Intelligent dispatching system and method for underground coal mine auxiliary transportation robot
By designing an auxiliary transportation robot intelligent scheduling system underground in coal mines, including personnel, material scheduling and real-time monitoring modules, and using ant colony algorithm for path planning, the problem of intelligent scheduling in multiple working conditions is solved, and transportation efficiency and safety are improved performance.
Patent Information
- Application Number
- CN202411229953.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-03
- Publication Date
- 2024-11-22
AI Technical Summary
The existing intelligent scheduling system for underground auxiliary transportation of coal mines is difficult to achieve intelligent scheduling of multi-condition auxiliary transportation under complex geological conditions, and lacks full-equipment status monitoring and complex path planning, resulting in low transportation efficiency, high safety risks, and inability to adapt to multiple goals. Intelligent dispatch of personnel and materials in multiple links.
An intelligent dispatching system for underground auxiliary transportation robots of coal mines was designed, including personnel dispatching module, material dispatching module, real-time monitoring module, emergency response module and human-computer interaction module. The master-slave control strategy was adopted, and the ant colony algorithm and the hybrid ant colony algorithm were used. Carry out path planning and scheduling optimization, and build an intelligent scheduling system for auxiliary transportation of all mines.
It realizes efficient and intelligent distribution of personnel and materials from underground coal mines, improves the efficiency and safety performance of auxiliary transportation scheduling, and can perform coordinated scheduling of interleaved multi-equipment operation under complex geological conditions to deal with abnormal working conditions and special scheduling tasks.
Smart Images

Figure CN119005629A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of underground coal mine dispatching, and in particular to an intelligent dispatching system and method for an auxiliary transport robot in an underground coal mine. Background Art
[0002] Auxiliary transportation in coal mines is an important part of the system of mine production, and undertakes the transportation tasks of personnel, equipment, materials, etc. The degree of intelligence of the auxiliary transportation system is directly related to the efficiency of coal mine production operations, and auxiliary transportation safety accidents seriously affect coal mine safety and endanger the lives and health of workers. Therefore, the country focuses on promoting the intelligent construction of auxiliary transportation robots in coal mines. Focusing on the development goals of continuous, standardized, and intelligent auxiliary transportation in coal mines, the key scientific and technological issues of standardized loading, automated transportation, unmanned transportation, and intelligent scheduling of auxiliary transportation in mines are condensed, aiming to improve the efficiency and safety performance of auxiliary transportation in coal mines.
[0003] At present, patent number CN115762212 A discloses an intelligent integrated dispatching and commanding system for coal mine auxiliary transportation with multi-subsystem integration. Based on the dispatching perception system of trackless rubber-tyred vehicles, a dispatching and commanding system with multi-subsystem integration is designed by integrating personnel dispatching and material dispatching, so as to improve the efficiency of auxiliary transportation and reduce transportation costs; patent number CN114677063 B discloses an intelligent dispatching system and method for mine vehicles based on GNSS high-precision positioning, discloses a method for tracking the position and status of mining equipment in open-pit mines, and realizes real-time optimization dispatching of mining trucks, electric shovels and other equipment; patent number CN112360560 B discloses a coal mine underground vehicle dispatching and supervision system, which collects underground vehicle location information and personnel location information in real time by building a map information database, so as to facilitate information management and monitoring; patent number CN109507969 B discloses an intelligent dispatching and management system for trackless rubber-tyred vehicles in coal mines, which transmits to the comprehensive management platform through the vehicle-mounted terminal and artificial intelligence terminal, realizes comprehensive perception of trackless rubber-tyred vehicle information and intelligent auxiliary dispatching of vehicle resources; patent number CN115619130 A discloses a comprehensive intelligent dispatching and control platform for coal mines, which deploys ETL to form a data sharing platform for systems at all levels, realizing centralized control and decision-making for mine safety production; Patent No. CN112037503 A discloses a mine intelligent dispatching system, which tracks vehicle location information by carrying UWB tags on shovels and mining trucks, and plans the paths set between sites to ensure the safety between mining trucks; Patent No. CN112360560 B discloses a coal mine underground vehicle dispatching and supervision system, which is used to receive order demand information, dispatch vehicles in combination with the underground map information database, and realize information management and control; Patent No. CN116011784 A discloses a coal yard vehicle intelligent dispatching method and system, which predicts the vehicle's reverse trajectory based on the operating parameters of the coal yard vehicle to improve the safety of the coal yard vehicle.
[0004] However, the above methods mainly focus on the positioning of auxiliary transportation vehicles in coal mines, and more importantly, the monitoring of trackless transportation vehicles. There is little consideration of intelligent scheduling and scheduling of auxiliary transportation in coal mines and optimization of complex paths. There is a lack of exploration in abnormal scheduling of auxiliary transportation and status monitoring of all equipment, and it is impossible to realize intelligent scheduling of multi-condition auxiliary transportation under complex geological conditions.
[0005] In summary, only a few companies have developed and applied the existing intelligent dispatching system for auxiliary transportation in coal mines for local scenarios, and the degree of promotion in different fields is also different. In the non-coal field, some mines have demonstrated the remote intelligent unmanned driving dispatching management of underground mines, but have not realized the multi-target and multi-link intelligent dispatching of personnel and materials in the whole mine; in the coal-related field, limited by the geological conditions of coal mines, trackless rubber-wheeled vehicles have been relatively maturely applied in mines with good geology, such as Tashan Mine; but in most coal mines with poor geology, they rely on rail transportation, and their dispatching systems mostly remain at the level of industrial squares, without considering the real-time needs of underground material distribution, resulting in the disconnection of material distribution and its operation information, and cannot adapt to the needs of intelligent operation of robots in auxiliary transportation systems, and have not realized complex path intelligent planning and material tracking, and the intelligent dispatching management system for auxiliary transportation based on rail robot unmanned driving systems is still in the research and development stage.
[0006] Due to complex geological conditions, the needs of underground coal mine scheduling are diverse, the types of materials are complex, the uncertainty of abnormal working conditions and special scheduling tasks is large, there are many types of underground auxiliary transportation equipment, the operation status monitoring is difficult, the transportation routes are complicated, it is difficult to achieve the optimal path planning, the manual scheduling efficiency is low, there are many safety hazards, and there is a lack of integrated intelligent scheduling systems and methods with multi-functional coupling. Therefore, how to realize the intelligent scheduling of robots in the underground auxiliary transportation system of coal mines has become a critical stage and an important bottleneck in the intelligent construction of coal mines. Summary of the invention
[0007] The purpose of the present invention is to provide an intelligent dispatching system and method for auxiliary transportation robots in underground coal mines, which can realize efficient management of personnel and intelligent distribution of materials in underground coal mines, and improve the efficiency and safety performance of auxiliary transportation dispatching.
[0008] To achieve the above object, the present invention provides an intelligent dispatching system for an auxiliary transport robot in an underground coal mine, comprising:
[0009] The personnel dispatch module includes personnel basic information management, normal personnel dispatch and abnormal personnel dispatch functions; among which, personnel basic information management includes personnel attendance management and personnel classification information management, normal personnel dispatch includes coal mine personnel and vehicle dispatch and work content dispatch, and abnormal personnel dispatch includes emergency rescue path planning for underground personnel in emergency situations;
[0010] Material dispatch module, including material demand submission and review, intelligent material assembly, mine car loading and binding, target dispatch scheduling and auxiliary transportation route planning;
[0011] Real-time monitoring module, including equipment configuration page, vehicle-mounted camera, fixed camera, positioning base station and equipment communication, monitors the operation status and location information of the auxiliary transport robot;
[0012] The human-computer interaction module includes a handheld terminal, a vehicle-mounted terminal, and a dispatching display screen, which establishes a communication connection with the intelligent dispatching platform through optical fiber and 5G base stations. The handheld terminal is carried by the auxiliary transport worker, and the vehicle-mounted terminal is placed in the cab of the auxiliary transport robot. The dispatching display screen includes an LED information guide screen, a dispatching departure board, and a dispatching display screen. The LED information guide screen and the dispatching departure board are arranged in the underground parking lot and lanes, and the dispatching display screen is arranged in the ground dispatching room;
[0013] The emergency response module includes an expert library and a case library, which are used to handle abnormal situations in auxiliary transportation; the emergency response module is automatically triggered for abnormal information status of auxiliary transportation robot equipment; and the emergency response module is manually triggered for abnormal information status of auxiliary transportation lane environment.
[0014] An intelligent dispatching method for an auxiliary transport robot in an underground coal mine comprises the following steps:
[0015] S1. According to the auxiliary transportation dispatching tasks, the demand for personnel and materials is reported through the material dispatching module, and summarized to the intelligent dispatching platform through the human-computer interaction module;
[0016] S2. Based on the demand information summarized by the intelligent dispatching platform, the auditor will audit the demand list; for the demand list that passes the audit, the material dispatching module and the personnel dispatching module will be activated according to the content of the list; for the demand list that fails the audit, the auditor will feedback to the mining area and the person who submitted the information, and explain the reason for failure;
[0017] S3. According to the material demand list, the material dispatching module sorts the urgency and intelligently groups the materials. The human-computer interaction module guides the loading personnel to load and bind the containers.
[0018] S4. According to the personnel demand list, the personnel who need to enter and exit the well are scheduled through the personnel scheduling module;
[0019] S5. Use the intelligent dispatching platform to schedule auxiliary transport robots without deadlock, and dispatch underground personnel and materials;
[0020] S6. Clarify the task scheduling of the auxiliary transport robot and plan the path according to the task destination;
[0021] S7, according to the instructions issued by the intelligent dispatching platform, assist the transport robot to operate autonomously, and feed back the operating status to the intelligent dispatching platform through the real-time monitoring module and the human-computer interaction module;
[0022] S8. When the auxiliary transport robot encounters abnormal conditions during autonomous operation, the emergency response module is automatically triggered. Based on the expert library and case library, the rule reasoning of the cause of the abnormal information is carried out to obtain the corresponding solution, and the hybrid ant colony algorithm is used for emergency dispatch;
[0023] S9. When the auxiliary transport robot carries the required materials or personnel to the destination, the handheld terminal is used to inspect the arrival of the materials or provide feedback on the location of the personnel.
[0024] Preferably, the intelligent assembly includes establishing a material loading objective function based on maximum space utilization and maximum load-bearing weight, as follows:
[0025]
[0026] In the formula, f max represents the objective function of the material loading problem, λ represents the utilization coefficient, λ=1, the space utilization rate of the objective function is the maximum, λ=0, the load utilization rate of the objective function is the maximum; m0 represents the type of material; n i , l i 、w i 、h i Respectively represent the quantity, length, width, and height of the i-th material; g i represents the weight of the i-th material; Indicates the status of material loading. Indicates that the i-th material has not been loaded into the minecart; when When , it means that the i-th material has been loaded into the mine car; G represents the rated load of the mine car; V represents the rated volume of the mine car.
[0027] Preferably, in step S5, the deadlock-free scheduling of the auxiliary transport robot includes adjusting the robot departure time and establishing a scheduling strategy for different robots;
[0028] Among them, the time interval between the two auxiliary transport robots is:
[0029] T=(L m +L e ) / v
[0030] The maximum time the auxiliary transport robot occupies a section is:
[0031] T=T z +T x (T z +T x >(L m +L e ) / v)
[0032] Where, T z Indicates the loading time, Tx Indicates the time of unloading, L m Indicates the length of the mth segment, L e represents the length of the auxiliary transport robot itself, and v represents the running speed of the auxiliary transport robot.
[0033] Preferably, in step S6, path planning is performed according to the destination of the demand list, including constructing an objective function and constraint conditions for optimizing the mine auxiliary transportation path, as follows:
[0034] The objective function is:
[0035]
[0036] In the formula, l ij represents the distance from material demand point i to material demand point j, x ijk It represents the auxiliary transport robot k from material demand point i to material demand point j, m1 is the number of auxiliary transport robots, and n is the number of material demand points;
[0037] The constraints are:
[0038] Constraint 1: The material demand distribution volume of each material demand point must not exceed the robot's maximum carrying capacity. c i represents the material distribution volume of the i-th demand point, C represents the maximum loading capacity, y ik Indicates that the material transportation task of material demand point i is completed by robot k;
[0039] Constraint 2: The total amount of material demand for each transport route must not exceed the robot's maximum carrying capacity;
[0040] Constraint 3: Each material demand point can only be transported by one robot, and no second robot will pass through it repeatedly.
[0041] Constraint 4: Each robot must strictly follow a fixed planned path and is not allowed to preempt operations or reverse. It means that the robot that reaches the material demand point j is unique;
[0042] Constraint 5: There is only one underground parking lot. All robots can only start from the parking lot, reach various material demand points, complete the transportation task, and then return to the parking lot. It means that the robot that leaves material demand point j is unique.
[0043] Preferably, the planning path is solved by using an ant colony algorithm, as follows:
[0044] Let the probability formula for the kth ant to transfer from position i to position j at time t be:
[0045]
[0046] In the formula, α is the pheromone inspiration factor, β is the expected inspiration factor, η ij is the expected function, where η ij Indicates the visibility of node i to node j, d ij represents the distance from node i to node j, d ij The smaller the ij The larger the probability transfer formula The larger the value, the more ant k expects to choose node j; τ ij (t) is the pheromone content on the path between nodes ij at time t;
[0047] At time t+1, the pheromone concentration on path ij is updated to:
[0048] τ ij (t+1)=(1-p)τ ij (t)+Δτ ij
[0049]
[0050] In the formula, τ ij (t+1) represents the pheromone concentration on path ij at time t+1, p represents the pheromone volatility coefficient, Δτ ij represents the increment of pheromone, Q represents the pheromone intensity constant, L k Represents the length of the path produced by the kth ant.
[0051] Preferably, in step S8, the hybrid ant colony algorithm includes combining the taboo search with the ant colony algorithm, and using the local optimal solution of the taboo search as the basis for initializing the pheromone concentration in the ant colony algorithm;
[0052] Among them, the initial pheromone concentration is:
[0053]
[0054] Where Q0 is the current pheromone concentration, Q is the total amount of pheromone, and L is the cost of taboo search for the local optimal solution.
[0055] Preferably, the weight coefficient of each attribute in the attribute set is determined by the order relationship analysis method, and the probability density function corresponding to the case single-dimensional attribute set is solved by kernel density estimation to obtain the local optimal solution of the attribute set;
[0056] The weight of each attribute is calculated as follows:
[0057] σ h-1 >σ / h, h∈{2,3,...,n}
[0058]
[0059] ω h-1 =σ h ω h
[0060] In the formula, σ represents the importance, h represents the ranking number of the attribute, and σ h Indicates the relative importance between the hth and h-1th attribute indicators, σ h-1 Indicates the relative importance between the h-1th and h-2th attribute indicators, ω n ,ω h-1 ,ω h They represent the weight coefficients of the nth, h-1th, and hth attribute indicators respectively.
[0061] Therefore, the present invention adopts the above-mentioned intelligent dispatching system and method of the coal mine underground auxiliary transportation robot, which has the following technical effects:
[0062] (1) Integrate the material dispatching module, personnel dispatching module, real-time monitoring module, emergency response module, and human-computer interaction module in the process of auxiliary transportation in coal mines to build an intelligent dispatching system for auxiliary transportation personnel and materials in the whole mine, which integrates demand submission, material grouping, dispatching and scheduling, operation monitoring, and emergency response. Adopt a master-slave control strategy, establish a domain control system for key scenarios, improve the response efficiency of equipment, realize the efficient and intelligent distribution of auxiliary transportation dispatching tasks and the coordinated control of the robot system, and greatly improve the safety performance of auxiliary transportation.
[0063] (2) Based on the three-dimensional space heuristic grouping algorithm and deadlock-free scheduling strategy, the auxiliary transportation scheduling tasks are intelligently grouped and scheduled. By decomposing the mine car space into several two-dimensional planes, and then dividing and combining them, the spatial utilization rate of the mine car is effectively improved. A collaborative scheduling model for the staggered operation of multiple auxiliary transportation equipment is established to avoid deadlock constraints in the operation of multiple equipment and improve the efficiency of auxiliary transportation distribution.
[0064] (3) The emergency response system based on case and rule reasoning adopts a hybrid ant colony algorithm to carry out emergency dispatch for auxiliary transportation emergencies, uses the taboo search algorithm to optimize the initial pheromone, and then uses the ant colony algorithm to solve the optimal path, so as to realize the emergency dispatch of auxiliary transportation system under abnormal conditions, special dispatch tasks and fault conditions.
[0065] The technical solution of the present invention is further described in detail below through the accompanying drawings and embodiments. BRIEF DESCRIPTION OF THE DRAWINGS
[0066] Figure 1 It is a functional structure diagram of the intelligent dispatching system of the underground auxiliary transportation robot in a coal mine in the embodiment;
[0067] Figure 2 Schematic diagram of the distributed control process of mine auxiliary transportation equipment in the embodiment;
[0068] Figure 3 : is a flow chart of the intelligent dispatching method of the auxiliary transport robot in the coal mine underground in the embodiment;
[0069] Figure 4 It is an example diagram of the coal mine underground auxiliary transportation emergency response system in the embodiment. DETAILED DESCRIPTION
[0070] The present invention can be explained in more detail by the following examples. The purpose of disclosing the present invention is to protect all changes and improvements within the scope of the present invention. The present invention is not limited to the following examples.
[0071] like Figure 1 As shown, the present invention provides an intelligent dispatching system for underground auxiliary transportation robots in coal mines, including a material dispatching module, a personnel dispatching module, a real-time monitoring module, an emergency response module and a human-computer interaction module. In addition, the personnel dispatching module and the material dispatching module are the core of the intelligent dispatching platform. By connecting the robot equipment, processes and fault information encountered in the distribution process of personnel and materials in series, the real-time monitoring module, the human-computer interaction module and the emergency response module are developed in sequence, starting from the two aspects of normal dispatching and abnormal dispatching of auxiliary transportation, to achieve tracking and monitoring of the entire process of auxiliary transportation.
[0072] In addition, the intelligent dispatching system for auxiliary transportation in coal mines adopts a master-slave control strategy to manage and control the auxiliary transportation equipment in the entire mine in layers, including equipment layer, regional layer and global layer, such as Figure 2 Among them, the equipment layer includes dampers, turnouts, auxiliary transport robots, car blockers, and large-screen dispatching display equipment; the regional layer includes collaborative domain controllers; and the global layer includes intelligent dispatching systems.
[0073] Among them, the data of the equipment layer is mainly controlled by the intelligent dispatching system in the global layer, and is connected to the real-time monitoring module of the intelligent dispatching system by wired or wireless means. The location data is transmitted to the intelligent dispatching platform through the 5G base station and UWB positioning base station arranged underground, and the locomotive location information is displayed in real time on the GIS map; at the same time, the equipment in the key scene is controlled by the collaborative domain controller in the regional layer, mainly including the coordination of equipment actions and the logical control of air doors and switches, and the intelligent dispatching system and the collaborative domain controller establish a communication connection through the optical fiber ring network, which can improve the response rate of auxiliary transportation equipment and reduce the computing power of the main server.
[0074] The personnel dispatch module includes basic personnel information management, normal personnel dispatch and abnormal personnel dispatch; specifically, basic personnel information management includes personnel attendance management and personnel classification information management, normal personnel dispatch includes coal mine personnel and vehicle dispatch scheduling and work content scheduling, and abnormal personnel dispatch refers to emergency rescue route planning and personnel escape notification for underground personnel in case of emergency, so as to improve personnel dispatch efficiency and reduce safety accidents.
[0075] The material dispatch module includes a basic material information database, a shift schedule, intelligent grouping and a GIS map, which can realize demand submission and review, intelligent material grouping, mine car loading and binding, multi-target dispatching and scheduling, and auxiliary transportation route planning functions.
[0076] Among them, intelligent material assembly is based on the loading space of the mine car. The material loading process is abstracted into layer-by-layer assembly. Each layer of material is regarded as a plane assembly. One layer is considered each time, thereby simplifying the three-dimensional space into several two-dimensional spaces and reducing the complexity of assembly. The details are as follows:
[0077] Based on the three-dimensional loading of the mine car, a spatial coordinate system is set along one side of the mine car. The material is regarded as a regular cuboid according to its size. When loading the material layer by layer, the lower left corner of the material is placed as close to the origin of the coordinate system as possible. When the first material is placed in the mine car, the mine car will be divided into three spaces, and this irregular polyhedron will be divided into three sub-spaces: front, right, and top. The steps of placing the material into the mine car are repeated, and the sub-spaces are divided and combined until the remaining materials can no longer be placed in any sub-space, and the loading of the mine car is completed.
[0078] Mine car loading and binding means that after workers load the industrial square materials into the mine car according to the assembly plan, they scan the RFID tag through a handheld terminal to bind the order with the mine car information, and use wireless radio frequency identification technology to track the materials during the distribution process.
[0079] The real-time monitoring module is used to monitor the robot's operating status and location information: the vehicle-mounted terminal is used to collect the robot's operating status data, which is transmitted to the real-time monitoring module through the 5G base station deployed underground, and the operating location information and status of the equipment and personnel are displayed in real time on the GIS map; the vehicle-mounted terminal sends dispatch instructions to the robot equipment, and the robot operates autonomously according to the instructions. In addition, if the robot parameters exceed or fall below the normal threshold, the equipment can be warned of faults, reminding the dispatcher to repair it in time.
[0080] The human-computer interaction module mainly includes vehicle-mounted terminal, handheld terminal and dispatch display screen.
[0081] Among them, the vehicle-mounted terminal is placed in the robot's cab, and establishes a communication connection with the robot equipment through CAN protocol, MQTT protocol, etc., and uses the IP point table to obtain the robot's operating parameters in real time, exchange information with the intelligent scheduling platform, and realize the issuance and feedback of scheduling instructions.
[0082] The handheld terminal is mainly carried by auxiliary transportation workers and can be used for reporting personnel and material requirements and acceptance of arrival, and for marking between signal workers and hook workers during inclined shaft operation. In addition, when workers encounter potential danger information or fault information such as track deformation and roof collapse while working and walking underground, they can report the danger information through the handheld terminal.
[0083] The dispatch display screen mainly includes LED information guidance screens arranged in underground parking lots and tunnels to alert nearby workers to incoming vehicles and materials. In addition, it also includes dispatch departure plan boards and material assembly boards, which are arranged in industrial squares to remind workers in the industrial squares to load and ship orders according to the prompt plan.
[0084] The emergency response module is used to deal with abnormalities and emergencies encountered during the auxiliary transportation process, including emergency rescue and emergency route planning, including:
[0085] When a robot malfunctions, water seeps through, a roof collapses, or other abnormalities occur in the transportation environment, rule reasoning is first used to find out whether there are similar cases and solutions in the expert library and case library. If so, the solution is directly called; if not, manual intervention is required, and leaders and experts are asked to conduct research and analysis in a timely manner and provide solutions.
[0086] like Figure 3 As shown, an intelligent scheduling method for an auxiliary transportation robot in an underground coal mine comprises the following steps:
[0087] S1. According to the auxiliary transportation dispatching tasks, the demand is reported through the mobile terminal and the web terminal. The mobile terminal uses the human-computer interaction module for the underground coal mine workers to report the demand for materials and personnel according to the actual production needs, including the material name, type, quantity, work content or the name and number of the personnel; the web terminal uses the material dispatching module for the dispatch room personnel to report the demand for materials and personnel that need to be distributed according to the work plan prepared in advance by the mine, including the material name, type, quantity, work content or the name and number of the personnel.
[0088] S2. After the dispatching platform summarizes the demand information, the auxiliary transportation dispatching reviewer will review the demand list through the intelligent dispatching platform, mainly including judging whether it is passed based on factors such as the inventory of coal mine storage materials, whether the working face tasks are reasonable, the correlation between the demand materials and the target tasks, and whether the demand personnel have work conflicts:
[0089] For approved dispatching tasks, tasks are decomposed according to the list contents, and the required materials and personnel are respectively processed through the material dispatching module and the personnel dispatching module for the next step;
[0090] For demand orders that fail to pass the review, feedback will be given to different departments based on different reasons, and the submitting personnel will be informed. For example, for materials with insufficient inventory, feedback will be given to the coal mine purchasing department, requiring them to purchase as soon as possible; for materials that do not match the tasks, feedback will be given to the submitting personnel, requiring workers to verify the material list to avoid wasting scheduling resources due to mistakes; for conflicts between demand and personnel, feedback will be given to the submitting personnel, explaining the situation and reminding workers to complete the current work as soon as possible.
[0091] S3. The material demand list is prioritized according to the degree of urgency. The material dispatch module intelligently groups the materials according to the number and type of mine carts required, and sends the grouping plan to the transport workers in the industrial square to guide them to load the materials in the industrial square. The transport workers then bind the container information after loading with the mine cart information through handheld terminals.
[0092] Among them, the priority sorting rules include material arrival requirement time, task type, requirement submission time, and emergency order situation.
[0093] Intelligent assembly is used to improve the loading efficiency of mine cars. The objective function is established with the maximum space utilization and the maximum load weight as the goal, as follows:
[0094]
[0095] In the formula, f max represents the objective function of the material loading problem, f max The larger it is, the better the loading scheme is; λ represents the utilization coefficient, λ=1, the space utilization rate of the objective function is the largest, λ=0, the load utilization rate of the objective function is the largest; m0 represents the type of materials; n i , l i 、w i 、h i Respectively represent the quantity, length, width, and height of the i-th material; g i represents the weight of the i-th material; Indicates the status of material loading. Indicates that the i-th material has not been loaded into the minecart; when When , it means that the i-th material has been loaded into the mine car; G represents the rated load of the mine car; V represents the rated volume of the mine car.
[0096] Specifically, the required materials in the order are abstracted into standardized modules such as cuboids, cubes, cylinders, etc. of varying volumes, and the carrying capacity of the mine cart is divided into three-dimensional space according to the X, Y, and Z directions; when the materials are placed inside the mine cart, three subspaces will be generated, and the unoccupied volume of the mine cart will be further reduced. The remaining space will be traversed to determine whether there are coplanar required materials; the coplanar adjacent subspaces are determined, and the required materials are spatially combined according to the coplanar characteristics, including front-to-back combination, up-down combination, and left-to-right combination; the assembly rules include translation rules and gravity rules. The translation rule minimizes the gaps between materials by translating the required materials up and down and left and right. The gravity rule is to protect the materials themselves and prevent them from being squeezed and deformed, thereby causing unnecessary losses.
[0097] After the material dispatch module obtains the assembly plan through the above method, it sends it to the loader through the handheld terminal to guide the loader to load the materials. After the loading is completed, the material order and the information of the mine car are bound through the RFID tag to facilitate the tracking and positioning of the demand list in the mine.
[0098] S4. For the personnel demand list, the personnel dispatch module will schedule the personnel entering and leaving the mine. After the personnel are transported to the underground waiting area via the overhead passenger device, they will be transported to the required point on the working face via the personnel vehicle.
[0099] S5. For underground personnel and material dispatching tasks, the intelligent dispatching platform schedules the auxiliary transport robots.
[0100] Based on the coal mine safety regulations and information collection and closure rules, the main reason for limiting the dispatching efficiency is the time that the locomotive occupies the largest track operation section, and the same vehicle can only be dispatched once. Therefore, for materials and workers that need to be delivered to the destination, to avoid collisions or conflicts between auxiliary transportation equipment during underground operation, different robot equipment is selected to perform deadlock-free scheduling of dispatching tasks, adjust the robot departure time through information locking and other methods, and establish dispatching strategies for different robots, as follows:
[0101] Set the time for the first manned robot to travel on track: L i Indicates the length of the i-th segment, L e is the length of the auxiliary transport robot itself, v is the running speed of the auxiliary transport robot, and n1 is the number of sections.
[0102] Assume that the second robot starts immediately after the first robot leaves L1. The time interval is T = (L1 + L e) / v, before the second robot reaches L2, if L1>L2, the robot does not need to wait and can directly enter L2. At this time, the time interval is still T=(L1+L e ) / v, if L1<L2, the first robot has not yet driven out of L2, the robot needs to wait for T=(L2-L1) / v, and the time interval is T=(L1+L e ) / v+(L2-L1) / v=(L2+L e ) / v.
[0103] By analogy, the time interval between the two robots is T = (L m +L e ) / v or T=T z +T x (T z +T x >(L m +L e ) / v), is the longest time the robot occupies the segment; where T z Indicates the loading time, T x Indicates the time of unloading, L m Indicates the length of the mth segment.
[0104] When different types of auxiliary transport robots are used for cyclic transportation, the departure time interval between different types of auxiliary transport robots should be the driving time of the longest common section.
[0105] S6. Clarify the departure time of the robots that need to be operated, plan the operation route of the auxiliary transport robots according to the mission destination, and reduce the robot operation time and loss as much as possible while ensuring safety.
[0106] Due to the limited space in the coal mine, after completing the delivery task, the robot must return to the yard to wait for the next dispatch task. In order to improve the efficiency of auxiliary transportation and reduce transportation costs, the following constraints need to be imposed on the dispatch task:
[0107] Constraint 1: The material demand distribution volume of each material demand point must not exceed the robot's maximum carrying capacity. c i represents the material distribution volume of the i-th demand point, C represents the maximum loading capacity, y ik Indicates that the material transportation task of material demand point i is completed by robot k. ;
[0108] Constraint 2: The total amount of material demand for each transport route must not exceed the robot's maximum carrying capacity;
[0109] Constraint 3: Each material demand point can only be transported by one robot, and no second robot will pass through it repeatedly.
[0110] Constraint 4: Each robot must strictly follow a fixed planned path and is not allowed to preempt operations or reverse. It means that the robot that reaches material demand point j is unique.
[0111] Constraint 5: There is only one underground parking lot. All robots can only start from the parking lot, reach various material demand points, complete the transportation task, and then return to the parking lot. It means that the robot that leaves material demand point j is unique.
[0112] Based on the above constraints, the optimization objective function of mine auxiliary transportation path is constructed:
[0113]
[0114] In the formula, z is the path objective function, l ij (l ij >0) represents the distance from material demand point i to material demand point j; x ijk represents the auxiliary transport robot k from material demand point i to material demand point j, if y ik =1, otherwise y ik =0; m1 is the number of auxiliary transport robots; n is the number of material demand points.
[0115] The planning path model is solved based on the ant colony algorithm, as follows:
[0116] The randomness of the ant colony algorithm lies in the fact that the probability of each ant passing through a different node is different. Assume that the probability formula for the kth ant (k=1,…,m1) to transfer from position i to another position j at time t is as follows:
[0117]
[0118] In the formula, α is the pheromone inspiration factor, β is the expected inspiration factor; η ij is the expected function, which represents the visibility from node i to node j. d ij represents the distance from node i to node j, d ij The smaller the ij The larger the probability transfer formula The larger the value, the more ant k expects to choose node j; τ ij (t) is the pheromone content on the path between nodes ij at time t.
[0119] Assume that the pheromone content between paths ij at time t is τij (t), the pheromone concentration on path ij is updated at time t+1, and the pheromone update formula is as follows:
[0120] τ ij (t+1)=(1-p)τ ij (t)+Δτ ij
[0121]
[0122] In the formula, τ ij (t+1) represents the old pheromone attenuation plus the new iterative pheromone; p represents the pheromone volatility coefficient, p∈(0,1), 1-p represents the pheromone residual coefficient; Δτ ij Indicates the increment of pheromone;
[0123] Considering the global convergence and search ability of the ant colony algorithm, the algorithm model selects the ant cycle model to update the global pheromone:
[0124]
[0125] Where Q represents the pheromone intensity constant, L k Represents the length of the path produced by the kth ant.
[0126] S7. The robot equipment operates autonomously according to the departure time and route issued by the intelligent dispatching platform, and feeds back the equipment status data and location data during transportation to the dispatching platform in real time.
[0127] S8. If any unexpected situation occurs during robot scheduling, transportation route planning, or autonomous operation of the robot, which makes the original work impossible to complete or delayed, it is necessary to promptly feedback to the emergency response module and conduct emergency process abnormality scheduling;
[0128] Collect real cases and simulation data of assisted transportation at home and abroad, and build an emergency response expert database and case library for learning and inductive reasoning;
[0129] Design a multi-layer similarity matching algorithm for characteristic attributes of emergency abnormal cases, use the order relationship analysis method to solve the terminal attribute weight set, and use the EPanchnikov kernel function to determine the final weight value to improve the accuracy of case matching. Determine the abnormal response strategy by calculating the similarity between the target case and the historical case;
[0130] The weight coefficient is calculated as follows:
[0131] σ h-1 >σ / h, h∈{2,3,...,n}
[0132] The reasonable value of σ set by the evaluator needs to be satisfied to obtain the minimum weight coefficient ω n The calculation of is as follows:
[0133]
[0134] Based on the minimum weight coefficient ω n , and obtain the weight coefficient of the hth (h=n,n-1,…,2)th sorting number attribute in turn:
[0135] ω h-1 =σ h ω h
[0136] In the formula, σ represents the importance, h represents the ranking number of the attribute, and σ h Indicates the relative importance between the hth and h-1th attribute indicators, σ h-1 Indicates the relative importance between the h-1th and h-2th attribute indicators, ω h ,ω h-1 ,ω h They represent the weight coefficients of the nth, h-1th, and hth attribute indicators respectively.
[0137] In order to ensure the rationality of case attribute weight setting, multiple evaluation experts are usually selected to evaluate the importance of case attribute sets, and the weights of case attributes are solved by ordinal relationship analysis. Kernel density estimation is used to solve the probability density function corresponding to the case single-dimensional attribute set, and the value of the independent variable corresponding to the highest point of the function is the local optimal solution of the attribute set.
[0138] Emergency dispatch based on hybrid ant colony algorithm, when updating pheromone concentration, use function to initialize pheromone concentration of the path between nodes involved in the local optimal solution
[0139] Where Q0 is the current pheromone concentration, Q is the total amount of pheromone, and L is the cost of taboo search for the local optimal solution.
[0140] S9. After the auxiliary transport robot carries the required materials or personnel to the destination, it will conduct material arrival inspection and personnel location information feedback through the handheld terminal.
[0141] like Figure 4 As shown in the figure, an example of emergency response process for auxiliary transportation in underground coal mines is as follows:
[0142] When the robot operation monitoring or workers find track deformation, the track deformation information is uploaded to the intelligent dispatching platform through the vehicle terminal or handheld terminal; the coal mine dispatching command center receives the abnormal alarm of the electric locomotive robot and confirms it, determines the emergency level of the abnormal information, whether the leakage of the electric locomotive robot is within the processing range, and imports the abnormal information into the expert system for diagnosis, otherwise an emergency trigger will be triggered; the auxiliary transportation expert system based on case and rule reasoning performs reasoning diagnosis, and uses case feature similarity calculation and abnormal case attribute weight calculation to obtain an emergency dispatch plan for abnormal working conditions; according to the dispatch information, a personnel dispatch list (personnel in charge of the maintenance department, electromechanical department, and security inspection department rush to the scene) and a material dispatch list (prepare maintenance tools, wrenches, L-AN46 oil, steel rulers, etc.) are generated, and the personnel dispatching system and the material dispatching system perform the next dispatch according to the dispatch list; after the personnel dispatching system and the material dispatching system complete the task, they wait for the abnormal processing to be completed; the coal mine dispatching command center receives the abnormal recovery information and determines whether the abnormality needs to be stored. If necessary, it is imported into the case library and the alarm is lifted.
[0143] Therefore, the present invention adopts the above-mentioned intelligent scheduling system and method of coal mine underground auxiliary transportation robot, which can realize efficient management of coal mine underground personnel and intelligent distribution of materials, and improve the efficiency and safety performance of auxiliary transportation scheduling.
[0144] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that they can still modify or replace the technical solution of the present invention with equivalents, and these modifications or equivalent replacements cannot cause the modified technical solution to deviate from the spirit and scope of the technical solution of the present invention.
Claims
1. An intelligent dispatching system for auxiliary transportation robots in underground coal mines, characterized in that: The intelligent scheduling platform includes: The personnel dispatch module includes personnel basic information management, normal personnel dispatch and abnormal personnel dispatch functions; among which, personnel basic information management includes personnel attendance management and personnel classification information management, normal personnel dispatch includes coal mine personnel and vehicle dispatch and work content dispatch, and abnormal personnel dispatch includes emergency rescue path planning for underground personnel in emergency situations; Material dispatch module, including material demand submission and review, intelligent material assembly, mine car loading and binding, target dispatch scheduling and auxiliary transportation route planning; Real-time monitoring module, including equipment configuration page, vehicle-mounted camera, fixed camera, positioning base station and equipment communication, monitors the operation status and location information of the auxiliary transport robot; The human-computer interaction module includes a handheld terminal, a vehicle-mounted terminal, and a dispatching display screen, which establishes a communication connection with the intelligent dispatching platform through optical fiber and 5G base stations; the handheld terminal is carried by the auxiliary transport worker, the vehicle-mounted terminal is placed in the cab of the auxiliary transport robot, and the dispatching display screen includes an LED information guide screen, a dispatching departure board, and a dispatching display screen. The LED information guide screen and the dispatching departure board are arranged in the underground parking lot and lanes, and the dispatching display screen is arranged in the ground dispatching room; The emergency response module includes an expert library and a case library, which are used to handle abnormal situations in auxiliary transportation; the emergency response module is automatically triggered for abnormal information status of auxiliary transportation robot equipment; and the emergency response module is manually triggered for abnormal information status of auxiliary transportation lane environment.
2. An intelligent dispatching method for an auxiliary transport robot in an underground coal mine, characterized in that: The following steps are involved: S1. According to the auxiliary transportation dispatching tasks, the demand for personnel and materials is reported through the material dispatching module, and summarized to the intelligent dispatching platform through the human-computer interaction module; S2. Based on the demand information summarized by the intelligent dispatching platform, the auditor will audit the demand list; for the demand list that passes the audit, the material dispatching module and the personnel dispatching module will be activated according to the content of the list; for the demand list that fails the audit, the auditor will feedback to the mining area and the person who submitted the information, and explain the reasons for failure; S3. According to the material demand list, the material dispatching module sorts the urgency and intelligently groups the materials. The human-computer interaction module guides the loading personnel to load and bind the mine cars. S4. According to the personnel demand list, the personnel dispatching module is used to dispatch and schedule the personnel entering and leaving the mine; S5. Use the intelligent dispatching platform to schedule auxiliary transport robots without deadlock, and dispatch underground personnel and materials; S6. Clarify the task scheduling of the auxiliary transport robot and plan the path according to the task destination; S7, according to the instructions issued by the intelligent dispatching platform, assist the transport robot to operate autonomously, and feed back the operating status to the intelligent dispatching platform through the real-time monitoring module and the human-computer interaction module; S8. When the auxiliary transport robot encounters abnormal conditions during autonomous operation, the emergency response module is automatically triggered. Based on the expert library and case library, the rule reasoning of the cause of the abnormal information is carried out to obtain the corresponding solution, and the hybrid ant colony algorithm is used for emergency dispatch; S9. When the auxiliary transport robot carries the required materials or personnel to the destination, the handheld terminal is used to inspect the arrival of the materials or provide feedback on the location of the personnel.
3. The intelligent dispatching method of an auxiliary transport robot in underground coal mines according to claim 2 is characterized in that: In step S3, the intelligent assembly includes establishing an objective function of the material loading problem based on the maximum space utilization and the maximum load-bearing weight, as follows: In the formula, f max represents the objective function of the material loading problem, λ represents the utilization coefficient, λ=1, the space utilization rate of the objective function is the maximum, λ=0, the load utilization rate of the objective function is the maximum; m0 represents the type of material; n i , l i 、w i 、h i Respectively represent the quantity, length, width, and height of the i-th material; g i represents the weight of the i-th material; Indicates the status of material loading. Indicates that the i-th material has not been loaded into the minecart; when When , it means that the i-th material has been loaded into the mine car; G represents the rated load of the mine car; V represents the rated volume of the mine car.
4. The intelligent dispatching method of an auxiliary transport robot in underground coal mines according to claim 2 is characterized in that: In step S5, the deadlock-free scheduling of the auxiliary transport robot includes adjusting the robot departure time and establishing the scheduling strategy for different robots; Among them, the time interval between the two auxiliary transport robots is: T=(L m +L e ) / v The maximum time the auxiliary transport robot occupies a section is: T=T z +T x (T z +T x >(L m +L e ) / v) Where, T z Indicates the loading time, T x Indicates the time of unloading, L m Indicates the length of the mth segment, L e represents the length of the auxiliary transport robot itself, and v represents the running speed of the auxiliary transport robot.
5. The intelligent dispatching method of an auxiliary transport robot in underground coal mines according to claim 2 is characterized in that: In step S6, path planning is performed according to the destination of the demand list, including constructing the objective function and constraint conditions for optimizing the mine auxiliary transportation path, as follows: The objective function is: Where z is the path objective function, l ij represents the distance from material demand point i to material demand point j, x ijk It represents the auxiliary transport robot k from material demand point i to material demand point j, m1 is the number of auxiliary transport robots, and n is the number of material demand points; The constraints are: Constraint 1: The material demand distribution volume of each material demand point must not exceed the robot's maximum carrying capacity. ≤C,c i represents the material distribution volume of the i-th demand point, C represents the maximum loading capacity, y ik Indicates that the material transportation task of material demand point i is completed by robot k; Constraint 2: The total amount of material demand for each transport route must not exceed the robot's maximum carrying capacity; Constraint 3: Each material demand point can only be transported by one robot, and no second robot will pass through it repeatedly. Constraint 4: Each robot must strictly follow the planned path and is not allowed to preempt operations or reverse. It means that the robot that reaches the material demand point j is unique; Constraint 5: All robots can only depart from the parking lot, reach various material demand points, complete the transportation task, and then return to the parking lot. It means that the robot that leaves material demand point j is unique.
6. The intelligent dispatching method of an auxiliary transport robot in underground coal mines according to claim 4 is characterized in that: The ant colony algorithm is used to solve the planning path, as follows: Let the probability formula for the kth ant to transfer from position i to position j at time t be: In the formula, α is the pheromone inspiration factor, β is the expected inspiration factor, η ij is the expected function, d ij represents the distance from node i to node j, τ ij (t) is the pheromone content on the path between nodes ij at time t; At time t+1, the pheromone concentration on path ij is updated to: t ij (t+1)=(1-p)τ ij (t)+Δτ ij In the formula, τ ij (t+1) represents the pheromone concentration on path ij at time t+1, p represents the pheromone volatility coefficient, Δτ ij represents the increment of pheromone, Q represents the pheromone intensity constant, L k Represents the length of the path produced by the kth ant.
7. The intelligent dispatching method for auxiliary transportation robots in underground coal mines according to claim 2 is characterized in that: In step S8, the hybrid ant colony algorithm includes using the local optimal solution of the taboo search as a basis for initializing the pheromone concentration in the ant colony algorithm; Among them, the initial pheromone concentration is: Where Q0 is the current pheromone concentration, Q is the total amount of pheromone, and L is the cost of taboo search for the local optimal solution.
8. The intelligent dispatching method for auxiliary transportation robots in underground coal mines according to claim 7 is characterized in that: The weight coefficient of each attribute in the attribute set is determined by the order relationship analysis method, and the probability density function corresponding to the case single-dimensional attribute set is solved by kernel density estimation to obtain the local optimal solution of the attribute set; The weight of each attribute is calculated as follows: s h-1 >σ / h,h∈{2,3,...,n} oh h-1 =s h oh h In the formula, σ represents the importance, h represents the ranking number of the attribute, and σ h Indicates the relative importance between the hth and h-1th attribute indicators, σ h-1 Indicates the relative importance between the h-1th and h-2th attribute indicators, ω n ,ω h-1 ,ω h They represent the weight coefficients of the nth, h-1th, and hth attribute indicators respectively.
Citation Information
Patent Citations
A smart dispatching and management system for trackless rubber-tired vehicles in coal mines
CN109507969B
Intelligent mine scheduling system
CN112037503A
Coal Mine Underground Vehicle Dispatch and Monitoring System
CN112360560B
Intelligent Dispatch System and Method for Mining Vehicles Based on GNSS High-Precision Positioning
CN114677063B
Intelligent comprehensive dispatching management and control platform for coal mine
CN115619130A
Cited By
Emergency power supply vehicle scheduling optimization method and device based on ant colony algorithm, equipment and medium
CN120450373A
Intelligent dispatching method for underground coal mine trackless rubber-tyred vehicle based on time sequence information reasoning
CN120598117A
