Modularized design and construction method of coke oven gas collection system
The modular design and segmented installation of the coke oven gas gathering system through BIM software solves the problems of difficult quality assurance and high-altitude risks in traditional construction, achieves efficient and safe gas gathering system construction, and adapts to the needs of diverse furnace types. .
Patent Information
- Application Number
- CN202410778236.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-17
- Publication Date
- 2024-10-18
Smart Images

Figure CN118792064A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of coke oven construction engineering, and more specifically, to a modular design and construction method for a coke oven gas collection system. Background Art
[0002] Coke oven is a device used to produce coke from coal, and is the main thermal equipment for coking. The construction process of coke oven involves various construction disciplines and processes such as civil foundation, furnace refractory body, steel structure installation, pipeline installation, electrical and instrumentation equipment, etc. Among them, the construction of coke oven top gas collection system is an important construction link in the coke oven pipeline installation.
[0003] During the construction of the coke oven, a temporary coke oven masonry shed will be installed. Two to three cranes will be installed on the top of the shed. There is a certain height of running space between the crane and the completed coke oven top. The traditional construction method is to only assemble and weld the gas collecting pipe into several sections on the furnace top, and then weld it into a whole after hoisting it in place by the crane in the masonry shed. Then, the steel structure operation platform, pipe bracket, process pipeline, electromechanical bridge, etc. will be assembled on the gas collecting pipe in a scattered manner. There are many shortcomings in the traditional construction method: the construction quality is not easy to guarantee, the high-altitude construction risk is high and the efficiency is low, the labor cost is high, the environmental pollution is heavy, and the construction period is long. In addition, according to the diversification of production processes, the furnace types are also diversified. Due to the high processing and production cost of masonry sheds, it is impossible to reserve multiple sheds according to different furnace types. When building some larger furnace types, it is quite difficult or impossible to use the shed crane to install the gas collecting pipe, operation platform and process pipeline.
[0004] The existing Chinese patent CN 203212208 proposes an assembly and hoisting formwork frame suitable for modular construction of pipelines. The formwork frame is composed of longitudinal and transverse beams, supporting legs, suspension arms, platforms, positioning blocks, and diagonal braces. The purpose is to fix the pipeline on the frame, then lift it to the installation site, and then install and fix the pipeline on the frame to the building body, and then lower the formwork frame to assist in the installation of the pipeline.
[0005] The existing Chinese patent CN 114382951 A proposes a modular pipeline installation method, the steps and equipment are as follows: determine the pipeline size, adjust the position of the support ring in the mold frame according to the pipeline size, and adjust the opening size of the support ring to ensure that the support ring fits the pipeline; fix the two support rings by fixing them with tension bolts; install the rubber ring, place a rubber ring bag with glue at the pipeline socket position, the rubber ring bag is set in a circle and adhered to the inner wall of the pipeline socket; install the pipeline, butt-joint and fix the two mold frames, and fix the two pipelines by pipe plug-in. After the rubber ring breaks, the glue is distributed at the pipeline connection position. This patent aims to butt-joint two sections of pipelines. Summary of the invention
[0006] In view of the above-mentioned defects in the prior art, the present invention provides a modular design and construction method for a coke oven gas collection system. By performing a BIM-based forward structural design on the modular segments of the gas collection system, it is ensured that the construction of the gas collection system meets the modular production and installation requirements, thereby reducing the reliance on cranes in the coke oven masonry shed.
[0007] To achieve the above object, the present invention provides a modular design and construction method for a coke oven gas collection system, wherein the gas collection system comprises a gas collection pipe, an operating platform on the gas collection pipe, a process pipeline and a pipeline support thereof; the operating platform is constructed by columns on both sides of the gas collection pipe and a crossbeam on the top; the modular design and construction method comprises the following steps:
[0008] Step S1, modularize the gas gathering system into sections and determine the length of each section; the sectioning standard is based on the weight of the entire system, the restrictions of the site conditions on module processing, and whether the requirements of the module weight on the lifting equipment meet the site conditions;
[0009] Step S2: Using BIM software to carry out integrated design and construction of the gas collecting pipe and the operating platform;
[0010] Step S3, using BIM software to forward design and determine the position of each process pipeline and its pipeline support relative to the center of the gas collecting pipe, and the relative position relationship includes the horizontal and vertical positions;
[0011] Step S4, establishing a BIM segment model of the gas collection system according to the modular segment lengths and the relative positions determined in step S3;
[0012] Step S5: Decompose the system module into processing components using the BIM segmentation model, export component data and number them, form a material list and processing drawing, and process to obtain installation components;
[0013] Step S6, assembling the gas collecting pipe, the operating platform and the pipeline support according to the determined relative positions;
[0014] Step S7, welding the pipeline positioning hoop on the pipeline support according to the determined relative position;
[0015] Step S8, installing the process pipeline on the pipeline positioning hoop to complete the construction of a segmented module;
[0016] Step S9: After the construction of all the segmented modules is completed, the segmented modules are hoisted to the top of the coke oven using the gas collecting pipe as a hoisting force-bearing structure to complete the assembly of the gas collecting system.
[0017] Furthermore, in step S2, the column and the gas collecting pipe are detachably fixedly connected by a transverse perforated steel plate and a first bolt assembly matched therewith; the crossbeam and the gas collecting pipe are detachably fixedly connected by a longitudinal perforated steel plate and a second bolt assembly matched therewith; one side of the transverse perforated steel plate or the longitudinal perforated steel plate is fitted into the surface of the connecting object; the selection of the size of the transverse perforated steel plate and the longitudinal perforated steel plate and the specification of the bolt assembly meets the requirement that the gas collecting pipe serves as a lifting force-bearing structure and bears the entire weight of the segmented module; the shear bearing capacity F of the perforated steel plate is greater than the distribution force G of the total weight of the segmented module on the perforated steel plate; the ratio of the length dimension of the perforated steel plate in the compressive direction to the plate thickness is not greater than 20.
[0018] Furthermore, the two transverse perforated steel plates are respectively welded on the opposite sides of the middle of the column and the gas collecting pipe, and are connected to the column and the gas collecting pipe in cooperation with the bolt assembly; the two longitudinal perforated steel plates are respectively welded on the opposite sides of the middle of the crossbeam and the gas collecting pipe, and are connected to the crossbeam and the gas collecting pipe in cooperation with the bolt assembly.
[0019] Furthermore, the thickness of the transverse perforated steel plate and the longitudinal perforated steel plate is 10 mm respectively, the first bolt assembly includes 5 M20 bolts with a spacing of 100 mm; the second bolt assembly includes 3 M20 bolts with a spacing of 100 mm.
[0020] Furthermore, the pipeline support includes a support column and a support beam.
[0021] Furthermore, in step S3, according to the design route of the process pipeline, the pipeline support is installed on the top or side of the operating platform; the specific position design of the pipeline support (8) meets the on-site process pipeline layout and production requirements.
[0022] Compared with the prior art, the above invention has the following advantages or beneficial effects:
[0023] (1) The modular design method of the present invention performs forward structural design based on BIM on the modular segments of the gas gathering system to ensure that the construction of the gas gathering system meets the modular production and installation requirements, while avoiding conflicts between pipelines, ensuring that the gas gathering pipes and process pipelines of each segment are accurately and uniformly positioned, and that the segments are accurately docked when assembled into a whole to ensure excellent quality.
[0024] (2) The modular design and construction method of the present invention solves the problem that the traditional gas collection system needs to be assembled in a scattered manner using a crane in a masonry shed, so that the production of the coke oven gas collection system and the operating platform can be started in a timely manner, ensuring that the gas collection pipes and process pipelines have sufficient processing and production time, and reducing the dependence on the crane in the coke oven masonry shed.
[0025] (3) The present invention can reduce high-altitude operations and lower safety risks; improve construction conditions and enhance project quality; improve construction efficiency and save labor costs; and facilitate the implementation of environmental protection measures. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] The present invention and its features, appearance and advantages will become more apparent by reading the detailed description of non-limiting embodiments with reference to the following drawings. The same reference numerals indicate the same parts in all the drawings. The drawings are not drawn to scale, and emphasis is placed on illustrating the subject matter of the present invention.
[0027] Figure 1 A schematic diagram of the process of modular design and construction of a coke oven gas collection system according to an embodiment of the present invention;
[0028] Figure 2 A side view of an integrated design of a gas collecting pipe and an operating platform according to an embodiment of the present invention;
[0029] Figure 3 It is a structural schematic diagram of a connecting piece between a coke oven gas collecting pipe and an operating platform according to an embodiment of the present invention;
[0030] Figure 4 It is a three-dimensional structural schematic diagram of a coke oven gas collecting pipe and an operating platform segment module according to an embodiment of the present invention;
[0031] Figure 5 A side view of a process pipeline and a pipeline support position design according to an embodiment of the present invention;
[0032] Figure 6 It is a schematic diagram of the three-dimensional structure of a segmented module operating platform and a pipeline support according to an embodiment of the present invention;
[0033] Figure 7 A model diagram of a gas collection system segment module according to an embodiment of the present invention;
[0034] Figure 8 This is a schematic diagram of the installation structure of a pipeline positioning hoop according to an embodiment of the present invention;
[0035] Among them, 1. column; 2. beam; 3. gas collecting pipe; 4. longitudinal connector; 5. first transverse connector; 6. second transverse connector; 7. process pipeline; 8. pipeline support; 9. pipeline positioning hoop; 10. operating platform; 4-1. first longitudinal perforated steel plate; 4-2. second longitudinal perforated steel plate; 4-3. first bolt assembly; 5-1. first transverse perforated steel plate on the left; 5-2. second transverse perforated steel plate on the left; 5-3. second bolt assembly on the left; 6-1. first transverse perforated steel plate on the right; 6-2. second transverse perforated steel plate on the right; 6-3. second bolt assembly on the right; 8-1. bracket column; 8-2. bracket beam. DETAILED DESCRIPTION
[0036] The following is a further description of the structure of the present invention in conjunction with the accompanying drawings and specific embodiments, but it is not intended to limit the present invention. The execution order of actions, steps, etc. in the devices and methods shown in the claims, specifications and drawings of the present invention can be implemented in any order as long as there is no special explicit limitation on the order and the output of the previous processing is not used in the subsequent processing.
[0037] It should also be noted that in the description of this application, the terms "up", "down", "left", "right", "top", "bottom", etc. indicate directions or positional relationships based on the directions or positional relationships shown in the accompanying drawings. They are only for the convenience of describing the present invention and do not require that the present invention must be constructed and operated in a specific direction. Therefore, they should not be understood as limitations on the present invention.
[0038] It should be understood that the terms "first" and "second" described in this application are only used for descriptive purposes and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features.
[0039] The technical solution of the present invention is described in detail below with specific embodiments and examples.
[0040] Example
[0041] This embodiment relates to a modular design and construction method for a coke oven gas collection system. The gas collection system includes a gas collection pipe, an operating platform on the gas collection pipe, a process pipeline and a pipeline support thereof. Figure 1 , the modular design and construction method comprises the following steps:
[0042] Step S1, modularize the gas gathering system into sections and determine the length of the modular sections; the sectioning standard is based on the weight of the entire system, the restrictions of the site conditions on module processing, and whether the requirements of the module weight on the lifting equipment meet the site conditions.
[0043] Step S2: Use BIM software to design and construct the gas collecting pipe 3 and the operating platform 10 in an integrated manner. Figure 2, the operating platform 10 is constructed by the columns 1 on both sides of the gas collecting pipe 3 and the crossbeam 2 on the top. As a preferred technical solution, the columns 1 and the gas collecting pipe 3 are detachably fixedly connected by a transverse perforated steel plate and its matching first bolt assembly; the crossbeam 2 and the gas collecting pipe 3 are detachably fixedly connected by a longitudinal perforated steel plate and its matching second bolt assembly; one side of the transverse perforated steel plate or the longitudinal perforated steel plate fits the surface of the connected object. Furthermore, the columns 1 and the gas collecting pipe 3 are detachably fixedly connected by a first transverse connector 5 and a second transverse connector 6; the crossbeam 2 and the gas collecting pipe 3 are detachably fixedly connected by a longitudinal connector 4. See. Figure 3 , the longitudinal connector 4 includes a first longitudinal perforated steel plate 4-1, a second longitudinal perforated steel plate 4-2 and a first bolt assembly 4-3. The first transverse connector 5 includes a first transverse perforated steel plate 5-1 on the left, a second transverse perforated steel plate 5-2 on the left and a second bolt assembly 5-3 on the left; the second transverse connector 6 includes a first transverse perforated steel plate 6-1 on the right, a second transverse perforated steel plate 6-2 on the right and a second bolt assembly 6-3 on the right. One side of the first transverse perforated steel plate 5-1 on the left and the second transverse perforated steel plate 6-2 on the right are in contact with the column 2; one side of the second transverse perforated steel plate 5-2 on the left and the first transverse perforated steel plate 6-1 on the right are in contact with the surface of the gas collecting pipe 3. The first longitudinal perforated steel plate 4-1 is longitudinally in contact with the axial surface of the gas collecting pipe 3. The selection of the sizes of the transverse and longitudinal perforated steel plates and the specifications of the bolt assemblies meets the requirement that the gas collector 3 is used as a hoisting force-bearing structure to bear the entire weight of the segmented module; the shear bearing capacity F of the perforated steel plate is greater than the distribution force G of the entire weight of the segmented module on the perforated steel plate; the ratio of the length dimension of the perforated steel plate in the compression direction to the plate thickness is not greater than 20. The specifications of the perforated steel plate and the connecting bolts are ingeniously designed to meet the hoisting stability requirements of the overall structure with the gas collector as the hoisting force-bearing structure.
[0044] As an example, the weight of the segmented modules of the gas collector and the operating platform is subjected to force verification, and the model specifications of the longitudinal connector 4, the first transverse connector 5 and the second transverse connector 6 of the connection structure between the gas collector and the operating platform are calculated when the gas collector is used as a hoisting force-bearing structure. There are two principles for calculating the specifications of the connectors: First, the strength of the connecting plate meets the load-bearing requirements, that is, the shear bearing capacity F of the connecting plate is greater than the force G allocated to the connecting plate by the weight of the segmented module. G = h*l*f v , where h is the thickness of the connecting plate, l is the length of the connecting plate, and f v is the shear strength of the connecting plate. Since l is determined by the connection length between the connecting plate and the gas collecting pipe or column or beam, the shear strength of the connecting plate f v The material of the connecting plate determines that the steel connecting plate is used in this embodiment. When F>G, h>G / l*f v。Secondly, the connecting plate meets the principles of compressive stability and structural requirements. During the installation of the gas collecting pipe, the connecting plate is squeezed by the structural support. To ensure the compressive stability of the connecting plate, the ratio of the length dimension of the plate in the compressive direction to the plate thickness is not greater than 20, that is, h>l / 20. In this embodiment, the maximum compressive dimension of the connecting plate is 185mm, and according to the above principle, the plate thickness is not less than 10mm. According to the principle of material saving, this embodiment uses a 10mm thick steel plate as a connecting piece.
[0045] The integrated construction of the gas collecting pipe 3 and the operating platform 10 includes steps S11 to S13:
[0046] Step S11, according to the calculated and determined model specifications, the first longitudinal perforated steel plate 4-1, the second longitudinal perforated steel plate 4-2, the first bolt assembly 4-3, the left first transverse perforated steel plate 5-1, the left second transverse perforated steel plate 5-2, the left second bolt assembly 5-3, the right first transverse perforated steel plate 6-1, the right second transverse perforated steel plate 6-2, and the right second bolt assembly 6-3 are processed and manufactured;
[0047] Step S12, the two transverse perforated steel plates are welded to the opposite sides of the middle of the column 1 and the gas collecting pipe 3 respectively; the two longitudinal perforated steel plates are welded to the opposite sides of the middle of the cross beam 2 and the gas collecting pipe 3 respectively; the perforated steel plates are welded on each span according to the above welding positions to complete the welding of the perforated steel plates in the segmented module. For more details, see Figure 2 , add structural connectors, weld the upper part of the second longitudinal perforated steel plate 4-2 to the middle bottom of the crossbeam 2 along the longitudinal direction of the gas collecting pipe 3, and weld the first longitudinal perforated steel plate 4-1 to the top of the gas collecting pipe 3 along the longitudinal direction of the gas collecting pipe 3 and the corresponding part of the second longitudinal perforated steel plate 4-2. The first transverse perforated steel plate 5-1 on the left is welded to the middle part of the column 1 corresponding to the gas collecting pipe 3, and the second transverse perforated steel plate 5-2 on the left is welded to the gas collecting pipe 3 and the corresponding part of the second transverse perforated steel plate 5-2 on the left. The second transverse perforated steel plate 6-2 on the right is welded to the side of the column 1 corresponding to the gas collecting pipe 3, and the first transverse perforated steel plate 6-1 on the right is welded to the gas collecting pipe 3 and the corresponding part of the second transverse perforated steel plate 6-2 on the right. According to the above welding positions, the first longitudinal perforated steel plate 4-1, the second longitudinal perforated steel plate 4-2, the first transverse perforated steel plate 5-1 on the left, the second transverse perforated steel plate 5-2 on the left, the first transverse perforated steel plate 6-1 on the right, and the second transverse perforated steel plate 6-2 on the right are welded on each span. All the first longitudinal perforated steel plate 4-1, the second longitudinal perforated steel plate 4-2, the first transverse perforated steel plate 5-1 on the left, the second transverse perforated steel plate 5-2 on the left, the first transverse perforated steel plate 6-1 on the right, and the second transverse perforated steel plate 6-2 on the right in the segmented module are welded.
[0048] Step S13, use the first bolt assembly 4-3 of M20 to connect the first longitudinal perforated steel plate 4-1 and the second longitudinal perforated steel plate 4-2, use the second bolt assembly 5-3 on the left side of M20 to connect the first transverse perforated steel plate 5-1 on the left side and the second transverse perforated steel plate 5-2 on the left side, use the second bolt assembly 6-3 on the right side of M20 to connect the first transverse perforated steel plate 6-1 on the right side and the second transverse perforated steel plate 6-2 on the right side, and complete the connection of all the first longitudinal perforated steel plate 4-1, the second longitudinal perforated steel plate 4-2, the first transverse perforated steel plate 5-1 on the left side, the second transverse perforated steel plate 5-2 on the left side, the first transverse perforated steel plate 6-1 on the right side, and the second transverse perforated steel plate 6-2 on the right side in the modular segment. The structure is as follows Figure 4 As shown. The remaining modular segments are processed and manufactured according to the above steps. Further preferably, the first bolt assembly includes 5 M20 bolts with a spacing of 100 mm; the second bolt assembly includes 3 M20 bolts with a spacing of 100 mm.
[0049] Following step S2, step S3 is to use BIM software to forward design and determine the position of each process pipeline 7 and its pipeline support 8 relative to the center of the gas collecting pipe 3. The relative position relationship includes the horizontal and vertical positions. Figure 5 According to the design route of the process pipeline, the pipeline support 8 is installed on the top or side of the operating platform 10; the specific position design of the pipeline support 8 meets the on-site process pipeline layout and production requirements, and tries to make the center of gravity of the segmented module close to the center of the gas collecting pipe 3. The pipeline support 8 includes a support column 8-1 and a support beam 8-2. Figure 6 A three-dimensional structural schematic diagram of the segmented module operating platform and pipeline support is given.
[0050] Step S4: Establish a BIM segmented model of the gas collection system according to the modular segment length and the relative position determined in step S3, and review the model to ensure that the data is accurate. Establishing the segmented model is also to verify whether the pipeline installation complies with the specifications and avoid contradictions. Figure 7 The model diagram of the segmented module of the gas gathering system is given.
[0051] Step S5: Use the BIM segmentation model to decompose the system module into processing components, export the component data and number them, and form a material list and processing drawing. The on-site material list supports material procurement and budgeting, and the numbering and processing drawings provide quick conditions for production and assembly. Process and manufacture the installation components according to the drawings. All processed components must be accepted and qualified, and qualified components guarantee the overall quality.
[0052] Step S6: assemble the gas collecting pipe 3, the operating platform 10 and the pipeline support 8 according to the determined relative positions.
[0053] Step S7, see Figure 6 and Figure 8, and the pipeline positioning hoop 9 is welded on the pipeline support according to the determined relative position.
[0054] Step S8: Install the process pipeline 7 on the pipeline positioning hoop 9 to complete the construction of one segmented module.
[0055] Step S9: After the construction of all segment modules is completed, the segment modules are hoisted to the coke oven top for integration using the gas collecting pipe 3 as a hoisting force-bearing structure to complete the assembly of the gas collecting system.
[0056] From the above description, it can be seen that the modular design and construction method of the coke oven gas collection system provided by the present invention performs a forward structural design of the modular segments of the gas collection system based on BIM, thereby ensuring that the construction of the gas collection system meets the modular production and installation requirements, while avoiding conflicts between pipelines, ensuring that the positions of the gas collection pipes and process pipelines of each segment are accurate and uniform, and achieving precise docking when the segments are assembled into a whole, thereby ensuring excellent construction quality.
[0057] Those skilled in the art should understand that those skilled in the art can implement variations by combining the prior art and the above embodiments, which will not be described in detail here. Such variations do not affect the essential content of the present invention, and will not be described in detail here.
[0058] The above describes the preferred embodiments of the present invention. It should be understood that the present invention is not limited to the above-mentioned specific embodiments, and the devices and structures that are not described in detail should be understood to be implemented in a common manner in the art; any technician familiar with the art can use the above-disclosed methods and technical contents to make many possible changes and modifications to the technical solutions of the present invention without departing from the scope of the technical solutions of the present invention, or modify them into equivalent embodiments of equivalent changes, which does not affect the essential content of the present invention. Therefore, any simple modifications, equivalent changes and modifications made to the above embodiments based on the technical essence of the present invention without departing from the content of the technical solutions of the present invention are still within the scope of protection of the technical solutions of the present invention.
Claims
1. A modular design and construction method for a coke oven gas collection system, the gas collection system comprising a gas collection pipe (3), an operating platform (10) on the gas collection pipe (3), a process pipeline (7) and a pipeline support (8) thereof; the operating platform (10) is constructed by means of columns (1) on both sides of the gas collection pipe (3) and a crossbeam (2) on the top; It is characterized in that The modular design and construction method comprises the following steps: Step S1, modularize the gas gathering system into sections and determine the length of each section; the sectioning standard is based on the weight of the entire system, the restrictions of the site conditions on module processing, and whether the requirements of the module weight on the lifting equipment meet the site conditions; Step S2, using BIM software to perform integrated design and construction of the gas collecting pipe (3) and the operating platform (10); Step S3, using BIM software to forward design and determine the position of each process pipeline (7) and its pipeline support (8) relative to the center of the gas collecting pipe (3), wherein the relative position relationship includes the horizontal and vertical positions; Step S4, establishing a BIM segment model of the gas collection system according to the modular segment lengths and the relative positions determined in step S3; Step S5: Decompose the system module into processing components using the BIM segmentation model, export component data and number them, form a material list and processing drawing, and process to obtain installation components; Step S6, assembling the gas collecting pipe (3), the operating platform (10) and the pipeline support (8) according to the determined relative positions; Step S7, welding the pipeline positioning hoop (9) on the pipeline support according to the determined relative position; Step S8, installing the process pipeline (7) on the pipeline positioning hoop (9) to complete the construction of a segmented module; Step S9: After the construction of all the segmented modules is completed, the segmented modules are hoisted to the top of the coke oven using the gas collecting pipe (3) as a hoisting force-bearing structure to complete the assembly of the gas collecting system.
2. The modular design and construction method of the coke oven gas collection system according to claim 1, It is characterized in that In the step S2, the column (1) and the gas collecting pipe (3) are detachably fixedly connected by a transverse perforated steel plate and a first bolt assembly matched therewith; the crossbeam (2) and the gas collecting pipe (3) are detachably fixedly connected by a longitudinal perforated steel plate and a second bolt assembly matched therewith; one side of the transverse perforated steel plate or the longitudinal perforated steel plate is in contact with the surface of the connecting object; the size of the transverse perforated steel plate and the longitudinal perforated steel plate and the specification of the bolt assembly are selected to meet the requirement that the gas collecting pipe (3) serves as a lifting load-bearing structure and bears the entire weight of the segmented module; the shear bearing capacity F of the perforated steel plate is greater than the distribution force G of the entire weight of the segmented module on the perforated steel plate; The ratio of the length dimension of the perforated steel plate in the compression direction to the plate thickness shall not exceed 20.
3. The modular design and construction method of the coke oven gas collection system according to claim 2, It is characterized in that The two transverse perforated steel plates are respectively welded to the opposite sides of the middle of the column (1) and the gas collecting pipe (3), and are used in conjunction with a bolt assembly to achieve a connection between the column (1) and the gas collecting pipe (3); the two longitudinal perforated steel plates are respectively welded to the opposite sides of the middle of the crossbeam (2) and the gas collecting pipe (3), and are used in conjunction with a bolt assembly to achieve a connection between the crossbeam (2) and the gas collecting pipe (3).
4. The modular design and construction method of the coke oven gas collection system according to claim 2, It is characterized in that The thickness of the transverse perforated steel plate and the longitudinal perforated steel plate is 10 mm respectively. The first bolt assembly includes 5 M20 bolts with a spacing of 100 mm; the second bolt assembly includes 3 M20 bolts with a spacing of 100 mm.
5. The modular design and construction method of the coke oven gas collection system according to claim 1 or 2, It is characterized in that The pipeline support (8) comprises a support column (8-1) and a support crossbeam (8-2).
6. The modular design and construction method of the coke oven gas collection system according to claim 5, It is characterized in that In the step S3, the pipeline support (8) is installed on the top or side of the operating platform (10) according to the design route of the process pipeline; the specific position design of the pipeline support (8) meets the on-site process pipeline layout and production requirements.