Non-power-cut operation-friendly evaluation method and system for overhead distribution line

Through the friendly evaluation method of non-powered power distribution lines, the strict requirements of important industrial users for power supply reliability are solved. Through identity authentication, environmental information collection and evaluation models, the adaptability of non-powered power operations is determined, which improves the Power supply reliability and evaluation accuracy and efficiency.

CN119029834APending Publication Date: 2024-11-26YUNNAN POWER GRID CO LTD TRANSMISSION BRANCH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410815256.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-24
Publication Date
2024-11-26

AI Technical Summary

Technical Problem

Important industrial users have strict requirements on power supply reliability. The existing power outage maintenance methods cannot meet the requirements of uninterrupted power supply, making it difficult to improve power supply reliability.

Method used

A friendly evaluation method for power outage operations for overhead distribution lines is adopted. Through identity authentication, environmental information collection, evaluation model construction and adaptability calculation, a suitable intelligent evaluation terminal is selected and the evaluation results are output to determine power outage operations. fit.

Benefits of technology

Effectively evaluate whether the overhead distribution network meets the requirements of non-power outage operations, provide effective prompts and instructions, and improves the reliability of power supply and the accuracy and efficiency of evaluation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119029834A_ABST
    Figure CN119029834A_ABST
Patent Text Reader

Abstract

The invention discloses an uninterruptible operation friendly evaluation method and system for an overhead distribution line, and relates to the technical field of distribution network uninterruptible operation evaluation, and the method comprises the steps: obtaining an evaluation request of the overhead distribution line, and analyzing the evaluation request to obtain evaluation information; constructing an evaluation model to determine a plurality of to-be-evaluated devices, and selecting a target to-be-evaluated device; determining a plurality of assessment items to form a set based on the target to-be-assessed equipment, and calculating an assessment task load associated with adaptation degree assessment of the assessment items and the target assessment equipment; and obtaining the associated assessment task load and the distance with the intelligent station, selecting a matched intelligent assessment terminal, and outputting an assessment result based on the target to-be-assessed device. According to the method, whether the evaluated overhead power distribution network meets the requirement of the non-power-cut operation or not can be determined, the adaptation degree or the adaptation rate of the evaluated overhead power distribution network to the non-power-cut operation can be effectively determined, and effective prompts or instructions can be provided when the overhead power distribution line is subjected to the non-power-cut operation.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of non-stop operation evaluation for distribution networks, and in particular to a non-stop operation-friendly evaluation method and system for overhead distribution lines. Background Art

[0002] At present, with the rapid and high-quality development of the national economy, the whole society has higher and higher requirements for power supply quality and reliability. Industrial production, the popularization of household appliances, the rise of the Internet, the rapid development of smart devices, etc., are inseparable from the supply of electricity. The use of electricity has changed from an embellishment of life to a benchmark for measuring the quality of life. Therefore, a continuous and reliable supply of electricity has become a necessity for economic and social development and people's pursuit of a better life.

[0003] The power outage maintenance method is to shut down the power supply to the line or equipment that needs maintenance work, and carry out maintenance after taking necessary safety technical measures (power outage, power testing, hanging ground wires, hanging signs, installing fences, etc.), and then restore power supply after the work is completed. Since some important industrial users have very strict requirements on power supply reliability, the power outage maintenance method may not meet the requirements of uninterrupted power supply. In this case, improving power supply reliability has become an important task for the power grid, and non-stop operation is one of the most direct and effective measures to improve power supply reliability. Summary of the invention

[0004] In view of the problems existing in the existing non-stop operation-friendly evaluation methods for overhead distribution lines, the present invention is proposed.

[0005] Therefore, the problem to be solved by the present invention is that some important industrial users have very strict requirements on power supply reliability, and the power outage maintenance method may not be able to meet the requirements of uninterrupted power supply.

[0006] In order to solve the above technical problems, the present invention provides the following technical solutions:

[0007] In the first aspect, an embodiment of the present invention provides an evaluation method for overhead distribution lines that is friendly to non-stop operations, which includes obtaining an evaluation request for the overhead distribution line, parsing the evaluation request to obtain evaluation information; based on the evaluation information, constructing an evaluation model to determine multiple devices to be evaluated, and selecting a target device to be evaluated; based on the target device to be evaluated, determining multiple evaluation items to form a set of multiple evaluation items, and calculating the evaluation task volume associated with the fitness evaluation of the evaluation items and the target evaluation device; obtaining the associated evaluation task volume and the distance to the smart site, selecting a matching smart evaluation terminal, and outputting the evaluation result based on the target device to be evaluated.

[0008] As a preferred solution of the non-stop operation-friendly evaluation method for overhead distribution lines described in the present invention, identity information authentication is performed before parsing the evaluation request, and the identity authentication information includes: an identity identifier and multiple current authentication data items; when it is determined that there are multiple authentication data items that match the identity identifier, the multiple pre-stored authentication data items that match the identity identifier are used as pre-stored authentication information associated with the identity identifier, and before obtaining environmental information of the evaluation area or evaluation line to be evaluated, identity authentication is performed based on the pre-stored authentication information and the identity authentication information to obtain an identity authentication result; according to the pre-stored authentication information The multiple authentication data items in the information are used to verify the current multiple authentication data items. When each identity data item in the multiple authentication data items passes the verification, the identity authentication result is determined to be authentication success, otherwise, the identity authentication result is determined to be authentication failure; wherein, the authentication items include: face recognition, fingerprint recognition, ID number, mobile phone number, work number, password; face recognition and fingerprint recognition are set as the main verification items that must be accurately matched, and the others are secondary verification items; if face recognition and fingerprint recognition are accurately matched, and all secondary verification items are matched, the authentication is directly passed, and the login time, location, and device information used are recorded; if some of the secondary verification items match, the authentication is passed, However, it will enter restricted mode, restrict certain sensitive operations, send emails and text messages to notify update information, and give a 7-day update period, otherwise the authority will be reduced; if all secondary verification items do not match, the authentication is passed, but it will enter highly restricted mode, only basic operations and information viewing are allowed, and use is suspended; if face recognition matches accurately, fingerprint recognition does not match, and all secondary verification items match, fingerprint recognition is allowed to be retried 3 times. If it still fails, the user is required to select another recorded finger. If all fail, it will enter restricted mode and arrange to re-enter the fingerprint; if some or all secondary verification items do not match, the authentication fails, the reason for the failure is recorded, the security department is notified, and the account is locked. 30 minutes; if fingerprint recognition matches accurately, face recognition does not match, and all secondary verification items match, face recognition is allowed to be retried 3 times. If it still fails, the user is required to adjust the light or posture. If all fail, the system enters restricted mode and arranges to re-enter the face information; if some or all secondary verification items do not match, the authentication fails, the reason for the failure is recorded, the security department is notified, and the account is locked for 30 minutes; if face recognition or fingerprint recognition cannot be performed, all secondary verification items match, temporary login is allowed, but highly restricted mode is entered, and the user is required to go to the designated location for equipment inspection and information update within 24 hours; if some secondary verification items do not match, the authentication fails.

[0009] As a preferred scheme of the non-stop operation-friendly evaluation method for overhead distribution lines described in the present invention, wherein: the evaluation information includes environmental information of the evaluation area and evaluation line to be evaluated; the environmental information includes: temperature information, humidity information, wind direction information, wind force information; wherein the temperature information is the current air temperature value and surface temperature value, the humidity information is the air humidity value, the wind direction information is used to describe the direction of the wind, and the wind force information includes wind force level data; the environmental information includes multiple environmental information items, each environmental information item includes a temperature information item, a humidity information item, a wind direction information item, and a wind force information item, and each environmental information item is associated with a device to be evaluated, then multiple sensors are set at each device to be evaluated to respectively detect the environmental information item data information.

[0010] As a preferred solution of the non-stop operation-friendly evaluation method for overhead distribution lines of the present invention, the evaluation model takes into account the influence of temperature, humidity, wind direction and wind force, and is expressed as:

[0011]

[0012] Where T is the current temperature, T 0 is the most suitable temperature; k is the temperature adjustment coefficient, H is the current relative humidity, H max is the maximum acceptable humidity, p is the humidity impact index, N is the number of wind direction and wind speed sampling times, W i is the wind force sampled at the i-th time, θ i is the wind direction angle of the i-th sampling, W max is the maximum acceptable wind force, q is the wind force influence index, and its value range is 0 to 1; based on the evaluation model, multiple evaluation indicators are obtained under different circumstances, and the equipment to be evaluated corresponding to each evaluation indicator is determined, all the equipment to be evaluated are sorted according to the ascending values ​​of the evaluation indicators, and an ascending list of the equipment to be evaluated is generated; based on a pre-set selection method, starting from the equipment to be evaluated with the smallest evaluation indicator, at least one target equipment to be evaluated is selected according to the ascending values ​​of the evaluation indicators, or a predetermined number of target equipment to be evaluated is selected, or at least one equipment to be evaluated whose evaluation indicator is less than a specific value is selected as the target equipment to be evaluated.

[0013] As a preferred scheme of the non-stop operation-friendly evaluation method for overhead distribution lines described in the present invention, the evaluation items are to comprehensively consider the impact of distribution network rack, pole path, arrangement method, pole type, conductor distance, equipment installation, lightning protection measures, operation items and operation application on non-stop operation from three dimensions: operation method, operation application and number of loops.

[0014] As a preferred solution of the non-stop operation-friendly evaluation method for overhead distribution lines of the present invention, a fitness evaluation model is constructed based on the evaluation items, which is expressed as:

[0015]

[0016] Among them, w i is the weight of the i-th dimension, f ij is the evaluation function of the jth factor in the i-th dimension, x ij is the input value of the jth factor in the i-th dimension, y k is the actual value of the kth evaluation factor, μ k is the ideal value of the kth evaluation factor, γ is the influence coefficient of the number of loops, N is the actual number of loops, and N 0 is the number of standard circuits; further, the parameters of the evaluation function include: the number of towers (Z) = the number of straight pole bases (Z1) + the number of tension pole bases (Z2) + the number of corner pole bases (Z3) + the number of branch pole bases (Z4) + the number of terminal pole bases (Z5); the total number of operations (R), including: the total number of straight poles adapted to 10kV non-stop operations (L1) = the number of straight poles adapted to 10kV non-stop operations (N1) × the number of straight poles (Z1); the total number of tension poles adapted to 10kV non-stop operations (L2) = tension poles adapted to 10kV non-stop operations Number of projects (N2) × number of tension pole bases (Z2); total number of corner poles that can adapt to 10kV non-stop power supply operations (L3) = number of corner poles that can adapt to 10kV non-stop power supply operations (N3) × number of corner pole bases (Z3); total number of branch poles that can adapt to 10kV non-stop power supply operations (L4) = number of branch poles that can adapt to 10kV non-stop power supply operations (N4) × number of branch pole bases (Z4); and total number of terminal poles that can adapt to 10kV non-stop power supply operations (L5) = number of terminal poles that can adapt to 10kV non-stop power supply operations (N5) × number of terminal pole bases (Z5).

[0017] As a preferred solution of the non-stop operation-friendly evaluation method for overhead distribution lines described in the present invention, the output of the evaluation result includes: determining the energy consumption of the intelligent evaluation terminal for traveling to and from the intelligent site based on the straight-line distance to the intelligent site; and determining the evaluation energy consumption of the intelligent evaluation terminal for completing the evaluation task based on the associated evaluation task amount; calculating the sum of the distance energy consumption and the energy consumption as the initial total energy consumption; obtaining a preset energy surplus ratio, and determining the adjusted total energy consumption based on the initial total energy consumption and the energy surplus ratio; selecting for each target evaluation device from multiple intelligent evaluation terminals a current energy greater than the adjusted total energy consumption. A number of intelligent evaluation terminals are used as matching intelligent evaluation terminals for target evaluation devices; the identifier and location of the target device to be evaluated, as well as the dynamic configuration file and the output format are sent to the matching intelligent evaluation terminal, so that the matching intelligent evaluation terminal can move to the target device to be evaluated based on the identifier and location of the target device to be evaluated, and perform adaptability evaluation; each evaluation item in a set of multiple evaluation items of the target device to be evaluated is evaluated based on the dynamic configuration file, and the evaluation result is output based on the output format, the adaptability of each target device to be evaluated to the non-stop operation is determined, and the adaptability of each target device to be evaluated to the non-stop operation is output based on the preset output format.

[0018] In a second aspect, an embodiment of the present invention provides an evaluation system for overhead distribution lines that is friendly to non-stop operations, comprising: a collection module for obtaining evaluation requests for overhead distribution lines, parsing the evaluation requests to obtain evaluation information; a selection module for constructing an evaluation model based on the evaluation information to determine multiple devices to be evaluated, and selecting a target device to be evaluated; an evaluation module for determining multiple evaluation items based on the target device to be evaluated, forming a set of multiple evaluation items, and calculating the evaluation task volume associated with the fitness evaluation of the evaluation items and the target evaluation device; an output module for obtaining the associated evaluation task volume and the distance to the smart site, selecting a matching smart evaluation terminal, and outputting the evaluation result based on the target device to be evaluated.

[0019] In a third aspect, an embodiment of the present invention provides a computer device, comprising a memory and a processor, wherein the memory stores a computer program, wherein: when the processor executes the computer program, it implements any step of the above-mentioned non-stop operation-friendly evaluation method for overhead distribution lines.

[0020] In a fourth aspect, an embodiment of the present invention provides a computer-readable storage medium having a computer program stored thereon, wherein: when the computer program is executed by a processor, any step of the above-mentioned non-stop operation-friendly evaluation method for overhead distribution lines is implemented.

[0021] The beneficial effect of the present invention is that the present invention can evaluate the suitability or adaptability rate of the constructed or modified non-stop operation-friendly overhead distribution lines for non-stop operations, thereby effectively determining whether the evaluated overhead distribution network meets the requirements for non-stop operations, or effectively determining the suitability or adaptability rate of the evaluated overhead distribution network for non-stop operations, and can provide effective prompts or instructions when the overhead distribution lines are performing non-stop operations. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following briefly introduces the drawings required for describing the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work. Among them:

[0023] Figure 1 A flowchart of a non-stop operation-friendly evaluation method for overhead distribution lines according to an embodiment of the present invention;

[0024] Figure 2 4 is a structural diagram of an uninterrupted operation-friendly evaluation system for overhead distribution lines according to an embodiment of the present invention. DETAILED DESCRIPTION

[0025] In order to make the above-mentioned purposes, features and advantages of the present invention more obvious and easy to understand, the specific implementation methods of the present invention are described in detail below in conjunction with the drawings of the specification. Obviously, the described embodiments are part of the embodiments of the present invention, but not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary persons in the art without creative work should fall within the scope of protection of the present invention.

[0026] In the following description, many specific details are set forth to facilitate a full understanding of the present invention, but the present invention may also be implemented in other ways different from those described herein, and those skilled in the art may make similar generalizations without violating the connotation of the present invention. Therefore, the present invention is not limited to the specific embodiments disclosed below.

[0027] Secondly, an embodiment or embodiments referred to herein refers to a specific feature, structure or characteristic that can be included in at least one implementation of the present invention. References to an embodiment in different places in this specification do not all refer to the same embodiment, nor are they separate or selective embodiments that are mutually exclusive with other embodiments.

[0028] Example 1

[0029] Reference Figure 1, which is a first embodiment of the present invention, provides a non-stop operation-friendly evaluation method for overhead distribution lines, comprising:

[0030] S1: Obtain an evaluation request for an overhead distribution line, and parse the evaluation request to obtain evaluation information.

[0031] Before evaluating the request for parsing, identity authentication is required. The identity authentication information includes: identity identification and multiple current authentication data items;

[0032] When it is determined that there are a plurality of authentication data items that match the identity identifier, the plurality of pre-stored authentication data items that match the identity identifier are used as pre-stored authentication information associated with the identity identifier.

[0033] Before obtaining the environmental information of the assessment area or assessment route to be assessed, identity authentication is performed based on the pre-stored authentication information and identity authentication information to obtain an identity authentication result, including:

[0034] Acquire multiple authentication data items in pre-stored authentication information, and acquire multiple current authentication data items;

[0035] The current multiple authentication data items are verified according to the multiple authentication data items in the pre-stored authentication information. When each identity data item in the multiple authentication data items passes the verification, the identity authentication result is determined to be authentication success, otherwise, the identity authentication result is determined to be authentication failure.

[0036] Among them, the authentication items include: face recognition, fingerprint recognition, ID number, mobile phone number, work number, password; face recognition and fingerprint recognition are set as the main verification items that must be accurately matched, and the others are secondary verification items;

[0037] If both face recognition and fingerprint recognition are accurately matched, and all secondary verification items are matched, the authentication is passed directly, and the login time, location, and device information used are recorded;

[0038] If some of the secondary verification items match, the authentication is passed, but the account enters restricted mode, restricts certain sensitive operations, sends emails and text messages to notify the user to update information, and gives a 7-day update period. Otherwise, the account permissions will be reduced;

[0039] If all secondary verification items do not match, the authentication is passed, but the account enters a highly restricted mode, allowing only basic operations and information viewing, and suspending account use.

[0040] If the face recognition is accurately matched, the fingerprint recognition is not matched, and all the secondary verification items are matched, the fingerprint recognition is allowed to be retried 3 times. If it still fails, the user is asked to select another registered finger. If all fail, enter the restricted mode and arrange to re-register the fingerprint;

[0041] If some or all of the secondary verification items do not match, the authentication fails, the reason for the failure is recorded, the security department is notified, and the account is locked for 30 minutes.

[0042] If fingerprint recognition matches accurately, face recognition does not match, and all secondary verification items match, face recognition is allowed to be retried three times. If it still fails, the user is asked to adjust the lighting or posture. If all fail, the restricted mode is entered and the face information is arranged to be re-entered;

[0043] If some or all of the secondary verification items do not match, the authentication fails, the reason for the failure is recorded, the security department is notified, and the account is locked for 30 minutes;

[0044] If face recognition or fingerprint recognition cannot be performed and all secondary verification items match, temporary login is allowed, but the user enters highly restricted mode and needs to go to a designated location for device inspection and information update within 24 hours;

[0045] If some of the secondary verification items do not match, the authentication fails.

[0046] The assessment request includes the environmental information of the assessment area and assessment route to be assessed;

[0047] Environmental information includes: temperature information, humidity information, wind direction information, and wind force information. The temperature information is the current air temperature value and the surface temperature value, the humidity information is the air humidity value, the wind direction information is used to describe the wind direction, and the wind force information includes the wind force level data.

[0048] The environmental information includes multiple environmental information items. Each environmental information item may include a temperature information item, a humidity information item, a wind direction information item, and a wind force information item, and each environmental information item may be associated with a device to be evaluated. Multiple sensors are set at each device to be evaluated to detect environmental information item data information respectively.

[0049] S2: Based on the evaluation information, an evaluation model is constructed to determine multiple devices to be evaluated, and a target device to be evaluated is selected.

[0050] Considering the influence of temperature, humidity, wind direction and wind force, an evaluation model is constructed, which is expressed as:

[0051]

[0052] Where T is the current temperature, T 0 is the most suitable temperature; k is the temperature adjustment coefficient, H is the current relative humidity, H max is the maximum acceptable humidity, p is the humidity impact index, N is the number of wind direction and wind speed sampling times, W i is the wind force sampled at the i-th time, θ i is the wind direction angle of the i-th sampling, Wmax is the maximum acceptable wind speed, and q is the wind impact index. The value range is 0 to 1, where 0 means that the environmental conditions are extremely unfriendly and not suitable for non-stop operations, and 1 means that the environmental conditions are extremely friendly and very suitable for non-stop operations.

[0053] Integrating multiple environmental factors into a single, quantifiable indicator (EFI) provides an intuitive and comparable basis for decision-making. It integrates four key environmental factors, namely temperature, humidity, wind direction and wind speed, and reflects their impact on operation friendliness through a nonlinear function.

[0054] A plurality of evaluation indicators under different circumstances are obtained from the evaluation model, and the device to be evaluated corresponding to each evaluation indicator is determined, all the devices to be evaluated are sorted according to the ascending values ​​of the evaluation indicators, and an ascending list of the devices to be evaluated is generated, and based on a pre-set selection method, starting from the device to be evaluated with the smallest evaluation indicator, at least one target device to be evaluated is selected according to the ascending values ​​of the evaluation indicators; or a predetermined number of target devices to be evaluated are selected, or at least one device to be evaluated whose evaluation indicator is less than a specific value is selected as the target device to be evaluated.

[0055] S3: Determine multiple evaluation items based on the target device to be evaluated, form a set of multiple evaluation items, and calculate the evaluation task amount associated with the fitness evaluation of the evaluation items and the target device to be evaluated.

[0056] The classification of work items for non-stop operations on overhead distribution lines is divided into simple type of work items, complex type of work items, comprehensive type of work items and power supply protection type of work items.

[0057] Simple type of work items include: general fault elimination and installation and removal of accessories (including: pruning branches, removing foreign objects, straightening insulators, dismantling retired equipment; installing or removing contact equipment bushings, fault indicators, bird repellers); live disconnection of drain lines (including: upper leads of fuses, branch line leads, and tension pole drain lines); live connection of drain lines (including: upper leads of fuses, branch line leads, and tension pole drain lines); live auxiliary installation or removal of insulation shielding; live replacement of lightning arresters; live replacement of fuses; live replacement of straight pole insulators and crossarms; live replacement of tension pole insulator strings; live replacement of pole switches or disconnectors.

[0058] Complex types of operations include: replacing insulators and crossarms of straight poles under power; replacing tension insulator strings and crossarms under power; replacing fuses under power; assembling or removing straight poles under power; replacing tension insulator strings and crossarms under power; replacing straight poles under power; converting straight poles to terminal poles under power; replacing fuses under load; replacing non-load-bearing wire clamps for conductors under load; replacing pole-mounted switches or disconnectors under load; converting straight poles to tension poles under load; disconnecting the connecting leads between no-load cable lines and overhead lines under power; connecting the connecting leads between no-load cable lines and overhead lines under power.

[0059] Comprehensive types of operation projects involve comprehensive non-stop operation methods, which are an effective means to reduce planned power outage time, improve power supply reliability, and increase the flexibility of distribution network maintenance. Comprehensive operation projects refer to operations that use a variety of methods to repair equipment with the purpose of achieving non-stop or short-term power outages for users with comprehensive non-stop operation methods. The comprehensive non-stop operation method composed of high-voltage bypass flexible cables, arc suppression switches and bypass load switches is also widely used. A bypass line is formed by high-voltage bypass flexible cables, arc suppression switches and bypass load switches to bypass and short-circuit pole switches, disconnectors, drop-out fuses and other equipment that need to be repaired and replaced.

[0060] Comprehensive types of operation projects include: replacing pole-mounted transformers without power outages, bypass operations to repair overhead lines, bypass operations to repair cable lines, bypass operations to repair ring network boxes, temporary power supply from ring network boxes (overhead lines) equipment to ring network boxes, and mobile box transformers.

[0061] The parameters for evaluating comprehensive operation projects include: application coverage of comprehensive operation projects, number of operations and proportion, and contribution to improving power supply reliability.

[0062] Power supply guarantee projects are to obtain temporary power supply or use mobile power supply as power supply without power outage or short-term power outage in the distribution network, so as to achieve power outage or short-term power outage for customers. Power supply guarantee projects include: obtaining temporary power supply and using mobile power supply as power supply.

[0063] The assessment of power supply protection type operation projects includes: the design of overhead lines, ring network cabinets, high and low voltage cabinets, considering the use of quick access devices and busbar clamps to carry out power supply protection work; new public distribution rooms, important user distribution rooms with high power supply reliability or underground distribution stations, consider setting up quick access devices in appropriate areas outside the station; switch cabinets in operation consider installing quick access devices on busbars or low voltage overhead lines; ring network boxes should reserve spare intervals to facilitate power supply from ring network cabinets or power supply protection work for ring network cabinets; medium and low voltage generator cars are considered to have parallel devices to achieve flexible expansion of power supply capacity; low voltage generator cars are considered to have grid connection functions to avoid short-term power outages during the connection and exit of low voltage generator cars.

[0064] Furthermore, the evaluation items for suitability evaluation of non-stop operation-friendly overhead distribution lines include:

[0065] The distribution network is used to determine the adaptability of the distribution network, whether it is suitable for the design of 10kV non-stop operation-friendly overhead distribution lines, and comprehensively determine the possibility of load transfer and bypass operation, the convenience of medium and low voltage generators connected to the grid, and the rationality of power supply and segmentation settings. The distribution network determines the possibility of switching load or load transfer, bypass operation, and medium and low voltage generators connected to the grid for power generation; and there are requirements for line power supply and segmentation.

[0066] The pole path determines the adaptability of the pole path of the 10kV overhead distribution line and whether it meets the requirements for the arrival of special operation vehicles for 10kV non-stop operation projects. Specifically, the pole path directly determines whether special operation vehicles can reach the pole for complex operation projects; there is no requirement for simple operation projects; the proportion of the number of poles that special operation vehicles can reach to the total number of poles on the line.

[0067] Erection on the same pole, determine the adaptability of 10kV overhead distribution line erection on the same pole, whether it affects the possibility of implementing 10kV non-stop power supply operations and the safety requirements of operations. Specifically, the different number of circuits affects the size of the 10kV non-stop power supply operation space, the possibility of carrying out 10kV non-stop power supply operations and the safety requirements of operations, the proportion of different number of circuits erected on the same pole and the proportion of impact on the operation items.

[0068] The pole head and lead arrangement determine the adaptability of the pole head and lead arrangement of the 10kV overhead distribution line, whether it affects the possibility of implementing 10kV non-stop power supply operations and the safety requirements of the operation. Specifically, the pole head arrangement affects the distance between the conductors and between the conductors and the ground potential, and directly determines the size of the operating space. Single-circuit conductors are arranged horizontally or in a triangle, and double-circuit conductors are arranged in a symmetrical triangle and symmetrical vertical arrangement.

[0069] Installation of equipment and facilities on poles, determine the adaptability of the installation of equipment and facilities on overhead distribution line poles, whether the equipment installation location and installation method, the arrangement of lightning protection measures, and the arrangement of auxiliary facilities affect the possibility of implementing 10kV non-stop power supply operations and the safety requirements of operations.

[0070] Pole type configuration, determining different pole types is related to the possibility and safety of carrying out non-stop power supply operations on the distribution network. Specifically, different pole types are related to the possibility and safety of carrying out 10kV non-stop power supply operations, including: straight poles, tension poles, corner poles, branch poles, and terminal poles.

[0071] Safety distance, determine whether the phase-to-phase distance between live parts, the distance between live parts and the ground potential (including metal components of poles, crossarms, and guy wires), the distance between live parts and leads, and the distance between equipment installation leads and the ground potential meet safety requirements.

[0072] Equipment and facility installation, determine the adaptability of overhead distribution line equipment and facility installation, whether the equipment installation location and installation method, the layout of lightning protection measures, and the layout of auxiliary facilities affect the possibility of implementing non-stop power distribution network operations and the safety requirements of operations. Specifically, the equipment installation location and installation method affect the size of the working space and various safety distances, and the possibility and safety of 10kV non-stop power operations.

[0073] Lightning protection measures are used to determine whether overhead lightning conductors affect the implementation of some complex operations such as erecting (removing) energized poles.

[0074] Auxiliary facilities, determining the installation position and number of straight pole windproof wires, tension pole wires, corner pole wires, terminal pole wires and branch pole wires, directly affect the implementation of some complex operations on energized pole erection (removal).

[0075] The suitability assessment of non-stop operation-friendly overhead distribution lines can be mainly carried out from three different dimensions (operation method, operation application, number of loops) to record, collect and process basic data information. According to different evaluation models, nine evaluation factors (distribution grid, pole path, arrangement, pole type, conductor distance, equipment installation, lightning protection measures, operation items, and operation application) are used to determine the field data of the non-stop operation site.

[0076] Based on the evaluation items, a fitness evaluation model is constructed, which is expressed as:

[0077]

[0078] Among them, w i is the weight of the i-th dimension, f ij is the evaluation function of the jth factor in the i-th dimension, x ij is the input value of the jth factor in the i-th dimension, y k is the actual value of the kth evaluation factor, μ k is the ideal value of the kth evaluation factor, γ is the influence coefficient of the number of loops, N is the actual number of loops, and N 0 The number of standard circuits.

[0079] The parameters of the evaluation function include:

[0080] The number of towers (Z) = the number of straight poles (Z1) + the number of tension poles (Z2) + the number of corner poles (Z3) + the number of branch poles (Z4) + the number of terminal poles (Z5);

[0081] The total number of operations (R) includes: the total number of operations for straight poles to adapt to 10kV non-stop power supply (L1) = the number of operations for straight poles to adapt to 10kV non-stop power supply (N1) × the number of straight pole bases (Z1); the total number of operations for tension poles to adapt to 10kV non-stop power supply (L2) = the number of operations for tension poles to adapt to 10kV non-stop power supply (N2) × the number of tension pole bases (Z2); the total number of operations for corner poles to adapt to 10kV non-stop power supply (L3) = the number of operations for corner poles to adapt to 10kV non-stop power supply (N3) × the number of corner pole bases (Z3); the total number of operations for branch poles to adapt to 10kV non-stop power supply (L4) = the number of operations for branch poles to adapt to 10kV non-stop power supply (N4) × the number of branch pole bases (Z4); and the total number of operations for terminal poles to adapt to 10kV non-stop power supply (L5) = the number of operations for terminal poles to adapt to 10kV non-stop power supply (N5) × the number of terminal pole bases (Z5).

[0082] Evaluation by working method: According to different working methods, it can be divided into three working method scenarios: insulating poles, insulating gloves, and comprehensive operations.

[0083] Evaluation by operational application: According to different operational applications, it can be divided into four operational application scenarios: business expansion and power connection, operation and maintenance business, engineering application, and key projects.

[0084] Evaluation by number of loops: Depending on the number of loops, it can be divided into three scenarios: single loop, double loop, and multiple loops.

[0085] Based on the set of evaluation items of each target evaluation device, an evaluation task amount associated with the fitness evaluation of each target evaluation device is determined, including:

[0086] Based on the set of evaluation items of each target evaluation device, determining a plurality of evaluation items associated with each target evaluation device and a project name of each evaluation item;

[0087] Based on the project name of each assessment project, determine the project type and basic assessment time length of each assessment project;

[0088] Determine the time adjustment coefficient of the evaluation project based on the project type, and determine the adjusted evaluation time length of each evaluation project based on the time adjustment coefficient and the basic evaluation time length, and use the product of the time adjustment coefficient and the basic evaluation time length as the adjusted evaluation time length. Preferably, the corresponding relationship between the project type and the time adjustment coefficient can be preset;

[0089] Based on the adjusted evaluation time length of each evaluation item, the evaluation task amount associated with the fitness evaluation of each target evaluation device is determined. The sum of the adjusted evaluation time lengths of each evaluation item of the target evaluation device is used as the evaluation task amount associated with the fitness evaluation of each target evaluation device.

[0090] S4: Obtain the associated evaluation task volume and the distance to the smart site, select a matching smart evaluation terminal, and output the evaluation result based on the identifier and location of the target device to be evaluated.

[0091] Based on the straight-line distance to the smart site, determine the energy consumption of the smart assessment terminal traveling to and from the smart site;

[0092] Based on the associated evaluation task amount, determining the evaluation energy consumption of the intelligent evaluation terminal to complete the evaluation task amount;

[0093] Calculate the sum of the energy consumption of the route and the energy consumption as the initial total energy consumption;

[0094] Obtaining a preset energy surplus ratio, and determining an adjusted total energy consumption based on an initial total energy consumption and the energy surplus ratio;

[0095] An intelligent evaluation terminal whose current energy is greater than the adjusted total energy consumption is selected from a plurality of intelligent evaluation terminals for each target evaluation device as a matching intelligent evaluation terminal for the target evaluation device.

[0096] The identifier and location of the target device to be evaluated, as well as the dynamic configuration file and the output format are sent to the matching intelligent evaluation terminal, so that the matching intelligent evaluation terminal can move to the target device to be evaluated based on the identifier and location of the target device to be evaluated, and perform the fitness evaluation. The dynamic configuration file includes a specific evaluation method for each of the multiple evaluation items above, or a fitness evaluation weight for each evaluation item, or a key point for evaluating the evaluation item.

[0097] Each evaluation item in the set of evaluation items of the target device to be evaluated is evaluated based on the dynamic configuration file, and the evaluation result is output based on the output format to determine the adaptability of each target device to be evaluated for the non-stop operation. The adaptability of each target device to be evaluated for the non-stop operation is output based on a preset output format.

[0098] In summary, the present invention provides a comprehensive, flexible and accurate method for evaluating the adaptability of distribution lines for non-stop operations. By integrating multi-dimensional evaluation factors, such as pole type, workload, line scale, equipment layout, etc., and adopting modular function design, a quantitative evaluation of the adaptability of non-stop operations is achieved. This method not only improves the accuracy and reliability of the evaluation, but also has good scalability and dynamic adaptability. It contributes to refined management, improved safety, optimized efficiency and rational allocation of resources, while supporting standardized evaluation and long-term planning. By promoting data-driven decision-making and continuous improvement, the present invention provides strong support for improving the overall non-stop operation capability of the distribution network, enhancing power supply reliability and customer satisfaction, and promoting the development of the distribution system in a smarter and more modern direction.

[0099] Example 2

[0100] Reference Figure 2 Based on the first embodiment, this embodiment further provides a non-stop operation-friendly evaluation system for overhead distribution lines, including:

[0101] A collection module, used for obtaining an evaluation request for an overhead distribution line, parsing the evaluation request to obtain evaluation information;

[0102] A selection module is used to construct an evaluation model based on the evaluation information to determine multiple devices to be evaluated and select a target device to be evaluated;

[0103] An evaluation module, used to determine a plurality of evaluation items based on a target device to be evaluated, form a set, and calculate an evaluation task amount associated with the evaluation of the fitness of the evaluation items and the target device to be evaluated;

[0104] The output module is used to obtain the associated evaluation task volume and the distance to the smart site, select a matching smart evaluation terminal, and output the evaluation result based on the target device to be evaluated.

[0105] This embodiment also provides a computer device, which is suitable for the case of an assessment method for non-stop operation-friendly overhead distribution lines, including a memory and a processor; the memory is used to store computer-executable instructions, and the processor is used to execute computer-executable instructions to implement the assessment method for non-stop operation-friendly overhead distribution lines as proposed in the above embodiments.

[0106] The computer device may be a terminal, and the computer device includes a processor, a memory, a communication interface, a display screen and an input device connected via a system bus. The processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system and a computer program. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The communication interface of the computer device is used to communicate with an external terminal in a wired or wireless manner, and the wireless manner can be achieved through WIFI, an operator network, NFC (near field communication) or other technologies. The display screen of the computer device may be a liquid crystal display screen or an electronic ink display screen, and the input device of the computer device may be a touch layer covering the display screen, or a key, trackball or touchpad provided on the housing of the computer device, or an external keyboard, touchpad or mouse, etc.

[0107] This embodiment also provides a storage medium having a computer program stored thereon, which, when executed by a processor, implements the non-stop operation-friendly evaluation method for overhead distribution lines as proposed in the above embodiment.

[0108] The storage medium proposed in this embodiment and the data storage method proposed in the above embodiment belong to the same inventive concept. The technical details not fully described in this embodiment can be found in the above embodiment, and this embodiment has the same beneficial effects as the above embodiment.

[0109] Example 3

[0110] On the basis of the previous two embodiments, this embodiment provides an evaluation method for overhead distribution lines that is friendly to non-stop operations. In order to verify the beneficial effects of the present invention, scientific demonstration is carried out through economic benefit calculation and simulation experiments.

[0111] In order to verify the effectiveness of the evaluation method proposed in this invention, we conducted a comparative test with the prior art. The test selected a 10kV overhead distribution line in a suburban area of ​​a city as the test object. The line is about 15 kilometers long and contains 100 towers. We divided the line into two sections, A and B, each section is about 7.5 kilometers long and has 50 towers. Section A is evaluated using the method of this invention, and section B is evaluated using the existing conventional manual evaluation method.

[0112] The method of the present invention is applied to section A: environmental sensors are deployed to collect data such as temperature, humidity, wind direction, wind force, etc. in real time, an evaluation model is constructed, the equipment to be evaluated is determined, the fitness is calculated based on the evaluation items, and the intelligent evaluation terminal independently completes the evaluation task.

[0113] Conventional manual evaluation methods are applied to Section B: manual visual inspection of each tower, manual recording of relevant data, and judgment based on experience on whether it is suitable for non-stop operation.

[0114] Compare the evaluation results of the two methods, including indicators such as accuracy, efficiency, and comprehensiveness

[0115] The experimental results are shown in Table 1:

[0116] Table 1 Evaluation effect comparison table

[0117]

[0118]

[0119] It can be seen from the above table that the method of the present invention improves the assessment accuracy to 98.6%, shortens the assessment time to 4 hours, increases the number of assessment items by 66.7%, and has all-weather working capabilities and real-time data collection functions. Through standardized processes, AI-assisted and dynamically adjusted assessment models, this method greatly improves the consistency of the assessment, the ability to identify anomalies, and environmental adaptability. Multi-dimensional data collection and analysis make the assessment more comprehensive and accurate, providing a more reliable basis for decision-making on non-stop operations. Overall, the method of the present invention is superior to traditional methods in terms of accuracy, efficiency, comprehensiveness, and intelligence, and provides power companies with a more scientific and efficient overhead distribution line assessment solution.

[0120] It should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solutions of the present invention may be modified or replaced by equivalents without departing from the spirit and scope of the technical solutions of the present invention, which should all be included in the scope of the claims of the present invention.

Claims

1. A method for evaluating the non-stop operation-friendly nature of overhead distribution lines, characterized by: include, Obtain an assessment request for an overhead distribution line, and parse the assessment request to obtain assessment information; Based on the evaluation information, an evaluation model is constructed to determine multiple devices to be evaluated, and a target device to be evaluated is selected; Determine multiple evaluation items based on the target device to be evaluated, form a set of multiple evaluation items, and calculate the evaluation task amount associated with the fitness evaluation of the evaluation items and the target device to be evaluated; The associated evaluation task volume and the distance to the smart site are obtained, a matching smart evaluation terminal is selected, and the evaluation result is output based on the target device to be evaluated.

2. The non-stop operation-friendly evaluation method for overhead distribution lines according to claim 1, characterized in that: Perform identity information authentication before parsing the evaluation request, the identity authentication information including: identity identification and multiple current authentication data items; When it is determined that there are multiple authentication data items that match the identity identifier, the multiple pre-stored authentication data items that match the identity identifier are used as pre-stored authentication information associated with the identity identifier, Before obtaining environmental information of an assessment area or assessment route to be assessed, identity authentication is performed based on pre-stored authentication information and identity authentication information to obtain an identity authentication result; Verifying the current multiple authentication data items according to the multiple authentication data items in the pre-stored authentication information, and determining the identity authentication result as authentication success when each identity data item in the multiple authentication data items passes the verification, otherwise, determining the identity authentication result as authentication failure; Among them, the authentication items include: face recognition, fingerprint recognition, ID number, mobile phone number, work number, password; face recognition and fingerprint recognition are set as the main verification items that must be accurately matched, and the others are secondary verification items; If both face recognition and fingerprint recognition are accurately matched, and all secondary verification items are matched, the authentication is passed directly, and the login time, location, and device information used are recorded; If some of the secondary verification items match, the authentication is passed, but the user enters restricted mode, restricts certain sensitive operations, sends emails and SMS notifications of update information, and is given a 7-day update period. Otherwise, the user's permissions are reduced; If all secondary verification items do not match, the authentication is passed, but the device enters a highly restricted mode, allowing only basic operations and information viewing, and the device is temporarily suspended; If the face recognition is accurately matched, the fingerprint recognition is not matched, and all the secondary verification items are matched, the fingerprint recognition is allowed to be retried 3 times. If it still fails, the user is asked to select another registered finger. If all fail, enter the restricted mode and arrange to re-register the fingerprint; If some or all of the secondary verification items do not match, the authentication fails, the reason for the failure is recorded, the security department is notified, and the account is locked for 30 minutes; If fingerprint recognition matches accurately, face recognition does not match, and all secondary verification items match, face recognition is allowed to be retried three times. If it still fails, the user is asked to adjust the lighting or posture. If all fail, the restricted mode is entered and the face information is arranged to be re-entered; If some or all of the secondary verification items do not match, the authentication fails, the reason for the failure is recorded, the security department is notified, and the account is locked for 30 minutes; If face recognition or fingerprint recognition cannot be performed and all secondary verification items match, temporary login is allowed, but the user enters highly restricted mode and needs to go to a designated location for device inspection and information update within 24 hours; If some of the secondary verification items do not match, the authentication fails.

3. The non-stop operation-friendly evaluation method for overhead distribution lines according to claim 2, characterized in that: The assessment information includes environmental information of the assessment area and assessment route to be assessed; Environmental information includes: temperature information, humidity information, wind direction information, and wind force information; The temperature information is the current air temperature value and the surface temperature value, the humidity information is the air humidity value, the wind direction information is used to describe the wind direction, and the wind force information includes the wind force level data; The environmental information includes multiple environmental information items, each of which includes a temperature information item, a humidity information item, a wind direction information item, and a wind force information item. Each environmental information item is associated with a device to be evaluated. Multiple sensors are set at each device to be evaluated to detect environmental information item data information respectively.

4. The non-stop operation-friendly evaluation method for overhead distribution lines according to claim 3, characterized in that: The evaluation model considers the influence of temperature, humidity, wind direction and wind force, and is expressed as: Among them, T is the current temperature, T0 is the most suitable temperature; k is the temperature influence adjustment coefficient, H is the current relative humidity, H max is the maximum acceptable humidity, p is the humidity impact index, N is the number of wind direction and wind speed sampling times, W i is the wind force sampled at the i-th time, θ i is the wind direction angle of the i-th sampling, W max is the maximum acceptable wind force, q is the wind force impact index, and the value range is 0 to 1; Based on obtaining multiple evaluation indicators under different circumstances in the evaluation model, and determining the device to be evaluated corresponding to each evaluation indicator, all the devices to be evaluated are sorted according to the ascending values ​​of the evaluation indicators to generate an ascending list of the devices to be evaluated, and based on a pre-set selection method, starting from the device to be evaluated with the smallest evaluation indicator, at least one target device to be evaluated is selected according to the ascending values ​​of the evaluation indicators, or a predetermined number of target devices to be evaluated are selected, or at least one device to be evaluated whose evaluation indicator is less than a specific value is selected as the target device to be evaluated.

5. The non-stop operation-friendly evaluation method for overhead distribution lines according to claim 4, characterized in that: The evaluation project comprehensively considers the impact of distribution network frame, pole path, arrangement method, pole type, conductor distance, equipment installation, lightning protection measures, operation items and operation application on non-stop operation from three dimensions: operation method, operation application and number of loops.

6. The non-stop operation-friendly evaluation method for overhead power distribution lines according to claim 5, characterized in that: A fitness evaluation model is constructed based on the evaluation items, which is expressed as: Among them, w i is the weight of the i-th dimension, f ij is the evaluation function of the jth factor in the i-th dimension, x ij is the input value of the jth factor in the i-th dimension, y k is the actual value of the kth evaluation factor, μ k is the ideal value of the kth evaluation factor, γ is the influence coefficient of the number of loops, N is the actual number of loops, and N0 is the standard number of loops; Furthermore, the parameters of the evaluation function include: The number of towers (Z) = the number of straight poles (Z1) + the number of tension poles (Z2) + the number of corner poles (Z3) + the number of branch poles (Z4) + the number of terminal poles (Z5); The total number of operations (R) includes: the total number of operations for straight poles to adapt to 10kV non-stop power supply (L1) = the number of operations for straight poles to adapt to 10kV non-stop power supply (N1) × the number of straight pole bases (Z1); the total number of operations for tension poles to adapt to 10kV non-stop power supply (L2) = the number of operations for tension poles to adapt to 10kV non-stop power supply (N2) × the number of tension pole bases (Z2); the total number of operations for corner poles to adapt to 10kV non-stop power supply (L3) = the number of operations for corner poles to adapt to 10kV non-stop power supply (N3) × the number of corner pole bases (Z3); the total number of operations for branch poles to adapt to 10kV non-stop power supply (L4) = the number of operations for branch poles to adapt to 10kV non-stop power supply (N4) × the number of branch pole bases (Z4); and the total number of operations for terminal poles to adapt to 10kV non-stop power supply (L5) = the number of operations for terminal poles to adapt to 10kV non-stop power supply (N5) × the number of terminal pole bases (Z5).

7. The non-stop operation-friendly evaluation method for overhead power distribution lines according to claim 6, characterized in that: The output of the evaluation results includes: Based on the straight-line distance to the smart site, determine the energy consumption of the smart assessment terminal traveling to and from the smart site; and determining the evaluation energy consumption of the intelligent evaluation terminal to complete the evaluation task amount based on the associated evaluation task amount; Calculate the sum of the energy consumption of the route and the energy consumption as the initial total energy consumption; Obtaining a preset energy surplus ratio, and determining an adjusted total energy consumption based on an initial total energy consumption and the energy surplus ratio; Selecting, from among the plurality of intelligent evaluation terminals, an intelligent evaluation terminal whose current energy is greater than the adjusted total energy consumption for each target evaluation device as a matching intelligent evaluation terminal for the target evaluation device; Sending the identifier and location of the target device to be evaluated, as well as the dynamic configuration file and the output format to the matching intelligent evaluation terminal, so that the matching intelligent evaluation terminal can move to the target device to be evaluated based on the identifier and location of the target device to be evaluated, and perform a compatibility evaluation; Each evaluation item in a set of multiple evaluation items of the target device to be evaluated is evaluated based on a dynamic configuration file, and the evaluation result is output based on an output format, so as to determine the adaptability of each target device to be evaluated for non-stop operation, and output the adaptability of each target device to be evaluated for non-stop operation based on a preset output format.

8. An evaluation system for the non-stop operation-friendly type of overhead distribution lines, based on the non-stop operation-friendly type evaluation method for overhead distribution lines according to any one of claims 1 to 7, characterized in that: include, A collection module, used for obtaining an evaluation request for an overhead distribution line, parsing the evaluation request to obtain evaluation information; A selection module is used to construct an evaluation model based on the evaluation information to determine multiple devices to be evaluated and select a target device to be evaluated; An evaluation module, used to determine multiple evaluation items based on the target device to be evaluated, form a set of multiple evaluation items, and calculate the evaluation task amount associated with the fitness evaluation of the evaluation items and the target device to be evaluated; The output module is used to obtain the associated evaluation task volume and the distance to the smart site, select a matching smart evaluation terminal, and output the evaluation result based on the target device to be evaluated.

9. A computer device comprising a memory and a processor, wherein the memory stores a computer program, wherein: When the processor executes the computer program, the steps of the non-stop operation-friendly evaluation method for overhead distribution lines according to any one of claims 1 to 7 are implemented.

10. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the non-stop operation-friendly evaluation method for overhead distribution lines according to any one of claims 1 to 7 are implemented.