Signal optimization method based on opposite inlet flow unbalance alarm
By obtaining the intersection model and opposite import flow data in real time, calculating the flow equalization coefficient for imbalance alarms, and adjusting the signal settings, it solves the problem of insufficient opposing import imbalance alarms in the existing technology, and realizes more efficient traffic signal control and flow Balance reduces traffic congestion.
Patent Information
- Application Number
- CN202411126422.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-16
- Publication Date
- 2024-11-22
AI Technical Summary
The lack of an anti-direction import imbalance alarm mechanism in the prior art leads to poor signal control effect, poor optimization effect, and inability to deal with flow imbalance in time, resulting in traffic congestion.
By obtaining intersection model information and opposite inlet flow data, calculating the flow flow ratio and equalization coefficient, performing imbalance alarms in real time, and adjusting the green light duration of the corresponding phase according to lane traffic needs, dynamically adjusting the signal settings to deal with flow imbalance.
It has achieved rapid response and precise adjustments, reduced traffic congestion, improved traffic fluency and traffic efficiency, ensured that the signal solution matched the flow rate, and improved overall traffic management efficiency.
Smart Images

Figure CN119007467A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of traffic control systems, and in particular to a method for configuring green light duration of a signal phase scheme at an intersection. Background Art
[0002] At present, the four-phase design of the signal control standard generally releases the opposite imports at the same time, that is, east-west straight, east-west left turn, north-south straight, and north-south left turn. However, in actual applications, there is an imbalance in the flow of opposite imports, which easily leads to congestion in one import and empty release in the opposite direction, and the signal control effect is not good. Therefore, a warning mechanism for the imbalance of opposite imports is designed to actively detect the imbalance of opposite imports. At the same time, according to the specific situation of the imbalance, the rationality of the timing plan is judged. For unreasonable situations, optimization suggestions for adding phases are proposed, and the green light duration of each phase after optimization is calculated to output a complete timing optimization plan.
[0003] For example, a Chinese patent with publication number CN108898855B discloses a method for configuring the green light duration of a signal phase scheme at an intersection, and provides the following technical solutions. The present invention provides a method for configuring the green light duration of a signal phase scheme at an intersection. Based on the traffic flow data of the lane and the saturated headway time, the minimum green time requirement of each direction of travel at the intersection is obtained by integrated calculation, and the optimal solution of the minimum green time requirement of the phase stage is solved based on the signal phase scheme; the method, for the problem of configuring the green light duration of each phase stage of the signal scheme, calculates the minimum green time requirement of each lane cycle of the entrance road within each unit time period based on the traffic flow data and saturated headway time information obtained by the intersection detector equipment, and determines the minimum green time requirement of each direction of travel based on the channelization and light group information, and further solves the shortest green light duration of each signal phase stage based on the corresponding signal phase scheme within the time period, thereby configuring a fixed signal phase scheme, and providing a supporting basis for the configuration of the inductive signal phase scheme, effectively improving the configuration efficiency of the signal scheme, and alleviating traffic congestion at the intersection. However, the above-mentioned green light duration configuration method of the intersection signal phase scheme adopts the signal phase scheme to solve the optimal solution of the minimum green time requirement in the phase stage, lacks the judgment and alarm of traffic imbalance, and the optimal scheme has poor balancing efficiency and poor optimization effect. Summary of the invention
[0004] The present invention solves the problems in the prior art of lack of opposite import imbalance alarm, slow alarm handling response, mismatch between signal scheme and flow rate, and poor signal control effect, and proposes a signal optimization method based on opposite import flow imbalance alarm, which achieves the purposes of fast alarm handling response, signal scheme and flow rate adaptation, and good signal control effect.
[0005] To achieve the above object, the present invention adopts the following technical solution: A signal optimization method based on counter-import flow imbalance alarm comprises the following steps: S1: Obtain intersection model information and calculate flow direction flow, and calculate flow direction saturated headway and saturated flow according to historical data; S2: Obtain intersection opposite import data, calculate flow direction flow ratio and flow direction balance coefficient, and issue an imbalance alarm according to the flow direction balance coefficient; S3: obtaining the current signal setting, and performing corresponding phase adjustment according to the current signal setting; S4: Calculate the lane traffic demand and the green light duration required for the flow direction, and for the opposite entrance of the imbalance alarm, adjust the green light duration of the corresponding phase according to the lane traffic demand and the green light duration required for the flow direction.
[0006] The benefit of this design is that traffic signals can be adjusted dynamically to cope with traffic imbalances, ensuring smooth and efficient traffic flow.
[0007] Preferably, the step S2 comprises the following steps: S2.1: Obtain the data of the opposite entrance of the intersection; S2.2: Determine whether the complete opposite import data is obtained. If so, proceed to step S2.3. If not, return to step S2.1. S2.3: Convert the vehicle passing data into hourly flow and calculate the flow ratio. S2.4: Calculate the flow balance coefficient; S2.5: Determine whether an imbalance alarm is issued based on the flow balance coefficient and the imbalance threshold. If yes, proceed to step S2.6; if no, return to step S2.1; S2.6: Determine the unbalanced inlet direction and the inlet direction with larger flow rate based on the flow balance coefficient and the imbalance threshold in each direction.
[0008] The benefit of this design is that it ensures the accuracy and completeness of the data, thereby improving the reliability and accuracy of the imbalance alarm.
[0009] Preferably, step S3 comprises: S3.1: Obtain the current signal scheme, and analyze the inlet with a larger flow rate among the opposite inlets of the imbalance alarm; S3.2: Determine whether the inlet with a larger flow rate in the opposite inlet of the imbalance alarm is set with a separate phase. If so, proceed to step S4; if not, proceed to step S3.3; S3.3: Set a separate phase for the left-turn and through-flow directions of the inlet, and insert it between the through-flow phase and the left-turn phase.
[0010] The advantage of this design is that it can optimize and adjust entrances with larger traffic volumes, thereby improving the flexibility and responsiveness of traffic signals.
[0011] Preferably, in step S4, the lane traffic demand is calculated by obtaining the vehicle passing and queue length data of the past m signal cycles, and obtaining the green light release start time g of each lane k in each signal cycle according to the matching relationship between the phase and the flow direction and the lane. k,start and end time g k,end , intercept the vehicle passing record according to the start and end time, and obtain the number of vehicles passing in lane k during the green light time of cycle C, q k,C , and use the end time g k,end The time period [g k,end -Δt,g k,end +Δt], intercept the queue length data in the time period, if multiple data are intercepted, take the maximum value as the queue length L at the end of the green light of the lane in cycle C k,C , the traffic demand of the lane in cycle C is r k,C =q k,C +L k,C , average the traffic demands of m signal cycles to obtain the average traffic demand of lane k
[0012] The advantage of this design is that through comprehensive analysis of historical data and current traffic, the traffic demand of the lane can be estimated more accurately, thereby optimizing the signal setting.
[0013] Preferably, the intersection model information includes the number of entrances of the intersection, the number of lanes at each entrance, and the flow direction of each lane; the calculation of flow direction flow includes counting the vehicle flow at fixed time intervals for each lane passing through, and for each flow direction, taking the maximum flow value of the lanes included in the flow direction as the flow direction flow.
[0014] The advantage of this design is that through detailed intersection model information and accurate traffic flow calculations, traffic signals can be better analyzed and optimized to ensure the reasonable allocation of green light time.
[0015] Preferably, the step of calculating the flow direction saturation headway time according to historical data comprises the following steps: Take the lane traffic data of historical M days with time interval T, sort the traffic in each lane by size, identify the time period corresponding to the maximum traffic, and then intercept the corresponding vehicle passing records in the original vehicle passing data according to the start and end time of the time period, sort the vehicle passing records by passing time, calculate the time interval between two adjacent vehicle passing records as the headway, filter the records with headway values less than or equal to a certain number of seconds and appearing for more than a certain number of consecutive times, and take the average of the headway times of all lanes that meet the conditions as the saturated headway time of the flow direction, recorded as h i,j is the saturated headway from inlet i to inlet j.
[0016] The advantage of this design is that through detailed analysis of historical data, the saturated headway time can be accurately calculated, thereby providing accurate reference data for signal optimization.
[0017] Preferably, step S2.6 includes: if the balancing coefficients of all east-west flow directions are greater than the imbalance threshold, the east-west imbalance is recorded, and the import with a larger flow rate is the east; if the balancing coefficients of all east-west flow directions are negative and the absolute value is greater than the imbalance threshold, the east-west imbalance is recorded, and the import with a larger flow rate is the west; if the balancing coefficients of all north-south flow directions are greater than the imbalance threshold, the north-south imbalance is recorded, and the import with a larger flow rate is the south; if the balancing coefficients of all north-south flow directions are negative and the absolute value is greater than the imbalance threshold, the north-south imbalance is recorded, and the import with a larger flow rate is the north.
[0018] The advantage of this design is that it can accurately optimize signals based on specific imbalance directions and directions with heavy traffic, thereby improving the efficiency of traffic management.
[0019] Preferably, in step S4, the green light duration is specifically to calculate the traffic demand of the entrance i flowing to j, and take the maximum traffic demand of the lanes included in the flow direction as the flow direction traffic demand. Calculate the green light time g required for import i to flow to j i,j , g i,j The calculation formula is
[0020] The advantage of this design is that by accurately calculating the green light duration required for each import flow direction, the green light time can be reasonably allocated, traffic signals can be optimized, and traffic efficiency at the intersection can be improved.
[0021] Preferably, in step S4, the green light duration of the corresponding phase is adjusted according to the lane traffic demand and the green light duration required for the flow direction: for the opposite entrance with an imbalance alarm, it is necessary to estimate the green light duration of three phases, namely, the phase P1 of the straight flow direction of the opposite entrance, the phase P2 of the left straight flow direction of the entrance with large traffic volume, and the phase P3 of the left turn flow direction of the opposite entrance. For the phase P1 of the straight flow direction of the opposite entrance, and the phase P3 of the left turn flow direction of the opposite entrance, take the green light duration of three phases. In the same flow direction of the import, the required green light duration with a shorter duration is taken as the estimated green light duration of the same release phase, and the recommended green light duration is calculated based on the comparison result of the estimated green light duration with the maximum and minimum green light durations of this phase. For the phase P2 of the left straight same release of the import with large flow, the remaining green light required durations of different flow directions are calculated, and the longer remaining green light required duration is taken as the estimated green light duration of the same release phase, and compared with the maximum and minimum green light durations of this phase to obtain the recommended green light duration.
[0022] The advantage of this design is that by reasonably calculating lane traffic demand and green light duration, the phase setting can be optimized to ensure that traffic signals are more in line with actual needs and improve traffic efficiency.
[0023] Preferably, the recommended green light duration is the result of comparing the green light duration estimated according to traffic demand with the maximum green and minimum green of the phase: if the estimated green light duration is greater than or equal to the minimum green light duration of the phase and less than or equal to the maximum green light duration, then the recommended green light duration is the estimated green light duration; if the estimated green light duration is less than the minimum green light duration of the phase, then the recommended green light duration is the minimum green light duration of the phase; if the estimated green light duration is greater than the maximum green light duration of the phase, then the recommended green light duration is the maximum green light duration of the phase; the recommended green light duration for the left straight same-release for the import with large traffic volume The phase P2 is specifically as follows: for the left-turn flow and the straight-through flow of the import respectively, the green light duration is subtracted from the recommended green light duration calculated in the previous step to obtain the remaining green light demand time for the left-turn flow and the straight-through flow, and the maximum value of the remaining green light demand time for the left-turn flow and the straight-through flow is taken as the recommended green light time for the phase of the left-turn flow and the straight-through flow of the import; the maximum and minimum green light durations are checked, if it is greater than or equal to the minimum green light duration and less than or equal to the maximum green light duration, it is output, if it is less than the minimum green light duration, it is the minimum green light duration, and if it is greater than the maximum green light duration, it is the maximum green light duration.
[0024] Compared with the prior art, the present invention has the following beneficial effects: 1. The present invention can quickly identify and respond to flow imbalances by acquiring intersection model information and opposite import flow data in real time. The specific steps include calculating the flow ratio and flow balance coefficient, and making imbalance alarms based on these data, so that signal settings can be adjusted in time. This rapid response mechanism can effectively reduce traffic congestion caused by flow imbalance and improve overall traffic smoothness. Compared with traditional methods, the real-time data acquisition and processing capabilities of this solution are significantly improved, allowing traffic management departments to respond to complex traffic conditions more flexibly and efficiently.
[0025] 2. The present invention determines the flow imbalance by calculating the flow balance coefficient, and performs corresponding signal optimization and adjustment according to the imbalance direction to ensure that the traffic flow is more balanced. The specific steps include analyzing the import with larger flow in the opposite import, and setting a separate phase for it, so that the phase scheme matches the flow situation. In addition, the lane traffic demand and the green light duration of the flow direction are calculated, and the green light duration of the corresponding phase is adjusted according to the imbalance to better allocate traffic resources. This method can not only effectively alleviate the traffic pressure of a single import, but also improve the overall traffic efficiency of the intersection, making the traffic flow in all directions more balanced.
[0026] 3. The present invention uses detailed historical data analysis and real-time traffic monitoring to accurately calculate the saturated headway and saturated traffic flow, and uses this as a basis for signal phase adjustment. The specific steps include obtaining the current signal settings, analyzing the entrances with large traffic flow, and optimizing the green light duration according to traffic demand. This optimization strategy based on dual analysis of real-time data and historical data makes signal control more scientific and reasonable, thereby greatly improving the optimization level of traffic signals. Compared with traditional methods, this solution can more effectively reduce waiting time, increase vehicle speed, and improve overall traffic efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] Figure 1 The present invention is a flow chart of imbalance alarm in one embodiment of a signal optimization method based on opposite inlet flow imbalance alarm.
[0028] Figure 2 The present invention is a signal optimization flow chart in an embodiment of a signal optimization method based on opposite inlet flow imbalance alarm.
[0029] Figure 3 This is the original phase sequence in an embodiment of a signal optimization method based on opposite inlet flow imbalance alarm of the present invention.
[0030] Figure 4 This is the optimized phase sequence in an embodiment of a signal optimization method based on opposite inlet flow imbalance alarm of the present invention. DETAILED DESCRIPTION
[0031] In order to make the purpose, technical scheme and advantages of the present disclosure clearer, the following will further describe the embodiments of the present disclosure in detail with reference to the accompanying drawings. The proportions of the components are not drawn according to the actual proportions, and the proportions and sizes shown in the accompanying drawings should not limit the substantial technical scheme of the present invention. These embodiments do not describe all the details in detail, nor do they limit the invention to the specific embodiments described.
[0032] See also Figure 1-2 As shown, a signal optimization method based on opposite import flow imbalance alarm includes the following steps: S1: obtaining intersection model information and calculating flow flow, and calculating flow saturation headway and saturation flow according to historical data; S2: obtaining opposite import data of the intersection, calculating flow flow ratio and flow balance coefficient, and performing imbalance alarm according to the flow balance coefficient; S3: obtaining the current signal setting, and performing corresponding phase adjustment according to the current signal setting; S4: Calculate the lane traffic demand and the green light duration required for the flow direction, and for the opposite entrance of the imbalance alarm, adjust the green light duration of the corresponding phase according to the lane traffic demand and the green light duration required for the flow direction.
[0033] like Figure 1 In one embodiment shown, Figure 1 The present invention is an imbalance alarm flow chart in an embodiment of a signal optimization method based on an imbalance alarm of opposite import flow. The present invention designs a signal optimization method based on an imbalance alarm of opposite import flow, which optimizes traffic signal control and reduces traffic imbalance at intersections through precise flow monitoring and calculation, thereby significantly improving the overall operation efficiency of traffic flow. The method includes acquiring and analyzing intersection model information, calculating flow flow, calculating flow saturation headway and saturation flow based on historical data, and performing imbalance alarm and adjusting signal control through real-time monitoring and analysis of opposite import data.
[0034] First, obtain the basic model information of the intersection. This information includes the number of entrances at the intersection, the number of each entrance lane, and the flow direction of each lane. This basic information will serve as the basis for subsequent calculations and analysis. Then, based on this model information, calculate the flow direction flow. This step specifically includes: counting the number of vehicles passing through each lane, recording the traffic flow at fixed time intervals, and for each flow direction, taking the maximum flow in the lane included in the flow as the flow in the direction. This processing method ensures that there is a most accurate estimate of the flow in each direction. Taking a cross intersection as an example, intersection A contains 4 entrances, and each entrance contains 4 lanes, namely left turn, straight, straight, and right turn. Because the right turn is not controlled by a signal, only the flow in the left turn and straight flow directions is counted.
[0035] After obtaining the current traffic data, the next step is to calculate the saturated headway and saturated flow rate of each flow direction based on historical data. The specific steps include: taking the lane flow data of the historical M days at the time interval T, sorting the flow rate by size for each lane, and identifying the time period corresponding to the maximum flow rate. Next, intercept the vehicle passing records of this period in the original vehicle passing data, sort these vehicle passing records in chronological order, and calculate the time interval between two adjacent vehicle passing records as the headway. Next, filter out the records with a headway time of less than or equal to a certain number of seconds and a certain number of consecutive records, and calculate their average value as the saturated headway time of this flow direction, denoted as hi,j, where i represents the import and j represents the flow direction.
[0036] The following table shows the saturated headway times of various directions at intersection A in one embodiment. Serial number Flow direction Saturated headway (s) 1 Dongzhi 2.3 2 East Left 2.7 3 Nanzhi 2.5 4 South Left 2.8 5 Xizhi 2.3 6 west left 2.7 7 Beizhi 2.4 8 north left 3
[0037] After completing the calculation and preparation of basic data, enter the real-time monitoring and imbalance alarm stage. First, obtain the data of the opposite entrance of the intersection. This step involves obtaining traffic data from sensors, cameras or other data acquisition devices in real time or regularly in each direction. Next, check whether the acquired data is complete. If the data is incomplete, return to the data acquisition step to reacquire the data. If the data is complete, convert the passing data into hourly flow and calculate the flow ratio of each flow direction. This step ensures the timeliness and accuracy of the flow data and provides a basis for the subsequent calculation of the balance coefficient.
[0038] Next, the flow direction balance coefficient is calculated based on the flow data of each flow direction. This coefficient is used to determine whether the flow between each flow direction is balanced, so as to detect whether there is an imbalance in the traffic flow. The calculated flow direction balance coefficient is compared with the preset imbalance threshold. If the balance coefficient exceeds the threshold, it indicates that the traffic flow is unbalanced, triggering an imbalance alarm and entering the judgment stage of the unbalanced opposite import direction and the import direction with larger flow; otherwise, return to the data monitoring step and continue real-time monitoring of the data.
[0039] After the imbalance alarm is triggered, the opposite import direction of the imbalance and the import direction with larger flow are determined based on the size of the balance coefficient of each flow direction and the imbalance threshold. The specific judgment conditions are as follows: If the balance coefficients of the east-west straight and left-turn flows are both greater than the imbalance threshold, the east-west imbalance is recorded, and the import direction with larger flow is determined to be east; if the balance coefficients of the east-west straight and left-turn flows are negative and their absolute values are greater than the imbalance threshold, the east-west imbalance is recorded, and the import direction with larger flow is determined to be west. Similarly, if the balance coefficients of the north-south straight and left-turn flows are both greater than the imbalance threshold, the north-south imbalance is recorded, and the import direction with larger flow is determined to be south; if the north-south flow balance coefficient is negative and its absolute value is greater than the imbalance threshold, the north-south imbalance is recorded, and the import direction with larger flow is determined to be north.
[0040] The benefit of this signal optimization method design based on the imbalance alarm of opposite import flow is that it significantly improves the efficiency of traffic signal control. Through real-time monitoring and imbalance alarm, traffic signals can be dynamically adjusted according to the actual traffic flow, thereby reducing the waiting time of vehicles and improving traffic efficiency. In addition, timely detection and handling of traffic flow imbalance can effectively reduce traffic congestion and improve the traffic capacity of intersections.
[0041] Another important advantage is that this method is based on scientific decision-making based on data. The combination of historical data and real-time data ensures the scientificity and accuracy of decision-making, avoids misjudgments caused by human factors, and thus improves traffic safety. Through this optimization method, it can reduce the situation of long waiting time and emergency stop and emergency movement of vehicles, and reduce the risk of traffic accidents.
[0042] In addition, the method is very flexible and scalable. It can be applied to intersections of different sizes and types, and can be effectively applied by simply adjusting data collection and parameter settings. Furthermore, this optimization method can also reduce vehicle fuel consumption and exhaust emissions, helping to improve the environmental performance of the transportation system. By reducing vehicle waiting time and unnecessary acceleration and deceleration, this method can not only improve the overall efficiency of traffic flow, but also contribute to environmental protection.
[0043] In one embodiment, the specific steps of the import imbalance alarm are: Step 1: Get the intersection model information, including the number of entrances at the intersection, the number of lanes at each entrance, and the flow direction of each lane, where the flow directions include (left turn, straight ahead, right turn, left straight, straight right, pass, left U-turn).
[0044] Step 2: Calculate the flow rate. For each lane, count the traffic volume at a fixed time interval T (T is in minutes, 5 minutes by default). For each flow direction, take the maximum flow rate of the lanes included in the flow direction as the flow rate. Mixed flow processing: left straight, straight right, and passing are processed as straight driving, and left U-turn is processed as left turn.
[0045] Step 3: Estimate the saturated headway time of the flow direction. Take the lane traffic data with time interval T for M days in history, sort the traffic in each lane by size, identify the time period t1-t2 corresponding to the maximum traffic, and then intercept the corresponding vehicle passing records in the original vehicle passing data according to the start and end time of the time period, sort the vehicle passing records by passing time, calculate the time interval between two adjacent vehicle passing records as the headway time, select the headway time value less than or equal to 5s and more than 3 consecutive records, and take the average of the headway time of all lanes that meet the conditions as the saturated headway time of the flow direction, record h i,j is the saturated headway from inlet i to inlet j.
[0046] Step 4: Estimate the saturated flow rate S in the flow direction i,j
[0047] The following table shows the saturated flow rates in each direction of intersection A in one embodiment. Serial number Flow direction Saturated headway (s) Saturated flow rate (veh / h) 1 Dongzhi 2.3 1565 2 East Left 2.7 1333 3 Nanzhi 2.5 1440 4 South Left 2.8 1286 5 Xizhi 2.3 1565 6 west left 2.7 1333 7 Beizhi 2.4 1500 8 north left 3 1200
[0048] Step 5: Get the data of a pair of opposite entrances at the intersection (one pair for east-west and one pair for north-south), and set the entrance numbering rule as east entrance 1, south entrance 2, west entrance 3, and north entrance 4. The flow direction numbering rule is 1 for straight lines and 2 for left turns. Taking the east-west direction as an example, set the number of vehicles turning left at the east entrance as The number of vehicles passing through is The number of vehicles turning left at the west entrance is The number of vehicles passing through is
[0049] Step 4: Determine whether there is complete data for the opposite imports, that is, two imports, each with data for the left turn and straight flow. If not, it cannot be determined and the calculation stops. If yes, go to Step 5.
[0050] Step 5: Calculate the flow rate ratio, convert the vehicle data into hourly flow, and calculate the flow rate ratio Among them, i is the inlet, j is the flow direction, and S is the saturated flow rate in the flow direction.
[0051] The following table shows the hourly flow rates and flow ratios in each direction at intersection A in one embodiment.
[0052] Step 4: Calculate the flow balance coefficient μ 13,j =x 1,j -x 3,j μ 24,j =x 2,j -x 4,j .
[0053] Step 5: If μ 13,1 >0.2 and μ 13,2 > 0.2, then an east-west imbalance is recorded, with the import with larger flow being in the east; 2) If μ 13,1 <-0.2 and μ 13,2 <-0.2, then an east-west imbalance is recorded, with the inlet with larger flow being the west; 3) If μ 24,1 >0.2 and μ 24,2 > 0.2, then a north-south imbalance is recorded, with the inlet with the larger flow being in the south; 4) If μ 24,1 <-0.2 and μ 24,2 <-0.2, then a north-south imbalance is recorded, with the inlet with the larger flow being the north; 5) In other cases, the flow rate is normal and there is no imbalance alarm; 0.2 is the imbalance threshold, which is a configurable parameter.
[0054] The following table shows the imbalance conditions and their determination in one embodiment.
[0055] like Figure 2 In one embodiment shown, Figure 2 The present invention is a signal optimization flow chart in an embodiment of a signal optimization method based on an alarm of an opposite import flow imbalance. After the imbalance alarm judgment is triggered, the system of the present invention determines the opposite import direction of the imbalance and the import direction with a larger flow rate according to the size of the balance coefficient of each flow direction and the imbalance threshold. The specific judgment conditions are as follows: If the balance coefficients of the east-west straight and left-turn flows are both greater than the imbalance threshold, the east-west imbalance is recorded, and the import direction with a larger flow rate is judged to be the east; if the balance coefficients of the east-west straight and left-turn flows are negative and their absolute values are greater than the imbalance threshold, the east-west imbalance is recorded, and the import direction with a larger flow rate is judged to be the west. Similarly, if the balance coefficients of the north-south straight and left-turn flows are both greater than the imbalance threshold, the north-south imbalance is recorded, and the import direction with a larger flow rate is judged to be the south; if the balance coefficients of the north-south straight and left-turn flows are negative and their absolute values are greater than the imbalance threshold, the north-south imbalance is recorded, and the import direction with a larger flow rate is judged to be the north.
[0056] After the system identifies the imbalance problem, it enters steps S3 and S4 to adjust the signal settings to alleviate the imbalance. Step S3 involves obtaining the current signal control scheme and making phase adjustments. The system first obtains the current signal control scheme and analyzes the import with a larger flow rate among the imports opposite the imbalance alarm. Next, the system determines whether a separate phase has been set for the import with a larger flow rate among the imports opposite the imbalance alarm. If a separate phase has been set, the system directly enters step S4 to adjust the green light duration; if not, the system needs to set a separate phase for the left turn and straight flow directions of the import, and insert it between the straight phase and the left turn phase. This adjustment method ensures that imports with larger flow rates can get more traffic opportunities, thereby alleviating traffic pressure.
[0057] In step S4, the system first calculates the traffic demand of the lane. The specific method is to obtain the data of vehicle passing and queue length in the past several signal cycles, and obtain the start and end time of the green light release of each lane in each signal cycle according to the matching relationship between the phase, flow direction and lane. The system intercepts the vehicle passing records according to these times and obtains the number of vehicles passing the lane during the green light time. At the same time, the system also obtains the queue length data within a few seconds before and after the end of the green light, and takes the maximum value as the queue length at the end of the green light of the lane in cycle C. The system combines these data to calculate the traffic demand of each lane in cycle C, and averages the traffic demand of m signal cycles to obtain the average traffic demand of the lane.
[0058] After calculating the average traffic demand of the lane, the system needs to estimate the green light duration of three phases for the opposite entrance with imbalance alarm, namely phase P1 for the opposite entrance straight flow, phase P2 for the opposite entrance left straight flow with large traffic, and phase P3 for the opposite entrance left turn flow. For phases P1 and P3, the system estimates the green light duration based on traffic demand, takes the shorter required green light duration in the same flow direction of the opposite entrance as the estimated green light duration of the phase, and calculates the recommended green light duration based on the comparison of the estimated green light duration with the maximum green light duration and the minimum green light duration of the phase. Specifically, if the estimated green light duration is greater than or equal to the minimum green light duration of the phase and less than or equal to the maximum green light duration, the recommended green light duration is the estimated value; if it is less than the minimum green light duration, the minimum green light duration is recommended; if it is greater than the maximum green light duration, the maximum green light duration is recommended.
[0059] For the phase P2 of the inlet left straight release with large flow, the system subtracts the green light duration of the left turn flow and the straight flow of the inlet from the recommended green light duration calculated in the previous step to obtain the remaining green light demand time for the left turn flow and the straight flow. The system takes the maximum value of the remaining green light demand time of the left turn flow and the straight flow as the recommended green light time for the phase of the inlet left straight release. Then it performs a maximum and minimum green check. If it is greater than or equal to the minimum green light duration and less than or equal to the maximum green light duration, it is the final output value; if it is less than the minimum green light duration, it is the minimum green light duration; if it is greater than the maximum green light duration, it is the maximum green light duration.
[0060] Through the above steps, the system can effectively adjust the signal settings according to real-time traffic data, increase the green light duration of the entrance with larger traffic flow, and not cause the opposite entrance to be vacant, thereby optimizing the distribution of traffic flow, reducing traffic congestion, and improving the traffic efficiency of the intersection. This method not only improves the operating efficiency of the transportation system, but also enhances the intelligence and automation level of traffic management, and provides technical support for the sustainable development of urban transportation. At the same time, this optimization method not only improves the overall efficiency of traffic flow by reducing vehicle waiting time and unnecessary acceleration and deceleration, but also reduces vehicle fuel consumption and exhaust emissions, which is helpful for environmental protection. In summary, the signal optimization method based on the opposite import flow imbalance alarm designed by the present invention provides an effective solution for the intelligent traffic management of modern cities through sophisticated data analysis and intelligent signal control.
[0061] In one embodiment, the specific steps of optimizing the signal of the import imbalance alarm are: Step 1: After the imbalance alarm is identified, start optimizing the signal plan. Get the current signal plan, and analyze whether the inlet with a larger flow rate in the opposite inlet of the imbalance alarm has a separate phase set. If there is a separate phase, the current phase setting is reasonable, and no phase adjustment is performed. Only the green light duration is optimized, and Step 2 is entered; if there is no separate phase, a phase adjustment is required, and a separate phase is set for the left turn and straight flow direction of the inlet, and inserted between the straight and left turn phases. Enter Step 2. (For the opposite inlet of the imbalance alarm, taking the east-west direction as an example, the east inlet is assumed to be the inlet with a larger flow rate. The original phase sequence plan is, Phase 1: East-West Straight, Phase 2: East-West Left Turn, Phase 3: North-South Straight, Phase 4: North-South Left Turn. The optimized phase sequence plan is: Phase 1: East-West Straight, Phase 2: East Straight, East Left, Phase 3: East-West Left Turn, Phase 4: North-South Straight, Phase 5: North-South Left Turn. Figure 3 and Figure 4 shown).
[0062] Step 2: Calculate lane traffic demand. Obtain the data of vehicle passing and queue length in the past m signal cycles, and obtain the green light release start time g for each lane k in each signal cycle based on the matching relationship between phase, flow direction and lane. k,start and end time g k,end , intercept the vehicle passing record according to the start and end time, and obtain the number of vehicles passing in lane k during the green light time of cycle C, q k,C , and use the end time g k,end The time period [g k,end -Δt,g k,end +Δt], Δt defaults to 2. The queue length data within the interception period is taken. If multiple queues are intercepted, the maximum value is taken as the queue length L at the end of the green light of the lane in cycle C. k,C The traffic demand of this lane in cycle C is r k,C =q k,C +L k,C , average the traffic demands of m signal cycles to obtain the average traffic demand of lane k
[0063] Step 3: Calculate the traffic demand from import i to j, and take the maximum traffic demand among the lanes included in the flow direction as the flow direction traffic demand
[0064] Step 4: Estimate the green light time g required for import i to flow to j i,j
[0065] The following table shows the parameters of each flow direction in an embodiment. Serial number Flow direction Saturated headway (s) Traffic demand (vehicles) Required green light time (s) 1 Dongzhi 2.3 28 64 2 East Left 2.7 25 68 3 Nanzhi 2.5 13 33 4 South Left 2.8 9 25 5 Xizhi 2.3 17 39 6 west left 2.7 15 41 7 Beizhi 2.4 12 29 8 north left 3 8 24
[0066] Step 5: For the opposite inlet with imbalance alarm, it is necessary to estimate the green light duration of three phases, namely phase P1 for the opposite inlet with straight flow, phase P2 for the opposite inlet with large flow, and phase P3 for the opposite inlet with left turn.
[0067] For the phase P1 for the straight flow at the opposite entrance, and the phase P3 for the left turn flow at the opposite entrance, the recommended green light duration is the result of comparing the green light duration estimated based on traffic demand with the maximum green light duration and the minimum green light duration of this phase. The shorter green light duration required for the same flow direction at the opposite entrance is taken as the estimated green light duration for the same phase.
[0068] If the estimated green light duration is greater than or equal to the minimum green light duration and less than or equal to the maximum green light duration, the recommended green light duration = the green light duration estimated based on traffic demand; If the estimated green light duration is less than the minimum green light duration, the recommended green light duration = the minimum green light duration; If the estimated green light duration is greater than the maximum green light duration, the recommended green light duration = the maximum green light duration.
[0069] The following table shows the recommended green light duration data for P1 and P2 in an embodiment. Serial number Flow direction Estimated green light duration (s) Maximum Green(s) Minimum Green(s) Recommended green light duration (s) P1 East and West 39 60 25 39 P3 East-West Left 41 60 20 41
[0070] For the phase P2 of the left straight-through discharge of the inlet with large flow, Subtract the estimated green light duration for the left-turn flow and the straight-through flow from the recommended green light duration calculated in the previous step to obtain the remaining green light required time for the left-turn flow and the straight-through flow; Take the maximum value of the remaining green light demand time for the left-turn flow and the straight-through flow as the recommended green light time for the phase of the left-turn and straight-through flow at the entrance; Check the maximum and minimum green light duration: if it is greater than or equal to the minimum green light duration and less than or equal to the maximum green light duration, output it directly; if it is less than the minimum green light duration, output the minimum green light duration; if it is greater than the maximum green light duration, output the maximum green light duration; assuming that according to the signal control requirements, the minimum green light duration for straight flow is g s,min , the maximum green light duration is g s,max , the minimum green light duration for left turn is g L,min , the maximum green light duration is g L,max The minimum green light duration for the left straight phase is g min , the maximum green light duration is g max .
[0071] The following table shows the recommended green light duration data in P2 situation in an embodiment.
[0072] Taking the imbalance of east-west imports and the large east import flow as an example, the recommended green light duration of phase P1 is The recommended green light duration for phase P3 is The recommended green light duration for phase P2 is
[0073] The present invention is not limited to the above-mentioned embodiments. No matter any changes are made in the shape or material composition, any structural design provided by the present invention is a variation of the present invention and should be considered to be within the protection scope of the present invention.
Claims
1. A signal optimization method based on counter-import flow imbalance alarm, characterized in that: The following steps are involved: S1: Obtain intersection model information and calculate flow direction flow, and calculate flow direction saturated headway and saturated flow based on historical data; S2: Obtain the opposite import data of the intersection, calculate the flow rate ratio and the flow balance coefficient, and issue an imbalance alarm according to the flow balance coefficient; S3: obtaining the current signal setting, and performing corresponding phase adjustment according to the current signal setting; S4: Calculate the lane traffic demand and the green light duration required for the flow direction, and for the opposite entrance of the imbalance alarm, adjust the green light duration of the corresponding phase according to the lane traffic demand and the green light duration required for the flow direction.
2. The signal optimization method based on the counter-import flow imbalance alarm according to claim 1 is characterized in that: The step S2 includes the following steps: S2.1: Obtain the data of the opposite entrance of the intersection; S2.2: Determine whether the complete opposite import data is obtained. If so, proceed to step S2.
3. If not, return to step S2.
1. S2.3: Convert the vehicle passing data into hourly flow and calculate the flow ratio. S2.4: Calculate the flow balance coefficient; S2.5: Determine whether an imbalance alarm is issued based on the flow balance coefficient and the imbalance threshold. If yes, proceed to step S2.6; if no, return to step S2.1; S2.6: Determine the unbalanced inlet direction and the inlet direction with larger flow rate based on the flow balance coefficient and the imbalance threshold in each direction.
3. The signal optimization method based on the counter-import flow imbalance alarm according to claim 1 is characterized in that: The step S3 comprises: S3.1: Obtain the current signal scheme, and analyze the inlet with a larger flow rate among the opposite inlets of the imbalance alarm; S3.2: Determine whether the inlet with a larger flow rate in the opposite inlet of the imbalance alarm is set with a separate phase. If so, proceed to step S4; if not, proceed to step S3.3; S3.3: Set a separate phase for the left-turn and through-flow directions of the inlet, and insert it between the through-flow phase and the left-turn phase.
4. A signal optimization method based on counter-import flow imbalance alarm according to claim 1, 2 or 3, characterized in that: In step S4, the lane traffic demand calculation is specifically to obtain the vehicle passing and queue length data of the past m signal cycles, and obtain the green light release start time g of each lane k in each signal cycle according to the matching relationship between the phase and flow direction and the lane. k,start and end time g k,end , intercept the vehicle passing record according to the start and end time, and obtain the number of vehicles passing in lane k during the green light time of cycle C, q k,C , and use the end time g k,end The time period [g k,end -Δt,g k,end +Δt], intercept the queue length data in the time period, if multiple data are intercepted, take the maximum value as the queue length L at the end of the green light of the lane in cycle C k,C , the traffic demand of the lane in cycle C is r k,C is the number of vehicles passing by q k,C The queue length L at the end of the green light k,C The average traffic demand of lane k is obtained by averaging the traffic demand of m signal cycles.
5. The signal optimization method based on the counter-import flow imbalance alarm according to claim 1 is characterized in that: The intersection model information includes the number of entrances at the intersection, the number of lanes at each entrance, and the flow direction of each lane; the calculation of flow direction flow includes counting the vehicle flow at fixed time intervals for each lane, and for each flow direction, taking the maximum flow value of the lanes included in the flow direction as the flow direction flow.
6. The signal optimization method based on the counter-import flow imbalance alarm according to claim 1 is characterized in that: The calculation of the flow direction saturation headway according to historical data comprises the following steps: Take the lane traffic data of historical M days with time interval T, sort the traffic in each lane by size, identify the time period corresponding to the maximum traffic, and then intercept the corresponding vehicle passing records in the original vehicle passing data according to the start and end time of the time period, sort the vehicle passing records by passing time, calculate the time interval between two adjacent vehicle passing records as the headway, filter the records with headway values less than or equal to a certain number of seconds and appearing for more than a certain number of consecutive times, and take the average of the headway times of all lanes that meet the conditions as the saturated headway time of the flow direction, recorded as h i,j is the saturated headway from inlet i to inlet j.
7. The signal optimization method based on the counter-import flow imbalance alarm according to claim 2 is characterized in that: The step S2.6 includes: if the balancing coefficients of all east-west flow directions are greater than the imbalance threshold, the east-west imbalance is recorded, and the import with a larger flow rate is the east; if the balancing coefficients of all east-west flow directions are negative and the absolute value is greater than the imbalance threshold, the east-west imbalance is recorded, and the import with a larger flow rate is the west; if the balancing coefficients of all north-south flow directions are greater than the imbalance threshold, the north-south imbalance is recorded, and the import with a larger flow rate is the south; if the balancing coefficients of all north-south flow directions are negative and the absolute value is greater than the imbalance threshold, the north-south imbalance is recorded, and the import with a larger flow rate is the north.
8. A signal optimization method based on opposite inlet flow imbalance alarm according to claim 1, 2 or 3, characterized in that: In the step S4, the green light duration of the corresponding phase is adjusted according to the lane traffic demand and the green light duration required for the flow direction. Specifically, for the opposite entrance with an imbalance alarm, it is necessary to estimate the green light duration of three phases, namely, the phase P1 of the opposite entrance straight flow direction, the phase P2 of the opposite entrance left straight flow direction with a large flow rate, and the phase P3 of the opposite entrance left turn flow direction. For the phase P1 of the opposite entrance straight flow direction, and the phase P3 of the opposite entrance left turn flow direction, take the opposite entrance For the same flow direction at the inlet, the shorter required green light duration is taken as the estimated green light duration of the same release phase, and the recommended green light duration is calculated based on the comparison result of the estimated green light duration with the maximum and minimum green light durations of this phase. For the phase P2 of the inlet left straight same release with large flow, the remaining green light required durations of different flow directions are calculated, and the longer remaining green light required duration is taken as the estimated green light duration of the same release phase, and compared with the maximum and minimum green light durations of this phase to obtain the recommended green light duration.
9. The signal optimization method based on the counter-import flow imbalance alarm according to claim 8 is characterized in that: The recommended green light duration is the result of comparing the green light duration estimated according to the traffic demand with the maximum green and minimum green of the phase: if the estimated green light duration is greater than or equal to the minimum green light duration of the phase and less than or equal to the maximum green light duration, the recommended green light duration is the estimated green light duration; if the estimated green light duration is less than the minimum green light duration of the phase, the recommended green light duration is the minimum green light duration of the phase; If the estimated green light duration is greater than the maximum green light duration of the phase, the recommended green light duration is the maximum green light duration of the phase; the phase P2 for the left and straight flow at the entrance with large traffic volume is specifically as follows: for the left turn flow and the straight flow at the entrance, the green light duration is subtracted from the recommended green light duration calculated in the previous step, and the remaining green light demand time of the left turn flow and the straight flow is obtained, and the maximum value of the remaining green light demand time of the left turn flow and the straight flow is taken as the recommended green light time of the phase of the left straight flow at the entrance; The maximum and minimum green light durations are checked. If it is greater than or equal to the minimum green light duration and less than or equal to the maximum green light duration, it is output. If it is less than the minimum green light duration, it is the minimum green light duration. If it is greater than the maximum green light duration, it is the maximum green light duration.
10. A signal optimization method based on opposite inlet flow imbalance alarm according to claim 1, 2 or 3, characterized in that: In step S4, the green light duration is specifically to calculate the traffic demand of the entrance i to the direction j, and take the maximum traffic demand of the lanes included in the direction as the traffic demand of the direction. Calculate the green light time g required for import i to flow to j i,j , g i,j The calculation formula is
Citation Information
Patent Citations
Intersection signal phase scheme green light duration configuration method
CN108898855B
Cited By
Intersection operation optimization evaluation method
CN119360642A
Intersection phase sequence configuration method, device, equipment and medium
CN121075141A