3D visual intelligent building system
By introducing a data acquisition module in the smart building system to make error judgments and screen monitoring data, combining BIM technology to display correct data in the 3D model, and setting up early warning modules, the problem of wrong data display in the existing technology is solved and monitoring is improved accuracy and timely exception handling.
Patent Information
- Application Number
- CN202411101909.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-12
- Publication Date
- 2024-11-22
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
In the prior art, smart building systems lack data screening process when displaying monitoring data to 3D building models, resulting in direct display of wrong data, affecting the accuracy of monitoring.
A 3D visual intelligent building system was designed, including modeling module, data acquisition module, data display module and early warning module. The building model was established through BIM technology, and the data acquisition module judged and discarded the wrong data. The data display module was in the 3D model. Display the correct data, and the early warning module issues an early warning when monitoring data abnormalities.
Improve the accuracy of monitoring data and monitoring accuracy, ensuring that monitoring personnel can timely understand the status of the building and handle abnormal situations.
Smart Images

Figure CN119004615A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of smart buildings, and in particular to a 3D visual smart building system. Background Art
[0002] BIM technology is a digital tool used in engineering design, construction, and management. By integrating the digital and information models of buildings, it is shared and transmitted throughout the entire life cycle of project planning, operation, and maintenance, enabling engineering and technical personnel to correctly understand and efficiently respond to various building information, providing a basis for collaborative work for the design team and all parties involved in the construction, including construction and operation units, and playing an important role in improving production efficiency, saving costs, and shortening construction periods. A smart building system refers to a system that can understand the electricity, fire, and water usage of a building in real time. In the prior art, generally, after using BIM technology to model a building, the monitoring data of the building is directly displayed in a 3D building model. There is a lack of a screening process for the monitoring data, and sometimes the erroneous monitoring data obtained is also directly displayed in the 3D building model, which is not conducive to accurate monitoring of the building's status. Summary of the invention
[0003] In view of the above problems, the object of the present invention is to provide a 3D visual intelligent building system, including a modeling module, a data acquisition module, a data display module and an early warning module;
[0004] The modeling module is used to establish a 3D building model of the building through BIM technology;
[0005] The data acquisition module is used to acquire monitoring data of the building, and judge whether the monitoring data is erroneous data. If the monitoring data is erroneous data, the monitoring data is discarded; if the monitoring data is not erroneous data, the monitoring data is transmitted to the data display module;
[0006] The data display module is used to display the monitoring data in the 3D building model;
[0007] The early warning module is used to determine whether the monitoring data is abnormal, and when the monitoring data is abnormal, issue an early warning prompt according to a preset early warning method;
[0008] The data acquisition module includes a power consumption data acquisition unit, a water consumption data acquisition unit and a fire monitoring data acquisition unit;
[0009] The power consumption data acquisition unit is used to acquire power consumption data of a building;
[0010] The water consumption data acquisition unit is used to acquire the water consumption data of the building;
[0011] The fire monitoring data acquisition unit is used to acquire the fire monitoring data of the building;
[0012] The fire monitoring data acquisition unit includes a wireless sensor node and a forwarding base station arranged in a building;
[0013] The wireless sensor node is used to obtain the fire monitoring data of its own location and send the fire monitoring data to the forwarding base station;
[0014] The forwarding base station is used to determine whether the fire monitoring data is erroneous data, if so, discard the fire monitoring data, if not, transmit the fire monitoring data to the data display module;
[0015] The determining whether the fire monitoring data is erroneous data includes:
[0016] For the fire monitoring data datanode,s obtained by the wireless sensor node node at time s, whether it is erroneous data is determined in the following way:
[0017] Calculate the deviation parameter of datanode,s:
[0018]
[0019] Wherein, whcnode,s represents the deviation parameter of datanode,s, neinode represents the set of other wireless sensor nodes whose distance to the wireless sensor node node is less than T, W1 and W2 represent the first weight coefficient and the second weight coefficient respectively, and datanei,s represents the fire monitoring data acquired by the wireless sensor node nei at time s.
[0020] (xnode, ynode, znode) represents the spatial coordinates of the wireless sensor node node, (xnei, ynei, znei) represents the spatial coordinates of the wireless sensor node nei,
[0021] Among them, nfnei represents the total number of elements contained in neinode, dist(nei,node) represents the straight-line distance between nei and node, and th represents the variance between the fire monitoring data obtained by all wireless sensor nodes in neinode at time s and datanode,s.
[0022] Compare datanode,s with the preset deviation parameter threshold plth. If datanode,s>plth, datanode,s is erroneous data. If datanode,s≤plth, datanode,s is not erroneous data.
[0023] 2. A 3D visual intelligent building system according to claim 1, characterized in that the monitoring data includes power consumption data, water consumption data and fire monitoring data.
[0024] 3. A 3D visual intelligent building system according to claim 1, characterized in that the fire monitoring data includes smoke concentration data and temperature data.
[0025] 4. The 3D visual intelligent building system according to claim 1, wherein the determining whether the monitoring data is abnormal comprises:
[0026] It is determined whether the monitoring data is within a preset value range. If so, it indicates that the monitoring data is normal data; if not, it indicates that the monitoring data is abnormal data.
[0027] 5. A 3D visual intelligent building system according to claim 1, characterized in that the warning prompt according to the preset warning method includes:
[0028] The prompt is given by a pop-up window on a computer device with a screen, or by an audible or visual alarm.
[0029] The present invention performs 3D modeling of buildings based on BIM technology, so that the monitoring data of the building can be directly and intuitively displayed in the 3D building model, which is conducive to the monitoring personnel to intuitively understand the conditions of different locations inside the building. In the process of obtaining monitoring, the present invention adds a step of judging whether the monitoring data is erroneous data, which is conducive to improving the accuracy of the obtained monitoring data and the accuracy of monitoring. At the same time, an early warning module is also set to promptly issue a prompt to the monitoring personnel when an abnormality is monitored, which is conducive to timely handling of abnormal situations. BRIEF DESCRIPTION OF THE DRAWINGS
[0030] The present invention is further described using the accompanying drawings, but the embodiments in the accompanying drawings do not constitute any limitation to the present invention. A person skilled in the art can obtain other drawings based on the following drawings without creative work.
[0031] Figure 1 , which is a diagram of an exemplary embodiment of a 3D visual intelligent building system of the present invention. DETAILED DESCRIPTION
[0032] Embodiments of the present invention are described in detail below, examples of which are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present invention, and cannot be understood as limiting the present invention.
[0033] like Figure 1 In one embodiment shown, the present invention provides a 3D visual intelligent building system, including a modeling module, a data acquisition module, a data display module and an early warning module;
[0034] The modeling module is used to establish a 3D building model of the building through BIM technology;
[0035] The data acquisition module is used to acquire monitoring data of the building, and judge whether the monitoring data is erroneous data. If the monitoring data is erroneous data, the monitoring data is discarded; if the monitoring data is not erroneous data, the monitoring data is transmitted to the data display module;
[0036] The data display module is used to display the monitoring data in the 3D building model;
[0037] The early warning module is used to determine whether the monitoring data is abnormal, and when the monitoring data is abnormal, issue an early warning prompt according to a preset early warning method.
[0038] The present invention performs 3D modeling of buildings based on BIM technology, so that the monitoring data of the building can be directly and intuitively displayed in the 3D building model, which is conducive to the monitoring personnel to intuitively understand the conditions of different locations inside the building. In the process of obtaining monitoring, the present invention adds a step of judging whether the monitoring data is erroneous data, which is conducive to improving the accuracy of the obtained monitoring data and the accuracy of monitoring. At the same time, an early warning module is also set to promptly issue a prompt to the monitoring personnel when an abnormality is monitored, which is conducive to timely handling of abnormal situations.
[0039] Preferably, the monitoring data includes power consumption data, water consumption data and fire monitoring data.
[0040] Monitoring data can also include humidity data, human flow data, etc.
[0041] Preferably, the data acquisition module includes a power consumption data acquisition unit, a water consumption data acquisition unit and a fire monitoring data acquisition unit;
[0042] The power consumption data acquisition unit is used to acquire power consumption data of a building;
[0043] The water consumption data acquisition unit is used to acquire the water consumption data of the building;
[0044] The fire monitoring data acquisition unit is used to acquire the fire monitoring data of a building.
[0045] Generally speaking, the power consumption data and water consumption data of a building on two consecutive days will not be too different. If it is judged that the power consumption data is quite different, there may be a leakage of electricity. The same is true for the water volume data. If the water volume data is abnormal, it means that there may be a water leakage.
[0046] Preferably, the data acquisition module may further include a humidity data acquisition unit and a human flow data acquisition unit.
[0047] The humidity data acquisition unit is used to acquire humidity data of the building;
[0048] The pedestrian flow data acquisition unit is used to acquire the pedestrian flow data of the building.
[0049] Preferably, the fire monitoring data includes smoke concentration data and temperature data.
[0050] Preferably, the fire monitoring data acquisition unit includes wireless sensor nodes and forwarding base stations arranged in the building;
[0051] The wireless sensor node is used to obtain the fire monitoring data of its own location and send the fire monitoring data to the forwarding base station;
[0052] The forwarding base station is used to determine whether the fire monitoring data is erroneous data. If so, the fire monitoring data is discarded; if not, the fire monitoring data is transmitted to the data display module.
[0053] By judging whether the data is wrong at the data collection end, it is helpful to improve the accuracy of fire monitoring data.
[0054] Preferably, the determining whether the fire monitoring data is erroneous data comprises:
[0055] For the fire monitoring data data obtained by the wireless sensor node node at time s node,s , determine whether it is erroneous data by the following method:
[0056] Calculate data node,s The deviation parameter is:
[0057]
[0058] Among them, whc node,s Represents data node,sThe deviation parameter, neinode represents the set of other wireless sensor nodes whose distance from the wireless sensor node node is less than T, W1 and W2 represent the first weight coefficient and the second weight coefficient respectively, data nei,s represents the fire monitoring data obtained by the wireless sensor node nei at time s,
[0059] (x node ,y node ,z node ) represents the spatial coordinates of the wireless sensor node node, (x nei ,y nei ,z nei ) represents the spatial coordinates of the wireless sensor node nei,
[0060] Among them, nfnei represents the total number of elements contained in neinode, dist(nei,node) represents the straight-line distance between nei and node, and th represents the fire monitoring data obtained by all wireless sensor nodes in neinode at time s and data node,s The variance between
[0061] The data node,s Compared with the preset deviation parameter threshold plth, if data node,s >plth then data node,s For error data, if data node,s ≤plth then data node,s It is not erroneous data.
[0062] In the above-mentioned embodiment of the present invention, when judging whether the fire monitoring data is erroneous data, the fire monitoring data is not directly compared with a preset value, but the deviation parameter between the fire monitoring data obtained by the wireless sensor node node and the fire monitoring data obtained by the wireless sensor node in neinode is calculated, and then whether it is erroneous data is judged according to the deviation parameter, which is conducive to improving the accuracy of the judgment. If it is directly compared with a single value, it is easy to make an erroneous judgment, mainly because the selection of this value is difficult to meet a variety of situations. For a local area, the differences between the fire monitoring data obtained by the wireless sensor nodes in the area are generally small. Therefore, the deviation parameter is generally in a relatively stable range, and by judging the data node,sBy weighting the differences between the fire monitoring data collected by multiple wireless sensor nodes, the deviation parameters can be determined, which can avoid subsequent misjudgments. For example, if the data obtained by a sensor node triggers an alarm, but in fact the data obtained by other wireless sensor nodes in the area do not trigger an alarm, a misjudgment occurs.
[0063] Preferably, determining whether the monitoring data is abnormal includes:
[0064] It is determined whether the monitoring data is within a preset value range. If so, it indicates that the monitoring data is normal data; if not, it indicates that the monitoring data is abnormal data.
[0065] Different types of monitoring data are set with corresponding normal value ranges. Since the data is preliminarily judged in the data acquisition module, this link can effectively avoid the occurrence of misjudgment events.
[0066] Preferably, the providing of early warning prompts according to a preset early warning method includes:
[0067] The prompt is given by a pop-up window on a computer device with a screen, or by an audible or visual alarm.
[0068] For example, pop-up prompts can be displayed on desktop computers, laptops and other devices in the duty room.
[0069] Although embodiments of the present invention have been shown and described, those skilled in the art will appreciate that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the claims and their equivalents.
Claims
1. A 3D visual intelligent building system, characterized in that: It includes modeling module, data acquisition module, data display module and early warning module; The modeling module is used to establish a 3D building model of the building through BIM technology; The data acquisition module is used to acquire monitoring data of the building, and judge whether the monitoring data is erroneous data. If the monitoring data is erroneous data, the monitoring data is discarded; if the monitoring data is not erroneous data, the monitoring data is transmitted to the data display module; The data display module is used to display the monitoring data in the 3D building model; The early warning module is used to determine whether the monitoring data is abnormal, and when the monitoring data is abnormal, issue an early warning prompt according to a preset early warning method; The data acquisition module includes a power consumption data acquisition unit, a water consumption data acquisition unit and a fire monitoring data acquisition unit; The power consumption data acquisition unit is used to acquire power consumption data of a building; The water consumption data acquisition unit is used to acquire the water consumption data of the building; The fire monitoring data acquisition unit is used to acquire the fire monitoring data of the building; The fire monitoring data acquisition unit includes a wireless sensor node and a forwarding base station arranged in a building; The wireless sensor node is used to obtain the fire monitoring data of its own location and send the fire monitoring data to the forwarding base station; The forwarding base station is used to determine whether the fire monitoring data is erroneous data, if so, discard the fire monitoring data, if not, transmit the fire monitoring data to the data display module; The determining whether the fire monitoring data is erroneous data includes: For the fire monitoring data data obtained by the wireless sensor node node at time s node,s , determine whether it is erroneous data by the following method: Calculate data node,s The deviation parameter is: Among them, whc node,s Represents data node,s The deviation parameter, neinode represents the set of other wireless sensor nodes whose distance to the wireless sensor node node is less than T, W1 and W2 represent the first weight coefficient and the second weight coefficient respectively, data nei,s represents the fire monitoring data obtained by the wireless sensor node nei at time s, (x node ,y node ,z node ) represents the spatial coordinates of the wireless sensor node node, (x nei ,y nei ,z nei ) represents the spatial coordinates of the wireless sensor node nei, Among them, nfnei represents the total number of elements contained in neinode, dist(nei,node) represents the straight-line distance between nei and node, and th represents the fire monitoring data obtained by all wireless sensor nodes in neinode at time s and data node,s The variance between The data node,s Compared with the preset deviation parameter threshold plth, if data node,s >plth then data node,s For error data, if data node,s ≤plth then data node,s It is not erroneous data.
2. A 3D visual intelligent building system according to claim 1, characterized in that: The monitoring data includes power consumption data, water consumption data and fire monitoring data.
3. The 3D visual intelligent building system according to claim 1, characterized in that: The fire monitoring data includes smoke concentration data and temperature data.
4. The 3D visual intelligent building system according to claim 1, characterized in that: The determining whether the monitoring data is abnormal includes: It is determined whether the monitoring data is within a preset value range. If so, it indicates that the monitoring data is normal data; if not, it indicates that the monitoring data is abnormal data.
5. The 3D visual intelligent building system according to claim 1, characterized in that: The step of providing an early warning prompt according to a preset early warning method includes: The prompt is given by a pop-up window on a computer device with a screen, or by an audible or visual alarm.