A dynamic optimization scheduling system and method based on sewage treatment
Through dynamic optimization of the scheduling system, dynamic scheduling algorithms and artificial intelligence technology, the sewage treatment process is adjusted in real time, and the problem that traditional systems cannot be effectively regulated and analyzed is solved, the treatment efficiency and intelligence are improved, and the quality and efficiency of sewage treatment are ensured. .
Patent Information
- Application Number
- CN202410556590.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-07
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2044-05-07
AI Technical Summary
Traditional sewage treatment systems cannot effectively deal with the uncertainty and complexity in the sewage treatment process, and it is difficult to conduct automatic and reasonable regulation and precise scheduling analysis, resulting in poor processing efficiency and effect and low intelligence and automation.
A dynamic optimization scheduling system based on sewage treatment was designed, including data collection, data processing, scheduling decision-making, optimization execution and monitoring modules. It uses dynamic scheduling algorithms and artificial intelligence technology to collect and analyze data in real time to generate the best scheduling solution, and Control the operation of the equipment through the optimization execution module, monitor and generate efficiency signals and early warnings.
It improves sewage treatment efficiency, reduces resource consumption and treatment costs, significantly improves the intelligence and automation of the system, ensures the quality and efficiency of sewage treatment, and reduces management difficulty.
Smart Images

Figure CN118131631B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of sewage treatment control, and in particular to a dynamic optimization scheduling system and method based on sewage treatment. Background Art
[0002] Sewage treatment refers to the treatment of wastewater containing various harmful substances to remove or reduce the pollutants in it so that it meets the prescribed discharge standards. It can effectively reduce the pollution of sewage to water bodies and protect the sustainable use of water resources. With the acceleration of urbanization, sewage treatment has become an important part of urban environmental protection.
[0003] However, the traditional sewage treatment system cannot effectively deal with the uncertainty and complexity of the sewage treatment process, cannot automatically and reasonably control the sewage treatment process and accurately judge the efficiency of scheduling analysis execution, and it is difficult to effectively guarantee the sewage treatment efficiency and sewage treatment effect. It is also unable to reasonably analyze the sewage treatment performance and issue timely warnings, and the degree of intelligence and automation is low.
[0004] In view of the above technical defects, a solution is now proposed. Summary of the invention
[0005] The purpose of the present invention is to provide a dynamic optimization scheduling system and method based on sewage treatment, which solves the problems that the prior art cannot automatically and reasonably regulate the sewage treatment process and accurately judge the efficiency of scheduling analysis execution, it is difficult to effectively guarantee the sewage treatment efficiency and sewage treatment effect, and it is impossible to reasonably analyze the sewage treatment performance and timely warn, and the degree of intelligence and automation is low.
[0006] To achieve the above object, the present invention provides the following technical solutions:
[0007] A dynamic optimization scheduling system based on sewage treatment includes a data acquisition module, a data processing module, a scheduling decision module, an optimization execution module, a tuning monitoring module and a remote terminal; the data acquisition module is used to collect various data in the sewage treatment process in real time, including water quality parameters and treatment equipment operation status information, and send the collected data to the data processing module; the data processing module processes and analyzes the received data, extracts key information, and sends the processed data to the scheduling decision module;
[0008] The scheduling decision module determines the best scheduling plan based on the processed data and the dynamic scheduling algorithm, and sends the determined scheduling plan to the optimization execution module. The optimization execution module controls the operation of the sewage treatment equipment according to the scheduling plan. The optimization monitoring module is used to monitor the scheduling analysis execution process, generate optimization inefficiency signals or optimization high efficiency signals through analysis, and send the optimization inefficiency signals or optimization high efficiency signals to the remote terminal. When the remote terminal receives the optimization inefficiency signal, it will issue a corresponding warning.
[0009] Furthermore, the specific operation process of the scheduling decision module includes:
[0010] Receive output data from the data processing module and start the built-in dynamic scheduling algorithm, where the dynamic scheduling algorithm is designed based on the characteristics and actual needs of sewage treatment, combined with optimization theory and artificial intelligence technology;
[0011] According to the current sewage treatment status, the dynamic scheduling algorithm conducts preliminary analysis and judgment, determines the current scheduling needs, and generates multiple feasible scheduling plans based on historical data and scheduling experience. These scheduling plans cover different scheduling strategies, including adjusting the working parameters of the equipment, changing the order of the treatment process, and starting or shutting down certain equipment;
[0012] The dynamic scheduling algorithm uses mathematical optimization models and intelligent analysis techniques to evaluate and compare the generated scheduling plans. The evaluation criteria include treatment efficiency, energy consumption, treatment cost, and emission compliance rate. By calculating the comprehensive score of each scheduling plan, the scheduling plan with the best performance under the current sewage treatment status is determined.
[0013] Furthermore, the specific operation process of the optimization and monitoring module includes:
[0014] A detection period is set, and the execution monitoring evaluation value of the detection period is obtained through analysis. The execution monitoring evaluation value is numerically compared with the preset execution monitoring evaluation threshold. If the execution monitoring evaluation value exceeds the preset execution monitoring evaluation threshold, an optimization-inefficient signal is generated; if the execution monitoring evaluation value does not exceed the preset execution monitoring evaluation threshold, an optimization-efficient signal is generated.
[0015] Furthermore, the analysis and acquisition method of the monitoring evaluation value is as follows:
[0016] All program planning times and all execution control times within the detection period are obtained, and the average of all program planning times is calculated to obtain the program planning time value, the average of all execution control times within the detection period is calculated to obtain the execution control time value, and the program planning time and the execution control time are numerically compared with the preset program planning time threshold and the preset execution control time threshold respectively, and the proportion of the number of program planning times that exceed the preset program planning time threshold during the detection period is marked as the program planning timeout value, and the proportion of the number of execution control times that exceed the preset execution control time threshold during the detection period is marked as the execution control timeout value; the execution monitoring evaluation value is obtained by numerically calculating the program planning time value, the execution control time value, the program planning timeout value and the execution control timeout value.
[0017] Furthermore, the analysis and acquisition method of the program planning duration and all execution control duration is as follows:
[0018] The moment when the scheduling decision module receives the data output by the data processing module is collected and marked as the data arrival moment, and the moment when the scheduling decision module determines the corresponding scheduling plan is collected and marked as the plan output moment, and the interval between the plan output moment and the data arrival moment is marked as the plan planning duration; and the moment when the optimization execution module receives the corresponding scheduling plan is collected and marked as the execution start moment, and the moment when the optimization execution module completes the corresponding execution control process is collected and marked as the execution end moment, and the interval between the execution end moment and the execution start moment is marked as the execution control duration.
[0019] Furthermore, the remote terminal is communicatively connected with the sewage treatment efficiency inspection module, which is used to analyze the treatment performance of the sewage treatment during the inspection period, generate a treatment efficiency inspection pass signal or a treatment efficiency inspection fail signal through the analysis, and send the treatment efficiency inspection pass signal or the treatment efficiency inspection fail signal to the remote terminal. When the remote terminal receives the treatment efficiency inspection fail signal, it issues a corresponding warning.
[0020] Furthermore, the specific operation process of the sewage treatment efficiency inspection module includes:
[0021] A number of monitoring time points are set during the detection period, and sampling quality inspection is carried out on the treated sewage at the corresponding monitoring time points. The corresponding monitoring time points are marked as abnormal monitoring time points or excellent monitoring time points through water sample quality inspection evaluation and analysis. The sewage treatment surface condition value is calculated by ratio between the number of abnormal monitoring time points and the number of excellent monitoring time points during the detection period. The sewage treatment surface condition value is numerically compared with the preset sewage treatment surface condition threshold. If the sewage treatment surface condition value exceeds the preset sewage treatment surface condition threshold, a treatment efficiency inspection failure signal is generated.
[0022] Furthermore, the specific analysis process of water sample quality inspection and evaluation is as follows:
[0023] Obtain the water quality parameters that need to be tested for the treated sewage, collect the test data of all water quality parameters, compare the test data of the corresponding water quality parameters with the corresponding preset data requirements, if the test data of the corresponding water quality parameters do not meet the preset data requirements, mark the corresponding water quality parameters as water abnormality parameters; mark the deviation value of the test data of the corresponding water abnormality parameters compared with the corresponding preset data requirements as water abnormality parameter value, compare the water abnormality parameter value with the corresponding preset water abnormality parameter threshold, if the water abnormality parameter value exceeds the preset water abnormality parameter threshold, mark the corresponding water abnormality parameter as water width parameter; if the water width parameter exists, mark the corresponding monitoring time point as abnormal monitoring time point;
[0024] If there is no water amplitude parameter, the number of water anomaly parameters at the corresponding monitoring point is obtained and marked as the water anomaly detection value, and the water anomaly parameter value of the corresponding water anomaly parameter is ratio-calculated with the corresponding preset water anomaly parameter threshold to obtain the water anomaly parameter table value, and the water anomaly parameter table values of all water anomaly parameters at the monitoring point are averaged to obtain the water anomaly percentage value, and the water anomaly evaluation value is obtained by numerically calculating the water anomaly detection value and the water anomaly percentage value, and the water anomaly evaluation value is numerically compared with the preset water anomaly evaluation threshold, and if the water anomaly evaluation value exceeds the preset water anomaly evaluation threshold, the corresponding monitoring point is marked as an abnormal monitoring point; if the water anomaly evaluation value does not exceed the preset water anomaly evaluation threshold, the corresponding monitoring point is marked as an excellent monitoring point.
[0025] Furthermore, if the sewage treatment surface condition value does not exceed the preset sewage treatment surface condition threshold, the amount of sewage treated during the detection period is collected and marked as the sewage net capacity value, and the total treatment time of sewage treatment during the detection period is collected, and the ratio of the sewage net capacity value to the total treatment time is marked as the sewage net rate value, and the treatment cost data of sewage treatment during the detection period is collected, and the ratio of the treatment cost data to the sewage net capacity value is marked as the sewage treatment value;
[0026] The sewage treatment efficiency comprehensive inspection value is obtained by numerically calculating the sewage net rate value, sewage treatment rate value and sewage treatment table value, and the sewage treatment efficiency comprehensive inspection value is numerically compared with the preset sewage treatment efficiency comprehensive inspection threshold. If the sewage treatment efficiency comprehensive inspection value exceeds the preset sewage treatment efficiency comprehensive inspection threshold, a treatment efficiency inspection failure signal is generated; if the sewage treatment efficiency comprehensive inspection value does not exceed the preset sewage treatment efficiency comprehensive inspection threshold, a treatment efficiency inspection pass signal is generated.
[0027] Furthermore, the present invention also proposes a dynamic optimization scheduling method based on sewage treatment, comprising the following steps:
[0028] Step 1: The data acquisition module collects various data in the sewage treatment process in real time and sends the collected data to the data processing module;
[0029] Step 2: The data processing module processes and analyzes the received data and extracts key information, and sends the processed data to the scheduling decision module;
[0030] Step 3: The scheduling decision module determines the best scheduling solution based on the processed data and in combination with the dynamic scheduling algorithm, and sends the determined scheduling solution to the optimization execution module;
[0031] Step 4: The optimization execution module controls the operation of the sewage treatment equipment according to the scheduling plan;
[0032] Step 5: The optimization monitoring module monitors the scheduling analysis execution process, generates an optimization inefficiency signal or an optimization high efficiency signal through analysis, and enables the remote terminal to issue a corresponding warning when an optimization inefficiency signal is generated.
[0033] Compared with the prior art, the present invention has the following beneficial effects:
[0034] 1. In the present invention, various data in the sewage treatment process are collected in real time through the data acquisition module, the data processing module processes and analyzes the data, the scheduling decision module determines the best scheduling plan based on the processed data and combined with the dynamic scheduling algorithm, and the optimization execution module controls the operation of the sewage treatment equipment according to the scheduling plan. The scheduling plan in the sewage treatment process can be adjusted and optimized in real time, the treatment efficiency is improved and resource consumption is reduced, and the degree of intelligence and automation is high;
[0035] 2. In the present invention, the scheduling analysis execution process is monitored by the optimization monitoring module, and an optimization inefficiency signal or an optimization high efficiency signal is generated through analysis. The treatment performance of sewage treatment during the detection period is analyzed by the sewage treatment efficiency inspection module, and a treatment efficiency inspection qualified signal or a treatment efficiency inspection unqualified signal is generated through analysis. When an optimization inefficiency signal or a treatment efficiency inspection unqualified signal is generated, the remote terminal sends a corresponding early warning to remind the management personnel to conduct cause investigation and tracing in time and take corresponding improvement measures, thereby ensuring the subsequent sewage treatment efficiency and treatment effect while reducing the treatment cost, and significantly reducing the management difficulty of the management personnel. BRIEF DESCRIPTION OF THE DRAWINGS
[0036] In order to facilitate understanding by those skilled in the art, the present invention is further described below in conjunction with the accompanying drawings;
[0037] Figure 1 This is a system block diagram of Embodiment 1 of the present invention;
[0038] Figure 2 This is a system block diagram of Embodiment 2 of the present invention;
[0039] Figure 3 This is a flow chart of the method of Embodiment 3 of the present invention. DETAILED DESCRIPTION
[0040] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0041] Embodiment 1: Figure 1 As shown, the present invention proposes a dynamic optimization scheduling system based on sewage treatment, including a data acquisition module, a data processing module, a scheduling decision module, an optimization execution module, a tuning monitoring module and a remote terminal; the data acquisition module is used to collect various data in the sewage treatment process in real time, including water quality parameters (such as COD, BOD, ammonia nitrogen, etc.) and treatment equipment operation status information such as flow, pressure, temperature, etc.), and send the collected data to the data processing module; the data processing module processes and analyzes the received data, extracts key information, such as pollutant concentration, treatment equipment efficiency, etc., and sends the processed data to the scheduling decision module;
[0042] The scheduling decision module determines the best scheduling plan based on the processed data and the dynamic scheduling algorithm, and sends the determined scheduling plan to the optimization execution module. The optimization execution module controls the operation of the sewage treatment equipment according to the scheduling plan to achieve optimized scheduling. It can adjust and optimize the scheduling plan in the sewage treatment process in real time, improve treatment efficiency, reduce resource consumption, and reduce the impact on the environment, significantly improving the intelligence and automation of sewage treatment. The specific operation process of the scheduling decision module is as follows:
[0043] Receive output data from the data processing module, which has been cleaned, integrated and feature extracted, and can directly reflect the real-time status of the current sewage treatment system; start the built-in dynamic scheduling algorithm, which is designed based on the characteristics and actual needs of sewage treatment, combined with optimization theory and artificial intelligence technology. It has the ability to respond in real time, self-adjust and optimize decisions, and can dynamically adjust the scheduling plan according to changes in sewage treatment status;
[0044] According to the current sewage treatment status, the dynamic scheduling algorithm conducts preliminary analysis and judgment to determine the current scheduling needs. Then, based on historical data and scheduling experience, it generates multiple feasible scheduling plans, which cover different scheduling strategies, such as adjusting the working parameters of the equipment, changing the order of the treatment process, starting or shutting down certain equipment, etc.
[0045] The dynamic scheduling algorithm uses mathematical optimization models and intelligent analysis techniques to evaluate and compare the generated scheduling plans. The evaluation criteria include treatment efficiency, energy consumption, treatment cost, and emission compliance rate. By calculating the comprehensive score of each scheduling plan, the scheduling plan with the best performance under the current sewage treatment status is determined. During the entire process, the scheduling decision module will continuously receive real-time data from the data acquisition module and dynamically adjust the scheduling plan based on this data. This real-time response and dynamic adjustment capabilities can cope with the uncertainty and complexity of the sewage treatment process and achieve efficient optimized scheduling.
[0046] The optimization and adjustment monitoring module is used to monitor the scheduling analysis execution process, generate optimization and adjustment inefficiency signals or optimization and adjustment efficiency signals through analysis, and send the optimization and adjustment inefficiency signals or optimization and adjustment efficiency signals to the remote terminal. When the remote terminal receives the optimization and adjustment inefficiency signals, it issues a corresponding warning to remind the management personnel to investigate and trace the cause, optimize the corresponding analysis algorithm as needed, and maintain the corresponding treatment equipment, so as to ensure the efficiency of the subsequent sewage optimization scheduling analysis; the specific operation process of the optimization and adjustment monitoring module is as follows:
[0047] Set a detection period, preferably, the detection period is seven days; collect the time when the scheduling decision module receives the data output by the data processing module and mark it as the data arrival time, and collect the time when the scheduling decision module determines the corresponding scheduling plan and mark it as the case-out time, and mark the interval between the case-out time and the data arrival time as the plan planning time; and collect the time when the optimization execution module receives the corresponding scheduling plan and mark it as the execution start time, and collect the time when the optimization execution module completes the corresponding execution control process and mark it as the execution end time, and mark the interval between the execution end time and the execution start time as the execution control time;
[0048] Obtain all program planning durations and all execution control durations within the detection period, and calculate the average of all program planning durations to obtain a program planning time value, calculate the average of all execution control durations within the detection period to obtain an execution control time value, and compare the program planning duration and the execution control duration with the preset program planning duration threshold and the preset execution control duration threshold, respectively, mark the number of program planning durations that exceed the preset program planning duration threshold during the detection period as a program planning timeout value, and mark the number of execution control durations that exceed the preset execution control duration threshold during the detection period as an execution control timeout value;
[0049] By formula The program planning time value YK, the execution control time value YL, the program planning timeout value YS and the execution control timeout value YM are numerically calculated to obtain the execution monitoring evaluation value YP; wherein, a1, a2, a3, a4 are preset proportional coefficients, and the values of a1, a2, a3, a4 are all positive numbers; and the larger the value of the execution monitoring evaluation value YP is, the worse the efficiency of the scheduling analysis execution for sewage treatment during the detection period is;
[0050] The execution monitoring evaluation value YP is numerically compared with the preset execution monitoring evaluation threshold. If the execution monitoring evaluation value YP exceeds the preset execution monitoring evaluation threshold, it indicates that the efficiency of the scheduling analysis execution for sewage treatment during the detection period is poor, and an optimization-inefficient signal is generated; if the execution monitoring evaluation value YP does not exceed the preset execution monitoring evaluation threshold, it indicates that the efficiency of the scheduling analysis execution for sewage treatment during the detection period is good, and an optimization-efficient signal is generated.
[0051] Embodiment 2: Figure 2 As shown, the difference between this embodiment and embodiment 1 is that the remote terminal is connected to the sewage treatment efficiency inspection module for communication. The sewage treatment efficiency inspection module is used to analyze the treatment performance of sewage treatment during the detection period, generate a treatment efficiency inspection qualified signal or a treatment efficiency inspection unqualified signal through analysis, and send the treatment efficiency inspection qualified signal or the treatment efficiency inspection unqualified signal to the remote terminal. When the remote terminal receives the treatment efficiency inspection unqualified signal, it issues a corresponding warning to remind the management personnel to conduct a cause investigation in time and take corresponding improvement measures, thereby ensuring the subsequent sewage treatment efficiency and treatment effect while reducing the treatment cost and the management difficulty of the management personnel, and the intelligent degree is high; the specific operation process of the sewage treatment efficiency inspection module is as follows:
[0052] Several monitoring time points are set within the detection period, and the treated sewage is sampled and quality inspected at the corresponding monitoring time points. The corresponding monitoring time points are marked as abnormal monitoring time points or excellent monitoring time points through water sample quality inspection evaluation and analysis. Specifically, the water quality parameters (such as heavy metal ion concentration, solid impurity particle concentration, etc.) that need to be tested for the treated sewage are obtained, and the detection data of all water quality parameters are collected. The detection data of the corresponding water quality parameters are compared with the corresponding preset data requirements. If the detection data of the corresponding water quality parameters do not meet the preset data requirements, the corresponding water quality parameters are marked as water abnormality parameters; the deviation value of the detection data of the corresponding water abnormality parameters compared with the corresponding preset data requirements is marked as a water abnormality parameter value, and the water abnormality parameter value is numerically compared with the corresponding preset water abnormality parameter threshold value. If the water abnormality parameter value exceeds the preset water abnormality parameter threshold value, indicating that the corresponding water quality parameter exceeds the standard seriously, the corresponding water abnormality parameter is marked as a water width parameter; if the water width parameter exists, it indicates that the treatment effect of the sewage at the corresponding monitoring time point is poor, and the corresponding monitoring time point is marked as an abnormal monitoring time point;
[0053] If there is no water amplitude parameter, the number of water anomaly parameters at the corresponding monitoring time point is obtained and marked as the water anomaly detection value, and the water anomaly parameter value of the corresponding water anomaly parameter is calculated by ratio with the corresponding preset water anomaly parameter threshold to obtain the water anomaly parameter table value, and the water anomaly parameter table values of all water anomaly parameters at the monitoring time point are averaged to obtain the water anomaly analysis value;
[0054] By formula The water abnormality detection value SP and the water abnormality analysis value SK are numerically calculated to obtain the water abnormality evaluation value SY, wherein hy1 and hy2 are preset proportional coefficients, and the values of hy1 and hy2 are both positive numbers; and the larger the value of the water abnormality evaluation value SY, the worse the treatment effect of sewage at the corresponding monitoring time point; the water abnormality evaluation value SY is numerically compared with the preset water abnormality evaluation threshold value, if the water abnormality evaluation value SY exceeds the preset water abnormality evaluation threshold value, it indicates that the treatment effect of sewage at the corresponding monitoring time point is poor, and the corresponding monitoring time point is marked as an abnormal monitoring time point; if the water abnormality evaluation value SY does not exceed the preset water abnormality evaluation threshold value, it indicates that the treatment effect of sewage at the corresponding monitoring time point is good, and the corresponding monitoring time point is marked as an excellent monitoring time point;
[0055] The sewage treatment surface condition value WS is calculated by ratioing the number of abnormal monitoring time points to the number of excellent monitoring time points during the detection period. It should be noted that the larger the value of the sewage treatment surface condition value WS, the worse the overall treatment effect on the sewage during the detection period; the sewage treatment surface condition value WS is numerically compared with the preset sewage treatment surface condition threshold. If the sewage treatment surface condition value WS exceeds the preset sewage treatment surface condition threshold, it indicates that the overall treatment effect on the sewage during the detection period is poor, and a treatment efficiency inspection failure signal is generated.
[0056] Furthermore, if the sewage treatment status value WS does not exceed the preset sewage treatment status threshold, the amount of sewage treated during the detection period is collected and marked as the sewage net capacity value, and the total treatment time of sewage treatment during the detection period is collected, and the ratio of the sewage net capacity value to the total treatment time is marked as the sewage net rate value, and the treatment cost data of sewage treatment during the detection period (i.e., the cost amount consumed for sewage treatment during the detection period) is collected, and the ratio of the treatment cost data to the sewage net capacity value is marked as the sewage treatment value;
[0057] By formula The sewage net rate value WY, the sewage treatment value WP and the sewage treatment status value WS are numerically calculated to obtain the sewage treatment efficiency comprehensive inspection value WX, where ey1, ey2, and ey3 are preset proportional coefficients, and the values of ey1, ey2, and ey3 are all greater than zero; and the larger the value of the sewage treatment efficiency comprehensive inspection value WX, the worse the comprehensive performance of sewage treatment during the detection period;
[0058] The sewage treatment efficiency comprehensive inspection value WX is numerically compared with the preset sewage treatment efficiency comprehensive inspection threshold. If the sewage treatment efficiency comprehensive inspection value WX exceeds the preset sewage treatment efficiency comprehensive inspection threshold, it indicates that the comprehensive performance of sewage treatment during the detection period is poor and needs to be investigated in time, then a treatment efficiency inspection failure signal is generated; if the sewage treatment efficiency comprehensive inspection value WX does not exceed the preset sewage treatment efficiency comprehensive inspection threshold, it indicates that the comprehensive performance of sewage treatment during the detection period is good, then a treatment efficiency inspection qualified signal is generated.
[0059] Embodiment 3: Figure 3 As shown, the difference between this embodiment and embodiment 1 and embodiment 2 is that the present invention proposes a dynamic optimization scheduling method based on sewage treatment, comprising the following steps:
[0060] Step 1: The data acquisition module collects various data in the sewage treatment process in real time and sends the collected data to the data processing module;
[0061] Step 2: The data processing module processes and analyzes the received data and extracts key information, and sends the processed data to the scheduling decision module;
[0062] Step 3: The scheduling decision module determines the best scheduling solution based on the processed data and in combination with the dynamic scheduling algorithm, and sends the determined scheduling solution to the optimization execution module;
[0063] Step 4: The optimization execution module controls the operation of the sewage treatment equipment according to the scheduling plan;
[0064] Step 5: The optimization monitoring module monitors the scheduling analysis execution process, generates an optimization inefficiency signal or an optimization high efficiency signal through analysis, and enables the remote terminal to issue a corresponding warning when an optimization inefficiency signal is generated.
[0065] The working principle of the present invention is as follows: when in use, various data in the sewage treatment process are collected in real time through the data acquisition module, the data processing module processes and analyzes the data, the scheduling decision module determines the best scheduling plan based on the processed data and combined with the dynamic scheduling algorithm, and the optimization execution module controls the operation of the sewage treatment equipment according to the scheduling plan. The scheduling plan in the sewage treatment process can be adjusted and optimized in real time, the treatment efficiency is improved and resource consumption is reduced, and the degree of intelligence and automation is high. The scheduling analysis execution process is monitored by the optimization monitoring module, and an optimization inefficiency signal or an optimization high efficiency signal is generated through analysis. When an optimization inefficiency signal is generated, the remote terminal sends a corresponding warning to remind the management personnel to conduct cause investigation and tracing in time to ensure the efficiency of subsequent sewage optimization scheduling analysis.
[0066] The above formulas are all dimensionless and numerical calculations. The formula is a formula obtained by collecting a large amount of data and performing software simulation to obtain the most recent real situation. The preset parameters in the formula are set by technicians in this field according to actual conditions. The preferred embodiments of the present invention disclosed above are only used to help explain the present invention. The preferred embodiments do not describe all the details in detail, nor do they limit the invention to only specific implementation methods. Obviously, many modifications and changes can be made according to the contents of this specification. This specification selects and specifically describes these embodiments in order to better explain the principles and practical applications of the present invention, so that technicians in the relevant technical field can understand and use the present invention well. The present invention is only limited by the claims and their full scope and equivalents.
Claims
1. A dynamic optimization scheduling system based on sewage treatment, characterized in that: It includes a data acquisition module, a data processing module, a scheduling decision module, an optimization execution module, an optimization monitoring module and a remote terminal; the data acquisition module is used to collect various data in the sewage treatment process in real time, including water quality parameters and treatment equipment operation status information, and send the collected data to the data processing module; the data processing module processes and analyzes the received data, extracts key information, and sends the processed data to the scheduling decision module; The scheduling decision module determines the best scheduling plan based on the processed data and the dynamic scheduling algorithm, and sends the determined scheduling plan to the optimization execution module. The optimization execution module controls the operation of the sewage treatment equipment according to the scheduling plan. The optimization monitoring module is used to monitor the scheduling analysis execution process, generate optimization inefficiency signals or optimization high efficiency signals through analysis, and send the optimization inefficiency signals or optimization high efficiency signals to the remote terminal. When the remote terminal receives the optimization inefficiency signal, it issues a corresponding warning. The specific operation process of the optimization and monitoring module includes: A detection period is set, and the execution monitoring evaluation value of the detection period is obtained through analysis. If the execution monitoring evaluation value exceeds the preset execution monitoring evaluation threshold, an optimization inefficiency signal is generated; if the execution monitoring evaluation value does not exceed the preset execution monitoring evaluation threshold, an optimization high efficiency signal is generated; The analysis and acquisition method of the execution monitoring evaluation value is as follows: Obtain all program planning durations and all execution control durations within the detection period, and calculate the average of all program planning durations to obtain a program planning time value, calculate the average of all execution control durations within the detection period to obtain an execution control time value, mark the number of program planning durations that exceed a preset program planning duration threshold during the detection period as a program planning timeout value, and mark the number of execution control durations that exceed a preset execution control duration threshold during the detection period as an execution control timeout value; By formula The program planning time value YK, the execution control time value YL, the program planning timeout value YS and the execution control timeout value YM are numerically calculated to obtain the execution monitoring evaluation value YP; wherein a1, a2, a3, a4 are preset proportional coefficients, and the values of a1, a2, a3, a4 are all positive numbers; The analysis and acquisition methods of the program planning duration and all execution control duration are as follows: The moment when the scheduling decision module receives the data output by the data processing module is collected and marked as the data arrival moment, and the moment when the scheduling decision module determines the corresponding scheduling plan is collected and marked as the plan output moment, and the interval between the plan output moment and the data arrival moment is marked as the plan planning duration; and the moment when the optimization execution module receives the corresponding scheduling plan is collected and marked as the execution start moment, and the moment when the optimization execution module completes the corresponding execution control process is collected and marked as the execution end moment, and the interval between the execution end moment and the execution start moment is marked as the execution control duration.
2. A dynamic optimization scheduling system based on sewage treatment according to claim 1, characterized in that: The specific operation process of the scheduling decision module includes: Receive output data from the data processing module and start the built-in dynamic scheduling algorithm, where the dynamic scheduling algorithm is designed based on the characteristics and actual needs of sewage treatment, combined with optimization theory and artificial intelligence technology; According to the current sewage treatment status, the dynamic scheduling algorithm conducts preliminary analysis and judgment, determines the current scheduling needs, and generates multiple feasible scheduling plans based on historical data and scheduling experience. These scheduling plans cover different scheduling strategies, including adjusting the working parameters of the equipment, changing the order of the treatment process, and starting or shutting down certain equipment; The dynamic scheduling algorithm uses mathematical optimization models and intelligent analysis techniques to evaluate and compare the generated scheduling plans. The evaluation criteria include treatment efficiency, energy consumption, treatment cost, and emission compliance rate. By calculating the comprehensive score of each scheduling plan, the scheduling plan with the best performance under the current sewage treatment status is determined.
3. A dynamic optimization scheduling system based on sewage treatment according to claim 1, characterized in that: The remote terminal is communicatively connected with the sewage treatment efficiency inspection module. The sewage treatment efficiency inspection module is used to analyze the treatment performance of the sewage treatment during the inspection period, generate a treatment efficiency inspection qualified signal or a treatment efficiency inspection unqualified signal through the analysis, and send the treatment efficiency inspection qualified signal or the treatment efficiency inspection unqualified signal to the remote terminal. When the remote terminal receives the treatment efficiency inspection unqualified signal, it will issue a corresponding warning.
4. A dynamic optimization scheduling system based on sewage treatment according to claim 3, characterized in that: The specific operation process of the sewage treatment efficiency inspection module includes: A number of monitoring time points are set during the detection period, and sampling quality inspection is carried out on the treated sewage at the corresponding monitoring time points. The corresponding monitoring time points are marked as abnormal monitoring time points or excellent monitoring time points through water sample quality inspection evaluation and analysis. The sewage treatment surface condition value is calculated by ratio between the number of abnormal monitoring time points and the number of excellent monitoring time points during the detection period. The sewage treatment surface condition value is numerically compared with the preset sewage treatment surface condition threshold. If the sewage treatment surface condition value exceeds the preset sewage treatment surface condition threshold, a treatment efficiency inspection failure signal is generated.
5. A dynamic optimization scheduling system based on sewage treatment according to claim 4, characterized in that: The specific analysis process of water sample quality inspection and evaluation is as follows: Obtain the water quality parameters that need to be tested for the treated sewage, collect the test data of all water quality parameters, compare the test data of the corresponding water quality parameters with the corresponding preset data requirements, if the test data of the corresponding water quality parameters do not meet the preset data requirements, then mark the corresponding water quality parameters as water anomaly parameters; mark the deviation value of the test data of the corresponding water anomaly parameters compared with the corresponding preset data requirements as water anomaly parameter value; if the water anomaly parameter value exceeds the preset water anomaly parameter threshold, then mark the corresponding water anomaly parameter as water width parameter; if the water width parameter exists, then mark the corresponding monitoring time point as an abnormal monitoring time point; If there is no water amplitude parameter, the number of water anomaly parameters at the corresponding monitoring point is obtained and marked as the water anomaly detection value, and the water anomaly parameter value of the corresponding water anomaly parameter is ratio-calculated with the corresponding preset water anomaly parameter threshold to obtain the water anomaly parameter table value, and the water anomaly parameter table values of all water anomaly parameters at the monitoring point are averaged to obtain the water anomaly percentage value, and the water anomaly evaluation value is obtained by numerically calculating the water anomaly detection value and the water anomaly percentage value. If the water anomaly evaluation value exceeds the preset water anomaly evaluation threshold, the corresponding monitoring point is marked as an abnormal monitoring point; if the water anomaly evaluation value does not exceed the preset water anomaly evaluation threshold, the corresponding monitoring point is marked as an excellent monitoring point.
6. A dynamic optimization scheduling system based on sewage treatment according to claim 4, characterized in that: If the sewage treatment surface condition value does not exceed the preset sewage treatment surface condition threshold, the amount of sewage treated during the detection period is collected and marked as the sewage net capacity value, and the total treatment time of sewage treatment during the detection period is collected, and the ratio of the sewage net capacity value to the total treatment time is marked as the sewage net rate value, and the treatment cost data of sewage treatment during the detection period is collected, and the ratio of the treatment cost data to the sewage net capacity value is marked as the sewage treatment value; The sewage treatment efficiency comprehensive inspection value is obtained by numerically calculating the sewage net speed value, sewage treatment rate value and sewage treatment table value. If the sewage treatment efficiency comprehensive inspection value exceeds the preset sewage treatment efficiency comprehensive inspection threshold, a treatment efficiency inspection failure signal is generated; If the sewage treatment efficiency comprehensive inspection value does not exceed the preset sewage treatment efficiency comprehensive inspection threshold, a treatment efficiency inspection pass signal is generated.
7. A dynamic optimization scheduling method based on sewage treatment, characterized in that: The method adopts the dynamic optimization scheduling system based on sewage treatment as described in any one of claims 1-6.
Citation Information
Cited By
Vibrating membrane bioreactor sewage treatment automatic monitoring system and method
CN120105928A
Automatic monitoring system and method for sewage treatment by vibrating membrane bioreactor
CN120105928B