Strong mine earthquake prediction method, storage medium and equipment

Through the combination of microseismic monitoring system and earthquake network data, the power-law G-R relationship and least squares method are used to fit the mineral seismic activity parameters to predict strong ore earthquake events, solving the problem of earthquake prediction of strong ore in coal mining and realizing risk warning and prevention and control have improved mine safety.

CN119045043AInactive Publication Date: 2024-11-29CHINA UNIV OF GEOSCIENCES (WUHAN)

Patent Information

Application Number
CN202411099482.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-12
Publication Date
2024-11-29
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

There is a lack of effective methods for predicting strong ore earthquake events during coal mining, which makes it difficult to warning and prevent and control the risk of mine earthquakes, threatening the safety of life and property.

Method used

Establish a microseismic monitoring system, combine seismic network data, and determine the minimum complete magnitude of the ore earthquake sequence through Albarello earthquake catalog integrity analysis and magnitude-sequence analysis method, and use the power law G-R relationship and least squares method to fit the ore earthquake activity Parameters predict the precursor characteristics of strong ore earthquakes, and then predict the time of occurrence of strong ore earthquake events.

Benefits of technology

It has achieved effective prediction of strong mine earthquake events, provided risk warning and prevention and control measures, and improved the reliability of mine production safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119045043A_ABST
    Figure CN119045043A_ABST
Patent Text Reader

Abstract

The invention discloses a strong mine earthquake prediction method, a storage medium and equipment, and relates to the technical field of strong mine earthquake.The method comprises the steps that micro-earthquake acquisition instruments are arranged on a coal face glue transportation gate road, an auxiliary transportation gate road, the underground and the ground surface, corresponding to the working face, of the ground surface, and a three-dimensional micro-earthquake monitoring system is formed; acquiring a mine earthquake sequence based on an earthquake network and a three-dimensional micro-earthquake monitoring system, and determining the minimum complete magnitude of the mine earthquake sequence by adopting a magnitude-sequence analysis method; performing magnitude-frequency relation analysis on the mine earthquake sequence, and fitting through a least square method and a maximum likelihood method based on a power law G-R relation and the minimum complete magnitude of the mine earthquake sequence to obtain mine earthquake activity parameters in different periods; and forming a change rule of mine earthquake activity precursor information under different time scales based on related mine earthquake activity parameters in different periods, obtaining strong mine earthquake precursor characteristics from the change rule, and predicting the occurrence time of a strong mine earthquake event through the strong mine earthquake precursor characteristics. The method can effectively predict the strong mine earthquake event.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of strong mining earthquakes, and in particular to a method, storage medium and equipment for predicting strong mining earthquakes. Background Art

[0002] With the expansion of coal demand, the intensity and depth of coal mining are also increasing, and some mines have entered the "kilometer era". The large mining depth not only brings corresponding mining technical difficulties, but also due to the complexity of geological conditions, the adverse geological structures in the relevant mining areas have increased sharply, and the relevant mine dynamic disasters have also increased significantly. Among them, mining-induced earthquakes (abbreviated as: mine earthquakes) have received widespread attention in recent years. In the process of deep coal mining, the sudden collapse of the large-span suspended roof behind the working face and the slip of the fault in front of the working face will cause strong mine earthquakes, which seriously threaten the safety of people's lives and property and restrict the safe and efficient production of mines. However, there is currently a lack of a more effective prediction method for strong mine earthquake events to achieve early warning and prevention and control of strong mine earthquake risks. Summary of the invention

[0003] The purpose of the present invention is to solve the problem of lack of effective strong mine earthquake prediction method in coal mining, and propose a strong mine earthquake prediction method, comprising the following steps:

[0004] S1. Microseismic acquisition instruments are installed on the rubber transport chute, auxiliary transport chute, underground and working surface of the coal mining face to form a three-dimensional microseismic monitoring system;

[0005] S2. Obtain earthquake catalogs based on the seismic network and three-dimensional microseismic monitoring system, obtain earthquake sequences through the Albarello earthquake catalog integrity analysis method, remove background earthquakes from the earthquake sequence to obtain the mining earthquake sequence, and use the magnitude-sequence analysis method to determine the minimum complete magnitude of the mining earthquake sequence;

[0006] S3. Analyze the magnitude-frequency relationship of the mine earthquake sequence. Based on the power law GR relationship and the minimum complete magnitude of the mine earthquake sequence, the mine earthquake activity parameters of different periods are obtained by fitting with the least square method and the maximum likelihood method.

[0007] S4. Based on the mine earthquake activity parameters in different periods, the changing laws of the mine earthquake activity parameters at different time scales are formed, the precursor characteristics of strong mine earthquakes are obtained from the changing laws, and the occurrence time of strong mine earthquake events is predicted through the precursor characteristics of strong mine earthquakes.

[0008] Furthermore, the earthquake catalog acquired by the seismic network and the three-dimensional microseismic monitoring system includes: date of occurrence of the mine earthquake event, time of occurrence, spatial coordinates of the earthquake source, event energy, event magnitude, system noise, underground blasting noise, surface hydraulic fracturing noise, and ground blasting noise.

[0009] Furthermore, the magnitude-sequence analysis method is used to determine the minimum complete magnitude of the mine earthquake sequence: the mine earthquake sequence is named in the order of occurrence, and according to the number density distribution of events of different magnitudes, the magnitude with the largest number density is the minimum complete magnitude.

[0010] Further, step S2 is specifically as follows: the Albarello earthquake catalog integrity analysis method is specifically as follows:

[0011] Assume that an earthquake catalog is complete and representative, and the seismicity rate conforms to a Gaussian distribution. i and Δt j The observed seismicity rate n i and n j Satisfy the following formula:

[0012] p(n i >n j )=p(n i <n j )=0.5

[0013] Among them, n i Represents the time period Δt i The observed seismicity rate in j Represents the time period Δt j The observed seismicity rate, p(n i >n j ) represents n i >n j The probability, p(n i <n j ) represents n i <n j The probability of

[0014] The entire earthquake catalog time ΔT is divided into 2N non-overlapping sub-catalogs, each with an interval of δt. For each independent sub-catalog, the seismic activity rate n is calculated. k , define a binary random variable D k :

[0015]

[0016] Among them, n k represents the seismicity rate calculated for the kth subdirectory, n k+N represents the seismicity rate calculated for the k+Nth subdirectory;

[0017] N ’ D k =0 is recorded as m, and the completeness of the earthquake catalog is determined according to the following formula:

[0018]

[0019] Among them, P(A|B) represents the probability that the earthquake catalog is complete under the condition that the earthquake catalog is representative. The larger the P(A|B) value, the more complete the earthquake catalog is. A and B represent the conditions in the conditional probability calculation, A represents that the earthquake catalog is complete, B represents that the earthquake catalog is representative, and N ’ Indicates the number of subdirectories, p ’ It represents the distribution probability, and the p value is 0.5.

[0020] Furthermore, based on the power law GR relationship and the minimum complete magnitude of the mine earthquake sequence, the mine earthquake activity parameter is expressed as:

[0021] logN=a+bM c

[0022] Where N is the cumulative number of earthquakes with magnitude greater than the minimum complete magnitude, a is a constant, and M is c represents the minimum complete magnitude, and b represents the mine earthquake activity parameter.

[0023] Furthermore, S4 is specifically:

[0024] Plotting curves of the changes of the mine earthquake activity parameters and time in different periods, using the curves to represent the change rules of the mine earthquake activity precursor information at different time scales, recording the extreme points where the mine earthquake activity parameters decrease and then increase in the curves in chronological order, and the extreme points where the mine earthquake activity parameters are less than the normal range among the recorded extreme points are the precursor features of strong mine earthquakes;

[0025] Calculate the time between the precursory characteristics of a strong mining earthquake and the time when the next strong mining earthquake occurs, and record it as the lead time;

[0026] The occurrence time of strong mining earthquake events is predicted based on the precursor characteristics and lead time of strong mining earthquakes.

[0027] The present invention also proposes a computer-readable storage medium, wherein the computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the above-mentioned strong mine earthquake prediction method is implemented.

[0028] The present invention also proposes an electronic device, including a processor and a memory, wherein the processor and the memory are interconnected, wherein the memory is used to store a computer program, the computer program includes computer-readable instructions, and the processor is configured to call the computer-readable instructions to execute the above-mentioned strong mine earthquake prediction method.

[0029] The beneficial effects brought by the technical solution provided by the present invention are:

[0030] The present invention proposes a method for predicting strong mining earthquakes based on precursor information of mining earthquake activity, obtains a catalog of strong mining earthquake events based on a microseismic monitoring system and a seismic network, obtains mining earthquake activity parameters that change with time through the catalog of strong mining earthquake events that is continuously updated over time, calculates the time variation law of mining earthquake activity parameters, obtains abnormal precursor variation characteristics from the variation law, and predicts the occurrence time of strong mining earthquake events through abnormal precursor variation characteristics. The present invention can effectively predict strong mining earthquake events and realize early warning and prevention and control of strong mining earthquake risks. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] Figure 1 is a flow chart of a method for predicting strong mining earthquakes according to an embodiment of the present invention;

[0032] Figure 2 It is a measurement point arrangement scheme of a well-ground integrated microseismic system according to an embodiment of the present invention;

[0033] Figure 3 is a schematic diagram of the magnitude-sequence number analysis method used in an embodiment of the present invention;

[0034] Figure 4 is a magnitude-frequency diagram of an embodiment of the present invention;

[0035] Figure 5 is a magnitude-cumulative frequency diagram of an embodiment of the present invention;

[0036] Figure 6 is a curve showing the change of the mine earthquake activity parameters and time in different periods of the embodiment of the present invention;

[0037] Figure 7 It is a block diagram of an electronic device in an exemplary embodiment of the present invention. DETAILED DESCRIPTION

[0038] To make the objectives, technical solutions and advantages of the present invention more clear, the embodiments of the present invention will be further described below with reference to the accompanying drawings.

[0039] The flowchart of the method for predicting strong mine earthquakes according to an embodiment of the present invention is as follows: Figure 1 , specifically including the following steps:

[0040] S1. Microseismic collectors are installed in the rubber transport chute, auxiliary transport chute, underground and on the surface of the working face to form a three-dimensional microseismic monitoring system.

[0041] According to the geological survey report of the mining area, the working face borehole histogram, borehole peek analysis, key layer theory and other data, the geological conditions and production conditions of the target working face are determined, and a measurement point arrangement plan for the well-ground integrated microseismic system is formulated. The geological conditions and production conditions of the target working face of the embodiment of the present invention refer to Table 1.

[0042] Table 1

[0043]

[0044] The measurement point arrangement scheme of the well-ground integrated microseismic system according to the embodiment of the present invention is referenced Figure 2 , 4-8 single-point microseismic collectors are arranged in the chutes (rubber transport chutes and auxiliary transport chutes) on both sides of the target working face. The installation interval between two adjacent single-point microseismic measuring points should be greater than 200m to obtain high-frequency effective signals and avoid mutual interference. Each single-point microseismic measuring point should be greater than 100m and less than 500m away from the current mining position of the working face, so as to ensure the accuracy and reliability of mining-induced seismic event monitoring while excluding the interference of production noise of comprehensive mining equipment as much as possible. 2-4 ground microseismic monitoring measuring points are arranged along the mining direction on the surface corresponding to the target working face. The installation interval between two adjacent measuring points is 50m. After the installation of each measuring point is completed, the measuring point is connected to the communication cable and the communication cable is connected to the portable high-precision collector to realize the synchronous continuous collection and real-time update of the vibration signal.

[0045] S2. Obtain an earthquake catalog based on the seismic network and the three-dimensional microseismic monitoring system, obtain an earthquake sequence through the Albarello earthquake catalog integrity analysis method (referring to the new statistical method proposed by Albarello et al. (2001)), remove background earthquakes in the earthquake sequence to obtain the mining earthquake sequence, and use the magnitude-sequence analysis method to determine the minimum complete magnitude of the mining earthquake sequence. Name the mining earthquake sequence in the order of occurrence, and according to the number density distribution of events of different magnitudes, take the magnitude with the largest number density as the minimum complete magnitude.

[0046] The earthquake catalog obtained by the seismic network and the three-dimensional microseismic monitoring system includes: the date of occurrence of the mining earthquake event (Day), the time of occurrence (Time), the spatial coordinates of the earthquake source (X, Y, Z), the event energy (E), and the event magnitude (M), refer to Table 2, which is an exemplary earthquake catalog of an embodiment of the present invention.

[0047] Table 2

[0048]

[0049]

[0050] Reference materials for earthquake history analysis in the relevant areas of the target working face should include "Historical Strong Earthquakes in China (23rd Century BC - 1911 AD)", "Catalogue of Modern Earthquakes in China (1912 AD - 1990 AD)", the China Earthquake Administration's earthquake catalogue and earthquake monitoring reports from relevant provinces. The relevant earthquake history analysis should fully consider complex production noises including but not limited to comprehensive mining system noise, underground blasting, surface hydraulic fracturing, ground blasting, etc.

[0051] The Albarello earthquake catalog integrity analysis method is as follows:

[0052] Assume that an earthquake catalog is complete and representative, and the seismicity rate conforms to a Gaussian distribution. i and Δt j The observed seismicity rate n i and n j Satisfy the following formula:

[0053] p(n i >n j )=p(n i <n j )=0.5

[0054] Among them, n i Represents the time period Δt i The observed seismicity rate in j Represents the time period Δt j The observed seismicity rate, p(n i >n j ) represents n i >n j The probability, p(n i <n j ) represents n i <n j The probability of

[0055] The entire earthquake catalog time ΔT is divided into 2N non-overlapping sub-catalogs, each with an interval of δt. For each independent sub-catalog, the seismic activity rate n is calculated. k , define a binary random variable D k :

[0056]

[0057] Among them, n k represents the seismicity rate calculated for the kth subdirectory, n k+N represents the seismicity rate calculated for the k+Nth subdirectory;

[0058] N ’ D k =0 is recorded as m, and the completeness of the earthquake catalog is determined according to the following formula:

[0059]

[0060] Among them, P(A|B) represents the probability that the earthquake catalog is complete under the condition that the earthquake catalog is representative. The larger the P(A|B) value, the more complete the earthquake catalog is. A and B represent the conditions in the conditional probability calculation, A represents that the earthquake catalog is complete, B represents that the earthquake catalog is representative, and N ’ Indicates the number of subdirectories, p ’ It represents the distribution probability, and the p value is 0.5.

[0061] The mine earthquake sequence is named according to the order in which it occurs. The density distribution of events of different magnitudes is studied. The line connecting the areas with higher earthquake density is roughly the minimum complete magnitude M. c , using the magnitude-serial number method for reference Figure 3 . Minimum complete magnitude M c It can be used as an important source for obtaining the cutoff magnitude for statistical seismological analysis.

[0062] S3. Analyze the magnitude-frequency relationship of the mine earthquake sequence. Based on the power-law GR relationship and the minimum complete magnitude of the mine earthquake sequence, the mine earthquake activity parameters of different periods are obtained by fitting with the least squares method and the maximum likelihood method.

[0063] The number of events in the mine earthquake sequence catalog set involved in the magnitude-frequency relationship analysis should be greater than 500 and less than 1000. The magnitude-frequency relationship analysis includes two diagrams, namely the magnitude-frequency diagram and the magnitude-cumulative frequency diagram. Figure 4 , magnitude-cumulative frequency graph reference Figure 5 .

[0064] Based on the power law GR relationship and the minimum complete magnitude of the mine earthquake sequence, the mine earthquake activity parameter (b value) is expressed as:

[0065] logN=a+bM

[0066] Among them, N represents the cumulative number of earthquakes with a magnitude greater than the minimum complete magnitude, a represents a constant, M represents the minimum complete magnitude, and b represents the mine earthquake activity parameter.

[0067] The mine earthquake catalog is updated in real time, and the relevant mine earthquake activity parameters in different periods are calculated to obtain the real-time changing b value.

[0068] S4. Based on the mine earthquake activity parameters in different periods, the changing laws of the mine earthquake activity parameters at different time scales are formed, the precursor characteristics of strong mine earthquakes are obtained from the changing laws, and the occurrence time of strong mine earthquake events is predicted through the precursor characteristics of strong mine earthquakes.

[0069] Plot a curve of the change of mine earthquake activity parameters and time in different periods, use the curve to represent the change law of mine earthquake activity precursor information at different time scales, record the extreme points of the curve where the mine earthquake activity parameters decrease and then increase in chronological order, and the extreme points where the mine earthquake activity parameters are less than the normal range among the recorded extreme points are the characteristics of strong mine earthquake precursors.

[0070] See also Figure 6 , Figure 6 It is a curve of the change of mining earthquake activity parameters with time in different periods, with a time scale of 5 days. In this implementation case, the b value has a relatively clear regular fluctuation range from January 2022 to August 2022, which is about 1.00 to 1.12. When the b value is within this range, the seismic activity in the study area is basically background seismic activity, and there is no mining-induced strong mining earthquake event. It is known that before multiple mining-induced strong earthquake events occur, the b value will have an abnormal minimum value within a period of time, and extreme points will appear in the trend of multiple b values ​​first decreasing and then increasing, and these extreme points are lower than the normal range. These extreme points are precursor characteristics of strong mining earthquakes.

[0071] A large amount of historical data of regional strong mine earthquakes are collected, and the time scale of the historical data of regional strong mine earthquakes is no more than 24 hours (the time scale is the interval between sampling the data once). The time between the precursor characteristics of a strong mine earthquake and the time when the most recent strong mine earthquake occurs is calculated, and recorded as the lead time. Under certain geological background and mining conditions, the lead time is relatively stable.

[0072] The occurrence time of a strong mining earthquake event is predicted based on the precursor characteristics and the lead time of the strong mining earthquake event. The moment of the precursor characteristics of the strong mining earthquake plus the lead time is the predicted occurrence time of the strong mining earthquake event.

[0073] In an exemplary embodiment, a computer-readable storage medium is included, wherein the computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the above-mentioned strong mine earthquake prediction method is implemented.

[0074] See also Figure 7 In an exemplary embodiment, an electronic device is also included, including at least one processor, at least one memory, and at least one communication bus.

[0075] Wherein, a computer program is stored in the memory, and the computer program includes computer-readable instructions. The processor calls the computer-readable instructions stored in the memory through the communication bus to execute the above-mentioned strong mine earthquake prediction method.

[0076] The above description of the disclosed embodiments enables one skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to one skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but rather to the widest scope consistent with the principles and novel features disclosed herein.

Claims

1. A method for predicting strong mining earthquakes, characterized in that: The following steps are involved: S1. Microseismic acquisition instruments are installed on the rubber transport chute, auxiliary transport chute, underground and working surface of the coal mining face to form a three-dimensional microseismic monitoring system; S2. Obtain earthquake catalogs based on the seismic network and three-dimensional microseismic monitoring system, obtain earthquake sequences through the Albarello earthquake catalog integrity analysis method, remove background earthquakes from the earthquake sequence to obtain the mining earthquake sequence, and use the magnitude-sequence analysis method to determine the minimum complete magnitude of the mining earthquake sequence; S3. Analyze the magnitude-frequency relationship of the mine earthquake sequence. Based on the power law GR relationship and the minimum complete magnitude of the mine earthquake sequence, obtain the mine earthquake activity parameters of different periods by fitting through the least square method and maximum likelihood method. S4. Based on the mine earthquake activity parameters in different periods, the changing laws of the mine earthquake activity parameters at different time scales are formed, the precursor characteristics of strong mine earthquakes are obtained from the changing laws, and the occurrence time of strong mine earthquake events is predicted through the precursor characteristics of strong mine earthquakes.

2. A method for predicting strong mine earthquakes according to claim 1, characterized in that: The earthquake catalog acquired by the seismic network and the three-dimensional microseismic monitoring system includes: date and time of occurrence of the mine earthquake event, spatial coordinates of the earthquake source, event energy, event magnitude, system noise, underground blasting noise, surface hydraulic fracturing noise, and ground blasting noise.

3. A method for predicting strong mine earthquakes according to claim 1, characterized in that: The magnitude-sequence analysis method is used to determine the minimum complete magnitude of the mine earthquake sequence. Specifically, the mine earthquake sequence is named in the order of occurrence, and based on the number density distribution of events of different magnitudes, the magnitude with the largest number density is taken as the minimum complete magnitude.

4. A method for predicting strong mine earthquakes according to claim 1, characterized in that: Step S2 is specifically as follows: The Albarello earthquake catalog integrity analysis method is specifically as follows: Assume that an earthquake catalog is complete and representative, and the seismicity rate conforms to a Gaussian distribution. i and Δt j The observed seismicity rate n i and n j Satisfy the following formula: p(n i >n j )=p(n i <n j )=0.5 Among them, n i Represents the time period Δt i The observed seismicity rate in j Represents the time period Δt j The observed seismicity rate, p(n i >n j ) represents n i >n j The probability, p(n i <n j ) represents n i <n j probability; The entire earthquake catalog time ΔT is divided into 2N non-overlapping sub-catalogs, each with an interval of δt. For each independent sub-catalog, the seismic activity rate n is calculated. k , define a binary random variable D k : Among them, n k represents the seismicity rate calculated for the kth subdirectory, n k+N represents the seismicity rate calculated for the k+Nth subdirectory; N ’ D k =0 is recorded as m, and the completeness of the earthquake catalog is determined according to the following formula: Among them, P(A|B) represents the probability that the earthquake catalog is complete under the condition that the earthquake catalog is representative. The larger the P(A|B) value, the more complete the earthquake catalog is. A and B represent the conditions in the conditional probability calculation, A represents that the earthquake catalog is complete, B represents that the earthquake catalog is representative, and N ’ Indicates the number of subdirectories, p ’ It represents the distribution probability, and the p value is 0.

5.

5. A method for predicting strong mining earthquakes according to claim 1, characterized in that: Based on the power law GR relationship and the minimum complete magnitude of the mine earthquake sequence, the mine earthquake activity parameter is expressed as: logN=a+bM c Where N is the cumulative number of earthquakes with magnitude greater than the minimum complete magnitude, a is a constant, and M is c represents the minimum complete magnitude, and b represents the mine earthquake activity parameter.

6. A method for predicting strong mining earthquakes according to claim 1, characterized in that: S4 is specifically: Plotting curves of the changes of the mine earthquake activity parameters and time in different periods, using the curves to represent the change rules of the mine earthquake activity precursor information at different time scales, recording the extreme points where the mine earthquake activity parameters decrease and then increase in the curves in chronological order, and the extreme points where the mine earthquake activity parameters are less than the normal range among the recorded extreme points are the precursor features of strong mine earthquakes; Calculate the time between the precursory characteristics of a strong mining earthquake and the time when the next strong mining earthquake occurs, and record it as the lead time; The occurrence time of strong mining earthquake events is predicted based on the precursor characteristics and lead time of strong mining earthquakes.

7. A computer-readable storage medium storing a computer program, characterized in that: When the computer program is executed by a processor, the method according to any one of claims 1 to 6 is implemented.

8. An electronic device, characterized in that: The method comprises a processor and a memory, wherein the processor and the memory are interconnected, wherein the memory is used to store a computer program, the computer program comprises computer-readable instructions, and the processor is configured to call the computer-readable instructions to execute the method according to any one of claims 1 to 6.

Citation Information

Patent Citations

  • Three-index joint early warning method for micro-earthquake large-magnitude event

    CN106530628A

  • Dynamic prediction method for impact danger of rock burst mine fold area based on microseism

    CN113962466A

  • Strong mine earthquake prediction method based on focus mechanism and positioning error calibration

    CN116243379A

  • Earthquake occurrence rate prediction method and device and electronic equipment

    CN116956621A

  • Earthquake prediction function acquisition device, earthquake prediction device, earthquake prediction system, and program used therefor, and method for acquiring earthquake prediction function

    JP2015184128A

Cited By

  • Underground micro-seismic monitoring station laying method for determining small-scale gauge function

    CN119936965A

  • Downhole microseismic monitoring station layout method for determining small-scale gauge function

    CN119936965B

  • Small-scale gauge function determination method based on micro-seismic monitoring system

    CN120044583A

  • A mine method tunnel dynamic disaster sequence risk intelligent prediction method

    CN122888782A