Water storage brick with drainage and water storage integrated function and construction method thereof

By designing water storage bricks with integrated drainage and water storage functions, combining super permeable materials and high-performance concrete, the existing water storage bricks have been solved, and the effective utilization of rainwater resources and road drying is achieved. Reduces safety hazards and urban drainage pressure.

CN118996942APending Publication Date: 2024-11-22HUNAN UNIV OF TECH +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411401495.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Priority Date
2024-09-05
Filing Date
2024-10-09
Publication Date
2024-11-22

AI Technical Summary

Technical Problem

The existing water storage bricks have small support area, poor compression resistance, easy to break, unstable laying, easy to loosen, easy to block the drainage channel, single function, it is difficult to take into account both drainage and water storage, and it is impossible to effectively utilize rainwater resources, especially in extreme weather. The road surface is slippery and has great safety risks.

Method used

Design a water storage brick with integrated drainage and water storage function. It can be detachably connected through the clamping part of the upper brick body and the lower brick body, and combines the first and second protrusions with super permeable materials to set up an arch-shaped drainage The passage and water storage cavity are made of ultra-high performance concrete and fiber reinforced materials to ensure firm laying and permeability. The brick body is secure and drained through construction methods such as measuring and laying, base leveling, and seam filling and maintenance.

Benefits of technology

It has achieved effective recycling and utilization of rainwater resources, reduced urban drainage pressure, prevented pollution, ensured dry road surfaces, and reduced safety hazards. It is suitable for large-area brick paving, and has good economic benefits and practical value.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118996942A_ABST
    Figure CN118996942A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of water storage bricks, and particularly relates to a water storage brick with a drainage and water storage integrated function and a construction method thereof.The water storage brick comprises an upper brick body, a lower brick body is correspondingly arranged at the bottom end of the upper brick body, the upper brick body and the lower brick body are detachably connected through a clamping part, and first protruding parts are fixedly connected to the side walls of the periphery of the upper brick body correspondingly; second protruding parts are fixedly connected to the side walls of the periphery of the lower brick body respectively, the first protruding parts correspond to the second protruding parts, a drainage part is arranged at the bottom end of the upper brick body, and a water storage part is arranged at the top end of the lower brick body. Water can be stored in summer, evaporation of stored water in summer can reduce the temperature of the road surface, relieve the heat island effect and relieve urban drainage and flood control pressure, the good effects of preventing pollution of public waters and treating sewage are achieved, rainwater resources are effectively utilized, the road surface is kept dry, splashing of rainwater and sewage is avoided, and the comfort degree of pedestrians is guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of water storage bricks, and in particular relates to a water storage brick with integrated drainage and water storage functions and a construction method thereof. Background Art

[0002] With the increasing scarcity of global water resources and the acceleration of urbanization, countries around the world are paying more and more attention to the collection and utilization of rainwater. By converting rainwater into usable water resources, water storage bricks can not only reduce the burden on urban drainage systems, but also provide cities with a sustainable way of water supply, which helps to alleviate the heat island effect. However, the common water storage bricks currently have the disadvantages of small support area, poor compressive strength, and easy breakage. Common water storage bricks also have the disadvantages of loose laying, easy loosening, easy blockage of water storage cavities and arched drainage channels, single drainage and storage functions, only water permeable or only water storage, difficult to take into account, and unable to cope with extreme weather. In heavy rain and flood seasons, it is easy to be blocked, drainage is not smooth, and water is retained, resulting in slippery roads, which is easy to cause safety accidents. Under the trampling and rolling of pedestrians and vehicles, it splashes everywhere, affecting normal use, and cannot retain and effectively utilize rainwater resources.

[0003] Therefore, it is necessary to design a water storage brick with integrated drainage and water storage functions and a construction method thereof to solve the above problems. Summary of the invention

[0004] The purpose of the present invention is to provide a water storage brick with integrated drainage and water storage functions and a construction method thereof, so as to solve the problems that the water storage cavity and the arched drainage channel are easy to be blocked, the drainage and storage functions are single, and the laying is not firm, easy to loosen, low in strength, easy to break, difficult to balance drainage and water storage, and cannot effectively utilize rainwater resources.

[0005] To achieve the above-mentioned purpose, the present invention provides the following solution: a water storage brick with integrated drainage and water storage functions, comprising an upper brick body, a lower brick body is correspondingly arranged at the bottom end of the upper brick body, the upper brick body and the lower brick body are detachably connected by a clamping part, the side walls around the upper brick body are respectively fixedly connected with a first protrusion, the side walls around the lower brick body are respectively fixedly connected with a second protrusion, the first protrusion and the second protrusion are arranged correspondingly, the bottom end of the upper brick body is provided with a drainage part, and the top of the lower brick body is provided with a water storage part.

[0006] Preferably, the first protrusion comprises an upper first protrusion and an upper second protrusion, the upper first protrusion and the upper second protrusion are both fixedly connected to the side wall of the upper brick body, and the upper second protrusion is arranged corresponding to the drainage portion.

[0007] Preferably, the upper first protrusion and the upper second protrusion are asymmetric with respect to a center line of the upper brick body side wall.

[0008] Preferably, the second protrusion includes two lower protrusions, the lower protrusions are fixedly connected to the side wall of the lower brick body, one of the lower protrusions is arranged corresponding to the upper first protrusion, and the other lower protrusion is arranged corresponding to the upper second protrusion.

[0009] Preferably, the drainage portion includes four arched drainage channels, which are opened at the bottom end of the upper brick body, two of the arched drainage channels form a group, the two arched drainage channels in each group are parallel and spaced apart, the two groups of arched drainage channels are perpendicular to each other, and the two upper second protrusions are correspondingly arranged at both ends of one of the arched drainage channels.

[0010] Preferably, the water storage part comprises a plurality of water storage cavities, the water storage cavities are opened at the top of the lower brick body, and the plurality of water storage cavities are arranged in an array.

[0011] Preferably, the clamping portion includes a plurality of tongue-and-groove clamping blocks and a plurality of grooves, the tongue-and-groove clamping blocks are fixedly connected to the middle of the bottom end of the upper brick body side wall, the grooves are arranged in the middle of the top end of the lower brick body side wall, and the tongue-and-groove clamping blocks are adapted to the grooves.

[0012] A method for constructing a water storage brick with integrated drainage and water storage functions, comprising the following steps:

[0013] S1. Brick selection;

[0014] S2, measurement and setting out;

[0015] S3, base leveling;

[0016] S4, brick laying;

[0017] S5, plane elevation detection;

[0018] S6. Grouting and maintenance.

[0019] Compared with the prior art, the present invention has the following advantages and technical effects:

[0020] The water storage part concentrates rainwater, which is conducive to the recycling of rainwater resources, maintaining soil moisture, and having a good effect on municipal maintenance; the arched drainage part utilizes the arched force characteristics to facilitate the upper brick body to bear force, and the drainage parts are interconnected, which is convenient for drainage and not easy to be blocked, reducing the pressure of urban drainage and flood control, and has a good effect on preventing pollution of public waters and treating sewage. The first raised part and the second raised part make the water storage brick more closely combined with the super-permeable material, ensuring that the laying is firm and not easy to loosen; at the same time, it can play a role of limiting, making the brick body not easy to slide, and easy to lay. The upper brick body and the lower brick body are easy to assemble and construct independently, and at the same time, the clamping part and the connecting part make the upper brick body and the lower brick body more closely embedded and not easy to loosen. Water storage bricks have integrated functions of drainage and water storage, and can meet the needs of water storage and drainage at the same time; they solve the problem of road surface waterlogging in rainy and flood environments, ensure the road surface is dry, reduce safety hazards, and facilitate travel; they store water in the dry season, and the evaporation of water can reduce the road surface temperature, alleviate the heat island effect, and facilitate construction. They are particularly suitable for large-area brick paving and have great practical value and good economic benefits. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments are briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For those of ordinary skill in the art, other drawings can be obtained based on these drawings without creative labor:

[0022] Figure 1 It is a schematic diagram of the overall structure of the present invention;

[0023] Figure 2 It is a schematic diagram of the upper brick structure of the present invention;

[0024] Figure 3 This is a schematic diagram of the lower brick structure of the present invention;

[0025] Figure 4 This is a schematic diagram of the laying effect of the present invention;

[0026] Figure 5 This is a structural diagram of Embodiment 2 of the present invention;

[0027] Figure 6 It is a cross-sectional view of the second embodiment of the present invention;

[0028] Figure 7 This is a structural diagram of Embodiment 3 of the present invention;

[0029] Figure 8 This is a cross-sectional view of Embodiment 3 of the present invention;

[0030] Fig. 9This is a structural diagram of Embodiment 4 of the present invention;

[0031] Fig.10 This is a structural diagram of Embodiment 5 of the present invention;

[0032] Fig.11 This is a schematic diagram of the upper brick body of the fifth embodiment of the present invention;

[0033] Fig.12 This is a schematic diagram of the lower brick body of the fifth embodiment of the present invention.

[0034] Among them, 1. upper brick body; 2. lower brick body; 3. upper first protrusion; 4. upper second protrusion; 5. lower protrusion; 6. arched drainage channel; 7. tongue and groove block; 8. water storage cavity; 9. groove; 10. first grouting channel; 11. positive drop-shaped groove; 12. reverse drop-shaped groove; 13. second grouting channel; 14. reverse vortex groove; 15. through channel; 16. right-angle protrusion; 17. straight plate protrusion; 18. square groove; 19. super permeable material. DETAILED DESCRIPTION

[0035] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0036] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the present invention is further described in detail below with reference to the accompanying drawings and specific embodiments.

[0037] Embodiment 1:

[0038] Reference Figures 1 to 4 As shown, the present embodiment provides a water storage brick with integrated drainage and water storage functions, including an upper brick body 1, a lower brick body 2 is correspondingly arranged at the bottom end of the upper brick body 1, the upper brick body 1 and the lower brick body 2 are detachably connected by a clamping part, the side walls around the upper brick body 1 are respectively fixedly connected with a first protrusion, the side walls around the lower brick body 2 are respectively fixedly connected with a second protrusion, the first protrusion and the second protrusion are arranged correspondingly, a drainage part is arranged at the bottom end of the upper brick body 1, and a water storage part is arranged at the top end of the lower brick body 2.

[0039] The upper brick body 1 and the lower brick body 2 are one or more of ultra-high performance concrete water storage bricks, ultra-high performance fiber reinforced concrete bricks, grouting fiber concrete bricks, ordinary sintered water storage bricks, and non-sintered concrete water storage bricks.

[0040] According to a further optimized solution, the first protrusion includes an upper first protrusion 3 and an upper second protrusion 4, both of which are fixedly connected to the side wall of the upper brick body 1, and the upper second protrusion 4 is arranged corresponding to the drainage portion.

[0041] According to a further optimized solution, the upper first protrusion 3 and the upper second protrusion 4 are asymmetric with respect to the center line of the side wall of the upper brick body 1 .

[0042] According to a further optimized solution, the second raised portion includes two lower protrusions 5 , which are fixedly connected to the side wall of the lower brick body 2 , one lower protrusion 5 is arranged corresponding to the upper first protrusion 3 , and the other lower protrusion 5 is arranged corresponding to the upper second protrusion 4 .

[0043] The upper first protrusion 3, the upper second protrusion 4 and the lower protrusion 5 are all semicircular columnar protrusions.

[0044] A further optimized solution is that the drainage part includes four arched drainage channels 6, which are opened at the bottom end of the upper brick body 1, two arched drainage channels 6 form a group, and the two arched drainage channels 6 in each group are parallel and spaced apart. The two groups of arched drainage channels 6 are perpendicular to each other, and the two upper second protrusions 4 are correspondingly arranged at both ends of an arched drainage channel 6.

[0045] According to a further optimization scheme, the water storage part includes a plurality of water storage cavities 8, and the water storage cavities 8 are opened at the top of the lower brick body 2, and the plurality of water storage cavities 8 are arranged in an array.

[0046] The shape of the water storage cavity 8 is one of a hemispherical shape, a hemispherical shape, a cubic shape, and a rectangular parallelepiped shape.

[0047] To further optimize the solution, the clamping part includes a plurality of tongue-and-groove blocks 7 and a plurality of grooves 9. The tongue-and-groove blocks 7 are fixedly connected to the middle of the bottom end of the side wall of the upper brick body 1. The grooves 9 are arranged in the middle of the top end of the side wall of the lower brick body 2. The tongue-and-groove blocks 7 are adapted to the grooves 9.

[0048] A method for constructing a water storage brick with integrated drainage and water storage functions, comprising the following steps:

[0049] S1. Brick selection;

[0050] Select upper brick body 1 and lower brick body 2 of appropriate specifications;

[0051] S2, measurement and setting out;

[0052] Before brick construction, measurement and layout are carried out according to the designed plane and elevation to control the elevation and direction;

[0053] S3, base leveling;

[0054] Level the base according to the measured position and elevation. If the base has defects, use the same material as the base for leveling.

[0055] S4, brick laying;

[0056] The strength and thickness of the mortar used for paving bricks should meet the design requirements. The mortar paving width should be 50mm to 100mm greater than the brick width;

[0057] First lay the lower brick body 2, and after the paving is completed, align the upper brick body 1 with the grooves 9 set around the lower brick body 2 and clamp it;

[0058] When laying bricks, they should be gently placed flat and tapped with a rubber hammer to stabilize them, but the corners of the upper brick body 1 and the lower brick body 2 should not be damaged;

[0059] If the mortar layer is uneven, the bricks should be picked up and re-leveled with mortar. It is strictly forbidden to fill the bottom of the bricks with mortar or support broken bricks.

[0060] The spacing of the brick joints is determined by the upper first protrusion 3, the upper second protrusion 4, and the lower protrusion 5;

[0061] After the first row of tiles is completed and corrected, move the line horizontally and lay the tiles in sequence according to the above method. When laying, pay attention to keeping it flat with the adjacent bricks. If the specifications or geometric shapes of the bricks are different, adjust them at any time during laying to make the gaps consistent in width;

[0062] S5, plane elevation detection;

[0063] After the bricks are laid, the plane and elevation of the bricks should be checked. If the plane and elevation exceed the specified value, they should be reworked. The stability and surface flatness of the bricks should also be checked. If the bricks are found to be loose, they should be repaired immediately.

[0064] S6, grouting and maintenance;

[0065] After the bricks are laid, grouting can be carried out only after inspection and approval. The super permeable material 19 is used as a filler to fill the adjacent brick joints. After the super permeable material 19 solidifies, it can be used after curing to reach the design strength requirements, and the construction is completed.

[0066] The upper first protrusion 3, the upper second protrusion 4 of the side wall of the upper brick body 1 and the lower protrusion 5 of the side wall of the lower brick body 2 are embedded with the super water-permeable material 19, which can effectively solve the problems of the existing water storage bricks being loose due to years of use and trampling by pedestrians and vehicles.

[0067] The arched drainage channels 6 are interconnected to facilitate the flow of water between the brick bodies, prevent blockage in the individual bricks and prevent water from being discharged in time, and make the urban flood control and drainage system more integrated and reasonable;

[0068] During construction, super permeable material 19 is laid on the side of the brick body, and the super permeable material 19 is tightly combined with the water storage brick. The super permeable material 19 penetrates rainwater, flows into the water storage cavity 8 and then is retained in the water storage cavity 8. When the water in the water storage cavity 8 is saturated, it is concentrated and converged into the urban drainage system through the connected arched drainage channel 6, ensuring the use of the water storage brick in extreme environments such as heavy rain and floods, preventing water accumulation, ensuring the dryness of the road surface, and improving the comfort of use;

[0069] This embodiment can store rainwater during normal use and evaporate it in summer to reduce the road surface temperature, alleviate the heat island effect, and combine it with urban greening to provide water for green plants and reduce the cost of municipal maintenance;

[0070] When laid in special environments, it can effectively collect sewage, prevent pollution of public waters, and facilitate centralized treatment of sewage.

[0071] Embodiment 2:

[0072] Reference Figures 5 and 6 As shown, the difference between this embodiment and the first embodiment is that the four corners of the upper brick body 1 are respectively provided with first grouting channels 10, the bottom end of the first grouting channel 10 is connected to a positive drop-shaped groove 11, the first grouting channel 10 and the positive drop-shaped groove 11 together penetrate the upper brick body 1 from top to bottom, and the four corners of the top end of the lower brick body 2 are respectively provided with reverse drop-shaped grooves 12, and the reverse drop-shaped grooves 12 are correspondingly connected to the positive drop-shaped grooves 11.

[0073] The first grouting channel 10 is large at the top and small at the bottom and is truncated. The first grouting channel 10, the positive drop-shaped groove 11, and the reverse drop-shaped groove 12 of this embodiment can be reserved when making the brick body, and cast on site when laying the brick body. The slurry cast on site is one or more of ultra-high performance concrete, fiber concrete, and high-strength grouting material.

[0074] Embodiment three:

[0075] Reference Figures 7 and 8 As shown, the difference between this embodiment and the first embodiment is that second grouting channels 13 are respectively opened at the four corners of the upper brick body 1, and the second grouting channel 13 penetrates the upper brick body 1 from top to bottom, and reverse vortex grooves 14 are respectively opened at the four corners of the top of the lower brick body 2, and the reverse vortex grooves 14 are correspondingly connected to the second grouting channels 13.

[0076] The second grouting channel 13 is larger at the top and smaller at the bottom and is truncated. The second grouting channel 13 and the reverse spiral groove 14 of this embodiment can be reserved when making the brick body, and cast on site when laying the brick body. The slurry cast on site is one or more of ultra-high performance concrete, fiber concrete, and high-strength grouting material.

[0077] Embodiment 4:

[0078] Reference Fig. 9 As shown, the difference between this embodiment and the first embodiment is that a through channel 15 is provided through the middle of the side wall of the upper brick body 1, and the through channel 15 corresponds to and fits with the groove 9. The through channel 15 and the groove 9 of this embodiment can be reserved when the brick body is made, and the brick body is cast on site when it is laid, and the slurry cast on site is one or more of ultra-high performance concrete, fiber concrete, and high-strength grouting material.

[0079] Embodiment five:

[0080] Reference Figures 10 to 12 As shown, the difference between this embodiment and the first embodiment lies in that right-angled protrusions 16 are fixedly connected to the four corners of the bottom end of the upper brick body 1, a straight plate protrusion 17 is arranged between any two adjacent right-angled protrusions 16, all the right-angled protrusions 16 and the straight plate protrusions 17 form a regular quadrilateral, and a square groove 18 is provided at the top of the lower brick body 2, and the regular quadrilateral formed by the right-angled protrusions 16 and the straight plate protrusions 17 is adapted to the square groove 18.

[0081] The right-angle protrusions 16, the straight plate protrusions 17 and the square grooves 18 can improve the stability of the connection between the upper brick body 1 and the lower brick body 2.

[0082] In the description of the present invention, it should be understood that the terms "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside" and "outside" etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.

[0083] The embodiments described above are only descriptions of the preferred embodiments of the present invention, and are not intended to limit the scope of the present invention. Without departing from the design spirit of the present invention, various modifications and improvements made to the technical solutions of the present invention by ordinary technicians in this field should fall within the protection scope of the present invention.

Claims

1. A water storage brick with integrated drainage and water storage functions, characterized in that: The utility model comprises an upper brick body (1), wherein a lower brick body (2) is arranged at the bottom end of the upper brick body (1) in a corresponding manner, wherein the upper brick body (1) and the lower brick body (2) are detachably connected via a clamping portion, wherein the side walls around the upper brick body (1) are respectively fixedly connected with a first protrusion, and the side walls around the lower brick body (2) are respectively fixedly connected with a second protrusion, wherein the first protrusion and the second protrusion are arranged in correspondence, wherein a drainage portion is arranged at the bottom end of the upper brick body (1), and a water storage portion is arranged at the top end of the lower brick body (2).

2. The water storage brick with integrated drainage and water storage function according to claim 1, characterized in that: The first protrusion comprises an upper first protrusion (3) and an upper second protrusion (4); the upper first protrusion (3) and the upper second protrusion (4) are both fixedly connected to the side wall of the upper brick body (1); and the upper second protrusion (4) is arranged corresponding to the drainage portion.

3. The water storage brick with integrated drainage and water storage function according to claim 2, characterized in that: The upper first protrusion (3) and the upper second protrusion (4) are asymmetrical with respect to the center line of the side wall of the upper brick body (1).

4. The water storage brick with integrated drainage and water storage function according to claim 2, characterized in that: The second raised portion comprises two lower protrusions (5), the lower protrusions (5) being fixedly connected to the side wall of the lower brick body (2), one of the lower protrusions (5) being arranged correspondingly to the upper first protrusion (3), and the other lower protrusion (5) being arranged correspondingly to the upper second protrusion (4).

5. The water storage brick with integrated drainage and water storage function according to claim 2, characterized in that: The drainage portion comprises four arched drainage channels (6), wherein the arched drainage channels (6) are opened at the bottom end of the upper brick body (1), two of the arched drainage channels (6) form a group, and the two arched drainage channels (6) in each group are arranged in parallel and at intervals, and the two groups of arched drainage channels (6) are perpendicular to each other, and the two upper second protrusions (4) are correspondingly arranged at the two ends of one of the arched drainage channels (6).

6. The water storage brick with integrated drainage and water storage function according to claim 1, characterized in that: The water storage part comprises a plurality of water storage cavities (8), wherein the water storage cavities (8) are opened at the top of the lower brick body (2), and the plurality of water storage cavities (8) are arranged in an array.

7. The water storage brick with integrated drainage and water storage function according to claim 1, characterized in that: The clamping portion comprises a plurality of tongue-and-groove clamping blocks (7) and a plurality of grooves (9); the tongue-and-groove clamping blocks (7) are fixedly connected to the middle of the bottom end of the side wall of the upper brick body (1); the groove (9) is arranged in the middle of the top end of the side wall of the lower brick body (2); and the tongue-and-groove clamping blocks (7) are adapted to the grooves (9).

8. A method for constructing a water storage brick with integrated drainage and water storage functions according to any one of claims 1 to 7, characterized in that: The following steps are involved: S1. Brick selection; S2, measurement and setting out; S3, base leveling; S4, brick laying; S5, plane elevation detection; S6. Grouting and maintenance.