Aerostat fixed-height closed umbrella ladder high-altitude wind energy utilization system and state switching method
By using a fixed-height enclosed parachute ladder system, the problem of frequent ascent and descent of the aerostat in parachute ladder-type high-altitude wind energy utilization has been solved, improving wind energy conversion efficiency and utilization rate, and realizing stable and safe wind energy conversion and state switching.
Patent Information
- Application Number
- CN202411249841.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-06
- Publication Date
- 2024-11-29
- Estimated Expiration
- 2044-09-06
AI Technical Summary
In existing umbrella ladder-type high-altitude wind energy utilization systems, the frequent ascent and descent of the airships cause the wind energy conversion efficiency to depend on the durability of the airships, the descent speed is limited, and additional electrical energy is consumed, reducing the overall wind energy utilization rate.
A fixed-height enclosed parachute ladder system is adopted, which is connected to the parachute ladder group through pulley blocks and drive unit to realize wind energy conversion. The airship provides the height of the parachute ladder group, and the parachute ladder group converts wind energy through the opening and closing of the parachute and gliding, avoiding frequent ascent and descent. Combined with the drive unit and transmission system, a closed parachute ladder system is formed to stably output wind energy.
It improves wind energy conversion efficiency, reduces reliance on the durability of airships, saves energy consumption, enhances overall wind energy utilization and stability, and enables safe and rapid state switching.
Smart Images

Figure CN119042076A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of new energy and energy conversion technology, and in particular to an aerostat fixed-height closed parachute ladder high-altitude wind energy utilization system and a state switching method. Background Art
[0002] High-altitude wind energy utilization system refers to an indirect or direct energy conversion system that converts high-altitude wind energy into other energy forms such as mechanical energy, electrical energy, gravitational potential energy, etc. Due to the needs of long-distance energy transmission and convenient use, in most cases, the high-altitude wind energy utilization system ultimately converts wind energy into electrical energy, which is called a high-altitude wind power generation system or device.
[0003] Taking the high-altitude wind power generation system as an example, according to the installation position of the energy conversion device, it is mainly divided into two types: tethered air-based and tethered land-based. The tethered air-based high-altitude wind power generation system refers to the final energy conversion device (such as a generator) installed on the airship, and the generated electric energy is transmitted to the ground through cables for use in the power supply network such as inverter and booster. Its airship is generally an aircraft-type airship towed by ground cables; the final energy conversion device (such as a generator) of the tethered land-based high-altitude wind power generation system is installed on the ground, and its wind energy receiving device is generally a paraglider or parachute type. The former uses a fixed trajectory to drag the tethered cable to generate electricity without the assistance of an airship, and the latter uses the wind blowing the umbrella surface to move obliquely upward to drag the tethered cable to generate electricity, which requires the assistance of aerostats such as balloons.
[0004] The tethered air-based energy conversion is stable, but due to the weight of the energy conversion device and the stability of the aerostat, the power is limited, which is not conducive to large-scale production and application; the tethered land-based medium paraglider type has complex motion control and low power, and is also not suitable for large-scale application at the current stage. The tethered land-based medium parachute ladder type has a simple structure and a small energy conversion power bottleneck, and has the prospect of large-scale promotion and application.
[0005] With the continuous development of new materials and new equipment, certain progress has been made in the field of parachute ladder high-altitude wind power generation, but there are still many technical problems to be solved. Chinese Patent (200910190150.2) provides a high-power parachute wind power generation system, which proposes to use an airship to drive the parachute ladder to take off. After taking off, by opening the working parachute, the wind energy is pulled by the cable to drag the generator to convert into electrical energy. In order to improve its feasibility, Chinese Patent (201110151527.0) provides an umbrella-type wind power device and wind power system. On the basis of the aforementioned invention, a winch and a transmission device are added to generate electricity by driving the generator by the winch. There is insufficient continuous power generation capacity. , Chinese patent (201110151521.3) provides a series-connected bidirectionally driven wind power system, proposes the use of a double-pick generator, and uses two sets of parachute ladders in series to achieve uninterrupted power generation; further discloses the details of the invention and improves the continuous power generation capacity. Chinese patent (201610800547.9) provides a medium- and high-altitude wind energy ground power generation power assembly and generator set, and designs a parachute ladder type high-altitude wind energy ground energy conversion device in detail to achieve continuous utilization of high-altitude wind energy and facilitate grid-connected applications.
[0006] In the above series of inventions, the practicality and continuous power generation capacity of the ground energy conversion device have been gradually improved through continuous improvement. However, various parachute ladder types require an aerostat to be equipped on the top of each parachute ladder. After the aerostat rises to a certain height, the parachute is opened, and the wind pushes the working parachute to rise. The aerostat continues to rise at the same time. When it reaches a certain height, the parachute is closed, and the mooring cable is dragged by the winch to recover the parachute ladder and the aerostat. This method of converting wind energy by driving the working parachute by the rise and pull of the aerostat has the following problems: 1. Since the aerostat needs to be frequently raised and lowered to convert wind energy, the wind energy conversion efficiency is highly dependent on the durability of the aerostat; 2. Due to the influence of the strength and volume of the aerostat material, the allowed descent speed of the aerostat is limited during the process of being pulled down, which further restricts the high-altitude wind energy conversion efficiency; 3. The pull-down airship also needs to be equipped with an additional electric motor, which consumes electricity and reduces the effective utilization rate of wind energy in the overall system.
[0007] Therefore, there is an urgent need for an aerostat fixed-height closed parachute ladder high-altitude wind energy utilization system and a state switching method that can overcome the above-mentioned problems, effectively improve the energy conversion efficiency of the high-altitude wind energy utilization system, and improve its effective utilization rate of wind energy. Summary of the invention
[0008] In order to solve the above technical problems, the present invention provides an aerostat fixed-height closed parachute ladder high-altitude wind energy utilization system, comprising: a control unit, an energy conversion unit and at least one set of driving units; The driving part is used to drive wind energy conversion; each set of driving parts includes a mooring part, an aerostat part, a pulley block part, a first hoisting part, a second hoisting part, a first transmission part, a second transmission part, a first parachute ladder group and a second parachute ladder group; The aerostat part includes an aerostat in the air and a mono-drum winch in the ground connected by ropes, and the aerostat is used to provide a parachute ladder set; the first parachute ladder set and the second parachute ladder set convert wind energy through the opening and closing of the parachute and the up and down sliding; The pulley assembly is hoisted and connected to the bottom of the airship, and the first parachute ladder group and the second parachute ladder group are respectively connected to the two sides of the airship through the mooring part. One end of the first hoisting part is connected to the first parachute ladder group, one end of the second hoisting part is connected to the second parachute ladder group, and the other end of the first hoisting part is connected to the first transmission part, the energy conversion part, the second transmission part and the other end of the second hoisting part in sequence to form a closed parachute ladder high-altitude wind energy utilization system.
[0009] The control unit is used to monitor the operation of the system and perform corresponding control according to the working mode of the system.
[0010] As an implementation mode of the present application, the energy conversion part is a double-pick type, and the first transmission part and the second transmission part are axially connected to the mechanical energy input ends on both sides of the energy conversion part.
[0011] As an implementation manner of the present application, it further includes a third transmission part; The first transmission part includes a shaft-connected clutch A and a gearbox A, the second transmission part includes a shaft-connected clutch B and a gearbox B, and the third transmission part includes a three-shaft reversing gearbox and a clutch C; The three-axis reversing gearbox is connected to clutch A, clutch B and clutch C respectively, wherein the other end of clutch C is connected to the mechanical energy input end of the energy conversion unit for converting wind energy.
[0012] As an implementation mode of the present application, the system includes two sets of driving parts, and the clutch C of each set of the driving parts is axially connected to the mechanical energy input ends on both sides of the energy conversion part.
[0013] As an embodiment of the present application, the mooring part includes a first hoisting mooring rope connecting the first hoisting part and the first parachute ladder group, a second hoisting mooring rope connecting the second hoisting part and the second parachute ladder group, a third hoisting mooring rope connecting the first parachute ladder group and the second parachute ladder group, and a fourth hoisting mooring rope connecting the airship and the single-drum winch.
[0014] As an embodiment of the present application, each set of driving parts further includes a steering part, and the steering part includes at least three steering wheels: The first hoisting mooring rope and the second hoisting mooring rope are respectively wound on the drums of the first hoisting part and the second hoisting part through the steering wheel; The fourth winch mooring rope is wound on the drum of the single-drum winch through the steering wheel.
[0015] As an implementation mode of the present application, the positions of the rope outlet holes of the first hoisting mooring rope, the second hoisting mooring rope and the fourth hoisting mooring rope are isosceles obtuse triangles, wherein the line connecting the positions of the rope outlet holes of the first hoisting mooring rope and the second hoisting mooring rope is the base of the isosceles obtuse triangle.
[0016] As an implementation mode of the present application, the first hoisting part, the second hoisting part, the control part, the first transmission part, the second transmission part and the energy conversion part are arranged in an indoor energy conversion production workshop; the energy conversion production workshop is arranged on the vertical center line of the base below the center of gravity of the isosceles obtuse triangle.
[0017] As an implementation mode of the present application, positioning terminals are respectively installed on the first parachute ladder group, the second parachute ladder group and the aerostat to perform altitude monitoring.
[0018] As an implementation mode of the present application, the first hoisting part, the second hoisting part and the ground single-drum hoist are respectively equipped with three-pulley sensors to calculate the moving speed, rope reeling length and rope releasing length of the mooring rope on the corresponding drum, and monitor the tension of the mooring rope on the corresponding drum.
[0019] The present invention also provides a method for switching the state of high-altitude wind energy utilization of an aerostat fixed-altitude closed parachute ladder, characterized in that the state switching method is implemented based on the high-altitude wind energy utilization system of the aerostat fixed-altitude closed parachute ladder described in any one of the above items, and the state switching method includes: the system switches from a preparation and maintenance state to a start-up and standby state, the system enters a normal working state from the start-up and standby state, the system enters a stop state from the normal working state, the system enters a start-up and standby state from the stop state, the system changes from a normal working state to a start-up and standby state, the system enters a height adjustment state from the start-up and standby state, and the system enters a preparation and maintenance state from the start-up and standby state.
[0020] As an implementation mode of the present application, the system switches from a preparation and maintenance state to a startup and standby state, comprising the following steps: Step S1-1: Perform status check, including system status check and weather condition check. If the check result meets the working conditions, proceed to step S1-2; Step S1-2: Set the predetermined floating height H of the airship, and calculate the initial release length L of the first hoisting mooring rope and the second hoisting mooring rope according to the predetermined floating height H and wind conditions. 初始 , and the release speed V4 of the fourth winch mooring rope; Step S1-3: slowly release the brake mechanism of the single-drum winch to control the release speed of the fourth winch mooring rope to not exceed V4; at the same time, release the brake mechanism of the first winch; Step S1-4: When the actual release length of the first winch mooring rope reaches L 1初始 After that, release the brake mechanism of the second hoisting unit, and at the same time, control the brake mechanism of the first hoisting unit to brake, and record the final initial release length L of the first hoisting mooring rope 1初始 ’ ; Step S1-5: Determine the actual release length of the second winch mooring rope, and whether it reaches L 2初始 Then control the brake mechanism of the second winch to brake and record the final initial release length L of the mooring rope of the second winch 2初始 ’ ; Step S1-6: Determine the actual release speed of the fourth hoisting mooring rope, and when it drops to 0, control the brake mechanism of the single-drum hoisting machine to brake the vehicle, and record the final release length L4 of the fourth hoisting mooring rope ’ ; Step S1-7: End the control, and the system completes the switch from the preparation and maintenance state to the start-up and standby state.
[0021] As an implementation mode of the present application, when the normal working state is the intermittent operation mode, the system enters the normal working state from the startup and standby states including: Step S2A-1: Perform status check again, including system status check and weather condition check. If the check result meets the working conditions, proceed to step S2A-2; Step S2A-2: Setting the mooring rope's draw-out speed V1 and draw-out length S1, as well as the maximum draw-out threshold S 1max ; Step S2A-3: Control clutch A and clutch B to be closed, clutch C to be open, and gearbox A and gearbox B to be switched to forward direction; Step S2A-4: releasing the brake mechanism of the first hoisting part and the brake mechanism of the second hoisting part, and at the same time, opening the first parachute ladder assembly; Step S2A-5: Monitor the actual outgoing speed V1 of the first winch mooring rope through the three-pulley sensor ’ And the actual rope length S1 ’ , when V1 ’ When V1 is equal to V1, the braking force of the brake mechanism of the first hoisting part is controlled so that V1 ’ Keep it equal to V1 and pull out the rope at a constant speed; Step S2A-6: When S1 ’When the set value S1 is exceeded, the second parachute ladder group is opened, and the braking force of the braking mechanism of the first hoisting part and the braking mechanism of the second hoisting part is controlled so that S1 does not exceed the threshold value S max ; Step S2A-7: When V1 ’ When it drops to 0, both gearbox A and gearbox B are controlled to reverse; Step S2A-8: releasing the brake mechanism of the first hoisting part and the brake mechanism of the second hoisting part, and at the same time, closing the first parachute ladder assembly; Step S2A-9: Monitor the actual rope-out speed V2 of the second winch mooring rope through the three-pulley sensor ’ And the actual rope length S2 ’ , when V2 ’ When V1 is equal to V2, the braking force of the brake mechanism of the second winch is controlled so that V2 ’ Keep it equal to V1 and pull out the rope at a constant speed; Step S2A-10: When S2 ’ When the set value S is exceeded, the second parachute ladder group is opened, and the braking force of the braking mechanism of the first hoisting part and the braking mechanism of the second hoisting part is controlled so that S1 does not exceed the threshold value S max ; Step S2A-11: When V1 ’ When it drops to 0, both gearbox A and gearbox B are controlled to reverse; Step S2A-12: releasing the brake mechanism of the first hoisting part and the brake mechanism of the second hoisting part, and at the same time, closing the second parachute ladder assembly; Step S2A-13: When the system does not receive other instructions, execute step S2A-4 and the system enters a normal working state.
[0022] As an implementation mode of the present application, during the process of the system entering a normal working state from a startup and standby state, the gearbox A and the gearbox B are in the same direction, the first hoisting part and the second hoisting part both have bottom rope outlets and opposite rope outlet directions; the gearbox A and the gearbox B are in opposite directions, and the first hoisting part and the second hoisting part have the same rope outlet directions.
[0023] As an implementation mode of the present application, in step S2A-5, the first hoisting mooring rope is unwound at a uniform speed, and the first parachute ladder group is gradually accelerated upward by the wind force, driving the first hoisting mooring rope to pull the first hoisting part to rotate forward, thereby driving the energy conversion part and the second hoisting part to rotate forward, and recovering the second hoisting mooring rope at the same speed as the first hoisting part, pulling the second parachute ladder group to move obliquely downward along the second hoisting mooring rope; Similarly, in step S2A-9, the second hoisting mooring rope is unwound at a uniform speed, and the second parachute ladder group is gradually accelerated upward by the wind, and the first hoisting mooring rope is recovered at the same speed as the second hoisting part, pulling the first parachute ladder group to move obliquely downward along the first hoisting mooring rope.
[0024] As an implementation mode of the present application, when the normal working state is the continuous operation mode, the system enters the normal working state from the startup and standby states including: Step S2B-1: Perform status check again, including system status check and weather condition check. If the check result meets the working conditions, proceed to step S2B-2; Step S2B-2: Setting the mooring rope's draw-out speed V1 and draw-out length S1, as well as the maximum draw-out threshold S 1max ; and set the start interval time T of the two sets of driving parts; wherein T is less than the time during which the first hoisting mooring rope or the second hoisting mooring rope in any set of driving parts continuously pulls out the rope at a uniform speed; Step S2B-3: Open the clutch C of the first drive unit and close the clutch C of the second drive unit; at the same time, start the first drive unit according to steps S2A-3 to S2A-13, and record the running time T of the first drive unit when executing step S2A-3. ’ ; Step S2B-4: When T ’ When T is reached, the second set of driving parts is started according to steps S2A-3 to S2A-13; Step S2B-5: During the operation, the operating status of the first set of driving parts and the second set of driving parts are monitored. When any set of driving parts executes step S2A-5 or step S2A-9 and maintains the rope delivery speed at V, the clutch C of the corresponding driving part is closed. When any set of driving parts finishes step S2A-5 or step S2A-9, the clutch C of the corresponding driving part is disconnected. Step S2B-6: When the system does not receive other instructions, execute step S2B-3 and the system enters a normal working state.
[0025] As an implementation manner of the present application, the method for switching from a normal operating state to a stop state includes: Step S3-1, opening all first parachute ladder groups and second parachute ladder groups, and starting the brake mechanisms of all first hoisting parts and second hoisting parts; Step S3-2: when the speeds of the first hoisting mooring rope and the second hoisting mooring rope drop to 0, close all the first parachute ladder groups and the second parachute ladder groups.
[0026] As an implementation mode of the present application, the step of entering the startup and standby states from the stop state includes: Step S4-1: Determine L 1初始’ and L 1初始 ’ Is it more than L 初始 : If neither exceeds, then execute step S4-7, otherwise go to step S4-2; Step S4-2: Determine whether each set of driving parts is provided with a third transmission part: If a third transmission part is provided, the clutch C of the third transmission part is disconnected; If the third transmission part is not provided, proceed to step S4-3; Step S4-3: close the clutch A and clutch B in each set of driving parts, and switch the clutch A and gearbox A, the second transmission part including the shaft-connected clutch B gearbox 1 and gearbox 2 to the forward direction; Step S4-4: closing the internal clutch of each winch 1 to connect the motor to the drum shaft; Step S4-5: starting the motor inside the hoisting part 1, dragging the hoisting part 1 to retract the hoisting mooring rope 1 at a constant speed, and determining the length of the hoisting mooring rope 1 in real time; Step S4-6: When the length of the mooring rope 1 of a certain driving unit is L1', the motor inside the corresponding hoisting unit 1 is turned off, the brakes of the corresponding hoisting units 1 and 2 are started, and the clutch inside the hoisting unit 1 is disconnected; Step S4-7: After all driving parts have executed the above steps, the system enters the startup and standby state.
[0027] As an implementation mode of the present application, the method for the system to enter the preparation and maintenance state from the startup and standby state is: Step S7-1: Disconnect clutch A, clutch B, and clutch 3, and simultaneously close the internal clutches of the first hoisting part and the second hoisting part; Step S7-2: Set gearbox A to forward and gearbox B to reverse; Step S7-3: Start the single-drum winch to recover the fourth winch mooring rope, pull the airship down, and at the same time, start the first winch part and the second winch part to recover the first winch mooring rope and the second winch mooring rope respectively; Step S7-4: the aerostat is recovered to the ground; the connection part between the first parachute ladder group and the first hoisting mooring rope is recovered to the position of the rope outlet hole of the first hoisting mooring rope; the connection part between the second parachute ladder group and the second hoisting mooring rope is recovered to the position of the rope outlet hole of the second hoisting mooring rope respectively; the system is completed from the startup and standby state to the preparation and maintenance state.
[0028] The embodiments of the present invention have the following technical effects: 1. The high-altitude wind energy utilization system of the airship with a fixed height and a closed parachute ladder in the present invention provides the height for the parachute ladder group to convert wind energy through the airship, and the two parachute ladder groups are symmetrical with each other with the airship. Through the pulley group, the first parachute ladder group and the second parachute ladder group are respectively connected to the two sides of the airship using the mooring part, one end of the first hoisting part is connected to the first parachute ladder group, one end of the second hoisting part is connected to the second parachute ladder group, and the other end of the first hoisting part is sequentially connected to the first transmission part, the energy conversion part, the second transmission part and the other end of the second hoisting part, together forming a closed parachute ladder high-altitude wind energy utilization system. In the process of wind energy conversion, the first parachute ladder group and the second parachute ladder group convert wind energy through the opening and closing of the parachute and the up and down sliding. The airship only provides the height for the parachute ladder group to convert wind energy, and does not need to be frequently lifted and pulled down, which overcomes the dependence on the durability of the airship, avoids the problem of restricting the efficiency of high-altitude wind energy conversion caused by the limited pulling speed of the airship, and saves the electric energy consumed by frequently pulling down the airship, thereby further improving the effective utilization rate of wind energy of the overall system.
[0029] 2. The high-altitude wind energy utilization system of the airship fixed-height closed parachute ladder provided by the present invention includes at least one set of driving parts. One set of driving parts is used to realize wind energy conversion. The two sets are used in combination to stably output the energy converted from wind energy, further improving the efficiency and stability of wind energy conversion.
[0030] 3. The present application also provides a method for switching the high-altitude wind energy utilization state of an aerostat fixed-height closed parachute ladder, so as to achieve safe, fast and stable switching of different working states of the above-mentioned system, and quickly and steadily complete the conversion of wind energy. BRIEF DESCRIPTION OF THE DRAWINGS
[0031] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0032] Figure 1 It is a schematic diagram of a configuration of a double-drum direct parallel driving mode using a single set of driving parts provided by an embodiment of the present invention; Figure 2 It is a schematic diagram of a configuration of a dual-roller direct parallel driving mode using a dual set of driving parts provided by an embodiment of the present invention; Figure 3 It is a schematic diagram of the configuration of the double-drum indirect series drive mode provided by an embodiment of the present invention; Figure 4 is a schematic diagram of system connection using a double-drum indirect series drive mode provided by an embodiment of the present invention; Figure 5It is a schematic diagram of a method for switching the high-altitude wind energy utilization state of an aerostat fixed-height closed parachute ladder provided by an embodiment of the present invention; Figure 6 It is a schematic diagram of the operating speed and operating time of the driving part and the energy conversion part corresponding to the continuous operating mode when the normal working state provided by the embodiment of the present invention is a continuous operating mode; Figure 7 It is a flow chart of a method for switching a system from a preparation and maintenance state to a startup and standby state provided by an embodiment of the present invention; Figure 8 The normal working state of the system provided by the embodiment of the present invention is an intermittent operation mode, and the system enters the normal working state from the startup and standby states. Fig. 9 The normal working state of the system provided by the embodiment of the present invention is a continuous operation mode, and the system enters the normal working state from the startup and standby states. Fig.10 It is a flow chart of a method for a system provided by an embodiment of the present invention to enter a startup and standby state from a stop state; Fig.11 It is a flow chart of a method for a system provided by an embodiment of the present invention to enter a preparation and maintenance state from a startup and standby state.
[0033] 1-1, first hoisting mooring rope; 1-5, second hoisting mooring rope; 1-3, third hoisting mooring rope; 1-6, fourth hoisting mooring rope; 10-1, first parachute ladder group; 10-2, second parachute ladder group; 2-1, airship; 2-2, single-drum winch; 3, pulley group; 4, steering wheel; 5-1, first hoisting part; 5-2, second hoisting part; 7-1, first transmission part; 7-2, second transmission part; 7-1-1 , clutch A; 7-1-2, gearbox A; 7-2-1, clutch B; 7-2-2, gearbox B; 7-3-1, three-axis reversing gearbox; 7-3-2, clutch C; 6, control unit; 8, energy conversion unit; 11, positioning terminal; 12-1, rope outlet hole of the first winch mooring rope; 12-2, rope outlet hole of the second winch mooring rope; 12-3, rope outlet hole of the fourth winch mooring rope; 13, three-pulley sensor. DETAILED DESCRIPTION
[0034] In order to make the purpose, technical solution and advantages of the present invention clearer, the technical solution of the present invention will be described clearly and completely below. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work belong to the scope of protection of the present invention.
[0035] Various devices for converting wind energy, through the rise and pull down of the aerostat to drive the work parachute to convert wind energy, the conversion efficiency is limited by the aerostat. Based on this problem, this application proposes an aerostat fixed height closed parachute ladder high altitude wind energy utilization system, which consists of Figure 4 It can be seen that it specifically includes: a control unit 6, an energy conversion unit 8 and at least one set of driving units; The driving part is used to drive the wind energy conversion; each set of driving parts includes a mooring part, an airship part, a pulley assembly part 3, a first hoisting part 5-1, a second hoisting part 5-2, a first transmission part 7-1, a second transmission part 7-2, a first parachute ladder group 10-1 and a second parachute ladder group 10-2; The aerostat part includes an aerostat 2-1 in the air and a mono-drum winch 2-2 in the ground connected by ropes. The aerostat 2-1 is used to provide a height for the parachute ladder group to convert wind energy. The first parachute ladder group 10-1 and the second parachute ladder group 10-2 convert wind energy by opening and closing the parachute and sliding up and down. The first umbrella ladder group 10-1 and the second umbrella ladder group 10-2 are symmetrical to each other, and are composed of a number of umbrella groups of equal number. The strength of the windward wind is controlled by switching the umbrella groups, thereby driving the corresponding hoisting parts to work.
[0036] The two parachute ladder groups are symmetrical to each other with the aerostat. Through the pulley group, the mooring part is used to connect one end of the first parachute ladder group and the second parachute ladder group to the two sides of the aerostat respectively. The other end of the first parachute ladder group is connected to the first hoisting part and the first transmission part in sequence, and the other end of the second parachute ladder group is connected to the second hoisting part and the second transmission part in sequence. The first transmission part and the second transmission part are connected through the energy conversion part, and together form a closed parachute ladder high-altitude wind energy utilization system. In the process of wind energy conversion, the first parachute ladder group and the second parachute ladder group convert wind energy through the opening and closing of the parachute and the up and down sliding. The aerostat only provides the height for the parachute ladder group to convert wind energy, and does not need to be frequently lifted and pulled down, which overcomes the dependence on the durability of the aerostat, avoids the problem of restricting the high-altitude wind energy conversion efficiency caused by the limited pulling speed of the aerostat, and saves the electric energy consumed by frequently pulling down the aerostat, thereby further improving the effective utilization rate of wind energy of the overall system.
[0037] The pulley block part 3 is hoisted and connected to the bottom of the airship 2-1, and the first parachute ladder group 10-1 and the second parachute ladder group 10-2 are respectively connected to the two sides of the airship 2-1 through the mooring part, one end of the first hoisting part 5-1 is connected to the first parachute ladder group 10-1, one end of the second hoisting part 5-2 is connected to the second parachute ladder group 10-2, and the other end of the first hoisting part 5-1 is connected to the first transmission part 7-1, the energy conversion part 8, the second transmission part 7-2 and the other end of the second hoisting part 5-2 in sequence to form a closed parachute ladder high-altitude wind energy utilization system.
[0038] The control unit 6 is used to monitor the operation of the system and perform corresponding control according to the working mode of the system.
[0039] As an embodiment of the present application, the energy conversion part 8 is a double-pick type, and the first transmission part 7-1 and the second transmission part 7-2 are respectively connected to the mechanical energy input ends on both sides of the energy conversion part 8. Figure 3 As shown, it can also be called a double-drum indirect series drive mode. Among them, there are only the first transmission part 7-1 and the second transmission part 7-2, the gearbox A7-1-2 shaft of the first transmission part 7-1 is connected to the output shaft of the first hoisting part 5-1, the clutch A7-1-1 shaft is connected to one side of the input shaft of the energy conversion part 8, the gearbox B7-2-2 shaft is connected to the output shaft of the second hoisting part 5-2, and the clutch B7-2-1 shaft is connected to the other side of the input shaft of the energy conversion part 8. The normal working state corresponding to this connection mode is the intermittent operation mode.
[0040] As an implementation mode of the present application, it further includes a third transmission part 7-3; The first transmission part 7-1 includes a shaft-connected clutch A7-1-1 and a gearbox A7-1-2, the second transmission part 7-2 includes a shaft-connected clutch B7-2-1 and a gearbox B7-2-2, and the third transmission part 7-3 includes a three-axis reversing gearbox 7-3-1 and a clutch C7-3-2; The three-axis reversing gearbox 7-3-1 is connected to the clutch A7-1-1, the clutch B7-2-1 and the clutch C7-3-2 respectively, wherein the other end of the clutch C7-3-2 is connected to the mechanical energy input end of the energy conversion unit 8, such as Figure 1 As shown, it can also be called a dual-drum direct parallel drive mode. The symmetrical axis of the three-axis reversing gearbox 7-3-1 of the third transmission part 7-3 is connected to the input shaft of the energy conversion part 8, the gearbox A7-1-2 of the first transmission part 7-1 is connected to the output shaft of the first hoisting part 5-1, the clutch A7-1-1 is connected to the asymmetrical input shaft on one side of the three-axis reversing gearbox 7-3-1, the gearbox B7-2-2 is connected to the output shaft of the second hoisting part 5-2, and the clutch B7-2-1 is connected to the asymmetrical input shaft on the other side of the three-axis reversing gearbox 7-3-1. The normal working state corresponding to this connection mode is the intermittent operation mode.
[0041] As an embodiment of the present application, the system includes two sets of drive units, and the clutch C7-3-2 of each set of drive units is respectively connected to the mechanical energy input ends on both sides of the energy conversion unit 8. Figure 2 As shown, it can also be called a double-drum direct parallel drive mode. Among them, the conversion part 8 selects a double-pick drive, that is, the shafts on both sides of the rotor are mechanical energy input shafts, and the two sets of drive parts are connected to the two sides of the energy conversion part 8. The normal working state corresponding to this connection mode is the continuous operation mode.
[0042] The airship fixed-height closed parachute ladder high-altitude wind energy utilization system provided by the present invention includes at least one set of driving parts. Only when the parachute ladder group is in uniform motion, the wind energy conversion process has actual conversion significance, so the wind energy conversion can be achieved by using one set of driving parts, but the uniform motion of the parachute ladder group is not persistent, and the energy output converted from wind energy is unstable, and the energy output of the system is intermittent. Therefore, two sets of driving parts are used in combination to alternately output stable energy, which greatly improves the stability while improving the efficiency of wind energy conversion.
[0043] As an embodiment of the present application, the mooring part includes a first hoisting mooring rope 1-1 connecting the first hoisting part 5-1 and the first parachute ladder group 10-1, a second hoisting mooring rope 1-5 connecting the second hoisting part 5-2 and the second parachute ladder group 10-2, a third hoisting mooring rope 1-3 connecting the first parachute ladder group 10-2 and the second parachute ladder group 10-2, and a fourth hoisting mooring rope 1-6 connecting the airship 2-1 and the single-drum winch 2-2.
[0044] As an implementation mode of the present application, each set of driving parts further includes a steering part, and the steering part includes at least three steering wheels 4: The first hoisting mooring rope 1-1 and the second hoisting mooring rope 1-5 are respectively wound on the drums of the first hoisting part 5-1 and the second hoisting part 5-2 through the steering wheel 4; The fourth hoisting mooring rope 1-6 is wound around the drum of the single-drum hoist 2-2 via the steering wheel 4.
[0045] As an implementation mode of the present application, the positions of the exit holes of the first hoisting mooring rope 1-1, the second hoisting mooring rope 1-5 and the fourth hoisting mooring rope 1-6 are isosceles obtuse triangles, wherein the line connecting the position of the exit hole 12-1 of the first hoisting mooring rope 1-1 and the position of the exit hole 12-2 of the second hoisting mooring rope 1-5 is the base of the isosceles obtuse triangle, and the position of the exit hole 12-3 of the fourth hoisting mooring rope 1-6 is the vertex of the isosceles obtuse triangle. The floor space is reduced while ensuring the stability of the system.
[0046] As an embodiment of the present application, the first hoisting unit 5-1, the second hoisting unit 5-2, the control unit 6, the first transmission unit 7-1, the second transmission unit 7-2 and the energy conversion unit 8 are arranged in an indoor energy conversion production workshop; the energy conversion production workshop is arranged on the vertical center line of the base below the center of gravity of the isosceles obtuse triangle.
[0047] As an implementation mode of the present application, positioning terminals 11 are respectively installed on the first parachute ladder group 10-1, the second parachute ladder group 10-2 and the aerostat 2-1 to perform altitude monitoring. Exemplarily, the positioning terminal is a Beidou positioning terminal with low power consumption. Each Beidou positioning terminal is connected to the control unit 6 via wireless communication.
[0048] As an embodiment of the present application, the first hoisting part 5-1, the second hoisting part 5-2 and the ground single-drum hoisting machine 2-2 are respectively equipped with three-pulley sensors 13 to calculate the moving speed, the length of the rope collected and the length of the rope released on the corresponding drum. The three-pulley sensors 13 have encoders and tension sensors. The encoder is used to calculate the moving speed and the length of the rope collected and released, and the tension sensor is used to monitor the rope tension at the hoisting machine end. Each three-pulley sensor 13 is connected to the control unit 6 through field bus communication.
[0049] Based on the high-altitude wind energy utilization system of an aerostat with a fixed-altitude enclosed parachute ladder in any of the above-mentioned embodiments, a method for switching the high-altitude wind energy utilization state of an aerostat with a fixed-altitude enclosed parachute ladder is also provided.
[0050] The working states of the airship fixed height closed parachute ladder high altitude wind energy utilization system are divided into preparation and maintenance state, start and standby state, normal working state, stop state, recovery state, and height adjustment state. The state switching method of the airship fixed height closed parachute ladder high altitude wind energy utilization state, such as Figure 5 As shown, it specifically includes: the system switches from the preparation and maintenance state to the start-up and standby state, the system enters the normal working state from the start-up and standby state, the system enters the stop state from the normal working state, the system enters the start-up and standby state from the stop state, the method of the system switching from the normal working state to the start-up and standby state, the system enters the height adjustment state from the start-up and standby state, and the system enters the preparation and maintenance state from the start-up and standby state. The safe, fast and stable switching of different working states of the above system can be achieved, and the conversion of wind energy can be completed quickly and steadily.
[0051] Preparation and maintenance state: It is a static state and the initial state of the system. When the system needs maintenance or avoids meteorological risks, the system stops working and finally enters this state. At this time, the first hoisting part 5-1 and the second hoisting part 5-2 recover their corresponding cables to the maximum recoverable amount, the airship 2-1 and the pulley group part 3 are recovered to the corresponding rope outlet hole 12-3 on the ground, and the connection part of the first parachute ladder group 10-1 and the first hoisting mooring rope 1-1, and the connection part of the second parachute ladder group 10-2 and the second hoisting mooring rope 1-5 are respectively recovered to the outside of the corresponding rope outlet hole, and the distance from the corresponding rope outlet hole is greater than 1m to prevent the umbrella from being rolled into the rope outlet hole. The distance of 1m will be adjusted in real time according to the size and speed of the umbrella. Each parachute ladder group and umbrella group are in a closed state.
[0052] Startup and standby state: It is a static state. In this state, the system can switch to other states at any time. It is a pre-condition for normal working state, recovery state and height adjustment state. At this time, the airship 2-1 is located near the initially set height, that is, the predetermined floating height H. The maximum height of the predetermined floating height H corresponds to the length of the fourth hoisting mooring rope 1-6. The connection part of the first parachute ladder group 10-1 and the first hoisting mooring rope 1-1 is located at the initial setting position of the corresponding rope outlet hole 12-1. The initial release length L of the first hoisting mooring rope 1-1 and the second hoisting mooring rope 1-5 is 初始。
[0053] The normal working state is a motion state, in which the first hoisting part 5-1 and the second hoisting part 5-2 are powered by the corresponding umbrella ladder groups to open and close the umbrella, and perform reciprocating motion to positively drive the energy conversion part 8 to work.
[0054] The stop state is a stationary state, which is the state after emergency stop; The recovery state is a moving state. The system needs to be repaired or shut down for a long time and needs to return to the preparation and maintenance state. At this time, the recovery state is started; The height adjustment state is a motion state, which means that after the system is started, the height of the aerostat 2-1 needs to be adjusted to reduce or increase the system power. At this time, the height adjustment state is entered; Furthermore, in the above-mentioned states, if it is a static state, the first hoisting part 5-1 and the second hoisting part 5-2 are both in a braking state, and the motion state refers to any hoisting system of the first hoisting part 5-1 and the second hoisting part 5-2 is retracting or releasing the cable; As an implementation method of the present application, the system switches from the preparation and maintenance state to the start-up and standby state. Figure 7 It can be seen that the following steps are included: Step S1-1: Perform status check, including system status check and weather condition check. If the check result meets the working conditions, proceed to step S1-2; Step S1-2: Set the predetermined floating height H of the airship 2-1, and calculate the initial release length L of the first hoisting mooring rope 1-1 and the second hoisting mooring rope 1-5 according to the predetermined floating height H and wind conditions. 初始 , and the release speed V4 of the fourth winch mooring rope 1-6; Step S1-3: slowly release the brake mechanism of the single-drum hoist 2-2, and control the release speed of the fourth hoisting mooring rope 1-6 not to exceed V4; at the same time, release the brake mechanism of the first hoisting part 5-1; Step S1-4: When the actual release length of the first hoisting mooring rope 1-1 reaches L 1初始After that, the brake mechanism of the second hoisting part 5-2 is released, and at the same time, the brake mechanism of the first hoisting part 5-1 is controlled to brake, and the final initial release length L of the first hoisting mooring rope 1-1 is recorded. 1初始 ’ ; Furthermore, the actual release length of the winch mooring rope 1 is L 1初始 ’ When the first parachute ladder assembly 10-1 and the first hoisting mooring rope 1-1 are connected, the position of the connection portion is set to the initial position of the rope outlet hole 12-1 corresponding to the connection portion of the first hoisting mooring rope 1-1.
[0055] Step S1-5: Determine the actual release length of the second hoisting mooring rope 1-5, and whether it reaches L 2初始 Then control the brake mechanism of the second hoisting part 5-2 to brake, and record the final initial release length L of the second hoisting mooring rope 1-5 2初始 ’ ; Step S1-6: Determine the actual release speed of the fourth hoisting mooring rope 1-6, and when it drops to 0, control the brake mechanism of the single-drum hoisting machine 2-2 to brake the vehicle, and record the final release length L4 of the fourth hoisting mooring rope 1-6 ’ ; Step S1-7: End the control, and the system completes the switch from the preparation and maintenance state to the start-up and standby state.
[0056] The system needs to enter a normal working state for energy conversion. According to the different driving forms (modes) and the number of driving parts 9, the system's normal working state operation methods and the method steps for entering the normal working state from the startup and standby states are different. Its normal working operation mode is divided into a continuous operation mode and an intermittent operation mode. In the continuous operation mode, two sets of driving parts 9 and double rollers are directly connected in parallel, and the energy conversion part 8 is a double-pick type; In the intermittent operation mode, a set of driving parts 9 is adopted, a double-roller direct parallel driving mode or a double-roller indirect series driving mode, wherein the energy conversion part 8 in the double-roller direct parallel driving mode is a single-pick type, and the energy conversion part 8 in the double-roller indirect series driving mode is a double-pick type.
[0057] Taking the left end surface of the energy conversion part as the reference, clockwise rotation is defined as positive rotation, and counterclockwise rotation is defined as negative rotation; Furthermore, when the normal working state is the intermittent operation mode, the system enters the normal working state from the startup and standby state. Figure 8 It is known that, including: Step S2A-1: Perform status check again, including system status check and weather condition check. If the check result meets the working conditions, proceed to step S2A-2; Step S2A-2: Setting the mooring rope's draw-out speed V1 and draw-out length S1, as well as the maximum draw-out threshold S 1max ; Step S2A-3: Control the clutch A7-1-1 and the clutch B7-2-1 to be closed, the clutch C7-3-2 to be open, and the gearbox A7-1-2 and the gearbox B7-2-2 to be switched to forward direction; Step S2A-4: releasing the brake mechanism of the first hoisting part 5-1 and the brake mechanism of the second hoisting part 5-2, and at the same time, opening the first parachute ladder assembly 10-1; Step S2A-5: Monitor the actual rope-out speed V1 of the first hoisting mooring rope 1-1 through the three-pulley sensor 13 ’ And the actual rope length S1 ’ , when V1 ’ When V1 is equal to V1, the braking force of the braking mechanism of the first hoisting part 5-1 is controlled so that V1 ’ Keep it equal to V1 and pull out the rope at a constant speed; Step S2A-6: When S1 ’ When the set value S1 is exceeded, the second parachute ladder group 10-2 is opened, and the braking force of the braking mechanism of the first hoisting part 5-1 and the braking mechanism of the second hoisting part 5-2 is controlled so that S1 does not exceed the threshold value S max ; Step S2A-7: When V1 ’ When the value drops to 0, the gearbox A7-1-2 and gearbox B7-2-2 are both controlled to change direction; Step S2A-8: releasing the brake mechanism of the first hoisting part 5-1 and the brake mechanism of the second hoisting part 5-2, and at the same time, closing the first parachute ladder assembly 10-1; Step S2A-9: Monitor the actual rope-out speed V2 of the second winch mooring rope 1-5 through the three-pulley sensor 13 ’ And the actual rope length S2 ’ , when V2 ’ When V1 is equal to V2, the braking force of the braking mechanism of the second hoisting part 5-2 is controlled so that V2 ’ Keep it equal to V1 and pull out the rope at a constant speed; Step S2A-10: When S2 ’ When the set value S is exceeded, the second parachute ladder group 10-2 is opened, and the braking force of the braking mechanism of the first hoisting part 5-1 and the braking mechanism of the second hoisting part 5-2 is controlled so that S1 does not exceed the threshold value S max ; Step S2A-11: When V1 ’ When the value drops to 0, the gearbox A7-1-2 and gearbox B7-2-2 are both controlled to change direction; Step S2A-12: releasing the brake mechanism of the first hoisting part 5-1 and the brake mechanism of the second hoisting part 5-2, and at the same time, closing the second parachute ladder assembly 10-2; Step S2A-13: When the system does not receive other instructions, execute step S2A-4 and the system enters a normal working state.
[0058] As an implementation mode of the present application, during the process of the system entering a normal working state from a startup and standby state, the gearbox A7-1-2 and the gearbox B7-2-2 have the same direction, the first hoisting part 5-1 and the second hoisting part 5-2 both have bottom rope outlets and opposite rope outlet directions; the gearbox A7-1-2 and the gearbox B7-2-2 have opposite directions, and the first hoisting part 5-1 and the second hoisting part 5-2 have the same rope outlet directions.
[0059] As an implementation mode of the present application, in step S2A-5, the first hoisting mooring rope 1-1 is unwound at a uniform speed, and the first parachute ladder group 10-1 is gradually accelerated upward by the wind force, driving the first hoisting mooring rope 1-1 to pull the first hoisting part 5-1 to rotate forward, thereby driving the energy conversion part 8 and the second hoisting part 5-2 to rotate forward, and recovering the second hoisting mooring rope 1-5 at the same speed as the first hoisting part 5-1, and pulling the second parachute ladder group 10-2 to move obliquely downward along the second hoisting mooring rope 1-5; Similarly, in step S2A-9, the second hoisting mooring rope 1-5 is unwound at a uniform speed, and the second parachute ladder group 10-2 is gradually accelerated upward by the wind, and the first hoisting mooring rope 1-1 is recovered at the same speed as the second hoisting part 5-2, and the first parachute ladder group 10-1 is pulled to move obliquely downward along the first hoisting mooring rope 1-1.
[0060] As an implementation mode of the present application, when the normal working state is the continuous operation mode, the system enters the normal working state from the startup and standby states. Fig. 9 It is known that, including: Step S2B-1: Perform status check again, including system status check and weather condition check. If the check result meets the working conditions, proceed to step S2B-2; Step S2B-2: Setting the mooring rope's draw-out speed V1 and draw-out length S1, as well as the maximum draw-out threshold S 1max ; and set the start interval time T of the two sets of driving parts; wherein T is less than the time during which the first hoisting mooring rope 1-1 or the second hoisting mooring rope 1-5 in any set of driving parts continuously pulls out the rope at a uniform speed; Figure 6 It is a schematic diagram of the operating speed and operating time of the driving part and the energy conversion part corresponding to the continuous operating mode when the normal working state provided by the embodiment of the present invention is a continuous operating mode; Step S2B-3: Open the clutch C7-3-2 of the first drive unit, and close the clutch C7-3-2 of the second drive unit; at the same time, start the first drive unit according to steps S2A-3 to S2A-13, and record the operating time T' of the first drive unit when executing step S2A-3; Step S2B-4: When T ’ When T is reached, the second set of driving parts is started according to steps S2A-3 to S2A-13; Step S2B-5: During operation, the operating status of the first set of driving parts and the second set of driving parts are monitored. When any set of driving parts executes step S2A-5 or step S2A-9 and maintains the rope delivery speed at V, the clutch C7-3-2 of the corresponding driving part is closed. When any set of driving parts finishes step S2A-5 or step S2A-9, the clutch C7-3-2 of the corresponding driving part is disconnected. Step S2B-6: When the system does not receive other instructions, execute step S2B-3 and the system enters a normal working state.
[0061] As an implementation manner of the present application, a method for switching from a normal operating state to a stop state includes: Step S3-1, open all the first umbrella ladder groups 10-1 and the second umbrella ladder groups 10-2, and start the brake mechanisms of all the first hoisting parts 5-1 and the second hoisting parts 5-2; Step S3-2, when the speeds of the first hoisting mooring rope 1-1 and the second hoisting mooring rope 1-5 are reduced to 0, all the first parachute ladder groups 10-1 and the second parachute ladder groups 10-2 are closed.
[0062] As an implementation method of the present application, the system enters the start and standby state from the stop state, by Fig.10 It is known that, including: Step S4-1: Determine L 1初始 ’ and L 1初始 ’ Is it more than L 初始 : If neither exceeds, then execute step S4-7, otherwise go to step S4-2; Step S4-2: Determine whether each set of driving parts is provided with a third transmission part 7-3: If a third transmission unit 7-3 is provided, the clutch C7-3-2 of the third transmission unit 7-3 is disconnected; If the third transmission part 7-3 is not provided, proceed to step S4-3; Step S4-3: close the clutch A7-1-1 and the clutch B7-2-1 in each drive unit, and switch the clutch A7-1-1 and the gearbox A7-1-2, the second transmission unit 7-2 including the shaft-connected clutch B7-2-1 gearbox 1 and gearbox 2 to the forward direction; Step S4-4: closing the internal clutch of each winch 1 to connect the motor to the drum shaft; Step S4-5: starting the motor inside the hoisting part 1, dragging the hoisting part 1 to retract the hoisting mooring rope 1 at a constant speed, and determining the length of the hoisting mooring rope 1 in real time; Step S4-6: When the length of the mooring rope 1 of a certain driving unit is L1', the motor inside the corresponding hoisting unit 1 is turned off, the brakes of the corresponding hoisting units 1 and 2 are started, and the clutch inside the hoisting unit 1 is disconnected; Step S4-7: After all driving parts have executed the above steps, the system enters the startup and standby state.
[0063] As an implementation method of the present application, a method for a system to enter a preparation and maintenance state from a startup and standby state is as follows: Fig.11 It can be seen that: Step S7-1: Disconnect the clutch A7-1-1, the clutch B7-2-1, and the clutch 3, and simultaneously close the internal clutches of the first hoisting part 5-1 and the second hoisting part 5-2; Step S7-2: Set the gearbox A7-1-2 to forward and the gearbox B7-2-2 to reverse; Step S7-3: Start the single-drum winch 2-2 to recover the fourth hoisting mooring rope 1-6, pull the airship 2-1 down, and at the same time, start the first hoisting part 5-1 and the second hoisting part 5-2 to recover the first hoisting mooring rope 1-1 and the second hoisting mooring rope 1-5 respectively; Step S7-4: the aerostat 2-1 is recovered to the ground; the connection part between the first parachute ladder group 10-1 and the first hoisting mooring rope 1-1 is recovered to the position of the rope outlet hole 12-1 of the first hoisting mooring rope 1-1; the connection part between the second parachute ladder group 10-2 and the second hoisting mooring rope 1-5 is recovered to the position of the rope outlet hole 12-2 of the second hoisting mooring rope 1-5 respectively; the system is completed from the startup and standby state to the preparation and maintenance state.
[0064] In the aforementioned method steps, the controller 6 collects data from each three-pulley sensor through a wired connection to obtain the rope length, rope speed and tension of each winch mooring rope. The controller 6 collects data from each Beidou positioning terminal through a wireless connection to obtain the height of each parachute ladder group and the height of the airship. The controller 6 controls each winch part and the transmission part to perform logical actions through the field bus.
[0065] It should be noted that the terms used in the present invention are only for describing specific embodiments, rather than limiting the scope of the present application. As shown in the present specification, unless the context clearly indicates an exception, the words "one", "a", "a kind of" and / or "the" do not specifically refer to the singular, but may also include the plural. The terms "include", "comprise" or any other variant thereof are intended to cover non-exclusive inclusion, so that the process, method or device including a series of elements includes not only those elements, but also includes other elements not explicitly listed, or also includes elements inherent to such process, method or device. In the absence of more restrictions, the elements defined by the sentence "include one..." do not exclude the presence of other identical elements in the process, method or device including the elements.
[0066] It should also be noted that the terms "center", "up", "down", "left", "right", "vertical", "horizontal", "inside", "outside", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention. Unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", etc. should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be a connection between the two elements. For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0067] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the technical solutions of the embodiments of the present invention.
Claims
1. The high altitude wind energy utilization system of the aerostat fixed height closed parachute ladder is characterized by: The system comprises: a control unit (6), an energy conversion unit (8) and at least one set of driving units; The driving part is used to drive wind energy conversion; each set of the driving part comprises a mooring part, an aerostat part, a pulley block part (3), a first hoisting part (5-1), a second hoisting part (5-2), a first transmission part (7-1), a second transmission part (7-2), a first parachute ladder group (10-1) and a second parachute ladder group (10-2); The aerostat part comprises an aerostat (2-1) in the air and a single-drum winch (2-2) in the ground connected by ropes, the aerostat (2-1) being used to provide a height for the parachute ladder group to convert wind energy; the first parachute ladder group (10-1) and the second parachute ladder group (10-2) convert wind energy by opening and closing the parachute and sliding up and down; The pulley block part (3) is hoisted and connected to the bottom of the airship (2-1); the first parachute ladder group (10-1) and the second parachute ladder group (10-2) are respectively connected to the two sides of the airship (2-1) through the mooring part; one end of the first hoisting part (5-1) is connected to the first parachute ladder group (10-1); one end of the second hoisting part (5-2) is connected to the second parachute ladder group (10-2); the other end of the first hoisting part (5-1) is connected to the first transmission part (7-1), the energy conversion part (8), the second transmission part (7-2) and the other end of the second hoisting part (5-2) in sequence, so as to form a closed parachute ladder high-altitude wind energy utilization system. The control unit (6) is used to monitor the operation of the system and perform corresponding control according to the working mode of the system.
2. The high altitude wind energy utilization system of the aerostat fixed height closed parachute ladder according to claim 1 is characterized in that: The energy conversion part (8) is of a double-pick type, and the first transmission part (7-1) and the second transmission part (7-2) are respectively axially connected to the mechanical energy input ends on both sides of the energy conversion part (8).
3. The high altitude wind energy utilization system of the aerostat fixed height closed parachute ladder according to claim 1 is characterized in that: Also includes a third transmission part (7-3); The first transmission part (7-1) includes a shaft-connected clutch A (7-1-1) and a gearbox A (7-1-2), the second transmission part (7-2) includes a shaft-connected clutch B (7-2-1) and a gearbox B (7-2-2), and the third transmission part (7-3) includes a three-shaft reversing gearbox (7-3-1) and a clutch C (7-3-2); The three-axis reversing gearbox (7-3-1) is respectively connected to a clutch A (7-1-1), a clutch B (7-2-1) and a clutch C (7-3-2), wherein the other end of the clutch C (7-3-2) is connected to the mechanical energy input end of the energy conversion unit (8).
4. The high altitude wind energy utilization system of the aerostat fixed height closed parachute ladder according to claim 3 is characterized in that: The system comprises two sets of driving parts, and the clutch C (7-3-2) of each set of the driving parts is axially connected to the mechanical energy input ends on both sides of the energy conversion part (8).
5. The high altitude wind energy utilization system of the aerostat fixed height closed parachute ladder according to claim 1 is characterized in that: The mooring section comprises a first hoisting mooring rope (1-1) connecting the first hoisting section (5-1) and the first parachute ladder group (10-1), a second hoisting mooring rope (1-5) connecting the second hoisting section (5-2) and the second parachute ladder group (10-2), a third hoisting mooring rope (1-3) connecting the first parachute ladder group (10-1) and the second parachute ladder group (10-2), and a fourth hoisting mooring rope (1-6) connecting the aerostat (2-1) and the mono-drum hoist (2-2).
6. The high altitude wind energy utilization system of the aerostat fixed height closed parachute ladder according to claim 5 is characterized in that: Each set of driving parts also includes a steering part, and the steering part includes at least three steering wheels (4): The first hoisting mooring rope (1-1) and the second hoisting mooring rope (1-5) are respectively wound on the drums of the first hoisting part (5-1) and the second hoisting part (5-2) via the steering wheel (4); The fourth winch mooring rope (1-6) is wound around the drum of the single-drum winch (2-2) via the steering wheel (4).
7. The high altitude wind energy utilization system of the aerostat fixed height closed parachute ladder according to claim 6 is characterized in that: The positions of the rope outlet holes of the first hoisting mooring rope (1-1), the second hoisting mooring rope (1-5) and the fourth hoisting mooring rope (1-6) form an isosceles obtuse triangle, wherein a line connecting the position of the rope outlet hole (12-1) of the first hoisting mooring rope (1-1) and the position of the rope outlet hole (12-2) of the second hoisting mooring rope (1-5) is the base of the isosceles obtuse triangle.
8. The high altitude wind energy utilization system of the aerostat fixed height closed parachute ladder according to claim 7 is characterized in that: The first hoisting part (5-1), the second hoisting part (5-2), the control part (6), the first transmission part (7-1), the second transmission part (7-2) and the energy conversion part (8) are arranged in an indoor energy conversion production workshop; the energy conversion production workshop is arranged on the vertical center line of the base below the center of gravity of the isosceles obtuse triangle.
9. The high altitude wind energy utilization system of the aerostat fixed height closed parachute ladder according to claim 1 is characterized in that: Positioning terminals (11) are respectively installed on the first parachute ladder group (10-1), the second parachute ladder group (10-2) and the aerostat (2-1) to perform altitude monitoring.
10. The high altitude wind energy utilization system of the aerostat fixed height closed parachute ladder according to claim 1 is characterized in that: The first hoisting section (5-1), the second hoisting section (5-2) and the ground single-drum hoist (2-2) are respectively equipped with three-pulley sensors (13) to calculate the moving speed, rope collection length and rope release length of the mooring rope on the corresponding drum, and monitor the tension of the mooring rope on the corresponding drum.
11. A method for switching the state of high-altitude wind energy utilization of an aerostat fixed-height closed parachute ladder, characterized in that: The state switching method is implemented based on the high-altitude wind energy utilization system of the airship fixed-height closed parachute ladder described in any one of claims 1-10, and the state switching method includes: the system switches from a preparation and maintenance state to a start-up and standby state, the system enters a normal working state from the start-up and standby state, the system enters a stop state from the normal working state, the system enters a start-up and standby state from the stop state, the system changes from a normal working state to a start-up and standby state, the system enters a height adjustment state from the start-up and standby state, and the system enters a preparation and maintenance state from the start-up and standby state.
12. The method for switching the high-altitude wind energy utilization state of an aerostat fixed-height closed parachute ladder according to claim 11 is characterized in that: The system switches from the preparation and maintenance state to the start-up and standby state, including the following steps: Step S1-1: Perform status check, including system status check and weather condition check. If the check result meets the working conditions, proceed to step S1-2; Step S1-2: setting a predetermined floating height H of the airship (2-1), and calculating the initial release length L of the first hoisting mooring rope (1-1) and the second hoisting mooring rope (1-5) according to the predetermined floating height H and wind conditions 初始 , and the release speed V4 of the fourth winch mooring rope (1-6); Step S1-3: slowly releasing the brake mechanism of the single-drum hoist (2-2) to control the release speed of the fourth hoisting mooring rope (1-6) to not exceed V4; at the same time, releasing the brake mechanism of the first hoisting part (5-1); Step S1-4: When the actual release length of the first winch mooring rope (1-1) reaches L 1初始 After that, the brake mechanism of the second hoisting part (5-2) is released, and at the same time, the brake mechanism of the first hoisting part (5-1) is controlled to brake, and the final initial release length L of the first hoisting mooring rope (1-1) is recorded. 1初始 ’ ; Step S1-5: Determine the actual release length of the second winch mooring rope (1-5) to reach L 2初始 Then the brake mechanism of the second hoisting part (5-2) is controlled to brake, and the final initial release length L of the mooring rope (1-5) of the second hoisting part is recorded. 2初始 ’ ; Step S1-6: Determine the actual release speed of the fourth hoisting mooring rope (1-6), and when it drops to 0, control the brake mechanism of the single-drum hoisting machine (2-2) to brake the vehicle, and record the final release length L4 of the fourth hoisting mooring rope (1-6) ’ ; Step S1-7: End the control, and the system completes the switch from the preparation and maintenance state to the start-up and standby state.
13. The method for switching the high-altitude wind energy utilization state of an aerostat fixed-height closed parachute ladder according to claim 11 is characterized in that: When the normal working state is the intermittent operation mode, the system enters the normal working state from the startup and standby states including: Step S2A-1: Perform status check again, including system status check and weather condition check. If the check result meets the working conditions, proceed to step S2A-2; Step S2A-2: Setting the mooring rope's draw-out speed V1 and draw-out length S1, as well as the maximum draw-out threshold S 1max ; Step S2A-3: Control the clutch A (7-1-1) and the clutch B (7-2-1) to be closed, the clutch C (7-3-2) to be open, and the gearbox A (7-1-2) and the gearbox B (7-2-2) to be switched to the forward direction; Step S2A-4: releasing the brake mechanism of the first hoisting part (5-1) and the brake mechanism of the second hoisting part (5-2), and at the same time, opening the first parachute ladder assembly (10-1); Step S2A-5: Using the three-pulley sensor (13), monitor the actual rope-out speed V1 of the first winch mooring rope (1-1). ’ And the actual rope length S1 ’ , when V1 ’ When V1 is equal to V1, the braking force of the braking mechanism of the first hoisting part (5-1) is controlled so that V1 ’ Keep it equal to V1 and pull out the rope at a constant speed; Step S2A-6: When S1 ’ When the set value S1 is exceeded, the second parachute ladder group (10-2) is opened, and the braking force of the braking mechanism of the first hoisting part (5-1) and the braking mechanism of the second hoisting part (5-2) is controlled so that S1 does not exceed the threshold value S max ; Step S2A-7: When V1 ’ When it drops to 0, both gearbox A (7-1-2) and gearbox B (7-2-2) are controlled to reverse; Step S2A-8: releasing the brake mechanism of the first hoisting part (5-1) and the brake mechanism of the second hoisting part (5-2), and at the same time, closing the first parachute ladder assembly (10-1); Step S2A-9: Using the three-pulley sensor (13), monitor the actual rope-out speed V2 of the second winch mooring rope (1-5). ’ And the actual rope length S2 ’ , when V2 ’ When V1 is equal to V2, the braking force of the braking mechanism of the second winch (5-2) is controlled so that V2 ’ Keep it equal to V1 and pull out the rope at a constant speed; Step S2A-10: When S2 ’ When the set value S is exceeded, the second parachute ladder group (10-2) is opened, and the braking force of the braking mechanism of the first hoisting part (5-1) and the braking mechanism of the second hoisting part (5-2) is controlled so that S1 does not exceed the threshold value S max ; Step S2A-11: When V1 ’ When it drops to 0, both gearbox A (7-1-2) and gearbox B (7-2-2) are controlled to reverse; Step S2A-12: releasing the brake mechanism of the first hoisting part (5-1) and the brake mechanism of the second hoisting part (5-2), and at the same time, closing the second parachute ladder assembly (10-2); Step S2A-13: When the system does not receive other instructions, execute step S2A-4 and the system enters a normal working state.
14. The method for switching the high-altitude wind energy utilization state of an aerostat fixed-height closed parachute ladder according to claim 13 is characterized in that: During the process of the system entering a normal working state from a startup and standby state, the gearbox A (7-1-2) and the gearbox B (7-2-2) have the same direction, the first hoisting part (5-1) and the second hoisting part (5-2) both discharge ropes from the bottom and in opposite directions; the gearbox A (7-1-2) and the gearbox B (7-2-2) have opposite directions, the first hoisting part (5-1) and the second hoisting part (5-2) have the same rope discharge direction.
15. The method for switching the high-altitude wind energy utilization state of an aerostat fixed-height closed parachute ladder according to claim 13 is characterized in that: In step S2A-5, the first hoisting mooring rope (1-1) is released at a constant speed, and the first parachute ladder group (10-1) is gradually accelerated upwards by the wind force, driving the first hoisting mooring rope (1-1) to pull the first hoisting part (5-1) to rotate forward, thereby driving the energy conversion part (8) and the second hoisting part (5-2) to rotate forward, recovering the second hoisting mooring rope (1-5) at the same rotation speed as the first hoisting part (5-1), and pulling the second parachute ladder group (10-2) to move obliquely downward along the second hoisting mooring rope (1-5); Similarly, in step S2A-9, the second hoisting mooring rope (1-5) is unwound at a uniform speed, and the second parachute ladder group (10-2) is gradually accelerated upwards by the wind, and the first hoisting mooring rope (1-1) is recovered at the same rotation speed as the second hoisting part (5-2), and the first parachute ladder group (10-1) is pulled to move obliquely downward along the first hoisting mooring rope (1-1).
16. The method for switching the high-altitude wind energy utilization state of an aerostat fixed-height closed parachute ladder according to claim 12 is characterized in that: When the normal working state is the continuous operation mode, the system enters the normal working state from the startup and standby states including: Step S2B-1: Perform status check again, including system status check and weather condition check. If the check result meets the working conditions, proceed to step S2B-2; Step S2B-2: Setting the mooring rope's draw-out speed V1 and draw-out length S1, as well as the maximum draw-out threshold S 1max ; and setting a start interval time T of the two sets of driving units; wherein T is less than the time during which the first hoisting mooring rope (1-1) or the second hoisting mooring rope (1-5) in any set of driving units continuously delivers the rope at a uniform speed; Step S2B-3: Open the clutch C (7-3-2) of the first drive unit, and close the clutch C (7-3-2) of the second drive unit; at the same time, start the first drive unit according to steps S2A-3 to S2A-13, and record the running time T of the first drive unit when executing step S2A-3. ’ ; Step S2B-4: when T' reaches T, start the second set of driving parts according to steps S2A-3 to S2A-13; Step S2B-5: During operation, the operating status of the first set of driving parts and the second set of driving parts are monitored. When any set of driving parts executes step S2A-5 or step S2A-9 and maintains the rope delivery speed at V, the clutch C (7-3-2) of the corresponding driving part is closed. When any set of driving parts finishes step S2A-5 or step S2A-9, the clutch C (7-3-2) of the corresponding driving part is disconnected. Step S2B-6: When the system does not receive other instructions, execute step S2B-3 and the system enters a normal working state.
17. The method for switching the high-altitude wind energy utilization state of an aerostat fixed-height closed parachute ladder according to claim 11 is characterized in that: The switching method from the normal operation state to the stop state includes: Step S3-1, opening all first parachute ladder groups (10-1) and second parachute ladder groups (10-2), and starting the brake mechanisms of all first hoisting parts (5-1) and second hoisting parts (5-2); Step S3-2, when the speed of the first hoisting mooring rope (1-1) and the second hoisting mooring rope (1-5) drops to 0, all the first parachute ladder groups (10-1) and the second parachute ladder groups (10-2) are closed.
18. The method for switching the high-altitude wind energy utilization state of an aerostat fixed-height closed parachute ladder according to claim 11 is characterized in that: The step of entering the start and standby state from the stop state includes: Step S4-1: Determine L 1初始 ’ and L 1初始 ’ Is it more than L 初始 : If neither exceeds, then execute step S4-7, otherwise go to step S4-2; Step S4-2: Determine whether each set of driving parts is provided with a third transmission part (7-3): If a third transmission part (7-3) is provided, the clutch C (7-3-2) of the third transmission part (7-3) is disconnected; If the third transmission part (7-3) is not provided, proceed to step S4-3; Step S4-3: close the clutch A (7-1-1) and the clutch B (7-2-1) in each set of the driving part, and switch the clutch A (7-1-1) and the gearbox A (7-1-2), the second transmission part (7-2) including the shaft-connected clutch B (7-2-1) gearbox 1 and gearbox 2 to the forward direction; Step S4-4: closing the internal clutch of each winch 1 to connect the motor to the drum shaft; Step S4-5: starting the motor inside the hoisting part 1, dragging the hoisting part 1 to retract the hoisting mooring rope 1 at a constant speed, and determining the length of the hoisting mooring rope 1 in real time; Step S4-6: When the length of the mooring rope 1 of a certain driving unit is L1', the motor inside the corresponding hoisting unit 1 is turned off, the brakes of the corresponding hoisting units 1 and 2 are started, and the clutch inside the hoisting unit 1 is disconnected; Step S4-7: After all driving parts have executed the above steps, the system enters the startup and standby state.
19. The method for switching the high-altitude wind energy utilization state of an aerostat fixed-height closed parachute ladder according to claim 11 is characterized in that: The method for the system to enter the preparation and maintenance state from the startup and standby state is: Step S7-1: Disconnect clutch A (7-1-1), clutch B (7-2-1), and clutch 3, and simultaneously close the internal clutches of the first hoisting part (5-1) and the second hoisting part (5-2); Step S7-2: Set gearbox A (7-1-2) to forward direction and gearbox B (7-2-2) to reverse direction; Step S7-3: starting the single-drum winch (2-2) to recover the fourth winch mooring rope (1-6), pulling the airship (2-1) down, and at the same time starting the first winch section (5-1) and the second winch section (5-2) to respectively recover the first winch mooring rope (1-1) and the second winch mooring rope (1-5); Step S7-4: the aerostat (2-1) is recovered to the ground; the connection portion between the first parachute ladder group (10-1) and the first hoisting mooring rope (1-1) is recovered to the location of the rope outlet hole (12-1) of the first hoisting mooring rope (1-1); the connection portion between the second parachute ladder group (10-2) and the second hoisting mooring rope (1-5) is recovered to the location of the rope outlet hole (12-2) of the second hoisting mooring rope (1-5); the system is completed from the start-up and standby state to the preparation and maintenance state.
Citation Information
Patent Citations
Series bidirectional wind power system
CN102278276A
Kite generator and electricity generation control method thereof
CN103899490A
Method for generating electricity by adopting kites to fly along escalator type track
CN104863795A
Reciprocating umbrella ladder power generation device and method
CN113915054A
Kite power generation device
CN203717242U
Cited By
Control device for a planar wind-collecting device, such as a missile, airfoil, sail or kite
DE102025113178B3
Control device for a flat wind-collecting device, such as a flying object, airfoil, sail, or kite
EP4818025A1