Collaborative design system based on BIM technology
Through a collaborative design system based on BIM technology, the problems of information asymmetry and difficulty in collaboration in BIM model design are solved, real-time sharing and collaborative design among multiple professions are realized, design efficiency and quality are improved, fundraising process is simplified, and File permissions and version management are provided.
Patent Information
- Application Number
- CN202410779194.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-17
- Publication Date
- 2024-11-22
AI Technical Summary
During the design process of existing BIM models, there are problems such as job-level information asymmetry, inconsistent specifications for professional introductory diagrams, and difficulty in coordination between majors.
Provide a collaborative design system based on BIM technology, including cloud platform and design end, and realizes multiple designers through project creation modules, file management modules, collaborative design method selection modules, three-dimensional collaborative design modules, fundraising management modules and other modules. Co-built BIM models in the cloud, support component-level collaboration and component-level permission settings, synchronize design content in real time, simplify the fundraising process, and provide collision detection and hole opening processing functions.
Realize instant information sharing and collaborative design among various majors, reduce errors and delays caused by poor communication, improve design efficiency and quality, ensure the singleness and accuracy of model information, simplify the fundraising process, and Provides file permission management and version control.
Smart Images

Figure CN119005924A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of BIM model design, and in particular to a collaborative design system based on BIM technology. Background Art
[0002] BIM is the abbreviation of Building Information Modeling. BIM is based on various relevant information data of construction projects to build a three-dimensional building model, and simulates the real information of the building through digital information simulation. It has eight characteristics: information completeness, information relevance, information consistency, visualization, coordination, simulation, optimization and mappability.
[0003] The development goals of the second chapter of the "14th Five-Year Plan" for the development of the construction industry clearly state: promote digital collaborative design, encourage large-scale design companies to establish digital collaborative design platforms, promote integrated design of buildings, structures, equipment pipelines, decoration, etc., and improve the collaborative design capabilities of various professions. However, in the existing BIM model design process, there are problems such as information asymmetry at the job level, inconsistent drawing standards within the profession, more variations between professions, and difficulty in collaboration. Summary of the invention
[0004] The purpose of this application is to overcome the problems of information asymmetry at the job level, inconsistent drawing specifications within a profession, more variations between professions, and difficulty in collaboration in the existing BIM model design process, and to provide a collaborative design system based on BIM technology.
[0005] In the first aspect, a collaborative design system based on BIM technology is provided, including a cloud platform and a design terminal connected to the cloud platform;
[0006] The cloud platform includes:
[0007] The project creation module is used to set project stages, sub-projects, involved disciplines, and member role allocations, and automatically allocate folder permissions based on member roles and project stages, as well as task planning and task distribution;
[0008] A file management module, which is used to automatically generate folders for corresponding sub-items according to the project phase, sub-items and the professions involved, and automatically classify the files in the folders according to their types and store them in corresponding sub-folders, wherein the file types include BIM model files, CAD drawing files and text files;
[0009] A collaborative design mode selection module is used to select a collaborative design mode, wherein the collaborative design mode includes a central file collaborative mode and a linked file collaborative mode. The central file collaborative mode refers to multiple designers jointly building a BIM model in the cloud, and the linked file collaborative mode refers to designers referring to different versions of BIM model files of the required profession through linked references at the design end, wherein the linked file collaborative mode supports component-level collaboration, component-level authority settings, and on-demand reference of component granularity;
[0010] 3D collaborative design module, used to establish unified design standards and provide a central file collaborative design platform with unified design standards for project members, where the design standards include layers, colors, line types and print styles;
[0011] The capital raising management module includes:
[0012] The funding initiation submodule is used to set the funding stages and required funding processes according to different project stages. When the project reaches the funding stage, the required funding process is initiated at the design end.
[0013] The capital raising review submodule is used to send the capital raising documents to the corresponding capital raising professional person in charge. If the capital raising professional person in charge approves the documents, the capital raising documents will be forwarded to the capital collecting professional person in charge to complete the capital collecting process;
[0014] The capital raising document archiving submodule is used to keep the capital raising documents, circulation records and approval opinions in the capital raising and capital collection process, and to export the capital raising documents, circulation records and approval opinions;
[0015] The design end includes:
[0016] A design module, used to draw and modify the BIM model and synchronize the BIM model to the three-dimensional collaborative design module;
[0017] The funding module is used to initiate the required funding process when the project reaches the funding stage;
[0018] The collision detection module is used to perform collision detection on the constructed model. The collision detection can identify the ID and spatial information of each component. After the collision detection, a collision report can be automatically generated. The collision report can display the colliding subject, the subject's ID, the subject's size and the collision view, and can export the collision report file. It can also locate the positions of the components that collide with each other based on the collision report, and view the collision component view in the model;
[0019] The collaborative hole opening module is used to identify the subject information and space information in the collision report and perform hole opening processing, and set hole opening rules according to different hole opening subjects and hole opening positions, generate hole opening files, which include hole opening subjects, hole opening positions and hole opening sizes, and send the hole opening files to civil engineering professional members.
[0020] Furthermore, the BIM model is synchronized to the three-dimensional collaborative design module in a real-time synchronization, a scheduled synchronization or a custom synchronization.
[0021] Furthermore, the file management module also includes:
[0022] The file permission setting submodule is used to set permissions for folders and subfolders;
[0023] The version management submodule is used to automatically sort the files uploaded in the subfolders by identifying the file names, and record the file upload time, uploader and version number.
[0024] Furthermore, the central file collaboration method allows users to view and edit the model in the current project in real time. It is a collaborative design mode with instant information sharing. Multiple designers can jointly build the same BIM model in the cloud. The design content of each designer is synchronized to the cloud at certain intervals or in real time. Before collaborative design, the authority is divided according to the professional participants and professional characteristics, the scope of work is determined, and each participant independently completes the corresponding design content.
[0025] Furthermore, the linked file collaboration method is based on the design end referring to different versions of files of the required profession through linked references. The reference means that when the BIM model file is submitted to the file management module in the cloud, it can be selected to refer to other professions or other sub-item BIM models of the profession, and it can be selected to refer to any version of the submitted BIM model file to complete the full professional modeling or generate the overall BIM model. When the referenced BIM model file is updated, the cloud and the design end will automatically generate dynamic reminders, and the design end has a model update comparison function for viewing the difference between the updated version and the original version. When the referenced BIM model file is updated, the designer can choose to automatically update to the latest version of the file on the design end.
[0026] Furthermore, the cloud also includes a dynamic notification module for monitoring whether the files on the cloud have changed. If the files on the cloud have changed, a message is automatically generated to remind relevant members, and a log file is generated. The log file is used to record the operating member, time and content of the file change.
[0027] The design end also includes a notification module, which is used to receive messages sent by the dynamic notification module and remind members to check the messages.
[0028] Furthermore, the capital raising management module also includes:
[0029] The retention submodule is used to retain the project's funding process and the records of opinions generated during the funding process;
[0030] The sharing submodule is used to generate and share sharing links or QR codes for one or more funding processes of the project.
[0031] Furthermore, the cloud side and the design side both include a version comparison module, which is used to select different version files for comparison and generate a comparison analysis file. The comparison analysis file classifies the components according to the addition, deletion, and modification of the components. Clicking on the component in the comparison analysis file can locate the component position, wherein the time and person in charge are recorded in each version file.
[0032] Furthermore, the cloud also includes a lightweight module for performing lightweight processing on the BIM model files uploaded to the cloud.
[0033] Furthermore, the cloud also includes a problem tracking module, which is used to create problems and customize problem titles. When a problem is found, a problem component or problem area is selected to create a problem according to the customized problem title, and a problem file is generated. The content of the problem file includes at least one of the following: problem title, problem component, problem area, problem view, relevant person in charge and problem record content, and the problem file is sent to the relevant person in charge of the problem so that the relevant person in charge can provide a solution and correct the model, and generate a problem record sheet, which includes at least one of the following: problem file, problem file flow record, solution and correction record. The problem tracking module is also used to generate a sharing link or QR code from the problem file or problem record sheet and share it.
[0034] This application has the following beneficial effects: the system enables members involved in the design to simultaneously build the BIM model on the cloud, and all design members design on a unified platform, thereby reducing errors, omissions, collisions, and deficiencies caused by poor or untimely communication between disciplines, truly realizing the unity of all drawings and model information elements, and realizing automatic modification of other parts when one is modified, thereby improving design efficiency and design quality. The BIM model is collaboratively designed by referring to different versions of BIM files of the required disciplines through linked references. When the BIM model is changed or updated, other design members can promptly obtain whether the referenced model has been updated and what content has been updated, ensuring the timeliness and accuracy of information communication among disciplines when the model is adjusted or changed, realizing rapid collaboration within disciplines, effectively improving the efficiency of model construction, and simplifying the funding process. The funding process can also be retained and exported, and files in the cloud can be classified and stored, and permissions such as access, modification, deletion, and download of cloud files can be set. BRIEF DESCRIPTION OF THE DRAWINGS
[0035] The drawings constituting a part of the present application are used to provide a further understanding of the present application. The illustrative embodiments of the present application and their descriptions are used to explain the present application and do not constitute an improper limitation on the present application.
[0036] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0037] Figure 1 It is a structural diagram of a collaborative design system based on BIM technology in an embodiment of the present application;
[0038] Figure 2 It is a structural block diagram of the cloud in the collaborative design system based on BIM technology in an embodiment of the present application;
[0039] Figure 3 It is a structural block diagram of the design end in the collaborative design system based on BIM technology in an embodiment of the present application;
[0040] Figure 4 It is a flowchart of the use of the collaborative design system based on BIM technology in an embodiment of the present application.
[0041] Reference numerals:
[0042] 100. Cloud; 101. Project creation module; 102. File management module; 1021. File permission setting submodule; 1022. Version management submodule; 103. Collaborative design mode selection module; 104. Three-dimensional collaborative design module; 105. Funding management module; 1051. Funding initiation submodule; 1052. Funding review submodule; 1053. Funding file archiving submodule; 1054. Sharing submodule; 106. Dynamic notification module; 107. Lightweight module; 108. Problem tracking module; 200. Design end; 201. Design module; 202. Funding module; 203. Collision detection module; 204. Collaborative opening module; 205. Notification module; 300. Version comparison module. DETAILED DESCRIPTION
[0043] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0044] Example
[0045] like Figure 1 As shown, a collaborative design system based on BIM technology involved in an embodiment of the present application includes a cloud platform 100 and a design terminal 200 connected to the cloud platform 100;
[0046] like Figure 2 As shown, the cloud 100 platform includes:
[0047] The project creation module 101 is used to set the project stage, sub-projects, the involved professions and member role allocation, and automatically allocate folder permissions according to member roles and project stages, as well as task planning and task distribution;
[0048] Specifically, project planning is carried out through the project creation module 101, and basic information of the current project is added, including personnel, project stages, sub-items, and various disciplines involved (architecture, structure, mechanical and electrical, etc.). The selected members will have different permissions to the platform folders according to the set roles, professions, and stages. By default, only the personnel of the current profession have the upload, reference, and editing permissions for the file. If other professions and stages require this permission, the corresponding administrator can open the permission.
[0049] The file management module 102 is used to automatically generate folders for corresponding sub-items according to the project phase, sub-items and the professions involved, and automatically classify the files in the folders according to their types and store them in corresponding sub-folders, wherein the file types include BIM model files, CAD drawing files and text files;
[0050] In a further embodiment, the file management module 102 further includes:
[0051] The file permission setting submodule 1021 is used to set permissions for folders and subfolders;
[0052] The version management submodule 1022 is used to automatically sort the files uploaded in the subfolder by identifying the file names, and record the upload time, uploader and version number of the files.
[0053] The file management module 102 will automatically generate folders for the corresponding sub-items under the file management module 102 according to the sub-items generated in the project planning stage and the set professions (architecture, structure, electromechanical, etc.), and will automatically divide the categories in the corresponding professional (architecture, structure, electromechanical, etc.) folders and store them in the corresponding sub-folders, for example: BIM model files, CAD files, text files, picture files, etc. This file is the location where the design end 200 saves the model to the platform after it is created.
[0054] The file permission setting submodule 1021 can set permissions based on the folders and subfolders where BIM model files, CAD files, etc. are located, including permissions such as file upload, download, deletion, and update. That is, the generated folders and subfolders can also control the permissions of members participating in the project, and set whether relevant members have permissions to upload, view, update, delete, download, etc., to ensure the security of files.
[0055] The version management submodule 1022 has a version management function, which can automatically sort the model files uploaded to the cloud 100 by identifying the model name, that is, the upload time and uploader will be recorded for the model files uploaded and saved to the cloud 100. For the model files uploaded at different times of the same model, the current version number will be automatically sorted and recorded, which is convenient for file storage and clear management.
[0056] The collaborative design mode selection module 103 is used to select the collaborative design mode, wherein the collaborative design mode includes a central file collaborative mode and a linked file collaborative mode. The central file collaborative mode refers to multiple designers jointly building a BIM model on the cloud 100, and the linked file collaborative mode refers to designers referring to different versions of BIM model files of the required profession on the design end 200 through a linked reference mode, wherein the linked file collaborative mode supports component-level collaboration, component-level authority setting, and component granularity on-demand reference;
[0057] In the above embodiment, through a set of self-developed core algorithms and encapsulated API interfaces, it can meet the application scenarios of forward collaborative design such as component-level collaboration, component-level permission control, and component granularity on-demand reference. Compared with traditional file-level collaboration, it gives full play to the advantages of component-level collaboration such as accuracy, efficiency, real-time, and imperceptibility.
[0058] The three-dimensional collaborative design module 104 is used to establish a unified design standard and provide a central file collaborative design platform with unified design standards for members within the project, wherein the design standard includes layers, colors, line types, and print styles;
[0059] Specifically, a unified design standard is established through the three-dimensional collaborative design module 104, including layers, colors, line types, print styles, etc. On this basis, all design disciplines and personnel design on a unified platform, thereby reducing errors, omissions, collisions, and deficiencies caused by poor or untimely communication between disciplines (and within disciplines), truly realizing the unity of all drawings and model information elements, realizing automatic modifications to other areas when modifications are made in one place, and improving design efficiency and quality.
[0060] The capital raising management module 105 includes:
[0061] The capital raising initiation submodule 1051 is used to set the capital raising stages and required capital raising processes according to different project stages. When the project reaches the capital raising stage, the required capital raising process is initiated at the design end 200;
[0062] The capital raising review submodule 1052 is used to send the capital raising document to the corresponding capital raising professional person in charge. If the capital raising professional person in charge approves the document, the capital raising document will be forwarded to the capital collecting professional person in charge to complete the capital collecting process;
[0063] The capital raising document archiving submodule 1053 is used to maintain the capital raising documents, circulation records and approval opinions in the capital raising and capital collecting process, and to export the capital raising documents, circulation records and approval opinions;
[0064] The so-called professional funding refers to the process and standards for proposing conditions between different professions in order to ensure design quality and work efficiency at each stage of each profession (scheme stage, preliminary design, construction drawing stage); among them, both the design end 200 and the cloud end 100 can set up a funding management module 105, and the funding management module 105 can set up a funding process to conduct funding review and save funding documents and materials; in the funding process module, the required funding process can be set according to different stages. When the project reaches the funding stage, different professions can initiate the funding process under the funding management module 105 on the design end 200. According to the stage of the current model file (file management module 102) and the set process, it will be automatically read when the funding is initiated (add in the project planning stage) When each profession needs to initiate a funding proposal, the person in charge of funding collection and the funding proposal model no longer need to be manually selected. When each profession needs to initiate a funding proposal, they can choose to initiate the funding proposal according to the entire model file or a component of the current model. When the person in charge of funding proposal checks that the funding proposal document is correct and can be sent to the funding collection profession, the funding proposal document will be transferred to the person in charge of funding collection according to the set process. The funding collection person will receive the information on both the cloud 100 and the design end 200 to complete the funding collection process. When the entire process is completed correctly, the funding proposal document and the approval opinions during the process flow will be automatically saved in the funding proposal area. The entire funding process will leave traces on the cloud 100 platform. When collecting information for project acceptance, all funding proposal documents and funding process records for the project can be exported in the funding proposal area with one click.
[0065] like Figure 3 As shown, the design end 200 includes:
[0066] The design module 201 is used to draw and modify the BIM model and synchronize the BIM model to the 3D collaborative design module 104. The synchronization mode of synchronizing the BIM model to the 3D collaborative design module 104 is real-time synchronization, scheduled synchronization or custom synchronization;
[0067] Specifically, the designer can design the BIM model locally on the design end 200, and save the BIM model locally as well as upload and synchronize it to the cloud 100. The synchronization method can be real-time synchronization, timed synchronization with a set time interval, or custom synchronization. Custom synchronization means that the designer can synchronize manually according to the actual situation when the designer considers synchronization necessary, such as completing a phased design.
[0068] A funding module 202 is used to initiate the required funding process when the project reaches the funding stage;
[0069] The collision detection module 203 is used to perform collision detection on the constructed model. The collision detection can identify the ID and spatial information of each component. After the collision detection, a collision report can be automatically generated. The collision report can display the colliding subject, the ID of the subject, the size of the subject and the collision view, and can export the collision report file. It can also locate the positions of the components that collide with each other based on the collision report, and view the collision component view in the model;
[0070] The collaborative hole opening module 204 is used to identify the subject information and space information in the collision report and perform hole opening processing, and set hole opening rules according to different hole opening subjects and hole opening positions, generate a hole opening file, and the hole opening file includes the hole opening subject, hole opening position and hole opening size, and send the hole opening file to civil engineering professional members.
[0071] After each professional model is built, the model needs to be deepened and collision detected. The design end 200 uses the collision detection module 203 to check whether the model components between or within each professional have collided. The ID and spatial information of each component can be identified for detection. After the detection, a collision report will be automatically generated. The collision report result will display the collision subject and its ID, elevation dimension information, etc. and the collision view, and can be exported as a word file; and the design end 200 can locate the positions of the components that collide with each other based on the collision report, and can view the collision component view intuitively and clearly; the collaborative opening module 204 can perform subsequent mechanical and electrical professional deepening and civil engineering professional opening processing based on the subject that caused the collision; after the collision report is generated, the design end 200 can identify the subject and space information in the collision check result through the collaborative opening function to perform opening processing, and can set opening rules according to the different main positions of the opening to generate an opening file. The file includes the opening subject, the opening size and other information and is sent to the civil engineering major. When the civil engineering major receives the file, it can perform one-click opening processing.
[0072] In a further embodiment, the central file collaboration method allows users to view and edit the model in the current project in real time. It is a collaborative design mode with instant information sharing. Multiple designers can jointly build the same BIM model in the cloud 100. The design content of each designer is synchronized to the cloud 100 at certain intervals or in real time. Before collaborative design, the authority is divided according to the professional participants and professional characteristics, the scope of work is determined, and each participant independently completes the corresponding design content.
[0073] In a further embodiment, the linked file collaboration method is based on the design end 200 referring to different versions of files of the required profession through linked reference. The reference means that when the BIM model file is submitted to the file management module 102 in the cloud 100, it can be selected to refer to other professions or other sub-item BIM models of the profession, and it can be selected to refer to any version of the submitted BIM model file to complete the full professional modeling or generate the overall BIM model. When the referenced BIM model file is updated, the cloud 100 and the design end 200 will automatically generate a dynamic reminder, and the design end 200 has a model update comparison function for viewing the difference between the updated version and the original version. When the referenced BIM model file is updated, the designer at the design end 200 can choose to automatically update to the latest version of the file.
[0074] In a further embodiment, the cloud 100 further includes a dynamic notification module 106 for monitoring whether files in the cloud 100 are changed. If a file in the cloud 100 is detected to be changed, a message is automatically generated to remind relevant members, and a log file is generated. The log file is used to record the operating member, time and content of the file change;
[0075] The design end 200 also includes a notification module 205 for receiving messages sent by the dynamic notification module 106 and reminding members to check the messages.
[0076] In a further embodiment, the funding management module 105 also includes: a retention sub-module, which is used to generate and retain records of the project's funding process and the opinions generated in the funding process; a sharing sub-module 1054, which is used to generate a sharing link or QR code for the project's funding process and share it, so that all funding processes and the opinions in the process will be recorded and retained, and subsequent personnel who log in to their accounts can view any process; at the same time, the sharing function can also be used to generate sharing links or QR codes for a single project, a single process, or multiple processes of a single project to share with others for learning.
[0077] In a further embodiment, the cloud end 100 and the design end 200 both include a version comparison module 300, and the version comparison module 300 is used to select different version files for comparison and generate a comparison analysis file. The comparison analysis file classifies the components according to the addition, deletion, and modification of the components. Clicking on the component in the comparison analysis file can locate the component position, wherein the time and person in charge are recorded in each version file.
[0078] In a further embodiment, the cloud 100 further includes a lightweight module 107 for lightweighting the BIM model files uploaded to the cloud 100 , making it faster to view, edit and compare models on the cloud 100 .
[0079] In a further embodiment, the cloud 100 also includes a problem tracking module 108, which is used to create problems and customize problem titles. When a problem is found, a problem component or problem area is selected to create a problem according to the customized problem title, and a problem file is generated. The content of the problem file includes the problem title, problem component (or problem area), problem view, relevant person in charge and problem record content, and the problem file is sent to the relevant person in charge of the problem so that the relevant person in charge can provide a solution and correct the model, and generate a problem record sheet, which includes the problem file, problem file flow record, solution and correction record. The problem tracking module is also used to generate a sharing link or QR code from the problem file or problem record sheet and share it with other members for viewing and learning. During the sharing process, the member accepting the sharing only has the right to view project annotations and problems, and can set whether the specific parameter information of the model is open to the member accepting the sharing after sharing.
[0080] Specifically, Figure 4 A flowchart of collaborative design based on BIM technology in a collaborative design system in an application embodiment is shown, and the specific description is as follows:
[0081] 1. This system mainly includes the cloud side and the design side (i.e. the tool side), where both sides can complete the upload and storage of model files to the cloud;
[0082] 2. Permission management refers to the ability to set permissions for participants in each professional folder saved on the platform, including download, update, reference and other permission settings; in addition, it also includes the function of version management, based on which version of the file to reference, you can choose to reference which version of the file, so as to ensure that the reference project is up-to-date and unique during the reference process;
[0083] 3. After setting permissions, you can select the project collaboration mode according to the project type: central file collaboration or linked file collaboration; when you need to refer to files, you can select the versions of files submitted to the cloud at different periods based on the design end, and you can choose to filter by floor or component when referring to them; at the same time, if there is an update to the referenced professional file, the notification module on the design end will also have information reminders, you can see which version is currently updated, and you can view the specific update content. At the same time, the update content can also be automatically divided into addition, deletion, and modification. You can also choose whether to update the file to the latest version. It can be automatically updated without re-reference;
[0084] 4. The referenced model can lock or show or hide components according to the family (component), and when the referenced model is updated, the updated content can be synchronized to the current project through the platform;
[0085] 5. During the entire collaborative design process, any updates or changes to the projects involved can be viewed through dynamic management. Dynamic notification means that if there are any adjustments or changes to the model on the entire platform and tool side, all professional project participants can receive this information synchronously. When the current project has multiple sub-items, you can also choose to view the updates of the sub-items related to you. When the entire project is completed or in progress, the log can be exported to view all the changes in the current project completion process.
[0086] 6. Funding management refers to the process of initiating funding between different disciplines when the project is completed to a certain stage. Funding can be initiated on the cloud, and the funder and the person in charge of the funding collection can be designated. The entire process can be customized. When different disciplines collaborate on collision detection and hole opening, the location of the hole to be opened, the main body of the hole, and the size of the hole can be automatically recorded based on the generated funding file. After sending it to the funder, the collision location and hole opening can be automatically performed based on the current file, and it can be selected whether to mark the hole.
[0087] 7. After the entire model reference, internal audit and funding, the problem tracking function can be used to mark problems on both the design side and the cloud; problem tracking means that any problem found based on the cloud + design side can create a problem list, and automatically take screenshots to generate a problem view. Enter the problem content, and the component with the problem will automatically identify the current component person in charge. It can also be classified according to the set problem tags. The recipient will automatically receive the problem and can locate the specific location and view. After the problem is solved, it can be summarized and recorded by floor, single file, and professionally and exported locally. You can also generate a link to share with other people in need; secondly, you can also check the problem solving progress at any time, and you can locate and highlight the problem location.
[0088] In this embodiment, a two-dimensional and three-dimensional collaborative design system is provided to achieve rapid collaboration within each profession. The cloud + terminal BIM forward design collaborative technology relies on the big data engine, combines the characteristics of BIM component data, and provides component permissions, relationships, versions, indexes and other management capabilities through structured processing of component data, providing support for machine learning, intelligent analysis and other application scenarios of massive BIM data. At the same time, based on the BIM big data management system, through a set of self-developed core algorithms and encapsulated API interfaces, it supports forward collaborative design application scenarios such as component-level collaboration, component-level permission control, and component granularity on-demand reference. Compared with traditional file-level collaboration, it gives full play to the advantages of component-level collaboration such as precision, efficiency, real-time, and imperceptibility.
[0089] The above are only preferred specific implementations of the present application; however, the protection scope of the present application is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical solution and its improved ideas of the present application within the technical scope disclosed in the present application, which should be included in the protection scope of the present application.
Claims
1. A collaborative design system based on BIM technology, characterized in that: It includes a cloud platform and a design end connected to the cloud platform; The cloud platform includes: The project creation module is used to set project stages, sub-projects, involved disciplines, and member role allocations, and automatically allocate folder permissions based on member roles and project stages, as well as task planning and task distribution; A file management module, which is used to automatically generate folders for corresponding sub-items according to the project phase, sub-items and the professions involved, and automatically classify the files in the folders according to their types and store them in corresponding sub-folders, wherein the file types include BIM model files, CAD drawing files and text files; A collaborative design mode selection module is used to select a collaborative design mode, wherein the collaborative design mode includes a central file collaborative mode and a linked file collaborative mode. The central file collaborative mode refers to multiple designers jointly building a BIM model in the cloud, and the linked file collaborative mode refers to designers referring to different versions of BIM model files of the required profession through linked references at the design end, wherein the linked file collaborative mode supports component-level collaboration, component-level authority settings, and on-demand reference of component granularity; 3D collaborative design module, used to establish unified design standards and provide a central file collaborative design platform with unified design standards for project members, where the design standards include layers, colors, line types and print styles; The capital raising management module includes: The funding initiation submodule is used to set the funding stages and required funding processes according to different project stages. When the project reaches the funding stage, the required funding process is initiated at the design end. The capital raising review submodule is used to send the capital raising documents to the corresponding capital raising professional person in charge. If the capital raising professional person in charge approves the documents, the capital raising documents will be forwarded to the capital collecting professional person in charge to complete the capital collecting process; The capital raising document archiving submodule is used to keep the capital raising documents, circulation records and approval opinions in the capital raising and capital collecting process, and to export the capital raising documents, circulation records and approval opinions; The design end includes: A design module, used for drawing and modifying the BIM model, and synchronizing the BIM model to the three-dimensional collaborative design module; The funding module is used to initiate the required funding process when the project reaches the funding stage; The collision detection module is used to perform collision detection on the constructed model. The collision detection can identify the ID and spatial information of each component. After the collision detection, a collision report can be automatically generated. The collision report can display the colliding subject, the subject's ID, the subject's size and the collision view, and can export the collision report file. It can also locate the positions of the components that collide with each other based on the collision report, and view the collision component view in the model; The collaborative hole opening module is used to identify the subject information and space information in the collision report and perform hole opening processing, and set hole opening rules according to different hole opening subjects and hole opening positions, generate hole opening files, which include hole opening subjects, hole opening positions and hole opening sizes, and send the hole opening files to civil engineering professional members.
2. The collaborative design system based on BIM technology according to claim 1 is characterized in that: The BIM model is synchronized to the three-dimensional collaborative design module in a real-time synchronization, a scheduled synchronization or a custom synchronization.
3. The collaborative design system based on BIM technology according to claim 1 is characterized in that: The file management module also includes: The file permission setting submodule is used to set permissions for folders and subfolders; The version management submodule is used to automatically sort the files uploaded in the subfolders by identifying the file names, and record the file upload time, uploader and version number.
4. The collaborative design system based on BIM technology according to claim 1 is characterized in that: The central file collaboration method allows users to view and edit the model in the current project in real time. It is a collaborative design mode with instant information sharing. Multiple designers can jointly build the same BIM model in the cloud. The design content of each designer is synchronized to the cloud at certain intervals or in real time. Before collaborative design, the authority is divided according to the professional participants and professional characteristics, the scope of work is determined, and each participant independently completes the corresponding design content.
5. The collaborative design system based on BIM technology according to claim 1 is characterized in that: The linked file collaboration method is based on the design end referring to different versions of files of the required profession through linked references. The reference means that when the BIM model file is submitted to the file management module in the cloud, it can be selected to refer to other professions or other sub-item BIM models of the profession, and it can be selected to refer to any version of the submitted BIM model file to complete the full professional modeling or generate the overall BIM model. When the referenced BIM model file is updated, the cloud and the design end will automatically generate dynamic reminders, and the design end has a model update comparison function for viewing the difference between the updated version and the original version. When the referenced BIM model file is updated, the designer can choose to automatically update to the latest version of the file at the design end.
6. The collaborative design system based on BIM technology according to claim 1 is characterized in that: The cloud also includes a dynamic notification module for monitoring whether files on the cloud have changed. If a file on the cloud has changed, a message is automatically generated to remind relevant members and a log file is generated. The log file is used to record the operating member, time and content of the file change. The design end also includes a notification module, which is used to receive messages sent by the dynamic notification module and remind members to check the messages.
7. The collaborative design system based on BIM technology according to claim 1 is characterized in that: The capital raising management module also includes: The retention submodule is used to retain the project's funding process and the records of opinions generated during the funding process; The sharing submodule is used to generate sharing links or QR codes for one or more funding processes of the project and share them.
8. The collaborative design system based on BIM technology according to claim 1 is characterized in that: The cloud end and the design end both include a version comparison module, which is used to select different version files for comparison and generate a comparison analysis file. The comparison analysis file classifies the components according to the addition, deletion, and modification of the components. Clicking on the component in the comparison analysis file can locate the component position, wherein each version file records the time and person in charge.
9. The collaborative design system based on BIM technology according to claim 8, characterized in that: The cloud also includes a lightweight module for performing lightweight processing on the BIM model files uploaded to the cloud.
10. The collaborative design system based on BIM technology according to claim 1, characterized in that: The cloud also includes a problem tracking module, which is used to create problems and customize problem titles. When a problem is found, a problem component or a problem area is selected to create a problem according to the customized problem title, and a problem file is generated. The content of the problem file includes at least one of the following: problem title, problem component, problem area, problem view, relevant person in charge and problem record content, and the problem file is sent to the relevant person in charge of the problem so that the relevant person in charge can provide a solution and correct the model, and generate a problem record sheet, which includes at least one of the following: problem file, problem file flow record, solution and correction record. The problem tracking module is also used to generate a sharing link or QR code from the problem file or problem record sheet and share it.
Citation Information
Cited By
Multi-dimensional digital design device and method for urban rail transit engineering
CN119323078A
Special-shaped curtain wall three-unification collaborative management platform system based on BIM (Building Information Modeling)
CN119941197A
A BIM-based special-shaped curtain wall three-unified collaborative management platform system
CN119941197B
Intelligent flow chart data information providing method and system based on single data source
CN121434309A