Detonator delay setting method for cooperative control of blasting vibration amplitude and frequency

By setting up a typical gun hole detonation network in rock excavation and blasting, and performing frequency domain analysis, combining safety vibration standards and natural frequency, adjusting the detonator delay, the coordinated control of the blast vibration amplitude and frequency is achieved, and the current solution is to solve the problem. There are problems in the technology that improve the safety and accuracy of the blasting process.

CN118896529APending Publication Date: 2024-11-05RAILWAY CONSTR RES INST OF CHINA ACAD OF RAILWAY SCI CO LTD +2

Patent Information

Application Number
CN202411326495.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-23
Publication Date
2024-11-05

AI Technical Summary

Technical Problem

In rock excavation and blasting construction, the existing technology is difficult to effectively control the blasting vibration amplitude and frequency, resulting in a safety threat to the structure and surrounding buildings. The determination of electronic detonator delay mainly depends on experience and lacks a unified and reasonable method.

Method used

By setting up a typical single-hole detonation network for blasting vibration monitoring, frequency domain analysis and multi-scale wavelet decomposition, the safe vibration standards and natural frequency of the protection object are determined, and the blasting vibration response under different detonator delay conditions are calculated. Adjust the detonator delay to coordinate the vibration amplitude and frequency.

Benefits of technology

It effectively avoids the superposition of blasting vibration waves, reduces the impact on the surrounding protected objects, ensures that the vibration amplitude during blasting is within the safety standards, avoids resonance risks, and improves the accuracy and reliability of blasting control.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118896529A_ABST
    Figure CN118896529A_ABST
Patent Text Reader

Abstract

The invention discloses a blasting vibration amplitude and frequency cooperative control detonator delay setting method. The method comprises the steps that a typical blast hole single-hole detonating network is arranged in a blasting area; setting blasting vibration monitoring points, and carrying out blasting vibration monitoring to obtain a single-hole blasting vibration waveform; performing frequency domain analysis on each single-hole blasting vibration waveform to obtain a main frequency attenuation law formula and a sub-wave amplitude attenuation law formula of single-hole blasting vibration; according to the dominant frequency attenuation law and the wavelet amplitude attenuation law, calculating blasting vibration responses under different detonator delay conditions, and outputting blasting vibration amplitudes and dominant vibration frequency bands at the protection object; and comparing the safe vibration standard and the inherent frequency of the protected object with the blasting vibration amplitude and the main vibration frequency band at the protected object, and adjusting the corresponding detonator delay according to the comparison result. According to the invention, effective control of the blasting vibration amplitude and cooperative regulation and control of the blasting vibration main vibration frequency band away from the structure inherent frequency can be realized.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of engineering blasting, and in particular to a detonator delay setting method for coordinated control of blasting vibration amplitude and frequency. Background Art

[0002] Engineering blasting is widely used in rock excavation for water conservancy and hydropower, transportation, mining, municipal engineering and other construction projects. During the rock excavation blasting construction process, the energy released after the explosives are detonated is used to crush and throw the rock to be blasted. Part of the energy converted into vibration will have an adverse effect on the safety and stability of the remaining rock and surrounding buildings (structures), threatening the safety of the project and its surrounding buildings (structures). Therefore, blasting vibration control has always been a difficult and important issue faced by rock excavation blasting construction.

[0003] There are three main control measures for rock excavation blasting vibration control: blast source adjustment, propagation path control, and protection of protected objects. Among them, blast source adjustment is the most effective and most commonly used control measure. The basic principle of blast source adjustment measures is to reduce the proportion of energy converted into vibration by adjusting the blast source parameters. At present, the widely used blast source adjustment measures include reducing the single-stage charge, adjusting the direction of the resistance line, and adopting a hole-by-hole micro-difference initiation network. With the widespread popularization of electronic detonators, micro-difference interference vibration reduction technology based on the precise delay characteristics of electronic detonators has been favored by researchers and engineering technicians. The core of micro-difference interference vibration reduction technology is to determine a reasonable delay of electronic detonators. At present, the determination of electronic detonator delay mainly depends on engineering experience and construction habits. The existing quantitative research results are only applicable to the current specific engineering conditions. A unified and convenient method for determining the reasonable delay of electronic detonators has not yet been formed, and the advantages of the precise delay characteristics of electronic detonators in blasting vibration control have not been fully utilized. Therefore, it is urgent to carry out research on the reasonable delay of electronic detonators for rock blasting with the goal of reducing vibration.

[0004] Blasting vibration control generally focuses on blasting vibration amplitude control, and the determination of electronic detonator delay is also mainly aimed at blasting vibration amplitude regulation, while the frequency that plays a key role in the blasting vibration response of engineering structures and their surrounding buildings (structures) has been ignored. Existing practices have shown that the blasting dynamic response is not only related to the blasting vibration amplitude, but also closely related to the blasting vibration frequency. Excessive blasting vibration amplitude will directly affect the safety and stability of the structure. When the blasting vibration amplitude is less than the safe allowable vibration velocity, the blasting vibration still poses a potential threat to the safety and stability of the structure, mainly manifested in the high-frequency vibration in the near area of ​​the blasting causing local damage to the structure and the low-frequency vibration in the middle and far areas of the blasting inducing the amplification of the structural vibration. Therefore, solving the blasting vibration control problem requires both blasting vibration amplitude control and frequency regulation. The determination of the reasonable delay of the electronic detonator also requires the coordinated control of the blasting vibration amplitude and frequency. Therefore, there is an urgent need for a method to determine the reasonable delay of the electronic detonator based on the coordinated control of the blasting vibration amplitude and frequency. Summary of the invention

[0005] The object of the present invention is to provide a detonator delay setting method for coordinated control of blasting vibration amplitude and frequency, which is used to solve at least one of the above-mentioned technical problems, and can achieve effective control of blasting vibration amplitude and coordinated regulation of the blasting vibration main frequency range away from the structural natural frequency.

[0006] The present invention is achieved in that:

[0007] A method for setting a detonator delay by coordinated control of blasting vibration amplitude and frequency, comprising:

[0008] A typical single-hole blasting network is set up in the blasting area.

[0009] Set up blasting vibration monitoring points, conduct blasting vibration monitoring, and obtain single-hole blasting vibration waveforms.

[0010] Frequency domain analysis is performed on each of the single-hole blasting vibration waveforms to obtain a main frequency attenuation law formula and a sub-wave amplitude attenuation law formula for the single-hole blasting vibration.

[0011] The safety vibration standard of the protected object is determined, and the natural frequency of the protected object is calculated.

[0012] According to the main frequency attenuation law and the sub-wave amplitude attenuation law, the blasting vibration response under different detonator delay conditions is calculated, and the blasting vibration amplitude and main vibration frequency band at the protected object are output.

[0013] The safety vibration standard and the natural frequency are compared with the blasting vibration amplitude and the main vibration frequency band, and the corresponding detonator delay is adjusted according to the comparison result.

[0014] In a preferred embodiment of the present invention, in the above-mentioned method for setting the time delay of detonators with coordinated control of blasting vibration amplitude and frequency, the setting of a typical blasthole single-hole detonation network in the blasting area comprises:

[0015] According to the blasting type, the blasting holes in the blasting area are determined.

[0016] The blasting holes of the same type are grouped to form a typical hole group.

[0017] The detonator detonation time of each typical blast hole group is set.

[0018] A detonator delay is set separately for the last detonating blasthole in each of the typical blasthole groups.

[0019] The technical effect is that by grouping the blasting holes of the same type and controlling the detonation time of the typical blasting hole groups in each group, the mutual interference between different blasting hole groups is effectively avoided, the peak values ​​of multiple blasting vibration waveforms are prevented from appearing at the same time point, and the excessive vibration amplitude is prevented from being generated in the blasting area, and the concentrated release of vibration energy is avoided. The superposition phenomenon of blasting vibration waves is effectively controlled, reducing the impact of blasting on surrounding protected objects.

[0020] In a preferred embodiment of the present invention, in the above-mentioned detonator delay setting method for coordinated control of blasting vibration amplitude and frequency, the time difference between the detonator detonation time of the last detonating blasthole in each typical blasthole group and the detonator detonation time of the adjacent blasting blasthole is greater than 50ms.

[0021] Its technical effect is: by setting a detonation time difference greater than 50ms, it is possible to collect a complete single-hole blasting vibration waveform, which is convenient for subsequent single-hole blasting vibration analysis.

[0022] In a preferred embodiment of the present invention, in the above-mentioned method for setting the time delay of detonators with coordinated control of blasting vibration amplitude and frequency, the steps of setting the blasting vibration monitoring point, performing blasting vibration monitoring, and obtaining the single-hole blasting vibration waveform include:

[0023] Determine the relative position of the explosion source and the protected object.

[0024] A straight line path from the blasting source to the protected object is selected, and blasting vibration monitoring points are arranged on the straight line path.

[0025] The distance between the blasting vibration monitoring points gradually increases from the blasting source to the protected object.

[0026] At least one blasting vibration monitoring point is arranged at the protected object.

[0027] A vibration sensor is installed at each blasting vibration monitoring point.

[0028] Blasting operations are carried out to collect single-hole blasting vibration waveforms at each of the blasting vibration monitoring points.

[0029] Its technical effect is: by gradually setting blasting vibration monitoring points along the straight path from the blasting source to the protected object, vibration data from different positions of the blasting source to the protected object can be obtained, ensuring that different distance ranges are covered and the vibration amplitude and frequency attenuation law can be accurately captured.

[0030] In a preferred embodiment of the present invention, in the above-mentioned method for setting the time delay of detonators with coordinated control of the blasting vibration amplitude and frequency, the frequency domain analysis of each single-hole blasting vibration waveform is performed to obtain the main frequency attenuation law formula and the sub-wave amplitude attenuation law formula of the single-hole blasting vibration, which include:

[0031] Each of the single-hole blasting vibration waveforms is converted from the time domain to the frequency domain, and the main vibration frequency at each of the blasting vibration monitoring points is extracted.

[0032] According to the main vibration frequency at each blasting vibration monitoring point, combined with the empirical formula of the main frequency attenuation of blasting vibration with distance, the main frequency attenuation law formula of single-hole blasting vibration is fitted: f(d) = K(Q n / d) α / Q n , where Q is the charge in a single stage, d is the distance from the blast center, K and α are the attenuation coefficients, n is the exponent, step blasting is 1 / 2, and tunnel blasting is 1 / 3.

[0033] Multi-scale wavelet decomposition is performed on each of the single-hole blasting vibration waveforms to extract the single-hole blasting vibration sub-waveforms within different frequency bands at each of the blasting vibration monitoring points.

[0034] According to the single-hole blasting vibration waveform at each blasting vibration monitoring point, combined with the empirical formula of vibration amplitude attenuation with distance, the single-hole blasting vibration amplitude attenuation law formula of different frequency band components is fitted: A(d)=A0d β , where A0 is the sub-wave amplitude at the explosion source and β is the amplitude attenuation coefficient.

[0035] Its technical effect is: through frequency domain analysis and multi-scale wavelet decomposition, the main frequency and sub-wave amplitude characteristics of blasting vibration can be extracted more accurately, and the main frequency and sub-wave amplitude attenuation law formula can be fitted. By mastering the vibration amplitude attenuation law in different frequency bands, targeted vibration control strategies can be formulated for protection objects at different distances.

[0036] In a preferred embodiment of the present invention, in the above-mentioned method for setting the time delay of a detonator with coordinated control of the blasting vibration amplitude and frequency, the step of determining the safety vibration standard of the protected object and calculating the natural frequency of the protected object comprises:

[0037] According to the industry norms and engineering standards of the protected object, the safety vibration standard is determined and adjusted, and the safety vibration standard includes a safety threshold of the vibration velocity and a safety threshold of the vibration acceleration.

[0038] The natural frequency is calculated according to the structural material, geometric dimensions and boundary conditions of the protected object.

[0039] Its technical effect is: by combining national standards and industry specifications, the safety vibration standards are determined, and the safety thresholds of vibration velocity and vibration acceleration are clarified, providing a clear safety boundary for blasting operations, ensuring that the protected objects will not be damaged by excessive vibration during the blasting process. By accurately calculating the natural frequency of the protected object, the main frequency of the blasting vibration is prevented from being close to its natural frequency, reducing the risk of resonance.

[0040] In a preferred embodiment of the present invention, in the above-mentioned method for setting the detonator delay with coordinated control of the blasting vibration amplitude and frequency, the blasting vibration response under different detonator delay conditions is calculated according to the main frequency attenuation law formula and the sub-wave amplitude attenuation law formula, and the blasting vibration amplitude and main vibration frequency band at the protected object are outputted, including:

[0041] By using the main frequency attenuation law formula and the sub-wave amplitude attenuation law formula, according to the sub-wave superposition, each single-hole blasting vibration waveform is superimposed in sequence according to the blast hole detonation order, and the vibration response induced by the blast source at different explosion center distances is calculated.

[0042] According to the result of the sub-wave superposition, the delay of the detonator is adjusted to reduce the gain superposition between the vibration waveforms.

[0043] Output the blasting vibration amplitude A at the protected object under different detonator delay conditions final and the main oscillation frequency band f final .

[0044] Its technical effect is: by calculating the vibration response under different detonator delay conditions and adjusting the delay according to the attenuation law of the main frequency and sub-wave, the overlapping effect between vibration waveforms can be effectively reduced. Precise control is performed on the protected objects at different distances to ensure that the vibration amplitude during the blasting process is always kept within the safety standard, effectively avoiding the risk of exceeding the safety threshold.

[0045] In a preferred embodiment of the present invention, in the above-mentioned method for setting the time delay of a detonator by coordinated control of the blasting vibration amplitude and frequency, the process of superposition of sub-waves includes:

[0046] Calculate the blasting vibration superposition response of the first two blasting holes, and for the blasting vibration superposition response, calculate the main frequency attenuation f combined =∑f i (d) and the wavelet amplitude attenuation A combined =∑A i (d), where f i (d) is the main frequency amplitude of the i-th blasting hole, A i (d) is the sub-wave amplitude of the i-th blasting hole.

[0047] A detonator delay is set between two blasting holes so that the waveform peaks and troughs of the first two blasting holes are superimposed.

[0048] On the basis of the waveform superposition of the first two blasting holes, the blasting vibration superposition response is calculated with the third blasting hole, and the blasting vibration response of each blasting hole is superimposed one by one until the superposition calculation of all the blasting holes is completed.

[0049] The vibration waveforms at the protected object at different distances from the explosion center after the different types of blast holes at the explosion source are detonated are calculated.

[0050] Its technical effect is: by gradually calculating the vibration superposition response of the blasting borehole, the gain superposition effect between vibration waveforms is effectively reduced, and the vibration peak and resonance risk are reduced.

[0051] In a preferred embodiment of the present invention, in the above-mentioned method for setting the detonator delay by coordinated control of the blasting vibration amplitude and frequency, the step of comparing the safety vibration standard and the natural frequency with the blasting vibration amplitude and the main vibration frequency band, and adjusting the corresponding detonator delay according to the comparison result comprises:

[0052] The blasting vibration amplitude is compared with the safety vibration standard. If the blasting vibration amplitude is lower than the safety vibration standard, the current detonator delay does not need to be adjusted. If the blasting vibration amplitude exceeds the safety vibration standard, the detonator delay needs to be adjusted.

[0053] Compare the main oscillation frequency band with the natural frequency. If the difference between the main oscillation frequency band and the natural frequency is not within the preset range, the current detonator delay does not need to be adjusted. If the difference between the main oscillation frequency band and the natural frequency is within the preset range, the detonator delay needs to be adjusted.

[0054] Its technical effect is: through real-time comparison of safety vibration standards, natural frequencies, blasting vibration amplitudes and main vibration frequency bands, the blasting vibration amplitudes can be effectively controlled and resonance can be avoided, thereby ensuring safety and reliability during the blasting process.

[0055] In a preferred embodiment of the present invention, in the above-mentioned method for setting the detonator delay by coordinated control of the blasting vibration amplitude and frequency, the method for adjusting the detonator delay includes:

[0056] Starting from the first detonator, the delay of each of said detonators is adjusted one by one.

[0057] After the delay of all the detonators is adjusted each time, the blasting vibration amplitude and the main vibration frequency band are recalculated until the safety vibration standard and the natural frequency requirements are met.

[0058] Its technical effect is: by adjusting the delay of the detonator one by one, the accuracy and effect of each adjustment are ensured, and the detonation time of each detonator is finely adjusted. After each adjustment of the detonator delay, the blasting vibration amplitude and main vibration frequency band are recalculated and compared with the safety vibration standard and natural frequency requirements, so as to flexibly adapt to different blasting environments and achieve the optimal vibration amplitude control.

[0059] The beneficial effects of the embodiments of the present invention are:

[0060] Based on the single-hole blasting vibration characteristics and propagation attenuation law, the present invention finally determines the reasonable delay of electronic detonators that realize the coordinated control of blasting vibration amplitude and frequency through wavelet superposition theory, and forms a detonator delay setting method for the coordinated control of blasting vibration amplitude and frequency.

[0061] The present invention takes into account both blasting vibration amplitude control and frequency regulation, which not only solves the problem of structural safety and stability caused by excessive blasting vibration amplitude, but also solves the problem of resonance damage to the protected object under low amplitude conditions, thus completely realizing blasting vibration control.

[0062] The electronic detonator delay determination method of the present invention determines the results of sub-wave superposition calculations in sequence according to the detonation order, and the calculation process is orderly and traceable, which facilitates the preparation of an automated calculation program for the method.

[0063] The present invention is applicable to complex scenarios, not only to open-air blasting, but also to underground blasting; specifically, it is applicable to complex blasting scenarios including multiple types of blastholes at one time, has wide applicability, and has high promotion value.

[0064] The present invention does not change the blasting parameters other than the delay, and the delay determination can be quickly realized through a registration machine. After the electronic detonator delay is determined by this method, other vibration reduction measures can be reduced or removed as appropriate, which can reduce the construction cost to a certain extent. BRIEF DESCRIPTION OF THE DRAWINGS

[0065] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for use in the embodiments are briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present invention and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without creative work.

[0066] Figure 1 The present invention is a flow chart of a method for setting a detonator delay by coordinated control of blasting vibration amplitude and frequency. DETAILED DESCRIPTION

[0067] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Generally, the components of the embodiments of the present invention described and shown in the drawings here can be arranged and designed in various different configurations.

[0068] Please refer to Figure 1The first embodiment of the present invention provides a detonator delay setting method for coordinated control of blasting vibration amplitude and frequency, which comprises: setting a typical blasthole single-hole detonation network in a blasting area; setting a blasting vibration monitoring point, performing blasting vibration monitoring, and obtaining a single-hole blasting vibration waveform; performing frequency domain analysis on each of the single-hole blasting vibration waveforms to obtain a main frequency attenuation law formula and a sub-wave amplitude attenuation law formula for the single-hole blasting vibration; determining a safety vibration standard for a protected object, and calculating the natural frequency of the protected object; calculating the blasting vibration response under different detonator delay conditions according to the main frequency attenuation law and the sub-wave amplitude attenuation law, and outputting the blasting vibration amplitude and the main vibration frequency band of the protected object; comparing the safety vibration standard and the natural frequency with the blasting vibration amplitude and the main vibration frequency band, and adjusting the corresponding detonator delay according to the comparison result.

[0069] In a preferred embodiment of the present invention, in the above-mentioned method for setting a detonator delay for coordinated control of blasting vibration amplitude and frequency, the setting of a typical blasthole single-hole detonation network in the blasting area includes: determining the blasting blastholes in the blasting area according to the blasting type; in step blasting, common blasthole types include main blastholes, buffer holes and pre-splitting (light blasting) holes, and in tunnel blasting, common blastholes include slot holes, auxiliary holes and peripheral holes; grouping the blasting blastholes of the same type to form typical blasthole groups, and independently setting the detonation time of the typical blasthole group of each group to avoid mutual interference between the blasthole groups; setting the detonator detonation time of each typical blasthole group; and setting a detonator delay separately for the last detonation blasthole in each typical blasthole group, so that it is not affected by the blasting vibration waveform of the adjacent blasting blastholes, ensuring that the blasting vibration waves will not be superimposed on each other to avoid causing unnecessary vibration effects.

[0070] The technical effect is that by grouping the blasting holes of the same type and controlling the detonation time of the typical blasting hole groups in each group, mutual interference between different blasting hole groups is effectively avoided. It ensures that the blasting vibration wave does not overlap with the blasting vibration wave of the adjacent blasting hole, avoids the peaks of multiple blasting vibration waveforms appearing at the same time point, prevents excessive vibration amplitude from being generated in the blasting area, and avoids the concentrated release of vibration energy. The superposition phenomenon of blasting vibration waves is effectively controlled, reducing the impact of blasting on surrounding protected objects.

[0071] In a preferred embodiment of the present invention, in the above-mentioned detonator delay setting method for coordinated control of blasting vibration amplitude and frequency, the time difference between the detonator detonation time of the last detonating blasthole in each of the typical blasthole groups and the detonator detonation time of the adjacent blasting blastholes is greater than 50ms, which effectively reduces the gain superposition effect of blasting vibration.

[0072] Its technical effect is: by setting a detonation time difference greater than 50ms, it is possible to collect a complete single-hole blasting vibration waveform, which is convenient for subsequent single-hole blasting vibration analysis.

[0073] In a preferred embodiment of the present invention, in the above-mentioned detonator delay setting method for coordinated control of blasting vibration amplitude and frequency, the setting of blasting vibration monitoring points, blasting vibration monitoring, and obtaining single-hole blasting vibration waveforms include: determining the relative positions of the blasting source (blasting point) and the protected object (building or structure to be protected, etc.); selecting a straight path from the blasting source to the protected object, and arranging blasting vibration monitoring points on the straight path; the distance between the blasting vibration monitoring points gradually increases from the blasting source to the protected object; at least one blasting vibration monitoring point is arranged at the protected object, and the number of monitoring points arranged between the blasting source and the protected object is not less than 5; a vibration sensor is installed at each blasting vibration monitoring point; and blasting operations are carried out to collect single-hole blasting vibration waveforms at each blasting vibration monitoring point.

[0074] The single-hole blasting vibration waveform is used for further frequency domain analysis and processing to obtain typical vibration characteristic parameters at each blasting vibration monitoring point, including main frequency, vibration amplitude, etc.

[0075] Its technical effect is: by gradually setting blasting vibration monitoring points along the straight path from the blasting source to the protected object, vibration data from the blasting point to different positions of the protected object can be obtained, ensuring that different distance ranges are covered and the vibration amplitude and frequency attenuation law can be accurately captured.

[0076] In a preferred embodiment of the present invention, in the above-mentioned method for setting the time delay of the detonator with coordinated control of the blasting vibration amplitude and frequency, the frequency domain analysis of each single-hole blasting vibration waveform is performed to obtain the main frequency attenuation law formula and the sub-wave amplitude attenuation law formula of the single-hole blasting vibration, including: converting each single-hole blasting vibration waveform from the time domain to the frequency domain, extracting the main vibration frequency at each blasting vibration monitoring point; according to the main vibration frequency at each blasting vibration monitoring point, combined with the empirical formula of the attenuation of the main frequency of blasting vibration with distance, fitting the main frequency attenuation law formula of the single-hole blasting vibration f(d)=K(Q n / d) α / Q n, where Q is the charge per stage, d is the distance from the blasting center, K and α are attenuation coefficients, n is an exponent, 1 / 2 for step blasting, and 1 / 3 for tunnel blasting; multi-scale wavelet decomposition is performed on each of the single-hole blasting vibration waveforms, and the single-hole blasting vibration sub-waveforms in different frequency bands at each of the blasting vibration monitoring points are extracted; based on the single-hole blasting vibration sub-waveforms at each of the blasting vibration monitoring points, combined with the empirical formula for the attenuation of the vibration amplitude with distance, the sub-wave amplitude attenuation law formula of the single-hole blasting vibration with different frequency band components is fitted A(d)=A0d β , where A0 is the sub-wave amplitude at the explosion source and β is the amplitude attenuation coefficient.

[0077] Its technical effect is: through frequency domain analysis and multi-scale wavelet decomposition, the main frequency and sub-wave amplitude characteristics of blasting vibration can be extracted more accurately, and the main frequency and sub-wave amplitude attenuation law formula can be fitted. By mastering the vibration amplitude attenuation law in different frequency bands, targeted vibration control strategies can be formulated for protection objects at different distances.

[0078] In a preferred embodiment of the present invention, in the above-mentioned detonator delay setting method for coordinated control of blasting vibration amplitude and frequency, the determining of the safety vibration standard of the protected object and calculating the natural frequency of the protected object include: determining and adjusting the safety vibration standard according to the industry specifications and engineering standards of the protected object, the safety vibration standard including the safety threshold of vibration velocity and the safety threshold of vibration acceleration; calculating the natural frequency according to the structural material, geometric dimensions and boundary conditions of the protected object.

[0079] Specifically, according to the safety requirements for blasting vibration, consult relevant national standards and industry standards, compare with the blasting vibration standards applied in similar engineering projects, combine standard specifications and engineering experience, determine the safety vibration standards for the protected objects, including the safety thresholds of vibration velocity and vibration acceleration, which will serve as the basis for judging whether the blasting will cause damage to the protected objects.

[0080] Finite element method (FEM) numerical simulation technology is used to establish a three-dimensional model of the protected object, and its natural frequency is calculated by simulating the vibration response under different external forces. This includes: building a three-dimensional finite element model based on the geometric shape, material properties and boundary conditions of the protected object; simulating possible vibration loads during blasting and applying them to the numerical model; calculating the natural frequencies of each order of the protected object through numerical analysis, and extracting the first few frequencies with a relatively large energy share.

[0081] Conducting modal tests, by applying excitation to the protected object and measuring its response, actually determines its vibration frequency and mode, which can be achieved through laboratory or field testing. It includes: arranging an excitation device on the protected object to apply external vibration to it; using a vibration sensor or accelerometer to measure the vibration response of the protected object; extracting the natural frequency and vibration mode of the protected object through experimental data, and obtaining the natural frequency with a relatively large proportion of the first few orders of energy.

[0082] After calculating or testing the natural frequencies of multiple orders, the first few natural frequencies with a relatively large energy share are selected as key outputs according to the concentration of blasting vibration energy. The natural frequencies are used in the detonator delay setting process to ensure that the main vibration frequency band of the blasting vibration deviates from the natural frequency of the protected object to reduce the possibility of resonance and ensure the safety of the blasting process.

[0083] Its technical effect is: by combining national standards and industry specifications, the safety standards for blasting vibration are determined, the safety thresholds of vibration velocity and vibration acceleration are clarified, and a clear safety boundary is provided for blasting operations, ensuring that the protected objects will not be damaged by excessive vibration during the blasting process. By accurately calculating the natural frequency of the protected object, the main frequency of the blasting vibration is prevented from being close to its natural frequency, reducing the risk of resonance.

[0084] In a preferred embodiment of the present invention, in the above-mentioned method for setting the detonator delay for coordinated control of the blasting vibration amplitude and frequency, the blasting vibration response under different detonator delay conditions is calculated according to the main frequency attenuation law formula and the sub-wave amplitude attenuation law formula, and the blasting vibration amplitude and main vibration frequency band at the protected object are output, which includes: using the main frequency attenuation law formula and the sub-wave amplitude attenuation law formula, according to sub-wave superposition, each of the single-hole blasting vibration waveforms is sequentially superimposed according to the blasting hole detonation order, and the vibration response of the explosion source at different explosion center distances is calculated; according to the result of the sub-wave superposition, the detonator delay is adjusted to reduce the gain superposition between the vibration waveforms, when the protected object is closer, a shorter detonator delay should be used, and when the protected object is farther, a longer detonator delay can be used; outputting the blasting vibration amplitude A at the protected object under different detonator delay conditions final and the main oscillation frequency band f final .

[0085] Its technical effect is: by calculating the vibration response under different detonator delay conditions and adjusting the delay according to the attenuation law of the main frequency and sub-wave, the overlapping effect between vibration waveforms can be effectively reduced. Precise control is performed on the protected objects at different distances to ensure that the vibration amplitude during the blasting process is always kept within the safety standard, effectively avoiding the risk of exceeding the safety limit.

[0086] In a preferred embodiment of the present invention, in the above-mentioned method for setting the time delay of the detonator with coordinated control of the blasting vibration amplitude and frequency, the process of the wavelet superposition includes: calculating the blasting vibration superposition response of the first two blasting holes, for each of the blasting holes, calculating the blasting vibration superposition response of the first two blasting holes, for the blasting vibration superposition response, respectively calculating the main frequency attenuation f combined =∑f i (d) and the wavelet amplitude attenuation A combined =∑A i (d), where f i (d) is the main frequency amplitude of the i-th blasting hole, A i (d) is the sub-wave amplitude of the i-th blasting hole; a detonator delay is set between two blasting holes so that the waveform peaks and troughs of the first two blasting holes are superimposed; on the basis of the superposition of the first two blasting holes, a blasting vibration superposition response is calculated with the third blasting hole, and the blasting vibration response of each blasting hole is superimposed one by one until the superposition calculation of all the blasting holes is completed; and the vibration waveforms at the protected object at different distances from the center of blasting after the blasting holes of different types are detonated at the blasting source are calculated.

[0087] Its technical effect is: by gradually calculating the vibration superposition response of the blasting borehole, the gain superposition effect between vibration waveforms is effectively reduced, and the vibration peak and resonance risk are reduced.

[0088] In a preferred embodiment of the present invention, in the above-mentioned method for setting the detonator delay for coordinated control of the blasting vibration amplitude and frequency, the safety vibration standard and the natural frequency are compared with the blasting vibration amplitude and the main vibration frequency band, and adjusting the corresponding detonator delay according to the comparison result includes: comparing the blasting vibration amplitude with the safety vibration standard, if the blasting vibration amplitude is lower than the safety vibration standard, the current detonator delay does not need to be adjusted, if the blasting vibration amplitude exceeds the safety vibration standard, the detonator delay needs to be adjusted; comparing the main vibration frequency band with the natural frequency, if the difference between the main vibration frequency band and the natural frequency is not within a preset range, the current detonator delay does not need to be adjusted, if the difference between the main vibration frequency band and the natural frequency is within a preset range, the detonator delay needs to be adjusted to keep the main vibration frequency band away from the natural frequency to avoid resonance.

[0089] Its technical effect is: through real-time comparison of safety vibration standards, natural frequencies, blasting vibration amplitudes and main vibration frequency bands, the blasting vibration amplitudes can be effectively controlled and resonance can be avoided, thereby ensuring safety and reliability during the blasting process.

[0090] In a preferred embodiment of the present invention, in the above-mentioned method for setting the detonator delay with coordinated control of the blasting vibration amplitude and frequency, the method for adjusting the detonator delay includes: starting from the first detonator, adjusting the delay of each detonator one by one; after each adjustment of the delay of all the detonators, recalculating the blasting vibration amplitude and the main vibration frequency band until the safety vibration standard and the natural frequency requirements are met.

[0091] Its technical effect is: by adjusting the delay of the detonator one by one, the accuracy and effect of each adjustment are ensured, and the detonation time of each detonator is finely adjusted. After each adjustment of the detonator delay, the blasting vibration amplitude and main vibration frequency band are recalculated and compared with the safety vibration standard and natural frequency requirements, so as to flexibly adapt to different blasting environments and achieve the optimal vibration amplitude control.

[0092] The present invention is further described below through the second embodiment of the present invention. This embodiment is an open-air blasting, and the blasting holes include main blasting holes, buffer holes and pre-splitting holes. The main blasting and buffer blasting adopt a hole-by-hole detonation network, and the inter-hole delay is set to 25ms. The pre-splitting blasting adopts multi-hole simultaneous blasting, and the inter-segment delay is set to 25ms. There are concrete frame houses near the blasting area, and strict requirements are placed on the control of blasting vibration. At present, the blasting vibration at the concrete frame house is monitored to be around 2.0cm / s, which meets the blasting vibration warning standard. It is intended to reduce the blasting vibration by adjusting the electronic detonator delay, and the electronic detonator delay is determined by the method of the present invention.

[0093] This embodiment includes the following steps:

[0094] (1) Set up a typical single-hole blasting network.

[0095] The main blasting holes, buffer holes and pre-splitting holes in the open-pit blasting area are determined as typical blasting holes, and the delay of the last detonated blasting hole in the typical main blasting holes, buffer holes and pre-splitting holes is adjusted. The inter-hole delay between the last detonated main blasting hole in the main blasting hole area and the adjacent detonated main blasting holes and buffer holes is adjusted to 100ms, the inter-hole (segment) delay between the last detonated buffer hole in the buffer hole area and the adjacent detonated buffer holes and pre-splitting holes is adjusted to 100ms, and the inter-segment delay between the last detonated pre-splitting hole in the pre-splitting hole area and the adjacent detonated pre-splitting holes is adjusted to 100ms.

[0096] (2) Carry out blasting vibration monitoring to obtain typical single-hole blasting vibration waveforms.

[0097] Six blasting vibration monitoring points are arranged from near to far on the straight path between the open-air blasting area and the concrete frame house. The distance between the blasting vibration monitoring points gradually increases from the blasting source to the concrete frame house. Two blasting vibration monitoring points are arranged at the concrete frame house. By comparing the blasting initiation network and the blasting vibration monitoring waveform, the typical single-hole (segment) blasting vibration waveforms of the main blasting hole, buffer hole and pre-cracking hole are extracted respectively.

[0098] (3) Determine the vibration attenuation law of single-hole blasting in different frequency ranges.

[0099] The measured blasting vibration waveform at each monitoring point is analyzed in the frequency domain. In this example, Fourier transform is used to analyze the measured blasting vibration waveform in the frequency domain to determine the main frequency of single-hole (segment) blasting vibration of typical main blasting holes, buffer holes and pre-splitting holes at each monitoring point. According to the attenuation formula of the main frequency of blasting vibration, the attenuation law of the main frequency of single-hole (segment) blasting vibration of typical main blasting holes, buffer holes and pre-splitting holes is fitted.

[0100] The measured blasting vibration waveform at each monitoring point is subjected to wavelet decomposition. In this example, the wavelet packet decomposition method is used to decompose the measured blasting vibration waveform. The frequency band of each wavelet is decomposed into 10 frequency bands of 0 to 200 Hz and 1 frequency band greater than 200 Hz. The blasting vibration sub-waveforms of different frequency band components of single-hole (segment) blasting vibration of typical main blasting holes, buffer holes and pre-cracking holes at each monitoring point are obtained. According to the blasting vibration amplitude attenuation formula (Sadovsky formula), the attenuation law of the blasting vibration sub-waveform amplitude of different frequency band components is fitted.

[0101] (4) Determine the safety vibration standard of the protected object and calculate the natural frequency of the protected object.

[0102] According to national and industry standards and similar engineering experience, the main frequency of open-air blasting vibration is within 10-50Hz, so the safety vibration standard of the concrete frame house to be protected is determined to be 2.0cm / s. Through theoretical estimation, the first-order natural frequency of the concrete frame house to be protected is 4.6Hz.

[0103] (5) Calculation of blasting vibration response under different delays.

[0104] The analysis found that the gain superposition of the blasting vibration waveform was obvious, and it was proposed to appropriately extend the delay setting based on the existing electronic detonator delay. The delay interval between the first and second blasting holes was set to 30ms. According to the attenuation law of the main frequency of the single-hole blasting and the attenuation law of the wavelet blasting vibration amplitude obtained in step (3), based on the wavelet waveforms of each frequency band of the single-hole blasting, the superposition results of the blasting vibration of the first and second blasting holes at the concrete frame house of the protected object were superimposed and inferred, and the blasting vibration amplitude at the protected object was output as 1.0cm / s and the main frequency was 25.2Hz.

[0105] (6) Optimize and determine the delay setting of electronic detonators.

[0106] The amplitude of the superimposed blasting vibration of the first and second blast holes is 1.0 cm / s, and the main frequency is 25.2 Hz, which is similar to the amplitude of the single hole blasting vibration, indicating that the superimposed gain phenomenon has been effectively adjusted, and the main frequency is also far away from the multiples of the natural frequency of the concrete frame house, indicating that the delay interval of the electronic detonator of the first and second blast holes is reasonable. Then calculate the delay interval between the second detonation blast hole and the third detonation blast hole according to steps (5) and (6), and repeat this cycle until the delay of all blast holes is determined.

[0107] It should be understood that the above specific embodiments of the present invention are only used to illustrate or explain the principles of the present invention, and do not constitute a limitation of the present invention. Therefore, any modifications, equivalent substitutions, improvements, etc. made without departing from the spirit and scope of the present invention should be included in the protection scope of the present invention. In addition, the appended claims of the present invention are intended to cover all changes and modifications that fall within the scope and boundaries of the appended claims, or the equivalent forms of such scope and boundaries.

Claims

1. A method for setting the time delay of a detonator by coordinated control of the amplitude and frequency of blasting vibration. It is characterized in that include: Set up a typical blasthole single-hole detonation network in the blasting area; Set up blasting vibration monitoring points, conduct blasting vibration monitoring, and obtain single-hole blasting vibration waveforms; Performing frequency domain analysis on each of the single-hole blasting vibration waveforms to obtain a main frequency attenuation law formula and a sub-wave amplitude attenuation law formula of the single-hole blasting vibration; Determine the safety vibration standard of the protected object and calculate the natural frequency of the protected object; According to the main frequency attenuation law and the sub-wave amplitude attenuation law, the blasting vibration response under different detonator delay conditions is calculated, and the blasting vibration amplitude and main vibration frequency band at the protected object are output; The safety vibration standard and the natural frequency are compared with the blasting vibration amplitude and the main vibration frequency band, and the corresponding detonator delay is adjusted according to the comparison result.

2. The method for setting the time delay of a detonator by coordinated control of the blasting vibration amplitude and frequency according to claim 1, It is characterized in that The typical blast hole single hole detonation network is set in the blasting area, including: Determine the blasting holes in the blasting area according to the blasting type; Grouping the blasting holes of the same type to form a typical blasting hole group; Setting the detonator detonation time of each typical blasthole group; A detonator delay is set separately for the last detonating blasthole in each of the typical blasthole groups.

3. The method for setting the time delay of a detonator by coordinated control of the blasting vibration amplitude and frequency according to claim 2, It is characterized in that The time difference between the detonation time of the last detonation hole in each typical blast hole group and the detonation time of the adjacent blast hole is greater than 50ms.

4. The method for setting the time delay of a detonator by coordinated control of the blasting vibration amplitude and frequency according to claim 1, It is characterized in that The setting of blasting vibration monitoring points, performing blasting vibration monitoring, and obtaining single-hole blasting vibration waveforms includes: Determine the relative position of the explosion source and the protected object; Select a straight line path from the blasting source to the protected object, and arrange blasting vibration monitoring points on the straight line path; The distance between the blasting vibration monitoring points gradually increases from the blasting source to the protected object; At least one blasting vibration monitoring point is arranged at the protected object; A vibration sensor is installed at each of the blasting vibration monitoring points; Blasting operations are carried out to collect single-hole blasting vibration waveforms at each of the blasting vibration monitoring points.

5. The method for setting the time delay of a detonator by coordinated control of blasting vibration amplitude and frequency according to claim 3, It is characterized in that The frequency domain analysis of each single-hole blasting vibration waveform is performed to obtain the main frequency attenuation law formula and the sub-wave amplitude attenuation law formula of the single-hole blasting vibration, including: Convert each of the single-hole blasting vibration waveforms from the time domain to the frequency domain, and extract the main vibration frequency at each of the blasting vibration monitoring points; According to the main vibration frequency at each blasting vibration monitoring point, combined with the empirical formula of the main frequency attenuation of blasting vibration with distance, the main frequency attenuation law formula of single-hole blasting vibration is fitted: f(d) = K(Q n / d) α / Q n , where Q is the charge per stage, d is the distance from the blast center, K and α are the attenuation coefficients, n is the exponent, step blasting is 1 / 2, and tunnel blasting is 1 / 3; Performing multi-scale wavelet decomposition on each of the single-hole blasting vibration waveforms to extract the single-hole blasting vibration sub-waveforms within different frequency bands at each of the blasting vibration monitoring points; According to the single-hole blasting vibration sub-waveform at each blasting vibration monitoring point, combined with the empirical formula of vibration amplitude attenuation with distance, the sub-wave amplitude attenuation law formula of single-hole blasting vibration with different frequency band components is fitted: A(d)=A 0 d β , where A 0 is the sub-wave amplitude at the explosion source, and β is the amplitude attenuation coefficient.

6. The method for setting the time delay of a detonator by coordinated control of blasting vibration amplitude and frequency according to claim 1, It is characterized in that Determining the safety vibration standard of the protected object and calculating the natural frequency of the protected object comprises: Determine and adjust the safety vibration standard according to the industry norms and engineering standards of the protected object, wherein the safety vibration standard includes the safety threshold of the vibration velocity and the safety threshold of the vibration acceleration; The natural frequency is calculated according to the structural material, geometric dimensions and boundary conditions of the protected object.

7. The method for setting the time delay of a detonator by coordinated control of blasting vibration amplitude and frequency according to claim 5, It is characterized in that The calculation of the blasting vibration response under different detonator delay conditions according to the main frequency attenuation law formula and the sub-wave amplitude attenuation law formula, and the output of the blasting vibration amplitude and main vibration frequency band at the protected object include: Using the main frequency attenuation law formula and the sub-wave amplitude attenuation law formula, according to sub-wave superposition, each of the single-hole blasting vibration waveforms is superimposed in sequence according to the blast hole detonation order, and the vibration response of the blast source at different explosion center distances is calculated; According to the result of the sub-wave superposition, the delay of the detonator is adjusted to reduce the gain superposition between the vibration waveforms; Output the blasting vibration amplitude A at the protected object under different detonator delay conditions final and the main oscillation frequency band f final .

8. The method for setting the time delay of a detonator by coordinated control of blasting vibration amplitude and frequency according to claim 7, It is characterized in that The process of wavelet superposition includes: Calculate the blasting vibration superposition response of the first two blasting holes, and for the blasting vibration superposition response, calculate the main frequency attenuation f combined =∑f i (d) and the wavelet amplitude attenuation A combined =∑A i (d), where f i (d) is the main frequency amplitude of the i-th blasting hole, A i (d) is the sub-wave amplitude of the i-th blasting hole; Setting a detonator delay between two blasting holes so that the peaks and troughs of the waveforms of the first two blasting holes overlap; On the basis of the waveform superposition of the first two blasting holes, the blasting vibration superposition response is calculated with the third blasting hole, and the blasting vibration response of each blasting hole is superimposed one by one until the superposition calculation of all the blasting holes is completed; The vibration waveforms of the protected object at different distances from the explosion center after the different types of blast holes at the explosion source are detonated are calculated.

9. The method for setting the time delay of a detonator by coordinated control of blasting vibration amplitude and frequency according to claim 1, It is characterized in that The comparing the safety vibration standard and the natural frequency with the blasting vibration amplitude and the main vibration frequency band, and adjusting the corresponding detonator delay according to the comparison result comprises: Comparing the blasting vibration amplitude with the safety vibration standard, if the blasting vibration amplitude is lower than the safety vibration standard, the current detonator delay does not need to be adjusted, and if the blasting vibration amplitude exceeds the safety vibration standard, the detonator delay needs to be adjusted; Compare the main oscillation frequency band with the natural frequency. If the difference between the main oscillation frequency band and the natural frequency is not within the preset range, the current detonator delay does not need to be adjusted. If the difference between the main oscillation frequency band and the natural frequency is within the preset range, the detonator delay needs to be adjusted.

10. The method for setting the time delay of a detonator by coordinated control of blasting vibration amplitude and frequency according to claim 9, It is characterized in that The method for adjusting the detonator delay comprises: Starting from the first detonator, adjusting the delay of each of said detonators one by one; After the delay of all the detonators is adjusted each time, the blasting vibration amplitude and the main vibration frequency band are recalculated until the safety vibration standard and the natural frequency requirements are met.

Citation Information

Patent Citations

  • Blasting vibration predicting method

    CN102135445A

  • Initiation control methods to reduce blasting vibration effects

    CN102269553A

  • Staggered-phase damping type blasting method

    CN102829678A

  • Test method of blasting vibration attenuation effect

    CN106840381A

  • Accurate delay control blasting delay parameter design method based on multi-target control

    CN112034006A

Cited By

  • Safe blasting construction method

    CN119989474A

  • Blasting vibration prediction method and device based on different seed waveforms

    CN121026309A