sources is distributed according to the power supply distribution strategy.
[0012] On the other hand, the present application also provides a power distribution device for a base station, comprising:
[0013] A prediction module is used to predict the power demand of the base station in at least one future cycle and the power generation of the green power equipment deployed at the base station in at least one future cycle;
[0014] A power supply allocation processing module, configured to determine, based on the power generation amount and the power supply parameters of the power supply source, a power supply allocation strategy that minimizes the operation consumption of the base station while meeting the power demand;
[0015] A power distribution module is used to distribute the power supply of each of the power supply sources according to the power distribution strategy.
[0016] In another aspect, the present application further provides a power distribution device for a base station, comprising:
[0017] processor;
[0018] A storage device stores a program thereon, and when the program is executed by the processor, the processor implements the power supply distribution method for the base station as described above.
[0019] On the other hand, the present application further provides a computer-readable storage medium storing a computer processing program, wherein the computer processing program is called by a processor to execute the power supply distribution method of the base station as described above. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] The accompanying drawings herein are incorporated into and constitute a part of the specification, illustrate embodiments consistent with the present application, and together with the specification, are used to explain the principles of the present application. In order to more clearly illustrate the technical solutions of the embodiments of the present application, the following is a brief introduction to the drawings required for describing the embodiments. Obviously, for those skilled in the art, other drawings can be obtained based on these drawings without inventive work.
[0021] FIG1 is a flow chart of a first embodiment of a power distribution method for a base station of the present application;
[0022] FIG2 is a schematic diagram of another implementation flow of S130 of the first embodiment of the power distribution method for a base station of the present application;
[0023] FIG3 is a flow chart of a second embodiment of a power distribution method for a base station of the present application;
[0024] FIG4 is a schematic diagram of a framework of a power supply distribution device of a base station of the present application.
[0025] The purpose of this application, its features, and advantages will be further described in conjunction with the embodiments and with reference to the accompanying drawings. The accompanying drawings illustrate specific embodiments of this application, which will be described in more detail below. These drawings and the accompanying text are not intended to limit the scope of the present application in any way, but rather to illustrate the concepts of this application to those skilled in the art by reference to specific embodiments. DETAILED DESCRIPTION
[0026] Exemplary embodiments will be described in detail herein, with examples illustrated in the accompanying drawings. In the following description, when referring to the drawings, identical numerals in different figures represent identical or similar elements, unless otherwise indicated. The embodiments described in the following exemplary embodiments are not intended to represent all embodiments consistent with the present application. Rather, they are merely examples of apparatus and methods consistent with certain aspects of the present application, as detailed in the appended claims.
[0027] It should be noted that, in this document, the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device comprising a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, an element defined by the sentence "comprising a ..." does not exclude the presence of other identical elements in the process, method, article or device comprising the element. In addition, components, features, and elements with the same name in different embodiments of the present application may have the same meaning or different meanings, and their specific meanings need to be determined by their explanation in the specific embodiment or further combined with the context of the specific embodiment.
[0028] It should be understood that although the terms "first," "second," "third," etc. may be used herein to describe various information, such information should not be limited to these terms. These terms are used solely to distinguish information of the same type from one another. For example, without departing from the scope of this disclosure, first information may also be referred to as second information, and similarly, second information may also be referred to as first information. Depending on the context, the term "if," as used herein, may be interpreted as "upon," "when," or "in response to a determination." Furthermore, as used herein, the singular forms "a," "an," and "the" are intended to include the plural forms as well, unless the context indicates otherwise. It should be further understood that the terms "comprising" and "including" indicate the presence of the recited features, steps, operations, elements, components, items, types, and / or groups, but do not preclude the presence, occurrence, or addition of one or more other features, steps, operations, elements, components, items, types, and / or groups. The terms "or," "and / or," "including at least one of the following," etc., as used herein, may be interpreted as inclusive, meaning any one or any combination. For example, “comprising at least one of the following: A, B, C” means “any of the following: A; B; C; A and B; A and C; B and C; A and B and C”; and for another example, “A, B or C” or “A, B and / or C” means “any of the following: A; B; C; A and B; A and C; B and C; A and B and C”. An exception to this definition will occur only when a combination of elements, functions, steps or operations are inherently mutually exclusive in some manner.
[0029] It should be understood that, although the various steps in the flowchart in the embodiment of the present application are shown in sequence according to the indication of the arrows, these steps are not necessarily performed in sequence in the order indicated by the arrows. Unless clearly stated herein, the execution of these steps is not strictly limited in order, and they can be performed in other orders. Moreover, at least a portion of the steps in the figure may include multiple sub-steps or multiple stages, and these sub-steps or stages are not necessarily performed at the same time, but can be performed at different times, and their execution order is not necessarily performed in sequence, but can be performed in turn or alternately with at least a portion of other steps or sub-steps or stages of other steps.
[0030] As used herein, the words "if" and "if" may be interpreted as "at the time of" or "when" or "in response to determining" or "in response to detecting," depending on the context. Similarly, the phrases "if it is determined" or "if (stated condition or event) is detected" may be interpreted as "when it is determined" or "in response to the determination" or "when detecting (stated condition or event)" or "in response to detecting (stated condition or event)," depending on the context.
[0031] In this document, step codes such as S110 and S120 are used for the purpose of expressing the corresponding content more clearly and concisely, and do not constitute a substantial limitation on the order. Those skilled in the art may execute S120 first and then S110 during specific implementation, but these should all be within the scope of protection of this application.
[0032] It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.
[0033] In the subsequent description, the use of suffixes such as "module", "component" or "unit" to represent elements is only for the purpose of facilitating the description of the present application and has no specific meaning. Therefore, "module", "component" or "unit" can be used interchangeably.
[0034] With the introduction of more spectrum and greater bandwidth, the energy costs of mobile base stations are increasing. At the same time, with the advancement of smart grids, the introduction of renewable energy, and the use of local power storage devices at base stations, mobile base stations can be flexibly powered by mains electricity, renewable energy, and stored electricity.
[0035] Currently, base stations are typically supplied with electricity from utility power, green power, or stored power according to pre-allocated time periods or power quantities. For example, utility power may provide x hours, green power may provide y hours, and stored power may provide z hours; or utility power may provide x kilowatts, green power may provide y kilowatts, and stored power may provide z kilowatts. However, utility power prices and green power generation vary based on time and environment. If utility power, green power, and stored power are supplied according to a fixed allocation, this could result in higher energy costs for mobile base stations, leading to excessively high operating costs.
[0036] In other words, current base stations lack a method or device for optimizing their power usage strategy to minimize their energy costs. This involves comprehensively considering factors such as the base station's real-time power demand, real-time utility power prices, real-time renewable energy generation, and real-time storage capacity to determine how much utility power, green power, and battery storage power to use for base station power supply, and how much utility power and green power to use for battery charging. Green power refers to electricity generated by renewable energy sources, including but not limited to solar, wind, biomass, and geothermal energy.
[0037] In this regard, the present application provides a power supply allocation method for a base station. Combined with the prediction of the base station's power consumption and green electricity generation, the power supply allocation strategy of the base station is configured according to the power supply parameters of the power supply source, such as electricity price and other information, so that when the base station allocates the power supply of the power supply source based on the power supply allocation strategy, the operating consumption of the base station is minimized to reduce the energy cost of the base station. In the embodiment of the present application, the operating consumption of the base station refers to the cost during the operation of the base station, including electricity cost and equipment depreciation cost, etc.
[0038] The following describes how to implement power distribution for base stations in different application scenarios.
[0039] Please refer to Figure 1, which shows an embodiment of a power distribution method for a base station provided by this application. In this embodiment, the power distribution method for a base station includes:
[0040] Step S110: Acquire power supply parameters of the power supply of the base station.
[0041] This embodiment is applied to a power distribution device of a base station, and is used to control power distribution from various power sources to the base station.
[0042] In different application scenarios, the power distribution control of the base station is different, so the requirements for the power supply parameters of the power supply are different.
[0043] For example, in one application scenario, the base station's power supply includes both mains electricity and green power devices. That is, the base station is powered by both mains electricity and green power devices. In this application scenario, the acquired power supply parameters correspond to the mains power supply parameters and the green power device power supply parameters. In one embodiment, the mains power supply parameters include the mains electricity price, and the green power device power supply parameters include the green power supply efficiency factor and the green power grid price.
[0044] In one embodiment, the mains electricity price refers to the unit price of electricity used by a base station for power supply from the power grid. The mains electricity price can be fixed or time-varying. By periodically acquiring the mains electricity price in accordance with the embodiments of the present application and then combining it with the power supply parameters of the green power equipment to calculate the lowest-cost power distribution method for the base station, the power distribution strategy can be regularly changed based on changes in the mains electricity price, and the optimal power supply method can be selected to achieve cost savings. In one embodiment, the mains electricity price is typically a value greater than 0 and can be obtained from the power grid through a specific interface.
[0045] In one embodiment, the green electricity feed-in price refers to the unit price that can be charged from the power grid company when the electricity generated by renewable energy equipment (i.e., green electricity equipment, such as solar or wind power) deployed at the base station is fed into the power grid. The green electricity feed-in price can be fixed or time-varying, and is typically a value greater than or equal to 0, determined based on the power grid agreement. In one embodiment, this green electricity feed-in price information can be obtained from the power grid through a specific interface.
[0046] In one embodiment, the green electricity supply efficiency factor refers to the ratio of the actual amount of power converted from green electricity to the base station's electricity consumption to the power output of the green electricity device to the base station. When green electricity devices power base stations, there are typically some losses, such as additional power losses caused by AC / DC conversion and green electricity control units. Therefore, the green electricity power conversion rate is less than 100%. Therefore, when using green electricity for power supply, the actual power received by the base station must be used to allocate power to avoid insufficient power to the base station or suboptimal power allocation. In one embodiment, the green electricity supply efficiency factor is determined by the renewable energy device, and different renewable energy devices have corresponding green electricity supply efficiency factors.
[0047] For example, in another application scenario, the power supply includes mains electricity, green electricity equipment, and power storage equipment, that is, the base station is powered by mains electricity, green electricity equipment, and the base station's power storage equipment. In this application scenario, the power supply parameters of the power supply are obtained, corresponding to the mains power supply parameters, the green electricity equipment power supply parameters, and the power storage equipment power supply parameters. In one embodiment, the mains power supply parameters include the mains electricity price, the green electricity equipment power supply parameters include the green electricity power supply efficiency factor and the green electricity grid-connected electricity price, and the power storage equipment power supply parameters include the charge and discharge efficiency factor and the charge and discharge unit loss price.
[0048] In one embodiment, the city electricity price, green electricity grid-connected electricity price, and green electricity supply efficiency factor are the same as those in the above application scenarios, and their acquisition methods are also the same as those in the above application scenarios, which will not be repeated here.
[0049] In this embodiment, the power supply also includes energy storage devices deployed on the base station, meaning the base station is powered by at least three power sources. In this case, the cost of electricity from the mains and green power grids must be considered, along with the depreciation of the energy storage devices, to determine the most cost-effective power distribution method.
[0050] In one embodiment, the charge and discharge unit depreciation price refers to the price calculated by converting the total price of the energy storage device and information such as the number of charge and discharge times and capacity. Energy storage devices usually support a limited number of charge and discharges, so the charge and discharge of energy storage devices are accompanied by losses. These damages can be converted into a charge and discharge unit depreciation price based on the limited number of charge and discharge times. In other words, the charge and discharge unit depreciation price refers to the depreciation cost of the energy storage device per unit discharge. When calculating power supply distribution, the depreciation cost of the energy storage device is taken into consideration, whether to use the energy storage device for power supply, or the power supply amount or power supply duration of the energy storage device are considered to determine the optimal power supply distribution method. The charge and discharge unit depreciation price is configured as a fixed value greater than 0.
[0051] The charge-discharge efficiency factor refers to the efficiency with which the energy storage device supplies power to the base station. When a battery supplies power to a base station, it experiences some losses. This loss is subtracted from the energy storage device's charge-discharge efficiency factor. This factor can be configured as a fixed value between 0 and 1. It is determined based on the energy storage device and varies depending on the device.
[0052] For example, in another application scenario, the power supply includes mains electricity, green electricity equipment and power storage equipment, that is, the base station is powered by mains electricity, green electricity equipment and the power storage equipment of the base station. At the same time, the power storage equipment is also stored according to the needs of the power storage equipment. In this application scenario, the power supply parameters obtained correspond to the power supply parameters of the mains electricity, the power supply parameters of the green electricity equipment and the power supply parameters of the power storage equipment. In one embodiment, the power supply parameters of the mains electricity include the mains electricity price and the mains electricity storage efficiency factor, the power supply parameters of the green electricity equipment include the green electricity power supply efficiency factor, the green electricity grid price and the green electricity storage efficiency factor, and the power supply parameters of the power storage equipment include the charging and discharging efficiency factor and the charging and discharging unit loss price.
[0053] In one embodiment, the city electricity price, green electricity grid-connected electricity price, green electricity supply efficiency factor, charging and discharging unit depreciation price and charging and discharging efficiency factor are the same as those in the above application scenarios, and their acquisition methods are also the same as those in the above application scenarios, which will not be repeated here.
[0054] In this embodiment, the power supply also includes energy storage devices deployed on the base station, meaning the base station is powered by at least three power sources. In this case, the power supply is determined based on the cost of utility electricity, the price of renewable electricity, the depreciation of the energy storage device, and the energy storage capacity of the energy storage device. The optimal power supply allocation method with the lowest cost and the best energy storage capacity is determined.
[0055] In one embodiment, when necessary, the mains power and green power equipment also need to store electricity in the power storage device. Storing electricity in the power storage device at an appropriate time can also save electricity storage costs.
[0056] When considering electricity storage, it is necessary to combine the mains electricity storage efficiency factor and the green electricity storage efficiency factor, and comprehensively consider the power supply parameters that affect power supply distribution, so that the power supply distribution is more reasonable and optimized.
[0057] In one embodiment, the mains power storage efficiency factor refers to the charging efficiency when the mains is charging the power storage device. Since the efficiency of the mains charging the power storage device will not reach 100%, there will be some losses. When calculating the power distribution strategy combined with the power storage strategy, considering the mains power storage efficiency factor can make the power distribution strategy more optimized. In one embodiment, the mains power storage efficiency factor can be a fixed value between 0 and 1, or it can be a variable value. For example, as the number of charge and discharge times of the power storage device increases, the corresponding mains power storage efficiency factor becomes smaller. The mains power storage efficiency factor is determined according to the power storage device.
[0058] The green power storage efficiency factor is also set based on the additional losses incurred when charging the energy storage device. In one embodiment, the green power storage efficiency factor and the mains power storage efficiency factor may be different or the same. In some applications, the green power storage efficiency factor is less than or equal to the mains power storage efficiency factor.
[0059] This embodiment is based on different application scenarios and obtains power supply parameters of different power sources according to needs.
[0060] Step S120, predicting the power demand of the base station in at least one future cycle, and predicting the power generation of the green power equipment deployed in the base station in at least one future cycle;
[0061] This embodiment configures the future power distribution of the base station by predicting the future power consumption of the base station and the future power generation of the green power equipment, combining the power supply of the mains power and green power, so as to achieve the minimum operating consumption according to the power distribution.
[0062] In one embodiment, the power demand of a base station within at least one future cycle refers to the power demand of all base stations within a preset range within at least one future cycle. In this embodiment, the power demand can be predicted based on the historical power consumption of the base station to improve the accuracy of the power demand. For example, a time series algorithm can be used to perform a prediction based on the recorded historical power consumption (actual power consumption). In one embodiment, the time series algorithm includes but is not limited to LSTM (Long Short-Term Memory) and Prophet prediction algorithms.
[0063] In one embodiment, the historical power consumption may be the power consumption corresponding to at least one recent historical period of the base station, or may be the power consumption of a historical period corresponding to a time period of at least one future period.
[0064] In one embodiment, the power generation of a green power device in at least one future cycle refers to the power generation of all green power devices of the corresponding number of steps of all base stations within a preset range in at least one future cycle. In this embodiment, the power generation can also be calculated based on the actual power generation of the green power device in the historical cycle. Alternatively, the power generation in at least one future cycle is predicted based on the historical power generation of the green power devices deployed on the base station, the historical environmental parameters of the green power devices, and the predicted environmental parameters in at least one future cycle. Since the power generation of green power devices changes according to environmental changes, the power generation corresponding to different environments is different. This embodiment combines the predicted environmental parameters in at least one future cycle to predict the power generation, thereby improving the accuracy of the power generation. In one embodiment, the environmental parameters include climate, humidity, temperature, time, weather forecast, etc.
[0065] Step S130, determining, based on the power generation amount and the power supply parameters of the power supply source, a power supply allocation strategy that minimizes the operating consumption of the base station while satisfying the power demand;
[0066] Based on the predicted power generation of green power devices, the amount of electricity that green power devices can provide to the base station, or the amount of electricity that green power devices can integrate into the grid, can be determined for at least one future cycle. This allows the allocation of power from various power sources to minimize base station operating costs while meeting the power demand. If the grid's revenue from green power is higher (higher than the price of utility electricity), utility power can be allocated to a greater amount than green power. Green power revenue can be used for utility power consumption, reducing the base station's overall costs. Alternatively, when the utility price is low, utility power can be used to supply the base station while simultaneously storing electricity in a power storage device. When the utility price is high, green power can be used to supply the base station while simultaneously storing electricity in a power storage device. Alternatively, when the utility price is high and the utility price of green power is also high, a power storage device can be used to supply the base station, reducing the amount of utility and green power supplied.
[0067] The present application provides a method for determining a power distribution strategy. The power distribution strategy determined based on this method can consistently minimize base station operating consumption (minimize expenditures). Even if electricity prices change, the method for determining a power distribution strategy provided in this embodiment can still yield an optimal power distribution strategy (optimal means minimizing base station operating consumption and costs).
[0068] In one embodiment, a linear programming problem is used to obtain a power supply allocation strategy. As shown in FIG2 , the steps of determining, based on the power generation and the power supply parameters of the power supply source, the power supply allocation strategy that minimizes the operating consumption of the base station while meeting the power demand include:
[0069] Step S131: inputting the power generation, the power demand, and the power supply parameters of the power supply source into a preset linear programming problem model to obtain a power supply allocation strategy that minimizes the operating consumption of the base station;
[0070] Based on the output requirements of the power distribution strategy, the constraints and objective function of the linear programming model are pre-configured. The constraints constrain the relationships between the input parameters. The optimal solution is determined based on the objective function, taking the set of points that satisfy all the constraints. In this embodiment, the optimal solution is the minimum value of the objective function, which is the minimum value that minimizes the operating power consumption of the base station.
[0071] In one embodiment, the power allocation strategy that minimizes the base station's operating consumption can also be obtained through other methods. For example, after determining the power generation capacity, power demand, and power supply parameters of the power supply source, a limited set of data combinations can be calculated, and the power consumption of the base stations in each data combination can be compared. The minimum value is then taken to determine the power allocation strategy. Alternatively, other methods can be used, which are not listed here.
[0072] In one embodiment, the power distribution strategies obtained by solving the linear programming problem model may be different in different application scenarios. The following describes how to obtain the optimal solution of the power distribution strategy for each scenario.
[0073] For example, in one application scenario, the base station is powered by both mains electricity and green power equipment. In this application scenario, the power supply parameters of the power source correspond to the mains power supply parameters and the green power equipment power supply parameters. In one embodiment, the mains power supply parameters include the mains electricity price, and the green power equipment power supply parameters include the green power supply efficiency factor and the green power grid price.
[0074] In this application scenario, the constraints of the linear programming problem model need to consider electricity demand, green electricity generation, mains power supply, and green electricity supply.
[0075] In one embodiment, the step of obtaining a power supply allocation strategy with minimum operating consumption of the base station by solving the linear programming problem model includes:
[0076] Configuring a first power supply amount to be provided by the mains electricity and a second power supply amount to be provided by the green electricity device, and determining a data combination corresponding to the first power supply amount and the second power supply amount that meets the power demand based on the constraints of the linear programming problem model; wherein the second power supply amount is determined based on the green electricity output amount of the green electricity device to the base station and the green electricity supply efficiency factor;
[0077] Based on the objective function of the linear programming problem model, the minimum difference between the expenditure and the green electricity access income in the data combination is solved, and the first power supply and the second power supply corresponding to the power supply allocation strategy are determined based on the corresponding relationship between the minimum difference and the data combination, so that the operating consumption of the base station is minimized.
[0078] In one embodiment, the sum of the first and second power quantities equaling the power demand serves as a constraint in the linear programming model. The difference between expenditure and green electricity grid access revenue serves as the objective function. The data set that satisfies the constraints is the specific values of the first and second power quantities, which are then substituted into the objective function to calculate the minimum difference. The data set corresponding to the minimum difference includes the first and second power quantities, and is configured as the power distribution quantity of the power supply source in the power distribution strategy.
[0079] In one embodiment, the expenditures include utility electricity costs, which are determined based on the first power supply amount and the utility electricity price. The green electricity access revenue is determined based on the green electricity access price and the amount of accessed electricity, where the accessed electricity amount is the difference between the power generated by the green electricity device and the green electricity output. This embodiment also considers the green electricity supply efficiency factor when calculating the base station's operating consumption. By combining losses and expenditures to calculate the minimum total expenditure, the calculation accuracy of the base station's operating consumption is more accurate, thereby optimizing the base station's operating consumption.
[0080] Take an example to illustrate the principle of solving the optimal solution of the objective function. When the price of green electricity entering the grid is higher than the price of mains electricity, part of the green electricity can be incorporated into the grid to offset part of the cost of mains electricity, so as to obtain the lowest consumption (lowest electricity cost). If the price of green electricity entering the grid is lower than the price of mains electricity, most of the green electricity can be used to supply power to the base station. If the difference between the price of green electricity entering the grid and the price of mains electricity is small, the amount of mains power supplied and the amount of green electricity supplied can be determined based on actual calculations to obtain the lowest electricity cost. Specifically, the power supply corresponding to the mains, green electricity equipment and power storage equipment is determined according to the optimized value of the objective function to form the power supply allocation strategy.
[0081] In another application scenario, the base station is powered by mains electricity, green power equipment, and a base station power storage device. In this application scenario, the power supply parameters of the power source correspond to the mains power supply parameters, the green power equipment power supply parameters, and the power storage equipment power supply parameters. In one embodiment, the mains power supply parameters include the mains electricity price, the green power equipment power supply parameters include the green power supply efficiency factor and the green power grid price, and the power storage equipment power supply parameters include the charge and discharge efficiency factor and the charge and discharge unit loss price.
[0082] In this application scenario, the constraints of the linear programming problem model take into account the electricity demand, green electricity generation, mains power supply, green electricity supply and power supply of energy storage equipment.
[0083] The step of obtaining a power supply allocation strategy with minimum operation consumption of the base station by solving the linear programming problem model includes:
[0084] Configuring a first power supply provided by the mains, a second power supply provided by the green power device, and a third power supply provided by the power storage device, and determining a data combination of the first power supply, the second power supply, and the third power supply that meets the power demand based on the constraints of the linear programming problem model;
[0085] Based on the objective function of the linear programming problem model, the difference between the expenditure and the green electricity grid access income in the minimum data combination is solved, and the first power supply amount, the second power supply amount and the third power supply amount of the power supply allocation strategy are determined based on the corresponding relationship between the minimum difference and the data combination, so that the operating consumption of the base station is minimized; wherein, the expenditure includes the mains electricity expenditure and the discharge depreciation expenditure of the energy storage equipment, the green electricity grid access income is determined according to the difference between the power generation and the green electricity output, and the green electricity grid access electricity price, and the discharge depreciation expenditure of the energy storage equipment is determined according to the storage output and the charge and discharge unit depreciation price.
[0086] The sum of the first power supply, the second power supply, and the third power supply is equal to the power demand, which is a constraint condition of the linear programming problem model. The difference between the expenditure and the green electricity grid access income is the objective function. In this embodiment, the expenditure includes the city electricity expenditure and the storage device discharge depreciation expenditure, that is, when the storage device is combined with the power supply, the converted consumption of the storage device charging and discharging is considered to improve the accuracy of the expenditure. The data combination that meets the constraint conditions includes the specific values of the first power supply, the second power supply, and the third power supply, and then they are respectively brought into the objective function to calculate the minimum difference. The data group corresponding to the minimum difference includes the first power supply and the second power supply, which are configured as the power supply distribution amount of the power supply source of the power supply distribution strategy.
[0087] In one embodiment, the second power supply amount is determined based on the green power output of the green power device to the base station and the green power supply efficiency factor, and the third power supply amount is determined based on the stored power output of the power storage device to the base station and the charge-discharge efficiency factor. The mains electricity expenditure is determined based on the first power supply amount and the mains electricity price, and the green power access income is determined based on the green power access price and the amount of power accessed, where the amount of power accessed is the difference between the green power device's generated power and the green power output. The power storage device discharge loss expense is determined based on the stored power output of the power storage device and the charge-discharge unit loss price. This embodiment also considers the green power supply efficiency factor and the charge-discharge efficiency factor of the power storage device when calculating the base station's operating consumption. By combining the green power supply loss, the power storage device power loss, and the expenditure, the minimum total expenditure is calculated, thereby increasing the accuracy of the calculation of the base station's operating consumption and optimizing the base station's operating consumption.
[0088] Take an example to illustrate the principle of solving the optimal solution of the objective function. For example, when the price of green electricity entering the grid is higher than the price of mains electricity, part of the green electricity can be incorporated into the grid to offset part of the cost of mains electricity, so as to obtain the minimum consumption of the base station (the lowest electricity cost). If the price of green electricity entering the grid is lower than the price of mains electricity, green electricity equipment and power storage equipment can be used to supply power to the base station. If the price of green electricity entering the grid is low and the price of mains electricity is high, the power storage equipment can be mainly used to supply power to the base station, and green electricity and mains electricity can be used as auxiliary power supply to obtain the lowest electricity cost. Specifically, the power supply corresponding to the mains electricity, green electricity equipment and power storage equipment is determined according to the optimized value of the objective function to form the power supply allocation strategy.
[0089] For example, in another application scenario, the base station is powered by the mains electricity, the green electricity equipment, and the power storage equipment of the base station. At the same time, the power storage equipment is also powered according to the needs of the power storage equipment. In this application scenario, the power supply parameters correspond to the power supply parameters of the mains electricity, the power supply parameters of the green electricity equipment, and the power supply parameters of the power storage equipment. In one embodiment, the power supply parameters of the mains electricity include the mains electricity price and the mains electricity storage efficiency factor, the power supply parameters of the green electricity equipment include the green electricity power supply efficiency factor, the green electricity grid price, and the green electricity storage efficiency factor, and the power supply parameters of the power storage equipment include the charging and discharging efficiency factor and the charging and discharging unit loss price.
[0090] In this application scenario, the constraints of the linear programming problem model take into account electricity demand, green electricity generation, city power supply, green electricity supply, power supply of power storage equipment, and storage capacity, etc.
[0091] The step of obtaining a power supply allocation strategy with minimum operation consumption of the base station by solving the linear programming problem model includes:
[0092] Configuring a first power supply amount provided by the mains, a second power supply amount provided by the green power device, and a third power supply amount provided by the power storage device; configuring a first storage amount provided by the mains and a second storage amount provided by the green power device; and determining, based on the constraints of a linear programming problem model, a data combination of the first power supply amount, the second power supply amount, the third power supply amount, the first storage amount, and the second storage amount that satisfies the power demand and satisfies the fact that the predicted storage amount of the power storage device is less than or equal to the maximum storage amount, wherein the second power supply amount is determined based on the green power output amount of the green power device to the base station and the green power supply efficiency factor, the third power supply amount is determined based on the storage output amount of the power storage device to the base station and the charge and discharge efficiency factor, the predicted storage amount is determined based on the current storage amount of the power storage device, the first storage amount, the second storage amount, and the third power supply amount, the first storage amount is determined based on the output storage amount of the mains to the power storage device and the mains storage efficiency factor, and the second storage amount is determined based on the output storage amount of the green power device to the power storage device and the green power storage efficiency factor;
[0093] Based on the objective function of the linear programming problem model, the difference between the expenditure and the green electricity grid access income in the minimum data combination is solved, and the first power supply amount, the second power supply amount and the third power supply amount of the power supply allocation strategy are determined based on the corresponding relationship between the minimum difference and the data combination, so that the operating consumption of the base station is minimized; wherein, the expenditure includes the mains electricity expenditure and the discharge depreciation expenditure of the energy storage equipment, the green electricity grid access income is determined according to the difference between the power generation and the green electricity output, and the green electricity grid access electricity price, and the discharge depreciation expenditure of the energy storage equipment is determined according to the storage output and the charge and discharge unit depreciation price.
[0094] The sum of the first, second, and third power supplies equals the power demand, which serves as the first constraint of the linear programming model. The predicted power storage capacity of the power storage device is less than or equal to the maximum power storage capacity of the power storage device, which serves as the second constraint of the linear programming model. The difference between expenditure and green power grid access revenue serves as the objective function. The predicted power storage capacity refers to the amount of power that the power storage device will store over at least one future cycle, when the power storage device is charged by mains power and green power, while the power storage device supplies power to the base station. The predicted power storage capacity is equal to the difference between the sum of the current power storage capacity, the first power storage capacity, and the second power storage capacity, and the third power supply capacity. In this embodiment, the predicted power storage capacity cannot exceed the maximum power storage capacity of the power storage device. When the predicted power storage capacity equals the maximum power storage capacity, the power storage device cannot charge. At this point, mains power and green power must cease charging the power storage device, otherwise energy is wasted. Therefore, this embodiment combines the second constraint to determine the data combination. Expenses include mains power expenditures and power storage device discharge depreciation expenses. In other words, this embodiment considers the charging and discharging expenses of the power storage device when the power storage device is supplying power.
[0095] The data combination that meets the constraint conditions is the specific values of the first power supply, the second power supply, the third power supply, the first storage capacity and the second storage capacity. Then, the first power supply, the second power supply and the third power supply are respectively substituted into the objective function to calculate the minimum difference. The data group corresponding to the minimum difference includes the first power supply, the second power supply, the third power supply, the first storage capacity and the second storage capacity, which are configured as the power supply distribution capacity of the power supply source and the storage distribution capacity of the power storage device of the power supply distribution strategy.
[0096] Charging the energy storage device with utility power requires paying electricity fees to the grid. Therefore, to optimize operating costs (minimize costs), the lowest electricity cost must be determined based on the charging status of the energy storage device. In other words, when using energy storage devices for power, it is necessary to determine how to charge the energy storage device (to facilitate subsequent power supply), reserve a certain amount of energy in the energy storage device, and optimize base station costs (minimize operating costs).
[0097] In one embodiment, the second power supply amount refers to the actual power supply amount provided by the green power received by the base station, which is determined based on the output power of the green power device and the green power supply efficiency factor. The third power supply amount refers to the actual power supply amount provided by the power storage device received by the base station, which is determined based on the output power of the power storage device and the charge and discharge efficiency factor.
[0098] The first storage capacity refers to the actual charging capacity of the mains electricity to the energy storage device, which is determined based on the output capacity of the mains electricity to the energy storage device and the mains electricity storage efficiency factor. The second storage capacity refers to the actual charging capacity of the green electricity device to the energy storage device, which is determined based on the output capacity of the green electricity device to the energy storage device and the green electricity storage efficiency factor.
[0099] The linear programming problem model in this embodiment is explained below with reference to specific formulas (taking the method for determining the power supply allocation strategy for the next cycle as an example):
[0100] In this embodiment, the objective function of the linear programming problem model is:
[0101] The constraints of the linear programming model include: D = U m +α g U g +α s U s ; 0≤S+β m S m +β g S g -U s ≤S max ; U m ≥0, U g ≥0, U s ≥0, S m ≥0, S g ≥0;
[0102] Among them, P m is the electricity price in the next cycle; P g is the green power grid access price in the next cycle; P s It is the unit depreciation price of charging and discharging, and the unit is ¥ / kWh.
[0103] α g is the green electricity supply efficiency factor; α s is the charge and discharge efficiency factor.
[0104] β m is the utility power storage efficiency factor; β g is the green electricity storage efficiency factor.
[0105] S is the current storage capacity of the power storage device; D is the predicted power demand of the base station in the next cycle; G is the power generation of the green power device in at least one cycle in the future.
[0106] U m U is the amount of electricity delivered to the base station by the mains in the next cycle (i.e., the first power supply); g The amount of green power output from the green power equipment to the base station in the next cycle (U g α g is the second power supply); U s The amount of electricity that the storage device will output to the base station in the next cycle (U s α s is the third power supply), and the unit is kWh.
[0107] S m The amount of storage capacity (S) output from the mains to the storage device in one cycle m β m is the first storage capacity); S g The output storage capacity of the green power equipment to the power storage equipment in one cycle (S g β g is the second power storage capacity), the unit is kWh.
[0108] (GU g -S g ) is the amount of electricity that green electricity equipment connects to the grid in one cycle. The amount of electricity that green electricity connects to the grid can be 0 or a value greater than 0, and the unit is kWh.
[0109] S max The maximum storage capacity of the energy storage device is restricted to avoid ineffective charging of the energy storage device by the mains and green power equipment.
[0110] By constraining U m 、S m 、U g 、U s 、S g The above constraints are met, and then the minimum value of the objective function is taken from the numerical group that meets the above constraints, so as to obtain the minimum power consumption distribution and power storage distribution for operation, and the power consumption distribution and power storage distribution form the power supply distribution strategy.
[0111] Step S140: Allocate power to each of the power sources according to the power distribution strategy.
[0112] After determining the power distribution strategy, the amount of power provided to the base station by each power source is controlled according to the power distribution strategy. The distribution strategy includes the amount of power provided to the base station by each power source, or the amount and duration of power supply, for at least one future cycle, as well as the amount of power stored in the power storage device using mains power and green power devices.
[0113] In one embodiment, a cycle can be one hour, 30 minutes, or other durations. That is, after determining the power distribution strategy for the next cycle, each power supply source is controlled to supply power to the base station according to the power distribution strategy. The steps of this embodiment are then repeated to recalculate the power distribution strategy for the next cycle.
[0114] In this embodiment, by predicting the electricity demand of the base station in at least one future cycle and the power generation of the green power equipment deployed at the base station in at least one future cycle, and then combining the power supply parameters of each power supply source, a power supply allocation strategy for each power supply source to the base station in each cycle is configured, and this power supply allocation strategy minimizes the energy cost of the base station. In this way, when the power supply of each power supply source to the base station is allocated according to the power supply allocation strategy, the energy cost of the base station can be reduced, thereby reducing the operating cost of the base station.
[0115] If the utility electricity price fluctuates, this embodiment adjusts the power supply distribution of the base station on a periodic basis, and can change the power supply distribution strategy as the utility electricity price fluctuates, thereby reducing the energy cost of the base station.
[0116] Furthermore, the power distribution strategy of this embodiment takes into account various costs of the power supply source and the cost of green electricity access to the grid, so that the solved electricity cost is more accurate.
[0117] Please refer to Figure 3, which shows another embodiment of the power supply allocation method for a base station provided by this application. Compared with the above embodiment, this embodiment is based on a one-time determination of the power supply allocation strategy for multiple cycles, while the above embodiment is based on a single cycle to determine the power supply allocation strategy. In this embodiment, the power supply allocation method for a base station includes:
[0118] Step S210: Acquire power supply parameters of the power supply of the base station.
[0119] In this embodiment, the power supply distribution method of the base station is applicable to the same scenario as the above embodiment, so the power supply parameters obtained are also different based on different application scenarios. The same as the above embodiment, please refer to step S110 of the above embodiment, and no further details will be given here.
[0120] Step S220, predicting the power demand of the base station in multiple future cycles, and predicting the power generation of the green power equipment deployed in the base station in multiple future cycles;
[0121] The power demand in this embodiment refers to the total power demand of the base station in multiple periods, and the power generation is also the power generation of the green power equipment deployed in the base station in multiple periods.
[0122] In this embodiment, the electricity demand is determined based on the sum of the electricity demand within each cycle, and the power generation is also determined based on the sum of the power generation within each cycle. The methods for predicting the electricity demand and power generation in this embodiment are the same as those in the above embodiment. For details, please refer to step S120 of the above embodiment and will not be repeated here.
[0123] Step S230, determining, based on the power generation amount and the power supply parameters of the power supply source, a power supply allocation strategy for each cycle that minimizes the operation consumption of the base station while satisfying the total power demand of multiple cycles;
[0124] When the electricity demand is the total electricity demand of multiple periods, this embodiment solves the power supply allocation strategy with the lowest total electricity cost of the base station in multiple periods based on the power generation, electricity demand and power supply parameters of the power supply source, combined with the linear programming problem model.
[0125] The application scenarios of this embodiment are the same as the various application scenarios in the above embodiments. In each application scenario, the method for obtaining the power supply allocation strategy can refer to the above embodiments. The difference is that in this embodiment, the power supply allocation strategy is obtained based on the minimum total operating consumption of multiple cycles, while the above embodiment obtains the power supply allocation strategy based on the minimum operating consumption of one cycle. Compared with the above embodiments, this embodiment predicts the power demand for multiple cycles and can report the demand to the power grid in advance. In this way, the power grid can prepare the power consumption of the base station in advance based on the power demand obtained in advance. Relatively speaking, the city electricity price can change according to the power demand. If the power demand is large and the power grid can know the power demand in advance, it can supply power to the base station at a lower market price, thereby reducing the cost of city power supply.
[0126] In one embodiment, the multiple cycles may be multiple time periods within a day, such as one cycle including but not limited to 15 minutes.
[0127] The following takes a 15-minute cycle as an example to illustrate the power distribution strategy with a 15-minute granularity within a day. This embodiment also uses a linear programming problem model to obtain the power distribution strategy.
[0128] In this embodiment, the objective function of the linear programming problem model is:
[0129] The constraints of the linear programming problem model include:
[0130] Among them, P m t is the electricity price for multiple cycles in the future; P g t P is the green power grid access price for multiple cycles in the future; s t It is the unit discount price of charging and discharging, and the unit is RMB / kWh, with a granularity of 15 minutes. A day includes 96 cycles t. The mains electricity price and green electricity grid-connected price of each cycle can be the same or different.
[0131] α g is the green electricity supply efficiency factor; α s is the charge and discharge efficiency factor.
[0132] β m is the utility power storage efficiency factor; β g is the green electricity storage efficiency factor.
[0133] S t-1 D is the current storage capacity of the power storage device; t The predicted electricity demand of the base station in multiple cycles in the future; G t The power generation of green power equipment in multiple cycles in the future.
[0134] U m t U is the amount of electricity delivered to the base station by the mains in multiple cycles in the future (i.e., the first power supply); g t is the amount of green electricity output delivered by the green electricity equipment to the base station in multiple cycles in the future (and U g t α g is the second power supply); U s t is the amount of stored electricity output that the storage device will deliver to the base station in multiple cycles in the future (and U s t α s is the third power supply), and the unit is kWh.
[0135] S m t The output storage capacity (S m t β m is the first storage capacity); S g t The output storage capacity (S) delivered by the green power equipment to the power storage equipment in multiple cycles in the future g t β g is the second power storage capacity), the unit is kWh.
[0136] (G t -U g t -S g t ) is the amount of electricity that green electricity equipment will connect to the grid in multiple cycles in the future. The amount of electricity that green electricity connects to the grid can be 0 or a value greater than 0, and the unit is kWh.
[0137] S max The maximum power of the energy storage device is limited to prevent the mains and green power equipment from ineffectively charging the energy storage device.
[0138] In this embodiment, based on the advance prediction of power demand and power generation in multiple future cycles, when configuring the power distribution strategy, the minimum total cost is also solved based on the total power supply of each power supply source in multiple cycles.
[0139] By constraining U m t 、S m t 、U g t 、U s t 、S g t The above constraints are met, and then the minimum value of the objective function is taken from the numerical group that meets the above constraints, so as to obtain the minimum power consumption distribution and power storage distribution for operation, and the power consumption distribution and power storage distribution form the power supply distribution strategy.
[0140] Step S140: Allocate power to each of the power sources according to the power distribution strategy.
[0141] After determining the power distribution strategy, the amount of power provided to the base station by each power source is controlled according to the power distribution strategy. The distribution strategy includes the power supply amount, or the power supply amount and power supply time, that each power source will provide to the base station over multiple future cycles, as well as the amount of power stored in the power storage device using the mains power and green power devices.
[0142] The power distribution strategy obtained by adopting this embodiment reduces the electricity cost of the base station and further reduces the operating cost of the mobile base station (for longer-term power forecasts, agreements with the power grid can be reached in advance to obtain lower city electricity prices).
[0143] The above examples are only for reference. In order to avoid redundancy, they will not be listed one by one here. In actual development or application, they can be flexibly combined according to actual needs, but any combination belongs to the technical solution of this application and is covered within the scope of protection of this application.
[0144] The present application also provides a power distribution device for a base station, comprising:
[0145] A prediction module is used to predict the power demand of the base station in at least one future cycle and the power generation of the green power equipment deployed at the base station in at least one future cycle;
[0146] A power supply allocation processing module, configured to determine, based on the power generation amount and the power supply parameters of the power supply source, a power supply allocation strategy that minimizes the operation consumption of the base station while meeting the power demand;
[0147] A power distribution module is used to distribute the power supply of each of the power supply sources according to the power distribution strategy.
[0148] In one embodiment, the power distribution processing module is configured with a linear programming problem model, which solves a power distribution strategy that minimizes the operation consumption of the base station while meeting the power demand based on power supply parameters and power generation.
[0149] The present application also provides a power distribution device for a base station, comprising:
[0150] processor;
[0151] A storage device stores a program thereon, and when the program is executed by the processor, the processor implements the power supply distribution method for the base station as described above.
[0152] Please refer to Figure 4, which shows a system framework diagram of the power supply distribution device of the base station. The power supply distribution device also includes a linear programming problem model. The power grid, green power equipment and power storage equipment are connected to the power supply distribution device. The power supply distribution device obtains the city electricity price, green power grid price and power storage efficiency factor from the power grid, obtains the power supply efficiency factor and power storage efficiency factor from the green power equipment, and obtains the charging and discharging loss price, power supply efficiency factor and current storage capacity from the power storage equipment. These parameters and the predicted electricity demand and the power generation of the green power equipment are used as input parameters of the linear programming problem model. The linear programming module solves the minimum electricity cost based on the input parameters and outputs the power supply distribution strategy.
[0153] The present application also provides a computer-readable storage medium storing a computer processing program, wherein the computer processing program is called by a processor to execute the power supply distribution method of the base station as described above.
[0154] In the embodiments of the communication device and computer-readable storage medium provided in this application, all technical features of any of the above-mentioned processing method embodiments may be included. The expanded and explained contents of the specification are basically the same as those of the embodiments of the above-mentioned methods and will not be repeated here.
[0155] An embodiment of the present application further provides a computer program product, which includes computer program code. When the computer program code runs on a computer, the computer executes the methods in the various possible implementation modes described above.
[0156] It is understood that the above scenarios are merely examples and do not limit the application scenarios of the technical solutions provided in the embodiments of this application. The technical solutions of this application can also be applied to other scenarios. For example, those skilled in the art will appreciate that with the evolution of system architecture and the emergence of new business scenarios, the technical solutions provided in the embodiments of this application will also be applicable to similar technical problems.
[0157] The serial numbers of the above embodiments of the present application are for description only and do not represent the advantages or disadvantages of the embodiments.
[0158] The steps in the method of the embodiment of the present application can be adjusted in order, combined and deleted according to actual needs.
[0159] The units in the device of the embodiment of the present application can be merged, divided and deleted according to actual needs.
[0160] In this application, the same or similar terminology, technical solutions and / or application scenario descriptions are generally only described in detail the first time they appear. When they appear again later, they are generally not repeated for the sake of brevity. When understanding the technical solutions and other contents of this application, for the same or similar terminology, technical solutions and / or application scenario descriptions that are not described in detail later, you can refer to the previous relevant detailed descriptions.
[0161] In this application, the description of each embodiment has its own focus. For parts that are not described or recorded in detail in a certain embodiment, please refer to the relevant description of other embodiments.
[0162] The various technical features of the technical solution of this application can be combined arbitrarily. In order to make the description concise, not all possible combinations of the various technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this application.
[0163] Through the description of the above implementation methods, those skilled in the art can clearly understand that the above-mentioned embodiment methods can be implemented by means of software plus the necessary general hardware platform, and of course can also be implemented by hardware, but in many cases the former is a better implementation method. Based on this understanding, the technical solution of the present application is essentially or the part that contributes to the prior art can be embodied in the form of a software product, which is stored in a storage medium (such as ROM / RAM, magnetic disk, optical disk) as mentioned above, and includes a number of instructions for enabling a terminal device (which can be a mobile phone, computer, server, controlled terminal, or network device, etc.) to execute the method of each embodiment of the present application.
[0164] In the above embodiments, it can be implemented in whole or in part by software, hardware, firmware or any combination thereof. When software is used for implementation, it can be implemented in whole or in part in the form of a computer program product. The computer program product includes one or more computer instructions. When the computer program instructions are loaded and executed on a computer, the process or function according to the embodiment of the present application is generated in whole or in part. The computer can be a general-purpose computer, a special-purpose computer, a computer network, or other programmable device. The computer instructions can be stored in a computer-readable storage medium or transmitted from one computer-readable storage medium to another computer-readable storage medium. For example, the computer instructions can be transmitted from one website, computer, server or data center to another website, computer, server or data center via a wired (e.g., coaxial cable, optical fiber, digital subscriber line) or wireless (e.g., infrared, wireless, microwave, etc.) method. The computer-readable storage medium can be any available medium that a computer can access or a data storage device such as a server or data center that includes one or more available media integrations. The available medium can be a magnetic medium (e.g., a floppy disk, a storage disk, a tape), an optical medium (e.g., a DVD), or a semiconductor medium (e.g., a solid-state storage disk Solid State Disk (SSD)).
[0165] The above are only some embodiments of the present application and are not intended to limit the patent scope of the present application. Any equivalent structure or equivalent process transformation made using the contents of the present application specification and drawings, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present application.
Claims
1. A power distribution method for a base station, wherein: The method comprises: Predicting the electricity demand of the base station in at least one future cycle, and predicting the power generation of the green power equipment deployed on the base station in at least one future cycle; Determine, based on the power generation and the power supply parameters of the power supply source, a power supply allocation strategy that minimizes the power consumption of the base station when the power demand is met; The power supply of each of the power supply sources is allocated according to the power supply allocation strategy.
2. The power distribution method for a base station according to claim 1, wherein: The step of determining, based on the power generation amount and the power supply parameters of the power supply source, a power supply allocation strategy for minimizing the operation consumption of the base station when the power demand is met comprises: The power generation, the power demand and the power supply parameters of the power supply source are input into a preset linear programming problem model to obtain a power supply allocation strategy with minimum operation consumption of the base station.
3. The power distribution method for a base station according to claim 1, wherein: The power supply source includes mains electricity and green electricity equipment, the mains power supply parameters include mains electricity price, and the green electricity equipment power supply parameters include green electricity power supply efficiency factor and green electricity grid access price; Alternatively, the power supply source includes AC power, green power equipment and power storage equipment, the power supply parameters of the AC power include at least one of the AC power price and the AC power storage efficiency factor, the power supply parameters of the green power equipment include at least one of the green power supply efficiency factor, the green power grid-connected power price and the green power storage efficiency factor, and the power supply parameters of the power storage equipment include at least one of the charging and discharging efficiency factor and the charging and discharging unit depreciation price.
4. The power supply distribution method for a base station according to claim 2 or 3, wherein: The step of inputting the power generation amount and the power supply parameters of the power supply source into a preset linear programming problem model to obtain a power supply allocation strategy with minimum operation consumption of the base station includes: The first power supply is provided by the mains and the second power supply is provided by the green power equipment, and a data combination corresponding to the first power supply and the second power supply that meets the power demand is determined based on the constraint conditions of the linear programming problem model; wherein the second power supply is determined according to the green power output amount of the green power equipment to the base station and the green power supply efficiency factor; Based on the objective function of the linear programming problem model, the difference between the expenditure and the green electricity grid-connected income in the minimum data combination is solved, and the first power supply and the second power supply corresponding to the power supply allocation strategy are determined based on the corresponding relationship between the minimum difference and the data combination, so that the operating consumption of the base station is minimized; wherein, the expenditure is determined according to the first power supply and the municipal electricity price, and the green electricity grid-connected income is determined according to the difference between the power generation and the green electricity output, and the green electricity grid-connected electricity price.
5. The power supply distribution method for a base station according to claim 2 or 3, wherein: The step of inputting the power generation amount and the power supply parameters of the power supply source into a preset linear programming problem model to obtain a power supply allocation strategy with minimum operation consumption of the base station includes: Configure a first power supply provided by the city power, a second power supply provided by the green power device, and a third power supply provided by the power storage device, and determine a data combination of the first power supply, the second power supply, and the third power supply that meets the power demand based on the constraint conditions of the linear programming problem model; wherein the second power supply is determined according to the green power output amount of the green power device to the base station and the green power supply efficiency factor, and the third power supply is determined according to the storage power output amount of the power storage device to the base station and the charging and discharging efficiency factor; Based on the objective function of the linear programming problem model, the difference between the expenditure and the green electricity grid-connected income in the minimum data combination is solved, and the first power supply, the second power supply and the third power supply of the power supply allocation strategy are determined based on the corresponding relationship between the minimum difference and the data combination, so that the operation consumption of the base station is minimized; wherein, the expenditure includes the municipal electricity expenditure and the discharge depreciation expenditure of the power storage equipment, the green electricity grid-connected income is determined according to the difference between the power generation and the green electricity output and the green electricity grid-connected electricity price, and the discharge depreciation expenditure of the power storage equipment is determined according to the storage output and the unit depreciation price of charging and discharging.
6. The power supply distribution method for a base station according to claim 2 or 3, wherein: The step of inputting the power generation amount and the power supply parameters of the power supply source into a preset linear programming problem model to obtain a power supply allocation strategy with minimum operation consumption of the base station includes: Configure the first power supply provided by the city power, the second power supply provided by the green power device, and the third power supply provided by the power storage device; configure the first power storage provided by the city power and the second power storage provided by the green power device; determine the data combination of the first power supply, the second power supply, the third power supply, the first power storage, and the second power storage that meet the power demand and satisfy the predicted power storage device The storage capacity is less than or equal to the maximum power storage capacity based on the constraint conditions of the linear programming problem model, wherein the second power supply is determined according to the green power output of the green power device to the base station and the green power supply efficiency factor, the third power supply is determined according to the power storage output of the power storage device to the base station and the charging and discharging efficiency factor, the predicted power storage is determined according to the current power storage capacity, the first power storage capacity, the second power storage capacity, and the third power supply of the power storage device, the first power storage capacity is determined according to the output power storage capacity of the city power to the power storage device and the city power storage efficiency factor, and the second power storage capacity is determined according to the output power storage capacity of the green power device to the power storage device and the green power storage efficiency factor; Based on the objective function of the linear programming problem model, the difference between the expenditure and the green electricity grid-connected income in the minimum data combination is solved, and the first power supply, the second power supply and the third power supply of the power supply allocation strategy are determined based on the corresponding relationship between the minimum difference and the data combination, so that the operation consumption of the base station is minimized; wherein, the expenditure includes the municipal electricity expenditure and the discharge depreciation expenditure of the power storage equipment, the green electricity grid-connected income is determined according to the difference between the power generation and the green electricity output and the green electricity grid-connected electricity price, and the discharge depreciation expenditure of the power storage equipment is determined according to the storage output and the unit depreciation price of charging and discharging.
7. The power distribution method for a base station according to claim 1, wherein: The step of predicting the power demand of the base station in at least one future cycle and predicting the power generation of the green power equipment deployed in the base station in at least one future cycle includes: Predicting the power demand of the base station in at least one future period based on the historical power consumption of the base station and a time series algorithm; The power generation in at least one future cycle is predicted according to the historical power generation of the green power equipment deployed on the base station, the historical environmental parameters of the green power equipment, and the predicted environmental parameters in at least one future cycle.
8. The power distribution method for a base station according to claim 1, wherein: The step of determining, based on the power generation amount and the power supply parameters of the power supply source, a power supply allocation strategy for minimizing the operation consumption of the base station when the power demand is met comprises: When the power demand is the total power demand of multiple cycles, the power supply allocation strategy for each cycle with the minimum operation consumption of the base station is determined based on the power generation and the power supply parameters of the power supply source while meeting the total power demand of multiple cycles.
9. A power distribution device for a base station, wherein: The device comprises: processor; A storage device having a program stored thereon, when the program is executed by the processor, the processor implements the power supply distribution method for the base station as claimed in any one of claims 1 to 8.
10. A computer-readable storage medium, wherein: A computer processing program is stored, and the computer processing program is called by a processor to execute the power supply distribution method for a base station according to any one of claims 1 to 8.
Citation Information
Patent Citations
Intelligent power grid management system
CN102280935A
Control system for power supply guaranteeing and power-fare optimization of communication base station and method
CN108258729A
Power supply management method of base station and related equipment
CN115802461A
Energy scheduling method and device, electronic equipment and readable storage medium
CN115940277A
Power supply control device
US20090217060A1
Cited By
Energy storage configuration method, system, device and equipment and storage medium
CN121216562A