A wind power conversion efficiency management method
By predicting and optimizing wind power generation, rationally storing and using electricity, and maintaining and managing it in combination with the distribution map of wind power generators, the loss problem of wind power generation efficiency in the transmission and configuration links is solved, and the final efficiency of wind power and energy utilization efficiency are improved.
Patent Information
- Application Number
- CN202410823958.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-25
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2044-06-25
AI Technical Summary
Wind power generation efficiency has a large amount of loss in the power transmission and configuration links, affecting the final energy efficiency.
By determining the power consumption and power generation forecast data under different weather conditions, optimizing the power consumption matching of power storage and maintenance, reasonably dividing maintenance working hours, using the two-dimensional distribution map of the wind turbine to divide the maintenance objects, and selecting the most downstream wind power generation The machine is maintained, evaluates and predicts wind speed and direction to determine maintenance boundaries and avoids waste of electricity.
It significantly reduces power loss, improves the ultimate efficiency of wind power, realizes precise control of maintenance electricity, and avoids unnecessary energy losses.
Smart Images

Figure CN118396240B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of wind power efficiency management, and in particular to a wind power conversion efficiency management method. Background Art
[0002] In wind power generation management, wind power conversion efficiency is related to many factors. How to fully improve wind power conversion efficiency is a topic of long-term research and discussion. At present, the efficiency of wind power generation is directly related to the performance of wind turbines, which is also the focus of most researchers at present. They hope to find a breakthrough in the performance of wind turbines themselves to further improve wind power conversion efficiency.
[0003] However, in wind power generation, wind turbines only determine the initial conversion rate of wind energy into electrical energy. After the wind turbines generate electrical energy, a large amount of loss will be generated in the transmission and allocation of electrical energy, which directly affects the ultimate energy efficiency of wind power.
[0004] In view of this, this application is hereby filed. Summary of the invention
[0005] The purpose of the present invention is to provide a wind power conversion efficiency management method, which can effectively improve the management and control capabilities of wind power, while ensuring the normal operation of wind power stations, significantly reduce power loss, improve the final efficiency of wind power, and avoid unnecessary energy losses.
[0006] The embodiment of the present invention is achieved as follows:
[0007] A wind power conversion efficiency management method comprises the following steps:
[0008] S1. Determine the daily power consumption of the wind power station under different weather conditions, the power generation under different weather conditions, the power supply pressure under different weather conditions, and the maintenance power consumption of the wind power station for different maintenance tasks.
[0009] S2. Determine the daily power consumption forecast data, power generation forecast data, and power supply pressure forecast data for a period of time in the future based on the weather forecast data.
[0010] S3. Determine a maintenance work plan for a period of time in the future based on weather forecast data, and determine maintenance power consumption forecast data based on the maintenance work plan.
[0011] S4. Determine the "power reserve-time" relationship based on the power generation forecast data, the daily power consumption forecast data and the power supply pressure forecast data. When the power reserve is positive, the excess power is intercepted and stored in the power storage module so that the power storage in the power storage module matches the maintenance power consumption forecast data.
[0012] S5. When the electric energy storage in the electric energy storage module matches the maintenance power consumption forecast data, the corresponding maintenance work is performed.
[0013] Furthermore, in S5, the maintenance work plan for a period of time in the future is divided into times, and the execution time of each maintenance work is different. When the electric energy storage in the electric energy storage module is greater than or equal to the maintenance power consumption forecast data of the most recent maintenance work, the maintenance work is executed.
[0014] Furthermore, S3 includes the following steps:
[0015] S31. Determine the "wind force, wind direction-time" forecast data for a period of time in the future based on the weather forecast data, select a maintenance time period based on the "wind force, wind direction-time" forecast data, and determine the wind direction and wind speed conditions within the maintenance time period based on the "wind force, wind direction-time" forecast data.
[0016] S32. Construct a two-dimensional distribution map of wind turbines according to the distribution of wind turbines, take the wind direction corresponding to the wind direction as a reference direction, and divide the wind turbines into several columns in the reference direction according to the two-dimensional distribution map of wind turbines, wherein the arrangement direction of each column is the same as the reference direction.
[0017] S33, selecting the most downstream wind turbine in each column as the maintenance object.
[0018] Further, in S32, when the wind turbine generators are divided into a plurality of columns in the reference direction according to the two-dimensional distribution diagram of the generators, it includes:
[0019] S321. In the reference direction, the wind turbines whose rotation axis lines are located on the same straight line are divided into the same column, and any one column is selected as a reference column.
[0020] S322. Screen out wind turbines whose rotation axis deviates from the reference column as evaluation objects, and determine the distance between the evaluation object and the reference column in a direction perpendicular to the reference direction as the evaluation distance.
[0021] S323. Determine the risk objects that may appear in the maintenance work according to the maintenance work plan, and evaluate the predicted drift distance of the risk objects in the direction perpendicular to the reference direction in combination with the wind speed conditions in S31. Take the straight line where the reference column is located as the reference line, offset the reference line to both sides thereof by the distance corresponding to the predicted drift distance, and obtain the boundary line. The two boundary lines enclose the predicted activity range of the risk objects.
[0022] S324: If the evaluation object is within the scope of the forecasting activity, the evaluation object is included in the reference column. If the evaluation object is outside the scope of the forecasting activity, the evaluation object is treated as an independent column.
[0023] Furthermore, in S32, when the wind turbine generators are divided into a plurality of columns in the reference direction according to the two-dimensional distribution diagram of the generators, the method further includes:
[0024] S325. Change the reference column and repeat S321 to S324.
[0025] Furthermore, the predicted drift distance is obtained by conducting drift experiments on risk objects at different wind speeds.
[0026] Furthermore, in S324, the evaluation object is located within the prediction activity range. After the evaluation object is included in the reference column, for the reference column, when determining the boundary line, the straight line where the rotation axis of the newly included wind turbine is located needs to be used as a reference line to determine the boundary line, and the maximum area encompassed by the boundary line is used as the new prediction activity range.
[0027] The beneficial effects of the technical solution of the embodiment of the present invention include:
[0028] The wind power conversion efficiency management method provided by the embodiment of the present invention will only intercept the excess electricity when the power generation of the wind power station is greater than its daily power consumption and the current power supply pressure, which avoids the waste of electric energy on the one hand, and will not affect the normal power supply at the same time. The intercepted electricity is limited according to the power required for the next maintenance work, and it can meet the electricity consumption of the next maintenance work. In this way, under the premise of ensuring the normal supply of electricity, the precise control of maintenance electricity is achieved, so that the wind power generated by the wind power station can be accurately allocated and fully utilized, effectively reducing the waste of electric energy.
[0029] Compared with the traditional management method, the traditional method is to temporarily call for power when maintenance is needed. When encountering large-scale and power-intensive maintenance work, it often conflicts with the peak power consumption, resulting in a temporary surge in power supply pressure. Or sometimes, in order to ensure the smooth progress of maintenance work, a serious excess of power is reserved for maintenance work, which will seriously affect the stability of power consumption during the period of tight power consumption.
[0030] This solution effectively solves these problems, regulates and allocates electricity more reasonably, effectively reduces unnecessary waste of electricity, and improves the ultimate efficiency of wind power.
[0031] In general, the wind power conversion efficiency management method provided by the embodiment of the present invention can effectively improve the management and control capabilities of wind power, while ensuring the normal operation of the wind power station, significantly reducing power loss, improving the final efficiency of wind power, and avoiding unnecessary energy losses. BRIEF DESCRIPTION OF THE DRAWINGS
[0032] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for use in the embodiments are briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present invention and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without creative work.
[0033] Figure 1 A schematic diagram is provided for selecting the maintenance object in the case of wind direction A;
[0034] Figure 2 A schematic diagram is shown for selecting the maintenance object in the case of wind direction B;
[0035] Figure 3 A schematic diagram is shown for selecting the maintenance object in the case of wind direction C;
[0036] Figure 4 A schematic diagram of evaluating an evaluation object based on a reference column;
[0037] Figure 5 A schematic diagram showing the new boundary line after the assessment object is included in the reference column. DETAILED DESCRIPTION
[0038] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Generally, the components of the embodiments of the present invention described and shown in the drawings here can be arranged and designed in various different configurations.
[0039] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the invention claimed for protection, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0040] It should be noted that similar reference numerals and letters denote similar items in the following drawings, and therefore, once an item is defined in one drawing, further definition and explanation thereof is not required in subsequent drawings.
[0041] As shown in this specification and claims, unless the context clearly provides an example, the words "a", "an", "the", etc. do not refer to the singular, but also include the plural. Generally speaking, the terms "include" and "comprise" only indicate the inclusion of the steps and elements that have been clearly identified, and these steps and elements do not constitute an exclusive list. The method or device may also include other steps or elements.
[0042] The flowcharts used in this specification are used to illustrate the operations performed by the system according to the embodiments of this specification. It is understood that the operations of each step are not necessarily performed precisely in order. On the contrary, the steps can be processed in reverse order or simultaneously. At the same time, other operations can also be added to these processes, or one or more operations can be removed from these processes.
[0043] In order to solve the problems in the prior art, this embodiment provides a wind power conversion efficiency management method, which includes the following steps:
[0044] S1. Determine the daily power consumption of the wind power station under different weather conditions, the power generation under different weather conditions, the power supply pressure under different weather conditions, and the maintenance power consumption of the wind power station for different maintenance tasks. It should be noted that the maintenance power consumption refers to the power required during the maintenance of the wind turbine, including but not limited to the lighting power and maintenance tool power during the maintenance process.
[0045] S2. Determine the daily power consumption forecast data, power generation forecast data, and power supply pressure forecast data for a period of time in the future based on the weather forecast data.
[0046] S3. Determine the maintenance work plan for the next period of time based on the weather forecast data, and determine the maintenance power consumption forecast data based on the maintenance work plan. The execution time of maintenance work is usually set when the weather conditions are good.
[0047] S4. Determine the "power surplus-time" relationship based on the power generation forecast data, daily power consumption forecast data and power supply pressure forecast data. When the power surplus is positive (i.e., power generation forecast data> daily power consumption forecast data+power supply pressure forecast data), the excess power is intercepted and stored in the power storage module (including but not limited to batteries) so that the power storage in the power storage module matches the maintenance power consumption forecast data. It should be noted that only when the power surplus is positive, the excess real-time power (i.e., the remaining power after power generation forecast data-(daily power consumption forecast data+power supply pressure forecast data)) is intercepted, and the intercepted amount is the integral of the excess power over time.
[0048] S5. When the electric energy storage in the electric energy storage module matches the maintenance power consumption forecast data, the corresponding maintenance work is performed.
[0049] Through this design, the excess electricity will be intercepted only when the power generation of the wind power station is greater than its daily power consumption and the current power supply pressure, which avoids the waste of electricity and does not affect the normal power supply. The intercepted electricity is limited according to the power required for the next maintenance work, and it can meet the power consumption of the next maintenance work. In this way, under the premise of ensuring the normal supply of electricity, the precise control of maintenance electricity is achieved, so that the wind power generated by the wind power station can be accurately allocated and fully utilized, effectively reducing the waste of electricity.
[0050] Compared with the traditional management method, the traditional method is to temporarily call for power when maintenance is needed. When encountering large-scale and power-intensive maintenance work, it often conflicts with the peak power consumption, resulting in a temporary surge in power supply pressure. Or sometimes, in order to ensure the smooth progress of maintenance work, a serious excess of power is reserved for maintenance work, which will seriously affect the stability of power consumption during the period of tight power consumption.
[0051] This solution effectively solves these problems, regulates and allocates electricity more reasonably, effectively reduces unnecessary waste of electricity, and improves the ultimate efficiency of wind power.
[0052] In general, the wind power conversion efficiency management method provided in this embodiment can effectively improve the management and control capabilities of wind power, while ensuring the normal operation of the wind power station, significantly reducing power loss, improving the final efficiency of wind power, and avoiding unnecessary energy losses.
[0053] In this embodiment, in S5, the maintenance work plan for a period of time in the future is divided into times, and the execution time of each maintenance work is different. When the electric energy storage in the electric energy storage module is greater than or equal to the maintenance power consumption forecast data of the most recent maintenance work, the maintenance work is executed. For other subsequent maintenance work, the required electricity can continue to be intercepted when the power surplus is positive. This not only does not delay the timely implementation of the most recent maintenance work, but also reserves sufficient preparation time for the subsequent maintenance work. At the same time, the maintenance work is carried out in batches, which also avoids large-scale shutdown of wind turbines and provides basic guarantees for the supply of electricity.
[0054] It should be noted that if sufficient electric energy is not retained before the previously set execution time of the maintenance work, the execution time of the maintenance work will be delayed, at least until the retained electric energy meets the power consumption of the maintenance work.
[0055] Furthermore, S3 includes the following steps:
[0056] S31. Determine the "wind force, wind direction-time" forecast data for a period of time in the future based on the weather forecast data, select a maintenance time period based on the "wind force, wind direction-time" forecast data, and determine the wind direction and wind speed conditions within the maintenance time period based on the "wind force, wind direction-time" forecast data.
[0057] S32, constructing a two-dimensional distribution map of wind turbines according to the distribution of wind turbines, taking the wind direction corresponding to the wind direction as a reference direction, dividing the wind turbines into several columns in the reference direction according to the two-dimensional distribution map of wind turbines, and the arrangement direction of each column is the same as the reference direction. Figure 1 As shown in the figure, wind direction A is the reference direction. Figure 1 In the example, the wind turbines can be divided into 4 columns: F1, F2, F3 and F4. Figure 2 As shown in the figure, wind direction B is the reference direction. Figure 2 In the example, the wind turbines can be divided into three columns: F1, F2 and F3. Figure 3 As shown in the figure, wind direction C is the reference direction. Figure 3 In the diagram, wind turbines can be divided into 6 columns, namely: F1, F2, F3, F4, F5 and F6.
[0058] S33, select the downstream wind turbine in each column as the maintenance object. Figure 1 In each row of wind turbines at the downstream of wind direction A, Figure 1 The wind turbine is circled by the dotted box X1. Figure 2 In each row of wind turbines at the downstream of wind direction B, Figure 2 The wind turbine is circled by the dotted box X2. Figure 3 In the example, the downstream wind turbines in each row in wind direction C are Figure 3 The wind turbines circled by the dotted line frame X3 are the maintenance objects in this maintenance work.
[0059] Through this design, only the wind turbines located farthest downstream in the wind direction are selected as maintenance objects, mainly considering the following points: (1) The wind turbines located farthest downstream in the wind direction are most affected by the wake upstream, and selecting them as maintenance objects will minimize power generation losses; (2) During maintenance work, there is inevitably a certain probability that certain objects (including but not limited to: plates, sealing films, adhesive films, etc.) will accidentally fall off and be blown away by the wind. The selected maintenance objects are all located at the farthest downstream position in the wind direction, and maintenance work is not performed upstream of them. Therefore, no fallen objects will be blown over from their upstream, avoiding the risk of interference or collision with fallen objects that poses a safety threat to maintenance work and maintenance personnel.
[0060] Specifically, in S32, when the wind turbine generators are divided into a plurality of columns in the reference direction according to the two-dimensional distribution diagram of the generators, the method includes:
[0061] S321. In the reference direction, the wind turbines whose rotation axis centers are on the same straight line are divided into the same column, and any column is selected as a reference column. Figure 4 As shown, in the case of wind direction A, the rotation axis center lines of the blades of wind turbine p2 and wind turbine p3 are located on the same straight line, and wind turbine p2 and wind turbine p3 are divided into the same column and selected as the reference column.
[0062] S322, select wind turbines whose rotation axis deviates from the reference column as evaluation objects, and determine the distance between the evaluation object and the reference column in a direction perpendicular to the reference direction as the evaluation distance. Figure 4 As shown, both wind turbine p1 and wind turbine p4 deviate from the reference column, and both wind turbine p1 and wind turbine p4 are taken as evaluation objects.
[0063] S323. Determine the risk objects that may appear during the maintenance work according to the maintenance work plan (risk objects are the objects mentioned above that may accidentally fall off and be blown away by the wind during the maintenance work, including but not limited to: plates, sealing films, adhesive films, etc.), and combine the wind speed conditions determined in the maintenance time period according to the "wind force, wind direction-time" prediction data in S31 to evaluate the predicted drift distance of the risk objects in the direction perpendicular to the reference direction. The predicted drift distance can be obtained by conducting a drifting experiment on the risk objects at different wind speeds, specifically, releasing the risk objects at the same height as the possible falling part of the wind power station, recording the offset distance of the risk objects in the direction perpendicular to the wind direction under different wind speed conditions, and repeating the experiment to determine a reasonable offset distance value, and obtain the "risk object type-wind speed-predicted drift distance" relationship.
[0064] The reference line is the reference line (e.g. Figure 4 S1 in the figure, i.e., the straight line where the rotation axis of the blades of wind turbines p2 and p3 are located under the action of wind direction A), the reference line is offset to both sides (perpendicular to the direction of S1) by the distance corresponding to the predicted drifting distance to obtain the boundary line (such as Figure 4 The two boundary lines (L1 and L2 in the figure) enclose the predicted activity range of the risk object (i.e. the area between the straight lines L1 and L2).
[0065] S324. If the evaluation object is within the scope of the forecasting activity, the evaluation object is included in the reference column. If the evaluation object is outside the scope of the forecasting activity, the evaluation object is treated as an independent column. Figure 4As shown, wind turbine p4 is located within the predicted activity range L1-L2, and wind turbine p4 is included in the reference column, that is, wind turbine p4, wind turbine p2 and wind turbine p3 are in the same column. Wind turbine p1 is located outside the predicted activity range L1-L2, so wind turbine p1 is not included in the reference column, and wind turbine p1 is treated as a separate column. It should be noted that when judging whether the evaluation object is within the predicted activity range, the center point of the evaluation object on the two-dimensional graph can be used as a basis for judgment, that is, to judge whether the center point of the evaluation object on the two-dimensional graph is within the predicted activity range.
[0066] It should be noted that in S324, the evaluation object is located within the prediction activity range. After the evaluation object is included in the reference column, when determining the boundary line of the reference column, the straight line where the rotation axis of the newly included wind turbine is located needs to be used as a reference line to determine the boundary line, and the maximum area encompassed by the boundary line is used as the new prediction activity range.
[0067] like Figure 4 and Figure 5 As shown, wind turbine p4 is included in the reference column, and now the reference column also includes wind turbine p2, wind turbine p3 and wind turbine p4. That is to say, the relative position relationship among wind turbine p2, wind turbine p3 and wind turbine p4 will affect the subsequent determination work.
[0068] Specifically, for this reference column, when determining the boundary line, the newly included straight line S2 where the rotation axis of the wind turbine p4 is located will be used as a reference line to determine the boundary line, and S2 will be offset to both sides by the distance corresponding to the predicted drift distance to obtain the boundary line corresponding to S2 (such as Figure 5 At this time, there are boundary lines L1, L2, L3 and L4, and the predicted activity range is the maximum area that these boundary lines can cover, that is, the area between L1 and L4.
[0069] Such a design takes into account the mutual influence between the column where wind turbines P2 and wind turbines P3 are located and wind turbine P4, and also takes into account the influence of wind turbine P4 on other surrounding wind turbines after incorporating wind turbine P4 into the reference column, making the planning of maintenance objects more comprehensive and reasonable, effectively reducing the potential risks in maintenance work, and avoiding large-scale shutdown of wind turbines.
[0070] Furthermore, in this embodiment, in S32, when the wind turbine generators are divided into a plurality of columns in the reference direction according to the two-dimensional distribution diagram of the generators, it further includes: S325, changing the reference column and repeating S321 to S324. Through this step, traversal judgment can be achieved to ensure that the final maintenance object is more reasonable.
[0071] In summary, the wind power conversion efficiency management method provided by the embodiment of the present invention can effectively improve the management and control capabilities of wind power, while ensuring the normal operation of the wind power station, significantly reducing power loss, improving the final efficiency of wind power, and avoiding unnecessary energy losses.
[0072] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A wind power conversion efficiency management method, It is characterized in that The steps include: S1. Determine the daily power consumption of the wind power station under different weather conditions, the power generation under different weather conditions, the power supply pressure under different weather conditions, and the maintenance power consumption of the wind power station for different maintenance tasks; S2. Determine the daily power consumption forecast data, power generation forecast data, and power supply pressure forecast data for a period of time in the future based on the weather forecast data; S3. Determine a maintenance work plan for a period of time in the future based on weather forecast data, and determine maintenance power consumption forecast data based on the maintenance work plan; S4, determining the "power reserve-time" relationship according to the power generation forecast data, the daily power consumption forecast data and the power supply pressure forecast data; when the power reserve is positive, retaining the excess power and storing it in the power storage module, so that the power storage in the power storage module matches the maintenance power consumption forecast data; S5. When the electric energy storage amount in the electric energy storage module matches the maintenance power consumption forecast data, corresponding maintenance work is performed.
2. The wind power conversion efficiency management method according to claim 1, It is characterized in that In S5, the maintenance work plan for the future period is divided into times, and the execution time of each maintenance work is different; when the energy storage in the energy storage module is greater than or equal to the maintenance power consumption forecast data of the most recent maintenance work, the maintenance work is executed.
3. The wind power conversion efficiency management method according to claim 1, It is characterized in that S3 includes the following steps: S31, determining "wind force, wind direction-time" forecast data for a period of time in the future according to the weather forecast data, selecting a maintenance time period according to the "wind force, wind direction-time" forecast data, and determining the wind direction and wind speed within the maintenance time period according to the "wind force, wind direction-time" forecast data; S32, constructing a two-dimensional distribution map of wind turbines according to the distribution of wind turbines, taking the wind direction corresponding to the wind direction as a reference direction, and dividing the wind turbines into a plurality of columns in the reference direction according to the two-dimensional distribution map of wind turbines, wherein the arrangement direction of each column is the same as the reference direction; S33, selecting the most downstream wind turbine in each column as the maintenance object.
4. The wind power conversion efficiency management method according to claim 3, It is characterized in that In S32, when the wind turbine generators are divided into a plurality of columns in the reference direction according to the two-dimensional distribution diagram of the generators, the method includes: S321, in the reference direction, the wind turbines whose rotation axis centers are on the same straight line are divided into the same column, and any one column is selected as a reference column; S322, selecting wind turbines whose rotation axis deviates from the reference column as evaluation objects, and determining the distance between the evaluation object and the reference column in a direction perpendicular to the reference direction as the evaluation distance; S323, determining the risk objects in the maintenance work according to the maintenance work plan, and evaluating the predicted drift distance of the risk objects in the direction perpendicular to the reference direction in combination with the wind speed condition in S31; taking the straight line where the reference column is located as the reference line, shifting the reference line to both sides thereof by the distance corresponding to the predicted drift distance to obtain a boundary line, and the two boundary lines enclose the predicted activity range of the risk objects; S324. If the evaluation object is within the prediction activity range, the evaluation object is included in the reference column; if the evaluation object is outside the prediction activity range, the evaluation object is treated as an independent column.
5. The wind power conversion efficiency management method according to claim 4, It is characterized in that In S32, when the wind turbine generators are divided into a plurality of columns in the reference direction according to the two-dimensional distribution diagram of the generators, the method further includes: S325. Change the reference column and repeat S321 to S324.
6. The wind power conversion efficiency management method according to claim 4, It is characterized in that The predicted drift distance is obtained by performing a drifting experiment on the risk object at different wind speeds.
7. The wind power conversion efficiency management method according to claim 4, It is characterized in that In S324, the evaluation object is located within the predicted activity range. After the evaluation object is included in the reference column, for the reference column, when determining the boundary line next, it is necessary to use the straight line where the rotation axis line of the newly included wind turbine is located as the reference line to determine the boundary line, and use the maximum area encompassed by the boundary line as the new predicted activity range.
