Reversible lane setting method and device
By collecting data based on passenger flow characteristics and conducting simulation verification, the tidal flow lane settings are dynamically adjusted, which solves the problems of insufficient data accuracy and dynamic adjustment in the tidal flow lane settings, and realizes more scientific and flexible tidal flow lane management, optimizes traffic flow, and reduces congestion.
Patent Information
- Application Number
- CN202411224812.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-03
- Publication Date
- 2024-11-22
AI Technical Summary
In existing technologies, the setting of tidal flow lanes suffers from insufficient data accuracy, lack of a unified identification process, and insufficient dynamic adjustment, which affects the scientific nature and flexibility of tidal flow lane setting.
By collecting road and passenger flow characteristic data based on passenger flow characteristics, we can determine road conditions and traffic demand, determine the number, length and usage time of tidal lanes, and verify the dynamic adjustment of tidal lane settings through simulation. We can also evaluate traffic imbalance by combining the TTI imbalance index and speed imbalance index, and optimize the setting scheme using traffic simulation tools.
It enables precise identification of tidal traffic flow, improves the scientific nature and accuracy of tidal lane settings, dynamically adjusts tidal lanes to cope with changes in traffic flow, optimizes traffic flow, reduces congestion, and improves road traffic efficiency and safety.
Smart Images

Figure CN119007446A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of road traffic planning, and specifically provides a tidal lane setting method and device. Background Art
[0002] With the development of the economy and society, the number of motor vehicles has continued to increase, and the limitation of the road network's carrying capacity has led to increasingly serious traffic congestion. The imbalance in urban planning and development has caused uneven distribution of employment opportunities, resulting in significant separation of work and residence and traffic tidal phenomena. In order to ease traffic pressure and improve road utilization, various urban management departments have continuously explored and implemented various traffic management measures.
[0003] Tidal lanes are a dynamic traffic management measure that optimizes the allocation of road resources by adjusting the direction of lanes during peak hours, thereby alleviating traffic congestion. The core concept of tidal lanes is to flexibly adjust the direction of lane use according to the temporal and spatial distribution characteristics of traffic flow, so that lane resources can maximize the traffic needs of different directions in different time periods. The setting of tidal lanes depends on a detailed analysis of the characteristics of road traffic flow. By collecting and analyzing road traffic flow data, key parameters such as peak hours, flow change patterns, and congestion length can be determined. These data provide a scientific basis for the design of tidal lanes, making the setting of tidal lanes more reasonable and effective.
[0004] Although tidal lanes have alleviated traffic congestion to a certain extent, there are still some problems and challenges in practical application:
[0005] (1) Data accuracy issues: Traditional methods of collecting traffic flow data may have problems with incomplete data or insufficient accuracy, and may contain noise and outliers, which will affect the accuracy of analysis and decision-making for tidal lane settings.
[0006] (2) Lack of a unified identification process: The identification process of tidal traffic flow lacks standardization, which makes it difficult to ensure the consistency of the identification results, affecting the scientific nature of the tidal lane scheme.
[0007] (3) Insufficient dynamic adjustment: The usage time and direction adjustment of many tidal lanes are based on fixed time periods, which lack flexibility and make it difficult to respond to changes in traffic flow in real time. Summary of the invention
[0008] The present invention aims at addressing the deficiencies of the above-mentioned prior art and provides a tidal lane setting method with strong practicality.
[0009] A further technical task of the present invention is to provide a tidal lane setting device that is rationally designed, safe and applicable.
[0010] The technical solution adopted by the present invention to solve its technical problem is:
[0011] A tidal lane setting method, based on passenger flow characteristics, has the following steps:
[0012] S1. Road and passenger flow characteristic data collection;
[0013] S2. Determine whether the road conditions and traffic requirements are met;
[0014] S3. Determine the number of tidal lanes;
[0015] S4. Determine the length of the tidal lane;
[0016] S5. Determine the use time of the tidal lane;
[0017] S6. Simulation verification.
[0018] Furthermore, in step S1, two parts are included: collecting road characteristic data and collecting passenger flow characteristic data;
[0019] The road characteristic data is the basis for judging road conditions, including:
[0020] Road length L_road: Use a distance meter, GPS device or map data to obtain the actual length of the road in meters;
[0021] Number of lanes N_lanes: records the total number of lanes on the target road and distinguishes the number of lanes in different directions, in lanes;
[0022] Lane width W_lane: Use the measurement tool to measure the width of each lane in meters;
[0023] Road type T_road: confirm the type of target road;
[0024] Road usage U_road: records whether the road is allowed to be used by heavy vehicles and large public transportation vehicles, expressed as a Boolean value;
[0025] The passenger flow characteristic data is the key to identifying tidal traffic flow, including:
[0026] Traffic flow V_flow: The traffic flow data at different time periods are obtained through traffic flow monitoring equipment, and the unit is vehicles / hour;
[0027] Peak hour identification T_peak: Statistics and analysis of traffic flow in different time periods, identification of morning and evening peak hours and their changing patterns, expressed as a string;
[0028] Traffic flow direction O_D_flow: the direction of traffic flow is incoming or outgoing, expressed by a Boolean value;
[0029] Average vehicle speed V_avg: The average speed of the traffic is obtained through the speed detection equipment on the road, in kilometers per hour.
[0030] Furthermore, in step S2, when the target road is a main urban road with three or more two-way lanes, it is also necessary to verify whether the traffic demand is met, including whether the traffic flow is oversaturated and whether the two-way traffic imbalance index exceeds a threshold;
[0031] (1) Determination of traffic flow saturation;
[0032] The lane group saturation is used to determine whether the traffic flow is oversaturated. The specific formula is:
[0033]
[0034] Among them, X i is the saturation of lane group i, Q i is the actual traffic flow of lane group i (pcu / h), Q si is the actual saturated flow of lane group i under the green light hour condition; when X i When it exceeds 0.95, it indicates that the traffic flow of the lane group is in an oversaturated state, one of the import lane group and the export lane group is in an oversaturated state, and the other is in an unsaturated state, indicating that traffic control is needed;
[0035] (2) Determination of two-way traffic imbalance index;
[0036] The two-way traffic imbalance index includes two indicators, namely the TTI imbalance index and the speed imbalance index. The TTI imbalance index is:
[0037]
[0038] Among them, I TTI is the TTI imbalance index, with a value range of greater than or equal to 0. TTI1 and TTI2 are the travel time indexes of the import lane group and the export lane group in the same period, respectively. min is the smaller value of the travel time index;
[0039] The speed imbalance index is:
[0040]
[0041] Among them, I speed is the speed imbalance index, with a value range of greater than or equal to 0. Speed1 and Speed2 are the average vehicle speeds of the import lane group and the export lane group in the same period, respectively. min is the smaller value of the average vehicle speed;
[0042] When I TTI and I speedIf the speed exceeds the set threshold at the same time, it means that the speed difference between the two-way lanes is obvious, and tidal lanes need to be set up to balance the two-way traffic flow.
[0043] Furthermore, in step S3, by calculating the lane capacity and the one-way traffic flow during peak hours, it is determined whether the traffic flow exceeds the lane capacity, thereby determining the number of tidal lanes. The lane capacity calculation formula is:
[0044]
[0045] Among them, C lane is the traffic capacity of each lane, V avg is the average vehicle speed, L road is the road length, T peak The time for peak hours;
[0046] The formula for calculating one-way traffic flow during peak hours is:
[0047]
[0048] Among them, V flow is the total traffic flow veh / h on the road, P peak is the traffic flow ratio during peak hours, O D_flow is the traffic flow ratio in a specific direction, N lanes is the total number of lanes;
[0049] Determine whether the one-way traffic flow exceeds the maximum capacity of the lane, and obtain the ratio of the one-way traffic flow to the lane capacity during peak hours. If the ratio is greater than 1, it means that the existing lane cannot meet the traffic demand and is oversaturated.
[0050] After obtaining the demand ratio, if the one-way traffic flow exceeds the lane capacity and the road structure allows, the number of tidal lanes is increased according to the demand ratio. The number of tidal lanes is estimated according to the following formula:
[0051]
[0052] Among them, N tidal_lanes is the number of tidal lanes required, N existing_lanes is the number of existing one-way lanes, Indicates rounding up to ensure that the number of tidal lanes is an integer. If N tidal_lanes >0, a corresponding number of tidal lanes need to be set up to meet traffic demand.
[0053] Further, in step S4, it is necessary to first identify the congested area during the peak hours, then determine the length of the buffer zone, and finally determine the length of the tidal lane, and use the peak hour identification and traffic flow data to determine the main congested area on the road;
[0054] The length of the congestion area is denoted as L congestion , which is the length of vehicle pile-up caused by traffic flow exceeding lane capacity during peak hours;
[0055]
[0056] Among them, V peak_flow is the one-way traffic flow veh / h during peak hours, C lane is the maximum traffic capacity of a single lane, D queue is the queue density of vehicles in congestion, veh / km;
[0057] A buffer zone needs to be set at the start and end of the tidal lane. The buffer zone length L buffer Considering the distance required for vehicles to switch from the normal lane to the tidal lane or from the tidal lane back to the normal lane, the buffer length is estimated by the following formula:
[0058]
[0059] Among them, V avg represents the average vehicle speed, a max Indicates the maximum deceleration of the vehicle, the value is 3.5m / s 2 ;
[0060] The total length of the tidal lane includes the congestion length and the buffer lengths at both ends, i.e., L congestion +2×L buffer .
[0061] Furthermore, in step S5, based on the traffic flow data identified during the peak hours, the fluctuation of traffic flow during the day is determined. The traffic flow usually reaches a peak value during the morning and evening peak hours. The start and end times of the peak hours are identified using the following method:
[0062]
[0063]
[0064] Among them, T peak_start and T peak_end Respectively represent the start and end time of the peak period, It represents the rate of change of traffic flow over time, and the peak points are the nodes where the peak starts and ends.
[0065] Furthermore, in step S6, after determining the number, length and usage time of the tidal lanes, the setting plan is verified through a traffic simulation tool; in the actual operation process, it is necessary to make real-time adjustments to the settings of the tidal lanes according to weather conditions and major events, and dynamically adjust the activation of the tidal lanes through real-time monitoring and data feedback.
[0066] A tidal lane setting device, comprising: at least one memory and at least one processor;
[0067] The at least one memory is used to store a machine-readable program;
[0068] The at least one processor is used to call the machine-readable program to execute a tidal lane setting method.
[0069] Compared with the prior art, the tidal lane setting method and device of the present invention have the following outstanding beneficial effects:
[0070] (1) Accurate identification of tidal traffic flow: Based on the temporal and spatial distribution characteristics of road passenger flow, the present invention can accurately determine whether there is significant tidal traffic flow on the target road through data collection and analysis, thus avoiding the misjudgment problem caused by subjective judgment in traditional methods and improving the scientificity and accuracy of tidal lane setting.
[0071] (2) Dual indicators to evaluate traffic imbalance: When evaluating two-way traffic imbalance, the TTI imbalance index focuses on overall delay, while the speed imbalance index focuses on instantaneous mobility. The combination of the two can provide a more complete analysis of traffic conditions. It can not only make up for the shortcomings of a single indicator, but also avoid the impact of local anomalies, providing a more comprehensive and accurate analysis of tidal traffic flow.
[0072] (3) Dynamic adjustment of tidal lane settings: The present invention dynamically adjusts the number, length and usage time of tidal lanes by comprehensively considering road conditions, traffic demand and specific circumstances during peak hours. It can effectively respond to the impact of different traffic flows, weather conditions and emergencies, and ensure road traffic efficiency and safety.
[0073] (4) Simulation verification improves the reliability of the scheme: Before implementing the tidal lane setting scheme, the scheme is verified through traffic simulation tools to evaluate its effects under different traffic flows, weather conditions and events to ensure the feasibility and effectiveness of the scheme. The introduction of simulation verification makes the tidal lane setting more reliable and helps reduce implementation risks.
[0074] (5) Optimizing traffic flow: The present invention can effectively balance traffic demand during peak hours by setting up tidal lanes, alleviate the saturation problem of one-way traffic flow, reduce congestion, and improve road traffic efficiency. At the same time, through reasonable buffer design and activation time setting, the stability and fluidity of traffic flow are further optimized. BRIEF DESCRIPTION OF THE DRAWINGS
[0075] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0076] Attached Figure 1 It is a schematic diagram of the tidal traffic flow identification process in a tidal lane setting method;
[0077] Attached Figure 2 The present invention is a schematic diagram of a tidal lane setting scheme and an adjustment process in a tidal lane setting method. DETAILED DESCRIPTION
[0078] In order to enable those skilled in the art to better understand the solution of the present invention, the present invention is further described in detail below in conjunction with specific implementation methods. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0079] A best embodiment is given below:
[0080] like Figure 1 , 2 As shown, a tidal lane setting method in this embodiment, based on passenger flow characteristics, has the following steps:
[0081] S1. Road and passenger flow characteristic data collection;
[0082] Data collection is the basic link to determine whether the target road is suitable for building a tidal lane and how to set up a tidal plan. It mainly includes two parts: road characteristic data collection and passenger flow characteristic data collection.
[0083] Road feature data collection includes road type T_road, length L_road, width W_lane, number of lanes N_lanes, road usage U_road and other information for collection and measurement;
[0084] The passenger flow characteristic data collection includes passenger flow peak period T_peak, traffic flow V_flow, traffic direction O_D_flow, average vehicle speed V_avg, etc. Multiple measurements and data cleaning are used to reduce noise for flow and speed.
[0085] Among them, road length (L_road): the actual length of the road obtained using a distance meter, GPS device or map data, in meters (m).
[0086] Number of lanes (N_lanes): records the total number of lanes on the target road and distinguishes the number of lanes in different directions, in lanes.
[0087] Lane width (W_lane): Use the measurement tool to measure the width of each lane in meters (m).
[0088] Road type (T_road): confirms the type of the target road, such as urban main road, secondary road or highway, etc., represented by a string (such as "main_road", "secondary_road", "highway").
[0089] Road usage (U_road): records whether the road is allowed to be used by heavy vehicles, large public transportation vehicles, etc., expressed as a Boolean value.
[0090] Traffic flow (V_flow): The traffic flow data of different time periods is obtained through traffic flow monitoring equipment (such as vehicle flow detectors, traffic cameras, etc.), and the unit is vehicle / hour (veh / h).
[0091] Peak hour identification (T_peak): Count and analyze traffic flow in different time periods, identify the morning and evening peak hours and their changing patterns, and represent them with strings (for example, "morning_peak", "evening_peak").
[0092] Traffic flow direction (O_D_flow): The direction of traffic flow is incoming or outgoing, represented by a Boolean value.
[0093] Average vehicle speed (V_avg): The average speed of the vehicle flow is obtained through speed detection equipment on the road (such as speed radar, traffic cameras), in kilometers per hour (km / h).
[0094] S2. Determine whether the road conditions and traffic requirements are met;
[0095] After the collection and processing of road characteristic data and passenger flow characteristic data, it is necessary to analyze these data to determine whether the target road meets the conditions for building a tidal lane and determine the feasibility of the tidal lane setting plan. First, determine whether the road conditions are met. The judgment criteria are whether the target road is a two-way main road and the number of roads is greater than or equal to 3. After the road conditions are met, determine whether the traffic flow of the one-way lane group is oversaturated and whether the two-way traffic imbalance index exceeds the threshold. If both the road conditions and traffic needs are met, it means that the target road has significant tidal traffic flow and a tidal lane can be set.
[0096] The specific steps are as follows:
[0097] When the target road is an urban trunk road with three or more two-way lanes, it is also necessary to verify whether the traffic demand is met, including traffic flow oversaturation and the two-way traffic imbalance index exceeding the threshold.
[0098] (1) Traffic flow oversaturation judgment
[0099] The lane group saturation is used to determine whether the traffic flow is oversaturated. The specific formula is:
[0100]
[0101] Among them, X i is the saturation of lane group i, Q i is the actual traffic flow of lane group i (pcu / h), Q si is the actual saturated flow of lane group i under the green light hour condition. i When it exceeds 0.95, it means that the traffic flow in the lane group is in an oversaturated state, one of the import lane group and the export lane group is in an oversaturated state, and the other is in an unsaturated state, indicating that traffic control is needed.
[0102] (2) Determination of two-way traffic imbalance index
[0103] The two-way traffic imbalance index includes two indicators, namely the TTI imbalance index and the speed imbalance index. The TTI imbalance index is:
[0104]
[0105] Among them, I TTI is the TTI imbalance index, with a value range of greater than or equal to 0. TTI1 and TTI2 are the travel time indexes of the import lane group and the export lane group in the same period, respectively. min is the smaller value of the travel time index.
[0106] The speed imbalance index is:
[0107]
[0108] Among them, I speed is the speed imbalance index, with a value range of greater than or equal to 0. Speed1 and Speed2 are the average vehicle speeds of the import lane group and the export lane group in the same period, respectively. min is the smaller value of the average vehicle speed.
[0109] When I TTI and I speed If the speeds of the vehicles in the two-way lanes are significantly different at the same time, it may be necessary to set up tidal lanes to balance the two-way traffic flow.
[0110] The TTI imbalance index can directly reflect traffic delays and takes travel time into account, which can better understand the overall situation of traffic flow. However, this indicator is not sensitive to short sections and may ignore subtle changes in vehicle speed within a short distance, so it is necessary to supplement it with the speed imbalance index. The speed imbalance index can reflect the fluidity of traffic flow in different directions, is independent of travel time, and has the advantages of convenient index collection, but it cannot reflect the overall situation of traffic flow. Taking these two indicators into consideration, it is possible to more comprehensively evaluate the imbalance of two-way traffic, avoid the limitations of a single indicator, and improve the accuracy of traffic analysis, thereby providing a more reliable basis for the setting of tidal lanes.
[0111] S3. Determine the number of tidal lanes;
[0112] After determining that the target road is suitable for the construction of tidal lanes, the number of tidal lanes shall be determined based on the lane demand during peak hours and the road structure conditions. It should be considered whether the one-way traffic flow during peak hours exceeds the maximum capacity of the lane. If there is a significant imbalance in lane demand and the road structure allows, the number of tidal lanes should be appropriately increased to meet traffic demand.
[0113] Specifically include:
[0114] By calculating the lane capacity and the one-way traffic flow during peak hours, it is determined whether the traffic flow exceeds the lane capacity, thereby determining the number of tidal lanes. The lane capacity calculation formula is:
[0115]
[0116] Among them, C lane is the traffic capacity of each lane, V avg is the average vehicle speed, L road is the road length, T peak The time for peak hours.
[0117] The formula for calculating one-way traffic flow during peak hours is:
[0118]
[0119] Among them, V flow is the total traffic volume on the road (veh / h), P peak is the traffic flow ratio during peak hours, O D_flow is the traffic flow ratio in a specific direction, N lanes is the total number of lanes.
[0120] To determine whether the one-way traffic flow exceeds the maximum capacity of the lane, it is necessary to obtain the ratio of the one-way traffic flow during peak hours to the lane capacity (demand ratio). If the ratio is greater than 1, it means that the existing lanes cannot meet the traffic demand and there is an oversaturation situation. After obtaining the demand ratio, if the one-way traffic flow exceeds the lane capacity and the road structure allows, the number of tidal lanes can be increased according to the demand ratio. The number of tidal lanes can be estimated according to the following formula:
[0121]
[0122] Among them, N tidal_lanes is the number of tidal lanes required, N existing_lanes is the number of existing one-way lanes, Indicates rounding up to ensure that the number of tidal lanes is an integer. tidal_lanes >0, a corresponding number of tidal lanes need to be set up to meet traffic demand.
[0123] S4. Determine the length of the tidal lane;
[0124] The length of the tidal lane is determined based on the congestion length of the road and the setting of the buffer zone. The length of the tidal lane should be sufficient to cover the main congestion area during peak hours, and sufficient buffer zones should be set at the starting and ending points to ensure that vehicles can change lanes smoothly and avoid impacting the traffic flow of the regular lanes.
[0125] Specifically include:
[0126] It is necessary to first identify the congested area during peak hours, then determine the length of the buffer zone, and finally determine the length of the tidal lane. Use peak hour identification and traffic flow data to determine the main congested areas on the road. The length of the congested area can be expressed as L congestion , which is the length of vehicle pile-up caused by traffic flow exceeding lane capacity during peak hours.
[0127]
[0128] Among them, V peak_flow is the one-way traffic flow during peak hours (veh / h), C lane is the maximum traffic capacity of a single lane, D queueis the queue density of vehicles in congestion (veh / km).
[0129] In order to ensure that vehicles can enter and exit the tidal lane smoothly, a buffer zone needs to be set at the start and end of the tidal lane. The buffer zone length L buffer The distance required for vehicles to switch from the normal lane to the tidal lane or from the tidal lane back to the normal lane should be taken into account. The buffer length can be estimated by the following formula:
[0130]
[0131] Among them, V avg represents the average vehicle speed, a max Indicates the maximum deceleration of the vehicle (the value is 3.5m / s 2 ).
[0132] The total length of the tidal lane includes the congestion length and the buffer lengths at both ends, i.e., L congestion +2×L buffer The total length of the tidal lane calculated in this way is sufficient to cover the main congested areas, while also ensuring smooth vehicle transfers at the starting and ending points to avoid adverse effects on regular traffic flows.
[0133] S5. Determine the use time of the tidal lane;
[0134] The use time of tidal lanes should be determined based on the specific time period during peak hours and the length of time the lanes are enabled. The opening and closing times of tidal lanes should be accurately set according to the time period changes in traffic flow to ensure that tidal lanes are used to the maximum extent during peak hours and traffic congestion is reduced.
[0135] Specifically include:
[0136] Based on the traffic flow data identified during peak hours, determine the fluctuation of traffic flow during the day. Traffic flow usually reaches its peak during the morning and evening peak hours. The start and end times of peak hours can be identified using the following methods:
[0137]
[0138]
[0139] Among them, T peak_start and T peak_end Respectively represent the start and end time of the peak period, It represents the rate of change of traffic flow over time, and the peak points are the nodes where the peak starts and ends.
[0140] The activation time should be sufficient to cover the entire peak period and extend a certain time to ensure a smooth transition of traffic flow. Therefore, the activation time should be the sum of the duration of the peak period and the buffer time before and after. The buffer time is usually set to 30 minutes to 1 hour to allow for adjustments before and after the start or end of peak traffic. In addition, the activation and closing time of the tidal lane needs to be further adjusted according to actual conditions. For example, during different weather conditions or major events, it may be necessary to temporarily adjust the activation time of the tidal lane.
[0141] S6, simulation verification;
[0142] After determining the number, length and use time of the tidal lanes, the setting plan is verified through traffic simulation tools. The simulation should include effect evaluation under different traffic flows, weather conditions and events to ensure that the tidal lane setting plan can effectively improve traffic flow, reduce congestion and improve road traffic efficiency. In actual operation, the setting of tidal lanes needs to be adjusted in real time according to weather conditions and major events (such as traffic accidents, special events, etc.). Through real-time monitoring and data feedback, the activation of tidal lanes is dynamically adjusted to ensure the smoothness and safety of traffic.
[0143] Based on the above method, a tidal lane setting device in this embodiment includes: at least one memory and at least one processor;
[0144] The at least one memory is used to store a machine-readable program;
[0145] The at least one processor is used to call the machine-readable program to execute a tidal lane setting method.
[0146] The above-mentioned specific implementations are only specific cases of the present invention. The patent protection scope of the present invention includes but is not limited to the above-mentioned specific implementations. Any technical solutions that conform to the above-mentioned specific implementations of the present invention and any appropriate changes or substitutions made by ordinary technicians in the relevant technical field shall fall within the patent protection scope of the present invention.
[0147] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A tidal lane setting method based on passenger flow characteristics, characterized in that: The steps are as follows: S1. Road and passenger flow characteristic data collection; S2. Determine whether the road conditions and traffic requirements are met; S3. Determine the number of tidal lanes; S4. Determine the length of the tidal lane; S5. Determine the use time of the tidal lane; S6. Simulation verification.
2. A tidal lane setting method according to claim 1, characterized in that: In step S1, it includes two parts: road feature data collection and passenger flow feature data collection; The road characteristic data is the basis for judging road conditions, including: Road length L_road: Use a distance meter, GPS device or map data to obtain the actual length of the road in meters; Number of lanes N_lanes: records the total number of lanes on the target road and distinguishes the number of lanes in different directions, in lanes; Lane width W_lane: Use the measurement tool to measure the width of each lane in meters; Road type T_road: confirm the type of target road; Road usage U_road: records whether the road is allowed to be used by heavy vehicles and large public transportation vehicles, expressed as a Boolean value; The passenger flow characteristic data is the key to identifying tidal traffic flow, including: Traffic flow V_flow: The traffic flow data at different time periods are obtained through traffic flow monitoring equipment, and the unit is vehicles / hour; Peak hour identification T_peak: Statistics and analysis of traffic flow in different time periods, identification of morning and evening peak hours and their changing patterns, expressed as a string; Traffic flow direction O_D_flow: the direction of traffic flow is incoming or outgoing, expressed by a Boolean value; Average vehicle speed V_avg: The average speed of the traffic is obtained through the speed detection equipment on the road, in kilometers per hour.
3. A tidal lane setting method according to claim 2, characterized in that: In step S2, when the target road is a main urban road with three or more two-way lanes, it is also necessary to verify whether the traffic demand is met, including whether the traffic flow is oversaturated and whether the two-way traffic imbalance index exceeds the threshold; (1) Determination of traffic flow saturation; The lane group saturation is used to determine whether the traffic flow is oversaturated. The specific formula is: Among them, X i is the saturation of lane group i, Q i is the actual traffic flow of lane group i (pcu / h), Q si is the actual saturated flow of lane group i under the green light hour condition; when X i When it exceeds 0.95, it indicates that the traffic flow of the lane group is in an oversaturated state, one of the import lane group and the export lane group is in an oversaturated state, and the other is in an unsaturated state, indicating that traffic control is needed; (2) Determination of two-way traffic imbalance index; The two-way traffic imbalance index includes two indicators, namely the TTI imbalance index and the speed imbalance index. The TTI imbalance index is: Among them, I TTI is the TTI imbalance index, with a value range of greater than or equal to 0. TTI1 and TTI2 are the travel time indexes of the import lane group and the export lane group in the same period, respectively. min is the smaller value of the travel time index; The speed imbalance index is: Among them, I speed is the speed imbalance index, with a value range of greater than or equal to 0. Speed1 and Speed2 are the average vehicle speeds of the import lane group and the export lane group in the same period, respectively. min is the smaller value of the average vehicle speed; When I TTI and I speed If the speed exceeds the set threshold at the same time, it means that the speed difference between the two-way lanes is obvious, and tidal lanes need to be set up to balance the two-way traffic flow.
4. A tidal lane setting method according to claim 3, characterized in that: In step S3, by calculating the lane capacity and the one-way traffic flow during peak hours, it is determined whether the traffic flow exceeds the lane capacity, thereby determining the number of tidal lanes. The lane capacity calculation formula is: Among them, C lane is the traffic capacity of each lane, V avg is the average vehicle speed, L road is the road length, T peak The time for peak hours; The formula for calculating one-way traffic flow during peak hours is: Among them, V flow is the total traffic flow veh / h on the road, P peak is the traffic flow ratio during peak hours, O D_flow is the traffic flow ratio in a specific direction, N lanes is the total number of lanes; Determine whether the one-way traffic flow exceeds the maximum capacity of the lane, and obtain the ratio of the one-way traffic flow to the lane capacity during peak hours. If the ratio is greater than 1, it means that the existing lane cannot meet the traffic demand and is oversaturated. After obtaining the demand ratio, if the one-way traffic flow exceeds the lane capacity and the road structure allows, the number of tidal lanes is increased according to the demand ratio. The number of tidal lanes is estimated according to the following formula: Among them, N tidal_lanes is the number of tidal lanes required, N existing_lanes is the number of existing one-way lanes, Indicates rounding up to ensure that the number of tidal lanes is an integer. If N tidal_lanes >0, a corresponding number of tidal lanes need to be set up to meet traffic demand.
5. A tidal lane setting method according to claim 4, characterized in that: In step S4, it is necessary to first identify the congested area during the peak hours, then determine the length of the buffer zone, and finally determine the length of the tidal lane, using the peak hour identification and traffic flow data to determine the main congested area on the road; The length of the congestion area is denoted as L congestion , which is the length of vehicle pile-up caused by traffic flow exceeding lane capacity during peak hours; Among them, V peak_flow is the one-way traffic flow veh / h during peak hours, C lane is the maximum traffic capacity of a single lane, D queue is the queue density of vehicles in congestion, veh / km; A buffer zone needs to be set at the start and end of the tidal lane. The buffer zone length L buffer Considering the distance required for vehicles to switch from the normal lane to the tidal lane or from the tidal lane back to the normal lane, the buffer length is estimated by the following formula: Among them, V avg represents the average speed, a max Indicates the maximum deceleration of the vehicle, the value is 3.5m / s 2 ; The total length of the tidal lane includes the congestion length and the buffer lengths at both ends, i.e., L congestion +2×L buffer .
6. A tidal lane setting method according to claim 5, characterized in that: In step S5, based on the traffic flow data identified during the peak hours, the fluctuation of traffic flow during the day is determined. The traffic flow usually reaches its peak during the morning and evening peak hours. The start and end times of the peak hours are identified using the following method: Among them, T peak_start and T peak_end Respectively represent the start and end time of the peak period, It represents the rate of change of traffic flow over time, and the peak points are the nodes where the peak starts and ends.
7. A tidal lane setting method according to claim 6, characterized in that: In step S6, after determining the number, length and usage time of the tidal lanes, the setting plan is verified through a traffic simulation tool; in actual operation, the setting of the tidal lanes needs to be adjusted in real time according to weather conditions and major events, and the activation of the tidal lanes can be dynamically adjusted through real-time monitoring and data feedback.
8. A tidal lane setting device, characterized in that: include: at least one memory and at least one processor; The at least one memory is used to store a machine-readable program; The at least one processor is configured to call the machine-readable program to execute the method according to any one of claims 1 to 7.
