Multi-track gravity energy storage and battery energy storage combined secondary frequency modulation optimization method

By establishing a secondary frequency regulation optimization model for a hybrid energy storage system combining multi-track gravity energy storage and battery energy storage, and using a genetic algorithm to optimize the charging and discharging power of the battery energy storage system and the number of mass blocks on the inclined track, the frequency regulation deviation problem during joint frequency regulation of multi-track inclined gravity energy storage and battery energy storage was solved, achieving efficient frequency regulation optimization.

CN119010076AInactive Publication Date: 2024-11-22GUANGDONG UNIV OF TECH

Patent Information

Application Number
CN202411055632.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-02
Publication Date
2024-11-22
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Currently, when multi-track inclined gravity energy storage and battery energy storage are used together for secondary frequency regulation, there are power dispersion and time lag issues that cause frequency regulation deviations, and there is a lack of effective optimization methods.

Method used

A secondary frequency regulation optimization model for a hybrid energy storage system combining multi-track gravity energy storage and battery energy storage is established. A genetic algorithm is used to optimize the charging and discharging power of the battery energy storage system and the number of mass blocks on the inclined track. By setting constraints and objective functions, precise frequency regulation is achieved.

Benefits of technology

It improves the frequency regulation speed and accuracy of multi-track gravity energy storage systems, reduces the capacity requirements of battery energy storage systems, and optimizes the operating costs of hybrid energy storage systems.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119010076A_ABST
    Figure CN119010076A_ABST
Patent Text Reader

Abstract

The invention provides a multi-track gravity energy storage and battery energy storage combined secondary frequency modulation optimization method. The method comprises the following steps: establishing a secondary frequency modulation optimization model of a hybrid energy storage system; reading a current frequency modulation instruction and the number of mass blocks on all current tracks, and initializing numerical values; sequentially detecting whether each track can be used for increasing or reducing the mass blocks or not to obtain the upper limit and the lower limit of the total quantity of the mass blocks in the next period; setting constraint conditions according to the operation characteristics of the multi-track gravity energy storage system and the battery energy storage system, and setting the obtained upper and lower limits of the number of mass blocks on the slope track in the next period and the allowable range of the secondary frequency modulation deviation electric quantity as the constraint conditions; setting a variable range of the genetic algorithm according to the constraint condition; and calculating the optimal charging and discharging power and the optimal mass block number on the slope orbit in the next period by utilizing a genetic algorithm. According to the invention, the response speed and precision of the secondary frequency modulation of the multi-track gravity energy storage system are improved, and meanwhile, the capacity requirement on the battery energy storage system is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of gravity energy storage, and in particular to a combined secondary frequency modulation optimization method of multi-track gravity energy storage and battery energy storage. Background Art

[0002] Gravity energy storage has the advantages of high safety, low cost, long life, and environmental friendliness, and has broad application prospects in the field of energy storage.

[0003] Currently, gravity energy storage can be divided into two types: vertical and slope types. Compared with vertical gravity energy storage, slope gravity storage can reduce the utilization of flat land resources and has stronger terrain adaptability.

[0004] The current multi-track slope gravity energy storage directly participates in secondary frequency regulation. Due to its inherent power discreteness and time lag, direct participation in frequency regulation will produce a large deviation in power. Therefore, it is necessary to form a hybrid energy storage with a battery energy storage system to ensure the frequency regulation accuracy. However, there is currently no secondary frequency regulation optimization method for the combination of multi-track gravity energy storage and battery energy storage. Summary of the invention

[0005] In view of the deficiencies of the prior art, the present invention provides a combined secondary frequency modulation optimization method of multi-track gravity energy storage and battery energy storage.

[0006] The technical solution of the present invention is: a combined secondary frequency modulation optimization method of multi-track gravity energy storage and battery energy storage, comprising the following steps:

[0007] S1) Establish a secondary frequency modulation optimization model for a hybrid energy storage system consisting of multi-track gravity energy storage and battery energy storage;

[0008] S2), read the current frequency modulation instruction and the total number of mass blocks n on all current tracks 0 , initialize the value, let n max =n min =n 0 ;

[0009] S3) Check whether each track can add or reduce mass blocks in turn, and obtain the upper limit n of the total number of mass blocks on all ramp tracks in the next cycle. max and lower limit n min ;

[0010] S4), set constraints according to the operating characteristics of the multi-track gravity energy storage system and the battery energy storage system, and at the same time obtain the upper limit n of the number of mass blocks on the ramp track in the next cycle in step S3), max and lower limit n min , the allowable range of secondary frequency modulation deviation power is set as a constraint condition;

[0011] S5), according to the constraint conditions obtained in step S4), setting the range of variation of the variables in the genetic algorithm, and setting the population size, number of iterations, selection rate, mutation rate, and crossover rate in the genetic function;

[0012] S6) Using genetic algorithm to solve the optimal charging and discharging power of the battery energy storage system and the optimal number of mass blocks on the slope track that minimize the fitness function F in the next cycle, which are used to control the battery energy storage system and the gravity energy storage system respectively.

[0013] Preferably, in step S1), the secondary frequency modulation model for the hybrid energy storage system consisting of multi-track gravity energy storage and battery energy storage is constructed, and the specific steps are as follows:

[0014] S101, construct the target frequency modulation function:

[0015] F = k 1 △Q+k 2 C (1)

[0016] Among them, k 1 and k 2 It represents the target weight coefficient, △Q represents the degree to which the SOC of the battery energy storage system deviates from 50% at the end of the next cycle, and C represents the operating cost of the battery energy storage system in the next cycle. The specific expression is:

[0017] S102. The operating cost function of the battery energy storage system in the next cycle is:

[0018]

[0019]

[0020] Among them, S is the initial investment cost of the battery energy storage system, N is the battery cycle life, Q 0 is the battery capacity, P c The battery charging power, P d is the battery discharge power, T is the duration of the next cycle, x c is the battery charging state variable, x d is the battery discharge state variable.

[0021] Preferably, in step S3), the operation of adding or reducing mass blocks is detected in turn for each track to obtain the upper limit n of the total number of mass blocks of all slope tracks in the next cycle. max and lower limit n min , the specific steps are:

[0022] S301, detect whether the crane of the i-th track is ready, if it is ready, the operation of adding or reducing the mass block of this track is allowed, and step S302 is executed; if it is not ready, the operation of adding or reducing the mass block of this track cannot be performed, and step S303 is executed;

[0023] S302, detect whether there is a mass block at the end of the i-th track in the current moving direction; if there is a mass block, it means that the number of mass blocks on the track can only be reduced but not increased in the next cycle, and the upper limit of the number of mass blocks on the slope track in the next cycle is n max Remain unchanged, lower limit n min Minus 1; if there is no mass block, it means that the number of mass blocks on the track can only increase but not decrease in the next cycle, so the upper limit of the number of mass blocks on the ramp track in the next cycle is n max Add 1, lower limit n min remain unchanged;

[0024] S303, detect whether there is a mass block within the safety distance of the starting end of the current motion direction of the ith track. If there is a mass block, the upper limit n of the number of mass blocks on the ramp track in the next cycle is max Minus 1; if there is no mass block, the upper limit of the number of mass blocks on the ramp track in the next cycle is n max constant;

[0025] S304: Determine whether the detection of all tracks has been completed. If it has been completed, output the upper limit n of the total number of mass blocks of all slope tracks in the next cycle. max and lower limit n min If not completed, steps S301, S302, and S303 are executed again until all tracks are traversed.

[0026] Preferably, in step S4), the operating characteristics of the multi-track gravity energy storage system and the battery energy storage system are used to set constraints, and the constraints are set based on the results obtained in step S3) and the secondary frequency modulation unbiased power. The specific steps are as follows:

[0027] S401. The expression of the constraint condition of the multi-track gravity energy storage system is:

[0028] 0≤n≤N max (4)

[0029] Where n is the number of mass blocks on the slope, N max The upper limit of the number of masses allowed on the slope for the entire gravity energy storage system;

[0030] S402. The expression of the constraint condition of the battery energy storage system is:

[0031] 0≤P d ≤Pd,max (5)

[0032] 0≤P c ≤P c,max (6)

[0033]

[0034] Among them, P c,max , P d,max are the maximum charging and discharging power of the battery energy storage system, SOC max , SOC min They are the upper and lower thresholds of the SOC of the battery energy storage system respectively;

[0035] S403. The expression of the constraint condition of the allowable range of secondary frequency modulation deviation quantity is:

[0036] 0.98P AGC ≤P≤1.06P AGC (8)

[0037] Among them, P AGC is the target power of the secondary frequency modulation instruction, and P is the power generated by the gravity energy storage system and the battery energy storage system, specifically:

[0038] P=nP g +(x c P c +x d P d ) (9)

[0039] Among them, P g Output power of the gravity energy storage system corresponding to a single mass block.

[0040] Preferably, in step S6), the genetic algorithm is used to solve the optimal charging and discharging power in the next cycle and the optimal number of mass blocks on the ramp track, and the specific steps are as follows:

[0041] S601, according to the population size set in step S5), while satisfying the constraints described in step S4), i.e., formulas (4), (5), and (6), and at the same time satisfying the upper limit n of the total number of all slope track mass blocks in the next cycle calculated in step S3). max and lower limit n min Under the premise of , randomly generate enough individuals to form the initial population;

[0042] S602. For all individuals in the population, calculate in turn whether the battery energy storage system can meet the SOC constraint at the end of the next cycle, i.e., formula (7). At the same time, calculate the power P jointly generated by the gravity energy storage system and the battery energy storage system to meet the constraint condition of the allowable range of secondary frequency modulation deviation power, i.e., formula (8). If it is not satisfied, the corresponding individual is eliminated.

[0043] S603, calculating the fitness value of each individual according to formulas (1), (2), and (3), eliminating some individuals with low fitness values, and performing crossover and mutation on the remaining individuals to generate a new population;

[0044] S604, determine whether the iteration termination condition is met. If the iteration termination condition is met, output the optimal number of mass blocks in the population and the optimal battery charge and discharge power. If not, re-execute steps S602 and S604 until the iteration termination condition is met.

[0045] The beneficial effects of the present invention are:

[0046] 1. The present invention forms a hybrid energy storage system with a multi-track gravity energy storage system and a battery energy storage system. On this basis, a secondary frequency modulation optimization model for the multi-track gravity energy storage and battery energy storage systems is established, and an optimization operation method is designed to effectively improve the speed and accuracy of the multi-track gravity energy storage system in responding to secondary frequency modulation. At the same time, by making the SOC of the battery energy storage system as close to 50% as possible, the capacity requirement for the battery energy storage system is reduced. BRIEF DESCRIPTION OF THE DRAWINGS

[0047] Figure 1 A schematic diagram of the process flow of the secondary frequency modulation optimization of the present invention;

[0048] Figure 2 A schematic diagram of the process flow for determining the optimal number of mass blocks and the optimal charge and discharge power for the present invention;

[0049] Figure 3 It is a specific optimization flow chart of the genetic algorithm of the present invention. DETAILED DESCRIPTION

[0050] The specific implementation of the present invention will be further described below in conjunction with the accompanying drawings:

[0051] like Figure 1 As shown, this embodiment provides a combined secondary frequency modulation optimization method of multi-track gravity energy storage and battery energy storage, comprising the following steps:

[0052] S1) Establish a secondary frequency modulation optimization model for a hybrid energy storage system consisting of multi-track gravity energy storage and battery energy storage;

[0053] S2), read the current frequency modulation instruction and the total number of mass blocks n on all current tracks0 , initialize the value, let n max =n min =n 0 ;

[0054] S3) Check whether each track can add or reduce mass blocks in turn, and obtain the upper limit n of the total number of mass blocks on all ramp tracks in the next cycle. max and lower limit n min ;

[0055] S4), set constraints according to the operating characteristics of the multi-track gravity energy storage system and the battery energy storage system, and at the same time obtain the upper limit n of the number of mass blocks on the ramp track in the next cycle in step S3), max and lower limit n min , the allowable range of secondary frequency modulation deviation power is set as a constraint condition;

[0056] S5, according to the constraint conditions obtained in step S4), set the range of variation of the variables in the genetic algorithm, and set the population size, number of iterations, selection rate, mutation rate, and crossover rate in the genetic function;

[0057] S6) Using genetic algorithm to solve the optimal charging and discharging power of the battery energy storage system and the optimal number of mass blocks on the slope track that minimize the fitness function F in the next cycle, which are used to control the battery energy storage system and the gravity energy storage system respectively.

[0058] As a preferred embodiment of this embodiment, in step S1), the secondary frequency modulation model for the hybrid energy storage system consisting of multi-track gravity energy storage and battery energy storage is constructed, and the specific steps are as follows:

[0059] S101. Construct objective function:

[0060] F = k 1 △Q+k 2 C (1)

[0061] Among them, k 1 and k 2 It represents the target weight coefficient, △Q represents the degree to which the SOC of the battery energy storage system deviates from 50% at the end of the next cycle, and C represents the operating cost of the battery energy storage system in the next cycle. The specific expression is:

[0062] S102. The operating cost function of the battery energy storage system in the next cycle is:

[0063]

[0064]

[0065] Among them, S is the initial investment cost of the battery energy storage system, N is the battery cycle life, Q0 is the battery capacity, P c The battery charging power, P d is the battery discharge power, T is the duration of the next cycle, x c is the battery charging state variable, x d is the battery discharge state variable;

[0066] As a preferred embodiment of the present invention, in step S3), it is detected in turn whether each track can perform the operation of adding or reducing mass blocks, and the upper limit n of the total number of mass blocks of all slope tracks in the next cycle is obtained. max and lower limit n min ,like Figure 2 As shown, the details are as follows:

[0067] S301, detect whether the crane of the i-th track is ready, if it is ready, the operation of adding or reducing the mass block of this track is allowed, and step S302 is executed; if it is not ready, the operation of adding or reducing the mass block of this track cannot be performed, and step S303 is executed;

[0068] S302, detect whether there is a mass block at the end of the i-th track in the current moving direction; if there is a mass block, it means that the number of mass blocks on the track can only be reduced but not increased in the next cycle, and the upper limit of the number of mass blocks on the slope track in the next cycle is n max Remain unchanged, lower limit n min Minus 1; if there is no mass block, it means that the number of mass blocks on the track can only increase but not decrease in the next cycle, so the upper limit of the number of mass blocks on the ramp track in the next cycle is n max Add 1, lower limit n min remain unchanged;

[0069] S303, detect whether there is a mass block within the safety distance of the starting end of the current motion direction of the ith track. If there is a mass block, the upper limit n of the number of mass blocks on the ramp track in the next cycle is max Minus 1; if there is no mass block, the upper limit of the number of mass blocks on the ramp track in the next cycle is n max constant;

[0070] S304: Determine whether the detection of all tracks has been completed. If it has been completed, output the upper limit n of the total number of mass blocks of all slope tracks in the next cycle. max and lower limit n min , if not completed, re-execute S301, S302, S303 until all tracks are traversed;

[0071] As a preferred embodiment of the present invention, in step S4), the operating characteristics of the multi-track gravity energy storage system and the battery energy storage system are used to set the constraint conditions, and the constraint conditions are set based on the result obtained in step S3) and the secondary frequency modulation unbiased power, specifically as follows:

[0072] S401. The expression of the constraint condition of the multi-track gravity energy storage system is:

[0073] 0≤n≤N max (4)

[0074] Where n is the number of mass blocks on the slope, N max The upper limit of the number of masses allowed on the slope for the entire gravity energy storage system;

[0075] S402. The expression of the constraint condition of the battery energy storage system is:

[0076] 0≤P d ≤P d,max (5)

[0077] 0≤P c ≤P c,max (6)

[0078]

[0079] Among them, P c,max , P d,max are the maximum charge and discharge power of the battery energy storage system, SOC max , SOC min They are the upper and lower thresholds of the SOC of the battery energy storage system respectively;

[0080] S403. The expression of the constraint condition of the allowable range of secondary frequency modulation deviation quantity is:

[0081] 0.98P AGC ≤P≤1.06P AGC (8)

[0082] Among them, P AGC is the target power of the secondary frequency modulation instruction, and P is the power generated by the gravity energy storage system and the battery energy storage system, specifically:

[0083] P=nP g +(x c P c +x d P d ) (9)

[0084] Among them, P g Output power of the gravity energy storage system corresponding to a single mass block;

[0085] As a preferred embodiment of this invention, in step S6), the optimal charging and discharging power and the optimal number of mass blocks are solved by using a genetic algorithm. For ease of understanding, please refer to Figure 3 , the specific steps are as follows:

[0086] S601, according to the population size set in step S5, while satisfying the constraints described in step S4, i.e., formulas (4), (5), (6), and at the same time satisfying the upper limit n of the total number of all slope track mass blocks in the next cycle calculated in step S3 max and lower limit n min Under the premise of , randomly generate enough individuals to form the initial population;

[0087] S602. For all individuals in the population, calculate in turn whether the battery energy storage system can meet the SOC constraint at the end of the next cycle, i.e., formula (7). At the same time, calculate the power P jointly generated by the gravity energy storage system and the battery energy storage system to meet the constraint condition of the allowable range of secondary frequency modulation deviation power, i.e., formula (8). If it is not satisfied, the corresponding individual is eliminated.

[0088] S603, calculating the fitness value of each individual according to formulas (1), (2), and (3), eliminating some individuals with low fitness values, and performing crossover and mutation on the remaining individuals to generate a new population;

[0089] S604, determine whether the iteration termination condition is met. If the iteration termination condition is met, output the optimal number of mass blocks in the population and the optimal battery charge and discharge power. If not, re-execute steps S602 and S604 until the iteration termination condition is met.

[0090] The above embodiments and descriptions are only for illustrating the principles and best embodiments of the present invention. Without departing from the spirit and scope of the present invention, the present invention may be subject to various changes and improvements, all of which fall within the scope of the present invention to be protected.

Claims

1. A combined secondary frequency modulation optimization method for multi-track gravity energy storage and battery energy storage, It is characterized in that include: S1) Establish a secondary frequency modulation optimization model for a hybrid energy storage system consisting of multi-track gravity energy storage and battery energy storage; S2), read the current frequency modulation instruction and the total number of mass blocks n on all current tracks 0 , initialize the value, let n max =n min =n 0 ; S3) Check whether each track can add or reduce mass blocks in turn, and obtain the upper limit n of the total number of mass blocks on all ramp tracks in the next cycle. max and lower limit n min ; S4), set constraints according to the operating characteristics of the multi-track gravity energy storage system and the battery energy storage system, and at the same time obtain the upper limit n of the number of mass blocks on the ramp track in the next cycle in step S3), max and lower limit n min , the allowable range of secondary frequency modulation deviation power is set as a constraint condition; S5), according to the constraint conditions obtained in step S4), setting the range of variation of the variables in the genetic algorithm, and setting the population size, number of iterations, selection rate, mutation rate, and crossover rate in the genetic function; S6) Using genetic algorithm to solve the optimal charging and discharging power of the battery energy storage system and the optimal number of mass blocks on the slope track that minimize the fitness function F in the next cycle, which are used to control the battery energy storage system and the gravity energy storage system respectively.

2. A combined secondary frequency modulation optimization method for multi-track gravity energy storage and battery energy storage according to claim 1, Features: In step S1), the expression of the secondary frequency modulation optimization model for the hybrid energy storage system composed of multi-track gravity energy storage and battery energy storage is: F=k 1 △Q+k 2 C (1) Among them, k 1 and k 2 It represents the target weight coefficient, △Q represents the degree to which the SOC of the battery energy storage system deviates from 50% at the end of the next cycle, and C represents the operating cost of the battery energy storage system in the next cycle.

3. A combined secondary frequency modulation optimization method for multi-track gravity energy storage and battery energy storage according to claim 2, Features: In step S1), the degree △Q of the battery energy storage system SOC deviation from 50% at the end of the next cycle and the expressions of the operating cost C of the battery energy storage system in the next cycle are respectively: Among them, S is the initial investment cost of the battery energy storage system, N is the battery cycle life, Q 0 is the battery capacity, P c The battery charging power, P d is the battery discharge power, T is the duration of the next cycle, x c is the battery charging state variable, x d is the battery discharge state variable.

4. A combined secondary frequency modulation optimization method for multi-track gravity energy storage and battery energy storage according to claim 1, Features: In step S3), the operation of adding or reducing mass blocks is detected for each track in turn, and the upper limit n of the total number of mass blocks of all slope tracks in the next cycle is obtained. max and lower limit n min , the specific steps are: S301, detect whether the crane of the i-th track is ready, if it is ready, the operation of adding or reducing the mass block of this track is allowed, and step S302 is executed; if it is not ready, the operation of adding or reducing the mass block of this track cannot be performed, and step S303 is executed; S302, detect whether there is a mass block at the end of the i-th track in the current moving direction; if there is a mass block, it means that the number of mass blocks on the track can only be reduced but not increased in the next cycle, and the upper limit of the number of mass blocks on the slope track in the next cycle is n max Remain unchanged, lower limit n min Minus 1; if there is no mass block, it means that the number of mass blocks on the track can only increase but not decrease in the next cycle, so the upper limit of the number of mass blocks on the ramp track in the next cycle is n max Add 1, lower limit n min remain unchanged; S303, detect whether there is a mass block within the safety distance of the starting end of the current motion direction of the ith track. If there is a mass block, the upper limit n of the number of mass blocks on the ramp track in the next cycle is max Minus 1; if there is no mass block, the upper limit of the number of mass blocks on the ramp track in the next cycle is n max constant; S304: Determine whether the detection of all tracks has been completed. If it has been completed, output the upper limit n of the total number of mass blocks of all slope tracks in the next cycle. max and lower limit n min If not completed, re-execute S301, S302, and S303 until all tracks are traversed.

5. A combined secondary frequency modulation optimization method for multi-track gravity energy storage and battery energy storage according to claim 1, Features: In step S4), the constraint condition of the multi-track gravity energy storage system is expressed as: 0≤n≤N max (4) Where n is the number of mass blocks on the slope, N max The upper limit of the number of mass blocks allowed on the slope for the entire gravity energy storage system.

6. A combined secondary frequency modulation optimization method for multi-track gravity energy storage and battery energy storage according to claim 1, Features: In step S4), the battery energy storage system constraint condition is expressed as: 0≤P d ≤P d,max (5) 0≤P c ≤P c,max (6) Among them, P c,max , P d,max are the maximum charging and discharging power of the battery energy storage system, SOC max , SOC min They are the upper and lower thresholds of the SOC of the battery energy storage system respectively.

7. A combined secondary frequency modulation optimization method for multi-track gravity energy storage and battery energy storage according to claim 1, Features: The constraint condition of the allowable range of the secondary frequency modulation deviation quantity is expressed as follows: 0.98P AGC ≤P≤1.06P AGC (8) Among them, P AGC is the target power of the secondary frequency modulation instruction, and P is the power generated by the gravity energy storage system and the battery energy storage system, specifically: P=nP g +(x c P c +x d P d ) (9) Among them, P g Output power of the gravity energy storage system corresponding to a single mass block.

8. A combined secondary frequency modulation optimization method for multi-track gravity energy storage and battery energy storage according to claim 1, Features: In step S6), the genetic algorithm is used to solve the optimal charging and discharging power of the battery energy storage system and the optimal number of mass blocks on the slope track that minimize the fitness function F in the next cycle, which are used to control the battery energy storage system and the gravity energy storage system respectively. The specific steps are as follows: S601, according to the population size set in step S5), while satisfying the constraints described in step S4), i.e., formulas (4), (5), and (6), and at the same time satisfying the upper limit n of the total number of all slope track mass blocks in the next cycle calculated in step S3). max and lower limit n min Under the premise of , randomly generate enough individuals to form the initial population; S602. For all individuals in the population, calculate in turn whether the battery energy storage system can meet the SOC constraint at the end of the next cycle, i.e., formula (7). At the same time, calculate the power P jointly generated by the gravity energy storage system and the battery energy storage system to meet the constraint condition of the allowable range of secondary frequency modulation deviation power, i.e., formula (8). If it is not satisfied, the corresponding individual is eliminated. S603, calculating the fitness value of each individual according to formulas (1), (2), and (3), eliminating some individuals with low fitness values, and performing crossover and mutation on the remaining individuals to generate a new population; S604, determine whether the iteration termination condition is met. If the iteration termination condition is met, output the optimal number of mass blocks in the population and the optimal battery charge and discharge power. If not, re-execute steps S602 and S604 until the iteration termination condition is met.

Citation Information

Patent Citations

  • Capacity and state-of-charge calculation method of slope type gravity energy storage system

    CN116488207A

  • Energy storage system power control method considering life loss and SOC center deviation

    CN116565893A

  • Slope type gravity energy storage system power fluctuation suppression method and system

    CN117013571A

  • New energy power system consumption method based on DMPC

    CN117477624A

  • Optimized operation method and system for improving slope type gravity energy storage AGC performance

    CN118412892A

Cited By

  • Collaborative optimization scheduling method and system between gravity energy storage system and conventional energy storage system

    CN120638412A