Suspension bridge catwalk erection displacement steel frame and construction method thereof

By using the catwalk to erect the displacement steel frame and hanging basket structure on the suspension bridge, the safety risks and low construction efficiency of the catwalk load-bearing rope displacement in the super-large span suspension bridge are solved, and the efficient assembly of the catwalk surface network is achieved. Improved construction efficiency.

CN118932874APending Publication Date: 2024-11-12CCCC SHEC FOURTH ENG
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411242447.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-05
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

In the construction of the superstructure of the suspension bridge, the displacement process of the cat-road load-bearing rope has problems such as safety risks and low construction efficiency, especially in the super-large span suspension bridge. Traditional methods require long-term pulling of the wire rope and frequent adjustment of the brackets height affects construction progress and safety.

Method used

The suspension bridge catwalk is used to erect the displacement steel frame, which includes an anchor seat, a limit plate and a hanging basket. The linear displacement of the load-bearing rope is achieved through the limit block, avoiding the long-term force operation of the steel rope, and designing the hanging basket To keep the working surface height unchanged and adapt to changes in the line shape of the catwalk.

Benefits of technology

The continuous operation of the assembly of the Maodao surface net is realized, the construction efficiency and safety is improved, the complexity of the tower top structure is reduced, the installation volume of steel structure is reduced, the construction cycle is shortened, high-altitude hanging operations are avoided, and the operation personnel are ensured. safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118932874A_ABST
    Figure CN118932874A_ABST
Patent Text Reader

Abstract

The invention discloses a deflection steel frame for erecting a catwalk of a suspension bridge and a construction method thereof.The two ends of the deflection steel frame are provided with an anchoring base and a limiting plate respectively, a bearing rope penetrates through the anchoring base and the limiting plate, and the bottom of one end of the deflection steel frame is connected with a hanging basket. The construction period can be shortened, the construction difficulty can be reduced, and the continuity and convenience of catwalk construction can be improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the field of suspension bridge construction, and in particular relates to a displacement steel frame for erecting a catwalk of a suspension bridge and a construction method thereof. Background Art

[0002] In the construction of the superstructure of the suspension bridge, the catwalk is the lifeline of the superstructure of the entire bridge. It is difficult to install and has a long existence time. It is the most important temporary structure of the entire project. When a three-span continuous catwalk structure is used, a variable steel frame is required to be set up to collect and divide the catwalk load-bearing ropes to smoothly cross the tower. How to quickly anchor the variable load-bearing ropes plays an important role in project safety management and progress control. At the same time, as a flexible structure, the line shape of the catwalk is constantly changing due to the sliding of the catwalk surface net assembly, the erection of the stiffening beam and the top push of the main cable saddle. The height difference of the load-bearing rope line at the variable steel frame on the top of the tower changes greatly, affecting the project progress, cost, work efficiency and construction safety quality control.

[0003] At present, the displacement of the load-bearing rope of the catwalk adopts upper and lower clamps or U-shaped anchoring. When the load-bearing rope is displaced, it is necessary to first pull the load-bearing rope to the designed position by the pulling wire rope, and then anchor the load-bearing rope with bolts. The load-bearing rope force of the super-large span suspension bridge is large, and the corresponding maximum displacement pulling force is up to 17t. During the period of bolt tightening and anchoring, the pulling wire rope is under force for a long time, and the risk of rebound of the pulling wire rope is high. The displacement anchoring takes a long time, and the safety of the operator is difficult to guarantee.

[0004] At present, one type of traditional catwalk erection process is to adopt a three-span continuous catwalk design. This method sets a complex steel structure or Bailey structure cantilevered tower top working platform on the tower top, and an adjustable height scaffolding or steel support is set on the working platform. The operators stand on the steel support and the variable position steel frame to coordinate the assembly of the catwalk surface net; the catwalk is a flexible structure and its line shape is constantly changing during the erection of the catwalk surface net and the erection of the stiffening beam. Therefore, the operator is required to constantly adjust the height of the scaffolding or steel support to ensure that the operator's position meets the needs of the superstructure construction. For super-large span suspension bridges, the tower top working platform method not only requires the erection of scaffolding or steel supports tens of meters high on the platform, but also requires the lowering of the support height when the catwalk line shape changes to avoid spatial conflicts. This method not only has a high safety risk, but also the frequent adjustment of the support height makes the catwalk construction discontinuous, affecting the construction period.

[0005] The other method adopts a three-span separated catwalk design with independent side spans and middle spans. This method sets additional anchoring devices, working platforms and adjustable-height steel supports on the top of the tower. When the catwalk is erected, operators stand on the steel supports and the catwalk load-bearing ropes to coordinate the assembly of the catwalk surface net. It has difficulties such as many embedded components, a large anchoring system, and a complex anchoring structure. The main tower is high, and there is a great safety risk in installing the anchoring system. It also prolongs the catwalk erection period, which is not conducive to cost control.

[0006] The invention patent with the publication number CN106758859A was disclosed on May 31, 2017, and the name is a suspension bridge catwalk bearing rope relocation fixing device and method. A crossbeam is set on the catwalk surface net below the cable clamp near the main tower and the loose cable saddle on the side span of the bridge. The bearing rope and the crossbeam are fixed with U-shaped bolts from the bottom of the catwalk bearing rope upward; the lower ends of the two tie rods are respectively connected to the two ends of the crossbeam by bolts, and the upper ends of the two tie rods are respectively connected to the two sides of the upper cable clamp by bolts; then the catwalk surface net layer above the three bearing ropes on the inner side of the catwalk to be relocated is removed, and then the three bearing ropes on the inner side are loosened one by one; finally, the three bearing ropes on the inner side of the catwalk are respectively firmly connected with the three bearing ropes on the outer side to complete the relocation. The suspension bridge catwalk bearing rope relocation fixing device and method cannot solve the above-mentioned technical problems. Summary of the invention

[0007] The purpose of the present invention is to provide a suspension bridge catwalk erection displacement steel frame and a construction method thereof, which has a simple structure, shortens the construction period, reduces the construction difficulty, and improves the continuity and convenience of catwalk construction.

[0008] In order to achieve the above object, the technical solution adopted by the present invention is:

[0009] The catwalk of the suspension bridge is equipped with a displaceable steel frame, and anchor seats and limit plates are respectively arranged at both ends of the displaceable steel frame. Load-bearing ropes are passed through the anchor seats and the limit plates, and a hanging basket is connected to the bottom of one end of the displaceable steel frame.

[0010] The displaceable steel frame includes a main crossbeam, the anchor seat is arranged at both ends of the main crossbeam near the tower end of the displaceable steel frame, the limit plate is arranged on the main crossbeam at the far tower end of the displaceable steel frame, a notch is arranged on the side of the limit plate, a limit screw is connected to the limit block, the limit screw presses the limit plate, the anchor seat is provided with an anchor hole, and the load-bearing rope passes through the anchor hole and the notch.

[0011] The anchoring seat and the limiting plate are arranged in one-to-one correspondence, and the anchoring seat and the limiting plate are symmetrically arranged about the middle part of the main beam; the anchoring holes are arranged at equal intervals on the anchoring seat, and the limiting plates are arranged at equal intervals on the main beam, and the spacing of the load-bearing cables gradually decreases from the anchoring seat to the limiting plate.

[0012] The notch is U-shaped, and the inner diameter of the notch is larger than the diameter of the load-bearing rope; the notch is arranged on one side of the limiting plate close to the middle of the main beam.

[0013] A handrail column is provided at the end of the displacement steel frame, and a handrail rope and a protective rope are passed through the handrail column. The handrail rope is located at the top of the handrail column, and the protective rope is located below the handrail rope.

[0014] The hanging basket is arranged horizontally, and connecting columns are arranged on the hanging basket. Longitudinal beams are connected between the main beams, and connecting flanges are arranged at the ends of the longitudinal beams and the tops of the connecting columns. Guardrails are arranged on the sides of the hanging basket, and the bottom of the hanging basket and the guardrails are both frame-shaped structures.

[0015] An oblique connection is provided between the longitudinal beams, one end of the oblique connection is fixedly connected to the middle of the longitudinal beam, and the other end is fixedly connected to the middle of the main cross beam; a transverse connection is provided between the ends of the longitudinal beams, and a reinforcing rib is provided at the bottom end of the handrail column.

[0016] The main cross beam and the middle part of the transverse connection are both provided with connecting plates, and the handrail column can be detachably connected to the displacement steel frame.

[0017] The bottom of the displacement steel frame is connected with a pull-down device, and the pull-down device comprises a steel wire rope.

[0018] The construction method of the suspension bridge catwalk erection displacement steel frame is realized by using the above-mentioned suspension bridge catwalk erection displacement steel frame, and comprises the following steps:

[0019] Step 1: Set up the catwalk load-bearing rope;

[0020] Step 2: Assemble the displacement steel frame and lift it;

[0021] Step 3: Connect the anchor seat near the tower end of the displacement steel frame to the load-bearing rope;

[0022] Step 4: The displacement steel frame far tower end limit plate completes the displacement and anchoring of the load-bearing rope;

[0023] Step 5: Install catwalk crossbeams, catwalk surface nets and transverse channels;

[0024] Step 6: Install the pull-down device on the displacement steel frame;

[0025] Step 7: Complete the installation of the catwalk one by one.

[0026] The technical effects of the present invention are as follows: the displacement steel frame for erecting a catwalk on a suspension bridge and the construction method thereof are used to achieve displacement of the load-bearing rope line through the limit block, so that the load-bearing rope line is parallel to the main cable line, and the unification of the catwalk surface net assembly working surface is achieved. The hanging basket is designed so that the relative height of the upper and lower working surfaces during the catwalk erection is not affected by the change of the catwalk line shape and remains unchanged, overcoming the difficulties of large structural deformation, long erection distance, and long erection period during the erection of the catwalk of a super-large span suspension bridge, and achieving continuous operation of laying the catwalk surface net. The operators are also in a safer working space, further improving the work efficiency of the catwalk erection. The displacement steel frame for erecting a catwalk on a suspension bridge and the construction method thereof completely replace the role of the traditional tower top platform, optimize the tower top space structure, and achieve the dual goals of safe and efficient production and saving manpower and material resources.

[0027] The overall structure of the displacement steel frame and the hanging basket is simple, easy to manufacture, low in cost, good in applicability, and has strong practicality and application prospects. After the displacement steel frame is equipped with the hanging basket, its installation position is no longer restricted by the tower top platform, and can be independently installed at any part of the tower area. It has good adaptability to the pre-bias design of super-long span suspension bridges, and can be coordinated and adjusted to any spatial position with the changes in the catwalk line caused by the top push of the main cable saddle and the erection of the stiffening beam.

[0028] The design of the lateral opening of the limit block achieves the effect of displacement and anchoring of the load-bearing rope, fundamentally eliminating the long-term force operation of pulling the wire rope, without the risk of rebound, effectively ensuring the protection and safety of the operators, and can efficiently and safely complete the displacement and anchoring of the load-bearing rope.

[0029] Compared with the traditional construction method, the use of the displacement steel frame construction method for erecting the catwalk of the suspension bridge solves the problems of the working surface's non-adaptive catwalk line changes and the anchoring of the load-bearing rope belt force. At the same time, it overcomes the large deformation characteristic of the catwalk as a flexible structure, and also realizes the displacement and anchoring of the load-bearing rope, reduces the complexity of the tower top structure, simplifies the tower top structure, greatly improves construction efficiency, reduces the installation and use of steel structures, shortens the upper structure construction period, avoids high-altitude suspended assembly operations as much as possible, and achieves dual optimization of safety and economy.

[0030] In summary, it adapts to the design and structural characteristics of extra-large span suspension bridges, replaces the unreasonable and inappropriate practices in the current construction process of suspension bridge superstructures, plays a significant role in the construction of suspension bridge superstructures, is suitable for the rapid displacement of load-bearing ropes of catwalks on extra-large span suspension bridges, realizes efficient assembly of catwalk surface nets, greatly improves the efficiency of catwalk erection and superstructure construction, is suitable for suspension bridges with a large pre-offset design of the main cable saddle, and has wide applicability to catwalk erection and suspension bridge superstructure construction under similar construction conditions in the future. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] This specification includes the following drawings, which show the following contents:

[0032] Figure 1 It is a side view of a displacement steel frame for erecting a catwalk of a suspension bridge of the present invention;

[0033] Figure 2 It is a top view of the displacement steel frame for erecting the catwalk of the suspension bridge of the present invention;

[0034] Figure 3-1 and Figure 3-2 It is a side view and a top view of the hanging basket of the present invention;

[0035] Figure 4 It is a structural schematic diagram of the main cross beam of the displacement steel frame near the tower end of the present invention;

[0036] Figure 5 It is a structural schematic diagram of the main cross beam at the far tower end of the displacement steel frame of the present invention;

[0037] Figure 6 It is a structural schematic diagram of the limiting plate of the present invention;

[0038] Figure 7 It is an operation flow chart of the installation of the displacement steel frame and catwalk of the present invention;

[0039] Figure 8 It is a structural schematic diagram of a three-span continuous catwalk of the present invention. DETAILED DESCRIPTION

[0040] The specific implementation methods of the present invention are further explained in detail below by describing the embodiments with reference to the accompanying drawings, with the aim of helping those skilled in the art to have a more complete, accurate and in-depth understanding of the inventive concept and technical solution of the present invention and facilitating their implementation.

[0041] like Figure 1 and Figure 2 As shown, the catwalk of the suspension bridge is equipped with a shifting steel frame, at both ends of which are provided with an anchor seat and a limit plate, load-bearing ropes penetrate the anchor seat and the limit plate, and a hanging basket is connected to the bottom of one end of the shifting steel frame.

[0042] The configuration of the hanging basket on the displacement steel frame realizes the unification of the displacement of the catwalk's load-bearing rope and the assembly of the catwalk's surface net. The operator stands in the hanging basket as the working surface for the assembly and lowering of the catwalk surface net, which can ensure that this operating surface is always at the same height as the catwalk, significantly improving the continuity and convenience of the catwalk construction. The hanging basket and the displacement steel frame are connected as a whole through the connecting flange. The hanging basket is suspended on the displacement steel frame, and then the displacement steel frame is anchored to the load-bearing rope. As the catwalk is erected and moved, the hanging basket is located below the displacement steel frame. The position of the hanging basket and the displacement steel frame always remains unchanged relative to the catwalk, so there is no need to change the position of the hanging basket, which greatly improves the convenience of construction.

[0043] Compared with traditional processes, the construction method of the catwalk of the suspension bridge with a variable steel frame meets the design of the super-large span suspension bridge structure. The design adopts a three-span continuous catwalk structure, which can better adapt to the changes in the main cable line type during the construction of the upper structure of the suspension bridge. It not only eliminates the design and installation of the tower top working platform and the adjustable height scaffolding or steel support, but also eliminates the need for additional load-bearing rope anchoring devices on the tower top. It effectively reduces the complexity of the tower top structure, saves a lot of materials and labor, greatly improves the safety and economy of the suspension bridge upper structure construction process, and fundamentally eliminates the huge safety hazards brought by the tower top working platform, load-bearing rope anchoring devices, scaffolding or steel supports during installation and use.

[0044] like Figure 2As shown, the displacement steel frame includes a main beam, an anchor seat is arranged at both ends of the main beam near the tower end of the displacement steel frame, a limit plate is arranged on the main beam at the far tower end of the displacement steel frame, a notch is arranged on the side of the limit plate, a limit screw is connected to the limit block, the limit screw presses the limit plate, an anchor hole is arranged on the anchor seat, and the load-bearing rope passes through the anchor hole and the notch. The limit block is used to anchor the load-bearing rope after displacement, and the load-bearing rope can be directly hung into the notch to achieve anchoring. After the load-bearing rope is displaced into the groove, the limit screw is immediately installed to prevent the load-bearing rope from jumping out of the groove. Compared with the method of pulling by pulling the wire rope and anchoring with bolts, the load-bearing rope is located in the notch and is restricted by the multi-directional constraints of the limit block, and its anchoring effect is more reliable.

[0045] like Figure 2 As shown, after the load-bearing rope passes through the anchor holes and notches in sequence, the load-bearing rope is constrained by the notches, and the plane spacing of the load-bearing rope is reduced, so that the load-bearing rope line shape can be adjusted to be in a stable design position, and the load-bearing rope line shape is ensured to be parallel to the main cable line shape. Combined with the unified effect of the hanging basket and the displacement steel frame working surface, the unified assembly working surface of the catwalk surface net is achieved, thereby adapting to the continuous change of the catwalk line shape of the flexible structure, reducing the height difference of the load-bearing rope line shape, and making the catwalk erection process more convenient and orderly. During the displacement process of the load-bearing rope, compared with the traditional displacement method, it avoids the long-term force operation of the traction wire rope, there is no risk of rebound, effectively ensures the protection safety of the operators, and can efficiently and safely complete the displacement and anchoring of the load-bearing rope.

[0046] like Figure 2 As shown, the anchor seat and the limit plate are arranged one by one, and the anchor seat and the limit plate are symmetrically arranged about the middle of the main beam; the anchor holes are arranged at equal intervals on the anchor seat, and the limit plates are arranged at equal intervals on the main beam, and the spacing of the load-bearing cables gradually decreases from the anchor seat to the limit plate. The anchor seat is an upper and lower pressure plate structure, which are connected and fixed to the main beam by bolts, which is convenient for installation and disassembly; the limit block is welded to the main beam and forms a whole with the displacement steel frame; the spacing of the limit plate is smaller than the spacing of the corresponding anchor seat, and the limit plate reduces the plane spacing of the densely arranged load-bearing ropes and limits their adjacent spacing and positions, so as to realize the displacement of the load-bearing ropes through the tower top.

[0047] like Figure 6 As shown, the notch is U-shaped, and the inner diameter of the notch is larger than the diameter of the load-bearing rope; the notch is set on one side of the limit plate close to the middle of the main beam. The U-shaped notch can reduce the wear on the load-bearing rope, and the notch is finely processed by planing and milling technology to make it slightly larger than the diameter of the load-bearing rope, which is convenient for the load-bearing rope to pass through; the load-bearing rope will generate an outward force when it is gathered inward. The design position of the above notch can avoid the load-bearing rope from contacting the limit screw and causing excessive force on it, ensuring the reliable connection effect of the limit screw.

[0048] like Figure 1 and Figure 2As shown, a handrail column is provided at the end of the displacement steel frame, and a handrail rope and a protective rope are passed through the handrail column. The handrail rope is located at the top of the handrail column, and the protective rope is located below the handrail rope. The handrail column fixes the distance between the handrail rope and the protective rope, which is conducive to reducing the disturbance of the rope and ensuring the safety of the construction personnel in the process of setting up the catwalk on the displacement steel frame. There are multiple protective ropes to improve the protection effect. A steel plate mesh is also provided on the hanging basket, which plays the role of safety protection and filtering separation. The hanging basket is mainly composed of connecting columns, main crossbeams, main longitudinal beams, ordinary crossbeams, ordinary longitudinal beams and protective railings. The connecting columns, main crossbeams and main longitudinal beams are made of channel steel; the crossbeams and longitudinal beams are made of I-beams; the protective railings are made of seamless steel pipes, and all components are connected by welding. The finished hanging basket is transported to the construction site as a whole, connected to the displacement steel frame through a connecting flange, and then hoisted to the installation position as a whole. There are multiple connecting columns, the hanging basket has high connection stability, and the connecting flange is inclined to ensure that the hanging basket is horizontal when the displacement steel frame is in an inclined posture, providing a safe and reliable working space for construction workers during the catwalk construction process.

[0049] like Figure 3-1 and Figure 3-2 As shown, the hanging basket is arranged horizontally, and a connecting column is arranged on the hanging basket. A longitudinal beam is connected between the main beams. A connecting flange is arranged at the end of the longitudinal beam and the top of the connecting column. A guardrail is arranged on the side of the hanging basket, and the bottom of the hanging basket and the guardrail are both frame-shaped structures. An oblique connection is arranged between the longitudinal beams, one end of the oblique connection is fixedly connected to the middle of the longitudinal beam, and the other end is fixedly connected to the middle of the main beam; a transverse connection is arranged between the ends of the longitudinal beams, and a reinforcing rib is arranged at the bottom of the handrail column. The above structure can improve the overall strength of the displacement steel frame and ensure that it does not deform. The displacement steel frame adopts steel as the main material of its main beam, longitudinal beam and transverse connection system in design, and welding is adopted between each component to improve production efficiency. The handrail column steel is anchored to the main beam by bolt connection, the load-bearing rope transfer device is welded to the main beam, and the hanging basket connection flange is welded to the lower part of the far tower end of the displacement steel frame.

[0050] like Figure 2 As shown, the main crossbeam and the middle of the transverse connection are both provided with connecting plates, and the handrail column can be detachably connected to the displacement steel frame. The displacement steel frame can be disassembled and installed along the middle thereof, and the handrail column can also be disassembled and installed. Through bolt connection and disassembly, the components of the displacement steel frame have the functions of pre-assembly and modular installation, which improves the construction efficiency, reduces the volume of the components during transportation, facilitates disassembly and pre-assembly on site, and facilitates production and component replacement in production.

[0051] like Figure 1 As shown, a pull-down device is connected to the bottom of the displacement steel frame, and the pull-down device includes a steel wire rope. The pull-down device can be used to adjust the catwalk line shape. After the winch on the tower seat is started, the steel wire rope drives the anchor seat to move, which can drive the displacement bracket to move, and the displacement bracket drives the load-bearing rope to move, thereby realizing the adjustment of the catwalk line shape.

[0052] The construction method of the suspension bridge catwalk erection displacement steel frame is realized by using the above-mentioned suspension bridge catwalk erection displacement steel frame, and comprises the following steps:

[0053] Step 1: Set up the catwalk load-bearing rope;

[0054] Step 2: Assemble the displacement steel frame and lift it;

[0055] Step 3: Connect the anchor seat near the tower end of the displacement steel frame to the load-bearing rope;

[0056] Step 4: The displacement steel frame far tower end limit plate completes the displacement and anchoring of the load-bearing rope;

[0057] Step 5: Install catwalk crossbeams, catwalk surface nets and transverse channels;

[0058] Step 6: Install the pull-down device on the displacement steel frame;

[0059] Step 7: Complete the installation of the catwalk one by one.

[0060] The construction process of catwalk erection for suspension bridge is as follows: a catwalk is set up below the center line of the main cable. The catwalk structure adopts a three-span continuous structure, and the design and installation of the tower top anchor device are cancelled, which greatly speeds up the catwalk erection progress. A single catwalk is equipped with 10 load-bearing ropes, and a variable steel frame is set up in the tower area to retract and extend the catwalk load-bearing ropes to meet the needs of crossing the main tower.

[0061] The bracket method is used to complete the traction and erection of the three-span continuous catwalk load-bearing ropes, and the load-bearing ropes are densely distributed on both sides. The displacement steel frame and hanging basket are manufactured by the steel structure processing plant and pre-assembled on site. After being disassembled and transported to the site, they are assembled into a whole through bolt connection and hoisted by a tower crane to the designed anchor position on the catwalk load-bearing rope.

[0062] During anchoring, the operator stands on the displacement steel frame, first completes the connection between the load-bearing rope and the displacement steel frame near the tower end anchor seat, then sets a steering pulley at the displacement of the displacement steel frame far from the tower end, guides the steering pulley after the rope is released from the tower top winch, and vertically connects the load-bearing rope to be displaced through the shackle, starts the tower top winch and slowly pulls the load-bearing rope to be displaced slightly beyond the lateral opening limit block, guides the load-bearing rope into the limit block through the crowbar, and loosens the rope of the tower top winch. At this time, the load-bearing rope is tightly stuck in the limit block, and the displacement of the load-bearing rope has been completed. Finally, the limit screw is installed to prevent the load-bearing rope from jumping. The displacement of the load-bearing rope of a single catwalk is carried out symmetrically and synchronously from the outside to the inside.

[0063] The assembly of the catwalk surface net is completed by operators on two working surfaces, the shifting steel frame and the hanging basket. At this time, the shifting steel frame and its construction method for the catwalk erection of the suspension bridge play the role of assembling the catwalk surface net and the starting position for the descent. The operators on the shifting steel frame and the hanging basket are located at the upper and lower levels of the catwalk respectively, and jointly complete the installation of the catwalk crossbeams, catwalk surface nets and transverse channels. When the overall installation of the catwalk reaches the designed length, it will slide down to the designed position as a whole, and this cycle will be repeated until the entire catwalk erection work is completed.

[0064] The displacement steel frame and construction method for erecting the catwalk of a suspension bridge realize the displacement of the load-bearing rope line through the limit block, realize the parallelism of the load-bearing rope line and the main cable line, realize the unification of the catwalk surface net assembly working surface, and design the hanging basket so that the relative height of the upper and lower working surfaces during the catwalk erection is not affected by the change of the catwalk line shape and remains unchanged, overcoming the difficulties of large structural deformation, long erection distance, and long erection period during the erection of the catwalk of a super-large span suspension bridge, realizing the continuous operation of the catwalk surface net laying, and the operators are also in a safer working space, further improving the work efficiency of the catwalk erection. The displacement steel frame and construction method for erecting the catwalk of a suspension bridge completely replace the role of the traditional tower top platform, optimize the tower top space structure, and achieve the dual goals of safe and efficient production and saving manpower and material resources.

[0065] The overall structure of the displacement steel frame and the hanging basket is simple, easy to manufacture, low in cost, good in applicability, and has strong practicality and application prospects. After the displacement steel frame is equipped with the hanging basket, its installation position is no longer restricted by the tower top platform, and can be independently installed at any part of the tower area. It has good adaptability to the pre-bias design of super-long span suspension bridges, and can be coordinated and adjusted to any spatial position with the changes in the catwalk line caused by the top push of the main cable saddle and the erection of the stiffening beam.

[0066] The design of the lateral opening of the limit block achieves the effect of displacement and anchoring of the load-bearing rope, fundamentally eliminating the long-term force operation of pulling the wire rope, without the risk of rebound, effectively ensuring the protection and safety of the operators, and can efficiently and safely complete the displacement and anchoring of the load-bearing rope.

[0067] Compared with the traditional construction method, the use of the displacement steel frame construction method for erecting the catwalk of the suspension bridge solves the problems of the working surface's non-adaptive catwalk line changes and the anchoring of the load-bearing rope belt force. At the same time, it overcomes the large deformation characteristic of the catwalk as a flexible structure, and also realizes the displacement and anchoring of the load-bearing rope, reduces the complexity of the tower top structure, simplifies the tower top structure, greatly improves construction efficiency, reduces the installation and use of steel structures, shortens the upper structure construction period, avoids high-altitude suspended assembly operations as much as possible, and achieves dual optimization of safety and economy.

[0068] In summary, it adapts to the design and structural characteristics of extra-large span suspension bridges, replaces the unreasonable and inappropriate practices in the current construction process of suspension bridge superstructures, plays a significant role in the construction of suspension bridge superstructures, is suitable for the rapid displacement of load-bearing ropes of catwalks on extra-large span suspension bridges, realizes efficient assembly of catwalk surface nets, greatly improves the efficiency of catwalk erection and superstructure construction, is suitable for suspension bridges with a large pre-offset design of the main cable saddle, and has wide applicability to catwalk erection and suspension bridge superstructure construction under similar construction conditions in the future.

[0069] The present invention is described above by way of example in conjunction with the accompanying drawings. Obviously, the specific implementation of the present invention is not limited to the above-mentioned methods. As long as various non-substantial improvements are made using the method concept and technical solution of the present invention; or the above concept and technical solution of the present invention are directly applied to other occasions without improvement, they are all within the protection scope of the present invention.

Claims

1. A displacement steel frame for erecting a catwalk on a suspension bridge, characterized in that: Anchor seats and limit plates are respectively arranged at both ends of the displacement steel frame, and load-bearing ropes are passed through the anchor seats and the limit plates. A hanging basket is connected to the bottom of one end of the displacement steel frame.

2. The displacement steel frame for erecting a catwalk for a suspension bridge according to claim 1, characterized in that: The displaceable steel frame includes a main crossbeam, the anchor seat is arranged at both ends of the main crossbeam near the tower end of the displaceable steel frame, the limit plate is arranged on the main crossbeam at the far tower end of the displaceable steel frame, a notch is arranged on the side of the limit plate, a limit screw is connected to the limit block, the limit screw presses the limit plate, the anchor seat is provided with an anchor hole, and the load-bearing rope passes through the anchor hole and the notch.

3. The displacement steel frame for erecting a catwalk for a suspension bridge according to claim 2 is characterized in that: The anchoring seat and the limiting plate are arranged in one-to-one correspondence, and the anchoring seat and the limiting plate are symmetrically arranged about the middle part of the main beam; the anchoring holes are arranged at equal intervals on the anchoring seat, and the limiting plates are arranged at equal intervals on the main beam, and the spacing of the load-bearing cables gradually decreases from the anchoring seat to the limiting plate.

4. The displacement steel frame for erecting a catwalk for a suspension bridge according to claim 3 is characterized in that: The notch is U-shaped, and the inner diameter of the notch is larger than the diameter of the load-bearing rope; the notch is arranged on one side of the limiting plate close to the middle of the main beam.

5. The displacement steel frame for erecting a catwalk for a suspension bridge according to any one of claims 1 to 4, characterized in that: A handrail column is provided at the end of the displacement steel frame, and a handrail rope and a protective rope are passed through the handrail column. The handrail rope is located at the top of the handrail column, and the protective rope is located below the handrail rope.

6. The displacement steel frame for erecting a catwalk for a suspension bridge according to claim 5, characterized in that: The hanging basket is arranged horizontally, and connecting columns are arranged on the hanging basket. Longitudinal beams are connected between the main beams, and connecting flanges are arranged at the ends of the longitudinal beams and the tops of the connecting columns. Guardrails are arranged on the sides of the hanging basket, and the bottom of the hanging basket and the guardrails are both frame-shaped structures.

7. The displacement steel frame for erecting a catwalk for a suspension bridge according to claim 6, characterized in that: An oblique connection is provided between the longitudinal beams, one end of the oblique connection is fixedly connected to the middle of the longitudinal beam, and the other end is fixedly connected to the middle of the main cross beam; a transverse connection is provided between the ends of the longitudinal beams, and a reinforcing rib is provided at the bottom end of the handrail column.

8. The displacement steel frame for erecting a catwalk for a suspension bridge according to claim 7, characterized in that: The main cross beam and the middle part of the transverse connection are both provided with connecting plates, and the handrail column can be detachably connected to the displacement steel frame.

9. The displacement steel frame for erecting a catwalk for a suspension bridge according to claim 1, characterized in that: The bottom of the displacement steel frame is connected with a pull-down device, and the pull-down device comprises a steel wire rope.

10. A construction method for erecting a displacement steel frame for a suspension bridge catwalk, which is implemented by using the displacement steel frame for erecting a suspension bridge catwalk according to any one of claims 1 to 9, characterized in that: The following steps are involved: Step 1: Set up the catwalk load-bearing rope; Step 2: Assemble the displacement steel frame and lift it; Step 3: Connect the anchor seat near the tower end of the displacement steel frame to the load-bearing rope; Step 4: The displacement steel frame far tower end limit plate completes the displacement and anchoring of the load-bearing rope; Step 5: Install catwalk crossbeams, catwalk surface nets and transverse channels; Step 6: Install the pull-down device on the displacement steel frame; Step 7: Complete the installation of the catwalk one by one.