Air tightness testing device for pressure pipeline

Through the remote control platform, the solenoid valve and remote pressure gauge are connected, which solves the problems of low accuracy and safety risks of manual control in the existing pressure pipeline testing methods, and achieves high accuracy and safety automated test data recording.

CN118999948APending Publication Date: 2024-11-22武汉地铁股份有限公司 +1
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411343817.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-25
Publication Date
2024-11-22

AI Technical Summary

Technical Problem

The existing pressure pipeline testing methods require manual pressure control, which is not accurate and has safety risks. The data recording is not automated, and poor communication may lead to safety accidents.

Method used

A pressure pipeline airtightness test device is designed, and a remote control platform is used to connect the solenoid valve and the remote pressure gauge, and remote control and real-time data monitoring are realized through a wireless data transmission module. The solenoid valve replaces manual operation, and the pressure data is automatically recorded and stored.

Benefits of technology

It improves the accuracy and safety of the test, reduces the risk of manual operation in high-voltage areas, realizes automated data recording and remote control, and enhances the degree of informatization.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118999948A_ABST
    Figure CN118999948A_ABST
Patent Text Reader

Abstract

The invention provides a pressure pipeline air tightness testing device which comprises an air supply unit, a first electromagnetic valve is installed on an external air supply pipeline of the air supply unit, the first electromagnetic valve is connected with the head end of a pressure pipeline in a building after passing through a first teletransmission pressure gauge, and a second teletransmission pressure gauge is installed at the tail end of the pressure pipeline. The second teletransmission pressure gauge is connected with the second electromagnetic valve, and the first electromagnetic valve, the first teletransmission pressure gauge, the second teletransmission pressure gauge and the second electromagnetic valve are respectively connected with the control platform. The electromagnetic valve is adopted to replace manual work to release and close gas supplied by the gas supply unit, and the precision is high; in the pressure testing process, the first teletransmission pressure gauge and the second teletransmission pressure gauge transmit real-time pressure data to the control platform and display the real-time pressure data on the control panel, the whole testing process is carried out in a remote control mode, workers do not need to enter a high-pressure area for operation, and safety is high.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of pipeline testing, and in particular to a pressure pipeline air tightness testing device. Background Art

[0002] In some factories and special buildings, various gases often need to be transported through pressure pipes, so the air tightness of these pressure pipes is very important. In order to test whether there is leakage in the pipeline, the common method of pressure testing the pipeline network is as follows: 1. Install a nitrogen bottle, valve and pressure gauge at the head end of the pipeline network, and install a pressure gauge at the end of the pipeline network; 2. Loosen the valve of the nitrogen bottle, and the pipeline begins to be filled with nitrogen; 3. When the pressure of the two pressure gauges at the beginning and end of the pipeline reaches 5MPa, close the valve of the nitrogen bottle, and take photos of the pressure values ​​of the two pressure gauges at the beginning and end for preservation; 4. After keeping it for 3-5 minutes, observe whether the pressure values ​​in the pressure gauges at the beginning and end change: if the pressure value changes, it means there is leakage, and the pipeline should be checked immediately; if the pressure value of the pressure gauge remains unchanged, it means that there is no leakage in the pipeline, take photos of the two pressure gauges at the beginning and end for preservation, and proceed to the next step; 5. If there is no gas leakage under the previous pressure condition, loosen the valve of the nitrogen bottle again to pressurize slightly again, and the pressurization amplitude is carried out according to the design requirements. Repeat steps 3 and 4 until the pressure value of the pressure gauge reaches the design requirements. After the pressure test is passed, the test process ends.

[0003] When implementing this process, there are the following problems: 1. Each pressurization requires manual control, which is slow, not very accurate, has large error accumulation, and is complex to control; 2. Each time you need to take a photo and add a watermark, and then export it from the mobile phone, it cannot be automatically recorded; 3. Manual confirmation is required at both ends before proceeding to the next step. The beginning and end of the pipeline are often far apart, and poor communication can easily lead to safety accidents; 4. Personnel need to record pressure values ​​near the high-pressure area, which poses a safety risk. Therefore, it is necessary to invent a pressure pipeline air tightness test device that can remotely perform air tightness tests on pressure pipelines at multiple pressure values ​​and save the data in the pressure gauge to avoid the danger of manual operation. Summary of the invention

[0004] The purpose of the present invention is to provide a pressure pipeline air tightness test device, wherein a first solenoid valve, a first remote pressure gauge, a second remote pressure gauge, and a second solenoid valve are respectively connected to a control platform, and the entire test process is performed in a remote control manner, and the staff does not need to enter the high-pressure area to operate, which is highly safe. In order to achieve the above technical features, the purpose of the present invention is achieved as follows: A pressure pipeline air tightness testing device comprises an air supply unit, wherein a first solenoid valve is installed on the external air supply pipeline of the air supply unit, the first solenoid valve is connected to the head end of the pressure pipeline in a building through a first remote pressure gauge, a second remote pressure gauge is installed at the end of the pressure pipeline, the second remote pressure gauge is connected to the second solenoid valve, and the first solenoid valve, the first remote pressure gauge, the second remote pressure gauge and the second solenoid valve are respectively connected to a control platform.

[0005] The second solenoid valve is connected to the gas collection system.

[0006] The gas collection system comprises an air compressor connected to the second solenoid valve and a gas collection tank connected to the air compressor.

[0007] The first solenoid valve and the second solenoid valve are connected to the control platform via wireless data transmission modules respectively.

[0008] The gas supply unit is a nitrogen tank.

[0009] A method for using a pressure pipeline air tightness testing device comprises the following steps: S1: First complete the installation of the device of the present application, and set the first solenoid valve and the second solenoid valve to a closed state; S2: Start the gas supply unit, and send an opening command to the first solenoid valve through the control platform, the gas in the gas supply unit starts to enter the pressure pipe, the control platform receives the air pressure values ​​of the first remote pressure gauge and the second remote pressure gauge and displays them on the control panel display screen of the control platform, when the air pressure values ​​of the first remote pressure gauge and the second remote pressure gauge both reach the initial preset value, send a closing command to the first solenoid valve through the control platform, and then close the first solenoid valve; S3: The timing module of the control platform starts timing. After t minutes, the pressure values ​​of the first remote pressure gauge and the second remote pressure gauge are observed through the control panel of the control platform to see if there is any change: if the pressure value changes, it means there is a gas leak, and the test is stopped immediately to check the pipeline; if the pressure value remains unchanged, it means that there is no gas leakage in the pressure pipeline, and the pressure values ​​of the first remote pressure gauge and the second remote pressure gauge are stored in the database of the control platform; S4: If there is no leakage under the previous pressure condition, the control platform sends an opening command to the first solenoid valve again, and the gas in the gas supply unit is started to enter the pressure pipeline to achieve re-pressurization. The pressurization amplitude is determined according to the design. Steps S3 and S4 are repeated until the pressure values ​​of the first remote pressure gauge and the second remote pressure gauge both meet the specified requirements; S5: After the specified pressure test is passed, an opening command is sent to the second solenoid valve through the control platform. The gas in the pressure pipe flows into the air compressor through the second solenoid valve, and then the air compressor compresses the gas into the gas collection tank. The test process ends.

[0010] The present invention connects the first solenoid valve, the first remote pressure gauge, the second remote pressure gauge and the second solenoid valve to the control platform respectively, and adopts the solenoid valve to replace manual release and closing of the gas supplied by the gas supply unit, with high accuracy; during the pressure test process, the first remote pressure gauge and the second remote pressure gauge transmit the real-time pressure data to the control platform and display it on the control panel, so that the control platform can monitor the pressure changes at both ends of the pressure pipeline in real time, and decide the next operation according to the pressure change value, and automatically record the pressure test data and form a pressure test statistical report stored in the database of the control platform, with high informatization; the whole test process is carried out in a remote control manner, and the staff does not need to enter the high-pressure area to operate, so it is highly safe. BRIEF DESCRIPTION OF THE DRAWINGS

[0011] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.

[0012] Figure 1 A schematic diagram of the connection structure of a pressure pipeline air tightness test device during operation provided by an embodiment of the present invention; Figure 2 A schematic diagram of a multi-channel pipeline provided by an embodiment of the present invention; Figure 3 A logic diagram of a pressure pipeline air tightness testing device provided by an embodiment of the present invention; In the figure: air supply unit 1, first solenoid valve 2, multi-channel pipeline 3, access port 301, output port 302, first remote pressure gauge 4, pressure pipeline 5, second remote pressure gauge 6, second solenoid valve 7, air compressor 8, plug 9, gas collection tank 10. DETAILED DESCRIPTION

[0013] The embodiments of the present invention are further described below in conjunction with the accompanying drawings.

[0014] Example 1: See attached Figure 1-3 A pressure pipeline air tightness testing device comprises an air supply unit 1, a first solenoid valve 2 is installed on the external air supply pipeline of the air supply unit 1, the first solenoid valve 2 is connected to the head end of a pressure pipeline 5 in a building through a first remote pressure gauge 4, a second remote pressure gauge 6 is installed at the end of the pressure pipeline 5, the second remote pressure gauge 6 is connected to a second solenoid valve 7, the first solenoid valve 2, the first remote pressure gauge 4, the second remote pressure gauge 6, and the second solenoid valve 7 are respectively connected to a control platform.

[0015] The present invention connects the first solenoid valve 2, the first remote pressure gauge 4, the second remote pressure gauge 6, and the second solenoid valve 7 to the control platform respectively, and adopts the solenoid valve to replace the manual release and closing of the gas supplied by the gas supply unit 1, with high accuracy; during the pressure test, the first remote pressure gauge 4 and the second remote pressure gauge 6 transmit the real-time pressure data to the control platform and display it on the control panel, so that the control platform can monitor the pressure changes at both ends of the pressure pipeline in real time, and decide the next operation according to the pressure change value, and automatically record the pressure test data and form a pressure test statistical report stored in the database of the control platform, with a high degree of informatization; the entire test process is carried out in a remote control manner, and the staff does not need to enter the high-pressure area to operate, so it is highly safe.

[0016] Furthermore, the second solenoid valve 7 is connected to a gas collection system to avoid waste of compressed gas.

[0017] Furthermore, the gas collection system includes an air compressor 8 connected to the second solenoid valve 7 and a gas collection tank 10 connected to the air compressor 8 .

[0018] Furthermore, the first solenoid valve 2 and the second solenoid valve 7 are respectively connected to the control platform via wireless data transmission modules, thereby simplifying the installation of the solenoid valves.

[0019] Furthermore, the gas supply unit 1 is a nitrogen tank.

[0020] Furthermore, the first solenoid valve 2 is connected to the first remote pressure gauge 4 through the multi-channel pipeline 3. The multi-channel pipeline 3 has multiple access ports 301 and an output port 302. The access port 301 can be connected to the air supply unit 1 through the first solenoid valve 2. The control platform can control multiple first solenoid valves 2, thereby avoiding the operator from manually replacing the air supply unit 1. The operator can seal the access ports that are not needed through the plug 9.

[0021] Embodiment 2: A method for using a pressure pipeline air tightness testing device, comprising the following steps: S1: First complete the installation of the device of the present application, and set the first solenoid valve 2 and the second solenoid valve 7 to a closed state; S2: Start the gas supply unit 1, and send an opening command to the first solenoid valve 2 through the control platform, the gas in the gas supply unit 1 starts to enter the pressure pipe 5, the control platform receives the air pressure values ​​of the first remote pressure gauge 4 and the second remote pressure gauge 6 and displays them on the control panel display screen of the control platform, when the air pressure values ​​of the first remote pressure gauge 4 and the second remote pressure gauge 6 both reach the initial preset value, send a closing command to the first solenoid valve 2 through the control platform, and then close the first solenoid valve 2; S3: The timing module of the control platform starts timing. After 5 minutes, the pressure values ​​of the first remote pressure gauge 4 and the second remote pressure gauge 6 are observed through the control panel of the control platform to see if there are any changes: if the pressure values ​​change, it means there is a gas leak, and the test is stopped immediately to check the pipeline; if the pressure values ​​remain unchanged, it means that there is no gas leakage in the pressure pipeline 5, and the pressure values ​​in the first remote pressure gauge 4 and the second remote pressure gauge 6 are stored in the database of the control platform; S4: If there is no leakage under the previous pressure condition, the control platform sends an opening command to the first solenoid valve 2 again, and the gas in the gas supply unit 1 is started to enter the pressure pipe 5 to achieve re-pressurization. The pressurization amplitude is determined according to the design. Steps S3 and S4 are repeated until the pressure values ​​of the first remote pressure gauge 4 and the second remote pressure gauge 6 both meet the specified requirements; S5: After the prescribed pressure test is passed, an opening command is sent to the second solenoid valve 7 through the control platform. The gas in the pressure pipe 5 flows into the air compressor 8 after passing through the second solenoid valve 7. The air compressor 8 then compresses the gas into the gas collection tank 10, and the test process ends.

Claims

1. A pressure pipeline air tightness testing device, characterized in that: The invention comprises an air supply unit (1), wherein a first solenoid valve (2) is installed on an external air supply pipeline of the air supply unit (1), the first solenoid valve (2) is connected to the head end of a pressure pipe (5) in a building via a first remote pressure gauge (4), a second remote pressure gauge (6) is installed at the end of the pressure pipe (5), the second remote pressure gauge (6) is connected to a second solenoid valve (7), and the first solenoid valve (2), the first remote pressure gauge (4), the second remote pressure gauge (6), and the second solenoid valve (7) are respectively connected to a control platform.

2. A pressure pipeline air tightness testing device according to claim 1, characterized in that: The second solenoid valve (7) is connected to the gas collection system.

3. A pressure pipeline air tightness testing device according to claim 2, characterized in that: The gas collection system comprises an air compressor (8) connected to the second solenoid valve (7) and a gas collection tank (10) connected to the air compressor (8).

4. A pressure pipeline air tightness testing device according to claim 3, characterized in that: The first solenoid valve (2) and the second solenoid valve (7) are respectively connected to the control platform via wireless data transmission modules.

5. A pressure pipeline air tightness testing device according to claim 4, characterized in that: The gas supply unit (1) is a nitrogen tank.

6. A method for using a pressure pipeline air tightness testing device according to any one of claims 1 to 5, characterized in that: The steps include: S1: first complete the installation of the device of the present application, and set the first solenoid valve (2) and the second solenoid valve (7) to a closed state; S2: starting the gas supply unit (1) and sending an opening instruction to the first solenoid valve (2) through the control platform, the gas in the gas supply unit (1) starts to enter the pressure pipe (5), the control platform receives the air pressure values ​​of the first remote pressure gauge (4) and the second remote pressure gauge (6) and displays them on the control panel display screen of the control platform, when the air pressure values ​​of the first remote pressure gauge (4) and the second remote pressure gauge (6) both reach the initial preset value, sending a closing instruction to the first solenoid valve (2) through the control platform, and then closing the first solenoid valve (2); S3: The timing module of the control platform starts timing. After t minutes, the control panel of the control platform is used to observe whether the pressure values ​​of the first remote pressure gauge (4) and the second remote pressure gauge (6) have changed. If the pressure values ​​have changed, it indicates that there is a gas leak. The test is stopped immediately and the pipeline is checked. If the pressure values ​​remain unchanged, it indicates that there is no gas leakage in the pressure pipeline (5). The pressure values ​​of the first remote pressure gauge (4) and the second remote pressure gauge (6) are stored in the database of the control platform. S4: If there is no leakage under the previous pressure condition, an opening command is sent to the first solenoid valve (2) through the control platform again, so that the gas in the gas supply unit (1) is started to enter the pressure pipe (5) to achieve re-pressurization. The pressurization amplitude is determined according to the design. Steps S3 and S4 are repeated until the pressure values ​​of the first remote pressure gauge (4) and the second remote pressure gauge (6) both reach the specified requirements; S5: After the prescribed pressure test is passed, an opening command is sent to the second solenoid valve (7) through the control platform, and the gas in the pressure pipe (5) flows into the air compressor (8) after passing through the second solenoid valve (7). The air compressor (8) then compresses the gas into the gas collection tank (10), and the test process ends.

Citation Information

Cited By

  • Gas pipeline gas tightness detection method and device and heating device

    CN120651447A