Controlled pipe penetration interface system with pre-formed elastomeric lagging sleeve
A pre-formed tubular elastomeric sleeve with uniform thickness addresses inefficiencies in conventional lagging methods by providing a self-retaining, durable, and efficient pipe-concrete interface that maintains consistent isolation and accommodates differential movements.
Patent Information
- Application Number
- PCT/AU2026/050422
- Authority / Receiving Office
- WO · WO
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2025-05-07
- Filing Date
- 2026-04-30
- Publication Date
- 2026-11-12
AI Technical Summary
Conventional lagging methods for pipe penetration in concrete structures are inefficient, unpredictable, and prone to damage or displacement during construction, leading to inconsistent isolation and increased labor time, which can result in pipe deformation, cracking, and stress concentration.
A pre-formed tubular elastomeric lagging sleeve made of polychloroprene or styrene-butadiene rubber with a uniform wall thickness is installed around the pipe, self-retaining through elastic engagement, providing a controlled annular separation zone that maintains isolation between the pipe and concrete, reducing manual wrapping and ensuring consistent installation.
The system ensures a predictable, durable, and efficient pipe-concrete interface that accommodates differential movements, reducing installation time, installer variability, and minimizing damage, while maintaining long-term durability and isolation.
Smart Images

Figure AU2026050422_12112026_PF_FP_ABST
Abstract
Description
Controlled Pipe Penetration Interface System with Pre-formed Elastomeric Lagging SleeveField of the Invention
[0001] The present invention relates generally to pipe penetration systems for concrete structures. More particularly, the invention relates to systems and methods for forming a controlled isolation interface between a pipe and a concrete structure using a pre-formed elastomeric lagging sleeve.Background of the Invention
[0002] In building and construction works, plumbing pipes and other conduits are commonly required to pass through concrete structures such as footings, slabs, walls and beams. Where a pipe passes through or is embedded in concrete, the pipe and the surrounding concrete may be subjected to different movement, loading and environmental conditions over the life of the structure. For example, thermal expansion and contraction of the pipe, ground movement, structural settlement, vibration, shrinkage of concrete during curing, and in-service loading may cause relative movement between the pipe and the surrounding concrete.
[0003] If a pipe is cast directly into concrete without a suitable isolation interface, direct bonding or rigid engagement may occur between the pipe and the concrete. Such direct engagement may transfer stresses to the pipe or to associated pipe joints, fittings or connections. Over time, this can contribute to pipe deformation, cracking, joint leakage, localised stress concentration or other forms of damage. It is therefore common to provide a separation or lagging layer around a pipe at a concrete penetration location.
[0004] Conventional lagging practices may involve manually wrapping a strip or tape of flexible lagging material around the pipe before concrete is poured. Such materials may include foam-based or polymer-based strips that are wound around the pipe at the intended penetration region. The wrapped material may then be taped, adhered or otherwise held in position before concrete placement. This approach can providea buffer between the pipe and the concrete, but the installation process is dependent on the care, time and skill of the installer.
[0005] Manual wrapping can lead to variability between installations. For example, adjacent turns of wrapping material may leave gaps, overlap one another, shift during handling, or produce localised regions of greater or lesser thickness around the pipe. Where a gap is present, concrete may contact the pipe directly. Where wrapping overlaps or bunches, an uneven interface may be formed around the pipe. These variations can reduce the predictability of the separation layer and may compromise the intended isolation between the pipe and the surrounding concrete.
[0006] Conventional wrap-based lagging arrangements may also be susceptible to damage or displacement during construction. Before and during concrete pouring, pipes and associated lagging materials may be exposed to reinforcement placement, formwork installation, tools, foot traffic, vibration, wet concrete pressure and other site activities. Thin or relatively soft lagging materials may tear, crush, unwrap, fold, compress or move from the intended position. If the lagging material is damaged or displaced before the concrete cures, the resulting pipe penetration interface may be incomplete or inconsistent.
[0007] A further practical consideration is installation efficiency. Manually wrapping lagging material around pipes can be time-consuming, particularly where pipes are located in trenches, near reinforcement, adjacent to formwork, or in other confined construction environments. The need to wrap, tape, layer or secure lagging material around each pipe can increase labour time and may introduce inconsistency between different installers or different pipe penetration locations on the same site.
[0008] There is therefore a need for an improved pipe penetration interface which can be installed efficiently, which can provide a more predictable annular separation zone around a pipe, and which can better maintain its position and form during construction and concrete placement. There is also a need for a lagging arrangement that can reduce reliance on manual wrapping technique while providing durable isolation between a pipe and surrounding concrete.
[0009] It is to be understood that, if any prior art information is referred to herein, such reference does not constitute an admission that the information forms part of the common general knowledge in the art, in Australia or any other country.Summary of the Disclosure
[0010] According to one aspect, there is provided a system for forming a controlled pipe penetration interface within a concrete structure, the system comprising a pipe configured to penetrate the concrete structure and a pre-formed tubular lagging sleeve positioned around the pipe at a region corresponding to a location of the concrete structure, the pre-formed tubular lagging sleeve comprising a resilient elastomeric sleeve body composed of polychloroprene rubber or styrene-butadiene rubber and having a substantially uniform wall thickness selected to define a substantially uniform annular separation zone between the pipe and the concrete structure, wherein a relaxed internal diameter of the pre-formed tubular lagging sleeve is selected relative to an external diameter of the pipe such that the pre-formed tubular lagging sleeve is elastically expanded during installation over the pipe and thereafter self-retains on the pipe by elastic engagement without requiring wrapping of lagging material around the pipe, and wherein, upon pouring and curing of concrete of the concrete structure, the pre-formed tubular lagging sleeve is entrapped between the pipe and the concrete structure to prevent direct bonding between the pipe and the concrete structure while maintaining the substantially uniform annular separation zone to accommodate differential movement therebetween.
[0011] Advantageously, the system provides a pre-formed and self-retaining isolation interface for a pipe penetration through concrete. By using a resilient elastomeric sleeve body composed of polychloroprene rubber or styrene-butadiene rubber, the sleeve may provide improved flexibility, elastic recovery, weather resistance and construction-stage durability compared with conventional manually wrapped lagging materials. The sleeve may be installed by sliding or otherwise fitting the sleeve over the pipe, thereby reducing or eliminating the need for manual wrapping, taping or layering of strip-form lagging materials. This can reduce installation time, reduce dependency on installer skill, and provide a more repeatable installation outcome.
[0012] The substantially uniform wall thickness of the pre-formed tubular lagging sleeve may assist in forming a predictable annular separation zone between the pipe and the surrounding concrete. This may reduce the risk of gaps, overlaps, inconsistent thicknesses, bunching or localised thin regions that can arise in manually wrapped systems. Maintaining the annular separation zone can assist in accommodating thermal expansion, contraction, ground movement, vibration, structural settlement, concrete shrinkage and other differential movement between the pipe and the concrete structure. The elastic self-retention of the sleeve may further assist in maintaining the sleeve in the correct axial position during handling, reinforcement placement, formwork preparation and concrete pouring.
[0013] In an embodiment, the resilient elastomeric sleeve body may be composed of polychloroprene rubber. In another embodiment, the resilient elastomeric sleeve body may be composed of styrene-butadiene rubber. These materials may provide suitable resilience, elasticity and durability for maintaining the annular separation zone during construction and during long-term service. The material selection may also assist in resisting tearing, abrasion, puncturing, compression or displacement under construction-site conditions.
[0014] In an embodiment, the substantially uniform wall thickness may be from about 3 mm to about 20 mm. Preferably, the substantially uniform wall thickness may be at least about 6 mm. Such thicknesses may assist in maintaining an effective annular buffer between the pipe and the concrete structure, including under wet concrete load and construction handling. A controlled minimum wall thickness may provide a more predictable pipe isolation interface than thin wrap-based materials that may be compressed, stretched, overlapped or installed inconsistently.
[0015] In an embodiment, the pre-formed tubular lagging sleeve may have a length greater than a thickness of the concrete structure and may be trimmable on site to match the thickness of the concrete structure. In an embodiment, the sleeve may be supplied in lengths of at least 2 metres. Such arrangements may allow a common sleeve product to be cut to suit different slab, wall, footing or beam thicknesses, thereby improving on-site flexibility and reducing the number of sleeve sizes required.
[0016] In an embodiment, the pre-formed tubular lagging sleeve may comprise at least one circumferential weakness to assist separation of the sleeve at a predefined axial location. In an embodiment, the sleeve may comprise a plurality of axially spaced circumferential weaknesses defining modular sleeve sections. The circumferential weaknesses may comprise perforations, scoring, reduced-thickness bands, grooves or other separation-assisting formations. Advantageously, these features may allow an installer to separate or trim the sleeve cleanly and consistently without requiring complex measuring or cutting operations.
[0017] In an embodiment, the resilient elastomeric sleeve body may be formed from a sheet of elastomeric material having opposed longitudinal edges joined along a longitudinal seam. In an embodiment, the opposed longitudinal edges may be joined by stitching. In another embodiment, the opposed longitudinal edges may be joined by adhesive bonding, heat welding, mechanical fastening, or a combination thereof. Such manufacturing arrangements may allow the sleeve to be formed from sheet elastomeric material while maintaining a tubular configuration and sufficient mechanical integrity for elastic expansion during installation.
[0018] In an embodiment, the pre-formed tubular lagging sleeve may comprise a longitudinal opening enabling the sleeve to be fitted laterally around the pipe. In an embodiment, the sleeve may comprise a closure arrangement configured to close the longitudinal opening after fitting of the sleeve around the pipe. The closure arrangement may comprise an adhesive strip, a mechanical fastener, a hook-and-loop fastener, a zip fastener, a clip formation, a welded seam or another suitable closure. This may allow the sleeve to be installed around an already-positioned pipe or around a pipe where axial installation over an end of the pipe is inconvenient or unavailable.
[0019] In an embodiment, an inner surface of the pre-formed tubular lagging sleeve may directly contact an outer surface of the pipe. In an embodiment, the inner surface may be configured to frictional ly engage the pipe to inhibit axial displacement of the sleeve during pouring of the concrete. Direct elastomer-to-pipe contact may assist inproviding elastic gripping, thereby allowing the sleeve to self-retain on the pipe without requiring external wrapping, tapes or separate fasteners.
[0020] In an embodiment, an adhesive may be provided at an internal surface of the pre-formed tubular lagging sleeve for bonding the sleeve to the pipe. The adhesive may be provided only at discrete axial locations within the sleeve, at or adjacent one or both axial ends of the sleeve, or in a circumferential band about the internal surface of the sleeve. Such adhesive arrangements may provide additional installation security while still allowing the sleeve to function as an isolation interface between the pipe and the concrete structure.
[0021] In an embodiment, the adhesive may be covered by a removable protective strip prior to installation. Preferably, an end of the removable protective strip may protrude from one end of the sleeve. This may allow the sleeve to be moved into position while the adhesive remains inactive or protected, and then allow the adhesive to be exposed after correct positioning. This may reduce premature sticking, contamination of the adhesive and repositioning difficulties during installation.
[0022] In an embodiment, the pre-formed tubular lagging sleeve may comprise an outer surface treatment configured to reduce bonding between the concrete and the sleeve. The outer surface treatment may comprise a low-friction coating, an anti-bond coating, a release coating or a laminated outer layer. In an embodiment, the sleeve may comprise an outer surface layer composed of a smooth abrasion-resistant material adhered to or laminated onto the resilient elastomeric sleeve body. These features may assist in resisting construction-site damage and may reduce mechanical interlock or bonding with the concrete, thereby preserving the ability of the sleeve to accommodate relative movement between the pipe and the concrete structure.
[0023] In an embodiment, the pre-formed tubular lagging sleeve may include circumferential surface features or deformation ribs. Preferably, the circumferential surface features or deformation ribs may be integrally formed with the resilient elastomeric sleeve body. Such features may assist in resisting radial compression during concrete pouring and may help maintain the annular separation zone around the pipe. The deformation ribs may also provide additional material thickness orlocalised reinforcing regions where increased construction-stage robustness is desirable.
[0024] In an embodiment, the pre-formed tubular lagging sleeve may include a reinforced edge or pull-tab at one end to assist installation over the pipe. In an embodiment, one or both ends of the sleeve may include a bevelled, flanged or thickened section. These features may assist in gripping, pulling, guiding or protecting the sleeve during installation. A reinforced edge, pull-tab, bevelled end, flanged end or thickened end may reduce tearing, folding or deformation when the sleeve is elastically expanded and moved along the pipe.
[0025] In an embodiment, an internal surface of the pre-formed tubular lagging sleeve may be tapered along its length to produce a compression fit against the pipe at one or both ends. The tapered internal surface may assist in increasing frictional engagement or sealing at selected regions while maintaining the annular separation function of the sleeve.
[0026] In an embodiment, the pre-formed tubular lagging sleeve may include visual indicia indicating a size, wall thickness, material type, cut location, insertion depth or installation orientation. In an embodiment, the sleeve may be colour coded to identify a pipe size, sleeve thickness, material grade or installation category. Such markings or colour coding may assist in rapid product selection, correct positioning, on-site inspection and quality control before concrete is poured.
[0027] In an embodiment, the resilient elastomeric sleeve body may comprise a crosslinked or layered structure. A cross-linked or layered structure may improve resilience to mechanical damage, compression, tearing or abrasion. Layered constructions may also allow the sleeve to combine different functional surfaces, for example a relatively high-friction inner surface for pipe engagement and a relatively low-friction or abrasion-resistant outer surface for interaction with concrete.
[0028] In an embodiment, the pre-formed tubular lagging sleeve may comprise a fire-retardant additive, an acoustic damping layer, a thermal insulation layer, or a combination thereof. These optional features may allow the sleeve to be adapted forparticular building performance requirements while retaining its primary function of forming a controlled pipe penetration interface.
[0029] In an embodiment, the pipe may comprise PVC, HDPE, copper, PEX, cast iron, mild steel, stainless steel or another plumbing conduit material. In an embodiment, the concrete structure may comprise a footing, slab, wall, beam or other cast concrete element. Accordingly, the system may be adapted for a range of pipe materials and construction environments by appropriate selection of sleeve size, wall thickness, elastomeric material and surface configuration.
[0030] According to another aspect, there is provided a method of forming a controlled pipe penetration interface within a concrete structure, the method comprising providing a pipe configured to penetrate the concrete structure, installing a preformed tubular lagging sleeve around the pipe at a region corresponding to a location of the concrete structure, the pre-formed tubular lagging sleeve comprising a resilient elastomeric sleeve body composed of polychloroprene rubber or styrene-butadiene rubber and having a substantially uniform wall thickness selected to define a substantially uniform annular separation zone between the pipe and the concrete structure, elastically expanding the pre-formed tubular lagging sleeve during installation over the pipe such that the sleeve thereafter self-retains on the pipe by elastic engagement without requiring wrapping of lagging material around the pipe, pouring concrete around the pipe and the sleeve, and curing the concrete such that the sleeve is entrapped between the pipe and the concrete structure to prevent direct bonding between the pipe and the concrete structure while maintaining the substantially uniform annular separation zone to accommodate differential movement therebetween.
[0031] Advantageously, the method may provide a single-step or reduced-step installation process when compared with manually wrapping lagging material around a pipe. The sleeve may be installed in a repeatable manner, may grip the pipe by elastic engagement, and may maintain a controlled separation interface during and after concrete placement. This may improve installation efficiency, reduce installer variability and improve consistency across multiple pipe penetrations.
[0032] In an embodiment, the method may further comprise trimming the pre-formed tubular lagging sleeve on site to match a thickness of the concrete structure. In an embodiment, the method may further comprise separating the sleeve at a circumferential weakness before or during installation. These steps may allow the sleeve length to be adapted to the concrete structure while maintaining a clean and controlled sleeve geometry.
[0033] In an embodiment, the method may further comprise selecting the pre-formed tubular lagging sleeve based on visual indicia provided on the sleeve. In an embodiment, the method may further comprise aligning the sleeve relative to formwork, ground level, reinforcement or a concrete penetration location based on visual indicia provided on the sleeve. These steps may assist in correct sleeve selection and placement, thereby reducing installation errors and supporting quality control prior to concrete pouring.
[0034] In an embodiment, installing the pre-formed tubular lagging sleeve may comprise sliding the sleeve axially over an end of the pipe. In another embodiment, installing the sleeve may comprise opening a longitudinal opening of the sleeve, fitting the sleeve laterally around the pipe, and closing the longitudinal opening. These alternative installation techniques may provide flexibility for new installations, retrofits or installations where pipe ends are inaccessible.
[0035] In an embodiment, the method may further comprise removing a protective strip from an internal adhesive of the sleeve after the sleeve has been positioned on the pipe. This may allow the sleeve to be positioned before adhesive engagement occurs, thereby reducing premature adhesion and assisting accurate placement.
[0036] In an embodiment, the sleeve may comprise an outer surface treatment, and the method may comprise orienting the outer surface treatment outwardly relative to the pipe. This may assist in providing abrasion resistance, reducing bonding to concrete or reducing mechanical interlock with the concrete structure. In an embodiment, the sleeve may comprise a reinforced edge or pull-tab, and the method may comprise pulling the reinforced edge or pull-tab to assist installation over the pipe. In an embodiment, the sleeve may comprise circumferential surface features ordeformation ribs, and the method may comprise embedding the circumferential surface features or deformation ribs in the concrete during curing of the concrete. These optional method steps may support efficient installation, construction-stage durability and maintenance of the annular separation zone.
[0037] Other aspects of the invention are also disclosed.Brief Description of the Drawings
[0038] Notwithstanding any other forms which may fall within the scope of the present invention, preferred embodiments of the disclosure will now be described, by way of example only, with reference to the accompanying drawings in which:
[0039] Figure 1 shows a perspective view of a pre-formed tubular lagging sleeve for forming a controlled pipe penetration interface.
[0040] Figure 2 shows a cross-sectional view of a pipe penetrating a concrete structure, with the pre-formed tubular lagging sleeve positioned between the pipe and the concrete structure.Description of Embodiments
[0041] Referring to Figures 1 and 2, a system for forming a controlled pipe penetration interface within a concrete structure is shown. The system comprises a pre-formed tubular lagging sleeve 100 and a pipe 103 configured to penetrate the concrete structure 104. Although the concrete structure 104 is shown as a concrete footing, it will be appreciated that the concrete structure 104 may comprise a footing, slab, wall, beam or other cast concrete element through which the pipe 103 is to pass. The preformed tubular lagging sleeve 100 is positioned around the pipe 103 at a region corresponding to a location of the concrete structure 104 so that the sleeve 100 forms an isolation interface between the pipe 103 and the concrete structure 104.
[0042] The pre-formed tubular lagging sleeve 100 comprises a resilient elastomeric sleeve body. In preferred embodiments, the resilient elastomeric sleeve body is composed of polychloroprene rubber, which may also be referred to as CR neoprene, or styrene-butadiene rubber, which may also be referred to as SBR. These materials may provide a useful combination of flexibility, resilience, durability, weatherresistance and elastic recovery. In further embodiments, the resilient elastomeric sleeve body may comprise a blended rubber, synthetic elastomer, thermoplastic elastomer, polyurethane elastomer, nitrile rubber, EPDM rubber, silicone elastomer, natural rubber blend or other elastomeric or polymer-based material providing comparable flexibility, resilience and construction-stage durability.
[0043] The pre-formed tubular lagging sleeve 100 has a generally cylindrical form and defines a continuous internal bore for receiving the pipe 103. The sleeve 100 may be manufactured in a range of sizes corresponding to common pipe diameters used in residential, commercial or industrial plumbing systems. The sleeve 100 may be supplied in pre-cut lengths, stock lengths, modular sections or other installation-ready forms. In use, the sleeve 100 may be fitted to the pipe 103 in the manner of an open-ended sleeve, thereby avoiding the need to manually wrap, tape or layer lagging material around the pipe 103.
[0044] The pre-formed tubular lagging sleeve 100 has a substantially uniform wall thickness selected to define a substantially uniform annular separation zone between the pipe 103 and the concrete structure 104. The substantially uniform wall thickness assists in providing predictable spacing around the pipe 103 and in avoiding localised thin regions, excessive overlaps, discontinuities or gaps that may otherwise occur with manually wrapped lagging materials. In this manner, the sleeve 100 may provide a controlled pipe penetration interface which supports repeatable installation quality and long-term accommodation of movement between the pipe 103 and the surrounding concrete structure 104.
[0045] In embodiments, the substantially uniform wall thickness of the pre-formed tubular lagging sleeve 100 may be from about 3 mm to about 20 mm. In preferred embodiments, the substantially uniform wall thickness may be at least about 6 mm. Providing a controlled minimum thickness may assist in maintaining an effective annular separation zone between the pipe 103 and the concrete structure 104, including under construction loads and during curing of the concrete. This may provide a more consistent buffer than comparatively thin wrap-based laggingproducts, particularly where those products are susceptible to inconsistent installation thickness, compression, overlap or tearing.
[0046] Prior to pouring concrete for the concrete structure 104, the pre-formed tubular lagging sleeve 100 is placed in position on the pipe 103. The relaxed internal diameter of the sleeve 100 is selected relative to the external diameter of the pipe 103 such that the sleeve 100 may be elastically expanded during installation over the pipe 103 and thereafter self-retain on the pipe 103 by elastic engagement. In this arrangement, the sleeve 100 may grip the outer surface of the pipe 103 sufficiently to inhibit axial displacement during handling, placement of reinforcement, formwork preparation and concrete pouring, without requiring wrapping of lagging material around the pipe 103.
[0047] In some embodiments, the relaxed internal diameter of the pre-formed tubular lagging sleeve 100 is slightly smaller than the external diameter of the pipe 103. For example, the relaxed internal diameter may be less than the external diameter of the pipe 103 by up to about 5 mm, although other interference amounts may be selected depending on pipe size, sleeve wall thickness and elastomer properties. In further embodiments, the internal diameter of the sleeve 100 may slightly exceed the external diameter of the pipe 103, for example by no more than about 10 mm, to provide a snug but slidable fit. These dimensional relationships may assist in balancing ease of installation with positional stability.
[0048] Upon pouring and curing of concrete of the concrete structure 104, the preformed tubular lagging sleeve 100 becomes entrapped between the pipe 103 and the concrete structure 104, as shown generally in Figure 2. The sleeve 100 prevents direct bonding between the pipe 103 and the concrete structure 104 while maintaining the substantially uniform annular separation zone. This arrangement accommodates differential movement between the pipe 103 and the concrete structure 104, including movement arising from thermal expansion, ground movement, vibration, structural settlement or loading changes over the life of a building. The sleeve 100 may thereby reduce mechanical stress on the pipe 103 and on associated joints or fittings.
[0049] Referring again to Figure 1, the pre-formed tubular lagging sleeve 100 may be manufactured from a sheet of elastomeric material which is folded or otherwiseshaped about a longitudinal axis to form the tubular sleeve body. Opposed longitudinal edges of the sheet may be joined along a longitudinal seam 101 to define the continuous internal bore. The longitudinal seam 101 may be formed by stitching, adhesive bonding, heat welding, mechanical fastening or a combination thereof. These joining techniques may provide mechanical integrity while allowing the sleeve 100 to retain flexibility and elastic behaviour during installation and use.
[0050] In one preferred embodiment, the opposed longitudinal edges are secured by stitching forming the longitudinal seam 101. The stitching may extend along the length of the sleeve 100 and may be selected to be compatible with the elastomeric material of the sleeve body. The stitching may assist in resisting separation of the opposed longitudinal edges during stretching over the pipe 103, construction-site handling, exposure to reinforcement, or concrete placement. In other embodiments, adhesive bonding, heat welding, mechanical fastening or other seam-forming techniques may be used to suit the selected elastomeric material and manufacturing process.
[0051] In further embodiments, the pre-formed tubular lagging sleeve 100 may be extruded, moulded or otherwise integrally formed so that no longitudinal seam is required. Such embodiments may provide a continuous annular sleeve body with uniform material distribution. Accordingly, the presence of the longitudinal seam 101 is not essential to all forms of the invention, but may provide a practical and cost-effective manufacturing option where sheet elastomeric material is used.
[0052] The pre-formed tubular lagging sleeve 100 may alternatively comprise a longitudinal opening 105 enabling the sleeve 100 to be opened and fitted laterally around the pipe 103. This may be useful where the pipe 103 has already been installed, where an end of the pipe 103 is not accessible, or where retrofitting is required. The longitudinal opening 105 may extend fully or partially along the length of the sleeve 100 and may be closed after fitting around the pipe 103 by a closure arrangement 106. The closure arrangement 106 may comprise an adhesive strip, mechanical fastener, hook-and-loop fastener, zip fastener, clip formation, welded seam or other fastening arrangement. The closure arrangement 106 may assist inrestoring the annular shape of the sleeve 100 and maintaining the sleeve 100 in position during concrete placement.
[0053] The pre-formed tubular lagging sleeve 100 may have a length greater than a thickness of the concrete structure 104 through which the pipe 103 is intended to penetrate. By providing a sleeve 100 that extends beyond the minimum required depth, an installer may cut or trim the sleeve 100 on site to match the actual thickness of the concrete structure 104. This allows flexibility during installation and assists in ensuring that the sleeve 100 spans the full concrete penetration, thereby maintaining the annular separation zone along the relevant interface between the pipe 103 and the concrete structure 104.
[0054] In embodiments, the pre-formed tubular lagging sleeve 100 may be supplied in standard stock lengths of at least 2 metres, enabling a single length to be cut to suit various site requirements. In further embodiments, the sleeve 100 may be supplied in longer lengths, such as 3 metres or more, particularly for commercial, industrial or large-scale residential projects. Supplying the sleeve 100 in stock lengths may reduce the need for multiple bespoke sleeve lengths and may allow installers to prepare appropriate lengths on site with reduced wastage.
[0055] In alternative embodiments, the pre-formed tubular lagging sleeve 100 may be supplied in smaller sleeve sections, for example less than about 150 mm in length or approximately 100 mm in length, for use on riser pipes or other pipe penetrations through slabs or relatively thin concrete structures. Such short section sleeves 100 may be installed individually or in stacked configuration where a greater coverage length is required. Modular sizing may assist in accommodating different concrete thicknesses and installation environments.
[0056] To facilitate cutting, tearing or separation on site, the pre-formed tubular lagging sleeve 100 may comprise one or more circumferential weaknesses 107 spaced along its length. The circumferential weaknesses 107 may comprise partial cuts, perforations, scoring, grooves, bands of reduced material thickness or other separation-assisting formations. The circumferential weaknesses 107 may allow an installer to separate the sleeve 100 at predefined axial locations, with or without useof cutting tools. This may reduce installation time and support repeatable sleeve lengths corresponding to common footing, slab or wall thicknesses.
[0057] In some embodiments, a plurality of axially spaced circumferential weaknesses 107 may define modular sleeve sections. The circumferential weaknesses 107 may be arranged at regular spacings, for example every 50 mm, 100 mm, 150 mm or 200 mm, although other spacings may be used. Such modular arrangements may assist installers in preparing a sleeve length that corresponds to a particular concrete structure 104 while maintaining clean edges and consistent sleeve geometry.
[0058] The pre-formed tubular lagging sleeve 100 may comprise an outer surface layer or outer surface treatment 108. The outer surface treatment 108 may be configured to reduce bonding between the concrete and the sleeve 100, to reduce friction, to provide an anti-bond function, to improve abrasion resistance, or to provide a release surface. In some embodiments, the outer surface treatment 108 may comprise a low-friction coating, anti-bond coating, release coating, laminated outer layer or other surface modification. This may assist in preserving the ability of the pipe 103 and concrete structure 104 to move relative to one another after curing.
[0059] In some embodiments, the outer surface layer 108 may comprise a smooth, abrasion-resistant material adhered to or laminated onto the resilient elastomeric sleeve body. The outer surface layer 108 may provide enhanced resistance to physical damage during construction activities, such as contact with reinforcement bars, formwork components, tools, footwear or other site equipment. By offering a smooth exterior finish, the outer surface layer 108 may also reduce mechanical interlock with the poured concrete, thereby preserving the differential movement functionality after curing. The outer surface layer 108 may be selected to maintain flexibility and resilience of the sleeve 100 while improving durability in constructionsite conditions.
[0060] Preferably, an inner surface of the pre-formed tubular lagging sleeve 100 directly contacts an outer surface of the pipe 103. Direct contact between the elastomeric sleeve body and the pipe 103 may increase frictional engagement and assist in maintaining axial positioning of the sleeve 100 during installation andconcrete pouring. The exposed elastomeric inner surface may also enable elastic gripping when the sleeve 100 is expanded over the pipe 103, thereby providing installation stability without requiring separate tapes, adhesives or external fasteners. In alternative embodiments, the sleeve 100 may comprise an inner surface layer configured to reduce sliding friction during fitting, provided that sufficient positional stability is retained for the intended installation.
[0061] The pre-formed tubular lagging sleeve 100 may be provided with an adhesive 102 applied to an internal surface thereof for bonding the sleeve 100 to the outer surface of the pipe 103. The adhesive 102 may assist in maintaining the correct axial position of the sleeve 100 during installation and during pouring of concrete. The adhesive 102 may be selected to resist displacement forces encountered during construction while still preserving the sleeve’s function as an isolation interface between the pipe 103 and the concrete structure 104. Accordingly, the adhesive 102 may provide installation security without necessarily rigidly fixing the pipe 103 to the concrete structure 104.
[0062] The adhesive 102 may be applied only at discrete axial locations within the sleeve 100. For example, the adhesive 102 may be provided as short strips or patches spaced apart along the internal surface of the sleeve 100. This may reduce material usage and avoid excessive bonding between the pipe 103 and the sleeve 100 while still providing sufficient securing action during installation. In some embodiments, the adhesive 102 may be provided at or adjacent one or both axial ends of the sleeve 100 to inhibit sleeve movement during concrete pouring, particularly for vertical pipe penetrations.
[0063] Alternatively or additionally, the adhesive 102 may be provided in the form of a circumferential band extending around the internal surface of the sleeve 100. A circumferential band of adhesive 102 may provide substantially uniform securing around the pipe 103 and may be useful for installations subject to vibration, movement or other construction-stage disturbances before concrete curing.
[0064] To protect the adhesive 102 prior to installation, the adhesive 102 may be covered by a removable protective strip. The removable protective strip may preventcontamination or premature activation of the adhesive 102 during handling and positioning of the sleeve 100. In a preferred arrangement, an end of the removable protective strip may protrude from one end of the sleeve 100. This allows an installer to first position the sleeve 100 on the pipe 103 and thereafter pull the exposed end of the strip to remove it progressively. Upon removal of the protective strip, the adhesive 102 contacts the pipe 103 and assists in securing the sleeve 100 in position without requiring separate taping or repositioning.
[0065] The pre-formed tubular lagging sleeve 100 may include circumferential surface features or deformation ribs 109 formed along its outer surface. The deformation ribs 109 may be configured to resist radial compression forces exerted during pouring of concrete, thereby assisting in maintaining the annular separation zone between the pipe 103 and the concrete structure 104. The deformation ribs 109 may be integrally formed with the resilient elastomeric sleeve body or may be provided as an added feature. By resisting collapse under the weight or pressure of wet concrete, the deformation ribs 109 may assist in preserving the differential movement capacity of the sleeve 100 and in maintaining consistent isolation of the pipe 103 within the concrete structure 104.
[0066] The elastomeric material forming the sleeve 100 may be selected to accommodate expected expansion and contraction of the pipe 103 due to temperature variation in situ. The resilient elastomeric sleeve body may deform elastically in response to pipe movement while maintaining the annular separation zone. Selection of elastomeric material, hardness, wall thickness, compression behaviour and thermal response may be made according to the pipe material, concrete structure, installation environment and expected service conditions.
[0067] To facilitate installation, the pre-formed tubular lagging sleeve 100 may include a reinforced edge or pull-tab 110 formed at one end. The pull-tab 110 may allow an installer to manually grip and draw the sleeve 100 over an end of the pipe 103, particularly where the sleeve 100 is dimensioned for a close or interference fit. Reinforcement of the edge or pull-tab 110 may reduce the risk of tearing during installation and may enable a hand tool to be used to assist fitting where appropriate.
[0068] One or both ends of the pre-formed tubular lagging sleeve 100 may include a bevelled, flanged or thickened section 111. Such reinforcement may reduce the risk of accidental tearing, folding or deformation as the sleeve 100 is pulled over the pipe 103 or subjected to handling before concrete placement. A bevelled end may assist in initiating installation over the pipe 103, while a thickened or flanged end may improve robustness at regions exposed to site handling.
[0069] In some embodiments, an internal surface of the pre-formed tubular lagging sleeve 100 may be tapered along its length. The taper may create a gradual compression fit against the outer surface of the pipe 103 at one or both ends of the sleeve 100. This configuration may enhance sealing or frictional engagement without requiring adhesives or external clamps, while still allowing relative movement between the pipe 103 and the concrete structure 104 after curing.
[0070] The pre-formed tubular lagging sleeve 100 may include visual indicia 112 printed, embossed, moulded, colour-contrasted or otherwise marked on its outer surface. The visual indicia 112 may indicate a size, wall thickness, material type, cut location, insertion depth, installation orientation, product grade or other installation information. The visual indicia 112 may assist installers in selecting an appropriate sleeve 100 and positioning the sleeve 100 correctly relative to formwork, ground level, reinforcement, slab thickness or other reference features. Such markings may reduce installation errors and improve consistency across multiple pipe penetrations.
[0071] In some embodiments, the sleeve 100 may be colour coded to identify a pipe size, sleeve thickness, material grade, material type, installation category or performance rating. For example, different colours may be used for different pipe diameters or wall thicknesses. Colour coding may assist rapid on-site selection and inspection, including visual confirmation that the correct sleeve type has been installed before concrete is poured.
[0072] In some versions, the resilient elastomeric sleeve body may have a crosslinked or layered structure. Cross-linking of polymer chains or lamination of multiple material layers may increase resilience against cuts, abrasions, tearing and compression damage encountered during construction. A layered structure may alsoallow different properties to be provided at inner and outer regions of the sleeve 100, such as a higher-friction inner surface for pipe gripping and a lower-friction or abrasion-resistant outer surface for engagement with concrete.
[0073] The pre-formed tubular lagging sleeve 100 may optionally comprise one or more additives, fillers or layers configured to enhance fire resistance, acoustic damping or thermal insulation. For example, the sleeve 100 may include a fire-retardant additive, an acoustic damping layer, a thermal insulation layer or a combination thereof. Such features may be selected according to building requirements, pipe type or installation environment. These enhancements may be provided without altering the primary function of the sleeve 100 as a controlled pipe penetration interface.
[0074] The pipe 103 may comprise any suitable material commonly used in plumbing or construction applications, including metal pipe materials such as cast iron, mild steel, stainless steel or copper, or polymeric pipe materials such as PVC, HDPE, PEX or other plastics. The sleeve 100 may be adapted for different pipe materials by selecting the sleeve internal diameter, wall thickness, elastomeric material, hardness and surface configuration to provide the desired installation fit and long-term movement accommodation.
[0075] The concrete structure 104 may comprise a footing, slab, wall, beam, suspended slab, ground slab, edge beam, penetration block-out region or other cast concrete element. Although many examples herein refer to a footing, this is not intended to limit the sleeve 100 to footing applications. The sleeve 100 may be used wherever a pipe 103 is to pass through or be embedded in concrete and where isolation from the concrete is desirable.
[0076] An exemplary method of use of the system will now be described with reference to Figures 1 and 2.
[0077] Prior to installation, a pre-formed tubular lagging sleeve 100 is selected having an internal diameter suitable for the external diameter of a pipe 103 intended to penetrate a concrete structure 104. The sleeve 100 may be selected based on pipe size, wall thickness, sleeve material, visual indicia 112, colour coding or otherinstallation requirements. The sleeve 100 may be provided in a standard stock length, pre-cut length or modular section.
[0078] If the length of the sleeve 100 exceeds the thickness of the concrete structure 104, the sleeve 100 may be trimmed on site. Trimming may be performed using a utility knife or other cutting tool. Where the sleeve 100 includes a circumferential weakness 107, the sleeve 100 may be separated at the circumferential weakness 107 to match or approximate the required concrete thickness. This may assist in preparing the sleeve 100 quickly and consistently without measuring or cutting each sleeve from an unmarked length.
[0079] The installer may then install the sleeve 100 around the pipe 103. In one example, the sleeve 100 is slid axially over an end of the pipe 103. Where the relaxed internal diameter of the sleeve 100 is smaller than the external diameter of the pipe 103, the sleeve 100 may be elastically expanded during fitting to provide a snug gripping engagement against the pipe 103. If the sleeve 100 includes a pull-tab 110 or reinforced edge, the installer may grasp the pull-tab 110 or reinforced edge to assist in sliding the sleeve 100 into position.
[0080] In another example, the sleeve 100 may be fitted laterally around the pipe 103 using the longitudinal opening 105. The installer may open the sleeve 100, position the sleeve 100 around the pipe 103, and close the longitudinal opening 105 using the closure arrangement 106. This may be useful where the pipe 103 is already connected at one or both ends or where axial sliding is inconvenient.
[0081] The sleeve 100 is positioned on the pipe 103 so that it envelops the portion of the pipe 103 corresponding to the planned location of the concrete structure 104. If the sleeve 100 includes visual indicia 112, the installer may use the visual indicia 112 to align the sleeve 100 relative to formwork, ground level, reinforcement or another reference associated with the planned concrete penetration. The elastic self-retention of the sleeve 100 may assist in holding the sleeve 100 in position during these installation steps.
[0082] Where the sleeve 100 includes an adhesive 102 covered by a removable protective strip, the installer may leave the protective strip in place while sliding orotherwise positioning the sleeve 100. Once the sleeve 100 is correctly positioned, the installer may pull the protruding end of the removable protective strip to expose the adhesive 102, thereby activating adhesion between the sleeve 100 and the pipe 103. This may provide additional positional security during subsequent construction stages.
[0083] With the sleeve 100 in place, concrete is poured around the pipe 103 and sleeve 100 to form the concrete structure 104. During pouring, the resilient elastomeric sleeve body may resist tearing, puncturing, crushing or displacement caused by wet concrete, reinforcement, tools, formwork components or foot traffic. Where present, the deformation ribs 109 may assist in resisting compression and maintaining the annular separation zone between the pipe 103 and the concrete structure 104.
[0084] After curing of the concrete, the sleeve 100 remains entrapped between the outer surface of the pipe 103 and the inner surface of the cured concrete structure 104. The sleeve 100 prevents direct bonding between the pipe 103 and the concrete structure 104 and maintains the substantially uniform annular separation zone to accommodate differential movement. The system thereby provides a controlled pipe penetration interface that may improve long-term durability of the pipe installation.
[0085] The described system may provide several technical advantages compared with conventional lagging arrangements, particularly arrangements based on manually wrapping strips of insulation or foam material around a pipe before concrete pouring. The pre-formed tubular lagging sleeve 100 allows the pipe 103 to be enveloped in a single installation operation, reducing the time and skill required to form the lagging interface and reducing variability between installers. This may be particularly useful in construction environments where multiple pipe penetrations must be prepared consistently and quickly.
[0086] The substantially uniform wall thickness of the sleeve 100 assists in maintaining a predictable annular separation zone around the pipe 103. This contrasts with manually wrapped arrangements, where gaps, overlaps, uneven tension, inconsistent layer thickness or localised compression may occur. Byproviding a pre-formed sleeve body, the system may reduce the risk of incomplete coverage and may provide a cleaner, more repeatable installation outcome.
[0087] The resilient elastomeric material of the sleeve 100, particularly where composed of polychloroprene rubber or styrene-butadiene rubber, may provide improved construction-stage durability compared with typical polyethylene or elastomeric foam wrap products. The sleeve 100 may be less susceptible to tearing, puncturing, abrasion, crushing or displacement during handling, placement of reinforcement, tool contact, foot traffic or concrete pouring. This improved robustness may reduce the risk that the isolation interface is compromised before or during concrete placement.
[0088] By enabling elastic expansion of the sleeve 100 over the pipe 103, a close and stable engagement may be achieved without requiring external tapes, separate wrapping or additional fasteners. Optional features such as the adhesive 102, removable protective strip, longitudinal opening 105, closure arrangement 106, pulltab 110 and visual indicia 112 may provide further installation flexibility without being required in all embodiments.
[0089] The optional outer surface treatment 108 may reduce bonding or mechanical interlock between the sleeve 100 and the concrete structure 104, thereby assisting the sleeve 100 in performing as an isolation interface after concrete curing. The optional deformation ribs 109 may further assist in maintaining the annular separation zone under concrete load. These features may be selected according to the expected installation conditions and performance requirements.
[0090] The thermal and mechanical properties of the selected elastomeric materials may assist in accommodating long-term differential movement between the pipe 103 and the concrete structure 104. The sleeve 100 may deform resiliently in response to thermal expansion, settlement, vibration or structural movement while maintaining isolation between the pipe 103 and the surrounding concrete. The system may thereby protect against stress-induced damage and preserve the integrity of the pipe penetration over the operational life of the structure.
[0091] The foregoing description, for purposes of explanation, used specific nomenclature to provide a thorough understanding of the invention. However, it will be apparent to one skilled in the art that specific details are not required in order to practise the invention. Thus, the foregoing descriptions of specific embodiments of the invention are presented for purposes of illustration and description. They are not intended to be exhaustive or to limit the invention to the precise forms disclosed as obviously many modifications and variations are possible in view of the above teachings. The embodiments were chosen and described in order to best explain the principles of the invention and its practical applications, thereby enabling others skilled in the art to best utilize the invention and various embodiments with various modifications as are suited to the particular use contemplated. It is intended that the following claims and their equivalents define the scope of the invention.
Claims
Claims1. A system for forming a controlled pipe penetration interface within a concrete structure, the system comprising:a pipe configured to penetrate the concrete structure; anda pre-formed tubular lagging sleeve positioned around the pipe at a region corresponding to a location of the concrete structure, the pre-formed tubular lagging sleeve comprising a resilient elastomeric sleeve body composed of polychloroprene rubber or styrene-butadiene rubber and having a substantially uniform wall thickness selected to define a substantially uniform annular separation zone between the pipe and the concrete structure, wherein a relaxed internal diameter of the pre-formed tubular lagging sleeve is selected relative to an external diameter of the pipe such that the pre-formed tubular lagging sleeve is elastically expanded during installation over the pipe and thereafter self-retains on the pipe by elastic engagement without requiring wrapping of lagging material around the pipe, and wherein, upon pouring and curing of concrete of the concrete structure, the pre-formed tubular lagging sleeve is entrapped between the pipe and the concrete structure to prevent direct bonding between the pipe and the concrete structure while maintaining the substantially uniform annular separation zone to accommodate differential movement therebetween.
2. The system of claim 1, wherein the resilient elastomeric sleeve body is composed of polychloroprene rubber.
3. The system of claim 1, wherein the resilient elastomeric sleeve body is composed of styrene-butadiene rubber.
4. The system of claim 1, wherein the substantially uniform wall thickness is from about 3 mm to about 20 mm.
5. The system of claim 1, wherein the substantially uniform wall thickness is at least about 6 mm.
6. The system of claim 1, wherein the pre-formed tubular lagging sleeve has a length greater than a thickness of the concrete structure and is trimmable on site to match the thickness of the concrete structure.
7. The system of claim 1, wherein the pre-formed tubular lagging sleeve is supplied in lengths of at least 2 metres.
8. The system of claim 1, wherein the pre-formed tubular lagging sleeve comprises at least one circumferential weakness to assist separation of the pre-formed tubular lagging sleeve at a predefined axial location.
9. The system of claim 1, wherein the pre-formed tubular lagging sleeve comprises a plurality of axially spaced circumferential weaknesses defining modular sleeve sections.
10. The system of claim 1, wherein the resilient elastomeric sleeve body is formed from a sheet of elastomeric material having opposed longitudinal edges joined along a longitudinal seam.
11. The system of claim 10, wherein the opposed longitudinal edges are joined by stitching.
12. The system of claim 10, wherein the opposed longitudinal edges are joined by adhesive bonding, heat welding, mechanical fastening, or a combination thereof.
13. The system of claim 1, wherein the pre-formed tubular lagging sleeve comprises a longitudinal opening enabling the pre-formed tubular lagging sleeve to be fitted laterally around the pipe.
14. The system of claim 13, wherein the pre-formed tubular lagging sleeve comprises a closure arrangement configured to close the longitudinal opening after fitting of the pre-formed tubular lagging sleeve around the pipe.
15. The system of claim 14, wherein the closure arrangement comprises an adhesive strip, a mechanical fastener, a hook-and-loop fastener, a zip fastener, a clip formation, or a welded seam.
16. The system of claim 1, wherein an inner surface of the pre-formed tubular lagging sleeve directly contacts an outer surface of the pipe.
17. The system of claim 1, wherein an inner surface of the pre-formed tubular lagging sleeve is configured to frictionally engage the pipe to inhibit axial displacement of the pre-formed tubular lagging sleeve during pouring of the concrete.
18. The system of claim 1, wherein an adhesive is provided at an internal surface of the pre-formed tubular lagging sleeve for bonding the pre-formed tubular lagging sleeve to the pipe.
19. The system of claim 18, wherein the adhesive is provided only at discrete axial locations within the pre-formed tubular lagging sleeve.
20. The system of claim 18, wherein the adhesive is provided at or adjacent one or both axial ends of the pre-formed tubular lagging sleeve.
21. The system of claim 18, wherein the adhesive is provided in a circumferential band about the internal surface of the pre-formed tubular lagging sleeve.
22. The system of claim 18, wherein the adhesive is covered by a removable protective strip prior to installation.
23. The system of claim 22, wherein an end of the removable protective strip protrudes from one end of the pre-formed tubular lagging sleeve.
24. The system of claim 1, wherein the pre-formed tubular lagging sleeve comprises an outer surface treatment configured to reduce bonding between the concrete and the pre-formed tubular lagging sleeve.
25. The system of claim 24, wherein the outer surface treatment comprises a low-friction coating, an anti-bond coating, a release coating, or a laminated outer layer.
26. The system of claim 1, wherein the pre-formed tubular lagging sleeve comprises an outer surface layer composed of a smooth abrasion-resistant material adhered to or laminated onto the resilient elastomeric sleeve body.
27. The system of claim 1, wherein the pre-formed tubular lagging sleeve includes circumferential surface features or deformation ribs.
28. The system of claim 27, wherein the circumferential surface features or deformation ribs are integrally formed with the resilient elastomeric sleeve body.
29. The system of claim 1, wherein the pre-formed tubular lagging sleeve includes a reinforced edge or pull-tab at one end to assist installation over the pipe.
30. The system of claim 1, wherein one or both ends of the pre-formed tubular lagging sleeve include a bevelled, flanged, or thickened section.
31. The system of claim 1, wherein an internal surface of the pre-formed tubular lagging sleeve is tapered along its length to produce a compression fit against the pipe at one or both ends.
32. The system of claim 1, wherein the pre-formed tubular lagging sleeve includes visual indicia indicating a size, wall thickness, material type, cut location, insertion depth, or installation orientation.
33. The system of claim 1, wherein the pre-formed tubular lagging sleeve is colour coded to identify a pipe size, sleeve thickness, material grade, or installation category.
34. The system of claim 1, wherein the resilient elastomeric sleeve body comprises a cross-linked or layered structure.
35. The system of claim 1, wherein the pre-formed tubular lagging sleeve comprises a fire-retardant additive, an acoustic damping layer, a thermal insulation layer, or a combination thereof.
36. The system of claim 1, wherein the pipe comprises PVC, HDPE, copper, PEX, cast iron, mild steel, stainless steel, or another plumbing conduit material.
37. The system of claim 1, wherein the concrete structure comprises a footing, slab, wall, beam, or other cast concrete element.
38. A method of forming a controlled pipe penetration interface within a concrete structure, the method comprising:providing a pipe configured to penetrate the concrete structure;installing a pre-formed tubular lagging sleeve around the pipe at a region corresponding to a location of the concrete structure, the pre-formed tubular lagging sleeve comprising a resilient elastomeric sleeve body composed of polychloroprene rubber or styrene-butadiene rubber and having a substantially uniform wall thickness selected to define a substantially uniform annular separation zone between the pipe and the concrete structure;elastically expanding the pre-formed tubular lagging sleeve during installation over the pipe such that the pre-formed tubular lagging sleeve thereafter self-retains on the pipe by elastic engagement without requiring wrapping of lagging material around the pipe;pouring concrete around the pipe and the pre-formed tubular lagging sleeve; andcuring the concrete such that the pre-formed tubular lagging sleeve is entrapped between the pipe and the concrete structure to prevent direct bonding between the pipe and the concrete structure while maintaining the substantially uniform annular separation zone to accommodate differential movement therebetween.
39. The method of claim 38, further comprising trimming the pre-formed tubular lagging sleeve on site to match a thickness of the concrete structure.
40. The method of claim 38, further comprising separating the pre-formed tubular lagging sleeve at a circumferential weakness before or during installation.
41. The method of claim 38, further comprising selecting the pre-formed tubular lagging sleeve based on visual indicia provided on the pre-formed tubular lagging sleeve.
42. The method of claim 38, further comprising aligning the pre-formed tubular lagging sleeve relative to formwork, ground level, reinforcement, or a concrete penetration location based on visual indicia provided on the pre-formed tubular lagging sleeve.
43. The method of claim 38, wherein installing the pre-formed tubular lagging sleeve comprises sliding the pre-formed tubular lagging sleeve axially over an end of the Pipe.
44. The method of claim 38, wherein installing the pre-formed tubular lagging sleeve comprises opening a longitudinal opening of the pre-formed tubular lagging sleeve, fitting the pre-formed tubular lagging sleeve laterally around the pipe, and closing the longitudinal opening.
45. The method of claim 38, further comprising removing a protective strip from an internal adhesive of the pre-formed tubular lagging sleeve after the pre-formed tubular lagging sleeve has been positioned on the pipe.
46. The method of claim 38, wherein the pre-formed tubular lagging sleeve comprises an outer surface treatment, and the method comprises orienting the outer surface treatment outwardly relative to the pipe.
47. The method of claim 38, wherein the pre-formed tubular lagging sleeve comprises a reinforced edge or pull-tab, and the method comprises pulling the reinforced edge or pull-tab to assist installation of the pre-formed tubular lagging sleeve over the pipe.
48. The method of claim 38, wherein the pre-formed tubular lagging sleeve comprises circumferential surface features or deformation ribs, and the method comprises embedding the circumferential surface features or deformation ribs in the concrete during curing of the concrete.