Control method and system for controlling overvoltage and three-phase imbalance in photovoltaic areas
Through the collaborative control of single-phase energy storage and smart reactance, combined with energy storage capacity and reactance switching indicators, the comprehensive management problem of overvoltage and three-phase imbalance in the photovoltaic station area is solved, and the equipment utilization rate and management efficiency are improved. It is suitable for large-scale applications. A low-voltage distribution station area with large-scale photovoltaic access.
Patent Information
- Application Number
- CN202410066279.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-16
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2044-01-16
AI Technical Summary
It is difficult to effectively control the overvoltage and three-phase imbalance problems in photovoltaic power stations with existing technology, especially in the case of large-scale photovoltaic access, which threatens the security and economy of power supply in distribution power stations and makes it difficult to solve problems due to insufficient energy storage capacity. Meet the needs of multi-objective comprehensive management.
Through flexible switching based on single-phase energy storage and smart reactance, combined with collaborative control of energy storage capacity and reactance, multi-objective control of overvoltage and three-phase imbalance at photovoltaic grid-connected points is achieved, taking advantage of the fast response characteristics and storage capabilities of smart reactance. It can intelligently control multiple power quality targets and formulate switching indicators SW1 and SW2 to optimize equipment utilization and management efficiency.
It improves equipment utilization and management efficiency, enhances the flexibility and versatility of the management plan, can effectively suppress overvoltage and three-phase imbalance in the low-voltage distribution station area, avoid frequent switching of energy storage, and quickly respond to high-power load impacts.
Smart Images

Figure CN118117574B_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of power system control, and in particular relates to a control method and system for controlling overvoltage and three-phase imbalance in a photovoltaic area. Background Art
[0002] The statements in this section merely provide background information related to the present invention and do not necessarily constitute prior art.
[0003] Large-scale distributed photovoltaic access has impacted the voltage control in the distribution area, and overvoltage problems frequently occur at the grid-connected nodes in the area. At the same time, there are a large number of single-phase user loads in the area, and their intermittent and disorderly nature has led to more serious three-phase imbalance problems, which has an adverse impact on transformer equipment and line losses, threatening the safe and reliable operation of power supply in the distribution area. Therefore, the demand for comprehensive management of overvoltage and imbalance in the current photovoltaic area is extremely urgent. With the access of larger-scale photovoltaics in the future, ensuring the safe, economical and reliable operation of the power system has become a practical problem that needs to be solved urgently.
[0004] At present, overvoltage in low-voltage distribution substations is mainly suppressed by passively installing control devices, such as static VAR compensators. Although this type of suppression method has a good suppression effect, it is not economical and is difficult to be widely promoted and applied as a general solution in distribution substations; the three-phase imbalance control in the substation area usually adopts the load phase sequence switching method. After analyzing and statistically analyzing a large amount of power consumption data, the best phase switching scheme is obtained, and the phase sequence switching is repeated according to the scheme. Although this method involves phase switching reconstruction, and the actual phase switching model has a high calculation dimension, it has the problems of poor flexibility and low timeliness.
[0005] Energy storage technology is developing rapidly, and energy storage units have gradually become an important device for optimizing the power supply quality of substations. At present, the role of energy storage in low-voltage distribution substations is usually to "shave peaks and fill valleys" to smooth out system frequency and voltage fluctuations. However, a comprehensive treatment method for overvoltage and three-phase imbalance control through single-phase energy storage has not yet been found, and the energy storage capacity currently configured in the substation is relatively small, and it is difficult to meet the needs of multi-objective comprehensive treatment when the capacity is limited. At the same time, energy storage as a regulating resource requires a certain delay to act on the power grid, which makes it difficult to achieve a rapid response to power quality problems caused by the switching of certain high-power and impact loads. Summary of the invention
[0006] In order to overcome the shortcomings of the above-mentioned prior art, the present invention provides a switching control method for controlling overvoltage and three-phase imbalance in photovoltaic areas. In response to the actual needs of flexible switching of equipment and improved equipment utilization under multi-objective management of photovoltaic areas, comprehensive management of overvoltage and three-phase imbalance is achieved based on flexible switching of energy storage and intelligent reactors.
[0007] To achieve the above objectives, one or more embodiments of the present invention provide the following technical solutions:
[0008] In the first aspect, a control method for controlling overvoltage and three-phase imbalance in a photovoltaic area is disclosed, comprising:
[0009] For low-voltage distribution substations with large-scale photovoltaic grid connection, the photovoltaic grid-connected power and load power at the grid connection point are analyzed item by item;
[0010] When the photovoltaic grid-connected power is less than the load power of the phase, the energy storage executes the three-phase unbalanced governance mode, and the active power currently sent by the energy storage to the grid is calculated. When the photovoltaic single-phase grid-connected power is greater than the load power of the phase, the energy storage of the phase executes the three-phase unbalanced and overvoltage multi-objective governance mode;
[0011] When the energy storage executes the three-phase unbalanced governance mode, the energy storage power setting value is set according to the mode, and the energy storage is controlled to send active power to the grid connection point to balance the three-phase power; when the energy storage executes the three-phase unbalanced and overvoltage multi-objective governance mode, the energy storage power setting value is set according to the mode, and the energy storage is controlled to absorb active power from the grid connection point to suppress overvoltage to balance the three-phase power.
[0012] As a further technical solution, a switching step is also included:
[0013] Based on the current voltage and current measurement values and the established energy storage capacity as constraints, the coordinated control requirements of the governance equipment are evaluated. Under the premise that the energy storage capacity is insufficient to complete multi-objective control, the intelligent reactor switching evaluation threshold is given, and the initial value X0 of the intelligent reactor is set. The size of the connected intelligent reactor is adjusted through sliding iteration to achieve non-inductive regulation of overvoltage problems.
[0014] Considering the attenuation coefficient of the charge and discharge rate of energy storage capacity under long-term operation, an evaluation threshold for intelligent reactor removal is given to achieve flexible switching and coordinated control of equipment based on single-phase energy storage and intelligent reactor for multi-objective management of three-phase imbalance and overvoltage.
[0015] As a further technical solution, before analyzing the size of the photovoltaic grid-connected power and the load power at the grid-connected point item by item, it also includes:
[0016] At the photovoltaic grid-connected point, phases A, B, and C are respectively connected to single-phase energy storage devices, and the voltage and current data at the grid-connected point are measured to calculate the photovoltaic grid-connected power and load power.
[0017] As a further technical solution, when the energy storage executes the three-phase unbalanced management mode, the energy storage power setting value is set according to the mode, and the specific method is as follows:
[0018] Assume that the current grid-connected power of photovoltaic is P PV , the active power currently sent by the energy storage to the grid is As shown in formula (1):
[0019]
[0020] in, is the i-phase energy storage outer loop reference value instruction, is the equivalent front load power.
[0021] As a further technical solution, when the energy storage implements the three-phase unbalance and overvoltage multi-objective governance mode, the energy storage power setting value is set according to formula (3):
[0022] The balance factor satisfies expression (2):
[0023]
[0024] At this time, the energy storage absorbs active power from the grid connection point, as shown in formula (3):
[0025]
[0026] is the i-phase energy storage outer loop reference value instruction, is the current load power, and the current photovoltaic grid-connected power is P PV , the active power currently sent by the energy storage to the grid is
[0027] Among them, the energy storage capacity is allocated as follows: absorbing excess photovoltaic power P PV -P i load To suppress overvoltage, absorb ε(P PV -P i load ) to balance the three-phase power.
[0028] As a further technical solution, it also includes formulating indicators for flexible switching of management equipment: SW1 is an evaluation threshold indicator for controlling the input of smart reactors into the grid, and SW2 is an evaluation threshold indicator for controlling the removal of smart reactors from the grid.
[0029] As a further technical solution, SW1 is the evaluation threshold index for controlling the smart reactor to be put into the grid. The expression of SW1 is shown in formula (4):
[0030]
[0031] in, is the current storage capacity of phase i, is the rated storage capacity of phase i, η d To characterize the discharge rate attenuation coefficient of energy storage power as the discharge time increases, It is the time for the i-phase energy storage to discharge with equal power.
[0032] F(SW1) is the judgment function that determines whether the smart reactor needs to be put into the grid, and its expression is shown in formula (5):
[0033]
[0034] When F(SW1) is 1, the smart reactor needs to be put into the grid to cooperate with the management; when F(SW1) is 0, in the current Within the time, the energy storage capacity meets the requirements and the smart reactor does not need to be switched on or off.
[0035] As a further technical solution, SW2 is an evaluation threshold index for controlling the removal of the smart reactor from the power grid. The expression of SW2 is shown in formula (6):
[0036]
[0037] Among them, η c To characterize the charging rate attenuation coefficient that changes with the increase of charging time.
[0038] F(SW2) is the judgment function that determines whether the smart reactor needs to be removed from the power grid. The expression is shown in formula (7):
[0039]
[0040] When F(SW2) is 1, the smart reactor can be removed from the grid; when F(SW2) is 0, the smart reactor is removed from the grid during the current T store During this time, the smart reactor will not be removed from the grid temporarily.
[0041] In the second aspect, a control system for controlling overvoltage and three-phase imbalance in a photovoltaic area is disclosed, including:
[0042] The comparison module is configured to: for the low-voltage distribution station area of large-scale photovoltaic grid-connected, analyze the size of the photovoltaic grid-connected power and the load power at the grid-connected point item by item;
[0043] The mode selection module is configured as follows: when the photovoltaic grid-connected power is less than the load power of the phase, the energy storage executes the three-phase unbalanced governance mode, and the active power currently sent by the energy storage to the grid; when the photovoltaic single-phase grid-connected power is greater than the load power of the phase, the energy storage of the phase executes the three-phase unbalanced and overvoltage multi-objective governance mode;
[0044] The mode execution module is configured as follows: when the energy storage executes the three-phase unbalanced governance mode, the energy storage power setting value is set according to the mode, and the energy storage is controlled to send active power to the grid connection point to balance the three-phase power; when the energy storage executes the three-phase unbalanced and overvoltage multi-objective governance mode, the energy storage power setting value is set according to the mode, and the energy storage is controlled to absorb active power from the grid connection point and suppress overvoltage to balance the three-phase power.
[0045] One or more of the above technical solutions have the following beneficial effects:
[0046] The technical solution of the present invention is based on multi-power quality target intelligent control of single-phase energy storage. By comparing the photovoltaic grid-connected power and the load power, it can flexibly execute the three-phase unbalanced governance mode and the multi-target governance mode, and has the advantage of high equipment utilization.
[0047] The technical solution of the present invention realizes the comprehensive management of overvoltage and three-phase imbalance through the flexible coordination of single-phase energy storage and intelligent inductor, greatly improves the equipment utilization and management efficiency, and takes into account the attenuation characteristics of energy storage capacity and charging and discharging speed, avoiding frequent switching of the two devices. It has extremely high flexibility and versatility in the management application of low-voltage distribution station areas.
[0048] The technical solution of the present invention proposes a flexible switching method for control equipment in multi-objective scenarios of overvoltage and three-phase imbalance. Under the premise that the energy storage capacity is insufficient to complete multi-objective control, the intelligent reactor is used as a passive component with fast response advantages to be quickly put into use, suppress overvoltage at the grid connection point, prevent overvoltage, and coordinate with energy storage to complete comprehensive control, which has the advantage of strong flexibility.
[0049] The technical solution of the present invention proposes a new indicator for flexible switching of two governance devices. By evaluating the threshold indicator, it controls the input and removal of the smart reactor, taking into account the constraints of the energy storage capacity on long-term equal-power charging and discharging, and has the significant advantages of avoiding the injection of excess reactive power into the power grid and preventing the repeated input and output of the smart reactor.
[0050] Advantages of additional aspects of the present invention will be given in part in the following description, and in part will become obvious from the following description, or will be learned through practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0051] The accompanying drawings in the specification, which constitute a part of the present invention, are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute improper limitations on the present invention.
[0052] Figure 1 This is an equivalent model diagram of the photovoltaic grid-connected low-voltage distribution station area used in the first and second embodiments of the present application;
[0053] Figure 2It is a schematic diagram of the structure and principle of the single-phase energy storage device of this application;
[0054] Figure 3 It is a simplified equivalent circuit diagram of photovoltaic grid-connected power flow;
[0055] Figure 4 It is a flow chart of the comprehensive treatment method for overvoltage and three-phase imbalance based on the flexible coordination of single-phase energy storage and intelligent reactor;
[0056] Figure 5 This is a schematic diagram of the outer loop of energy storage power control in this application. DETAILED DESCRIPTION
[0057] It should be noted that the following detailed descriptions are exemplary and are intended to provide further explanation of the present invention. Unless otherwise specified, all technical and scientific terms used herein have the same meanings as those commonly understood by those skilled in the art to which the present invention belongs.
[0058] It should be noted that the terms used herein are for describing specific embodiments only and are not intended to be limiting of exemplary embodiments according to the present invention.
[0059] In the absence of conflict, the embodiments of the present invention and the features of the embodiments may be combined with each other.
[0060] As a typical governance device within the power grid, smart reactors have the advantages of rapid response, flexible operation, and easy removal. They are usually configured with a higher capacity and can be used in conjunction with energy storage to coordinate power quality control.
[0061] Embodiment 1
[0062] This embodiment discloses a control method for controlling overvoltage and three-phase imbalance in a photovoltaic area. Figure 1 The low-voltage distribution station area equivalent model shown has both overvoltage and three-phase unbalanced power quality problems.
[0063] First, it is a multi-power quality target intelligent control method based on single-phase energy storage. According to the relationship between photovoltaic grid-connected power and load power, it flexibly executes three-phase imbalance control mode and overvoltage and three-phase imbalance multi-target control mode, and controls single-phase energy storage to emit or absorb active power according to the power setting value.
[0064] Two new indicators for flexible switching of governance equipment are proposed: SW1 is the evaluation threshold indicator for controlling the input of smart reactors into the grid, and SW2 is the evaluation threshold indicator for controlling the removal of smart reactors from the grid. The two indicator values are calculated by real-time measurement of power and voltage data at the grid connection point, and substituted into the judgment function F(SW1) and F(SW2) to determine whether to input / remove the smart reactor.
[0065] Secondly, a flexible switching method for control equipment in multi-objective scenarios of overvoltage and three-phase imbalance is proposed. When the judgment function F(SW1) value is 1, the smart reactor is put into use to respond quickly to suppress overvoltage and coordinate with single-phase energy storage for control. When the judgment function F(SW2) value is 1, the smart reactor is cut off and the single-phase energy storage continues to execute the multi-objective control mode to complete the control.
[0066] About single-phase energy storage, including:
[0067] The DC side is composed of energy storage battery modules and DC-DC transformer modules. The single-phase energy storage control circuit adopts a dual-loop control method. The outer loop applies a constant energy storage power control strategy, and the inner loop is a constant current control strategy. The power emitted by the energy storage is boosted by the Boost circuit and then applied to the AC side, or the energy storage is controlled to absorb the power after the Buck circuit steps down.
[0068] The AC side is composed of a single-phase rectifier / inverter module and an LCL filter module. The control circuit adopts a dual-loop control method, with the outer loop applying a constant DC side voltage control strategy and the inner loop a constant current control strategy. The DC power flowing out of the energy storage is inverted into AC power and then filtered and connected to the grid, or the AC power flowing into the grid is converted into DC power and then flows into the energy storage.
[0069] According to the positive or negative power difference between the photovoltaic grid-connected power and the load power, the single-target and multi-target management modes are flexibly implemented, different energy storage power setting values are set, and the energy storage is controlled to emit / absorb active power to complete the management.
[0070] Regarding the new indicator of flexible switching of governance equipment, the attenuation coefficient of energy storage capacity during long-term operation is taken into account. store Calculate SW1 and determine whether the smart reactor needs to be put into operation based on F(SW1); when the smart reactor is put into operation, no longer calculate SW1, and start calculating SW2 in the next cycle after the input, and determine whether the smart reactor needs to be removed based on F(SW2).
[0071] The intelligent reactor is used as a passive component to respond quickly and adjust the overvoltage without induction, and is coordinated with single-phase energy storage for control.
[0072] By flexibly switching indicators, the flexible switching of smart reactors can be achieved, breaking the limitations of single-phase energy storage capacity on management scenarios, with strong management capabilities and high versatility.
[0073] More specifically, the first aspect of this embodiment discloses a multi-power quality target intelligent control method based on single-phase energy storage, including:
[0074] At the photovoltaic grid-connected point, phases A, B, and C are connected to single-phase energy storage devices respectively. The voltage and current data at the grid-connected point are measured. The photovoltaic grid-connected power and load power are calculated according to equations (8) and (9). The energy storage power generation / charging mode is controlled by comparing the positive and negative values, and the active power received and sent by the energy storage device of each phase is controlled to complete the comprehensive treatment of overvoltage and three-phase imbalance.
[0075] P PV =U PV ×I PV (8)
[0076]
[0077] According to the calculation result, formula (1) or (3) is flexibly selected, and the set value of the energy storage power is obtained by substitution. The single-phase energy storage device is controlled to absorb or emit active power according to the set value.
[0078] Among them, the single-phase energy storage device is divided into an AC side and a DC side. The AC side adopts an outer loop control strategy of fixed DC side voltage, and the DC side applies an outer loop control method of fixed energy storage power.
[0079] The DC side control of the single-phase energy storage device is the key to achieving multi-objective governance functions. A dual closed-loop control method is adopted, with the inner loop using constant energy storage current control and the outer loop using constant energy storage power control. For each phase power at the photovoltaic grid-connected point, the energy storage power setting value in the above-mentioned constant energy storage power outer loop control is further explained in two cases:
[0080] When the PV grid-connected power is less than the load power of the phase, the energy storage executes the three-phase unbalanced management mode. Assuming that the current PV grid-connected power is P PV , the active power currently sent by the energy storage to the grid is As shown in formula (1):
[0081]
[0082] in, is the reference value instruction of the energy storage outer loop of phase i, is the equivalent front load power.
[0083] In the photovoltaic power flow reverse transmission scenario, energy storage independently implements the three-phase imbalance and overvoltage multi-objective governance mode. In this governance mode, energy storage must absorb excess photovoltaic power and balance the three-phase power. Therefore, the balance assessment factor ε is introduced to characterize the power component used for three-phase imbalance governance in the single-phase energy storage capacity to ensure the completion of three-phase imbalance governance. The balance factor satisfies expression (2):
[0084]
[0085] At this time, the energy storage absorbs active power from the grid connection point, as shown in formula (3):
[0086]
[0087] On the other hand, based on the above governance method, a flexible switching method for governance equipment in multi-objective scenarios of overvoltage and three-phase imbalance is proposed. Based on the voltage and current measurement values, the photovoltaic grid-connected power, the load power of each phase and the established energy storage capacity are calculated by equations (8) and (9) as constraints, and two new indicators SW1 and SW2 for flexible switching of governance equipment are proposed to evaluate the coordinated control requirements of governance equipment.
[0088] The flexible selection of governance modes mentioned above is for single-phase energy storage governance. The flexible switching method of governance equipment proposed here is to flexibly switch between smart reactors and single-phase energy storage.
[0089] Among them, the two new indicators SW1 and SW2 are both smart reactor removal evaluation threshold indicators given by considering the attenuation of the charge and discharge rate of the energy storage capacity during long-term operation. SW1 calculated by formula (4) is the evaluation threshold indicator for controlling the smart reactor to be put into the grid when the energy storage capacity is insufficient to complete multi-objective control; SW2 calculated by formula (6) is the evaluation threshold indicator for controlling the smart reactor to be removed from the grid.
[0090] The steps of smart reactor input management are as follows: set the initial value X0 of the smart reactor, adjust the size of the connected smart reactor through sliding iteration, and smoothly adjust the smart reactor input value to 10 times as one iteration process. In the smooth adjustment, calculate SW2 in real time according to formula (6). When the cut-out condition is met, stop the adjustment, cut out the smart reactor, and complete the non-inductive adjustment of the overvoltage problem.
[0091] SW1 is the evaluation threshold index for controlling the smart reactor to be put into the grid. Considering the current storage capacity of energy storage and the power attenuation characteristics during long-term operation, a method for evaluating the coordinated demand of single-phase energy storage and smart reactor is proposed. The expression of SW1 is shown in formula (4):
[0092]
[0093] in, is the current storage capacity of phase i, is the rated storage capacity of phase i, η d To characterize the discharge rate attenuation coefficient of energy storage power as the discharge time increases, It is the time for the i-phase energy storage to discharge with equal power.
[0094] F(SW1) is the judgment function that determines whether the smart reactor needs to be put into the grid, and its expression is shown in formula (5):
[0095]
[0096] When F(SW1) is 1, considering that the current amount of energy storage is difficult to maintain the required management capacity, the smart reactor needs to be put into the grid to cooperate with the management; when F(SW1) is 0, in the current Within the time, the energy storage capacity meets the requirements. In order to avoid injecting excess reactive power into the grid, the smart reactor does not need to be switched on or off.
[0097] Similarly, SW2 is the evaluation threshold index for controlling the removal of the smart reactor from the power grid. Considering the current storage capacity of the energy storage and the growth characteristics of the energy during long-term operation, the expression of SW2 is shown in formula (6):
[0098]
[0099] Among them, η c It is the charging rate attenuation coefficient that characterizes the change of energy storage power with the increase of charging time.
[0100] F(SW2) is the judgment function that determines whether the smart reactor needs to be removed from the power grid. The expression is shown in formula (7):
[0101]
[0102] When F(SW2) is 1, considering that the current storage capacity is high and the required management capacity can be maintained, the smart reactor can be removed from the grid; when F(SW2) is 0, in the current T store During this period, the amount of energy stored in the energy storage may not be able to independently meet the management requirements due to source load fluctuations. In order to avoid adverse effects on grid operation and control caused by frequent switching of smart reactors, the smart reactors will not be temporarily removed from the grid.
[0103] like Figure 2 The single-phase energy storage device shown is composed of an energy storage battery module, a boost / buck module, an inverter / rectifier module and an LCL filter module.
[0104] Among them, the energy storage battery module absorbs or emits active power according to the power setting value; the boost / buck module controls the increase and decrease of the energy storage output or input voltage; the inverter / rectifier module is used for voltage inversion and grid connection or rectification input energy storage battery; the LCL filter module is used to filter out harmonics.
[0105] The energy storage power setting value calculated from the measured value is applied to the DC side power outer loop, and the energy storage is controlled to achieve comprehensive management of the two power quality issues by absorbing active power from the grid-connected point or emitting active power to the grid-connected point.
[0106] In this embodiment, all data of the photovoltaic grid-connected point are realized through a voltage meter, an ammeter, and a power meter. The photovoltaic grid-connected power is calculated using the photovoltaic input voltage and current according to formula (8); the unbalanced load power is calculated according to formula (9) based on the unbalanced load voltage and current.
[0107] like Figure 4 As shown in FIG. 1 , the specific steps of the multi-power quality target intelligent control method based on single-phase energy storage are:
[0108] (1) First, compare the measured PV grid-connected power with the unbalanced load power, and flexibly select the energy storage management mode. When the PV single-phase grid-connected power is less than the i-phase load power, the energy storage of this phase implements the three-phase unbalanced management mode; when the PV single-phase grid-connected power is greater than the i-phase load power, the energy storage of this phase implements the three-phase unbalanced and overvoltage multi-objective management mode.
[0109] (2) Then set the energy storage power setting value P according to the energy storage management mode i storeref When the energy storage implements the three-phase unbalanced governance mode, the energy storage power setting value is set according to formula (1) to control the energy storage to send active power to the grid connection point and balance the three-phase power; when the energy storage implements the three-phase unbalanced and overvoltage multi-objective governance mode, the energy storage power setting value is set according to formula (3) to control the energy storage to absorb active power from the grid connection point, suppress overvoltage and balance the three-phase power.
[0110] In formula (3), the energy storage capacity is allocated as follows: Absorbing excess photovoltaic power P PV -P i load To suppress overvoltage, absorb ε(P PV -P i load ) to balance the three-phase power.
[0111] (3) Finally, the single-phase energy storage device is controlled to absorb / emit active power according to the energy storage power setting value, thereby completing the comprehensive treatment of overvoltage and three-phase imbalance, and calculating the voltage deviation and three-phase imbalance to test the treatment effect.
[0112] When the energy storage power setting value is less than 0, the energy storage battery module absorbs power. The current flows from the low-voltage distribution station area to the single-phase energy storage device, and is converted into direct current by the single-phase rectifier module. It is then stepped down by the Buck step-down circuit and applied to both ends of the energy storage battery to charge the energy storage battery.
[0113] When the energy storage power setting value is greater than 0, the energy storage battery module emits power. After the energy storage voltage is emitted from both ends of the energy storage battery, it is converted by the Boost boost circuit and applied to the single-phase inverter module. After passing through the inverter module and the LCL filter module, it is connected to the photovoltaic grid point. The current flows from the single-phase energy storage device to the low-voltage distribution station area.
[0114] The voltage at the photovoltaic grid-connected point is measured in real time, and the voltage deviation and three-phase imbalance are calculated according to equations (10) and (11):
[0115]
[0116] Where U N is the nominal voltage of the grid connection point.
[0117]
[0118] Where U a0 , U b0 , U c0 They correspond to the effective values of the fundamental wave components of the voltage at the three-phase grid connection points A, B and C respectively.
[0119] After the treatment is completed, the voltage and current at the grid connection point are measured, and the voltage deviation and three-phase imbalance are calculated. According to national standards, when the voltage deviation is less than 7% and the three-phase imbalance is less than 2% in the treatment results, the treatment effect is considered to be excellent. At this point, the comprehensive treatment of overvoltage and three-phase imbalance based on the intelligent input of single-phase energy storage devices is completed.
[0120] The multi-power quality target intelligent control method based on single-phase energy storage introduced in this embodiment is not limited by the photovoltaic grid-connected power, the size of unbalanced load and the low-voltage distribution station area structure. By analyzing the photovoltaic grid-connected power and load power conditions of each phase, the energy storage working mode is flexibly executed, the energy storage power set value is set, and the energy absorption or output power of the phase is controlled, which greatly improves the flexibility and versatility of the management plan. The single-phase energy storage is ready for use and is simple and convenient to use.
[0121] Another embodiment of the present application provides a method for flexible switching of control equipment in a multi-objective scenario of overvoltage and three-phase imbalance, including:
[0122] The voltage and current values at the grid connection point are measured in real time, and the coordinated control requirements of the management equipment are evaluated based on the measured values and the established energy storage capacity.
[0123] Under the premise that the energy storage capacity is not enough to complete multi-objective control, considering the attenuation / growth coefficient of the energy storage capacity during long-term operation, two new indicators for flexible switching of management equipment are proposed. SW1 is the evaluation threshold indicator for controlling the smart reactor to be put into the grid, and SW2 is the evaluation threshold indicator for controlling the smart reactor to be removed from the grid. Based on the two switching indicators, flexible switching and coordinated control of equipment for multi-objective management of three-phase imbalance and overvoltage based on single-phase energy storage and smart reactor is realized.
[0124] like Figure 4As shown in the figure, the specific steps of flexible switching and coordinated control of equipment for multi-objective management of three-phase imbalance and overvoltage based on single-phase energy storage and intelligent reactor are as follows:
[0125] (1) First, based on the evaluation threshold indicator SW1 of the smart reactor being put into the grid, it is determined whether the energy storage capacity is insufficient to complete multi-objective control and whether the smart reactor needs to be put into use.
[0126] According to the power situation at the grid connection point, the evaluation threshold index SW1 of the smart reactor input into the grid is calculated using formula (4), and the calculation result is substituted into the judgment function F(SW1).
[0127] When SW1<10%, F(SW1) takes 1, the current capacity of energy storage is difficult to maintain the required governance capacity, and the smart reactor needs to be put into the grid to cooperate with governance; when SW1≥10%, F(SW1) takes 0, in the current T store Within the time, the energy storage capacity meets the requirements. In order to avoid injecting excess reactive power into the grid, smart reactors do not need to be put into use.
[0128] (2) Secondly, the initial suppression of overvoltage is completed through the non-inductive adjustment of the smart reactor. The smart reactor is composed of an inductor and a capacitor. The initial value X0 of the smart reactor is set. After it is connected to the grid, the size of the connected smart reactor is adjusted through sliding iteration to achieve non-inductive adjustment of the overvoltage problem.
[0129] (3) Then, based on the evaluation threshold index SW2 of the smart reactor cutting off the power grid, it is judged whether the current capacity of the energy storage can complete the multi-objective control and whether the smart reactor needs to be cut off.
[0130] The next evaluation cycle starts after the smart reactor is put into operation. store The evaluation threshold index SW2 of the smart reactor cutting off the power grid is calculated according to formula (6) within the time, and the calculation result is substituted into the judgment function F(SW2).
[0131] When SW2 ≥ 85%, F(SW2) takes 1. Considering that the current storage capacity of energy storage is relatively high and the required management capacity can be maintained, the smart reactor can be removed from the grid. When SW2 < 85%, F(SW2) takes 0. store During this period, the amount of energy stored in the energy storage may not be able to independently meet the management requirements due to source load fluctuations. In order to avoid adverse effects on grid operation and control caused by frequent switching of smart reactors, the smart reactors will not be temporarily removed from the grid.
[0132] (4) Finally, single-phase energy storage completes the final treatment, and calculates the voltage deviation and three-phase imbalance to verify the treatment effect.
[0133] After the coordinated management of intelligent reactors and energy storage, the overvoltage and three-phase imbalance problems in the low-voltage distribution station area were solved, and the management effect was verified based on equations (10) and (11).
[0134] The detailed steps are the same as the comprehensive management inspection steps provided in Example 1 and will not be repeated here.
[0135] The comprehensive governance method introduced in this embodiment breaks the limitation of the capacity constraint of the single-phase energy storage device on the governance scenario. Based on the proposed evaluation index and judgment function, the comprehensive governance of overvoltage and three-phase imbalance is completed through the flexible switching of the intelligent reactor and the single-phase energy storage device. This method takes into account multiple governance influencing factors such as photovoltaic volatility, discharge rate attenuation of energy storage power as the discharge / charging time increases, and energy storage capacity, thereby improving the governance capability and having a wide range of applications.
[0136] When the energy storage capacity is sufficient, single-phase energy storage can complete the comprehensive management of the two power quality problems; when the energy storage capacity is insufficient, a method is further proposed to complete the management through flexible switching between smart reactors and single-phase energy storage devices. A new indicator for flexible switching between smart reactors and single-phase energy storage devices is proposed, and three-phase imbalance and voltage deviation are introduced as evaluation indicators to test the management effect of the comprehensive management method. This application utilizes the rapid response characteristics of smart reactors, and cooperates with single-phase energy storage devices to solve the problem of flexible switching in multi-target management scenarios of overvoltage and three-phase imbalance, and has extremely strong flexibility and versatility.
[0137] The method proposed in this embodiment effectively improves the utilization rate and efficiency of the management equipment, and takes into account the functional attenuation of energy storage capacity during long-term operation, the volatility of photovoltaic output and the diversity of scenarios, and has strong versatility.
[0138] Embodiment 2
[0139] The purpose of this embodiment is to provide a computer device, including a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements the steps of the above method when executing the program.
[0140] Embodiment 3
[0141] The purpose of this embodiment is to provide a computer-readable storage medium.
[0142] A computer-readable storage medium stores a computer program, which executes the steps of the above method when executed by a processor.
[0143] Embodiment 4
[0144] The purpose of this embodiment is to provide a control system for managing overvoltage and three-phase imbalance in a photovoltaic area, including:
[0145] The comparison module is configured to: for the low-voltage distribution station area of large-scale photovoltaic grid-connected, analyze the size of the photovoltaic grid-connected power and the load power at the grid-connected point item by item;
[0146] The mode selection module is configured as follows: when the photovoltaic grid-connected power is less than the load power of the phase, the energy storage executes the three-phase unbalanced governance mode, and the active power currently sent by the energy storage to the grid; when the photovoltaic single-phase grid-connected power is greater than the load power of the phase, the energy storage of the phase executes the three-phase unbalanced and overvoltage multi-objective governance mode;
[0147] The mode execution module is configured as follows: when the energy storage executes the three-phase unbalanced governance mode, the energy storage power setting value is set according to the mode, and the energy storage is controlled to send active power to the grid connection point to balance the three-phase power; when the energy storage executes the three-phase unbalanced and overvoltage multi-objective governance mode, the energy storage power setting value is set according to the mode, and the energy storage is controlled to absorb active power from the grid connection point and suppress overvoltage to balance the three-phase power.
[0148] The steps involved in the apparatuses of the above embodiments 2, 3 and 4 correspond to the method embodiment 1, and the specific implementation methods can refer to the relevant description part of embodiment 1. The term "computer-readable storage medium" should be understood as a single medium or multiple media including one or more instruction sets; it should also be understood to include any medium that can store, encode or carry an instruction set for execution by a processor and enable the processor to execute any method in the present invention.
[0149] Those skilled in the art should understand that the modules or steps of the present invention described above can be implemented by a general-purpose computer device, or alternatively, they can be implemented by a program code executable by a computing device, so that they can be stored in a storage device and executed by the computing device, or they can be made into individual integrated circuit modules, or multiple modules or steps therein can be made into a single integrated circuit module for implementation. The present invention is not limited to any specific combination of hardware and software.
[0150] Although the above describes the specific implementation mode of the present invention in conjunction with the accompanying drawings, it is not intended to limit the scope of protection of the present invention. Those skilled in the art should understand that various modifications or variations that can be made by those skilled in the art on the basis of the technical solution of the present invention without creative work are still within the scope of protection of the present invention.
Claims
1. A control method for controlling overvoltage and three-phase imbalance in a photovoltaic area, characterized in that: include: For low-voltage distribution substations with large-scale photovoltaic grid connection, the photovoltaic grid-connected power and load power at the grid connection point are analyzed phase by phase; When the photovoltaic single-phase grid-connected power is less than the load power of that phase, the energy storage executes the three-phase unbalanced governance mode, and the energy storage currently sends active power to the grid. When the photovoltaic single-phase grid-connected power is greater than the load power of that phase, the energy storage of that phase executes the three-phase unbalanced and overvoltage multi-objective governance mode; When the energy storage implements the three-phase unbalanced governance mode, the energy storage power setting value is set according to the mode, and the energy storage is controlled to send active power to the grid connection point to balance the three-phase power; when the energy storage implements the three-phase unbalanced and overvoltage multi-target governance mode, the energy storage power setting value is set according to the mode, and the energy storage is controlled to absorb active power from the grid connection point to suppress overvoltage to balance the three-phase power; When the energy storage executes the three-phase unbalanced management mode, the energy storage power setting value is set according to the mode. The specific method is as follows: Assume that the current grid-connected power of photovoltaic is P PV , the active power currently sent by the energy storage to the grid is As shown in formula (1): in, is the reference value instruction of the energy storage outer loop of phase i, is the equivalent front load power; When the energy storage implements the three-phase unbalance and overvoltage multi-objective management mode, the energy storage power setting value is set according to formula (3): The balance factor satisfies expression (2): At this time, the energy storage absorbs active power from the grid connection point, as shown in formula (3): is the reference value instruction of the energy storage outer loop of phase i, is the current load power, and the current photovoltaic grid-connected power is P PV , the active power currently sent by the energy storage to the grid is Among them, the energy storage capacity is allocated as follows: absorbing excess photovoltaic power P PV -P i load To suppress overvoltage, absorb ε(P PV -P i load ) to balance the three-phase power; The control method for controlling overvoltage and three-phase imbalance in photovoltaic areas also includes a switching step: based on the current voltage and current measurement values and the established energy storage capacity as constraints, the coordinated control requirements of the control equipment are evaluated, and under the premise that the energy storage capacity is insufficient to complete multi-objective control, an intelligent reactor switching evaluation threshold is given, and the initial value X0 of the intelligent reactor is set, and the size of the connected intelligent reactor is adjusted by sliding iteration to achieve non-inductive regulation of the overvoltage problem; considering the attenuation coefficient of the energy storage capacity to the charging and discharging rate during long-term operation, the intelligent reactor removal evaluation threshold is given to achieve flexible switching and coordinated control of equipment based on single-phase energy storage and intelligent reactor for multi-objective control of three-phase imbalance and overvoltage; The control method for controlling overvoltage and three-phase imbalance in photovoltaic areas also includes formulating indicators for flexible switching of control equipment: SW1 is an evaluation threshold indicator for controlling the input of smart reactors into the grid, and SW2 is an evaluation threshold indicator for controlling the removal of smart reactors from the grid; The expression of SW1 is shown in formula (4): in, is the current storage capacity of phase i, is the rated storage capacity of phase i, η d To characterize the discharge rate attenuation coefficient of energy storage power as the discharge time increases, is the time for the i-phase energy storage to be discharged with equal power; F(SW1) is the judgment function that determines whether the smart reactor needs to be put into the grid, and its expression is shown in formula (5): When F(SW1) is 1, the smart reactor needs to be put into the grid for governance; when F(SW1) is 0, in the current Within the time, the energy storage capacity meets the requirements, and the smart reactor does not need to be switched on or off; The expression of SW2 is shown in formula (6): Among them, η c To characterize the charging rate attenuation coefficient that changes with the increase of charging time. F(SW2) is the judgment function that determines whether the smart reactor needs to be removed from the power grid. The expression is shown in formula (7): When F(SW2) is 1, the smart reactor can be removed from the grid; when F(SW2) is 0, the smart reactor is removed from the grid during the current T store During this time, the smart reactor will not be removed from the grid temporarily.
2. The control method for controlling overvoltage and three-phase imbalance in a photovoltaic area according to claim 1, characterized in that: Before analyzing the size of the photovoltaic grid-connected power and the load power at the grid-connected point phase by phase, it also includes: At the photovoltaic grid-connected point, phases A, B, and C are respectively connected to single-phase energy storage devices, and the voltage and current data at the grid-connected point are measured to calculate the photovoltaic grid-connected power and load power.
3. A control system for controlling overvoltage and three-phase imbalance in photovoltaic areas, characterized by: include: The comparison module is configured to: for a low-voltage distribution station area of a large-scale photovoltaic grid-connected system, analyze the size of the photovoltaic grid-connected power and the load power at the grid-connected point phase by phase; The mode selection module is configured as follows: when the photovoltaic single-phase grid-connected power is less than the load power of the phase, the energy storage executes the three-phase unbalanced governance mode, and the energy storage currently sends active power to the grid; when the photovoltaic single-phase grid-connected power is greater than the load power of the phase, the energy storage of the phase executes the three-phase unbalanced and overvoltage multi-objective governance mode; The mode execution module is configured to: when the energy storage executes the three-phase unbalanced governance mode, set the energy storage power setting value according to the mode, and control the energy storage to send active power to the grid connection point to balance the three-phase power; when the energy storage executes the three-phase unbalanced and overvoltage multi-objective governance mode, set the energy storage power setting value according to the mode, control the energy storage to absorb active power from the grid connection point, and suppress overvoltage to balance the three-phase power; When the energy storage executes the three-phase unbalanced management mode, the energy storage power setting value is set according to the mode. The specific method is as follows: Assume that the current grid-connected power of photovoltaic is P PV , the active power currently sent by the energy storage to the grid is As shown in formula (1): in, is the reference value instruction of the energy storage outer loop of phase i, is the equivalent front load power; When the energy storage implements the three-phase unbalance and overvoltage multi-objective management mode, the energy storage power setting value is set according to formula (3): The balance factor satisfies expression (2): At this time, the energy storage absorbs active power from the grid connection point, as shown in formula (3): is the reference value instruction of the energy storage outer loop of phase i, is the current load power, and the current photovoltaic grid-connected power is P PV , the active power currently sent by the energy storage to the grid is Among them, the energy storage capacity is allocated as follows: absorbing excess photovoltaic power P PV -P i load To suppress overvoltage, absorb ε(P PV -P i load ) to balance the three-phase power; The control method for controlling overvoltage and three-phase imbalance in photovoltaic areas also includes a switching step: based on the current voltage and current measurement values and the established energy storage capacity as constraints, the coordinated control requirements of the control equipment are evaluated, and under the premise that the energy storage capacity is insufficient to complete multi-objective control, an intelligent reactor switching evaluation threshold is given, and the initial value X0 of the intelligent reactor is set, and the size of the connected intelligent reactor is adjusted by sliding iteration to achieve non-inductive regulation of the overvoltage problem; considering the attenuation coefficient of the energy storage capacity to the charging and discharging rate during long-term operation, the intelligent reactor removal evaluation threshold is given to achieve flexible switching and coordinated control of equipment based on single-phase energy storage and intelligent reactor for multi-objective control of three-phase imbalance and overvoltage; The control method for controlling overvoltage and three-phase imbalance in photovoltaic areas also includes formulating indicators for flexible switching of control equipment: SW1 is an evaluation threshold indicator for controlling the input of smart reactors into the grid, and SW2 is an evaluation threshold indicator for controlling the removal of smart reactors from the grid; The expression of SW1 is shown in formula (4): in, is the current storage capacity of phase i, is the rated storage capacity of phase i, η d To characterize the discharge rate attenuation coefficient of energy storage power as the discharge time increases, is the time for the i-phase energy storage to be discharged with equal power; F(SW1) is the judgment function that determines whether the smart reactor needs to be put into the grid, and its expression is shown in formula (5): When F(SW1) is 1, the smart reactor needs to be put into the grid for governance; when F(SW1) is 0, in the current Within the time, the energy storage capacity meets the requirements, and the smart reactor does not need to be switched on or off; The expression of SW2 is shown in formula (6): Among them, η c To characterize the charging rate attenuation coefficient that changes with the increase of charging time. F(SW2) is the judgment function that determines whether the smart reactor needs to be removed from the power grid. The expression is shown in formula (7): When F(SW2) is 1, the smart reactor can be removed from the grid; when F(SW2) is 0, the smart reactor is removed from the grid during the current T store During this time, the smart reactor will not be removed from the grid temporarily.
4. A computer device comprising a memory, a processor and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the program, the steps of the method described in any one of claims 1 to 2 are implemented.
5. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the program is executed by a processor, the steps of the method described in any one of claims 1 to 2 are performed.
Citation Information
Patent Citations
Distributed photovoltaic grid-connected voltage comprehensive treatment method and system
CN115719973A
Low-voltage transformer area three-phase imbalance treatment method based on flexible direct current system
CN115833216A