Drilling parameter optimization with stability map validation

The method and assembly validate and enhance heat maps using short-term measurements to maintain their relevance across varying formations, enhancing drilling efficiency and stability by adapting to changing conditions.

WO2026235702A1PCT designated stage Publication Date: 2026-11-12BAKER HUGHES OILFIELD OPERATIONS LLC
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
PCT/US2025/028584
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Filing Date
2025-05-09
Publication Date
2026-11-12

AI Technical Summary

Technical Problem

Existing heat maps used to optimize drilling parameters become invalid when a drill string crosses formations with different compositions, necessitating a method to validate their applicability.

Method used

A method and drilling assembly that includes sensors and a processor to determine a heat map, obtain short-term measurements, validate its validity, and enhance or clear it when necessary, ensuring the heat map remains applicable to the current formation.

Benefits of technology

Ensures the heat map accurately reflects the current formation's drilling conditions, optimizing drilling parameters for improved efficiency and stability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure US2025028584_12112026_PF_FP_ABST
    Figure US2025028584_12112026_PF_FP_ABST
Patent Text Reader

Abstract

A method of operating a drill string (106) is disclosed. A heat map (206) is determined that relates a drilling response of the drill string to drilling parameters for a first time period. Short-term measurements (304) of the drilling response and the drilling parameters for the drill string are obtained during a second time period subsequent to the first time period. A validity (308) of the heat map is checked against the short-term measurements for the drilling parameters. The heat map is cleared when the heat map is determined to be invalid. The heat map is enhanced using the short-term measurements. The drill string is operated using the heat map.
Need to check novelty before this filing date? Find Prior Art

Description

65ATM-511273-WO-1 (INT1048PCT)DRILLING PARAMETER OPTIMIZATION WITH STABILITY MAP VALIDATIONBACKGROUND

[0001] In the resource recovery industry and fluid sequestration industry, a heat map can be used to optimize a drilling process. A heat map shows a relation between drilling parameters of a drill string in a formation and a drilling response of the drill string. The heat map can thus be used to determine which drilling parameters to apply to the drill string to achieve a desired drilling response. The form of the heat map is due to a composition of the formation being drilled. Thus, while a heat map can be suitable for use in a first formation having a first composition, it can be invalid, or no longer applicable, when the drill string crosses over into a second formation having a second composition. Therefore, there is a need to be able to validate the applicability of the heat map to the formation being drilled.SUMMARY

[0002] In one aspect, a method of operating a drill string is disclosed. A heat map is determined that relates a drilling response of the drill string to drilling parameters for a first time period. Short-term measurements of the drilling response and the drilling parameters for the drill string are obtained during a second time period subsequent to the first time period. A validity of the heat map is checked against the short-term measurements for the drilling parameters. The heat map is cleared when the heat map is determined to be invalid. The heat map is enhanced using the short-term measurements. The drill string is operated using the heat map.

[0003] In another aspect, a drilling assembly is disclosed. The drilling assembly includes a drill string, one or more sensors for measuring drilling parameters of the drilling assembly and a drilling response of the drill string, and a processor. The processor is configured to determine a heat map that relates the drilling response of the drill string to the drilling parameters for a first time period, obtain short-term measurements of the drilling response and the drilling parameters for the drill string during a second time period subsequent to the first time period, check a validity of the heat map against the short-term measurements for the drilling parameters, clear the heat map when the heat map is determined to be invalid, enhance the heat map using the short-term measurements, and operate the drill string using the heat map.65ATM-511273-WO-1 (INT1048PCT)BRIEF DESCRIPTION OF THE DRAWINGS

[0004] The following descriptions should not be considered limiting in any way. With reference to the accompanying drawings, like elements are numbered alike:

[0005] Figure 1 shows a drilling assembly for drilling a well in a formation, in an embodiment;

[0006] Figure 2 depicts a heat map that can be used to control operation of a drill string during drilling of a formation;

[0007] Figure 3 shows a flowchart of a method for drilling through a formation using a heat map;

[0008] Figure 4 shows a graph of parameters suitable for use in building a heat map;

[0009] Figure 5 is a diagram depicting a side-by-side comparison of a first heat map and a second heat map; and

[0010] Figure 6 is a diagram illustrating a method of checking a validity of the heat map.DETAILED DESCRIPTION

[0011] A detailed description of one or more embodiments of the disclosed apparatus and method are presented herein by way of exemplification and not limitation with reference to the Figures.

[0012] Referring to Figure 1, a drilling assembly 100 is shown for drilling a well 102 in a formation 104, in an embodiment. The drilling assembly 100 includes a drill string 106 extending into the well 102 from a rig 108 at a surface location 110. The drill string 106 includes a drill bit 112 at a bottom end for drilling the well 102 and extending a length of the well 102. A rotary table 114 at the rig 108 can be used to rotate the drill string 106 and thereby rotate the drill bit 112. Alternatively, a downhole motor 116 can be used to rotate the drill bit 112 with respect to the drill string 106. A steering device or steering assembly 118 can be used to change a direction of drilling of the drill string 106, thereby allowing for the drilling of a deviated and / or horizontal well.

[0013] The drilling assembly 100 further includes a mud pit 120 for storage of drilling mud 122 used in drilling of the well 102. A standpipe 124 extends from the mud pit 120 to an opening at a top end of the drill string 106, and a return line 126 extends from a top end of the well 102 to the mud pit 120. Drilling mud 122 is circulated from the mud pit 120 to an interior bore 128 of the drill string 106 via the standpipe 124. The drilling mud 122 flows down the interior bore 128 to exit the drill string 106 at the drill bit 112 and then flows65ATM-511273-WO-1 (INT1048PCT)back to the surface via the annular space 130 between the drill string and a wall 132 of the well 102. The drilling mud 122 then flows back to the mud pit 120 via the return line 126. The drilling mud 122 can be used to rotate elements of the downhole motor 116 as it passes through the interior bore 128. Also, the drilling mud 122 flowing through the annular space 130 draws cuttings (not shown) formed by rotation of the drill bit 112 to the surface and out of the well 102. A pump 134 can be used to control a flow rate of the drilling mud 122.L0014 J The drilling assembly 100 includes various sensors 136, which can be at the surface location 110 or conveyed downhole by the drill string 106. The various sensors can be used to measure drilling parameters related to the drilling operation, such as revolutions per minute (RPM) of the drill bit 112, flow rate of the drilling mud 122, a weight-on-bit (WOB), a torque on the drill string 106 (surface and / or downhole), mud density, mud viscosity, mud sand content, motor speed, etc. The sensors can also be used to derive various drilling responses related to operation of the drill string using the drilling parameters.Illustrative drilling responses can include, but are not limited to, a rate of penetration (ROP) of the drill string 106, vibrations on the drill string including high frequency torsional oscillations (HFTO), differential pressure on the drill string, torque on the drill string, etc. In general, the control unit 140 can select drilling parameters to operate the drill string 106 to obtain a selected drilling response.

[0015] A control unit 140 can be used to control operation of the drilling assembly 100. The control unit 140 includes a processor 142 and a memory storage device 144 having programs and / or instructions stored therein that, when accessed by the processor 142, enable the processor 142 to perform various operations disclosed herein. In one embodiment, the processor 142 obtains measurements from the drilling assembly 100, such as drilling parameters and drilling responses, determines a heat map based on the drilling parameters and drilling responses and determines a set of drilling parameters for achieving an optimal drilling response at the drill string. The processor 142 can then control operation of the rig 108, rotary table 114, and pump 134 as well as other devices to apply the set of drilling parameters to the drilling assembly 100.

[0016] Figure 2 depicts a heat map 200 that can be used to control operation of a drill string during drilling of a formation. The heat map 200 relates drilling parameters to a drilling response. The drilling parameters can be selected from a weight on bit (WOB), a rotation rate revolutions per minute (RPM) of the drilling and / or a flow rate of the drilling mud. Exemplary drilling responses can be a rate of penetration (ROP), a vibration at the drill string, a high frequency torsional oscillation at the drill string, a differential pressure, and / or a65ATM-511273-WO-1 (INT1048PCT)torque. For illustrative purposes only, the heat map 200 disclosed herein uses the drilling parameters of revolutions per minute (RPM) and weight-on-bit (WOB) and the drilling response of rate of penetration (ROP).

[0017] The heat map 200 includes rotary speed along the abscissa in revolutions per minute (RPM) and a weight-on-bit (WOB) along the ordinate axis in tons. The abscissa is discretized into a plurality of RPM bins (such as RPM bin 204) and the ordinate axis is discretized into a plurality of WOB bins (such as WOB bin 206). Each RPM bin extends over an RPM bin range and each WOB bin extends over a WOB bin range. For illustrative purposes, the RPM bin range is about 10 RPM, and the WOB bin range is about 2.5 tons.

[0018] The heat map 200 further includes a plurality of two-dimensional bins (2D bins), with the dimensions of each 2D bin corresponding to an RPM bin and an WOB bin. The area of a 2D bin is defined by the RPM bin range of its corresponding RPM bin and the WOB bin range of its corresponding WOB bin. A color or intensity of the 2D bin indicates a value of die drilling response. Thus, a 2D bin having a light intensity (such as bin 208) has a low drilling response and a 2D bin having a dark intensity (such as bin 210) has a high drilling response.

[0019] Region 212 indicates a standard operating region for the drill string. Point 214 indicates a current operating point of the drill string. Point 216 indicates a desired operating point of the drill string.

[0020] The heat map 200 can be generated using measurements obtained while drilling through a formation. During drilling of a formation, the WOB, RPM and ROP are periodically measured and their values are added to the heat map. In another embodiment, the heat map 200 can be generated using measurements obtained from an offset well. In yet another embodiment, the heat map 200 can be generated using a simulation or a model.

[0021] Using the heat map 200, a desired ROP for the drill string can be selected and a corresponding RPM and WOB for achieving the desired ROP can be determined. Thus, the heat map 200 can be used to optimize drilling of the formation.

[0022] Figure 3 shows a flowchart 300 of a method for drilling through a formation using a heat map. In box 302. the drilling is commenced using an initial RPM, an initial WOB, and a first heat map or initial heat map. The first heat map can be a clear heat map (no entries) or a heat map that has been built up using measurements obtained over a first time period. The first heat map can also be a heat map that is loaded from a memory and which contains an expected response for the current formation.65ATM-511273-WO-1 (INT1048PCT)

[0023] In box 304, values of the drilling response (ROP) (“short term measurements”) are measured during the drilling process. The drilling response is measured over a second time period that follows the first time period. The second time period is generally a short time period while the first time period is generally a long time period. In various embodiments, the first time period is on an order of hours or days, and the second time period is on an order of minutes.

[0024] In box 306, the short-term measurements of the drilling response obtained in box 304 are used to the validate the first heat map. Validating the first heat map means determining whether the first heat map is still applicable to the drilling operation. Validating the first heat map can include comparing the short-term measurements to the first heat map. Alternatively, the short-term measurements can be considered to establish a second heat map, and the second heat map can be used to validate the first heat map.

[0025] In box 308, an action is determined based on the validity of the first heat map. If the first heat map is valid, the method proceeds to box 312. In box 312, the short-term measurements obtained during the second time period are added to the first heat map to thereby enhance the first heat map.

[0026] Returning to box 308, if the heat map is not valid, the method proceeds to box 310. In box 310, the first heat map is cleared. Clearing the first map means initializing the first map with a new first map in memory that represents the current formation or modifying the first map to form a new first map that is valid for the current formation. Alternatively, clearing the first map can mean initializing the first map to a base state such that all bins are at a set number, such as zero, or such that all bins contain values generated using a model, simulator or data from an offset well. The method then proceeds to box 312. In box 312, the short-term measures are used to enhance the first heat map. In this scenario, the short-term measurements are the first entries into the new first heat map.

[0027] In box 314, the first heat map is used to propose new drilling parameters (i.e., new RPM and WOB). In box 316, the drill string is operated using the new' drilling parameters from box 314. Hie method can then return to box 304 to reiterate the process.

[0028] Figure 4 show's a graph 400 of parameters suitable for use in building a heat map. The graph 400 includes drilling parameters (WOB, RPM) and a drilling response (ROP) over time. Three graphs are shown sharing a common abscissa. Time is shown along the common abscissa. A first graph 402 shows RPM along the ordinate axis, which is segmented into RPM bins 404a-404d. A second graph 406 shows WOB along the ordinate axis, which is segmented into WOB bins 408a-408d. A third graph 410 shows ROP along the65ATM-511273-WO-1 (INT1048PCT)ordinate axis. In the first graph 402, a first curve 412 shows RPM values over time. In the second graph 406, a second curve 414 shows WOB values over time. In the third graph 410, a third curve 416 shows ROP values over time.

[0029] Time intervals 426, 428 and 430 indicate times when the relation between RPM and WOB are approximately the same. For example, in these periods, the WOB is within WOB bin 408c and RPM is within RPM bin 404d. These values can be used to select the ROP values from third graph 410, which are then used to calculate a value for a corresponding 2-D bin on the heat map.

[0030] A first threshold line 418 indicates an average of ROP values over a first time period 420 (i.e., a long time period) during the intervals (e.g., 426, 428, 430) during which WOB values are approximately the same and RPM values are approximately the same. A second threshold line 422 indicates an average of ROP values over a second time period 424 (i.e., a short time period) during the intervals (e.g., 430) during which WOB values are approximately the same and RPM values are approximately the same. The first time period 420 and the second time period 424 are both moving windows extending backward in time from the present moment.

[0031] Various methods can be used to evaluate a validity of a heat map. In one embodiment, validating the heat map can include comparing an absolute change in ROP for one combination of WOB and RPM against a threshold value established for the combination. In another embodiment, validating the heat map can include comparing a relative change in ROP for one combination of WOB and RPM against a threshold for the combination. The threshold can be established using the heat map(s). For example, a difference between the first threshold line 418 and the second threshold line 422, either in relative terms or absolute terms, can be compared to criterion to determine the validity of the heat map. If the difference is less than the criterion, the heat map is valid. Otherwise, the heat map is considered not valid.

[0032] In another embodiment, pattern recognition (or classification) techniques can be used to detect changes and validate the heat map. For example, a color or intensity of bins within the first heat map can be compared to a color or intensity of corresponding bins within a second heat map to determine whether the first heat map is valid.

[0033] Figure 5 is a diagram 500 depicting a side-by-side comparison of a first heat map 502 including drilling responses obtained during a first time period (such as 420 in Figure 4) and a second heat map 504 including drilling responses obtained during a second65ATM-511273-WO-1 (INT1048PCT)time period (such as 424 in Figure 4). Due to the relative shortness of the second time period, the second heat map 504 includes only a subset of the bins shown in the first heat map 502.

[0034] A classifying algorithm can be used to assign each heat map to a class. The algorithm can assign a first class to the first heat map based on bins 506a, 506b, 506c (i.e., those bins in the first heat map 502 that have a corresponding bin in the second heat map 504). The algorithm can assign a second class to the second heat map based on the bins 508a, 508b, 508c. If the first class and the second class are not the same, within a criterion, then the first heat map is considered invalid.

[0035] In another embodiment, an algorithm can calculate a first value for the first heat map based on ROP values of bins 506a, 506b and 506c and a second value for the first heat map based on ROP values of bins 508a, 508b and 508c and compare the first value to the second value to determine a validity of the first heat map.

[0036] In another embodiment, the measurements used in determining the heat map can be used to predict an expected ROP and confidence interval for the heat map. In particular, an expected ROP and confidence interval for the 2-D bin can be calculated for a selected 2-D bin of the first heat map. This calculation can be performed using a Gaussian Process (GP). The GP can determine the expected value and a confidence interval for each 2D bin of the first heat map (not only the 2-D bins for which corresponding measurements are available). The confidence interval can be a selected value of the standard deviation (e.g., 1-σ, 2- σ, etc.) The average of the short-term measurements can be compared to the confidence interval of its corresponding 2-D bin from the first heat map. The first heat map can be considered invalid when the short-term average is outside the confidence interval.

[0037] Figure 6 is a diagram 600 illustrating another method of checking a validity of the heat map. A first graph 602 shows a first heat map and a second graph 604 shows a second heat map based on short term measurements. The first heat map includes bins 606a-606c that correspond to short term measurements 608a-608c. If there is uncertainty in the validity of the heat map using a comparison of values from the bins 606a-606c to short term measurements 608a-608c, the processor or algorithm can actively propose a selected WOB and RPM combination (indicated by point 610) for which ROP can be measured and use ROP measurements obtained at the selected WOB and RPM. The measured ROP can be compared to values from the first heat map (indicated by point 612) to run a test for validity, thereby resolving the uncertainty.

[0038] Set forth below are some embodiments of the foregoing disclosure:65ATM-511273-WO-1 (INT1048PCT)

[0039] Embodiment 1. A method of operating a drill string. A heat map is determined that relates a drilling response of the drill string to drilling parameters for a first time period. Short-term measurements of the drilling response and the drilling parameters for the drill string are obtained during a second time period subsequent to the first time period. A validity of the heat map is checked against the short-term measurements for the drilling parameters. The heat map is cleared when the heat map is determined to be invalid. The heat map is enhanced using the short-term measurements. The drill string is operated using the heat map.

[0040] Embodiment 2. The method of any prior embodiment, wherein the heat map is a first heat map and the short-term measurements obtained during the second time period is used to generate a second heat map, further comprising checking the validity of the first heat map using the second heat map.

[0041] Embodiment 3. The method of any prior embodiment, wherein the first time period is on an order of hours to days and the second time period is on an order of minutes.

[0042] Embodiment 4. The method of any prior embodiment, further including comparing the first heat map to the second heat map using pattern recognition.

[0043] Embodiment 5. The method of any prior embodiment, further including predicting an expected value and a confidence interval based on the heat map, determining an average of the short-term measurements, and comparing the average to the expected value and the confidence interval to determine the validity.

[0044] Embodiment 6. The method of any prior embodiment, further including invalidating the heat map when the average differs from the expected value by an amount greater than the confidence interval, which is one of: (i) 1-σ; and (ii) 2-σ.

[0045] Embodiment 7. The method of any prior embodiment, wherein the drilling parameters include two selected from: (i) weight-on-bit (WOB); (ii) rotation rate (RPM); (iii) flow rate of drilling fluid.

[0046] Embodiment 8. The method of any prior embodiment, wherein the drilling response is one of: (i) a rate of penetration (ROP); (ii) a vibration at the drill string; (iii) a high frequency torsional oscillation at the drill string; (iv) a differential pressure; and (v) a torque.

[0047] Embodiment 9. The method of any prior embodiment, further including proposing a selected weight-on-bit (WOB) and rotation rate (RPM) combination, measuring a rate of penetration (ROP) at the selected WOB and RPM combination, and comparing the65ATM-511273-WO-1 (INT1048PCT)ROP measurement to a value from the heat map for the same WOB and RPM combination to determine the validity of the heat map.

[0048] Embodiment 10. The method of any prior embodiment, wherein clearing the first map further comprises at least one of: (i) initializing the first map with a new first map in memory that represents the current formation; (ii) modifying the first map to form a new first map that is valid for the current formation; (iii) initializing the first map to a base state such that all bins are at a set number; and (iv) initializing the first map to a base state such that all bins contain values generated using a model, simulator or data from an offset well.

[0049] Embodiment 11. A drilling assembly. The drilling assembly includes a drill string, one or more sensors for measuring drilling parameters of the drilling assembly and a drilling response of the drill string, and a processor. The processor is configured to determine a heat map that relates the drilling response of the drill string to the drilling parameters for a first time period, obtain short-term measurements of the drilling response and the drilling parameters for the drill string during a second time period subsequent to the first time period, check a validity of the heat map against the short-term measurements for the drilling parameters, clear the heat map when the heat map is determined to be invalid, enhance the heat map using the short-term measurements, and operate the drill string using the heat map.

[0050] Embodiment 12. The drilling assembly of any prior embodiment, wherein the heat map is a first heat map and the processor is further configured to use the short-term measurements obtained during the second time period to generate a second heat map and check the validity of the first heat map using the second heat map.

[0051] Embodiment 13. The drilling assembly of any prior embodiment, wherein the first time period is on an order of hours to days and the second time period is on an order of minutes.

[0052] Embodiment 14. The drilling assembly of any prior embodiment, wherein the processor is further configured to compare the first heat map to the second heat map using pattern recognition.

[0053] Embodiment 15. The drilling assembly of any prior embodiment, wherein the processor is further configured to predict an expected value and a confidence interval based on the heat map, determine an average of the short-term measurements, and compare the average to the expected value and the confidence interval to determine the validity.

[0054] Embodiment 16. The drilling assembly of any prior embodiment, wherein the processor is further configured to invalidate the heat map when the average differs from the65ATM-511273-WO-1 (INT1048PCT)expected value by an amount greater than the confidence interval, which is one of: (i) 1-σ; and (ii) 2-σ.

[0055] Embodiment 17. The drilling assembly of any prior embodiment, wherein the drilling parameters include two selected from: (i) weight-on-bit (WOB); (ii) rotation rate (RPM); (iii) flow rate of drilling fluid; and the drilling response is one of: (i) a rate of penetration (ROP); (ii) a vibration at the drill string; (iii) a high frequency torsional oscillation at the drill string; (iv) a differential pressure; and (v) a torque.

[0056] Embodiment 18. The drilling assembly of any prior embodiment, wherein the processor is further configured to propose a selected WOB and RPM combination, measure ROP at the selected WOB and RPM combination, and compare the ROP measurement to a value from the heat map for the same WOB and RPM combination to determine the validity of the heat map.

[0057] The use of the terms “a” and “an” and “the” and similar referents in the context of describing the invention (especially in the context of the following claims) are to be construed to cover both the singular and the plural, unless otherwise indicated herein or clearly contradicted by context. Further, it should be noted that the terms “first,” “second,” and the like herein do not denote any order, quantity, or importance, but rather are used to distinguish one element from another. The terms “about”, “substantially” and “generally” are intended to include the degree of error associated with measurement of the particular quantity based upon the equipment available at the time of filing the application. For example, “about” and / or “substantially” and / or “generally” can include a range of + 8% a given value.

[0058] The teachings of the present disclosure may be used in a variety of well operations. These operations may involve using one or more treatment agents to treat a formation, the fluids resident in a formation, a borehole, and / or equipment in the borehole, such as production tubing. The treatment agents may be in the form of liquids, gases, solids, semi-solids, and mixtures thereof. Illustrative treatment agents include, but are not limited to, fracturing fluids, acids, steam, water, brine, anti-corrosion agents, cement, permeability modifiers, drilling muds, emulsifiers, demulsifiers, tracers, flow improvers etc. Illustrative well operations include, but are not limited to, hydraulic fracturing, stimulation, tracer injection, cleaning, acidizing, steam injection, water flooding, cementing, etc.

[0059] While the invention has been described with reference to an exemplary embodiment or embodiments, it will be understood by those skilled in the art that various changes may be made and equivalents may be substituted for elements thereof without departing from the65ATM-511273-WO-1 (INT1048PCT)scope of the invention. In addition, many modifications may be made to adapt a particular situation or material to the teachings of the invention without departing from the essential scope thereof. Therefore, it is intended that the invention not be limited to the particular embodiment disclosed as the best mode contemplated for carrying out this invention, but that the invention will include all embodiments falling within the scope of the claims. Also, in the drawings and the description, there have been disclosed exemplary embodiments of the invention and, although specific terms may have been employed, they are unless otherwise stated used in a generic and descriptive sense only and not for purposes of limitation, the scope of the invention therefore not being so limited.

Claims

65ATM-511273-WO-1 (INT1048PCT)What is claimed is:

1. A method of operating a drill string, characterized by:determining a heat map that relates a drilling response of the drill string to drilling parameters for a first time period;obtaining short-term measurements of the drilling response and the drilling parameters for the drill string during a second time period subsequent to the first time period;checking a validity of the heat map against the short-term measurements for the drilling parameters;clearing the heat map when the heat map is determined to be invalid;enhancing the heat map using the short-term measurements; andoperating the drill string using the heat map.

2. The method of claim 1, wherein the heat map is a first heat map and the shortterm measurements obtained during the second time period is used to generate a second heat map, further comprising checking the validity of the first heat map using the second heat map.

3. The method of claim 2, wherein the first time period is on an order of hours to days and the second time period is on an order of minutes.

4. The method of claim 2, further comprising comparing the first heat map to the second heat map using pattern recognition.

5. The method of claim 1, further comprising predicting an expected value and a confidence interval based on the heat map, determining an average of the short-term measurements, and comparing the average to the expected value and the confidence interval to determine the validity.

6. The method of claim 5, further comprising invalidating the heat map when the average differs from the expected value by an amount greater than the confidence interval, which is one of: (i) 1-σ; and (ii) 2-σ.

7. The method of claim 1, wherein the drilling parameters include two selected from: (i) weight-on-bit (WOB); (ii) rotation rate (RPM); (iii) flow rate of drilling fluid.

8. The method of claim 1, wherein the drilling response is one of: (i) a rate of penetration (ROP); (ii) a vibration at the drill string; (iii) a high frequency torsional oscillation at the drill string; (iv) a differential pressure; and (v) a torque.

9. The method of claim 1, further comprising proposing a selected weight-on-bit (WOB) and rotation rate (RPM) combination, measuring a rate of penetration (ROP) at the selected WOB and RPM combination, and comparing the ROP measurement to a value from65ATM-511273-WO-1 (INT1048PCT)the heat map for the same WOB and RPM combination to determine the validity of the heat map.

10. The method of claim 1, wherein clearing the first map further comprises at least one of: (i) initializing the first map with a new first map in memory that represents the current formation; (ii) modifying the first map to form a new first map that is valid for the current formation; (iii) initializing the first map to a base state such that all bins are at a set number; and (iv) initializing the first map to a base state such that all bins contain values generated using a model, simulator or data from an offset well.

11. A drilling assembly, characterized by:a drill string;one or more sensors for measuring drilling parameters of the drilling assembly and a drilling response of the drill string; anda processor configured to:determine a heat map that relates the drilling response of the drill string to the drilling parameters for a first time period;obtain short-term measurements of the drilling response and the drilling parameters for the drill string during a second time period subsequent to the first time period;check a validity of the heat map against the short-term measurements for the drilling parameters;clear the heat map when the heat map is determined to be invalid;enhance the heat map using the short-term measurements; andoperate the drill string using the heat map.

12. The drilling assembly of claim 11, wherein the heat map is a first heat map and the processor is further configured to use the short-term measurements obtained during the second time period to generate a second heat map and check the validity of the first heat map using the second heat map.

13. The drilling assembly of claim 12, wherein the first time period is on an order of hours to days and the second time period is on an order of minutes.

14. The drilling assembly of claim 12, wherein the processor is further configured to compare the first heat map to the second heat map using pattern recognition.

15. The drilling assembly of claim 11, wherein the processor is further configured to predict an expected value and a confidence interval based on the heat map, determine an average of the short-term measurements, and compare the average to the expected value and the confidence interval to determine the validity.65ATM-511273-WO-1 (INT1048PCT)16. The drilling assembly of claim 15, wherein the processor is further configured to invalidate the heat map when the average differs from the expected value by an amount greater than the confidence interval, which is one of: (i) 1-σ; and (ii) 2-σ.

17. The drilling assembly of claim 11, wherein the drilling parameters include two selected from: (i) weight-on-bit (WOB); (ii) rotation rate (RPM); (iii) flow rate of drilling fluid; and the drilling response is one of: (i) a rate of penetration (ROP); (ii) a vibration at the drill string; (iii) a high frequency torsional oscillation at the drill string; (iv) a differential pressure; and (v) a torque.

18. The drilling assembly of claim 17, wherein the processor is further configured to propose a selected WOB and RPM combination, measure ROP at the selected WOB and RPM combination, and compare the ROP measurement to a value from the heat map for the same WOB and RPM combination to determine the validity of the heat map.