Economic dispatch method for cascade hydropower, photovoltaic power and full-power variable-speed pumped storage
By employing an economical dispatching method for cascade hydropower, photovoltaic power, and full-power variable-speed pumped storage, the operation of hydropower, photovoltaic power, and variable-speed pumped storage is optimized, solving the economic issues in the joint operation of cascade hydropower, improving the absorption of new energy and the stability of the power system, and reducing operating costs.
Patent Information
- Application Number
- CN202311057274.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-08-22
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2043-08-22
AI Technical Summary
In existing technologies, there is a lack of effective economic dispatch methods for the combined operation of cascade hydropower, photovoltaic power, and full-power variable-speed pumped storage, resulting in low renewable energy consumption levels and insufficient power system stability and reliability.
An economical scheduling method for cascade hydropower, photovoltaic power, and full-power variable-speed pumped storage is proposed. By optimizing the operation of hydropower, photovoltaic power, and variable-speed pumped storage under different operating conditions, and combining gate control and load distribution strategies, the economical scheduling and optimization of the system can be achieved.
It has improved the absorption of new energy sources, reduced the operating costs of power generation companies, enhanced the stability and reliability of the power system, and possesses good storage capacity and load regulation characteristics.
Smart Images

Figure CN118100300B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of multi-energy complementarity, and in particular to an economic dispatching method for cascade hydropower, photovoltaic power and full-power variable-speed pumped storage. Background Art
[0002] Renewable energy sources such as wind power and photovoltaic power have characteristics such as randomness and volatility. The access of large-scale wind and solar energy has a huge impact on the stability of the power grid and the quality of power supply.
[0003] Hydropower is a globally recognized clean, high-quality, and flexible renewable energy source. In addition to its role as a clean energy source, hydropower also plays an important supporting role in the development of new energy sources such as wind and light. As a traditional type of renewable clean energy generation, hydropower plays a unique and important role in building a new power system with new energy as the main body. Multi-energy complementarity and coordinated development will help increase the use and consumption level of clean energy such as water, wind, and light.
[0004] Pumped-storage power stations are currently the most technologically mature, largest-scale commercialized, and most cost-effective energy storage power generation systems. The combined operation of wind and solar renewable energy with pumped-storage power stations is one of the effective ways to promote the consumption of new energy.
[0005] The joint operation of hydropower, pumped storage and wind and solar energy can not only reduce the phenomenon of wind and solar power abandonment and promote the consumption of new energy, but also improve the stability and reliability of the power system. At present, the economic dispatching and control technologies for cascade hydropower, pumped storage and wind and solar energy are mostly concentrated on the joint dispatching and control strategies of single hydropower and wind and solar energy, conventional fixed-speed pumped storage and wind and solar energy, while there are relatively few methods for optimizing the dispatching and operation of cascade hydropower combined with variable-speed pumped storage and wind and solar energy. Therefore, the economic dispatching and control methods for cascade hydropower, photovoltaics and full-power variable-speed pumped storage are proposed, which has important engineering practical value for improving the level of new energy consumption and enhancing the stability and reliability of the power system.
[0006] Since the power generation output of new energy sources such as wind power and photovoltaics is highly random, intermittent and volatile, the power generation operation of new energy sources is difficult to match with load demand, and flexible power sources are needed to coordinate with them.
[0007] In patent 202010220529.X, a medium- and long-term implicit random scheduling method for cascade hydropower stations combined with wind power and photovoltaic power stations is disclosed, which belongs to the technical field of hybrid energy system scheduling. This method takes into account the uncertainty of monthly runoff, and uses a radial basis function neural network to fit the scheduling model through an implicit random scheduling method. This inventive model reasonably considers the impact of wind power and photovoltaic uncertainty and the possible reverse peak-shaving phenomenon on the power grid. In the medium- and long-term scheduling, it considers leaving enough spare space for short-term wind and solar uncertainty, and allocates enough daily electricity to cope with the pressure of reverse peak-shaving on the power grid. This invention patent takes into account the impact of wind and solar uncertainty and reverse peak-shaving on the power grid, but does not consider the influencing factors such as the operating status of the unit and the gate. In addition, the division of wet and dry months is significantly different from this method.
[0008] In patent 201310247419.2, an optimization scheduling method for a wind-solar-water complementary power generation system is disclosed, which belongs to the field of new energy complementary power generation control technology. The optimization control method for a wind-solar-water complementary power generation system provided by the invention includes the optimization scheduling of wind power generation, the optimization scheduling of photovoltaic power generation, and the optimization scheduling of pumped storage. Among them, the operation of wind power generation adopts the maximum wind energy capture control strategy, the operation of photovoltaic power generation adopts the maximum power point tracking control, and the operation of pumped storage is operated according to the given output. This patent only considers the use of pumped storage for the scheduling of wind and solar new energy. This method does not consider factors such as cascade hydropower and gates, and the pumped storage is a conventional pumped storage unit, which cannot adjust the output under the water pump working condition.
[0009] Patent 201210579173.4 discloses a distributed wind-solar pumped-storage complementary power generation control system and method. By real-time data collection of the distributed wind-solar pumped-storage complementary power generation system, the operating status of the system is monitored in real time, and the pumped-storage unit is controlled to operate in the corresponding working condition by processing the real-time data, so that wind power generation and photovoltaic power generation are directly used for system load, excess power is used for pumped storage, and insufficient power is supplied by pumped storage power generation. Based on the detected data and analysis results, the distributed wind-solar pumped-storage complementary power generation system is intelligently controlled, thereby realizing intelligent scheduling of the system. This method does not consider factors such as cascade hydropower and gates, and the pumped storage is a conventional pumped-storage unit, which cannot adjust the output under the pump working condition. In addition, the invention does not consider the control of wind and solar new energy output. Summary of the invention
[0010] The purpose of the present invention is to overcome the shortcomings of the prior art and provide an economic scheduling method for cascade hydropower, photovoltaics and full-power variable-speed pumped storage. The method aims to solve the economic problems existing in the joint operation of cascade hydropower, photovoltaics and full-power variable-speed pumped storage. This method can improve the economic benefits of the joint operation of cascade hydropower, photovoltaics and full-power variable-speed pumped storage and reduce the operating costs of power generation enterprises.
[0011] The objective of the present invention is achieved through the following technical solutions:
[0012] Economic dispatch methods for cascade hydropower, photovoltaics and full-power variable-speed pumped storage;
[0013] The method performs economic dispatch and optimal allocation among cascade hydropower, photovoltaic power and full-power variable-speed pumped storage according to the operating status, water inflow mode and the operating status of each unit; the method is based on a joint operation system consisting of cascade hydropower, photovoltaic power and full-power variable-speed pumped storage, and the cascade hydropower, photovoltaic power and full-power variable-speed pumped storage units are all converged at the same substation; the cascade hydropower, photovoltaic power and full-power variable-speed pumped storage joint operation system is connected to the regional AC power grid after convergence, and two operating states, grid-connected state and off-grid state, are set according to the operating status of the line connected to the cascade hydropower, photovoltaic power and storage joint operation system and the AC power grid; the cascade hydropower, photovoltaic power and storage joint operation system is set with three water inflow modes, including flood mode, normal water mode and dry water mode.
[0014] In one or more embodiments of the present invention, the judgment conditions of the two operating states of the grid-connected state and the off-grid state include the circuit breaker switch state of the connection line between the cascade hydropower, photovoltaic and full-power variable-speed pumped storage converging substation and the regional AC power grid, the substation bus voltage, and the substation bus frequency, wherein:
[0015] When the system is in the grid-connected state, the circuit breakers of the cascade hydropower, photovoltaic and full-power variable-speed pumped storage converging substations and the regional AC power grid are closed, and the substation bus voltage and substation bus frequency are both within the normal operating range;
[0016] When the system is off-grid, the circuit breaker switches of the cascade hydropower, photovoltaic and full-power variable-speed pumped storage converging substations and the regional AC power grid are in the open state, and after the circuit breaker state changes from closed to open, the substation bus voltage or bus frequency exceeds the normal operating range;
[0017] The grid-connected status and off-grid status are automatically determined by the cascade hydropower, photovoltaic and storage combined operation system according to the above-mentioned judgment conditions, and can also be manually switched on the combined power generation system. Both the grid-connected status and off-grid status can be displayed in real time on the combined operation system and manually operated.
[0018] In one or more embodiments of the present invention, the flood mode, normal water mode and low water mode can be manually set on the combined power generation system according to the water inflow time period of the cascade basin, or can be automatically determined by the combined operation system, and the determination conditions are:
[0019] (1) Manually set the flood flow threshold Q wet and low flow threshold Q dry ;
[0020] (2) Based on the inflow QI of any power station in the cascade power station i i The total flow rate QL of the interval inflow i Compare with the flow threshold to determine the current operation mode;
[0021] ① When the total flow is greater than or equal to the flood flow threshold, it is flood mode;
[0022] ② If the total flow is less than or equal to the low-flow flow threshold, it is low-flow mode;
[0023] ③ If the total flow is greater than the low-water flow threshold and less than the high-water flow threshold, it is in normal water mode;
[0024] (3) Determine the current operation mode based on the real-time output, gate status and real-time water level of each cascade hydropower station;
[0025] ① If a certain level of hydropower station is not in an accident or maintenance and the gate is open, the current state is flood mode;
[0026] ② If the output of each cascade hydropower station is above 80% of the rated output of the station, the current state is flood mode;
[0027] ③ If the power generation output of each cascade power station is less than the rated output of a single unit, the current operating state is low-water mode;
[0028] ④ If the power generation output of each cascade power station is greater than or equal to the rated output of a single unit and less than or equal to 80% of the total output of the units, the current operating state is the level water mode.
[0029] In one or more embodiments of the present invention, (1) in the grid-connected state and flooding mode, the variable speed pumped storage unit only operates in the power generation state, and the secondary frequency regulation command is mainly responded by the variable speed unit. If it exceeds the response range of the variable speed unit, it will be adjusted by the photovoltaic power station; the cascade hydropower maintains full output operation due to abundant water; the output fluctuation of photovoltaic power is smoothed by the variable speed unit;
[0030] (2) In the grid-connected state and flat water mode, the variable-speed pumped storage unit can operate in the power generation state or the pumping state. The secondary frequency regulation command is mainly responded by the cascade hydropower. If it exceeds the response range of the cascade hydropower, it will be adjusted by the variable-speed pumped storage unit; the photovoltaic power station maintains full output operation; the output fluctuation of photovoltaic power is jointly smoothed by the cascade hydropower and the variable-speed unit;
[0031] (3) In the grid-connected low-water mode, the variable-speed pumped storage unit only operates in the pumping state, and the secondary frequency regulation command is mainly responded to by the cascade hydropower and the variable-speed unit. If it exceeds the response range of the cascade hydropower and the variable-speed pumped storage, it will be adjusted by the photovoltaic power station; the photovoltaic power station maintains full output operation; the output fluctuation of photovoltaic power is smoothed by the cascade hydropower;
[0032] (4) In the off-grid state and flood mode, the cascade hydropower stations bear the regional base load and maintain the output unchanged, and the regional voltage and frequency are controlled by the full-power variable-speed units; all photovoltaic power stations are shut down;
[0033] (5) In the off-grid level-water mode, cascade hydropower and photovoltaic power jointly bear the regional base load, cascade hydropower suppresses the fluctuation of photovoltaic output, and the full-power variable-speed units control the regional voltage and frequency;
[0034] (6) In the off-grid low-flow mode, photovoltaic power generation bears the regional base load, full-power variable-speed units smooth out photovoltaic output fluctuations, and cascade hydropower controls the regional voltage and frequency.
[0035] In one or more embodiments of the present invention, the method further includes an automatic start-stop control strategy for the cascaded hydro-photovoltaic-storage combined operation system:
[0036] The joint operation system automatically starts and stops cascade hydropower and full-power pumped storage units according to the dispatching power generation plan curve, and the automatic start and stop gives priority to the variable-speed pumped storage units.
[0037] (1) If the planned output of the dispatching power generation plan curve in the next hour is greater than the upper limit of the adjustable range of the current cascade hydropower, photovoltaic and variable-speed pumped storage combined power generation system, and there are variable-speed pumped storage units in a shutdown state, the variable-speed pumped storage units in a shutdown state will be started first, otherwise the hydropower units in a shutdown state will be started;
[0038] (2) If the difference between the planned output of the dispatching power generation plan curve in the next hour and the upper limit of the joint operation system is greater than the rated capacity of a single variable-speed pumped-storage unit, the variable-speed pumped-storage unit in the power generation state shall be stopped first; if there is no variable-speed pumped-storage unit in the power generation state and the difference is greater than the rated capacity of a single hydropower unit, the hydropower unit in the power generation state shall be stopped.
[0039] In one or more embodiments of the present invention, the method further includes a gate linkage control strategy for the cascade hydro-photovoltaic-storage combined operation system:
[0040] The gate automatic lifting linkage control function is implemented according to the real-time water level, output, overtopping water level and gate operation of each power station. When the overtopping water level is reached, the gate will automatically rise in an emergency. When the set dead water level is reached, the gate will automatically fall in an emergency. The overtopping water level is divided into the first-level overtopping water level and the second-level overtopping water level. The second-level overtopping water level is more urgent than the first-level overtopping water level. The thresholds are manually set by the operator.
[0041] (1) When the water level of the hydropower station reaches the set first-level overflow water level and the power station output is not at full power, the entire plant will be automatically prompted to adjust the sound and light information to full power. After the operator confirms, the output of all generating units in the power station will be adjusted to full power;
[0042] (2) When the water level of the hydropower station reaches the set first-level flooding water level and the power station output is at full capacity, the gate raising operation sound and light information will be automatically prompted. After the operator confirms, the power station gate raising operation will be executed;
[0043] (3) When the water level of the hydropower station reaches the set secondary overflow water level, the full power adjustment and gate raising operation sound and light information of the whole plant will be automatically prompted. After the operator confirms, the output of all the generating units of the power station will be adjusted to the full power state, and the power station gate will be raised at the same time;
[0044] (4) When the water level of the hydropower station reaches the set dead water level, if there are power station units in a non-shutdown state, the entire plant will be automatically prompted with sound and light shutdown information. After confirmation by the operating personnel, all non-generating units of the power station will be automatically shut down.
[0045] In one or more embodiments of the present invention, the method further includes a load optimization allocation strategy for the cascaded hydro-photovoltaic-storage combined operation system:
[0046] When cascade hydropower, photovoltaic and storage power stations are operated jointly, the load optimization distribution of cascade hydropower and photovoltaic power stations adopts equal proportion distribution;
[0047] (1) Cascade hydropower load distribution strategy:
[0048] The load distribution of cascade hydropower stations adopts the principle of proportionality of the dynamic and real-time adjustable total output of each cascade hydropower station;
[0049] (2) Photovoltaic power station load distribution strategy:
[0050] The load distribution of the photovoltaic power station adopts the principle of proportionality of the rated power of the photovoltaic array inverter;
[0051] (3) Full-power variable-speed pumped storage load distribution strategy:
[0052] The load distribution of full-power variable-speed pumped storage units adopts the principle of allocating all loads within the adjustable capacity range. If the adjustable capacity range is exceeded, only the allowable value of the adjustable capacity will be allocated.
[0053] Beneficial effects of the present invention:
[0054] The economic dispatch method of cascade hydropower, photovoltaics and full-power variable-speed pumped storage proposed in the present invention reduces the abandonment of wind, photovoltaics and water through the joint operation of hydropower, pumped storage and wind and solar new energy, promotes the consumption of new energy, improves the economic benefits of the joint operation of cascade hydropower, photovoltaics and storage, reduces the operating costs of power generation companies, and provides a practical method for the combination of hydropower bases and new energy; the method has good storage and regulation capabilities, and the variable-speed pumped storage units have the advantages of rapid start and stop, fast load regulation, and a large regulation range. Therefore, through the joint economic dispatch control of cascade hydropower, variable-speed pumped storage and photovoltaics, the friendliness of wind and solar new energy transmission can be effectively improved, the level of grid-connected consumption of renewable energy can be improved, better economic benefits can be achieved for power generation companies, and the operating and maintenance costs of companies can be reduced at the same time. BRIEF DESCRIPTION OF THE DRAWINGS
[0055] Figure 1 It is a schematic diagram of the combined operation process of the present invention;
[0056] Figure 2 It is a schematic diagram of the economic dispatch control process of the present invention. DETAILED DESCRIPTION
[0057] In order to make the purpose, technical scheme and advantages of the embodiments of the present invention clearer, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. The components of the embodiments of the present invention generally described and shown in the drawings here can be arranged and designed in various different configurations. Therefore, the following detailed description of the embodiments of the present invention provided in the drawings is not intended to limit the scope of the claimed invention, but merely represents selected embodiments of the present invention. Based on the embodiments in the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work belong to the scope of protection of the present invention.
[0058] In this embodiment, Figure 1 to Figure 2 As shown in the figure, an economic dispatch method for cascade hydropower, photovoltaic power and full-power variable speed pumped storage is provided, which performs economic dispatch and optimal allocation among cascade hydropower, photovoltaic power and full-power variable speed pumped storage according to the operating status, water inflow mode and the operating status of each unit; the method is based on a joint operation system composed of cascade hydropower, photovoltaic power and full-power variable speed pumped storage, and the cascade hydropower, photovoltaic power and full-power variable speed pumped storage units are all converged at the same substation; the cascade hydropower, photovoltaic power and full-power variable speed pumped storage joint operation system is connected to the regional AC power grid after convergence, and two operating states, namely grid-connected state and off-grid state, are set according to the operating status of the line connected to the cascade hydro-photovoltaic-storage joint operation system and the AC power grid; the cascade hydro-photovoltaic-storage joint operation system is set with three water inflow modes, including flood mode, normal water mode and dry water mode.
[0059] In this embodiment, the joint operation system includes 3 small cascade hydropower stations of run-of-river hydropower stations, 1 photovoltaic power station and 1 5MW full-power variable-speed pumped-storage unit. The full-power variable-speed pumped-storage unit is installed in a cascade hydropower station with a reservoir with at least daily regulation capacity. The variable-speed pumped-storage unit (variable-speed pumped-storage unit) in this method refers to a full-power variable-speed pumped-storage unit, and the hydropower unit specifically refers to a conventional hydro-turbine generator unit. The cascade hydropower, photovoltaic and full-power variable-speed pumped-storage joint operation system is connected to the regional AC power grid after confluence, and the two operating states of grid-connected state and off-grid state are set according to the operating conditions of the lines connected to the cascade hydro-photovoltaic-storage joint operation system and the AC power grid.
[0060] The joint operation system of cascade hydropower, photovoltaic and full-power variable-speed pumped storage (referred to as cascade hydro-PV-storage) consists of an economic dispatch control unit, a hydropower control unit, a photovoltaic control unit, a variable-speed pumped storage control unit and a gate control unit.
[0061] The economic dispatch control unit performs real-time coordinated control and economic dispatch of cascade hydropower, variable-speed pumped storage, photovoltaics and gates based on real-time information such as the operating conditions of hydropower units, reservoir water levels, and photovoltaic output through an optimization algorithm, and reasonably allocates the power of cascade hydropower, variable-speed pumped storage and photovoltaics to achieve the joint operation of cascade hydropower, variable-speed pumped storage and photovoltaics.
[0062] The hydropower control unit sends control instructions to the computer monitoring system of each hydropower station to adjust the active power of the hydropower station and control the start and stop of the units.
[0063] The photovoltaic control unit sends control instructions to the photovoltaic power station computer monitoring system to adjust the photovoltaic active power.
[0064] The variable speed pumped storage control unit sends control instructions to the computer monitoring system of the pumped storage power station to adjust the active power of the variable speed pumped storage unit and control the start and stop of the unit.
[0065] The gate control unit sends control instructions to the gate computer monitoring system to realize the lifting and lowering of the gate.
[0066] In one or more embodiments of the present invention, the judgment conditions of the two operating states of the grid-connected state and the off-grid state include the circuit breaker switch state of the connection line between the cascade hydropower, photovoltaic and full-power variable-speed pumped storage converging substation and the regional AC power grid, the substation bus voltage, and the substation bus frequency, wherein:
[0067] When the system is in the grid-connected state, the circuit breaker switches of the cascade hydropower, photovoltaic and full-power variable-speed pumped-storage confluence substations and the regional AC power grid connection lines are in the closed state, and the substation bus voltage and substation bus frequency are both in the normal operating range; for example, the normal voltage range of a 220kV substation bus is 220kV±Δv, and the normal frequency range is 50±Δf, Δvh is the voltage dead zone, Δf is the frequency dead zone, usually Δv≤10% of the rated voltage, Δf≤0.5Hz, which are the setting values for safe operation of the power grid.
[0068] When the system is off-grid, the circuit breaker switches of the cascade hydropower, photovoltaic and full-power variable-speed pumped storage converging substations and the regional AC power grid are in the open state, and after the circuit breaker state changes from closed to open, the substation bus voltage or bus frequency exceeds the normal operating range;
[0069] The grid-connected status and off-grid status are automatically determined by the cascade hydropower, photovoltaic and storage combined operation system according to the above-mentioned judgment conditions, and can also be manually switched on the combined power generation system. Both the grid-connected status and off-grid status can be displayed in real time on the combined operation system and manually operated.
[0070] In one or more embodiments of the present invention, the flood mode, normal water mode and low water mode can be manually set on the combined power generation system according to the water inflow time period of the cascade basin, or can be automatically determined by the combined operation system, and the determination conditions are:
[0071] (1) Manually set the flood flow threshold Q wet and low flow threshold Q dry ;
[0072] (2) Based on the inflow QI of any power station in the cascade power station i i The total flow rate QL of the interval inflow i Compare with the flow threshold to determine the current operation mode;
[0073] ① When the total flow is greater than or equal to the flood flow threshold, it is flood mode;
[0074] ② If the total flow is less than or equal to the low-flow flow threshold, it is low-flow mode;
[0075] ③ If the total flow is greater than the low-water flow threshold and less than the high-water flow threshold, it is in normal water mode;
[0076] (3) Determine the current operation mode based on the real-time output, gate status and real-time water level of each cascade hydropower station;
[0077] ① If a certain level of hydropower station is not in an accident or maintenance and the gate is open, the current state is flood mode;
[0078] ② If the output of each cascade hydropower station is above 80% of the rated output of the station, the current state is flood mode;
[0079] ③ If the power generation output of each cascade power station is less than the rated output of a single unit, the current operating state is low-water mode;
[0080] ④ If the power generation output of each cascade power station is greater than or equal to the rated output of a single unit and less than or equal to 80% of the total output of the units, the current operating state is the level water mode.
[0081] In one or more embodiments of the present invention, (1) in the grid-connected state and flooding mode, the variable speed pumped storage unit only operates in the power generation state, and the secondary frequency regulation command is mainly responded by the variable speed unit. If it exceeds the response range of the variable speed unit, it will be adjusted by the photovoltaic power station; the cascade hydropower maintains full output operation due to abundant water; the output fluctuation of photovoltaic power is smoothed by the variable speed unit;
[0082] (2) In the grid-connected state and flat water mode, the variable-speed pumped storage unit can operate in the power generation state or the pumping state. The secondary frequency regulation command is mainly responded by the cascade hydropower. If it exceeds the response range of the cascade hydropower, it will be adjusted by the variable-speed pumped storage unit; the photovoltaic power station maintains full output operation; the output fluctuation of photovoltaic power is jointly smoothed by the cascade hydropower and the variable-speed unit;
[0083] (3) In the grid-connected low-water mode, the variable-speed pumped storage unit only operates in the pumping state, and the secondary frequency regulation command is mainly responded to by the cascade hydropower and the variable-speed unit. If it exceeds the response range of the cascade hydropower and the variable-speed pumped storage, it will be adjusted by the photovoltaic power station; the photovoltaic power station maintains full output operation; the output fluctuation of photovoltaic power is smoothed by the cascade hydropower;
[0084] (4) In the off-grid state and flood mode, the cascade hydropower stations bear the regional base load and maintain the output unchanged, and the regional voltage and frequency are controlled by the full-power variable-speed units; all photovoltaic power stations are shut down;
[0085] (5) In the off-grid level-water mode, cascade hydropower and photovoltaic power jointly bear the regional base load, cascade hydropower suppresses the fluctuation of photovoltaic output, and the full-power variable-speed units control the regional voltage and frequency;
[0086] (6) In the off-grid low-flow mode, photovoltaic power generation bears the regional base load, full-power variable-speed units smooth out photovoltaic output fluctuations, and cascade hydropower controls the regional voltage and frequency.
[0087] In one or more embodiments of the present invention, the method further includes an automatic start-stop control strategy for the cascaded hydro-photovoltaic-storage combined operation system:
[0088] The joint operation system automatically starts and stops cascade hydropower and full-power pumped storage units according to the dispatching power generation plan curve, and the automatic start and stop gives priority to the variable-speed pumped storage units.
[0089] (1) If the planned output of the dispatching power generation plan curve in the next hour is greater than the upper limit of the adjustable range of the current cascade hydropower, photovoltaic and variable-speed pumped storage combined power generation system, and there are variable-speed pumped storage units in a shutdown state, the variable-speed pumped storage units in a shutdown state will be started first, otherwise the hydropower units in a shutdown state will be started;
[0090] (2) If the difference between the planned output of the dispatching power generation plan curve in the next hour and the upper limit of the joint operation system is greater than the rated capacity of a single variable-speed pumped-storage unit, the variable-speed pumped-storage unit in the power generation state shall be stopped first; if there is no variable-speed pumped-storage unit in the power generation state and the difference is greater than the rated capacity of a single hydropower unit, the hydropower unit in the power generation state shall be stopped.
[0091] In one or more embodiments of the present invention, the method further includes a gate linkage control strategy for the cascade hydro-photovoltaic-storage combined operation system:
[0092] The gate automatic lifting linkage control function is implemented according to the real-time water level, output, overtopping water level and gate operation of each power station. When the overtopping water level is reached, the gate will automatically rise in an emergency. When the set dead water level is reached, the gate will automatically fall in an emergency. The overtopping water level is divided into the first-level overtopping water level and the second-level overtopping water level. The second-level overtopping water level is more urgent than the first-level overtopping water level. The thresholds are manually set by the operator.
[0093] (1) When the water level of the hydropower station reaches the set first-level overflow water level and the power station output is not at full power, the entire plant will be automatically prompted to adjust the sound and light information to full power. After the operator confirms, the output of all generating units in the power station will be adjusted to full power;
[0094] (2) When the water level of the hydropower station reaches the set first-level flooding water level and the power station output is at full capacity, the gate raising operation sound and light information will be automatically prompted. After the operator confirms, the power station gate raising operation will be executed;
[0095] (3) When the water level of the hydropower station reaches the set secondary overflow water level, the full power adjustment and gate raising operation sound and light information of the whole plant will be automatically prompted. After the operator confirms, the output of all the generating units of the power station will be adjusted to the full power state, and the power station gate will be raised at the same time;
[0096] (4) When the water level of the hydropower station reaches the set dead water level, if there are power station units in a non-shutdown state, the entire plant will be automatically prompted with sound and light shutdown information. After confirmation by the operating personnel, all non-generating units of the power station will be automatically shut down.
[0097] In one or more embodiments of the present invention, the method further includes a load optimization allocation strategy for the cascaded hydro-photovoltaic-storage combined operation system:
[0098] When cascade hydropower, photovoltaic and storage power stations are operated jointly, the load optimization distribution of cascade hydropower and photovoltaic power stations adopts equal proportion distribution;
[0099] (1) Cascade hydropower load distribution strategy:
[0100] The load distribution of cascade hydropower stations adopts the principle of proportionality of the dynamic and real-time adjustable total output of each cascade hydropower station. The formula is:
[0101]
[0102] Where: Hyd i Set is the load distribution value of the i-th hydropower station;
[0103] Hyd i P max is the maximum value of the dynamic real-time adjustable output of the i-th hydropower station;
[0104] n is the total number of cascade hydropower stations;
[0105] (2) Photovoltaic power station load distribution strategy:
[0106] The load distribution of the photovoltaic power station adopts the principle of proportionality of the rated power of the photovoltaic array inverter, and the formula is:
[0107]
[0108] Where: Pv j Set is the load distribution value of the jth PV inverter in the PV power station;
[0109] Pv j E is the rated power of the jth PV inverter in the PV power station;
[0110] m is the total number of PV inverters in the PV power station;
[0111] (3) Full-power variable-speed pumped storage load distribution strategy:
[0112] The load distribution of full-power variable-speed pumped storage units adopts the principle of allocating all loads within the adjustable capacity range. If the load exceeds the adjustable capacity range, only the allowable value of the adjustable capacity is allocated. The formula is:
[0113]
[0114] Where: VspSet is the power setting value of the variable speed pumped storage unit;
[0115] PvspSet is the power allocation value of the variable speed pumped storage unit;
[0116] Nvsp is the adjustable capacity range of the variable-speed pumped-storage unit, which is the maximum rated output when generating electricity and the maximum rated input when pumping water.
Claims
1. An economic dispatching method for cascade hydropower, photovoltaic power and full-power variable-speed pumped storage, characterized by: The method performs economic dispatch and optimal allocation among cascade hydropower, photovoltaic power and full-power variable-speed pumped storage according to the operating status, water inflow mode and the operating status of each unit; the method is based on a joint operation system composed of cascade hydropower, photovoltaic power and full-power variable-speed pumped storage, and the cascade hydropower, photovoltaic power and full-power variable-speed pumped storage units are all converged at the same substation; the cascade hydropower, photovoltaic power and full-power variable-speed pumped storage joint operation system is connected to the regional AC power grid after convergence, and two operating states, grid-connected state and off-grid state, are set according to the operating status of the line connected to the cascade hydro-photovoltaic-storage joint operation system and the AC power grid; the cascade hydro-photovoltaic-storage joint operation system is set with three water inflow modes, including flood mode, normal water mode and dry water mode; The economic dispatching method of cascade hydropower, photovoltaic and full-power variable speed pumped storage is as follows: (1) In the grid-connected state and flooding mode, the variable-speed pumped storage unit only operates in the power generation state, and the secondary frequency regulation command is mainly responded by the variable-speed unit. If it exceeds the response range of the variable-speed unit, it will be adjusted by the photovoltaic power station; the cascade hydropower maintains full output operation due to abundant water supply; the output fluctuation of photovoltaic power is smoothed by the variable-speed unit; (2) In the grid-connected state and flat water mode, the variable-speed pumped storage unit can operate in the power generation state or the pumping state. The secondary frequency regulation command is mainly responded by the cascade hydropower. If it exceeds the response range of the cascade hydropower, it will be adjusted by the variable-speed pumped storage unit; the photovoltaic power station maintains full output operation; the output fluctuation of photovoltaic power is jointly smoothed by the cascade hydropower and the variable-speed unit; (3) In the grid-connected low-water mode, the variable-speed pumped storage unit only operates in the pumping state, and the secondary frequency regulation command is mainly responded to by the cascade hydropower and the variable-speed unit. If it exceeds the response range of the cascade hydropower and the variable-speed pumped storage, it will be adjusted by the photovoltaic power station; the photovoltaic power station maintains full output operation; the output fluctuation of photovoltaic power is smoothed by the cascade hydropower; (4) In the off-grid state and flood mode, the cascade hydropower stations bear the regional base load and maintain the output unchanged, and the regional voltage and frequency are controlled by the full-power variable-speed units; all photovoltaic power stations are shut down; (5) In the off-grid level-water mode, cascade hydropower and photovoltaic power jointly bear the regional base load, cascade hydropower suppresses the fluctuation of photovoltaic output, and the full-power variable-speed units control the regional voltage and frequency; (6) In the off-grid low-water mode, the photovoltaic power plant bears the regional base load, the full-power variable-speed unit smoothes the fluctuation of photovoltaic output, and the cascade hydropower plant controls the regional voltage and frequency; The method also includes an automatic start-stop control strategy for the cascade hydro-photovoltaic-storage combined operation system: The joint operation system automatically starts and stops cascade hydropower and full-power pumped storage units according to the dispatching power generation plan curve, and the automatic start and stop gives priority to the variable-speed pumped storage units. (1) If the planned output of the dispatching power generation plan curve in the next hour is greater than the upper limit of the adjustable range of the current cascade hydropower, photovoltaic and variable-speed pumped storage combined power generation system, and there are variable-speed pumped storage units in a shutdown state, the variable-speed pumped storage units in a shutdown state will be started first, otherwise the hydropower units in a shutdown state will be started; (2) If the difference between the planned output of the dispatching power generation plan curve in the next hour and the upper limit of the joint operation system is greater than the rated capacity of a single variable-speed pumped storage unit, the variable-speed pumped storage unit in the power generation state shall be stopped first; if there is no variable-speed pumped storage unit in the power generation state and the difference is greater than the rated capacity of a single hydropower unit, the hydropower unit in the power generation state shall be stopped; The method also includes a gate linkage control strategy for the cascade hydro-photovoltaic-storage joint operation system: The gate automatic lifting linkage control function is implemented according to the real-time water level, output, overtopping water level and gate operation of each power station. When the overtopping water level is reached, the gate will automatically rise in an emergency. When the set dead water level is reached, the gate will automatically fall in an emergency. The overtopping water level is divided into the first-level overtopping water level and the second-level overtopping water level. The second-level overtopping water level is more urgent than the first-level overtopping water level. The thresholds are manually set by the operator. (1) When the water level of the hydropower station reaches the set first-level overflow water level and the power station output is not at full power, the entire plant will be automatically prompted to adjust the sound and light information to full power. After the operator confirms, the output of all generating units in the power station will be adjusted to full power; (2) When the water level of the hydropower station reaches the set first-level flooding water level and the power station output is at full capacity, the gate raising operation sound and light information will be automatically prompted. After the operator confirms, the power station gate raising operation will be executed; (3) When the water level of the hydropower station reaches the set secondary overflow water level, the full power adjustment and gate raising operation sound and light information of the whole plant will be automatically prompted. After the operator confirms, the output of all the generating units of the power station will be adjusted to the full power state, and the power station gate will be raised at the same time; (4) When the water level of the hydropower station reaches the set dead water level, if there are power station units in a non-shutdown state, the entire plant will be automatically prompted with sound and light information for shutdown. After confirmation by the operating personnel, all non-generating units in the power station will be automatically shut down; The method also includes a load optimization allocation strategy for the cascaded hydro-photovoltaic-storage combined operation system: When cascade hydropower, photovoltaic and storage power stations are operated jointly, the load optimization distribution of cascade hydropower and photovoltaic power stations adopts equal proportion distribution; (1) Cascade hydropower load distribution strategy: The load distribution of cascade hydropower stations adopts the principle of proportionality of the dynamic and real-time adjustable total output of each cascade hydropower station; (2) Photovoltaic power station load distribution strategy: The load distribution of the photovoltaic power station adopts the principle of proportionality of the rated power of the photovoltaic array inverter; (3) Full-power variable-speed pumped storage load distribution strategy: The load distribution of full-power variable-speed pumped storage units adopts the principle of allocating all loads within the adjustable capacity range. If the adjustable capacity range is exceeded, only the allowable value of the adjustable capacity will be allocated.
2. The economic dispatching method of cascade hydropower, photovoltaic and full-power variable-speed pumped storage according to claim 1 is characterized by: The judgment conditions for the two operating states of the grid-connected state and the off-grid state include the circuit breaker switch status of the connection line between the cascade hydropower, photovoltaic and full-power variable-speed pumped storage converging substation and the regional AC power grid, the substation bus voltage, and the substation bus frequency, among which: When the system is in the grid-connected state, the circuit breakers of the cascade hydropower, photovoltaic and full-power variable-speed pumped storage converging substations and the regional AC power grid are closed, and the substation bus voltage and substation bus frequency are both within the normal operating range; When the system is off-grid, the circuit breaker switches of the cascade hydropower, photovoltaic and full-power variable-speed pumped storage converging substations and the regional AC power grid are in the open state, and after the circuit breaker state changes from closed to open, the substation bus voltage or bus frequency exceeds the normal operating range; The grid-connected status and off-grid status are automatically determined by the cascade hydropower, photovoltaic and storage combined operation system according to the above-mentioned judgment conditions, and can also be manually switched on the combined power generation system. Both the grid-connected status and off-grid status can be displayed in real time on the combined operation system and manually operated.
3. The economic dispatching method of cascade hydropower, photovoltaic and full-power variable-speed pumped storage according to claim 1 is characterized by: The flood mode, normal water mode and low water mode can be manually set on the joint power generation system according to the water inflow time period of the cascade basin, or can be automatically determined by the joint operation system, and the determination conditions are: (1) Manually set the flood flow threshold Q wet and low flow threshold Q dry ; (2) Based on the inflow QI of any power station in the cascade power station i i The total flow rate QL of the interval inflow i Compare with the flow threshold to determine the current operation mode; ① When the total flow is greater than or equal to the flood flow threshold, it is flood mode; ② If the total flow is less than or equal to the low-flow flow threshold, it is low-flow mode; ③ If the total flow is greater than the low-water flow threshold and less than the high-water flow threshold, it is in normal water mode; (3) Determine the current operation mode based on the real-time output, gate status and real-time water level of each cascade hydropower station; ① If a certain level of hydropower station is not in an accident or maintenance and the gate is open, the current state is flood mode; ② If the output of each cascade hydropower station is above 80% of the rated output of the station, the current state is flood mode; ③ If the power generation output of each cascade power station is less than the rated output of a single unit, the current operating state is low-water mode; ④ If the power generation output of each cascade power station is greater than or equal to the rated output of a single unit and less than or equal to 80% of the total output of the units, the current operating state is the level water mode.
