Intelligent decision-making method for large-scale transportation routes based on fuzzy hierarchical comprehensive evaluation method
Through the fuzzy hierarchical comprehensive evaluation method, the problem of insufficient economic and timeliness assessment in the planning of large-piece transportation paths in the existing technology is solved, intelligent path decision-making of large-piece transportation vehicles and bridge passability assessment are realized, and transportation efficiency is improved and security.
Patent Information
- Application Number
- CN202311382191.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-10-24
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2043-10-24
AI Technical Summary
The existing large-piece transportation path planning technology lacks comprehensive economic and timeliness considerations, and cannot effectively evaluate the bridge safety and space passability of large-piece transportation vehicles, resulting in the inability to achieve intelligent decision-making.
Using the method based on the fuzzy hierarchy comprehensive evaluation method, we can determine the optimal path and evaluate the passability of large-scale transport vehicles by obtaining user information, determining the membership function set, calculating influencing factors, performing fuzzy comprehensive evaluation, sorting and passability verification. sex.
A comprehensive evaluation of the economy, timeliness and risk of large-scale transportation paths is achieved, and the passability of large-scale transportation vehicles is quickly judged, which reduces human resources investment, and provides a rapid assessment and path of bridge passability. Intelligent decision-making.
Smart Images

Figure CN117350623B_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of intelligent transportation path planning, and in particular relates to an intelligent decision-making method for large-scale transportation paths based on a fuzzy hierarchical comprehensive evaluation method. Background Art
[0002] Intelligent Traffic System (ITS), also known as Intelligent Transportation System, effectively and comprehensively applies advanced science and technology (information technology, computer technology, data communication technology, sensor technology, electronic control technology, automatic control theory, operations research, artificial intelligence, etc.) to transportation, service control and vehicle manufacturing, strengthens the connection between vehicles, roads and users, and thus forms a comprehensive transportation system that ensures safety, improves efficiency, improves the environment and saves energy.
[0003] Under the intelligent transportation system, large-scale transportation will inevitably become an indispensable part of it. Large-scale transportation refers to the transportation and distribution of large equipment. Large equipment has advantages in weight and volume. Large items have strict requirements and cannot be transported by ordinary transportation vehicles. Special transportation tools are required to complete them. In the process of large-scale cargo distribution, logistics companies need to reasonably utilize the space of containers for loading and unloading goods in order to better save costs, and they also need to consider the economy and timeliness of large-scale transportation.
[0004] Under the management of the intelligent transportation system, the planning method of large-scale transportation routes has become an indispensable part of the intelligent transportation system. The existing large-scale transportation route planning technology directly uses map-assisted software or the shortest path algorithm to plan the route, and then performs spatial passability and safety verification on this basis to finally provide the optimal route. However, there is a lack of a method that comprehensively considers economy and timeliness to determine the recommended transportation route, and then verifies the passability of the control bridges along the recommended route, evaluates the safety and spatial passability of large-scale transportation vehicles crossing the bridge, and finally realizes intelligent route decision-making. Summary of the invention
[0005] In view of this, the purpose of the present invention is to provide an intelligent decision-making method for large-scale transportation routes based on fuzzy hierarchical comprehensive evaluation method to comprehensively consider economy and timeliness and determine the recommended transportation route, and then perform feasibility verification on the controlling bridges along the recommended route, evaluate the safety of large-scale transportation vehicles crossing the bridge and spatial feasibility, and finally realize a method for intelligent decision-making on large-scale transportation routes.
[0006] In order to achieve the above object, the present invention provides the following technical solutions:
[0007] The large-scale transport path intelligent decision-making method based on fuzzy hierarchical comprehensive evaluation method provided by the present invention comprises:
[0008] Step S1, obtaining the first application information about large-piece transportation submitted by the user, and determining a plurality of membership function sets therein;
[0009] Step S2: Determine the transportation starting point and end point according to the first application information and perform path optimization calculation to obtain multiple alternative paths;
[0010] Step S3, for any alternative path, predict and calculate multiple factors affecting the evaluation result generated by the target vehicle on the alternative path and generate a factor set, and use a fuzzy comprehensive evaluation method to perform fuzzy comprehensive evaluation based on multiple membership function sets and factor sets to obtain the evaluation result of the corresponding alternative path;
[0011] Step S4: sort the multiple candidate paths according to the evaluation results, and make a feasibility judgment on each candidate path in order based on whether the target vehicle can pass, until the optimal and passable candidate path is output.
[0012] Preferably, multiple membership function sets are pre-set by multiple experts from the company corresponding to the user, and each membership function set contains multiple membership functions. The membership function is used to calculate the evaluation results of the corresponding experts on the influencing factors according to the corresponding input influencing factors.
[0013] Preferably, step S3 includes:
[0014] Step S31: for any alternative route, a highway toll value is calculated based on multiple highway toll standards on the alternative route and the first application information, and fuel consumption is calculated by the total length of the alternative route and the vehicle type, and time information is calculated according to the total length of the route and the vehicle speed, and a factor set is formed using the highway toll value, fuel consumption, and time information;
[0015] Step S32: using multiple membership functions within any membership function set to perform calculations based on the factors in the factor set, determine the fuzzy mapping relationship between any element in the factor set and the evaluation index in the evaluation set, and obtain the scoring results of the experts corresponding to the membership function set for each factor;
[0016] Step S33: Count the scoring results of all experts, determine the distribution of evaluation indicators corresponding to any factor, and construct a single factor evaluation vector;
[0017] Step S34: construct a single factor evaluation matrix using multiple single factor evaluation vectors, and construct a comprehensive evaluation model in combination with the factor weight vector in the first application information to calculate and obtain the evaluation result of the corresponding alternative path.
[0018] Preferably, step S4 comprises:
[0019] Step S41, sorting multiple candidate paths according to the evaluation results to obtain a candidate path selection sequence;
[0020] Step S42: Select the alternative path with the best evaluation result, and determine all bridges on the pass path according to the target vehicle going up and down the alternative path and the hub conversion direction;
[0021] Step S43: for any bridge on the selected alternative path, determine the corresponding bridge-related parameters stored in the cloud, respectively use the load effect comparison method and the curved bridge anti-overturning verification algorithm to perform the first-stage calculation, and the bending bearing capacity detection algorithm to perform the second-stage calculation of the passability verification, and obtain the verification results;
[0022] Step S44: determining whether the bridge passes the traversability verification according to the verification result and the preset judgment criteria;
[0023] Step S45: When any bridge on the alternative path passes the traversability verification, the current alternative path is determined to be the optimal path. Otherwise, steps S42 to S44 are executed cyclically according to the suboptimal alternative path in the alternative path selection sequence until the optimal path is output.
[0024] Preferably, in step S43, when selecting any bridge on the alternative path, the bridges are preferentially selected in sequence from the alternative path close to the starting end and the passability is verified, and when the first impassable bridge appears, the bridge is recorded, and all alternative paths containing the bridge in the alternative path selection sequence are eliminated.
[0025] Preferably, the feasibility determination of each alternative path based on whether the target vehicle can pass also includes:
[0026] Acquire vehicle model information of a target vehicle and first-category three-dimensional point cloud scanning data of the target vehicle in a cargo-carrying state;
[0027] Obtaining the second type of three-dimensional point cloud scanning data of the real space corresponding to the multiple sections of the alternative path in advance, and the second type of three-dimensional model generated accordingly;
[0028] According to the vehicle model information of the target vehicle, a vehicle parameter model corresponding to the vehicle model pre-stored in the cloud is obtained, and the vehicle parameter model is matched with the first type of three-dimensional point cloud scanning data to obtain a matching result;
[0029] Determine the correspondence between the first type of 3D point cloud scan data and the vehicle body parts in the vehicle parameter model according to the matching results, and remove the sparse point cloud data in the first type of 3D point cloud scan data and the corresponding ground point cloud data below the wheels to obtain the third type of 3D point cloud scan data;
[0030] Generate a first-type three-dimensional model of the target vehicle in a cargo-carrying state according to the third-type three-dimensional point cloud scanning data, and establish a corresponding relationship between the third-type three-dimensional point cloud scanning data and the vehicle body parts in the first-type three-dimensional model;
[0031] Using the first type of three-dimensional model and the second type of three-dimensional model to conduct a simulation experiment of the target vehicle driving in the middle position of the corresponding road, and record the collision area and collision time of the first type of three-dimensional model and the second type of three-dimensional model;
[0032] When there is no collision area in multiple sections of the alternative path, it is determined that the target vehicle can pass on the alternative path.
[0033] The present invention has achieved at least the following beneficial effects:
[0034] 1. Through the present invention, it is possible to determine the recommended transportation route based on the fuzzy comprehensive evaluation method taking into account the economy, timeliness and risk, and evaluate the passability of large-scale transport vehicles on alternative routes, thereby ultimately achieving intelligent decision-making on the driving route of large-scale transport vehicles.
[0035] 2. Use membership function as the scoring standard to replace the direct scoring process by experts, thereby effectively reducing the investment in human resources.
[0036] 3. The system has implemented a simulation test on the collision of the target vehicle on the alternative path. Through the simulation test results, it can be judged whether the large-scale transport vehicle will inevitably collide with the height limit piles on the road, the top of the tunnel, and various points on the bridge structure during the transportation process, thereby realizing a rapid judgment on the passability and providing reference suggestions for relevant staff.
[0037] Other advantages, objectives and features of the present invention will be described in the following description and will be apparent to those skilled in the art to some extent, or those skilled in the art may be taught from the practice of the present invention. The objectives and other advantages of the present invention may be realized and obtained through the following description. BRIEF DESCRIPTION OF THE DRAWINGS
[0038] In order to make the purpose, technical solution and beneficial effects of the present invention clearer, the present invention provides the following drawings for illustration:
[0039] Figure 1It is a flowchart of a large-scale transportation route intelligent decision-making method based on fuzzy hierarchical comprehensive evaluation method in an embodiment of the present invention;
[0040] Figure 2 It is a flow chart of a fast decision-making method for large-scale transportation routes based on fuzzy hierarchical comprehensive evaluation method in an embodiment of the present invention;
[0041] Figure 3 The figure is a flow chart of the steps of judging the passability of a bridge in an embodiment of the present invention. DETAILED DESCRIPTION
[0042] The preferred embodiments of the present invention are described below in conjunction with the accompanying drawings. It should be understood that the preferred embodiments described herein are only used to illustrate and explain the present invention, and are not used to limit the present invention.
[0043] The large-scale transportation path intelligent decision-making method provided by the present invention based on the fuzzy hierarchical comprehensive evaluation method is referred to Figure 1 to Figure 2 ,include:
[0044] Step S1, obtaining the first application information about large-piece transportation submitted by the user, and determining a plurality of membership function sets therein;
[0045] Step S2: Determine the transportation starting point and end point according to the first application information and perform path optimization calculation to obtain multiple alternative paths;
[0046] Step S3, for any alternative path, predict and calculate multiple factors affecting the evaluation result generated by the target vehicle on the alternative path and generate a factor set, and use a fuzzy comprehensive evaluation method to perform fuzzy comprehensive evaluation based on multiple membership function sets and factor sets to obtain the evaluation result of the corresponding alternative path;
[0047] Step S4: sort the multiple candidate paths according to the evaluation results, and make a feasibility judgment on each candidate path in order based on whether the target vehicle can pass, until the optimal and passable candidate path is output.
[0048] The working principle and beneficial effects of the above technical solution are as follows: by obtaining the first application information submitted by the user regarding the transportation of large items, and determining multiple membership function sets therein; wherein the first application information at least includes the target vehicle model, the target vehicle load, the starting point and the end point of the target vehicle, the unit to which the target vehicle belongs, the departure time of this transportation, the estimated target duration, and multiple membership function sets, etc., the transportation starting point and the end point are determined according to the first application information, and the A* shortest path algorithm is used to traverse the nodes in the topological road network map, and the alternative paths are found in turn according to the total length of the path, so as to obtain multiple alternative paths; for any Consider an alternative path, predict and calculate the multiple factors affecting the evaluation results of the target vehicle on the alternative path, and generate a factor set, wherein the factor set includes at least multiple factors such as travel distance, time consumption, highway tolls, fuel consumption, and risk coefficient. The fuzzy comprehensive evaluation method is used to perform fuzzy comprehensive evaluation based on multiple membership function sets and factor sets to obtain the evaluation results of the corresponding alternative path, thereby realizing a comprehensive evaluation of the economy, timeliness, and risk of the alternative path. Before the fuzzy comprehensive evaluation, the weights of multiple influencing factors are determined by expert scoring or hierarchical analysis. Finally, multiple alternative paths are sorted according to the evaluation results, and each alternative path is judged in order based on the feasibility of whether the target vehicle can pass, until the optimal and passable alternative path is output. If all alternative paths cannot pass, a result of failure is generated and stored in the historical record for reference. Through the present invention, it is possible to determine the recommended transportation route based on the fuzzy comprehensive evaluation method by considering economy, timeliness and risk, and evaluate the passability of large-scale transport vehicles on alternative routes, thereby ultimately achieving intelligent decision-making on the driving route of large-scale transport vehicles.
[0049] In a preferred embodiment, multiple membership function sets are pre-set by multiple experts in the company or industry field corresponding to the user, and each membership function set contains multiple membership functions. The membership function is used to calculate the evaluation results of the corresponding experts for the influencing factors based on the corresponding input influencing factors.
[0050] The working principle and beneficial effects of the above technical solution are as follows: multiple membership function sets are pre-set by multiple experts in the company or industry field corresponding to the user, and each membership function set contains multiple membership functions. The membership function is used to calculate the evaluation results of the corresponding expert for the influencing factors according to the corresponding input influencing factors. For example, expert A sets the scoring criteria for any influencing factor as the membership function for fuel consumption. The fuel consumption is set as follows: 200L or less is excellent, 200~220L is good, 220L~240L is average, 240L~250L is poor, and 250L or more is very poor. When the calculated fuel consumption on a certain alternative path is 210L, the membership function can quickly calculate that the expert A's score for the influencing factor of fuel consumption is good, thereby using the membership function as the scoring criterion to replace the expert's direct scoring process, thereby effectively reducing the investment in human resources.
[0051] In a preferred embodiment, step S3 comprises:
[0052] Step S31: for any alternative route, a highway toll value is calculated based on multiple highway toll standards on the alternative route and the first application information, and fuel consumption is calculated by the total length of the alternative route and the vehicle type, and time information is calculated according to the total length of the route and the vehicle speed, and a factor set is formed using the highway toll value, fuel consumption, and time information;
[0053] Step S32: using multiple membership functions within any membership function set to perform calculations based on the factors in the factor set, determine the fuzzy mapping relationship between any element in the factor set and the evaluation index in the evaluation set, and obtain the scoring results of the experts corresponding to the membership function set for each factor;
[0054] Step S33: Count the scoring results of all experts, determine the distribution of evaluation indicators corresponding to any factor, and construct a single factor evaluation vector;
[0055] Step S34: construct a single factor evaluation matrix using multiple single factor evaluation vectors, and construct a comprehensive evaluation model in combination with the factor weight vector in the first application information to calculate and obtain the evaluation result of the corresponding alternative path.
[0056] The working principle and beneficial effects of the above technical solution are as follows: the highway toll value is calculated by using the multiple sections of highway toll standards on any alternative route and the first application information, and the fuel consumption and time consumption information are calculated by the total length of the alternative route, and the factor set is formed by using the information such as the highway toll value, fuel consumption and time consumption. , so as to realize the calculation and prediction of multiple influencing factors such as the travel distance, time consumption, highway tolls, fuel consumption and risk coefficient of large-scale transportation; using multiple membership functions within any membership function set based on the factor set Calculate multiple factors in and determine the factor set Any factor Relative to the evaluation set Medium evaluation index , where n represents the total number of evaluation types in the evaluation set P, and m represents the total number of factor types in the factor set, and the scoring results of the experts corresponding to the membership function for each factor are obtained. ,use Indicates the expert j's opinion on the factor concentration factor The scoring results, ; Count the scoring results of all experts, determine the distribution of evaluation indicators corresponding to any factor and construct a single factor evaluation vector. For example, for a certain factor , multiple experts correspond to multiple scoring results, People give reviews ,have People give reviews , ,have People give reviews ,and , The single factor evaluation vector is , and then extended to other factors. Then, multiple single factor evaluation vectors are used to construct a single factor evaluation matrix. is the evaluation factor of item i is the jth level The number of votes, is the total number of experts in the group, then the single factor evaluation matrix R is established:
[0057]
[0058] Combined with the factor weight vector in the first application information ,in Indicates the factors in advance The weights assigned are used to construct a comprehensive evaluation model to calculate the evaluation results of the corresponding alternative paths. And the single factor evaluation matrix R, by calculating Get the fuzzy vector, and then according to the system score weight vector The total score is calculated as the evaluation result, so as to finally perform fuzzy operations on relevant factors such as economy, timeliness and risk for each alternative path, and obtain the scoring result of each alternative path.
[0059] In a preferred embodiment, referring to Figure 3 , step S4 comprises:
[0060] Step S41, sorting multiple candidate paths according to the evaluation results to obtain a candidate path selection sequence;
[0061] Step S42: Select the alternative path with the best evaluation result, and determine all bridges on the pass path according to the target vehicle going up and down the alternative path and the hub conversion direction;
[0062] Step S43: for any bridge on the selected alternative path, determine the corresponding bridge-related parameters stored in the cloud, respectively use the load effect comparison method and the curved bridge anti-overturning verification algorithm to perform the first-stage calculation, and the bending bearing capacity detection algorithm to perform the second-stage calculation of the passability verification, and obtain the verification results;
[0063] Step S44: determining whether the bridge passes the traversability verification according to the verification result and the preset judgment criteria;
[0064] Step S45: When any bridge on the alternative path passes the traversability verification, the current alternative path is determined to be the optimal path. Otherwise, steps S42 to S44 are executed cyclically according to the suboptimal alternative path in the alternative path selection sequence until the optimal path is output.
[0065] The working principle and beneficial effects of the above technical solution are as follows: after obtaining the scoring result of each alternative path, multiple alternative paths are sorted according to the evaluation results to obtain an alternative path selection sequence; the alternative path with the best evaluation result is selected, and all bridges on the passage path are determined according to the up and down directions of the target vehicle on the alternative path and the direction of hub conversion; for any bridge on the selected alternative path, the corresponding bridge-related parameters stored in the cloud are determined, and the load effect comparison method and the curved bridge anti-overturning test algorithm are used for the first-stage calculation, and the bending bearing capacity test algorithm is used for the second-stage calculation. Passability verification, and obtain the verification result; determine whether the bridge has passed the passability verification according to the verification result and the preset judgment criteria, wherein the judgment criteria include: when the first-stage verification passes, it is determined that the bridge has passed the passability verification, or when the first-stage verification fails but the second-stage verification passes, it is determined that the bridge has passed the passability verification; when any bridge on the alternative path passes the passability verification, it is determined that the current alternative path is the optimal path, otherwise, according to the suboptimal alternative path in the alternative path selection sequence, steps S42 to S44 are executed cyclically until the optimal path is output. Through the embodiment of the present invention, the selected passability verification of all bridge structures on the alternative path of the target vehicle is realized, and the alternative paths are screened according to whether they can be passed, so that a highly evaluated and passable transportation path can be obtained.
[0066] Preferably, in step S43, when selecting any bridge on the alternative path, the bridges are preferentially selected in sequence from the alternative path close to the starting end and the passability is verified, and when the first impassable bridge appears, the bridge is recorded, and all alternative paths containing the bridge in the alternative path selection sequence are eliminated.
[0067] The working principle and beneficial effects of the above technical solution are as follows: when calculating the passability of any bridge on the alternative path, the bridges are selected in sequence from the alternative path close to the starting point and the passability is verified, so that the impassable bridges can be quickly determined and the calculation process can be terminated in time to avoid meaningless calculation processes. When the first impassable bridge appears, the bridge is recorded, and all alternative paths containing the bridge in the alternative path selection sequence are eliminated, thereby reducing the amount of calculation and effectively improving the decision-making speed of path selection.
[0068] In a preferred embodiment, the feasibility determination of each candidate path based on whether the target vehicle can pass through further includes:
[0069] Acquire vehicle model information of a target vehicle and first-category three-dimensional point cloud scanning data of the target vehicle in a cargo-carrying state;
[0070] Obtaining the second type of three-dimensional point cloud scanning data of the real space corresponding to the multiple sections of the alternative path in advance, and the second type of three-dimensional model generated accordingly;
[0071] According to the vehicle model information of the target vehicle, a vehicle parameter model corresponding to the vehicle model pre-stored in the cloud is obtained, and the vehicle parameter model is matched with the first type of three-dimensional point cloud scanning data to obtain a matching result;
[0072] Determine the correspondence between the first type of 3D point cloud scan data and the vehicle body parts in the vehicle parameter model according to the matching results, and remove the sparse point cloud data in the first type of 3D point cloud scan data and the corresponding ground point cloud data below the wheels to obtain the third type of 3D point cloud scan data;
[0073] Generate a first-type three-dimensional model of the target vehicle in a cargo-carrying state according to the third-type three-dimensional point cloud scanning data, and establish a corresponding relationship between the third-type three-dimensional point cloud scanning data and the vehicle body parts in the first-type three-dimensional model;
[0074] Using the first type of three-dimensional model and the second type of three-dimensional model to conduct a simulation experiment of the target vehicle driving in the middle position of the corresponding road, and record the collision area and collision time of the first type of three-dimensional model and the second type of three-dimensional model;
[0075] When there is no collision area in multiple sections of the alternative path, it is determined that the target vehicle can pass on the alternative path.
[0076] The working principle and beneficial effects of the above technical solution are as follows: when a feasibility judgment is made on each alternative path based on whether the target vehicle can pass, as a parallel technical solution, the vehicle model information of the target vehicle and the first type of three-dimensional point cloud scanning data of the target vehicle in a cargo state can be obtained; then the second type of three-dimensional point cloud scanning data of the real space corresponding to multiple sections of the alternative path and the corresponding second type of three-dimensional model generated are obtained in advance; according to the vehicle model information of the target vehicle, a vehicle parameter model corresponding to the vehicle model pre-stored in the cloud is obtained, and the vehicle parameter model is model-matched with the first type of three-dimensional point cloud scanning data to obtain a matching result; according to the matching result, the correspondence between the first type of three-dimensional point cloud scanning data and the vehicle body part in the vehicle parameter model is determined, and the sparse point cloud data in the first type of three-dimensional point cloud scanning data and the corresponding ground point cloud data below the wheels are trimmed to obtain the third type of three-dimensional point cloud scanning data, thereby realizing the matching of the shadows in the first type of three-dimensional point cloud scanning data. The sparse point cloud data that affects the model judgment is cut off to make the model more accurate; the first type of 3D model of the target vehicle in the cargo state is generated according to the third type of 3D point cloud scanning data, and the corresponding relationship between the third type of 3D point cloud scanning data and the body parts in the first type of 3D model is established, so as to facilitate motion simulation according to the connection relationship of the target vehicle. For example, the trailer vehicle can be segmented accordingly, and then the motion of the trailer vehicle is simulated; the first type of 3D model and the second type of 3D model are used to conduct a simulation experiment of the target vehicle driving in the middle position of the corresponding road, and the collision area and collision time of the first type of 3D model and the second type of 3D model are recorded. According to the recorded collision area and collision time, it is convenient for relevant personnel to judge the spatial structure of the collision location through manual intervention, and it is convenient for relevant personnel to make passability judgments and make adjustment suggestions for the cargo position status on large-scale transport vehicles; when there is no collision area in multiple sections of the alternative path, it is determined that the target vehicle can pass on the alternative path. Through the above technical scheme, simulation tests on the collision of target vehicles on alternative routes are realized. Through the simulation test results, it is judged whether large-scale transport vehicles will inevitably collide with height limit piles on the road, tunnel tops, and various locations on bridge structures during transportation, thereby achieving a rapid judgment on passability and providing reference suggestions for relevant staff.
[0077] Finally, it should be noted that the above preferred embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail through the above preferred embodiments, those skilled in the art should understand that various changes can be made in form and details without departing from the scope defined by the claims of the present invention.
Claims
1. An intelligent decision-making method for large-scale transportation routes based on fuzzy hierarchical comprehensive evaluation method, characterized in that: include: Step S1, obtaining the first application information about large-scale transportation submitted by the user, and determining a plurality of membership function sets therein; Step S2: Determine the transportation starting point and end point according to the first application information and perform path optimization calculation to obtain multiple alternative paths; Step S3, for any alternative path, predict and calculate multiple factors affecting the evaluation result generated by the target vehicle on the alternative path and generate a factor set, and use a fuzzy comprehensive evaluation method to perform fuzzy comprehensive evaluation based on multiple membership function sets and factor sets to obtain the evaluation result of the corresponding alternative path; Step S4: sorting the multiple candidate paths according to the evaluation results, and performing feasibility judgment on each candidate path in order based on whether the target vehicle can pass, until the optimal and passable candidate path is output; The feasibility determination of each alternative path based on whether the target vehicle can pass includes: Acquire vehicle model information of a target vehicle and first-category three-dimensional point cloud scanning data of the target vehicle in a cargo-carrying state; Obtaining the second type of three-dimensional point cloud scanning data of the real space corresponding to the multiple sections of the alternative path in advance, and the second type of three-dimensional model generated accordingly; According to the vehicle model information of the target vehicle, a vehicle parameter model corresponding to the vehicle model pre-stored in the cloud is obtained, and the vehicle parameter model is matched with the first type of three-dimensional point cloud scanning data to obtain a matching result; Determine the correspondence between the first type of 3D point cloud scan data and the vehicle body parts in the vehicle parameter model according to the matching results, and remove the sparse point cloud data in the first type of 3D point cloud scan data and the corresponding ground point cloud data below the wheels to obtain the third type of 3D point cloud scan data; Generate a first-type three-dimensional model of the target vehicle in a cargo-carrying state according to the third-type three-dimensional point cloud scanning data, and establish a corresponding relationship between the third-type three-dimensional point cloud scanning data and the vehicle body parts in the first-type three-dimensional model; Using the first type of three-dimensional model and the second type of three-dimensional model to conduct a simulation experiment of the target vehicle driving in the middle position of the corresponding road, and record the collision area and collision time of the first type of three-dimensional model and the second type of three-dimensional model; When there is no collision area on all sections of the alternative path, it is determined that the target vehicle can pass on the alternative path.
2. The large-scale transport route intelligent decision-making method based on fuzzy hierarchical comprehensive evaluation method according to claim 1 is characterized in that: The multiple membership function sets are pre-set by multiple experts of the company corresponding to the user, and each membership function set contains multiple membership functions. The membership functions are used to calculate the evaluation results of the corresponding experts on the influencing factors according to the corresponding input influencing factors.
3. The large-scale transport route intelligent decision-making method based on fuzzy hierarchical comprehensive evaluation method according to claim 1 is characterized in that: The step S3 comprises: Step S31: for any alternative route, a highway toll value is calculated based on multiple highway toll standards on the alternative route and the first application information, and fuel consumption is calculated by the total length of the alternative route and the vehicle type, and time information is calculated according to the total length of the route and the vehicle speed, and a factor set is formed using the highway toll value, fuel consumption, and time information; Step S32: using multiple membership functions within any membership function set to perform calculations based on the factors in the factor set, determine the fuzzy mapping relationship between any element in the factor set and the evaluation index in the evaluation set, and obtain the scoring results of the experts corresponding to the membership function set for each factor; Step S33: Count the scoring results of all experts, determine the distribution of evaluation indicators corresponding to any factor, and construct a single factor evaluation vector; Step S34: construct a single factor evaluation matrix using multiple single factor evaluation vectors, and construct a comprehensive evaluation model in combination with the factor weight vector in the first application information to calculate and obtain the evaluation result of the corresponding alternative path.
4. The large-scale transport route intelligent decision-making method based on fuzzy hierarchical comprehensive evaluation method according to claim 1 is characterized in that: The step S4 comprises: Step S41, sorting multiple candidate paths according to the evaluation results to obtain a candidate path selection sequence; Step S42: Select the alternative path with the best evaluation result, and determine all bridges on the pass path according to the target vehicle going up and down the alternative path and the hub conversion direction; Step S43: for any bridge on the selected alternative path, determine the corresponding bridge-related parameters stored in the cloud, respectively use the load effect comparison method and the curved bridge anti-overturning verification algorithm to perform the first-stage calculation, and the bending bearing capacity detection algorithm to perform the second-stage calculation of the passability verification, and obtain the verification results; Step S44: determining whether the bridge passes the traversability verification according to the verification result and the preset judgment criteria; Step S45: When any bridge on the alternative path passes the traversability verification, the current alternative path is determined to be the optimal path. Otherwise, steps S42 to S44 are executed cyclically according to the suboptimal alternative path in the alternative path selection sequence until the optimal path is output.
5. The large-scale transport route intelligent decision-making method based on fuzzy hierarchical comprehensive evaluation method according to claim 4 is characterized in that: In step S43, when selecting any bridge on the alternative path, the bridges are preferentially selected in sequence from the alternative path close to the starting point and the passability is verified. When the first impassable bridge appears, the bridge is recorded, and all alternative paths containing the bridge in the alternative path selection sequence are eliminated.
Citation Information
Cited By
Building equipment and material intelligent transportation analysis system based on mixed reality
CN121032361A
Mixed reality based construction equipment and material intelligent transportation analysis system
CN121032361B
